Moffett Groundwater UpdateMay 15, 2008
Julie Crosby-BrooksRemedial Project Manager
2
Presentation OverviewPresentation Overview
• Base-wide Groundwater Monitoring – Water Level Measurements– Groundwater Sampling
• Site 28– WATS Overview– Coordination with MEW Companies and NASA– Path Forward
• Site 26– EATS Overview– EATS Technical Memorandum– Path Forward
3
Introduction Introduction –– Regional Regional Location MapLocation Map
4
Introduction Introduction –– Plan View of Plan View of Regional PlumeRegional Plume
5
Moffett AquifersMoffett Aquifers
Approximate Depths of Moffett Aquifers
• Upper A-Aquifer: 0 - 35 Feet Below Ground Surface (BGS)
• Lower A-Aquifer: 35 – 55 Feet BGS
• B Aquifer: 55 – 160 Feet BGS
• C Aquifer: 160 – 240 Feet BGS
• Deep Aquifer: Greater than 240 Feet BGS
6
Introduction Introduction –– AquifersAquifers
7
Basewide GW Program Basewide GW Program ––Groundwater ElevationsGroundwater Elevations
Groundwater Elevation Measurements• Joint Effort with Middlefield-Ellis-Whisman (MEW) Companies and NASA• Water Levels Measured in March and November • Results are Compiled and Evaluated in Annual Groundwater Reports
– 2007 Annual Groundwater Report Available in June 2008• Upper and Lower A-Aquifer Wells and B-Aquifer Wells
________________________
One Day Event – Twice a Year
1000+ Total Water Level Measurements
400+ Water Level MeasurementsCollected by Navy
Approximately 20 Navy Field Crews
_______________________
8
Basewide GW Program Basewide GW Program ––2006 Water Levels2006 Water Levels
9
Basewide GW Program Basewide GW Program ––Groundwater SamplingGroundwater Sampling
Groundwater Sampling • Joint Effort with MEW Companies and NASA • Sampling Conducted in November / December Timeframe • Results are Compiled and Evaluated in Annual Groundwater Reports
– 2007 Annual Groundwater Report Available in June 2008• Upper and Lower A-Aquifer Wells and B-Aquifer Wells_______________________600+ Wells Sampled North of
Highway 101
Navy Samples Approximately 125 of the Wells
Volatile Organic Compounds (VOCs)
Dissolved Metals & Total Petroleum Hydrocarbons (TPH) - Every 5
Years
_______________________
10
Basewide GW Program Basewide GW Program –– 2006 2006 Annual Report ConclusionsAnnual Report Conclusions
Site 28 - WATS• Groundwater Consistently Flows to the North• Dissolved VOCs Continue to Flow onto Moffett
Site 26 - EATS• Groundwater Consistently Flows to the North• VOC Plume Stable – No Movement or Shape Change
11
Site 28 Site 28 –– IntroductionIntroduction
Site 28 - Introduction
• Located West of the Runways
• Contamination is from Navy Sources and Regional Plume
• Includes West-Side Aquifers Treatment System – WATS
12
Site 28 Site 28 –– WATS WellsWATS Wells
N
13
Site 28 Site 28 –– WATS OverviewWATS Overview
WATS is a Groundwater Pump and Treat System
• Began Operating in 1998 • Complies with Requirements in the MEW Study Area Record of Decision
(ROD)– MEW ROD Finalized in 1989– Navy Adopted MEW ROD in 1993
• Six Upper A-aquifer and Three Lower A-aquifer Extraction Wells• Treats Groundwater Using Advanced Oxidation Process and Granular
Activated Carbon• Treated Water is Discharged to the Eastern Diked Marsh and Stormwater
Retention Pond (Northern Moffett Boundary)– Discharged per the Requirements of the National Pollutant Discharge
Elimination System (NPDES) Permit– All Discharge Water has been Compliant with NPDES Requirements
14
Site 28 Site 28 –– WATSWATS
15
Site 28 Site 28 –– WATS Operation DataWATS Operation Data
