nbppl.in · 2014-06-23 · BHEL SPEC Rev. No.: D TECHNICA Sl. No. 1.00 2.00 3.00 4.00 5.00 6.00 ....
Transcript of nbppl.in · 2014-06-23 · BHEL SPEC Rev. No.: D TECHNICA Sl. No. 1.00 2.00 3.00 4.00 5.00 6.00 ....
BHEL SPECRev. No.: DTECHNICA
C. NO. :PE-TS-4Dated : AL SPECIFICA
T
TEC
FGUTP
401-600-C002
ATIONS
Techni
CHNICAL CONBOP CIVIL
P STAGE‐IV (1
TECHNIC
S
ical Co
NDITIONS OF WORKS PAC1X 500 MW)
Section A: CAL CONDITIOCONTRACT
Section
onditio
CONTRACTCKAGE AT UNCHAHA
ONS OF DR
n A
ons of C
AR
DOC. NO.: NBPRev. No.:
Contra
PPL-004-302-P4
act
C-A-001
Page No.: N 1 of 38
BHEL SPECRev. No.: DTECHNICA
Sl. No.
1.00
2.00
3.00
4.00
5.00
6.00
C. NO. :PE-TS-4Dated : AL SPECIFICA
Project In
Scope of
Construct
T&Ps to b
Time Sch
Other Req
Annexure
• ACi
• ABe
TEC
FGUTP
401-600-C002
ATIONS
DES
nformation
Works
tion Facilitie
be deployed
hedule
quirements
es
nnexure - A ivil Site Lab
nnexure – Be Arranged B
CHNICAL CONBOP CIVIL
P STAGE‐IV (1
TECHNIC
SCRIPTION
es
by Contract
: List Of Eboratory
B : IndicativeBy Contract
NDITIONS OF WORKS PAC1X 500 MW)
Section A: CAL CONDITIOCONTRACT
INDEX
N
tor
quipment’s F
e List Of T&or
CONTRACTCKAGE AT UNCHAHA
ONS OF DR
P
P
P
Pa
Pa
Pa
For Pa
&P To Pa
AR
DOC. NO.: NBPRev. No.:
Page
Page 1 to 1
Page 1 to 9
Page 9 to 11
age 12 to 12
age 13 to 15
age 15 to 30
ge 31 to 33
ge 34 to 36
PPL-004-302-P4
NBPPL
Page N
N 3 to
N 3 to N
N 11 to
2 N 14 to
5 N 15 to
0 N 17 to
N 33 to
N 36 to
C-A-001
Doc.
No.
N 3
N 11
N 13
N 14
N 17
N 32
N 35
N 38
Page No.: N 2 of 38
BHEL SPEC Rev. No.: DTECHNICA
Clause N1.0 1.1
2.0
2.1
C. NO. :PE-TS-4Dated :
AL SPECIFICA
No. PROFero(2X2Ltd. (1X2
The STAProje The bounlocat UnchNortLuck The
SCO
Civil The archistruc
TEC
FGUTP
401-600-C002
ATIONS
OJECT INFoze Gandhi210MW) wa
and therea210MW).
present exp
AGE-IV (1x5ect Private L
FGUTPP (1nded by villated at a dista
hahar railwathern railwaknow at a dis
latitude and
OPE OF WO
l, Structural
broad scopeitectural woctures/ substr
The broaand archisystems,
• Plan
• Site
• Exca
• CW
acce
sump
CHNICAL CONBOP CIVIL
P STAGE‐IV (1
TECHNICAC
FORMATIOi Unchaharas implemenafter NTPC
pansion pro500 MW) to Limited (NBP
1X500MW)ages khanpurance of abou
ay station onay (NR) is stance of app
longitude of
ORK
and Archite
e of work urks related tructures, bui
ad scope of witectural worstructures/ s
nt Road Layo
leveling and
avation, bed
pump hous
ess ladder fo
p
NDITIONS OF WORKS PAC1X 500 MW)
Section A: AL CONDITION
CONTRACT
DescrON r Thermal ted by UPRV implement
posal is forbe owned b
PPL) is the p
is located inr, Faridpur a
ut 3 Kms from
n Allahabad2 KMs aw
proximately
f Site are 25
ectural works
nder this pato, but not lildings and f
work under trks related tosubstructures
out and Cros
d Grading of
preparation
se including
or flow mete
CONTRACTCKAGE AT UNCHAHA
NS OF DORevPag
ription
Power SVN. Furtherted Stage-II
r setting upby NTPC Ltdprime contra
n Raebareli dand khaliqpum plant.
d- Raebareli way. The ny 110 Km fro
◦ 54' 50” to
s
ackage shall limited to, tfacilities in p
this package o, but not lims, buildings
ss Section.
f the BOP ar
n and back fi
control roo
er, CW duc
AR
OC. NO.: NBPPLv. No.: ge 1 of 36
Station (FGr, it was takeI (2X210M
p of a coal d... The NTPactor of this
district of Uur khurd. Mu
board gaugnearest airpoom the proje
o 81◦19' 50”
include civthe followingplant area.
shall includmited to, theand facilitie
reas.
lling of CW
om, pit along
ct encasing,
L-004-302-P4C-A
GUTPP) Sten over by N
MW) & Stag
based FGUPC BHEL Pproject.
Uttar Pradeshustafabad tow
ge(BG) sectioort is locatect site.
respectively
vil, structurag areas, sys
de civil, struce following as in plant are
W Piping.
g with canop
thrust block
A-001
tage-I NTPC ge-III
UTPP Power
h. It is wn is
on of ed at
y.
al and tems,
ctural areas, ea.
py &
k and
Page No.: N 3 of 38
BHEL SPEC Rev. No.: DTECHNICA
C. NO. :PE-TS-4Dated :
AL SPECIFICA
TEC
FGUTP
401-600-C002
ATIONS
• CW
• Raw
• PT p
• O &
• Clar
• CWT
• Cont
• RO-
MCC
equi
• CPU
build
• Hyd
build
• Fire
• Foam
• Fire
• Fire
• Fire
• Cont
• Fuel
• LDO
sepa
• Serv
• Port
• Plan
exist
CHNICAL CONBOP CIVIL
P STAGE‐IV (1
TECHNICAC
fore bay and
w water pump
plant control
& M store
rified water d
TP building
trol Chlorina
DM Plant in
C buildin
ipment platfo
U regeneratio
ding
drogen gene
ding
water pump
m pump hou
booster pum
water tank f
station build
trol cum MC
l oil Pump ho
O Tank Fo
arator pit.
vice water su
able water ta
nt drainage
ting/owner’s
NDITIONS OF WORKS PAC1X 500 MW)
Section A: AL CONDITION
CONTRACT
d CW chann
p house mod
l cum MCC b
distribution
including co
ation buildin
ncluding she
ng, Misc.
orm, laborat
on building
eration buil
p house and S
use,
mp house and
foundations,
ding.
CC building
ouse. and co
oundation,
ump, tank an
ank.
Layout an
s system/netw
CONTRACTCKAGE AT UNCHAHA
NS OF DORevPag
nel and interc
dification wo
building if r
chamber and
ontrol room
ng and contr
eds, control
Tank foun
ory etc.
and Contro
lding (inclu
SWGR. Bui
d MCC build
,
in makeup w
ontrol cum M
Tank unloa
nd pump hou
nd detail a
work.
AR
OC. NO.: NBPPLv. No.: ge 2 of 36
connection.
orks
required.
d pump hou
(CW treatm
rol cum MCC
room includ
ndations, p
ol , battery
uding fenc
ilding
ding
water pump
MCC buildin
ading platf
use
and its con
L-004-302-P4C-A
se.
ment building
C building
ding control
aving, tren
room cum M
ing) and M
house
ng
form, Oil w
nnection to
A-001
g)
l cum
nches,
MCC
MCC
water
o the
Page No.: N 4 of 38
BHEL SPEC Rev. No.: DTECHNICA
C. NO. :PE-TS-4Dated :
AL SPECIFICA
TEC
FGUTP
401-600-C002
ATIONS
• Plan
• Plan
its co
• Cont
pum
• ETP
cont
• Pipe
• Pipe
hous
cros
• Pavi
in
• Pipe
• Cabl
• Cabl
requ
• Civi
• Layi
• Duct
• Any
Fenc
com
area
• Can
scop
desi
spec
CHNICAL CONBOP CIVIL
P STAGE‐IV (1
TECHNICAC
nt drainage su
nt sewage lay
onnection to
trol cum M
mp house
P waste wate
trol cum MC
e and cable r
e pedestals
se to main p
sing of pipe
ing and Misc
e and cable tr
le trench fro
le trench in
uired.
il works pert
ing of Earthi
t-banks, cab
y other build
cing etc. th
mplete the ci
.
nteen buildi
pe of work a
gn procedu
cification
NDITIONS OF WORKS PAC1X 500 MW)
Section A: AL CONDITION
CONTRACT
ump
yout and sew
o the existing
CC building
er sump, ETP
CC building
ack structure
including in
plant, Pipe
etc.
c. Equipmen
renches inclu
m transform
n TG Hall,
taining to Se
ing mat.
ble pits, Misc
dings, facili
hough not
ivil structura
ng includin
also include
ures includi
and
CONTRACTCKAGE AT UNCHAHA
NS OF DORevPag
wage water p
g/owner’s sy
g for Coolin
P pipe pede
e and founda
nterconnecti
crossing ov
nt Foundatio
uding pedes
mer yard to sw
Boiler area,
ewage piping
c. sumps etc
ities, founda
specifically
al and asso
ng MCC ro
es architectu
ing rain wa
coordinat
AR
OC. NO.: NBPPLv. No.: ge 3 of 36
pump house
ystem/netwo
ng tower an
stal, trenche
ations.
ion from R
ver fore bay
ons, trenches
tals, pits etc
witch yard
, ESP and
g, Culverts
.
ations and s
y covered b
ociated work
oom (Green
ural (as per
ater harves
tion w
L-004-302-P4C-A
(if required
ork.
nd clarified w
es, Sheds etc
Raw water p
y channels,
s, pits, sump
.
Chimney ar
structural w
but, require
ks of main
n Building)
r energy effi
sting etc. as
with va
A-001
d) and
water
c. and
pump
Road
ps etc
rea if
works,
ed to
plant
) The
icient
s per
rious
Page No.: N 5 of 38
BHEL SPEC Rev. No.: DTECHNICA
2.2
2.2.1
C. NO. :PE-TS-4Dated :
AL SPECIFICA
The SupeTemStaffor spworkWorkDrawownethe rStruc
The manpfor fo
ab
TEC
FGUTP
401-600-C002
ATIONS
elect
ECB
BHE
conc
the
Gre
sum
for
pain
The
roun
inter
cons
• Con
own
works to beervision, Ma
mporary Workf, Temporarypecified but k in all respeks, Preparat
wings, Prepaer before corates of itemctural Fabric
Contractor upower for a
following ser
a. Store Assb. Skilled w
CHNICAL CONBOP CIVIL
P STAGE‐IV (1
TECHNICAC
trical/mech
BC GUIDEL
EL/NBPPL/
cerned govt
architectu
en Building
m basis is inc
various it
nting brick
battery lim
nd the plint
rconnecting
struction of
ducting CBR
ner.
e performed aterial, Scaffks, Temporay Site officereasonably
ects. Testingtion of Bar aration of Faommencemenms of work.cation Drawi
under this cototal period rvices:
sistant for wworkers for w
NDITIONS OF WORKS PAC1X 500 MW)
Section A: AL CONDITION
CONTRACT
anical agen
LINES, dra
/NTPC, ob
t. authoritie
ural works
g consultant
cluded in th
tems like
work etc. sh
mit for this l
th of Cante
g gallery to
f rain water
R test and s
under this cfolding, Conary Storage es, Transport
implied or g of all mate
Bending Sabrication Drnt of fabrica. Works shings and App
ontract shall of 130 man-
working in stoworking in st
CONTRACTCKAGE AT UNCHAHA
NS OF DORevPag
ncies) desig
awing prepa
btaining r
s regarding
including
t for constr
his B.O.Q. it
involved li
hall be mad
lump sum p
een building
power hou
harvesting.
submission/a
contract connstruction Eq
Sheds, Temtation and alnecessary f
erials, ConcSchedules onrawings, getation/erectiohall only beproved RCC
also provide-months exc
ores. tores/office.
