    SCIENCE AND TECHNOLOGY CORPORATION FOR THE NAVAL,MARITIME AND RIVERINE INDUSTRIES

    Project:Offshore Patrol Vessel OPV80

    Hull No. 069 Rev.: 1 Page. 1 de 29

    Date: 2012-08-01

    NON DESTRUCTIVE TESTING PLAN

    HULL No. 069

    OFFSHORE PATROL VESSELOPV 80

  • 8/10/2019 Ndt Final 2012

    2/30

    SCIENCE AND TECHNOLOGY CORPORATION FOR THE NAVAL,MARITIME AND RIVERINE INDUSTRIES

    Project:Offshore Patrol Vessel OPV80

    Hull No. 069 Rev.: 1 Page. 2 de 29

    Date: 2012-08-01

    1. GENERAL

    The scope of each the non-destructive testing (NDT) shall be used underGL-2000, Rules for Material and Welding: II Part 3, Chapter 2, Section4 and Chapter 3, Section 1 - 2, part C.

    2. SCOPE

    2.1. Main Dimensions OPV 80Length overall: 80.60 mBeam Moulded: 13.0 mBeam True: 13.8 m.Depth: 6.50 m.Design Draught: 3.80 m.

    2.2. Inspection pointsThe following Lumber of inspection points was determined:

    Welded Joints Quality Grade I 117Welded Joints Quality Grade II 76__________________________________________________Total number of inspection points 193

    3. METHODS AND PERSONNEL NDT.

    3.1.NDT Methods.

    The following methods shall be used:Visual Inspection (VT)Radiographic Testing (RT)Ultrasonic Testing (UT)Magnetic Particle Testing (MT)Liquid Penetrant Testing (PT)

    3.2. Personnel

    The non-destructive test shall be performed by qualified and trained ineach of the techniques. The non-destructive testing shall carry out in

    accordance with GL-2000, Rules for Material and Welding: II

    Part 3,Chapter 2, Section 4, part C.

  • 8/10/2019 Ndt Final 2012

    3/30

    SCIENCE AND TECHNOLOGY CORPORATION FOR THE NAVAL,MARITIME AND RIVERINE INDUSTRIES

    Project:Offshore Patrol Vessel OPV80

    Hull No. 069 Rev.: 1 Page. 3 de 29

    Date: 2012-08-01

    4. INSPECTION PLANThe location of inspection points in butt joints is shown in the shellexpansion and transversal bulkheads.

    The location of inspection points in superstructure (aluminum), decks andlongitudinal bulkheads shall be determined with local Surveyor.

    5. NON-DESTRUCTIVE TESTING (NDT)

    5.1 Visual Inspection (VT)

    All welded joints shall be visually inspected. In fillet joints is measurethe size according to approved drawings and welding table. Also verifythe integrity and quality of the surface of the beads.

    5.2.Liquid Penetrant Testing (PT) and Magnetic Particle Testing (MT).

    All welded joints at engine and generator foundation will be inspectedwith MT. In places where in not possible carry out MT will be inspectedwith PT.

    Fillet joints with thickness greater than 30 or equal will be inspectedusing MT or PT.

    Other sections to be tested for these methods are crane base and bitt.

    5.3. Ultrasonic Testing (UT)

    The total number of inspection points listed in item 2.2 is preferablyinspected using UT. For the ultrasonic inspection will be used anultrasonic flaw detector with scan A or scan S representation, and thelength of inspection shall be minimum 1000mm.

    In some cases and in agreement with the Surveyor, the ultrasonictesting (UT) can be replaced by radiographic testing (RT). For the RTwill be used a source of Iridium 192 and the length inspection shall be

    480mm

  • 8/10/2019 Ndt Final 2012

    4/30

    SCIENCE AND TECHNOLOGY CORPORATION FOR THE NAVAL,MARITIME AND RIVERINE INDUSTRIES

    Project:Offshore Patrol Vessel OPV80

    Hull No. 069 Rev.: 1 Page. 4 de 29

    Date: 2012-08-01

    All checkpoints are shown in the drawings on pages 5, 6, 7, 8, 9, 10, 11,12, 13 and 14.

    Other parts to be inspected by ultrasonic testing are:

    Butt joints of the engine foundation

    Outrigger

    Joints between the rudder stock and blade attachment

    Shaft struts bossing and shaft struts shell insert. Bow thruster tunnel union

    The following table summarizes the number of inspection points:

  • 8/10/2019 Ndt Final 2012

    5/30

    SCIENCE AND TECHNOLOGY CORPORATION FOR THE NAVAL,MARITIME AND RIVERINE INDUSTRIES

    Project:Offshore Patrol Vessel OPV80

    Hull No. 069 Rev.: 1 Page. 5 de 29

    Date: 2012-08-01

    Table 1. Summary NDT Point.

