National Resonance Group Dominique Daens. GM2 11/2/2010 The general objective of CoNeT: ▫ Update...

17
National Resonance Group Dominique Daens

Transcript of National Resonance Group Dominique Daens. GM2 11/2/2010 The general objective of CoNeT: ▫ Update...

National Resonance Group Dominique Daens

GM2 11/2/2010

• The general objective of CoNeT:▫ Update the knowledge and skills of existing employees in

Ethernet-based systems and related areas in the field of

Industrial Automation: Realtime Ethernet in an Industrial environment as

Input/Output fieldbus Industrial Ethernet as communication platform for vertical

integration between production and administration floor▫ produce independent training modules in Industrial

Ethernet based Network Systems

Objective CoNeT (Cooperative Network Training) (1)

2

2

GM2 11/2/2010

• The general aims of this project can be divided into five main areas:▫ To train automation engineers, maintenance engineers,

process workers and under- and postgraduates in modern network technology applied to control operations and automated solutions

▫ To develop hands-on training modules at different levels of complexity aimed at students and company employees

▫ To assemble mobile laboratories▫ To foment mobility between the companies, universities

and other organisations involved in the project▫ To develop the general, vocational and social skills of the

trainees and trainers involved.

Objective CoNeT (Cooperative Network Training) (2)

3

3

GM2 11/2/2010

• CML will be developed and assembled• After the project period, these boxes can be easily

multiplied• The equipment can be very easily extended, depending on

the local needs in future• For the local needs we need to have input of the NRG• Maybe, part of the equipment will be financed by the

participating companies.• The materials will be developed in English and edited by a

native speaker before the first test phase

Practical training CoNeT Mobile Labs (CML)

4

4

GM2 11/2/2010

• CML (=portable boxes equipped with industrial network devices) can be exchanged between the partners as the labs are small

• Laboratories can be brought to the companies where the engineers and technicians can be trained on the floor

• All Laboratories can be brought to one place for training (e.g. Intensive Programme (IP))

Why CoNeT Mobile Labs?

5

5

GM2 11/2/2010

• Some topics in industrial network systems have been identified as areas of need by the Consortium (GM1)▫ We translate these topics in training modules▫ Each of these modules stands alone, meaning that it

does not matter in which order they are followed by the participants of the training programme, as long as they have the right compentences to enroll in the module

▫ In GM1 per module a team leader and team members were assigned

Project position at this moment (1)

6

6

GM2 11/2/2010

• A questionnaire was sent to the industrial partners

interested in trainings in the field (= First Input)▫ Taking into account the comments from the needs▫ Industrial partners can become member of the national

resonance group ▫ The comments from the needs analysis will be taken into

account while tuning the outlines• Next Step: Local partner(s) organize a meeting with the

resonance group to discuss the needs (= Second Input)

Project position at this moment (2)

7

7

GM2 11/2/2010

• Each participating country will install a NRG • NRG adapt the content of the modules in accordance with the

need analysis ▫ provide input to course design ▫ discuss the subjects covered by the training programme, the

training materials and mobile laboratories created • NRG provide facilities for testing and evaluation • The ECTS and competence files will be discussed in the NRG

▫ competence files should reflect the industry’s needs, therefore, information should be obtained using the different NRG

▫ are the competences needed in the industry correctly covered?

Objectives National Resonance Group (NRG)

8

8

GM2 11/2/2010

• 1. Ethernet based IO systems• 2. Profinet on Siemens platform• 3. Profinet on Phoenix-Contact platform• 4. Beckhoff EtherCat• 5. Allen Bradley Ethernet IP• 6. Realtime processes• 7. Wireless

Proposal of modules

9

9

GM2 11/2/2010

• Objective: Basis principles (Theory) of ethernet based IO systems in a practical context

▫ Industrial Ethernet Based network standards▫ Basis principles of Ethernet and the difference between

an ‘Office LAN’ and an ‘Industrial LAN’▫ Switching, routing etc.▫ TCP/UDP /IP Items and text

Module 1: Ethernet based IO systems

10

10

Teamleader:Yildiz (Galip Cansever)