AR
OC. NO.: NBPPLv. No.: ge 4 of 36
gned with
aration and
required a
g energy effi
supervision
ruction to b
tem (Howev
ike concret
de in releva
package sha
g excluding
use but incl
.
approval of
nsist of provquipment’s, T
mporary Cololl incidental for the proprete, Earthwn the basis tting the samon at site etce carried outC Constructio
e free of costclusively for
L-004-302-P4C-A
conformanc
d approval
approvals
icient rating
n by design
be done on l
ver the pay
ting, plaste
ant BOQ ite
all be 5.00 m
g car parkin
luding desig
the report t
viding all LaTools and P
ony for Laboitems not sher completio
work Other Aof Constru
me approved c. are includt with Appron Drawings
t services ofuse by NBP
A-001
ce to
from
from
g. All
nated
lump
ment
ering
ems.).
m all-
ng &
gn &
to the
abour, lants,
our & hown on of
Allied uction
from ded in roved s
f PPL
Page No.: N 6 of 38
BHEL SPEC Rev. No.: DTECHNICA
2.3
2.4 2.5 2.6 2.7
C. NO. :PE-TS-4Dated :
AL SPECIFICA
PersoWorkexpeextenIn caNBPthe rmontprevabov
For t& Stthe Eno ex The objecdispo All pstonefounduly perso All tEngi Layo Befoestabby thEngicontrequipshallconssuchthemand prote
TEC
FGUTP
401-600-C002
ATIONS
ons so deplokmen provid
erienced in thnded up to thase contractoPPL, the latterisk and cost ths as per thailing minim
ve plus 10%
the works, thtructural SteEmployer’s sxtra cost to t
area of wctionable mosed of as di
precious mees, coils, tre
nd in or uponpreserve the
ons as NBPP
the works arineer-in-Cha
out and Lev
ore start of blished by Nhe Contractineer with bractor shallpment, matel be responstruction. Thh approved rm without the
pillars alreaected and ma
CHNICAL CONBOP CIVIL
P STAGE‐IV (1
TECHNICAC
oyed have toded as per thhe nature of he extended or fails to proer shall haveof the contr
he above provmum wages a
will be mad
he materials el, the biddestores and trthe employer
work shall bmatter, and irected by th
etal, oil or oeasures, relicn the site she same and fPL may from
reas shall bearge when th
vels
the work, NBPPL. Permtor at suffiench marks l provide aerials and lansible for
he contractorreference line prior approady establisaintained by
NDITIONS OF WORKS PAC1X 500 MW)
Section A: AL CONDITION
CONTRACT
work in exthe above prowork for whperiod of co
ovide above-e right to hireractor. Howevision, fully at FGUTPP,
de from the fi
issued by ther shall be reransport it tor (Store shal
be cleared materials r
he Engineer-i
other minercs, antiques,hall be the pfrom time to
m time to tim
e adequatelyhe work is in
one referenmanent baseiciently closat all end p
at his expeabour for est
their mainr shall maintnes, marks aoval of the Eshed by NBy the contract
CONTRACTCKAGE AT UNCHAHA
NS OF DORevPag
tended hoursvisions shall
hich they areontract. -mentioned e such servicever, if NBPy or partly, re, Unchahar ffinal bill of th
he Employeresponsible too the works ll be located
of all vegremoved, shin-Charge.
rals of any , and other sproperty of Oo time delive
me appoint to
y flood lightn progress du
nce line ande lines and crse intervals points to servense all temtablishing th
ntenance dutain a certifiand levels a
Engineer-in-CBPPL in thetor. He shal
AR
OC. NO.: NBPPLv. No.: ge 5 of 36
s whenever rl be fully trae deployed. T
man-power ces from oth
PPL does notecovery at thfor the categohe contracto
r e.g. Cemeno get the matsite for execinside the p
getation, rubhall be bur
description similar thingOwner. Theer the same to receive the
ted to the sauring the nig
d two benchross lines shas may be
ve as `Refermplates, pilhe Grid lineuring the eied copy of dand shall noCharge. Thee works arell repair and
L-004-302-P4C-A
required. ained and This shall be
as required bher agencies t utilize the mhe rate of theories stated
or.
nt, Reinforceterial issued cution of wo
plant premise
bbish and rnt or other
and all pregs which mae contractor to such pers
e same.
atisfaction oht shifts.
h marks wihall be establ
directed byrence Grid’. llars and ss and Pillarentire periodrawing sho
ot remove ane reference pea shall be d rebuild the
A-001
e
by at
man-e
ement from
ork at es).
other rwise
ecious ay be shall
son or
of the
ill be lished y the The
stakes s and
od of owing ny of points
fully same
Page No.: N 7 of 38
BHEL SPEC Rev. No.: DTECHNICA
2.8 2.9 2.10 2.11 2.12
C. NO. :PE-TS-4Dated :
AL SPECIFICA
in ca The conscorrefact Char The linesby th Setti The work The numbshallwork All trepremain No sbe mthe u The labounatur In caand w In caSectwill The ment
TEC
FGUTP
401-600-C002
ATIONS
ase of any da
contractor sultation witectness of althat the sam
rge.
contractor ss and gradeshe Engineer-
ing of labor
contractor sk site as per
laboratory bers to carryl ensure thatk to avoid sto
the tests shaesentative anntained, and
separate paymmade. The counit rates ten
unit rates ur, temporarre necessary
ase of any cowill be bindi
ase of any cion 'D' the be binding.
unit rates qutioned in Se
CHNICAL CONBOP CIVIL
P STAGE‐IV (1
TECHNICAC
amage
shall layouth the Engll measurememe might h
hall be resps as may be -in-Charge fr
ratory :
shall set upthe direction
shall be eqy out all the t the equipmoppage of w
all be carriend a joint reavailable wi
ment for theost of these
ndered for th
shall includry works an
y for the com
onflict, the ring.
conflict betwrequiremen
uoted for varction C and
NDITIONS OF WORKS PAC1X 500 MW)
Section A: AL CONDITION
CONTRACT
ut the workineer-in-Chaents and anyave been ch
onsible for tspecified in
from time to
his own labns of Engine
quipped withtests as requ
ment is avaiwork on this a
ed out by thecord of all oith the Engin
ese operationoperations se different it
de all tools,nd everythin
mpletion of th
equirements
ween the reqnts as stipu
rious items ospecification
CONTRACTCKAGE AT UNCHAHA
NS OF DORevPag
k from thearge and shy connectionhecked by t
the proper en the drawintime.
boratory in teer-in-charge
h latest testuired under ilable well iaccount.
he contractoobservationsneer.
ns/tests and fshall be deemtems under b
tackles, mng whether he job in all
s stipulated b
quirementsulated in Se
of B.O.Q shans and nothi
AR
OC. NO.: NBPPLv. No.: ge 6 of 36
ese referenchall be respn therein, notthe staff of
xecution of ng or establis
the very close at his cost.
ting equipmthe contract
in advance o
or in presens and results
for setting omed to have bill of quanti
material, equof permanerespects..
by Vol. III B
s of Section ection 'C' sh
all include aing extra sha
L-004-302-P4C-A
ce base lineponsible fortwithstandinthe Enginee
the work toshed or indi
se vicinity o
ment in suffit. The controf starting o
ce of Engins thereof sha
f laboratory been includ
ities.
uipment, fixtent or temp
BOQ shall pr
'C' and thohall prevail
all the stipulaall be paid ex
A-001
es in r the
ng the er-in-
such icated
of the
ficient ractor of the
neer’s all be
shall ded in
tures, orary
revail
ose of l and
ations xcept
Page No.: N 8 of 38
BHEL SPEC Rev. No.: DTECHNICA
2.13 2.14 2.15 2.16 2.17 2.18 2.19 2.20
C. NO. :PE-TS-4Dated :
AL SPECIFICA
in B. No sdurinEmpinclu Purche thfinalBidd The himslaw know The bid:
•
•
Apprany m The not bitemjob a The invosite/c TheScheincom
TEC
FGUTP
401-600-C002
ATIONS
.O.Q rates.
separate payng the execuployer and thusive of all s
chaser reservhinks fit, to fl and bindingder.
Contractor mself fully wiand order
wledge abou
bidder shall
Name & preparatio
• Name & Energy mBuilding
roval of Engmaterials for
scope of wobe specificas not specifias a whole al
scope of wolved. The sconstruction
work undeedule. In casmplete, the d
CHNICAL CONBOP CIVIL
P STAGE‐IV (1
TECHNICAC
yment for dution of workhe rates in thuch dewater
ves the unilatfacilitate theg on the bidd
must visit thth the naturand other s
ut the site con
l necessarily
credentials oon of fabrica
credentials modeling, dECBC guid
gineer In chr civil works
ork will also ally mentionfied but reasoll as desired
ork covered cope of wor
n requiremen
er this contse the descrdecision of t
NDITIONS OF WORKS PAC1X 500 MW)
Section A: AL CONDITION
CONTRACT
ewatering ok including he B.O.Q foring, if neces
teral right toe ease of hander. The sam
he site prior e, type and site conditionditions shal
y submit foll
of the agencation drawing
of agenciesday lightingdelines
harge (EIC) s.
include sucned in the aonably impland as direc
above is nork may vary
nts for which
tract shall bription / spethe employer
CONTRACTCKAGE AT UNCHAHA
NS OF DORevPag
of sub-soil omonsoon pe
or various itssary.
o split the pandling of theme shall nee
to submittinscope of woons. Any all not be ente
lowing docu
cies proposedgs.
s proposed fg simulation
is to be obt
ch other relatabove paragrlied and neccted by the E
ot a comprehy considerab
h no extra co
be carried ocifications ar shall be fin
AR
OC. NO.: NBPPLv. No.: ge 7 of 36
or surface weriod ) wouldtems would
ackage in whe package. Ded explicit co
ng his quotaork and invo
additional clertained.
uments/detai
d to be engag
for Architectn & analysi
tained before
ted works alraph and al
cessary for cEngineer In c
hensive list bly dependi
ost shall be p
out as per Bas per BOQnal and bindi
L-004-302-P4C-A
water (if reqd be made bbe deemed
hatsoever maDecision shaoncurrence o
ations to acqolvement thelaim for lac
ils along wit
ged for desig
tural & planis as per G
e procureme
lthough theyl such incid
completion ocharge(EIC)
of items of ing on the apaid.
BOQ Cum Q are found
ing.
A-001
quired by the to be
anner all be of the
quaint erein, ck of
th the
gn
nning, Green
ent of
y may dental of the .
work actual
Rate to be
Page No.: N 9 of 38
BHEL SPEC Rev. No.: DTECHNICA
2.21 2.22
C. NO. :PE-TS-4Dated :
AL SPECIFICA
Quanvariachanas peshallpaymindicindiv Unleitemfollo
1
2
3
4
5
6
TEC
FGUTP
401-600-C002
ATIONS
ntities mentiation due to nges in desiger advice of l be workedments will cated againsvidual items
ess otherwiss mentioned
owing.
1. Furnishinequipmenwater, tratemporarnecessaryworks, econtract Engineer
2. Furnishin(EIC) forsamples works.
3. Furnishincalled focharge(E
4. Giving ageneral crequired
5. Arranginmanufact
6. Carrying and coorcoordinatout the lmarking
CHNICAL CONBOP CIVIL
P STAGE‐IV (1
TECHNICAC
ioned in thechange of
gn etc. The tEngineer In
d out on thalso be regst each itemshall remain
e specified, d in the “Bill
ng all labnt, supplies, ansit and stry works noy for the proexcept in acdocuments a
r In charge(E
ng samples r testing / imay be reta
ng test reporor the spec
EIC).
all notices, pconditions offor all work
ng manufactuturer’s speci
out topogrardinates at tes furnishedlocations anof reference
NDITIONS OF WORKS PAC1X 500 MW)
Section A: AL CONDITION
CONTRACT
e rate scheduscope of wotenderers shacharge(EIC
he basis of gulated for m may varyn firm throug
the work tol of Quantitie
our, materitransport, to
torage insuraot shown ooper compleccordance wand additionEIC) during t
of all materinspection aained by the
rts for the pcifications o
paying all ff contract or s including t
urer’s superfications wh
aphic surveysuitable in
d by the cund levels of e pillars and
CONTRACTCKAGE AT UNCHAHA
NS OF DORevPag
ules are appork / variatioall undertake
C) and accordquantities athe same
y to any exghout the va
o be provides” shall inc
ials, supervo and from tance and al
or specified tion, mainte
with the stinal stipulatiothe course o
rials requiredand approvae engineer f
products useor if so de
fees, taxes ein any other
temporary w
rvision for hen so specif
y of the wontervals fromstomer estab
f proposed sother identif
AR
OC. NO.: NBPPLv. No.: ge 8 of 36
proximate onon in schedue to executedingly the finactually execaccordinglyxtent; howealidity of con
ded by the cclude but not
vision, conthe site, fuelll other inci
but reasonenance and hipulations laons as may bf works.
d by the Enal for use infor final inco
ed or intendesired by t
etc., in accor tender docu
works.
items of wfied.
ork area andm existing blished bencstructures, cfication work
L-004-302-P4C-A
nly and liablule of quant
e actual quannal contract cuted at site
y. The quanever the ratntract.
contractor fot be limited t
nstruction pl, compressedental items
nably impliehandling oveaid down inbe provide b
ngineer In chn the works.orporation i
ded to be usethe Enginee
ordance withuments, thos
work done a
d establish lgrid levels
ch marks, seconstructionsks etc.,
A-001
le for tities, ntities price
e and ntities e for
or the to the
plans, ed air, s and ed or er the n the
by the
harge . The in the
ed, if er In
h the se are
s per
levels s and etting s and
Page No.: N 10 of 38
BHEL SPEC Rev. No.: DTECHNICA
3.0 3.1
3.2
3.3
C. NO. :PE-TS-4Dated :
AL SPECIFICA
7
8
CON
Land
1
2
3
Con The conswatcprov Elec
1
TEC
FGUTP
401-600-C002
ATIONS
7. The conassistancrequired weight or
8. Providingimplied accordan
NSTRUCTId
1. Dependinand otherextent avuse the eland by oplant maerections
2. The contover to h
3. Area witharea etc. free of co
struction of
contractor struction of ch and wardvided by cont
ctricity
1. Contractoworks. Hprovided availabilidraw elec
CHNICAL CONBOP CIVIL
P STAGE‐IV (1
TECHNICAC
ntractor shae, instrumenfor examinir quantity of
g all incideor necessar
nce with contION FACIL
ng upon ther facilities wvailable/ conexisting landother civil /mchineries an
s agencies.
tractor will bim by EMPL
hin plant prefor constru
ost.
f temporary
shall arranhis temporad of all thetractor at his
or shall havHowever ele
free of coity. Bidders ctricity.