    SYMBOL POSITION R.T. U.T. M.T. P.T. TOTAL LENGTH (M)

    PS,SB -SP Shell Plate 26 73 99 85.48

    TBHD Transverse Bulkhead 24 22 46 33.5

    KP Keel Plate 12 12 12

    TD Tween Deck 4 4 4

    MD Main Deck 4 6 10 7,92

    SD Superstructure Deck 4 4 4

    WDWheelhouse Deck

    (Aluminum)10 10 10

    ND Navigation Deck 3 3 3

    LBHD Longitudinal Bulkhead 5 5 5

    SUB-TOTAL NDT 54 139 193 164.9

    Notes:R.T. = Radiographic Testing

    U.T. = Ultrasonic TestingM.T. = Magnetic Particle TestingP.T. = Penetrant Liquid Testing

    Symbol:

    RADIOGRAPHIC TESTING

    ULTRASONIC TESTING

    MAGNETIC PARTICLE TESTING

    PENETRABLE LIQUID TESTING

  • 8/10/2019 Ndt Final 2012

    6/30

    SCIENCE AND TECHNOLOGY CORPORATION FOR THE NAVAL,MARITIME AND RIVERINE INDUSTRIES

    Project:Offshore Patrol Vessel OPV80

    Hull No. 069 Rev.: 1 Page. 6 de 29

    Date: 2012-08-01

    Table 2. Shell Plating NDT Check List. (SP)

    I/D No.Activity

    No.

    Thickness(mm)

    CheckLength(mm)

    R.T.(%)

    U.T.(%)

    M.T.(%)

    RemarkT1 T2

    SB-1 1000

    PS-2 1000

    SB-3 1000

    PS-4 1000

    SB-5 1000PS-6 1000

    SB-7 1000

    PS-8 1000

    SB-9 1000

    PS-10 1000

    SB-11 1000

    PS-12 1000

    SB-13 1000

    PS-14 1000

    SB-15 480PS-16 480

    SB-17 480

    PS-18 480

    SB-19 480

    PS-20 480

    SB-21 1000

    PS-22 1000

    SB-23 1000

    PS-24 1000

    SB-25 1000

    PS-26 1000

    SB-27 480

    PS-28 480

    SB-29 480

    PS-30 480

    SB-31 1000

    PS-32 1000

    SB-33 1000

    PS-34 1000

    SB-35 480

    PS-36 480SB-37 1000

  • 8/10/2019 Ndt Final 2012

    7/30

    SCIENCE AND TECHNOLOGY CORPORATION FOR THE NAVAL,MARITIME AND RIVERINE INDUSTRIES

    Project:Offshore Patrol Vessel OPV80

    Hull No. 069 Rev.: 1 Page. 7 de 29

    Date: 2012-08-01

    Table 2. Shell Plating NDT Check List. (SP)

    I/D No.Activity

    No.

    Thickness(mm)

    CheckLength(mm)

    R.T.(%)

    U.T.(%)

    M.T.(%)

    Remark

    T1 T2

    PS-38 1000

    SB-39 1000

    PS-40 1000

    SB-41 1000

    PS-42 1000SB-43 1000

    PS-44 1000

    SB-45 480

    PS-46 1000

    SB-47 1000

    PS-48 1000

    SB-49 480

    PS-50 1000

    SB-51 1000

    PS-52 1000SB-53 1000

    PS-54 1000

    SB-55 1000

    PS-56 1000

    SB-57 1000

    PS-58 1000

    SB-59 1000

    PS-60 1000

    SB-61 1000

    PS-62 480

    SB-63 480

    PS-64 480

    SB-65 480

    PS-66 1000

    SB-67 1000

    PS-68 1000

    SB-69 1000

    PS-70 1000

    SB-71 1000

    PS-72 1000

    SB-73 1000

  • 8/10/2019 Ndt Final 2012

    8/30

    SCIENCE AND TECHNOLOGY CORPORATION FOR THE NAVAL,MARITIME AND RIVERINE INDUSTRIES

    Project:Offshore Patrol Vessel OPV80

    Hull No. 069 Rev.: 1 Page. 8 de 29

    Date: 2012-08-01

    Table 2. Shell Plating NDT Check List. (SP)

    I/D No.Activity

    No.

