US Army Corps of Engineers BUILDING STRONG ® NC WATER RESOURCE CONGRESS ANNUAL RALEIGH MEETING Jim Medlock Chief, Programs Management Branch Wilmington District November 9, 2012

description

Jim Medlock Chief, Programs Management Branch Wilmington District November 9, 2012. NC WATER RESOURCE CONGRESS ANNUAL RALEIGH MEETING. NEW PARADIGM AGAIN??. FY11: NO BUDGET BILLS PASSED - PowerPoint PPT Presentation

Transcript of NC WATER RESOURCE CONGRESS ANNUAL RALEIGH MEETING

Page 1: NC WATER RESOURCE CONGRESS  ANNUAL RALEIGH MEETING

US Army Corps of EngineersBUILDING STRONG®

NC WATER RESOURCE CONGRESS ANNUAL RALEIGH MEETINGJim MedlockChief, Programs Management Branch

Wilmington District

November 9, 2012

Page 2: NC WATER RESOURCE CONGRESS  ANNUAL RALEIGH MEETING

BUILDING STRONG®

NEW PARADIGM AGAIN??FY11: NO BUDGET BILLS PASSED

OMNIBUS resulted in “WORKPLAN” developed by HQUSACE based on President’s Budget and projects

with prior funding

FY12: APPROPRIATIONS PASSED DEC 23, 2012NO EARMARKS but included “Mini Workplan”

+ $33M for Wilmington Harbor, Carolina Beach, etc.Disaster Assistance (Miss R & Hurricane Irene)

+ $27M in funding for waterways in NC

FY13: CONTINUING RESOLUTION until MARCH 2013Appropriations Bill likely in April or later Could include “Mini Workplan” – how will it be allocated?FY 13 Disaster Assistance/Emergency Supplemental??MOA funding from state & locals (from last year & new)Sequestration?????????

Page 3: NC WATER RESOURCE CONGRESS  ANNUAL RALEIGH MEETING

BUILDING STRONG®

Wilmington

ManteoGreensboro

Asheville Raleigh

MoreheadCity

VANC

SC

Coastal Storm Damage Reduction

Carolina BeachKure Beach

Ocean Isle Beach

Dare CountyBeaches /

Bodie Island

Bogue Banks

Wrightsville Beach

Dare County Hatteras to Ocracoke

N. Topsail, Surf CityTopsail Beach

Oak Island, Caswell,and Holden Beaches

Charlotte

Page 4: NC WATER RESOURCE CONGRESS  ANNUAL RALEIGH MEETING

BUILDING STRONG®

COASTAL STORM DAMAGE REDUCTION FY 2012 & 2013 APPROPRIATIONS

Pres.Budget

2012

App. 2012

Mini Work Plan

Disaster Assist.

Pres.Budget

2013

App.2013

Bogue Banks Feasibility

$0 $0 $0 $0 $445K Expect~ PB

Surf City/N. Topsail PED

$300K $287K $0 $0 $225K Expect~ PB

West Onslow (Topsail Bch)

$0 $0 $0 $0 $200K Expect~ PB

Brunswick Beaches inc. Ocean Isle

$0 $0 $0 $0 $0 ?

Carolina Beach (inc. Kure Beach)

$0 $0 $4.4M $0 $0 ?

WrightsvilleBeach

$0 $0 $0 $0 $0 ?

Page 5: NC WATER RESOURCE CONGRESS  ANNUAL RALEIGH MEETING

BUILDING STRONG®

SHALLOWDRAFT NAVIGATION (O&M)FY 2012 & 2013 APPROPRIATIONS

Pres.Budget

2012

App. 2012

Mini Work Plan

Disaster Assist.