NDITIONS OF WORKS PAC1X 500 MW)
Section A: AL CONDITION
CONTRACT
all providents, machineng, measurinf any materia
ental items nry for the tract.
LITIES
e availabilitywill be allocnsidered necd inside the mechanical/
nd materials.
be responsibLOYER/Cus
emises for fauction purpo
y office, stor
nge at his ary office, ste above. Mas own cost.
e to deploy ectricity (foost at emplhave to ma
CONTRACTCKAGE AT UNCHAHA
NS OF DORevPag
e the custoes, labour anng and testinal used.
not shown successful c
y, Land forcated with ccessary. The project preelectrical co The existin
ble for handistomer.
abrication, bose shall be
res etc.
own cost tores, cemenaterials requ
the DG setor constructloyer’s singake his own
AR
OC. NO.: NBPPLv. No.: ge 9 of 36
omer/EMPLnd materialsng any work
or specifiedcompletion
r contractor’ertain time e contractor emise considontractors an
ng land shall
ing back all
batching planprovided as
cleaning ont godown uired for th
s for carryintion purposegle point son distribution
L-004-302-P4C-A
LOYER sucs as are normk and the qu
d but reasonof the wor
’s office, stoframe and thas to plan
dering the und the storal be shared b
lands, as ha
nt, office, stos per availa
of area alloetc. and als
he same sha
ng out the tee only) maource subjen arrangeme
A-001
ch a mally
uality,
nably rk in
orage to the n and use of age of by all
anded
orage ability
otted, o the
all be
ender ay be ect to ent to
Page No.: N 11 of 38
BHEL SPEC Rev. No.: DTECHNICA
3.4
C. NO. :PE-TS-4Dated :
AL SPECIFICA
2
3
4
5
6
7
8
Wat
TEC
FGUTP
401-600-C002
ATIONS
2. Contractoduring cotemporardifferent workmenquoted rarequiremmaintaine
3. Supply oInstallatiocontractosame madeviationreserve th
4. For chimcapacity arrangem
5. DemobiliContracto
6. The biddpoint wh
7. The powbe respointerrupticompenssuch nongrounds.
8. The contrin the evelectric sresponsibrestoratioaffected.
ter
CHNICAL CONBOP CIVIL
P STAGE‐IV (1
TECHNICAC
or will haveonstruction rry pole light
floors/workn till the permate. The illum
ment as specied.
of electricityon Rules an
or shall ensuy be audited
n from normhe right to im
mney work itto be installe
ment.
ization of thors scope.
der shall haverever huma
er supply wionsible for ion of powation for del
n-supply on
ractor shoulvent of powsupply, if tbility of theon of electr
NDITIONS OF WORKS PAC1X 500 MW)
Section A: AL CONDITION
CONTRACT
e to procureright from stting, portabking areas fmanent illummination shified by Indi
y shall be gnd other Ru
ure usage of d by EMPLO
mally acceptempose penalt
is a mandated for chimn
he facilities
ve to providan operated e
ill be from tany inconv
wer supply/lay in work the grounds
d ensure thawer breakdothe progresse contractor ic supply s
CONTRACTCKAGE AT UNCHAHA
NS OF DORevPag
e & install tart of his wo
ble lighting for executiomination systould be suchian standard
governed byules and Reelectricity in
OYER time ted norms is ty as deemed
tory requiremney passenge
after comp
de earth leakelectrical dri
the availablevenience or / variation can be claim
s of idle lab
at the work iown. In the s of work i
to step up o that over
AR
OC. NO.: NBPPLv. No.: ge 10 of 36
general illuork. This sytowers with
on of the wtem is establh that minim
ds for genera
y Indian Eleegulation asn an efficiento time. In cobserved, Ed fit for such
ment that DGer lift operat
pletion of w
akage circuitives/ T&Ps a
e grid. EMPLr delay cau
in voltagemed by the
bour, machin
in critical areevent of b
is hamperedthe progre
rall progress
L-004-302-P4C-A
umination system will in
h dg back-uwork & safe
lished, withimum illuminal illuminati
ectricity Act applicable.
nt manner ancase of any mEMPLOYERh cases.
G set of adetion as a stan
works shall b
t breaker at are deployed
LOYER shaused due toe level andcontractor d
nery or any
eas is not hereakdown in
d, it will bess of work
s of work i
A-001
ystem clude
up for ety of in the nation ion is
t and . The nd the major R will
quate nd-by
be in
each d.
all not o any d no
due to other
eld up n the e the after
s not
Page No.: N 12 of 38
BHEL SPEC Rev. No.: DTECHNICA
3.5
3.6
C. NO. :PE-TS-4Dated :
AL SPECIFICA
1
2
3
4
Com ContTelep Com
1
2
3
TEC
FGUTP
401-600-C002
ATIONS
1. Contractodrinking etc. Necedone by water tesemployerfrom all undertakiauthoritieemployerrequired respectiv
2. Contractocolony.
3. EMPLOYcaused dclaim noContractoseparate p
4. Contractoday requwater to m
mmunication
tractor will phone, fax, i
mpressed Ai
1. Contractoequipmenpipes, va
2. Installatiosame wil
3. Contractothe above
CHNICAL CONBOP CIVIL
P STAGE‐IV (1
TECHNICAC
or has to mwater by re
essary netwothe bidder asted and appr shall acqui
local, statings in thees or unders name fofor the perfo
ve obligation
or should ar
YER shall ndue to any Ino compensaor may mapayment sha
or will haveuirement. Bimeet the req
n Facilities
have to arrainternet, intr
r Supply
or will havent required flves, storage
on of the abl be in contr
or will have e system dur
NDITIONS OF WORKS PAC1X 500 MW)
Section A: AL CONDITION
CONTRACT
make his osorting to th
ork for constat his own coproved by tire and pay fte or natione country wertakings reqr the execu
ormance by bns under the c
rrange on th
not be responterruption oation for d
ake standby all be made b
e to arrange idder will e
quirement of
ange for all ranet, e-mail
e to arrange for compresse systems etc
bove systemractor’s scop
to arrange fring the cont
CONTRACTCKAGE AT UNCHAHA
NS OF DORevPag
own arrangehe methods truction & drost. Contracthe customefor all perminal govt. auwhere the squire the eution of coboth the concontract).
heir own, dr
onsible for of water supdelay in w
arrangemenby EMPLOY
for storage ensure adeqf water durin
l necessary cl etc. for prop
for Supply sor and comc.
m and operatpe.
for Supply otract period.
AR
OC. NO.: NBPPLv. No.: ge 11 of 36
ement for clike bore werinking watector is to geter at his owits, approvaluthorities osite is locatemployer toontract (Thentractor and e
rinking wate
any inconvepply and the
work for sunt for wateYER.
of water to quate supplyng major con
communicatper site oper
of Compresmpressed air
tion and ma
of the all the
L-004-302-P4C-A
constructionell, water taner system shat the constru
wn cost. Howls and/or lic
or public seted, which o obtain iney include employer of
er in their la
enience or e contractor uch interruper for whic
meet the day of construncreting.
tion facilitierations.
ssor and all system inclu
aintenance o
consumable
A-001
n and nkers all be
uction wever enses
ervice such
n the those
f their
abour
delay shall
ption. ch no
ay-to-uction
es i.e.
other uding
of the
es for
Page No.: N 13 of 38
BHEL SPEC Rev. No.: DTECHNICA
4.0 4.1 4.2
4.3
4.4
4.5
C. NO. :PE-TS-4Dated :
AL SPECIFICA
T&PTentwork It maThe specinstrcompactivadditQuotcontr In thsustathe camoucontrprogcontrotherbill. contr T&Prequand EMPT&Pwith FurthcontrentirEMPextraregar
TEC
FGUTP
401-600-C002
ATIONS
PS TO BE Dtative list of k is given in
ay be noted contractor
ified to beuments & pletion of to
vities may hational T&P. ted rate shractor shall s
he event of ain desired wcontract on tunt of the coractor to de
gress, EMPLractor includr agency & Decision o
ractor.
P shown in irement .Actmaterial av
PLOYER siPs, and the out written a
her requiremractor will pre work wPLOYER. Aa cost to EMrding capaci
CHNICAL CONBOP CIVIL
P STAGE‐IV (1
TECHNICAC
DEPLOYEDT&P to be Annexure –
that the listis required
e provided handing eq
otal work asave to pre-po
hall be inclsubmit deplo
any failure work progresthis ground,ontract from eploy necessOYER will ding transpocharges as
of EMPLOY
the Annextual Mobilizvailability ate periodicasame have approval of E
ment of T&provide add
within schedAll other T&MPLOYER. Vity etc. prior
NDITIONS OF WORKS PAC1X 500 MW)
Section A: AL CONDITION
CONTRACT
D BY CONTdeployed by
–B.
t is not exhato provide
by EMPLOquipment’s ts per contracone. In such
usive of suoyment plan
on the partss, EMPLOY after givingthe scope of
sary and sufbe at liberty
ortation cost applicable s
YER in thi
xure –B arezation scheduat site is toally from tito be adherEMPLOYER
P will be rditional T&Pdule time w
&Ps shall be Vendor willto dispatch
CONTRACTCKAGE AT UNCHAHA
NS OF DORevPag
TRACTORy contractor
austive and ie all necessOYER, if ato maintainct. In case o
h cases the co
uch emerginn of all T&P
t of the conYER may atg due noticef the contracfficient T&P
y to arrange tof same fro
shall be dedis regard w
e tentative ule, based ono reviewed ime to timered to and nR site.
reviewed froP/ equipmenwithout anprovided by
l give advanof heavy equ
AR
OC. NO.: NBPPLv. No.: ge 12 of 36
R for successf
is only for gsary T&P (oany) measun work progof project reontractor ma
ng requiremalong with t
ntractor to dt his discretioe, and take octor. In the eP/ IMTEs tthe same at tom any of Educted from will be fina
based on pn front availand mutua
e for mobilino change w
om time to nt’s to ensurny financialy the contra
nce intimatiouipment’s.
L-004-302-P4C-A
ful completi
general guidother than
uring (calibrgress for tiequirement, ay have to de
ments. Howtender bid.
deploy T & on also termout any or wevent of failuo maintain the risk & co
EMPLOYERcontractor’
l & bindin
planned prolability, drawally agreed ization of m
will be perm
time at sitere completiol implicatioactor withouon & certific
A-001
on of
dance. those rated) imely some eploy
wever,
P to minate whole ure of work ost of
R site/ s RA
ng on
ogress wings
with major mitted
e and on of
on to ut any cation
Page No.: N 14 of 38
TECHNICAL CONDITIONS OF CONTRACT
BOP CIVIL WORKS PACKAGE FGUTPP STAGE-IV (1X 500 MW) AT UNCHAHAR
BHEL SPEC. NO. :PE-TS-401-600-C002 Rev. No.: Dated :
Section A: TECHNICAL CONDITIONS OF
CONTRACT
DOC. NO.: NBPPL-004-302-P4C-A-001Rev. No.:
TECHNICAL SPECIFICATIONS Page 13 of 36
5.0 TIME SCHEDULE 5.1 5.2 5.3
Mobilization Contractor shall mobilize necessary resources within 2weeks from the date of issue of LOI or as per the directive of Project Manager / Construction Manager. Such resources shall be progressively augmented to match the schedule of milestones and completion. Completion Schedule
1. Entire work as detailed in tender specification shall be completed within 18 months from the scheduled date of Issue of LOI.
2. In order to meet above schedule in general, and any other intermediate
targets set, to meet customer/ project schedule requirements, contractor shall arrange & augment all necessary resources from time to time on the instructions of EMPLOYER.