    Thickness(mm)

    CheckLength(mm)

    R.T.(%)

    U.T.(%)

    M.T.(%)

    Remark

    T1 T2

    PS-74 1000

    SB-75 1000

    PS-76 1000

    SB-77 1000

    PS-78 480SB-79 480

    PS-80 480

    SB-81 480

    PS-82 1000

    SB-83 1000

    PS-84 1000

    SB-85 1000

    PS-86 1000

    SB-87 1000

    PS-88 1000SB-89 1000

    PS-90 480

    SB-91 480

    PS-92 480

    SB-93 480

    PS-94 1000

    SB-95 1000

    PS-96 1000

    SB-97 1000

    PS-98 1000

    SB-99 1000

  • 8/10/2019 Ndt Final 2012

    9/30

    SCIENCE AND TECHNOLOGY CORPORATION FOR THE NAVAL,MARITIME AND RIVERINE INDUSTRIES

    Project:Offshore Patrol Vessel OPV80

    Hull No. 069 Rev.: 1 Page. 9 de 29

    Date: 2012-08-01

    Table3. Transverse Bulkhead NDT Check List. (TBHD)

    I/D No.Activity

    No.

    Thickness(mm)

    CheckLength(mm)

    R.T.(%)

    U.T.(%)

    M.T.(%)

    Remark

    T1 T2

    TBHD-1 1000

    TBHD-2 1000

    TBHD-3 1000

    TBHD-4 1000

    TBHD-5

    1000TBHD-6 1000

    TBHD-7 1000

    TBHD-8 1000

    TBHD-9 1000

    TBHD-10 1000

    TBHD-11 1000

    TBHD-12 1000

    TBHD-13 1000

    TBHD-14 1000

    TBHD-15

    1000TBHD-16 1000

    TBHD-17 1000

    TBHD-18 1000

    TBHD-19 1000

    TBHD-20 1000

    TBHD-21 1000

    TBHD-22 1000

    TBHD-23 480

    TBHD-24 480

    TBHD-25 480

    TBHD-26

    480

    TBHD-27 480

    TBHD-28 480

    TBHD-29 480

    TBHD-30 480

    TBHD-31 480

    TBHD-32 480

    TBHD-33 480

    TBHD-34 480

    TBHD-35 480

    TBHD-36 480

  • 8/10/2019 Ndt Final 2012

    10/30

    SCIENCE AND TECHNOLOGY CORPORATION FOR THE NAVAL,MARITIME AND RIVERINE INDUSTRIES

    Project:Offshore Patrol Vessel OPV80

    Hull No. 069 Rev.: 1 Page. 10 de 29

    Date: 2012-08-01

    Table3. Transverse Bulkhead NDT Check List. (TBHD)

    I/D No.Activity

    No.

    Thickness(mm)

    CheckLength(mm)

    R.T.(%)

    U.T.(%)

    M.T.(%)

    Remark

    T1 T2

    TBHD-37 480

    TBHD-38 480

    TBHD-39 480

    TBHD-40 480

    TBHD-41

    480TBHD-42 480

    TBHD-43 1000

    TBHD-44 480

    TBHD-45 480

    TBHD-46 1000

  • 8/10/2019 Ndt Final 2012

    11/30

    SCIENCE AND TECHNOLOGY CORPORATION FOR THE NAVAL,MARITIME AND RIVERINE INDUSTRIES

    Project:Offshore Patrol Vessel OPV80

    Hull No. 069 Rev.: 1 Page. 11 de 29

    Date: 2012-08-01

    Table 4. Keel Plate NDT Check List. (KP)

    I/D No.Activity

    No.

    Thickness(mm)

    CheckLength(mm)

    R.T.(%)

    U.T.(%)

    M.T.(%)

    Remark

    T1 T2

    KP-1 1000

    KP-2 1000

    KP-3 1000

    KP-4 1000

    KP-5

    1000

    KP-6 1000

    KP-7 1000

    KP-8 1000

    KP-9 1000

    KP-10 1000

    KP-11 1000

    KP-12 1000

  • 8/10/2019 Ndt Final 2012

    12/30

    SCIENCE AND TECHNOLOGY CORPORATION FOR THE NAVAL,MARITIME AND RIVERINE INDUSTRIES

    Project:Offshore Patrol Vessel OPV80

    Hull No. 069 Rev.: 1 Page. 12 de 29

    Date: 2012-08-01

    Table 5. Tween Deck NDT Check List. (TD)

    I/D No.Activity

    No.

