SCIENCE AND TECHNOLOGY CORPORATION FOR THE NAVAL,MARITIME AND RIVERINE INDUSTRIES
Project:Offshore Patrol Vessel OPV80
Hull No. 069 Rev.: 1 Page. 1 de 29
Date: 2012-08-01
NON DESTRUCTIVE TESTING PLAN
HULL No. 069
OFFSHORE PATROL VESSELOPV 80
-
8/10/2019 Ndt Final 2012
2/30
SCIENCE AND TECHNOLOGY CORPORATION FOR THE NAVAL,MARITIME AND RIVERINE INDUSTRIES
Project:Offshore Patrol Vessel OPV80
Hull No. 069 Rev.: 1 Page. 2 de 29
Date: 2012-08-01
1. GENERAL
The scope of each the non-destructive testing (NDT) shall be used underGL-2000, Rules for Material and Welding: II Part 3, Chapter 2, Section4 and Chapter 3, Section 1 - 2, part C.
2. SCOPE
2.1. Main Dimensions OPV 80Length overall: 80.60 mBeam Moulded: 13.0 mBeam True: 13.8 m.Depth: 6.50 m.Design Draught: 3.80 m.
2.2. Inspection pointsThe following Lumber of inspection points was determined:
Welded Joints Quality Grade I 117Welded Joints Quality Grade II 76__________________________________________________Total number of inspection points 193
3. METHODS AND PERSONNEL NDT.
3.1.NDT Methods.
The following methods shall be used:Visual Inspection (VT)Radiographic Testing (RT)Ultrasonic Testing (UT)Magnetic Particle Testing (MT)Liquid Penetrant Testing (PT)
3.2. Personnel
The non-destructive test shall be performed by qualified and trained ineach of the techniques. The non-destructive testing shall carry out in
accordance with GL-2000, Rules for Material and Welding: II
Part 3,Chapter 2, Section 4, part C.
-
8/10/2019 Ndt Final 2012
3/30
SCIENCE AND TECHNOLOGY CORPORATION FOR THE NAVAL,MARITIME AND RIVERINE INDUSTRIES
Project:Offshore Patrol Vessel OPV80
Hull No. 069 Rev.: 1 Page. 3 de 29
Date: 2012-08-01
4. INSPECTION PLANThe location of inspection points in butt joints is shown in the shellexpansion and transversal bulkheads.
The location of inspection points in superstructure (aluminum), decks andlongitudinal bulkheads shall be determined with local Surveyor.
5. NON-DESTRUCTIVE TESTING (NDT)
5.1 Visual Inspection (VT)
All welded joints shall be visually inspected. In fillet joints is measurethe size according to approved drawings and welding table. Also verifythe integrity and quality of the surface of the beads.
5.2.Liquid Penetrant Testing (PT) and Magnetic Particle Testing (MT).
All welded joints at engine and generator foundation will be inspectedwith MT. In places where in not possible carry out MT will be inspectedwith PT.
Fillet joints with thickness greater than 30 or equal will be inspectedusing MT or PT.
Other sections to be tested for these methods are crane base and bitt.
5.3. Ultrasonic Testing (UT)
The total number of inspection points listed in item 2.2 is preferablyinspected using UT. For the ultrasonic inspection will be used anultrasonic flaw detector with scan A or scan S representation, and thelength of inspection shall be minimum 1000mm.
In some cases and in agreement with the Surveyor, the ultrasonictesting (UT) can be replaced by radiographic testing (RT). For the RTwill be used a source of Iridium 192 and the length inspection shall be
480mm
-
8/10/2019 Ndt Final 2012
4/30
SCIENCE AND TECHNOLOGY CORPORATION FOR THE NAVAL,MARITIME AND RIVERINE INDUSTRIES
Project:Offshore Patrol Vessel OPV80
Hull No. 069 Rev.: 1 Page. 4 de 29
Date: 2012-08-01
All checkpoints are shown in the drawings on pages 5, 6, 7, 8, 9, 10, 11,12, 13 and 14.