3. The work under the scope of this contract is deemed to be completed in
all respects, only when all the works are carried out as per satisfaction of EMPLOYER. The decision of EMPLOYER on completion date shall be final and binding on the contractor.
Milestones
Sl. No.
Activity Time from date of LOA
1.0.0 Date of LOA Zero date 2.0.0 Mobilisation Within 2 Weeks 3.0.0 CW System 3.1.0 Start Civil Works for CW Pump House Building Within 1 Month 3.2.0 Start of Civil Works of Fore bay from CW Pump
House Up to CW Outlet Within 1Month
3.3.0 Completion of Civil Works of Fore bay from CW Pump House Up to CW Outlet
Within 12Months
3.4.0 Readiness of CW Pump House for Erection of EOT Crane
Within 10 Months
3.5.0 Readiness of CW Pump House for Erection of CW Pumps
Within 14 Months
4.0.0 RO+DM Building
4.1.0 Start of foundations for RO+DM building Within 2 Months
Page No.: N 15 of 38
BHEL SPEC Rev. No.: DTECHNICA
C. NO. :PE-TS-4Dated :
AL SPECIFICA
4.2
5.05.15.25.35.4
5.5
5.6
6.0
7.0
BaseworkThesprog Biddsubmactiv
a
b
Exte
1
2
TEC
FGUTP
401-600-C002
ATIONS
2.0 Complestart of
0.0 Fire Fi1.0 Start of2.0 Start of3.0 Start of4.0 Comple
House 5.0 Comple
House 6.0 Comple
House 0.0 Compl
steel wPlant
0.0 ComplFaciliti
ed on the abk program (Lse documentgram shall be
der to note thmission and fvities requirea) Getting th
specified same appdifferent
b) Submissisame app
ension Of Ti
1. If the combeyond thextensionthe contr
2. Based on
CHNICAL CONBOP CIVIL
P STAGE‐IV (1
TECHNICAC
ete Handing of equipment erighting Systef Civil Worksf Civil Worksf Civil Worksete Handing O
ete Handing O
ete Handing O etion of Pipeork from Wa
ete handing ies and comp
bove milestoL2 network)ts shall be sue finalized w
hat, during Mfinalisation/ ed to be comhe Concrete in Section-C
proved from grades of co
ion of detailsproved from
ime For Co
mpletion of he contract/cn of the conact.
n the review
NDITIONS OF WORKS PAC1X 500 MW)
Section A: AL CONDITION
CONTRACT
over of RO+Drection m Buildings
s for Fire booss for Fire Wats of Foam PumOver of Fire W
Over of Fire b
Over of Foam
e Rack includater System u
over of Miscpletion of pun
one the biddalong with Tubmitted by
with the owne
Mobilisation completion
mpleted for exMix Design
C (Specific Towner. The
oncrete separs of Agency the owner fo
mpletion
work as detcompletion p
ntract and EM
ws jointly si
CONTRACTCKAGE AT UNCHAHA
NS OF DORevPag
DM building f
ster Pump Hoter Pump Hoump House Water Pump
booster Pump
m Water Pump
ding Structurup to Main
c. Buildings &nch points
der shall furT&P list for
y the bidder er within 15
period the bof following
xecution of wn done from Technical ReMix design rately each fproposed to
or preparatio
tailed in theperiod, the cMPLOYER
igned, the w
AR
OC. NO.: NBPPLv. No.: ge 14 of 36
for Within
ouse Withinuse Within
WithinWithin
p Within
p Within
ral Withi
& Withi
rnish the der completion along with days of plac
bidder shall hg activities bwork: the reputed equirementsshall be got
for OPC ando be engagedon of fabrica
e scope of wcontractor sh
at its discre
works balan
L-004-302-P4C-A
n 8 Months
n 2 Months n 3 Months n 6 Months n 8 Months
n 8 Months
n 10 Months
n 12 Months
n 18 Months
etailed quan of the workthe bid. Thecement of aw
have to ensubesides other
agencies as s) and gettingt done for d PPC. d & getting thation Drawin
work gets dehall request fetion may ex
nce at the en
A-001
s
s
ntified ks. e said ward.
ure r
g the
he ngs.
layed for an xtend
nd of
Page No.: N 16 of 38
BHEL SPEC Rev. No.: DTECHNICA
6.0 6.1
6.2
C. NO. :PE-TS-4Dated :
AL SPECIFICA
3
4
5
6
OTHCapCapacontrBHEQualcons Mat
TEC
FGUTP
401-600-C002
ATIONS
original shall be required this perioportion oextensionbe worke
3. Howevercontinuatattributabthe rightattributabEMPLOY
4. A joint pcompleteresourcesReview o
5. During thresources
6. At the echarge(Eextensionand (iii) Eexhaustedthe sum the schedcontract. attributabcontracto
HER REQUacity of Bidacity of prosract based on
EL and as aplified’ as pesidered.
erials
CHNICAL CONBOP CIVIL
P STAGE‐IV (1
TECHNICAC
contract perquantified,
for completod of ‘Time of backlog n’ or ‘Time eed out simila
r if any ‘Timtion of woble to the cots of EMPble to the YER may w
programme sed during ths to be depof the progra
he period os as per mutu
end of totaEIC), and upns attributabEMPLOYERd in the samof (i), (ii) aduled date oLD shall be
ble to contraor. UIREMENTdder: spective biddn the ‘Assespplicable in r the assessm
NDITIONS OF WORKS PAC1X 500 MW)
Section A: AL CONDITION
CONTRACT
riod less theand the nu
tion of the sextension’, attributable
extensions’ aarly.
me extensionork and comontractor aloLOYER to
contractorish to take a
shall be drawe period of ployed by tamme and re
of ‘Time extually agreed
al work copon analysisble to (i) CoR, shall be w
me order. Theand (iii) abovof completioe imposed/ lactor and re
TS
ders shall be ssment of Cathe similar ment carried
CONTRACTCKAGE AT UNCHAHA
NS OF DORevPag
e backlog aumber of mame shall bthe contracto the con
at the end of
n’ is granted mpletion ofone, then it so impose pr, in additiat the risk an
wn for the b‘Time Exte
the contractecord of shor
tension’, cod program.
ompletion ass of the totaontractor, (iiworked out ae total periove and shallon and the alevied for thecoverable fr
assessed byapacity of Btype of jobs
d out for thi
AR
OC. NO.: NBPPLv. No.: ge 15 of 36
attributable tmonths of ‘e jointly wo
ctor is boundntractor. Anf the previou
to the contrf contract, shall be withenalty/ LD ion to any
nd cost of con
alance amouension’, alontor as per srtfall shall be
ontractor sha
s certified al delay, thei) Force majand shall be
od of time exl be equal toactual date ohe portion offrom the due
y NBPPL befidder’ proces. If the biddis tender, his
L-004-302-P4C-A
to the contrTime exten
orked out. Wd to completny further ‘us extension
ractor to facidue to bac
hout prejudifor the d
y other acntractor.
unt of work ng with matcspecified foe done.
all maintain
by Engineee portion of ajeure condit
considered xtensions shao period betof completiof time extenes payable t
fore awardinedure followder is founds bid shall n
A-001
ractor nsion’
Within te the Time
n shall
ilitate cklog ice to
delays ctions
to be ching
ormat.
their
er In f time tions, to be all be tween on of
nsions to the
ng the wed by d ‘Not not be
Page No.: N 17 of 38
BHEL SPEC Rev. No.: DTECHNICA
C. NO. :PE-TS-4Dated :
AL SPECIFICA
1
2
3
4
5
TEC
FGUTP
401-600-C002
ATIONS
1. The contrmaterialsreinforce
2. All storebest kindor as per by the EEngineer
3. The ContEngineerworks. Tof samplto the Conot. If samsupply tocomplyinin approcontracto
4. The Engior all ofin accordcharacterthe part oIn chargeThe Engproper mthe Contrby other substituti
5. The Conemployeeinfringemdesign ripayable iin the Cobrought EMPLOYContracto
CHNICAL CONBOP CIVIL
P STAGE‐IV (1
TECHNICAC
ractor shall, s other thaement steel, c
es and materd in conform
relevant IndEngineer In r In charge(E
tractor shall,r In charge (EThe Engineeles or withiontractor in mples are noo the Engineng with the oval of samor eligible fo
ineer In chaf the materdance with r or quality of the Contre (EIC) shallgineer In chamaterial to be
ractor refusimeans. All
ion, shall be
ntractor shaes against
ment or use ghts and shain respect oontract. In tagainst EM
YER in resor shall imm
NDITIONS OF WORKS PAC1X 500 MW)
Section A: AL CONDITION
CONTRACT
at his own ean the free cement etc. r
rials to be prmity with thdian standardcharge(EIC
EIC) that the
, at his own EIC) sampler In charge(in such furthwriting, wh
ot approved,eer In chargspecification
mples (originor any compe
arge(EIC) shrials broughtthe Contracto samples aractor in rel be at libertarge (EIC)
e substituted ng to complcosts, whichborne by the
all indemnifany actio
of any patenall pay any f any articlthe event of
MPLOYER ospect of mediately b
CONTRACTCKAGE AT UNCHAHA
NS OF DORevPag
expenses (Inissue mat
required for
rovided by the specificatid and the Co
C), furnish e materials so
expense andes of materiaEIC) shall w
her period ashether samp, the Contracge (EIC) forns laid downnal or freshensation.
hall have fult to site by t
ct specificatapproved byemoving rejety to have thshall have ffor rejected
ly; he may ch may attende Contractor
fy EMPLOYon, claim nt or design royalties or le or materf any claim or any age any suc
be notified
AR
OC. NO.: NBPPLv. No.: ge 16 of 36
nclusive of Tterials like the work.
the Contractions laid dowontractor shproof to th
o comply.
d without deals proposedwithin sevens he may reqples are appctor shall forr his approvn in the Conh ones) sha
ll powers fothe Contract
ations or doy him. In cected materi
hem removedfull powers
d materials ancause the samd upon such r.
YER, its reor proceed or any alother charg
rial or part being madent, servant h matters athereof, pro
L-004-302-P4C-A
Taxes), provistructural
tor shall be own in the conhall, if requhe satisfacti
elay, supply td to be used in days of suquire will intproved by hrthwith arranval fresh samntract. Any
all not mak
or removal otor which aro not conforcase of defauials, the Engd by other mto procure
nd in the eveme to be supremoval an
epresentativeding relatinlleged paten
ges which mthereof inc
e or action or employe
as aforesaidovided that
A-001
ide all steel,
of the ntract
uested ion of
to the in the upply timate him or nge to mples delay
ke the
of any re not rm in ult on gineer
means. other
ent of pplied nd / or
es or ng to nt or
may be luded being ee of
d, the such
Page No.: N 18 of 38
BHEL SPEC Rev. No.: DTECHNICA
C. NO. :PE-TS-4Dated :
AL SPECIFICA
6
7
8
9
1
TEC
FGUTP
401-600-C002
ATIONS
indemnitcomplyinContractoany suchonly if thsubmissio
6. The Engispecifiedother thalready bshall prrequire fsuch tesall facilitshall be in tests otherwise
7. In additiotests / samthe materin such te
8. Material supplied approvedthe respo
9. EMPLOYany timeon the wplace(s) wat any pobtained required
10. All mateof EMPLprior writhe Worksuch matforthwith
CHNICAL CONBOP CIVIL
P STAGE‐IV (1
TECHNICAC
y shall not ng with the or shall payh use, the ahe use was thon of the ten
ineer In chard in the Conhan those fbeen furnisherovide at hfor the purpts are requties requiredborne by thshall be boe provided.
on, the Conmples as marials used byests/ samples
required foby EMPLOY
d by the Engonsibility of t
YER's office to inspect works, eitherwhere such mplace (s) w
and the for such insp
rials broughLOYER anitten approvaks are finallyterial is full
h remove fro
NDITIONS OF WORKS PAC1X 500 MW)
Section A: AL CONDITION
CONTRACT
apply whenspecific dir
y any royaltiamount so phe result of ander.
rge(EIC) shntract for anfor which, ed, at the co
his expenspose. If no uired by thed for the puhe Contractorrne by th
ntractor shallay be requirey the compas.
or the worksYER, shall bgineer. Storathe contracto
cials concernand examiner on the Sitmaterials ar
where these Contractor pection and
ht to the Sitend shall noal of the Ey completed ly recoveredom the Site a
CONTRACTCKAGE AT UNCHAHA
NS OF DORevPag
n such infrinrections issuies or other paid being any drawing
hall be entitleny materials
as stated aost of the Ce all facilititests are sp
e Engineer, urpose and r only. The
he Contracto
l perform / ed by the Enany except fo
s, whether bbe stored by age and safeor.
