1 Single Lane Roundabouts Geometric Design in Context -Urban versus Rural

Transcript of National Single Lane Roundabouts R Geometric Design in ... · PDF fileVehicle Entry Path...

Page 1: National Single Lane Roundabouts R Geometric Design in ... · PDF fileVehicle Entry Path • Determines the design speed of a roundabout ... 9Traverse thru entry, around central island,

1

Single Lane RoundaboutsGeometric Design in Context

-Urban versus Rural

National R

oundabout Conference 2005 D

RA

FTN

ational Roundabout C

onference 2005 DR

AFT

National R

oundabout Conference 2005 D

RA

FT

Page 2: National Single Lane Roundabouts R Geometric Design in ... · PDF fileVehicle Entry Path • Determines the design speed of a roundabout ... 9Traverse thru entry, around central island,

2

ICD

GEOMETRIC PARAMETERSAffecting Capacity

National R

oundabout Conference 2005 D

RA

FTN

ational Roundabout C

onference 2005 DR

AFT

National R

oundabout Conference 2005 D

RA

FT

Page 3: National Single Lane Roundabouts R Geometric Design in ... · PDF fileVehicle Entry Path • Determines the design speed of a roundabout ... 9Traverse thru entry, around central island,

3

Effective Geometry

V = Approach Road half width

E = Entry Width

L’ = Effective Flare Length

D = Inscribed Circle Diameter

R = Entry Radius

Phi = Entry Angle

National R

oundabout Conference 2005 D

RA

FTN

ational Roundabout C

onference 2005 DR

AFT

National R

oundabout Conference 2005 D

RA

FT

Page 4: National Single Lane Roundabouts R Geometric Design in ... · PDF fileVehicle Entry Path • Determines the design speed of a roundabout ... 9Traverse thru entry, around central island,

4

Empirical EvidenceN

ational Roundabout C

onference 2005 DR

AFT

National R

oundabout Conference 2005 D

RA

FTN

ational Roundabout C

onference 2005 DR

AFT

Page 5: National Single Lane Roundabouts R Geometric Design in ... · PDF fileVehicle Entry Path • Determines the design speed of a roundabout ... 9Traverse thru entry, around central island,

5

Empirical EvidenceN

ational Roundabout C

onference 2005 DR

AFT

National R

oundabout Conference 2005 D

RA

FTN

ational Roundabout C

onference 2005 DR

AFT

Page 6: National Single Lane Roundabouts R Geometric Design in ... · PDF fileVehicle Entry Path • Determines the design speed of a roundabout ... 9Traverse thru entry, around central island,

6

Empirical Evidence

Entry angle (phi)Gap models do not include phi, blind to effect

If designs uses large phi• Like R, the large loss in capacity not

predicted

• Large phi increase crashes into central island

• Uncomfortable for drivers, additional capacity reduction

Phi best between 200 – 350 on MLRs

National R

oundabout Conference 2005 D

RA

FTN

ational Roundabout C

onference 2005 DR

AFT

National R

oundabout Conference 2005 D

RA

FT

Page 7: National Single Lane Roundabouts R Geometric Design in ... · PDF fileVehicle Entry Path • Determines the design speed of a roundabout ... 9Traverse thru entry, around central island,

7

Entry Angle & Entry Radius

Tangent approaches:• Small entry angle

• Large entry radius

• Not much deflection

This can result in:– High capacity– Poor observance of yield

and potential for high speeds and entry-circulating crashes

National R

oundabout Conference 2005 D

RA

FTN

ational Roundabout C

onference 2005 DR

AFT

National R

oundabout Conference 2005 D

RA

FT

Page 8: National Single Lane Roundabouts R Geometric Design in ... · PDF fileVehicle Entry Path • Determines the design speed of a roundabout ... 9Traverse thru entry, around central island,

8

Entry Angle & Entry Radius

Perpendicular approaches:• Large entry angle

• Small entry radius

• Lots of deflection

Combined Net Effect:– Low capacity– Abrupt braking at entries

and potential for rear-end crashes (especially in high-speed locations)