Other parts to be inspected by ultrasonic testing are:
Butt joints of the engine foundation
Outrigger
Joints between the rudder stock and blade attachment
Shaft struts bossing and shaft struts shell insert. Bow thruster tunnel union
The following table summarizes the number of inspection points:
-
8/10/2019 Ndt Final 2012
5/30
SCIENCE AND TECHNOLOGY CORPORATION FOR THE NAVAL,MARITIME AND RIVERINE INDUSTRIES
Project:Offshore Patrol Vessel OPV80
Hull No. 069 Rev.: 1 Page. 5 de 29
Date: 2012-08-01
Table 1. Summary NDT Point.
SYMBOL POSITION R.T. U.T. M.T. P.T. TOTAL LENGTH (M)
PS,SB -SP Shell Plate 26 73 99 85.48
TBHD Transverse Bulkhead 24 22 46 33.5
KP Keel Plate 12 12 12
TD Tween Deck 4 4 4
MD Main Deck 4 6 10 7,92
SD Superstructure Deck 4 4 4
WDWheelhouse Deck
(Aluminum)10 10 10
ND Navigation Deck 3 3 3
LBHD Longitudinal Bulkhead 5 5 5
SUB-TOTAL NDT 54 139 193 164.9
Notes:R.T. = Radiographic Testing
U.T. = Ultrasonic TestingM.T. = Magnetic Particle TestingP.T. = Penetrant Liquid Testing
Symbol:
RADIOGRAPHIC TESTING
ULTRASONIC TESTING
MAGNETIC PARTICLE TESTING
PENETRABLE LIQUID TESTING
-
8/10/2019 Ndt Final 2012
6/30
SCIENCE AND TECHNOLOGY CORPORATION FOR THE NAVAL,MARITIME AND RIVERINE INDUSTRIES
Project:Offshore Patrol Vessel OPV80
Hull No. 069 Rev.: 1 Page. 6 de 29
Date: 2012-08-01
Table 2. Shell Plating NDT Check List. (SP)
I/D No.Activity
No.
Thickness(mm)
CheckLength(mm)
R.T.(%)
U.T.(%)
M.T.(%)
RemarkT1 T2
SB-1 1000
PS-2 1000
SB-3 1000
PS-4 1000
SB-5 1000PS-6 1000
SB-7 1000
PS-8 1000
SB-9 1000
PS-10 1000
SB-11 1000
PS-12 1000
SB-13 1000
PS-14 1000
SB-15 480PS-16 480
SB-17 480
PS-18 480
SB-19 480
PS-20 480
SB-21 1000
PS-22 1000
SB-23 1000
PS-24 1000
SB-25 1000
PS-26 1000
SB-27 480
PS-28 480
SB-29 480
PS-30 480
SB-31 1000
PS-32 1000
SB-33 1000
PS-34 1000
SB-35 480
PS-36 480SB-37 1000
-
8/10/2019 Ndt Final 2012
7/30
SCIENCE AND TECHNOLOGY CORPORATION FOR THE NAVAL,MARITIME AND RIVERINE INDUSTRIES
Project:Offshore Patrol Vessel OPV80
Hull No. 069 Rev.: 1 Page. 7 de 29
Date: 2012-08-01
Table 2. Shell Plating NDT Check List. (SP)
I/D No.Activity
No.
Thickness(mm)
CheckLength(mm)
R.T.(%)
U.T.(%)
M.T.(%)
Remark
T1 T2
PS-38 1000
SB-39 1000
PS-40 1000
SB-41 1000
PS-42 1000SB-43 1000
PS-44 1000
SB-45 480
PS-46 1000
SB-47 1000
PS-48 1000
SB-49 480
PS-50 1000
SB-51 1000
PS-52 1000SB-53 1000
PS-54 1000
SB-55 1000
PS-56 1000
SB-57 1000
PS-58 1000
SB-59 1000
PS-60 1000
SB-61 1000
PS-62 480
SB-63 480
PS-64 480
SB-65 480
PS-66 1000
SB-67 1000
PS-68 1000
SB-69 1000
PS-70 1000
SB-71 1000
PS-72 1000
SB-73 1000
-
8/10/2019 Ndt Final 2012
8/30
SCIENCE AND TECHNOLOGY CORPORATION FOR THE NAVAL,MARITIME AND RIVERINE INDUSTRIES
Project:Offshore Patrol Vessel OPV80
Hull No. 069 Rev.: 1 Page. 8 de 29
Date: 2012-08-01
Table 2. Shell Plating NDT Check List. (SP)
I/D No.Activity
No.