rned with thee any materite or at fa
re assembledare lying orshall give examination
e shall becomot be removEngineer In and advanc
d, the Contraall surplus m
AR
OC. NO.: NBPPLv. No.: ge 17 of 36
ngement hasued by EMPcharges payreimbursed
gs / specifica
ed to have tesupplied b
above, satisfContractor anies which thpecified in tthe Contrac the chargee cost of maor in all ca
submit at hngineer In chor the costs
brought by ty the Contrace custody of
e Contract shials intendeactory or wod, fabricated,r from whichsuch facilit
n.
me and remved off the Scharge(EIC
ce, if any, inactor shall at
material origi
L-004-302-P4C-A
s taken plaPLOYER buyable in resp
to the Contrations issued
ests carried oby the Contrfactory proond the Contrhe Engineerthe Contract
ctor shall pres for these aterials consases except
his own costharge (EIC) oof materials
the Contractctor only at pf material sh
hall be entited to be usedorkshop or , manufacturh these are ties as may
main the proSite withou). But whe
n respect oft his own expinally suppli
A-001
ace in ut the ect of ractor
d after
out as ractor of has ractor r may t, and rovide
tests umed when
t such out of s used
tor or places all be
tled at d in or
other red or being
y be
operty ut the never f any pense ied by
Page No.: N 19 of 38
BHEL SPEC Rev. No.: DTECHNICA
6.3 6.4 6.5
C. NO. :PE-TS-4Dated :
AL SPECIFICA
Exec
1
2
Setti
1
2
Site
TEC
FGUTP
401-600-C002
ATIONS
him and the prop
cution Of W
1. The worksatisfactitender. Inshall be f
2. The Enginstructio"Work Sivisit thissigning thor notice
ing Out
1. All the windicatedand set oshall be mThis refecontract points hoEMPLOYdo workestablishecontractoproperly its own e
2. The contprecautioposition accident deemed expenses
Drainage
CHNICAL CONBOP CIVIL
P STAGE‐IV (1
TECHNICAC
upon such erty of the C
Work
k shall be exon of the Enn case of cofinal & bindi
gineer In ons to the Coite Order Bo office dailyhe relevant s in writing
works shall d on the drawout the worksmade availerence linesand the cont
orizontal andYER well ink in the areed by him ar
or to proceelocated may
expenses.
tractor shall ons to prese
In the evenor due to necessary p
s.
NDITIONS OF WORKS PAC1X 500 MW)
Section A: AL CONDITION
CONTRACT
removal, thContractor.
xecuted in angineer and aonflict, the ding.
charge(EIC)ontractor in ook” maintaiy and shall entries in thwithin the in
be set out wing. The cs. Only oneable for sett shall be utractor has td vertical conn advance of ea allotted re checked b
ed with the y be removed
at his own erve and m
nt of these any other
placed by E
CONTRACTCKAGE AT UNCHAHA
NS OF DORevPag
he same sh
a workman las per techn
decision of th
) will comrespect of thined at his oconfirm rec
his book. Suntent and me
to the truecontractor e grid referting out the
used as datuto establish fntrol points.
f the times &to him so
by EMPLOYworks. And and / or di
expense takmaintain thes
marks beinr cause whaEMPLOYER
AR
OC. NO.: NBPPLv. No.: ge 18 of 36
hall re-vest
like manner nical specifiche Engineer
mmunicate he executionffice and theceipt of suchuch entries weaning of the
e lines, gradshall be resprence line works und
um for the for his work. The contra
& places at wthat suitab
YER / Custony work donismantled by
ke all properse datum mng disturbedatsoever, theR / Custom
L-004-302-P4C-A
in and be
and to the ecation issuedr In charge (
or confirmn of the worke Contractorh instructionwill rank as ese condition
des and elevponsible to land bench
der the conworks unde
k area at avaactor shall in
which he wishble datum pomer to enabne without y the contrac
r and responmarks to itsd or obliterate same may
mer at contra
A-001
ecome
entire d with (EIC)
m his k in a r shall ns by order ns.
vation locate mark
ntract. er the ailable nform hes to points
ble the being
ctor at
nsible s true ted by y be actor's
Page No.: N 20 of 38
BHEL SPEC Rev. No.: DTECHNICA
6.6 6.6.1 6.6.2 6.7 6.7.1
C. NO. :PE-TS-4Dated :
AL SPECIFICA
All wprogshallEngiwatepumpplantin qu Retu Retu Sealeof co15 dcondidentto habags Retu
1
2
3
Cem Cem
1
2
TEC
FGUTP
401-600-C002
ATIONS
water includgress of the wl be removeineer In chaer all the fouping out, wt site. All suoted rates.
urn Of Mate
urn Of Ceme
ed cement bompletion or
days from asdition of thetified withinandling and s will be take
urn Of Steel I
1. All surpweighme
2. Surplus, returned the projehandling
3. All wastato the staccountinadditiona
ment And St
ment Consum
1. The theor
2. For desig
CHNICAL CONBOP CIVIL
P STAGE‐IV (1
TECHNICAC
ing sub-soil works or in tred by the carge(EIC). Itundation pits
well point sysuch expendi
erials
ent
ags remaininr terminationsessment) if
e cement. Ren the projectincidental ch
en back on w
Including Sc
plus steel anent basis.
unused andseparately fo
ect area; Reand inciden
age/ scrap (itores on weng purposesal cost due h
eel Consum
mption
retical consu
gn mix concr
NDITIONS OF WORKS PAC1X 500 MW)
Section A: AL CONDITION
CONTRACT
water whichrenches and contractor frt will also bs, trenches wstem etc. iture on de-w
ng unused ann of the conf EMPLOYEeturn of suct area by Engharges. Surp
weighment b
crap
nd all wast
d un-tamperefor a place dieturn of sucntal charges.
including waeighment ba. Return of andling and
mption And W
umption of c
rete as per ap
CONTRACTCKAGE AT UNCHAHA
NS OF DORevPag
h may accumd excavationsfrom the Sitbe responsibwith suitablConsideringwatering sha
nd in perfectntract shall bER / Enginech cement togineer/ EMPplus sealed aasis.
tage materi
ed steel shalirected by Ech materials
astage, unusasis and a rsuch materitransportati
Wastage
cement shall
pproved des
AR
OC. NO.: NBPPLv. No.: ge 19 of 36
mulate on ths, includingte to the satbility of the le de-waterig the depth all be deeme
tly good conbe returned peer is satisfieo the projecPLOYER wand good co
ials will be
ll be sorted MPLOYERwill not be
sable scrap) receipt obtaial will not bon and incid
be based on
sign mix.
L-004-302-P4C-A
he Site durin monsoon ptisfaction ofcontractor ting methodsof water tabed to be inc
ndition at thepromptly, (wed of the phyt stores/ plaill not be en
onditioned ce
e taken bac
section-wisR /Engineer w
e entitled to
shall be retuined for mabe entitled todental charge
n the followi
A-001
ng the period f the to de-s like, ble at luded
e time within ysical ace as ntitled ement
ck on
e and within o any
urned aterial o any e.
ing.
Page No.: N 21 of 38
BHEL SPEC Rev. No.: DTECHNICA
6.7.2 6.7.3
C. NO. :PE-TS-4Dated :
AL SPECIFICA
3
4
5
Cem
1
2
Sl.NC-1
C-2
C-3
Rein
1
TEC
FGUTP
401-600-C002
ATIONS
3. For nomi
as approv
4. For itemEMPLOYcement cConsump2013 unlcontract o
5. Actual creturned be taken
ment Wastage
1. Allowablconsumpspecifica
2. For any and whicrecovery
No. Cement
Theoretiany wasActual chalf percconsumpActual cpercent
nforcement S
1. The theoMS rounbending weights contracto
CHNICAL CONBOP CIVIL
P STAGE‐IV (1
TECHNICAC
inal mix conved by Engin
m of works, YER, for maconsumptionption” attachless otherwior mutually
consumptionin good conback by EM
e
le wastage:ption of cemtion.
material issch is not accfor such ma
consumptio
ical consumpstage or loss)consumptioncent (+1.5%ption towardconsumption(+1.5%) of a
Steel & MS
oretical consnd shall be schedule. Was per India
or for any
NDITIONS OF WORKS PAC1X 500 MW)
Section A: AL CONDITION
CONTRACT
ncrete work,neer-in-char
where voluasonry workn shall be ghed to the Dse specifiedagreed by E
n = Issue –ndition by co
MPLOYER).
One and ment unless
ued by EMPcounted for aterial shall b
on
ption (witho). n being Limi) of aforesai
ds allowablen beyond oneabove (C-1).
Round Cons
sumption of based on a
Weight shall an standardsdeviation in
CONTRACTCKAGE AT UNCHAHA
NS OF DORevPag
, as per minrge.
ume mix is ks, plaster otgoverned byDelhi schedud in the specEngineer-in-c
– Surplus/ ontractor to s
half perces specified
PLOYER toby the cont
be affected a
out consideri
ited to one anid theoretica wastage. e and half .
sumption
various diaapproved co
be calculats. No extra n weights f
AR
OC. NO.: NBPPLv. No.: ge 20 of 36
imum cemen
permitted ither miscellay the “Stateule of Ratescifications ocharge and c
unused quastore. (No sw
ent (+1.5%otherwise
o the contratractor to EMat Recovery
Basis recove
ing Free
nd al
Free
Recov
ameters of reonstruction ted considercost shall b
for the diff
L-004-302-P4C-A
nt as specifi
n writing baneous item
ement of Ces of CPWDDor the drawicontractor.
antity of ceweep cemen
%) of theorin the tech
actor free of MPLOYER,rates.
of issue & ery
very rate
einforcemendrawing andring the sectbe payable tferent proce
A-001
ied or
by the ms, the
ement DSR- ng of
ement nt will
retical hnical
f cost, , then
nt and d bar tional to the edures
Page No.: N 22 of 38
BHEL SPEC Rev. No.: DTECHNICA
6.7.4 6.7.5
C. NO. :PE-TS-4Dated :
AL SPECIFICA
2
3
4
Rein
1
2
Sl.N
R-1
R-2
R-3
Stru
1
2
3
4
TEC
FGUTP
401-600-C002
ATIONS
adopted including
2. Actual co
3. Surplus contracto
4. Wastage
nforcement S
1. Allowablconsidere
2. Wastage
No. Reinforc
TheoretiwastageWastageaforesaitowards Wastagetheoretic
uctural Steel
1. The theoapproved
2. Weights Indian stpayable procedurconsump
3. Actual co
4. Surplus =EMPLOY
CHNICAL CONBOP CIVIL
P STAGE‐IV (1
TECHNICAC
for issue g rolling tole
onsumption
= Un-tampeor to EMPLO
= Actual co
Steel & MS R
le wastage: ed as allowa
and scrap sh
cement steel
ical consume and scrap oe limited to pd theoretiAllowable w
e beyond focal consump
l Consumpt
oretical cond drawings.
shall be catandard as to you fores adopted
ption includin
onsumption
= UntempereYER store.
NDITIONS OF WORKS PAC1X 500 MW)
Section A: AL CONDITION
CONTRACT
and calculerances.
= Issue – Su
ered and unOYER store
nsumption –
Round Wast
(+4%) of ble wastage.
hall be as pe
l
mption (withor loss) plus four perical consuwastage.
four percentption above (
tion
nsumption o
alculated comentioned
r any deviad for issueng rolling to
= Issue – Su
ed, unused, u
CONTRACTCKAGE AT UNCHAHA
NS OF DORevPag
lation of th
urplus.
nused quantalong-with r
– Theoretica
tage
the theore.
er actual weig
out conside
rcent (+4%) umption (R
t (+4%) of (R-1).
of various
onsidering thin relevant
ation in wee and calcolerances.
urplus.
uncut quanti
AR
OC. NO.: NBPPLv. No.: ge 21 of 36
he theoretic
tity of steel relevant doc
al consumpti
etical consu
ghment basi
Basis recove
ring Free
of R-1)
Free
the Recov
sections sha
he sectionalt clause. Noeights for thculation of
ity of steel re
L-004-302-P4C-A
cal consum
returned bcuments.
on.
umption sha
is.
of issue & pery
very rate
all be base
l weights ao extra shahe two diff
the theor
eturned by y
A-001
mption
by the
all be
penal
ed on
as per all be fferent retical
you to
Page No.: N 23 of 38
BHEL SPEC Rev. No.: DTECHNICA
6.7.6 6.8
C. NO. :PE-TS-4Dated :
AL SPECIFICA
5 Stru
1
Sl.N
S-1
S-2
S-3
2
Reco
1
2
3
TEC
FGUTP
401-600-C002
ATIONS
5. Wastage
uctural Steel
1. Allowablshall be cmeasuredmaterialsto 0.5% (considereshall be percent).
No. Structur
Theoretiany was& drg. Wastagethe aforetowards Wastageaforesai
2. All wastreturned
onciliation O
1. The contrissued toBill.
2. The contspecifiedbalance m
3. If it is recovery for the exbill.
CHNICAL CONBOP CIVIL
P STAGE‐IV (1
TECHNICAC
= Actual co
l Wastage
le wastage: considered. d as per acs due to gas (zero point fed for recon
considered
ral steel and
ical consumpstage, scrap o
e limited to pesaid theoretallowable w
e beyond foud theoretical
tage reinforto EMPLOY
Of EMPLO
ractor shall so him every
tractor shall d herein to tmaterial are
noticed by at the pena
xcess wastag
NDITIONS OF WORKS PAC1X 500 MW)
Section A: AL CONDITION
CONTRACT
nsumption –
4% (four pWastage is
ctual weightcutting, stra
five percent)nciliation pud to be inc
SS liner
ption (withoor loss) as pe
plus four pertical consum
wastage. ur percent (4l consumptio
rcement, MYER.