    Thickness(mm)

    CheckLength(mm)

    R.T.(%)

    U.T.(%)

    M.T.(%)

    Remark

    T1 T2

    TD-1 1000

    TD-2 1000

    TD-3 1000

    TD-4 1000

  • 8/10/2019 Ndt Final 2012

    13/30

    SCIENCE AND TECHNOLOGY CORPORATION FOR THE NAVAL,MARITIME AND RIVERINE INDUSTRIES

    Project:Offshore Patrol Vessel OPV80

    Hull No. 069 Rev.: 1 Page. 13 de 29

    Date: 2012-08-01

    Table 6. Main Deck NDT Check List. (MD)

    I/D No.Activity

    No.

    Thickness(mm)

    CheckLength(mm)

    R.T.(%)

    U.T.(%)

    M.T.(%)

    Remark

    T1 T2

    MD-1 1000

    MD-2 1000

    MD-3 480

    MD-4 1000

    MD-5

    480MD-6 1000

    MD-7 1000

    MD-8 480

    MD-9 480

    MD-10 1000

  • 8/10/2019 Ndt Final 2012

    14/30

    SCIENCE AND TECHNOLOGY CORPORATION FOR THE NAVAL,MARITIME AND RIVERINE INDUSTRIES

    Project:Offshore Patrol Vessel OPV80

    Hull No. 069 Rev.: 1 Page. 14 de 29

    Date: 2012-08-01

    Table 7. Superstructure Deck NDT Check List. (SD)

    I/D No.Activity

    No.

    Thickness(mm)

    CheckLength(mm)

    R.T.(%)

    U.T.(%)

    M.T.(%)

    Remark

    T1 T2

    SD-1 1000

    SD-2 1000

    SD-3 1000

    SD-4 1000

  • 8/10/2019 Ndt Final 2012

    15/30

    SCIENCE AND TECHNOLOGY CORPORATION FOR THE NAVAL,MARITIME AND RIVERINE INDUSTRIES

    Project:Offshore Patrol Vessel OPV80

    Hull No. 069 Rev.: 1 Page. 15 de 29

    Date: 2012-08-01

    Table 8. Wheelhouse Deck NDT Check List. (WD)

    I/D No.Activity

    No.

    Thickness(mm)

    CheckLength(mm)

    R.T.(%)

    U.T.(%)

    M.T.(%)

    Remark

    T1 T2

    WD-1 1000

    WD-2 1000

    WD-3 1000

    WD-4 1000

    WD-5

    1000

    WD-6 1000

    WD-7 1000

    WD-8 1000

    WD-9 1000

    WD-10 1000

  • 8/10/2019 Ndt Final 2012

    16/30

    SCIENCE AND TECHNOLOGY CORPORATION FOR THE NAVAL,MARITIME AND RIVERINE INDUSTRIES

    Project:Offshore Patrol Vessel OPV80

    Hull No. 069 Rev.: 1 Page. 16 de 29

    Date: 2012-08-01

    Table 9. Navigation Deck NDT Check List. (ND)

    I/D No.Activity

    No.

    Thickness(mm)

    CheckLength(mm)

    R.T.(%)

    U.T.(%)

    M.T.(%)

    Remark

    T1 T2

    ND-1 1000

    ND-2 1000

    ND-3 1000

  • 8/10/2019 Ndt Final 2012

    17/30

    SCIENCE AND TECHNOLOGY CORPORATION FOR THE NAVAL,MARITIME AND RIVERINE INDUSTRIES

    Project:Offshore Patrol Vessel OPV80

    Hull No. 069 Rev.: 1 Page. 17 de 29

    Date: 2012-08-01

    Table 10. Longitudinal Bulkhead NDT- Check List. (LBHD)

    I/D No.Activity

    No.

    Thicknes(mm)

    CheckLength(mm)

    R.T.(%)

    U.T.(%)

    M.T.(%)

    Remark

    T1 T2

    LBHD-1 1000

    LBHD-2 1000

    LBHD-3 1000

    LBHD-4 1000

    LBHD-5

    1000

  • 8/10/2019 Ndt Final 2012

    18/30

  • 8/10/2019 Ndt Final 2012

    19/30

  • 8/10/2019 Ndt Final 2012

    20/30

  • 8/10/2019 Ndt Final 2012

    21/30

  • 8/10/2019 Ndt Final 2012

    22/30

  • 8/10/2019 Ndt Final 2012

    23/30

  • 8/10/2019 Ndt Final 2012

    24/30

  • 8/10/2019 Ndt Final 2012

    25/30

  • 8/10/2019 Ndt Final 2012

    26/30

  • 8/10/2019 Ndt Final 2012

    27/30

  • 8/10/2019 Ndt Final 2012

    28/30

  • 8/10/2019 Ndt Final 2012

    29/30

  • 8/10/2019 Ndt Final 2012

    30/30