Natural Gas and Power Generation

14
Natural Gas and Power Generation Natural Gas and Power: A Look at Prices Carbon Legislation and Power Generation The future of Power Generation and the Natural Gas Industry Conclusions and Discussion

description

Natural Gas and Power Generation. Natural Gas and Power: A Look at Prices Carbon Legislation and Power Generation The future of Power Generation and the Natural Gas Industry Conclusions and Discussion. Natural Gas and Power Prices….a little volatility?. - PowerPoint PPT Presentation

Transcript of Natural Gas and Power Generation

Page 1: Natural Gas and Power Generation

Natural Gas and Power Generation

•Natural Gas and Power: A Look at Prices•Carbon Legislation and Power Generation•The future of Power Generation and the Natural Gas Industry•Conclusions and Discussion

Page 2: Natural Gas and Power Generation

2

Natural Gas and Power Prices….a little volatility?

Cinergy Hub vs. Henry Hub Prices

0

10

20

30

40

50

60

70

80

90

100

Jan-06 Jul-06 Jan-07 Jul-07 Jan-08 Jul-08 Jan-09 Jul-09 Jan-10 Jul-10 Jan-11 Jul-11

Time History

Cine

rgy

Hub

$/M

W

0.000

2.000

4.000

6.000

8.000

10.000

12.000

14.000

Henr

y Hu

b $/

MM

Btu

Historical Cinergy Hub

Futures Cinergy HubHistorical Henry Hub

Futures Henry Hub

Page 3: Natural Gas and Power Generation

3

Power Prices and Carbon Legislation: Can Other Fuels Displace Coal?

Midwest Power Generation Capacity

Coal55%

Natural Gas28%

Nuclear8%

Wind6%

Hydro3%

Coal

Natural Gas

Nuclear

Wind

Hydro

Page 4: Natural Gas and Power Generation

4

Coal Displacement….Recent Examples Nationally, PIRA estimates September 2009 coal generation

fell 11.8% from September 2008 While power demand only fell 2.6% during the same time

frame??? The disparity between the drop in coal generation and the

drop in power demand indicates a significant amount of “fuel switching” took place

Low cost of spot natural gas resulted in coal-to-natural gas switching, particularly in the Southeast

Wind generation also experienced and increased level of generation during this time frame.

Page 5: Natural Gas and Power Generation

5

Where Can Grid Operators Turn If Cost Increases Cause Coal Displacement?

Midwest Capacity Utilization

0.0

10.0

20.0

30.0

40.0

50.0

60.0

70.0

80.0

90.0

100.0

2004 2005 2006 2007 2008 2009

% U

tiliz

atio

n

Nuclear

CoalNatural Gas

WindHyrdro

Page 6: Natural Gas and Power Generation

6

Investors View on Carbon Legislation and the Future of Power Generation?

Midwest Planned Capacity Additions

0

1000

2000

3000

4000

5000

6000

7000

8000

9000

10000

2010 2011 2012 2013 2014 2015

Volu

me

(MW

s)

CoalNatural GasWind

Hydro

Page 7: Natural Gas and Power Generation

7

Noticeable Growth in Renewable Generation Planned

Midwest Generation Capacity - 2009 vs. 2015

-

10,000

20,000

30,000

40,000

50,000

60,000

70,000

80,000

90,000

Coal Gas Nuc Petro Wind Hydro

Volu

me

(MW

s)

Current Capacity

Projected 2015 Capacity

Page 8: Natural Gas and Power Generation

8

Power Generation After Carbon Legislation….. Carbon tax increases the operating cost of coal-fired

generation Can power price increases be contained by

displacement of coal-fired generation Nuclear licensing/permitting and investment issues are

successfully managed ?? Natural gas price volatility is contained ?? Wind generation becomes easier to forecast ?? Other renewable sources of generation become well

established ?? Energy efficiency programs reduce load growth??

Page 9: Natural Gas and Power Generation

9

Can Wind Generation Limit Cost of Generation Increases….or Magnify Volatility? Pros:

Significant growth of installed capacity by wind generators over the last 2 years and projected over the next 5 years….capacity will be there

Near zero incremental cost of generation Short development period (as short as 2 years)

Cons: Variable nature of wind - does not coincide with variations in electricity

demand Non-controllable and non-dispatchable practice by wind farms Sudden Changes in wind generation due to cut-off, wind gusts, etc. Minimum generation events magnified by wind generation production

Page 10: Natural Gas and Power Generation

10

Growth of Wind GenerationMidwest Monthly Average Wind Generation Volumes (MW)

0

500

1,000

1,500

2,000

2,500

3,000

Jan-08

Feb-08

Mar-08

Apr-08

May-08

Jun-08

Jul-08

Aug-08

Sep-08

Oct-08

Nov-08

Dec-08

Jan-09

Feb-09

Mar-09

Apr-09

May-09

Jun-09

Jul-09

Aug-09

Sep-09

Oct-09

Nov-09

Term

MW

Vol

ume

Page 11: Natural Gas and Power Generation

11

Can Wind Generation Displace Conventional Generation?

Midwest Hourly Wind Gen vs Load

1000

1050

1100

1150

1200

1250

1300

1350

1400

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Hour

Win

d Vo

lum

e (M

W)

50

55

60

65

70

75

80

Load

Vol

ume

(GW

)

Wind Gen Volume (MW)

Midwest Load Volume (GW)

Page 12: Natural Gas and Power Generation

12

Natural Gas-Fired Generation: Opportunity for Expansion?? Natural gas-fired generation is the 2nd largest capacity source

for Midwest power generation Capacity usage factors are currently much lower than coal and

nuclear generators Initial Investment costs and licensing/permitting are more

attractive than coal and nuclear Emissions are much lower than coal-fired generation Natural gas-fired generators are much easier to operate than

coal and nuclear generation Start-up and shut-down times are much better

providing much greater flexibility to grid managers

Page 13: Natural Gas and Power Generation

13

Natural Gas-Fired Generation: Challenges in Expansion?? Natural gas generators present non-standard

pipeline draws Operation flexibility leads grid managers to rely on natural

gas generators as power demand exceeds forecasts Grid managers reliance on natural gas-fired

generation to offset unpredictable wind generation trickles down to pipelines

Storage is essential to natural gas-fired generation owners…..more generation, more storage demand???

Page 14: Natural Gas and Power Generation

14

Time

Cents / kWh

Realignment of asset base, supply constraints through capacity shortages or transmission constraints

Price signals draw in new capacity (construction time-lag 2 -3 years)

Significant capacity additions

Increasing demand, retirements increase price volatility, postponed projects value potential increases

Conclusion: Can Prospect of Economic Recovery and Carbon Legislation Lead the Power Market Higher?

Credit & banking crisis cause economic contraction

Prospect of economic recovery and carbon legislation