OYER Issued
submit a recmonth. The
properly acthe satisfactavailable wi
EMPLOYEal rate, then ge as per pe
CONTRACTCKAGE AT UNCHAHA
NS OF DORevPag
– Theoretica
percent) of further classtment basis.aightening o) of theoreticurposes onlycluded in a
out considerier specificat
rcent (+4%) mption (S-1)
4%) of the on (S-1).
MS round an
d Materials
conciliation se same may
ccount for thtion of EMPith contracto
ER that theEMPLOYE
enal recovery
AR
OC. NO.: NBPPLv. No.: ge 22 of 36
al consumpti
the theoretisified as cut. Invisible w
of edges etc.cal consumpy. But this iallowable w
Basis recove
ing tion
Free
of Free
Recov
nd structura
statement ofbe submitte
he material PLOYER ce
or’s custody
e wastage isER will procy rates as sp
L-004-302-P4C-A
on.
ical consumt pieces and wastage (lo) shall be lim
ption and shinvisible wa
wastage (i.e.
of issue & pery
very rate
al steel sha
f cement anded along wit
issued to hiertifying thaat site.
s high and ceed for recpecified from
A-001
mption scrap
oss of mited all be
astage four
penal
all be
d steel th RA
im as at the
calls overy m RA
Page No.: N 24 of 38
BHEL SPEC Rev. No.: DTECHNICA
6.9 6.10 6.11
C. NO. :PE-TS-4Dated :
AL SPECIFICA
4
Reco If wamade Reco Sl.N
1 2 3
Insp All apprto thnoticthe qdispuconc Unco
1
2
TEC
FGUTP
401-600-C002
ATIONS
4. The apprthe purpo
overy Of M
astage exceee from mont
overy Rate O
No. Cement ReinforcStructur
pection And
work embraoval at each
he Engineer ce being recquality and eute, the deciclusive.
overing And
1. The Coopeningsdirect forthe satisbeen covand is suwith the in or throEMPLOYContracto
2. If neitherof constrwhose d
CHNICAL CONBOP CIVIL
P STAGE‐IV (1
TECHNICAC
roved drawinose of reconc
aterial
eds the specthly RA bill
Of Materials
(OPC/ PPC/cement steelral steel mate
Stage Appr
acing more th stage thereo
In charge (eived, the Eextent thereoision of the
d Making G
ontractor shas in or througr his verificasfaction of vered up or pubsequently
Contract, though, reinstaYER. In anor.
r drawing noruction whicdecision sha
NDITIONS OF WORKS PAC1X 500 MW)
Section A: AL CONDITION
CONTRACT
ngs/ bar benciliation of m
cified limit, at the penal
Item /PSC). l and MS roderials.
roval Of Th
than one proof and the C(EIC) when
Engineer In cof at any timEngineer In
Good
all uncover gh the same ation and sha the Engine
put out of vifound on un
he expensesating and m
ny other case
or specificatich in the opill be final
CONTRACTCKAGE AT UNCHAHA
NS OF DORevPag
nding schedumaterials.
the recoveryrate stipulat
d etc.
he Work
ocess shall bContractor sh
each stage charge (EIC)
me he may chn charge (EI
any part oas the Engall reinstateeer In chargiew after beincovering tos of uncovermaking goode all such ex
ion contain ainion of thand conclu
AR
OC. NO.: NBPPLv. No.: ge 23 of 36
ules are to b
y of excess ted below.
Rec7500/-58,00070,000
be subject tohall give due
is ready. In) shall be enhoose and inC) thereon s
of the Workineer may fe and make gge(EIC). If aing approved
o be executedring and / ord the same sxpenses shal
any mentionhe Engineeusive, are
L-004-302-P4C-A
be considere
wastage sha
covery rate (R- per MT 0/- per MT0/- per MT
examinatioe notice in wn default of ntitled to appn the event oshall be fina
ks and/or from time to good such pany such pard by the Engd in accordr making opshall be bornll be borne b
n of minor der In chargereasonable
A-001
ed for
all be
Rs)
n and writing f such prove
of any al and
make time
part to rt has gineer dance ening ne by by the
details (EIC) and
Page No.: N 25 of 38
BHEL SPEC Rev. No.: DTECHNICA
6.12 6.13 6.14 6.15
C. NO. :PE-TS-4Dated :
AL SPECIFICA
Nuis The do ownegene Mat Matepropcharg Trea All remashallContotherimmchargdispo Prot
1
2
3
TEC
FGUTP
401-600-C002
ATIONS
obviouslysuch detaas if thincluded
sance
Contractor sanything whers, tenants
erally.
erial Obtain
erials of anyperty of EMPge(EIC) may
asure, Trove
fossils, coains or thingl be the absotractor shallr person fro
mediately upoge(EIC) withosal of the sa
tection Of W
1. Trees deduring thsuch treprotected
2. The contguards, fthe Enginsafety an
3. The contit is final
CHNICAL CONBOP CIVIL
P STAGE‐IV (1
TECHNICAC
y and faails shall be hey were in the scope
shall not at ahich shall cor occupiers
ned From E
y kind obtaPLOYER / iy direct, at n
e, Fossils Et
oins, articlegs of geologolute propertl take reasonom removingon discoveryh such discoame.
Works
esignated byhe course ofee shall nod by providin
tractor shall fencing and neer In char
nd convenien
tractor shall lly taken ove
NDITIONS OF WORKS PAC1X 500 MW)
Section A: AL CONDITION
CONTRACT
airly intendprovided byspecially
e.
any time do,cause unnecs of other pr
Excavation
ained from eits client andno extra cost.
tc.
es of valugical or archty of EMPLnable precaug or damag
y thereof andovery and ca
y the Enginef the Work
ot be chargeng tempora
provide andwatching wrge(EIC) for
nce of those e
have total reer by the EM
CONTRACTCKAGE AT UNCHAHA
NS OF DORevPag
ded for satisy the contramentioned
cause or pecessary disturoperties nea
excavation od shall be di.
ue or antiquhaeological iLOYER / EMutions to pr
ging any sd before remoarryout the E
eer shall bks and earth led. Where nary fencing.
d maintain awhen and wh
r the protectemployed on
esponsibilityMPLOYER.
AR
OC. NO.: NBPPLv. No.: ge 24 of 36
sfactory comactor withou
and shall b
ermit any nuurbance or
ar the Site an
on the Site isposed of a
uity and struinterest discoMPLOYER'srevent his such articleoval acquainEngineer's di
be protectelevel withi
necessary, su
at his own ehere necessartion of the Wn the Works
y for protect No claim w
L-004-302-P4C-A
mpletion of wut any extra be deemed
uisance on Sinconvenien
nd to the p
shall remais the Engine
uctures and overed on ths client andworkmen o
e or thing, nt the Engineirections as t
ed from dan 1 meter ofuch trees sha
expense all lry or requireWorks or fo or the publi
ting his workwill be entert
A-001
work, cost, to be
Site or nce to public
in the eer In
other he site d the r any shall
eer In to the
amage f each all be
lights, ed by or the ic.
ks till tained
Page No.: N 26 of 38
BHEL SPEC Rev. No.: DTECHNICA
6.16 6.17 6.18 6.19
C. NO. :PE-TS-4Dated :
AL SPECIFICA
Prot The In cgreasdirecto be Clea Contworkconsobstrthe s Qua The testinpropline has tbe dois resame Com
TEC
FGUTP
401-600-C002
ATIONS
by the Econtractocompletecomply wto the cohis supewith thethe repairof such immediatsuch disp
tection Of E
contractor scharge(EIC),sing, rappincted by Engie included in
arance Of Si
tractor has tk is to be cstruction mruction in thsite, this will
ality Assuran
contractor hng of civil
per quality, gwith approv
to submit deone as per Iquired by the shall be bo
mpletion Of
CHNICAL CONBOP CIVIL
P STAGE‐IV (1
TECHNICAC
Engineer In or's works ae restorationwith the speontractor's wrvision or c
e party conr of such dadisputes.
tely and no putes.
Embedment
shall ensure of all bol
ng them withineer In cha
n the rates qu
ite And Rep
to clear the commenced
materials andhe erection l be done at h
nce
has to establconstruction
grade and sved field quaetailed reportS code spec
he engineer torne by the c
Work
NDITIONS OF WORKS PAC1X 500 MW)
Section A: AL CONDITION
CONTRACT
charge(EICand the con of the damecifications aworks occucontrol, the ncerned. Thamaged work
The contracause thereo
’s Bolts Etc
proper protets, inserts, h gunny bagrge(EIC). C
uoted for the
pairs.
site / area w/ or in pro
d equipmen work withinhis risk & co
ish / arrangen materials strength of tality check lt for testing ifications/ Eto be carriedontractor.
CONTRACTCKAGE AT UNCHAHA
NS OF DORevPag
C) for any ontractor shmaged workand drawingur because
contractor she contractorks because oactor shall pof will be as
c.
ection to theembedmentgs or canva
Cost of suche item.
where mechaogress. The nt lying in n 24 hrs. Nost by EMPL
e at site thand concre
the materiallist of EMPLof all mater
EMPLOYERd from outsi
AR
OC. NO.: NBPPLv. No.: ge 25 of 36
damage orhall be reks to its origgs. Should a
of other shall make hr shall not caof any delayproceed to ssigned pend
e satisfactiont etc. from as or by anyh protections
anical and e contractorthe vicinityotice, In casLOYER.
he field tesete cubes s used in th
LOYER/ its rial used etc.R's quality plide laborator
L-004-302-P4C-A
r loss to esponsible foginal conditiany such daparty not u
his claim dirause any del
y in the resolrepair the
ding resoluti
n of the Engweather et
y other meas shall be de
electrical erer shall rey and case he fails to
sting facilitiefor ensurin
he constructiclient. Contr All testinglan. If furthery, the cost o
A-001
the or the ion to amage under rectly lay in lution work
ion of
gineer tc. by ans as eemed
ection move
ausing clear
es for ng the ion in ractor
g shall er test of the
Page No.: N 27 of 38
BHEL SPEC Rev. No.: DTECHNICA
6.20 6.21
C. NO. :PE-TS-4Dated :
AL SPECIFICA
1
2
3
Meth MethCode Heal
1
2
3
TEC
FGUTP
401-600-C002
ATIONS
1. The workcharge(Ein the Coequipmenthings shall wastethe Engin
2. EMPLOYtime to tsatisfactinot be treto the sashall com
3. The Engwhich the
hod Of Mea
hod of measues / CPWD c
lth, Safety &
1. The contAccounta
2. The contmanagemthem. Tsafety angood sanand planThe Engwhich, incase theprecautioaccount s
3. The contrwho sha
CHNICAL CONBOP CIVIL
P STAGE‐IV (1
TECHNICAC
ks shall be cEIC) and in aontract, andnt, temporarhall be rem
e materials aneer In charg
YER shall htime such seon of the Eeated as havatisfaction o
mmence only
ineer In chae work is co
asurement
urements if ncodes.
& Environm
tractor shall ability;
tractor will ment at site he contracto
nd preventionitary conditint operation gineer In chn the E I/C’e contractorons and anyshall not affe
ractor shall aall have fu
NDITIONS OF WORKS PAC1X 500 MW)
Section A: AL CONDITION
CONTRACT
ompleted toaccordance wd all unusery buildingsmoved and tand deliveredge(EIC) at th
have power ections of th
Engineer In cve been compof Engineer y after handin
arge(EIC) shmpleted and
not specified
ment manag
comply wi
be responsifor the con
or shall conton of humanions in and amust be car
harge(EIC) rs opinion, i
r must immy delays attect the agree
appoint dediull authority
CONTRACTCKAGE AT UNCHAHA
NS OF DORevPag
o the entire swith the comed stores as, site officethe site and d up clean ahe Contracto
to take ovehe work ascharge(EIC)pleted until In charge(E
ng over of th
hall certify td the date the
d in the tend
gement
ith following
ible for Heanstruction actinuously takn and equipmaround the sirried out in reserves thes being perfmediately atributed to ed contractua
icated full-tiy to ensure
AR
OC. NO.: NBPPLv. No.: ge 26 of 36
atisfaction ompletion scheand matere, labour huwork cleare
and tidy to tor's expenses
er from the have been
). Such wothe extra woEIC). The Ghe entire wo
to the contrereof.
der, shall be
g towards S
alth, Safety ctivities to bke special cment accideite. All the c the safest pe right to sformed dangadhere the the work s
al finishing d
ime Qualifiee that all n
L-004-302-P4C-A
of the Engineedule as specrials, tools, putments and ed of rubbishthe satisfactis.
