Navgathi-New Shipbuilding Project Management

download Navgathi-New Shipbuilding Project Management

of 17

Transcript of Navgathi-New Shipbuilding Project Management

NEW SHIPBUILDING PROJECT MANAGEMENT Navgathi Marine Design & Constructions Pvt. Ltd. ABOUT US Three years young and growing fast Client interest as a primar y driving force Handling prestigious projects like VLOO Blend of youth and experience Focus on developing innovative solutions WHAT WE OFFER Concept Design of Ships Shipyard Assessment Contract Specification Analysis Plan Approval New Shipbuilding Super vision CONCEPT DESIGN OF SHIPS Our Design team can conceptualize Clients ideas to a design for initial discussions SHIPYARD ASSESSMENT Analysis of Shipyard facilities, Quality standards, Track record CONTRACT SPECIFICATION ANALYSIS Our Technical team, with New Shipbuilding and Operations experience, can provide a detailed review on the contact specification PLAN APPROVAL Key stage in Shipbuilding where it is possible to incorporate Client standards in to the project Our Technical team can execute approval process NEW SHIPBUILDING SUPERVISION Site team -Site manager, Hull, Coating, Machiner y, Electrical Naval Architects, Welding Engineers, M a r i n e E n g i n e e r s , C h e m i c a l Engineers, Electrical Engineers Nationality - Indian, Korean, or other nationality CURRENT PROJECTS Nine 320,000 TDW VLOO at Hyundai Heavy Industries, S.Korea Par ticulars Length 340 m Breadth 60 m Depth 31 m Draft 22.28 m Deadweight 320,000 T Speed 15.5 Kn Holds Five center hold (Ore/Oil) + Ten wing tanks (Oil) + Ten wing tanks (Ballast) Main Engine Hyundai War tsila 7RT-FLEX 82 T 31,640 KW @ 80 rpm Classification LR +100A1 ORE & OIL CARRIER, ESP, SHIPRIGHT (SDA,FDA, CM), LMC, UMS, IGS, COW, LI CURRENT PROJECTS Nine 320,000 TDW VLOO at Hyundai Heavy Industries, S.Korea CURRENT PROJECTS Four 37,000 TDW Bulk Carrier at Hyundai Mipo Dockyard, S.Korea Par ticulars Length 186 m Breadth 27.8 m Depth 15.6 m Draft 10.9 m Deadweight 37,000 T Speed 14.8 Kn Holds Five center hold (Bulk) + Ten wing tanks (Ballast) Main Engine Hyundai-B&W 6S46MC-C8 7,860 KW @ 129 rpm Classification DNV +1A1, Bulk Carrier ESP, BC-A, Grab [20], CSR, E0, BIS, TMON, BWM-E(S), DG-B CURRENT PROJECTS Four 37,000 TDW Bulk Carrier at Hyundai Mipo Dockyard, S.Korea CURRENT PROJECTS Two 260,000 TDW VLOC at Hyundai Heavy Industries, S.Korea Par ticulars Length 330 m Breadth 57 m Depth 26.5 m Draft 18.8 m Deadweight 2,63,000 T Speed 14.9 Kn Holds Five center hold (Bulk) + Ten wing tanks (Ballast) Main Engine Hyundai-War tsila 6RT FLEX 82T 27,120 KW @ 80 rpm Classification LR +100A1, ORE CARRIER, ESP, SHIP RIGHT (SDA, FDA, CM), ACS(B), L1, IWS, LMC, UMS CURRENT PROJECTS Two 260,000 TDW VLOC at Hyundai Heavy Industries, S.Korea PROJECTS STARTING NEXT YEAR Two 80,000 TDW Bulk Carrier at Sungdong Shipyard, S.Korea CONTACT Navgathi Marine Design & Constructions Pvt. E: [email protected] W: www.navgathi.com III/131, Kalamasser y, Kochi - 683104 India T: +91-484-6492607, F: +91-484-2543609 P.K. Mohammad E: [email protected] M: +91-9497793296 TMT Site Office, Hyundai Heavy Industries, Ulsan - 682792 S.Korea T: +82-52-250-6730 Sandith Thandasherr y E: [email protected] M: +82-1091450692