National R

oundabout Conference 2005 D

RA

FTN

ational Roundabout C

onference 2005 DR

AFT

National R

oundabout Conference 2005 D

RA

FT

Page 9: National Single Lane Roundabouts R Geometric Design in ... · PDF fileVehicle Entry Path • Determines the design speed of a roundabout ... 9Traverse thru entry, around central island,

9

Geometric Parameters Affecting Safety

Geometric Parameters in the Predictive Relationship:

•Entry Path Curvature(Ce)•Entry Width (E)•Approach lane(s) width (v)•Angle between arms (phi)•Inscribed Circle (IC)•Diameter/Central Island Diameter (CI)

•(19 Others less significant e.g. sight distance to the left

National R

oundabout Conference 2005 D

RA

FTN

ational Roundabout C

onference 2005 DR

AFT

National R

oundabout Conference 2005 D

RA

FT

Page 10: National Single Lane Roundabouts R Geometric Design in ... · PDF fileVehicle Entry Path • Determines the design speed of a roundabout ... 9Traverse thru entry, around central island,

10

Safety Explicit in Design:

UK Graph of crashes versus EPC for Entry Deflection

EPC is a surrogate for entry angle and other speed related parameters

Optimum100’< EPC < 300’

National R

oundabout Conference 2005 D

RA

FTN

ational Roundabout C

onference 2005 DR

AFT

National R

oundabout Conference 2005 D

RA

FT

Page 11: National Single Lane Roundabouts R Geometric Design in ... · PDF fileVehicle Entry Path • Determines the design speed of a roundabout ... 9Traverse thru entry, around central island,

11

Vehicle Entry Path

• Determines the design speed of a roundabout• Fastest path allowed based on geometry is

drawn• Fastest path possible for a single vehicle

Absence of other traffic,

Ignore all lane markings

Traverse thru entry, around central island, out the exit

Fastest path is the thru movementCheck Right turns for skewed intersections

National R

oundabout Conference 2005 D

RA

FTN

ational Roundabout C

onference 2005 DR

AFT

National R

oundabout Conference 2005 D

RA

FT

Page 12: National Single Lane Roundabouts R Geometric Design in ... · PDF fileVehicle Entry Path • Determines the design speed of a roundabout ... 9Traverse thru entry, around central island,

12

Fastest Path Through a Single Lane Rdbt

5 feet5 ft off curbs

Curb Splitter IslandsPage 134

FHWA

5 ft off curbs

National R

oundabout Conference 2005 D

RA

FTN

ational Roundabout C

onference 2005 DR

AFT

National R

oundabout Conference 2005 D

RA

FT

Page 13: National Single Lane Roundabouts R Geometric Design in ... · PDF fileVehicle Entry Path • Determines the design speed of a roundabout ... 9Traverse thru entry, around central island,

13

Application of EPC requires assessment of traffic flows…

LARGEFLOW

SMALL CIRCULATING

FLOWS

Optimum entry safety depends on this combination

National R

oundabout Conference 2005 D

RA

FTN

ational Roundabout C

onference 2005 DR

AFT

National R

oundabout Conference 2005 D

RA

FT

Page 14: National Single Lane Roundabouts R Geometric Design in ... · PDF fileVehicle Entry Path • Determines the design speed of a roundabout ... 9Traverse thru entry, around central island,

14

A1bMatching the design to the context

Outside Truck Aprons?

•Same intersection•Different design•Very different operations

•Focus was peds./bikes •Required outside truck apron

Virtually no effect of tight radii

National R

oundabout Conference 2005 D

RA

FTN

ational Roundabout C

onference 2005 DR

AFT

National R

oundabout Conference 2005 D

RA

FT

Page 15: National Single Lane Roundabouts R Geometric Design in ... · PDF fileVehicle Entry Path • Determines the design speed of a roundabout ... 9Traverse thru entry, around central island,

Controlling entry speed•R1 should be used to control speed - Not entry angle

•PHI amongst other geometrics is simply a means to an end NOT the end itself – an outcome not a criteria.

•With a small PHI for improved capacity you can use other geometrics to compensate and get a small R1 so that speed is controlled.