Members:AGH (Wojciech Grega)TEI Crete(Giorgos Papadourakis) FHD(Reinhard Langmann)ENOSAD (Sedat Ömeroglu)KdG (Dominique Daens) (reserve list)

GM2 11/2/2010

• Objective: Practical implementation of Profinet IO systems (multi vendor) on a Siemens PLC

▫ PLC: Simatic S7 (Simatic S7 Manager)▫ Implementation of Profinet IO (Phoenix Contact, Wago,

Beckhoff…) on Siemens PLC ▫ Profinet CBA▫ Study of different Gateways

Profinet/Profibus Profinet/Interbus Other

Module 2: Profinet on Siemens Platform

11

Teamleader:Rousse (Maria Gerasimova Popova, Antoaneta Dobreva))

Members:LIMTEC (Benny Siemons)FHD (Reinhard Langmann)ENOSAD (Sedat Ömeroglu) (reserve)

GM2 11/2/2010

• Objective: Practical implementation of Profinet IO systems (multi vendor) on a Phoenix Contact PLC▫ PLC: Phoenix Contact (PC Worx) ▫ Implementation of Profinet IO Siemens / Wago / Beckhoff …. in

PC Worx ▫ Profinet CBA???▫ Study of different Gateways

Profinet/Profibus Profinet/Interbus other

Module 3: Profinet on Phoenix Contact Platform

12

12

Teamleader:FHD (Reinhard Langmann)

Members:Yildiz (Galip Cansever)KdG (Dominique Daens)LIMTEC (Benny Siemons)Phoenix Contact (Antje Guese)

GM2 11/2/2010

• Objective: Practical implementation of EtherCat IO on a Beckhoff PLC▫ PLC: Beckhoff Controllers (TWIN CAT) ▫ Implementation of EtherCat IO (Beckhoff or other) in TWIN CAT▫ Study of different Gateways

EtherCat/Profibus EtherCat/Modbus TCP/IP other

Module 4: EtherCat on a TwinCat platform

13

13

Teamleader:LIMTEC (Benny Siemons)

Members:KdG (Dominique Daens)

GM2 11/2/2010

• Objective: Practical implementation of Ethernet IP Input Output on an Allen Bradley PLC ▫ Allen Bradley ▫ Implementation of Ethernet IP in Allen Bradley ▫ Study of different Gateways

EthernetIP/Device Net (Allen Bradley/Wago/Beckhoff) other

Module 5: Ethernet IP on Allen Bradley platform

14

14

Teamleader:AGH (Wojciech Grega)

Members:Industrial partner Poland???TEI Crete (Giorgos Papadourakis)??LIMTEC (Benny Siemons) (reserve)

GM2 11/2/2010

• Objective: Develop of little realtime processes in witch the several Ethernet IO and fieldbusses could be integrated Developing of practical exercises Processes will be connected to the PLC modules by using

several fieldbusses and Ethernet based IO by simple replacement of the fieldbus module.

Examples processes: Level Control, Temperature Control, mechatronics laboratory

models, pneumatic manipulators…

Module 6: Real Time processes

15

15

Teamleader:TEI Crete (Giorgos Papadourakis)

Members:AGH (Wojciech Grega)FHD (Reinhard Langmann)

GM2 11/2/2010

• Objective: Practical implementation of Wireless communication concepts in an industrial environment▫ Wireless Ethernet, Access Point, Access Client▫ Bluetooth based wireless▫ Security: WEP, WAP, MAC filters etc.▫ GPRS???

Module 7: Wireless Communication

16

16

Teamleader:KdG (Dominique Daens)

Members:TEI Crete (Giorgos Papadourakis)Phoenix Contact (Antje Guese)

GM2 11/2/2010

• As soon as the outlines of the modules are adapted to the requirements of the local industry the development of the training materials and the mobile laboratories can start

• The NRG collaborating with the academic partners will provide input to course design and content

• NRG provide facilities for testing and evaluation of the modules

• Each module will be tested and evaluated in work situations and feedback of the NRG will be incorporated into the materials

Conclusion