Contractor completed t
ork however orks are exeGuarantee p
orks.
actor the da
as per releva
Safety and S
& Environbe carried oucare to ensurents and maiconstruction possible mastop any prgerously. In
requisite sstoppage ondates.
ed Safety Offnecessary s
A-001
eer In cified plant, other h and ion of
from to the
shall ecuted period
ate on
ant IS
Social
nment ut by re the intain work
anner. ocess n this safety n this
fficers safety
Page No.: N 28 of 38
BHEL SPEC Rev. No.: DTECHNICA
C. NO. :PE-TS-4Dated :
AL SPECIFICA
4
N
N
N
D
N
D
M
N
A
i
&
A
h
S
c
T
A
&
D
W
s
M
A
b
TEC
FGUTP
401-600-C002
ATIONS
precautiocontractoof all per
4. Some of follows:-
Nobody is al
Never enter w
No climbing/
Do not excee
No debris ob
Do not walk
Maintain goo
No photograp
All Site sup
mparted stru
& record to b
Availability
hours.
Site Safety t
cover every w
Tools box tal
All accident
& procedure
Daily Safety
Weekly co-o
safety officer
Monthly safe
All Safety e
before use.
CHNICAL CONBOP CIVIL
P STAGE‐IV (1
TECHNICAC
ons are obsors. These arsonnel withi
the commo-
llowed to ent
work area w
/working all
ed the speed
bstacles allow
on pipelines
od Housekee
phy/ Videog
pervisors &
uctured tra
be maintaine
of qualified
training to b
worker.
lk (5-15 min
/ incidents(N
should be f
Checking b
ordination m
r.
ety meeting w
equipment m
NDITIONS OF WORKS PAC1X 500 MW)
Section A: AL CONDITION
CONTRACT
served by appointees shin the contra
n safety rule
ter at constru
without Safety
lowed withou
limit 25 Km
wed on the ro
s or false cei
eping at wor
graphy allow
& engineers
aining on con
ed.
& trained S
be imparted
nutes) by sup
Near Miss)
finalized)
y Each Site
meeting of a
with Site In-
must be ISI
CONTRACTCKAGE AT UNCHAHA
NS OF DORevPag
the Contrahall have fulactor's area o
es to be foll
uction site w
y helmet & c
ut proper sa
mph within p
oads & pass
iling.
rk site.
wed without p
(including
nstruction sa
Site Enginee
to all work
pervisor prio
to be report
Engineer alo
all Safety en
-charges.
marked &
AR
OC. NO.: NBPPLv. No.: ge 27 of 36
actor's emplll responsibiof the works
lowed durin
without Safet
chin strap in
fety belt abo
premises.
sages.
permission
g subcontrac
afety before
er at site dur
kers & plan
or to start of
ted & invest
ong with Saf
ngineers with
checked by
L-004-302-P4C-A
loyees and lity for the s.
ng working a
ty Shoe.
n place.
ove 2 m. heig
ctors) must
start of the
ring all work
to be made
any job.
tigated.(form
fety enginee
h EMPLOY
y Safety offi
A-001
sub-safety
are as
ght.
be
job
king
e to
mats
er.
YER
ficer
Page No.: N 29 of 38
BHEL SPEC Rev. No.: DTECHNICA
C. NO. :PE-TS-4Dated :
AL SPECIFICA
T
B
L
G
f
S
c
D
a
D
T
P
m
D
F
m
F
i
C
c
5
A
B
C
TEC
FGUTP
401-600-C002
ATIONS
Tag system f
Bamboo/woo
LPG cylinde
Good House
flammable m
Safety awar
competitions
Deployment
at work site.
Display of L
Testing certi
Provision &
material stor
Display of em
For work in
motors or ele
For confined
ntervals.
Checking &
cutting set et
5. Contracto
A. Contracto& other including
B. Contractoworkers.
C. Contracto
nurse & This eme
CHNICAL CONBOP CIVIL
P STAGE‐IV (1
TECHNICAC
for erection &
oden Scaffol
rs not allow
keeping. Sep
material.
eness progr
s, talks etc.
of Safety S
ist of First A
ficates for li
& maintenan
es.
mergency te
n confined sp
ectric tools w
d space ent
tag of equip
tc. by superv
or shall ensu
or has to maultra-mode
g Ambulance
or has to en
or has to enambulance
ergency set-u
NDITIONS OF WORKS PAC1X 500 MW)
Section A: AL CONDITION
CONTRACT
& use of sca
lding materia
ed for gas cu
parate waste
rams for wo
upervisors f
Aid trained p
fting tools &
nce of fire
lephone num
pace use 24
with max. 24
try Gas test
pment like gr
visors before
ure following
aintain contaern medical e.
nsure pre-em
nsure that adare availab
up should inc
CONTRACTCKAGE AT UNCHAHA
NS OF DORevPag
affoldings.
al not allowe
utting.
e bins to be u
orkers by d
for every 25
persons.
& tackle.
extinguishe
mbers at vari
4 V lamp fi
4 V.
t must be
rinding mac
e use.
g:
act with locfacilities r
mployment m
dequate Firsle at work clude, but no
AR
OC. NO.: NBPPLv. No.: ge 28 of 36
ed.
used for flam
display of b
50 workers a
ers at const
ious location
itting & use
done before
hine, weldin
cal hospital hrequired du
medical chec
st Aid facilisite for emeot limited to
L-004-302-P4C-A
mmable & n
boards, post
and part ther
truction site
ns.
e tools with
e & at regu
ng machine,
having scanuring emerge
ck for all sta
ities with trergency pur
o, followingA-001
non-
ters,
reof
e &
air
ular
gas
nning ency
aff &
ained rpose.
Page No.: N 30 of 38
BHEL SPEC Rev. No.: DTECHNICA
C. NO. :PE-TS-4Dated :
AL SPECIFICA
6
7
8
TEC
FGUTP
401-600-C002
ATIONS
Male n Oxyge Breath Eye w Stretch Traum Medic
6. The Contor his agobservancompensrequirem(EIC).
7. The amoContractothe safetybe final a
8. The coAccounta
(a) The age ihavebearsubsfami
(b) The abid
(c) The stipuAbo
(d) The and failu
(e) The (Reg
(f) The Wag
CHNICAL CONBOP CIVIL
P STAGE‐IV (1
TECHNICAC
nurse (in shien set up hing apparatu
wash facilityher
ma blanket cines
tractor shall gents or wornce of the ation for inj
ments will res
unt towards or. The amouy activities aand binding o
ntractor shability;
contractor sin pursuant te been engagring his edustantiate appily enabling contractor
de by abolitiocontractor
ulated in thlition) Act 1Contractor shall be li
ure in meetinContractor
gulation & AContractor s
ges Act 1948
NDITIONS OF WORKS PAC1X 500 MW)
Section A: AL CONDITION
CONTRACT
ifts)
us
be fully resprkmen’s negsafety requ
juries. It masult in penal
penalties wunt so collecat site. The on the Contr
hall compl
shall not empto ILO convged , the Coucation expepropriate edu
to bear the cshall not en
on of Bondedshall main
he Contract 1970. shall abide iable for D
ng with relevshall abide
Abolition) Acshall abide b8, payment o
CONTRACTCKAGE AT UNCHAHA
NS OF DORevPag
ponsible forgligence or cuirements aay be noted
action as de
will be deduccted above wdecision of
ractor.
ly with f
mploy any emvention. If anntractor shaenditure whucation or emchild educatingage Forced Labour Sy
ntain Healtht and Contr
by UN conDiscriminatiovant requireme the requict, 1970 for by the statutoof Wages Ac
AR
OC. NO.: NBPPLv. No.: ge 29 of 36
r accidents ccarelessness
and shall bthat non-comecided by En
cted from runwill be utilizf EMPLOYE
following
mployee lessny child laboall be levied hich will inmploy any ion expendited/Bonded Lystem (Abolih & safety ract Labour
nvention w.ron/Corporal ments. irement of working houory requiremct 1936.
L-004-302-P4C-A
caused due tos in regard tbe liable tompliance to ngineer In ch
nning bills oed for suppo
ER on above
towards S
than 15 yeaour were fouwith expens
nclude stipenother membture. Labour and ition) Act, 1
requiremenr (Regulatio
r.t Human Rpunishmen
Contract Laurs.
ment of Mini
A-001
o him to the o pay
HSE harge
of the orting e will
Social
ars of und to ses of nd to ber of
shall 976. nt as on &
Rights nt for
abour
imum
Page No.: N 31 of 38
BHEL SPEC Rev. No.: DTECHNICA
6.22
C. NO. :PE-TS-4Dated :
AL SPECIFICA
Disc
1
2
3
4
TEC
FGUTP
401-600-C002
ATIONS
(g) The & w
crepancies A
1. The seveexplanatopreferencto scale a
2. In case respect tterms of order of and GCC(a) Tech
SectiSectiSecti
(b) Techspeci
(c) Spec(d) Tend
(e) Gen
3. If there aforming deciding
4. Any erroomissionfrom the therein aobligatio
CHNICAL CONBOP CIVIL
P STAGE‐IV (1
TECHNICAC
Contractor sworkers.
And Adjustm
eral documenory of onece to small sand special c
of discrepanto any item conditions, preference w
C being the lehnical Specifion-C(Speciion-B(BOQ)ion-D(Generhnical condifications)
cial Conditioder Drawingeral conditio
are varying part of the authority wi
or in descrn therefrom s
execution according tons under the
NDITIONS OF WORKS PAC1X 500 MW)
Section A: AL CONDITION
CONTRACT
shall arrange
ment Of Err
nts forming e another, scale drawin
conditions in
ncies betwedescription
the documewithin( SCCeast preferrefications (TSfic Technica) ral Technicaditions of
ons of Contras
ons of contra
or conflictincontract, th
ith regard to
ription, quashall not vit of the who
o the drawine contract.
CONTRACTCKAGE AT UNCHAHA
NS OF DORevPag
e potable dri
rors
the Contracdetailed dr
ngs and figun preference
een the diffen, quantity, ent should bC being the med documentS) : al requireme
al specificaticontract
act (SCC)
act (GCC)
ng provisionhe Engineer o the docume
antity in sctiate the conole or any
ngs and spec
AR
OC. NO.: NBPPLv. No.: ge 30 of 36
inking water
ct are to be rawings beures dimensito general c
ferent tenderpayment tee considered
most preferrt):-
ents)
ion) (Section-A
ns made in ar In charge(Eent.
chedule of ntract or rele
part of the cifications o
L-004-302-P4C-A
r to its emplo
taken as mueing followions in prefeonditions.
r documentsrms and or d in the folled/final doc
of Tech
any one docEIC) shall b
quantities oease the cont
works comor from any
A-001
oyees
utually wed in ference
s with other
lowing ument
hnical
ument be the
or any tractor
mprised of his
Page No.: N 32 of 38
BH RTE
SL
HEL SPEC. NO. :Pev. No.: Dated ECHNICAL SPEC
COL NO. NA
1 InitCon
2 ShrAut
3 Abr
4 Aggtest
5 Aggtest
6 Flak
7 Elo
8 Bulbulk
9 Con
10 Cemcast
11 Co
12 Wo
13 Speagg
14 Cemvibr
PE‐TS‐401‐600‐C: IFICATIONS
ONCRETE TAME OF TEtial & final snsistency of rinkage of to Clave Tes
rasion value
gregate Impt
gregate crust
kiness index
ngation Indelk density, king appratu
ncrete Comp
ment motting
oncrete Cube
orkability of
ecific gragregates ment morrating
TECM
FGUTP
C001
LIST OF E
TESTING EEST
etting time, cement cement ,
st
test
pact value
shing value
x
ex voids and
us
pressive test
tor cube
e casting
f concrete
avity of
rtor cube
CHNICAL CONMAIN PLANT CPP STAGE‐IV (
TECHNICA
EQUIPMEN
EQUIPMENNAME OVicat Apppot Le ChatAuto ClavLos Anglemachine Aggregatetesting macounter
Crushing v
ThicknessmeasuringElongation
Measuring
Digital Testing MKN capaci
Mortor Cu
Concrete C
Slump con
Pycnomete
Motorisedmachine fo
NDITIONS OFCIVIL WORKS(1X 500 MW)
Section A:AL CONDITIONS
ANNEXURE‐A
ANNEXURNTS FOR C
NT F EQUIPMparatus with
telier's appve Equipmenes Abrasion t
e Impact achine with
value appara
gauge g flakiness inn guage
g cylinders
ComprMachine with
ity.
ube mould
Cube Mould
ne
er
d vibfor cement te
F CONTRACTS PACKAGE ) AT UNCHAH
OF CONTRACTA
RE- A IVIL SITE
MENT SIZh desk Sta
paratus nt Sta
testing Sta
value h blow Sta
atus Sta
for ndex Sta
Sta3, cyl
ressive h 2000 200
70.mindes
d
15020 conmajactStanos
Sta
bration esting Sta
HAR
DOC. NO.: NBNo.: Page 31 of 36
LABORAT
ZE OF EQI
andard
andard
andard
andard
andard
andard
andard 5,10 &
linders
00KN capac
.6 x 70.6 x nimum 0sired. 0x150x150m
sets nsidering Tajor cotivity. andard, at s.
andard, atlea
andard
BPPL‐4‐301‐P4C
6
TORY
IPMENT
15 liters
city
70.6 mm, 06 sets
mm, min. desired
TG Raft oncereting
least 04
ast 02 nos.