National R

oundabout Conference 2005 D

RA

FTN

ational Roundabout C

onference 2005 DR

AFT

National R

oundabout Conference 2005 D

RA

FT

Page 16: National Single Lane Roundabouts R Geometric Design in ... · PDF fileVehicle Entry Path • Determines the design speed of a roundabout ... 9Traverse thru entry, around central island,

16

Entry Deflection Urban Case

40 km/h

20 km/h

Simple to draw – poor composition = POOR performance

National R

oundabout Conference 2005 D

RA

FTN

ational Roundabout C

onference 2005 DR

AFT

National R

oundabout Conference 2005 D

RA

FT

Page 17: National Single Lane Roundabouts R Geometric Design in ... · PDF fileVehicle Entry Path • Determines the design speed of a roundabout ... 9Traverse thru entry, around central island,

17

Entry Deflection with Roundabout

30 km/h

35 km/h

Complex to draw but expect optimal safety and efficiency

National R

oundabout Conference 2005 D

RA

FTN

ational Roundabout C

onference 2005 DR

AFT

National R

oundabout Conference 2005 D

RA

FT

Page 18: National Single Lane Roundabouts R Geometric Design in ... · PDF fileVehicle Entry Path • Determines the design speed of a roundabout ... 9Traverse thru entry, around central island,

18

DESIGN EXAMPLEOriginal – Re-design

More entry curvature

Flatter exit

National R

oundabout Conference 2005 D

RA

FTN

ational Roundabout C

onference 2005 DR

AFT

National R

oundabout Conference 2005 D

RA

FT

Page 19: National Single Lane Roundabouts R Geometric Design in ... · PDF fileVehicle Entry Path • Determines the design speed of a roundabout ... 9Traverse thru entry, around central island,

19

Rural Context Design Elements

•Provide a minimum SSD to the entry.

•Align approach roadways

•Set vertical profiles to make the central island conspicuous.

•Splitter islands should extend to initiate deceleration.

National R

oundabout Conference 2005 D

RA

FTN

ational Roundabout C

onference 2005 DR

AFT

National R

oundabout Conference 2005 D

RA

FT

Page 20: National Single Lane Roundabouts R Geometric Design in ... · PDF fileVehicle Entry Path • Determines the design speed of a roundabout ... 9Traverse thru entry, around central island,

20

Rural Context Design Elements

•Use landscaping on extended splitter islands and roadside to create a tunnel effect.

•Provide illumination in transition to the roundabout.

•Use signs and marking effectively to advise of the appropriate speed and path for drivers.

National R

oundabout Conference 2005 D

RA

FTN

ational Roundabout C

onference 2005 DR

AFT

National R

oundabout Conference 2005 D

RA

FT

Page 21: National Single Lane Roundabouts R Geometric Design in ... · PDF fileVehicle Entry Path • Determines the design speed of a roundabout ... 9Traverse thru entry, around central island,

21

Central Island Delineation

National R

oundabout Conference 2005 D

RA

FTN

ational Roundabout C

onference 2005 DR

AFT

National R

oundabout Conference 2005 D

RA

FT

Page 22: National Single Lane Roundabouts R Geometric Design in ... · PDF fileVehicle Entry Path • Determines the design speed of a roundabout ... 9Traverse thru entry, around central island,

22

Australian Researched Method of Achieving Speed Reduction National R

oundabout Conference 2005 D

RA

FTN

ational Roundabout C

onference 2005 DR

AFT

National R

oundabout Conference 2005 D

RA

FT

Page 23: National Single Lane Roundabouts R Geometric Design in ... · PDF fileVehicle Entry Path • Determines the design speed of a roundabout ... 9Traverse thru entry, around central island,

23

Speed Differential Alternative – FHWA Guide

National R

oundabout Conference 2005 D

RA

FTN

ational Roundabout C

onference 2005 DR

AFT

National R

oundabout Conference 2005 D

RA

FT

Page 24: National Single Lane Roundabouts R Geometric Design in ... · PDF fileVehicle Entry Path • Determines the design speed of a roundabout ... 9Traverse thru entry, around central island,