Thickness(mm)
CheckLength(mm)
R.T.(%)
U.T.(%)
M.T.(%)
Remark
T1 T2
PS-74 1000
SB-75 1000
PS-76 1000
SB-77 1000
PS-78 480SB-79 480
PS-80 480
SB-81 480
PS-82 1000
SB-83 1000
PS-84 1000
SB-85 1000
PS-86 1000
SB-87 1000
PS-88 1000SB-89 1000
PS-90 480
SB-91 480
PS-92 480
SB-93 480
PS-94 1000
SB-95 1000
PS-96 1000
SB-97 1000
PS-98 1000
SB-99 1000
-
8/10/2019 Ndt Final 2012
9/30
SCIENCE AND TECHNOLOGY CORPORATION FOR THE NAVAL,MARITIME AND RIVERINE INDUSTRIES
Project:Offshore Patrol Vessel OPV80
Hull No. 069 Rev.: 1 Page. 9 de 29
Date: 2012-08-01
Table3. Transverse Bulkhead NDT Check List. (TBHD)
I/D No.Activity
No.
Thickness(mm)
CheckLength(mm)
R.T.(%)
U.T.(%)
M.T.(%)
Remark
T1 T2
TBHD-1 1000
TBHD-2 1000
TBHD-3 1000
TBHD-4 1000
TBHD-5
1000TBHD-6 1000
TBHD-7 1000
TBHD-8 1000
TBHD-9 1000
TBHD-10 1000
TBHD-11 1000
TBHD-12 1000
TBHD-13 1000
TBHD-14 1000
TBHD-15
1000TBHD-16 1000
TBHD-17 1000
TBHD-18 1000
TBHD-19 1000
TBHD-20 1000
TBHD-21 1000
TBHD-22 1000
TBHD-23 480
TBHD-24 480
TBHD-25 480
TBHD-26
480
TBHD-27 480
TBHD-28 480
TBHD-29 480
TBHD-30 480
TBHD-31 480
TBHD-32 480
TBHD-33 480
TBHD-34 480
TBHD-35 480
TBHD-36 480
-
8/10/2019 Ndt Final 2012
10/30
SCIENCE AND TECHNOLOGY CORPORATION FOR THE NAVAL,MARITIME AND RIVERINE INDUSTRIES
Project:Offshore Patrol Vessel OPV80
Hull No. 069 Rev.: 1 Page. 10 de 29
Date: 2012-08-01
Table3. Transverse Bulkhead NDT Check List. (TBHD)
I/D No.Activity
No.
Thickness(mm)
CheckLength(mm)
R.T.(%)
U.T.(%)
M.T.(%)
Remark
T1 T2
TBHD-37 480
TBHD-38 480
TBHD-39 480
TBHD-40 480
TBHD-41
480TBHD-42 480
TBHD-43 1000
TBHD-44 480
TBHD-45 480
TBHD-46 1000
-
8/10/2019 Ndt Final 2012
11/30
SCIENCE AND TECHNOLOGY CORPORATION FOR THE NAVAL,MARITIME AND RIVERINE INDUSTRIES
Project:Offshore Patrol Vessel OPV80
Hull No. 069 Rev.: 1 Page. 11 de 29
Date: 2012-08-01
Table 4. Keel Plate NDT Check List. (KP)
I/D No.Activity
No.
Thickness(mm)
CheckLength(mm)
R.T.(%)
U.T.(%)
M.T.(%)
Remark
T1 T2
KP-1 1000
KP-2 1000
KP-3 1000
KP-4 1000
KP-5
1000
KP-6 1000
KP-7 1000
KP-8 1000
KP-9 1000
KP-10 1000
KP-11 1000
KP-12 1000
-
8/10/2019 Ndt Final 2012
12/30
SCIENCE AND TECHNOLOGY CORPORATION FOR THE NAVAL,MARITIME AND RIVERINE INDUSTRIES
Project:Offshore Patrol Vessel OPV80
Hull No. 069 Rev.: 1 Page. 12 de 29
Date: 2012-08-01
Table 5. Tween Deck NDT Check List. (TD)
I/D No.Activity
No.