C‐M‐001 Rev.
IS REF.
IS 5513
IS 5514
IS 2386
IS 9377
IS 2386
IS 2386
IS 2386
IS 2505
IS 10086
IS 10086
IS 456
IS 383
IS 4031
Page No.: N 33 of 38
BH RTE
HEL SPEC. NO. :Pev. No.: Dated ECHNICAL SPEC
Soi1 Liq
2 Cor
3 Pro
4 Mo
Pr
1 Ho
2 Ele
3 Ph
4 Th
5 Po(Co
15 CoanaRoa
16 Finana
17 Seiv18 Silt
19 Ulttest
PE‐TS‐401‐600‐C: IFICATIONS
il Testing Equid limit tes
re Cutter tes
octor density
oisture Conte
ocess Contr
ot air oven
ectronic bala
ysical balan
hermometer
ker Thermomoncrete Roa
ourse aggregalysis (Conad Works)
e aggregaalysis
ve Shaker t content chetrasonic pult
TECM
FGUTP
C001
quipment (Lst
st
y test
ent
rol Accessor
ance
ce
meter d)
gate Sieve ncrete &
ate sieve
eck lse velocity
CHNICAL CONMAIN PLANT CPP STAGE‐IV (
TECHNICA
Leveling & Liquid
core cu
Std proapparat
Rapid m
ries Temperto 300°
3 nos
5 kg capTemper150° C Temper50° C &
Sieve set
Sieve set
MotorizedSand silt c
UPV appa
NDITIONS OFCIVIL WORKS(1X 500 MW)
Section A:AL CONDITIONS
ANNEXURE‐A
Grading) limit appara
utter apparatu
octor Compatus
moisture me
rature range C
pacity rature range
rature range & 150° C
d Sieve shakecontent beak
aratus for con
F CONTRACTS PACKAGE ) AT UNCHAH
OF CONTRACTA
atus St
us Rco
action St
eter Stno
50° C 60(m6050W
0° C to D
0° C to 02
450Siz75 40 12.mm200siev2.3mic15075 cov
er Mfker Sta
ncrete Sta
HAR
DOC. NO.: NBNo.: Page 32 of 36
tandard Rammer, 6 noore cutter mo
tandard
tandard, at leos.
00x600x600min.size) 00gx0.01g, 10 kg
Weights upto
Digital
2 nos each re
0mm dia Gze: 125 mmmm, 63 mmmm, 20 mm
.5 mm, 10 mm, Pan and c0 mm dives; Size 4
36 mm, 1.18cron, 300 0 micron, 75
micron, ver fg. Catalogueandard
andard
BPPL‐4‐301‐P4C
6
os of std ould, dolly
east 04
0mm
10g and
5 kg
equired
GI Frames , 90 mm,
m, 53 mm, m, 16 mm, mm, 4.75 over ia Brass 4.75 mm, 8 mm 600
micron, 5 micron, Pan and
e
C‐M‐001 Rev.
IS 2720
IS 2720
IS 2720
IS 2720
IS 383
IS 383
Page No.: N 34 of 38
BH RTE
HEL SPEC. NO. :Pev. No.: Dated ECHNICAL SPEC
6 Me
7 Ga
8 Sp
9 Sta10 Ve11 Dig12 Dig
13 Digme
14 GI
15 Ele
16 Re
17 Scr
18
Digmeconme
*The abo
*The depimplemen
* Any adany extra
PE‐TS‐401‐600‐C: IFICATIONS
easuring jars
auging trowl
atula
ainless steel ernier calipergital pH metgital micromgital paint theter for steel
tray
ectric morter
ebound hamm
rew Gauge
gital paint theter for masancrete paintieasurement
ove list of eq
ployment of ntation sche
dditional equa cost to NBP
TECM
FGUTP
C001
s
ers
scoop rs ter
meter hickness
r mixer
mer test
hickness anory/ ing
quipment is m
equipment’sdule.
uipment requPPL
CHNICAL CONMAIN PLANT CPP STAGE‐IV (
TECHNICA
2 nos se
4 nos
2 nos ea
2 nos ea2 nos ea01 nos 01 no
02 nos.
02 nos.
01 no
01 no
02 nos.
02 nos.
minimum/ te
s shall be ma
uired shall be
NDITIONS OFCIVIL WORKS(1X 500 MW)
Section A:AL CONDITIONS
ANNEXURE‐A
et of each siz
ach size
ach ach
each
entative.
ade as per ac
e deployed b
F CONTRACTS PACKAGE ) AT UNCHAH
OF CONTRACTA
ze 10&10w10ww2 12.00.
50
6045300.Dha0.co
15
ctual require
by bidder as
HAR
DOC. NO.: NBNo.: Page 33 of 36
00ml, 200ml& 1000 ml
00mm & 200with wooden
00mm & 200with long bladwooden handl
kg and 5 kg2 and 6" Siz
01 mm least .01 mm least
00 micron R
00x450x50m50x300x40m00x250x40m.25 CUM ca
Digital Rebouammer .1 mm-10mmount 0.05
50 micron ra
ement at site
s per site req
BPPL‐4‐301‐P4C
6
l, 500ml
0 mm handle 0 mm de le
g es " count t count
Range
mm, mm, mm apacity und
m, Least
ange
to meet proj
quirement wi
C‐M‐001 Rev.
IS 13311
ject
ithout
Page No.: N 35 of 38
BHEL SPEC. Rev. No.: DTECHNICAL
1. B2. T3. P4. A5. C6. R7. E8. D9. P10. D11. T
p12. C
m13. C
u14.
15. S16. D17. 18. M
S19. P20. V21. V22. C23. E24. T25. C26. A
s27. D28. T
w
NO. :PE‐TS‐401‐Dated : SPECIFICATION
INDICAT
Batch mixinTransit mixePre-mix planArrangemenConcrete puRoad auto pExcavator (MDe-wateringPay Loader Dumpers/TrTruck mounplacing boomConcrete cutmake) Concrete corupto 75mm 10 HP subm1040+ of KiSelf-primingDozer. 12 / 20mm tMS scaffoldSystem Power driveVibromax (eVibro compaCompressionElectric winTheodolite 1Concrete cubAdequate nosite Drinking waTruck mounwith sprinkle
TEC
FGUTP
‐600‐C002
S
IVE LIST O
Majng plant (Miner (Minimumnt nt for controlumps (Minimaver Minimum 1 g pumps (ele
rippers nted concretem minimum tting power
re Cutting mdia along wi
mersible monirloskar or eqg dewatering
thick Ply shuding pipe / A
n earth rammearth compacactor/ plate cn testing ma
nch with buil1 second accbe moulds o. of small tr
ater tank – 50nted water taner arrangem
CHNICAL CONBOP CIVIL
P STAGE‐IV (1
TECHNICAL CA
ANNOF T&P TO
jor T&P itemnimum 30 cum 5 cum/hr c
lled blastingmum 30 CUM
CUM capacectrical & sta
e mixer cum 40 m hightools (DD2E
machine for dith diamond
no-block elecquivalent) g pump 2 HP
uttering boarAcrow Pipe P
mer cter) compactor –
achine (200 Tding hoist
curacy
rucks 2T/5T
000 lit. nk (minimument.
NDITIONS OF WORKS PAC1X 500 MW)
Section A: ONDITIONS OF CANNEXURE –B
NEXURE –BO BE ARRA
ms um/hr capacicapacity)
g including cM capacity)
city) and by diesel
pump along
E of HILTI/B
drilling in cobits
ctric pump (K
P (diesel/ ele
rd (4500 sqmPreferably Cu
– drum widthT cap)
for moveme
m 5000 lit) C
CONTRACTCKAGE AT UNCHAHA
CONTRACT DORePa
B ANGED BY
ity)
ompressor
l)
gwith
BOSCH
oncrete
KOS-
ectric)
m) up Lock
h 750mm
ent within
Capacity
AR
OC. NO.: NBPPLev. No.: age 34 of 36
Y CONTRA
Qty. to be
0
As per si
10 (10
30
As per si
‐004‐302‐P4C‐A
ACTOR
e deployed(n2 4 1
02 Sets 2
ite requirem3
HP to 50HP2
10 1
1
1
1
2 1
0,000 RM
4 1 2 1 3 1
80 ite requirem
2 1
A‐001
nos.)
ment
P)
ment
Page No.: N 36 of 38
BHEL SPEC. Rev. No.: DTECHNICAL
29. 30. C
31. C32. C33. S34. E35. H36. P37. E38. M39. W40. T
b41. S
to
42. J43. P44. P45. U46. S47. M48. D49. H50. M51. H52. S53. L54. M55. R56. S57. P
SDCWF
NO. :PE‐TS‐401‐Dated : SPECIFICATION
125KVA EleConcrete vib
Crawler mouCrawler mouSumitomo cElec. GantryHyd. Crane/Passenger cuElectro hyd.Magnetic baWelding genTorque tightbolt tighteniSufficient qutop of each eof columns. Jack hammePower winchPower winchUltra-sonogrSubmerged aMIG/CO2 wDC Arc welHoisting eqpMechanizedHeavy plate Shearing maLathes Milling macRotary HydrSlip Form ShPortable fireSoda acid Dry chemicaCO2 Water & sanFire hose wi
TEC
FGUTP
‐600‐C002
S
ectric Generbrator with a
unted Crane unted Crane rane or equi
y crane(40 M/Escort/Tata um goods lif Pipe bend m
ase drill macnerator (320 tening m/c. (ng) uantity of steerected colum
ers/pavementh – 2T/3T/5Th – 10T/15Traphy testingarc welding
welding machding rectifiept.
d modular unbending ma
achines
chines raulic Rig huttering
e extinguishe
al powder
nd bucket (4 ith nozzle (5
CHNICAL CONBOP CIVIL
P STAGE‐IV (1
TECHNICAL CA
rator adequate nee
(75 MT cap100 MT valent Capa
MT) P&H320 or
ft machine hine (All CuAmp.)
(2 no. Capac
eel ladders fomn to be req
t breakers. T for structu
T for structurg machine fomachine hine
er
nits of Scaffoachines
ers as below
buckets in o0 M length)
NDITIONS OF WORKS PAC1X 500 MW)
Section A: ONDITIONS OF CANNEXURE –B
edle
pacity)
city- 250 MT
equivalent
ut)
city up to 30
for approach quired during
ural erectionral erection or structural
olding and sh
:
one stand)
CONTRACTCKAGE AT UNCHAHA
CONTRACT DORePa
T
dia HSFG
up to the g erection
work.
huttering
AR
OC. NO.: NBPPLev. No.: age 35 of 36
(2-diese
14T
As per si
‐004‐302‐P4C‐A
1 7
l & 5- electr4 1 1 3
T-2 & 8T-3 1 2 4
40 4
2
2 5 2 1 2
10 6 8
ite requirem2 2 2 2 1
01 set
10 sets 10 sets 5 sets 5 sets 4 sets
A‐001
ric)
ment
Page No.: N 37 of 38
BHEL SPEC. Rev. No.: DTECHNICAL
*The abo
*The depimplemen
* Any adany extra
NO. :PE‐TS‐401‐Dated : SPECIFICATION
ove deploym
ployment of ntation sche
dditional equa cost to NBP
TEC
FGUTP
‐600‐C002
S
ment is minim
T&P shall bdule.
uipment requPPL.
CHNICAL CONBOP CIVIL
P STAGE‐IV (1
TECHNICAL CA
mum/tentativ
be made as p
uired shall be
NDITIONS OF WORKS PAC1X 500 MW)
Section A: ONDITIONS OF CANNEXURE –B
ve.
per actual req
e deployed b
CONTRACTCKAGE AT UNCHAHA
CONTRACT DORePa
quirement at
by bidder as
AR
OC. NO.: NBPPLev. No.: age 36 of 36
t site to meet
per site requ
‐004‐302‐P4C‐A
t project
uirement wit
A‐001
thout
Page No.: N 38 of 38