Pres.Budget

2013

App.2013

Bogue Inlet $0 $0 $0 $500K $0 No adds

Carolina Beach Inlet $0 $0 $0 $500K $0 No adds

Lockwoods Folly R. $0 $0 $0 $500K $0 No adds

New River Inlet $0 $0 $0 $500K $0 No adds

New Topsail Inlet $0 $0 $0 $500K $0 No adds

Masonboro Inlet $0 $0 $0 $6.5M $0 No adds

Channel from Pamlico Sound to Rodanthe

$0 $0 $347K $150K $0 No adds

Rollison Channel $50K $49K $0 $2M $50K ~ PB

Silver Lake $250K $243K $252K $200K $300K ~ PB

Manteo $1M $970K $0 $4.5M $1.4M ~ PB

AIWW $0 $0 $1.5M $3M $2.9M ~ PB

Page 6: NC WATER RESOURCE CONGRESS  ANNUAL RALEIGH MEETING

BUILDING STRONG®

CONTRIBUTED GRATUITIOUS FUNDS via MOAs from STATE & LOCALs

• MANTEO (OREGON INLET)• SHALLOWDRAFT INLETS• FERRY CHANNELS• BULKHEAD CHANNEL (Beaufort)• LONG TERM MOA ???• COASTAL STORM DAMAGE

REDUCTION CONTRIBUTED FUNDS ???

Page 7: NC WATER RESOURCE CONGRESS  ANNUAL RALEIGH MEETING

BUILDING STRONG®

ECOSYSTEM RESTORATION and OTHERFY 2012 & 2013 APPROPRIATIONS

Pres.Budget

2012

App. 2012

Mini Work Plan

Disast. Assist.

Pres.Budget

2013

App.2013

John H. Kerr 216 Feas

$365K $349K $0 $0 $50K Expect~ PB

Currituck Sound Feas

$400K $383K $0 $0 $358K Expect~ PB

Neuse River Basin PED

$450K $431K $0 $0 $450K Expect~ PB

Princeville Feas

$0 $0 $0 $0 $0 ?

Manteo (SB) Bay Constr

$0 $0 $0 $0 $600K Expect~ PB

Page 8: NC WATER RESOURCE CONGRESS  ANNUAL RALEIGH MEETING

BUILDING STRONG®

Charlotte

Wilmington

ManteoGreensboro

Asheville

Raleigh

MoreheadCity

Roanoke

Falls Lake

John H. KerrReservoirPhilpott Lake

VA

Washington

MULTI-PURPOSE RESERVOIRS

B. Everett JordanDam and Lake

W. Kerr Scott Dam and Reservoir

SC

NC

10

Page 9: NC WATER RESOURCE CONGRESS  ANNUAL RALEIGH MEETING

BUILDING STRONG®

MULTIPURPOSE RESERVOIRS

• Flood Risk Management • Water Quality

• Water Supply• Fish/Wildlife• Recreation • Flow Augmentation

11

Page 10: NC WATER RESOURCE CONGRESS  ANNUAL RALEIGH MEETING

BUILDING STRONG®

ProjectFY 12 Pres

Budget

FY 13 Pres

Budget

PossibleConsequences

FY 13

JOHN H. KERR LAKE, VA & NC $10.6M $10.2M

• Reduce O&M recreation services• Reduce O&M services contract• Reduced frequency of facility cleaning and grounds maintenance• Keep project in caretaker status• Defer remedial action on two DSAC 2 dams: Cape Fear above Wilmington (Locks and Dams 1 and 2). CAPE FEAR ABOVE

WILMINGTON, NC $806K $489K

B. EVERETT JORDAN LAKE $1.8M $1.7M

FALLS LAKE $2M $1.8M

W KERR SCOTT LAKE $3.5M $3.2M

Appropriations down while operating costs continue rise = less service; more deferred maintenance including for the dams

12

MULTIPURPOSE RESERVOIRS

Page 11: NC WATER RESOURCE CONGRESS  ANNUAL RALEIGH MEETING

BUILDING STRONG®

OTHER CORPS ACTIVITIES and AUTHORITIESContinuing Authorities Program:

Wilson Bay Section 206 – Under ConstructionWestern Cary Section 206 – Under ConstructionConcord Streams Section 206 – RE AcquisitionManteo (Shallowbag) Bay Section 204 – Upcoming DesignSouthport Section 14 – Upcoming Design

Planning Assistance to States Program:Greenville Utilities Commission StudyPasquotank County Hydrology and Hydraulics Study