24

Speed Differential Alternatives for Rural DesignLong medians N

ational Roundabout C

onference 2005 DR

AFT

National R

oundabout Conference 2005 D

RA

FTN

ational Roundabout C

onference 2005 DR

AFT

Page 25: National Single Lane Roundabouts R Geometric Design in ... · PDF fileVehicle Entry Path • Determines the design speed of a roundabout ... 9Traverse thru entry, around central island,

25

• Safety:

– Transition between high-speed rural and low-speed urban environments

50mph

30mph

National R

oundabout Conference 2005 D

RA

FTN

ational Roundabout C

onference 2005 DR

AFT

National R

oundabout Conference 2005 D

RA

FT

Page 26: National Single Lane Roundabouts R Geometric Design in ... · PDF fileVehicle Entry Path • Determines the design speed of a roundabout ... 9Traverse thru entry, around central island,

26

Proof: Predicted Vs. Measured Speeds - Data CollectionN

ational Roundabout C

onference 2005 DR

AFT

National R

oundabout Conference 2005 D

RA

FTN

ational Roundabout C

onference 2005 DR

AFT

Page 27: National Single Lane Roundabouts R Geometric Design in ... · PDF fileVehicle Entry Path • Determines the design speed of a roundabout ... 9Traverse thru entry, around central island,

27

Speed StudiesN

ational Roundabout C

onference 2005 DR

AFT

National R

oundabout Conference 2005 D

RA

FTN

ational Roundabout C

onference 2005 DR

AFT

Page 28: National Single Lane Roundabouts R Geometric Design in ... · PDF fileVehicle Entry Path • Determines the design speed of a roundabout ... 9Traverse thru entry, around central island,

28

Additional Treatment of High Speed Entry

National R

oundabout Conference 2005 D

RA

FTN

ational Roundabout C

onference 2005 DR

AFT

National R

oundabout Conference 2005 D

RA

FT

Page 29: National Single Lane Roundabouts R Geometric Design in ... · PDF fileVehicle Entry Path • Determines the design speed of a roundabout ... 9Traverse thru entry, around central island,

29

Original SLR N

ational Roundabout C

onference 2005 DR

AFT

National R

oundabout Conference 2005 D

RA

FTN

ational Roundabout C

onference 2005 DR

AFT

Page 30: National Single Lane Roundabouts R Geometric Design in ... · PDF fileVehicle Entry Path • Determines the design speed of a roundabout ... 9Traverse thru entry, around central island,

30

Empirically Based Re-DesignN

ational Roundabout C

onference 2005 DR

AFT

National R

oundabout Conference 2005 D

RA

FTN

ational Roundabout C

onference 2005 DR

AFT

Page 31: National Single Lane Roundabouts R Geometric Design in ... · PDF fileVehicle Entry Path • Determines the design speed of a roundabout ... 9Traverse thru entry, around central island,

31

National R

oundabout Conference 2005 D

RA

FTN

ational Roundabout C

onference 2005 DR

AFT

National R

oundabout Conference 2005 D

RA

FT

Page 32: National Single Lane Roundabouts R Geometric Design in ... · PDF fileVehicle Entry Path • Determines the design speed of a roundabout ... 9Traverse thru entry, around central island,

32

Entry Path Curvature

Entry Curvature =Slow entry(R1 & R2)

Entry curvature = tangential entry

National R

oundabout Conference 2005 D

RA

FTN

ational Roundabout C

onference 2005 DR

AFT

National R

oundabout Conference 2005 D

RA

FT

Page 33: National Single Lane Roundabouts R Geometric Design in ... · PDF fileVehicle Entry Path • Determines the design speed of a roundabout ... 9Traverse thru entry, around central island,

33

Components (geometric elements) vs. Composition (functionality)

•The design isn’t functional unless it passes the test of the driver interface

•It’s not enough to have knowledge of the components

•Composition based on principles is what determines the functionality

•If you only focus on the components the final assembly may be totally overlooked

•Adhering to the manual using data, figures and tables does not guarantee a sound design.