2007 Operation Data
• WATS Operational 98.9% of Time• Treated 34,532,488 Gallons of Extracted Groundwater• Removed 378 Pounds VOCs• Annual O&M cost is approx $760,644 or $2,012/pound
Lifetime Operation Data
• Treated 304,302,868 Gallons of Extracted Groundwater
• Removed 3,997 Pounds VOCs
16
Site 28 Site 28 –– Coordination with Coordination with MEW CompaniesMEW Companies
Currently Partnering with MEW Companies to Prepare Site-wide Focused Feasibility Study (FFS) and Technical Impracticability (TI) Evaluation
• Evaluates Effectiveness of the Current Remedy• Evaluates and Compares Alternatives for Site-Wide Groundwater Cleanup
Submitted Volume I (Sections 1 through 5) to EPA on April 14, 2008
17
Site 26 Site 26 –– IntroductionIntroduction
Site 26 - Introduction• Located East of the Runways• Contamination is from Navy Sources Only (Not Part of Regional Plume)• Includes East-Side Aquifer Treatment System – EATS
18
Site 26 Site 26 –– EATS Overview & EATS Overview & Operation DataOperation Data
East-Side Aquifer Treatment System - EATS• Operated from January 1999 Through July 2003• Five Upper A-Aquifer Extraction Wells • Treats Groundwater Using an Air Stripper and Granular Activated Carbon
EATS Lifetime Operation Data• Removed 67 Million Gallons of Groundwater• Approximately 23.6 Pounds VOCs
EATS Taken Off-Line in 2003 to Evaluate:• Plume Stability• Chemical of Concern Rebound• Natural Attenuation• Application of Hydrogen Release Compound® (HRC)
19
Site 26 Site 26 –– EATSEATS
20
Site 26 Draft Technical Site 26 Draft Technical MemorandumMemorandum
• Reviewed Site Hydrogeology
• In Depth Evaluation of Contamination
• Evaluation of Remedial Alternatives
Sand Thickness Evaluation
21
Site 26 Draft Tech Memo Site 26 Draft Tech Memo ––Hydrogeology EvaluationHydrogeology Evaluation
In Depth Evaluation of Contamination
• Low Concentration • Plume Contracts with Depth• Residual Limited Contamination Remains in Fine-
Grained Soils
22
Site 26 Draft Tech Memo Site 26 Draft Tech Memo –– Remedial Remedial AlternativesAlternatives
Evaluated for Implementabilty and Effectiveness
Optimized Pump and Treat System
Air Sparging / Soil Vapor Extraction
Dual Phase Extraction
Substrate Enhanced Biostimulation
Bioaugmentation
Micro-Scale Zero Valent Iron –Nanoscale Zero Valent Iron
Combination of Biotic and Abiotic Treatment
Phytoremediation
Monitored Natural Attenuation
In-Situ Chemical Oxidation
In-Situ Thermal Treatment
23
Site 26 Draft Tech Memo Site 26 Draft Tech Memo –– Remedial Remedial AlternativesAlternatives
Remedial Alternatives that are Effective and Implementable Screened Out Based on Cost
Micro-Scale Zero Valent Iron – $40 Million
Nanoscale Zero Valent Iron - $46 Million
Combination of Biotic and Abiotic Treatment - $13 to $14 Million
24
Site 26 Draft Tech MemoSite 26 Draft Tech Memo
Site 26 Technical Memorandum Conclusions• No Remedial Alternative can be Implemented Without Inordinate Costs
– Complex Site Hydrogeology • Recommend Evaluating Technical Impracticability Waiver
Navy Will Coordinate with Regulatory Agencies to Develop Path Forward
25
Summary Summary –– Moffett Moffett Groundwater ProgramGroundwater Program
Moffett Groundwater Program Path Forward
• Continue Groundwater Sampling and Water Level Measurements– Next Groundwater Sampling Occurs in November / December 2008
• Continue to Operate Pump and Treat System at WATS• Continue Working with MEW Companies to Finalize FFS• Work with Regulatory Agencies to Determine Path Forward at EATS
26
Questions