Thickness(mm)
CheckLength(mm)
R.T.(%)
U.T.(%)
M.T.(%)
Remark
T1 T2
TD-1 1000
TD-2 1000
TD-3 1000
TD-4 1000
-
8/10/2019 Ndt Final 2012
13/30
SCIENCE AND TECHNOLOGY CORPORATION FOR THE NAVAL,MARITIME AND RIVERINE INDUSTRIES
Project:Offshore Patrol Vessel OPV80
Hull No. 069 Rev.: 1 Page. 13 de 29
Date: 2012-08-01
Table 6. Main Deck NDT Check List. (MD)
I/D No.Activity
No.
Thickness(mm)
CheckLength(mm)
R.T.(%)
U.T.(%)
M.T.(%)
Remark
T1 T2
MD-1 1000
MD-2 1000
MD-3 480
MD-4 1000
MD-5
480MD-6 1000
MD-7 1000
MD-8 480
MD-9 480
MD-10 1000
-
8/10/2019 Ndt Final 2012
14/30
SCIENCE AND TECHNOLOGY CORPORATION FOR THE NAVAL,MARITIME AND RIVERINE INDUSTRIES
Project:Offshore Patrol Vessel OPV80
Hull No. 069 Rev.: 1 Page. 14 de 29
Date: 2012-08-01
Table 7. Superstructure Deck NDT Check List. (SD)
I/D No.Activity
No.
Thickness(mm)
CheckLength(mm)
R.T.(%)
U.T.(%)
M.T.(%)
Remark
T1 T2
SD-1 1000
SD-2 1000
SD-3 1000
SD-4 1000
-
8/10/2019 Ndt Final 2012
15/30
SCIENCE AND TECHNOLOGY CORPORATION FOR THE NAVAL,MARITIME AND RIVERINE INDUSTRIES
Project:Offshore Patrol Vessel OPV80
Hull No. 069 Rev.: 1 Page. 15 de 29
Date: 2012-08-01
Table 8. Wheelhouse Deck NDT Check List. (WD)
I/D No.Activity
No.
Thickness(mm)
CheckLength(mm)
R.T.(%)
U.T.(%)
M.T.(%)
Remark
T1 T2
WD-1 1000
WD-2 1000
WD-3 1000
WD-4 1000
WD-5
1000
WD-6 1000
WD-7 1000
WD-8 1000
WD-9 1000
WD-10 1000
-
8/10/2019 Ndt Final 2012
16/30
SCIENCE AND TECHNOLOGY CORPORATION FOR THE NAVAL,MARITIME AND RIVERINE INDUSTRIES
Project:Offshore Patrol Vessel OPV80
Hull No. 069 Rev.: 1 Page. 16 de 29
Date: 2012-08-01
Table 9. Navigation Deck NDT Check List. (ND)
I/D No.Activity
No.
Thickness(mm)
CheckLength(mm)
R.T.(%)
U.T.(%)
M.T.(%)
Remark
T1 T2
ND-1 1000
ND-2 1000
ND-3 1000
-
8/10/2019 Ndt Final 2012
17/30
SCIENCE AND TECHNOLOGY CORPORATION FOR THE NAVAL,MARITIME AND RIVERINE INDUSTRIES
Project:Offshore Patrol Vessel OPV80
Hull No. 069 Rev.: 1 Page. 17 de 29
Date: 2012-08-01
Table 10. Longitudinal Bulkhead NDT- Check List. (LBHD)
I/D No.Activity
No.
Thicknes(mm)
CheckLength(mm)
R.T.(%)
U.T.(%)
M.T.(%)
Remark
T1 T2
LBHD-1 1000
LBHD-2 1000
LBHD-3 1000
LBHD-4 1000
LBHD-5
1000
-
8/10/2019 Ndt Final 2012
18/30
-
8/10/2019 Ndt Final 2012
19/30
-
8/10/2019 Ndt Final 2012
20/30
-
8/10/2019 Ndt Final 2012
21/30
-
8/10/2019 Ndt Final 2012
22/30
-
8/10/2019 Ndt Final 2012
23/30
-
8/10/2019 Ndt Final 2012
24/30
-
8/10/2019 Ndt Final 2012
25/30
-
8/10/2019 Ndt Final 2012
26/30
-
8/10/2019 Ndt Final 2012
27/30
-
8/10/2019 Ndt Final 2012
28/30
-
8/10/2019 Ndt Final 2012
29/30
-
8/10/2019 Ndt Final 2012
30/30