description

National Rental Affordability Scheme. National Rental Affordability Scheme. Shovel R eady round Round 5. Shovel Ready Rounds. Tender opens 18 April 2013 and will close on 22 May 2013 Projects must be substantially completed by 30 June 2014 and available for rent by December 2014 - PowerPoint PPT Presentation

Transcript of National Rental Affordability Scheme

Page 1: National Rental  Affordability Scheme

National Rental Affordability Scheme

Page 2: National Rental  Affordability Scheme

National Rental Affordability Scheme

• Shovel Ready round• Round 5

Page 3: National Rental  Affordability Scheme

Shovel Ready Rounds

• Tender opens 18 April 2013 and will close on 22 May 2013

• Projects must be substantially completed by 30 June 2014 and available for rent by December 2014

• Up to 500 will be incentives available

Page 4: National Rental  Affordability Scheme

Round 5• Tender opens 7 May 2013 and will close on 6 August 2013

• All projects are to be delivered by 30 June 2016

• State Government support still to be confirmed

• Quality proposals in high demand locations are important and may also allow for reallocation

Page 5: National Rental  Affordability Scheme

How to Apply• Application form and guidelines at www.fahcsia.gov.au/nras• State assessment criteria and guidelines at

www.housing.wa.gov.au

When completing your application please refer to both the Commonwealth and State websites.

Application and supporting documentation, including the States assessment tool, is to be lodged with the Commonwealth prior to the due date.

Page 6: National Rental  Affordability Scheme

Assessment• Assessments for both rounds will be carried out by the

Commonwealth and the State in parallel• The Commonwealth assessment criteria can be found

on the website - www.fahcsia.gov.au/nras • The State priority criteria will be listed on the Department

website along with a self assessment tool – www.housing.wa.gov.au

Page 7: National Rental  Affordability Scheme

Ranking Projects• Each project will be assessed against a scoring matrix

based on the State priority criteria

• This will enable the State to identify those projects it wishes to recommend to the Commonwealth

Page 8: National Rental  Affordability Scheme

State Priority Criteria1. Location (LGA)

2. Proximity to Activity Centres (Directions 2031)

3. Proximity to services

4. Dwelling configuration

5. Rent discount

6. Involvement of a Community Housing Provider

7. Other affordable housing initiatives within the project

Page 9: National Rental  Affordability Scheme

Location

• Scoring preference given to projects in local government areas with high demand for affordable housing, as listed on website

• Proponents will need to identify the specific address of the project to be delivered

INTENT:NRAS housing should be targeted to areas where there is a need for affordable housing by low to moderate income households.

Page 10: National Rental  Affordability Scheme

Proximity to Activity Centres (Directions 2031)

• Scoring preference will be given to those projects in close proximity to activity centres identified in Directions 2031 (some exclusions apply – see list on website)

INTENT:Well located NRAS housing will enable residents to actively participate in Perth’s future economic, social and community development.

Page 11: National Rental  Affordability Scheme

Proximity to ServicesINTENT:NRAS housing should be well located and provide low to moderate households with access to key services.

• Consistent with previous rounds• Scoring preference will apply to projects within

close proximity of key services:

Page 12: National Rental  Affordability Scheme

Dwelling Configuration

• Applicants will need to specify the proposed dwelling configuration and rationale

• Scoring preference will be based on: 1. evidence of demand for proposed housing type;

2. shortfall in supply of housing type; and

3. failure/inability of normal market to deliver.

INTENT:NRAS housing should help to fill the gaps in housing supply and positively contribute to the diversity of housing in local communities.

Page 13: National Rental  Affordability Scheme

Rental Discount

• Consistent with previous rounds• Scoring preference will apply to those projects

that provide rental discounts greater than 20%

INTENT:Wherever possible NRAS housing should maximise the affordability for residents

Page 14: National Rental  Affordability Scheme

Involvement of Community Housing Organisations (CHO)

• Consistent with previous rounds • Scoring preference will apply to projects that

involve a CHO

INTENT:While focused on creating new supply, State Government investment in NRAS housing supports our efforts to strengthen and diversify the affordable housing delivery system

Page 15: National Rental  Affordability Scheme

Other Affordable Housing Initiatives

• Scoring preference will be given to those projects that provide additional affordable housing opportunities

INTENT:NRAS housing should optimise the social benefits derived from Government investment

Page 16: National Rental  Affordability Scheme

Information and Enquiries• Detailed information and guidelines about the State assessment

criteria will be available on the Department website from 22 April 2013

• During the tender period questions should be directed in writing to [email protected]

• Additional information is also available on the FAHCSIA website www.fahcsia.gov.au/nras

• .

Page 17: National Rental  Affordability Scheme

Notification• State Assessments completed by:

• early June 2013 – Shovel Ready round• early September 2013 – Round 5

• Final decisions and notification to applicants will be provided by the Commonwealth

Page 18: National Rental  Affordability Scheme

Shovel Ready Department Projects

• A number of Department of Housing projects may meet the shovel ready criteria

• Contact details will be provided to Department partners to determine NRAS suitability

Page 19: National Rental  Affordability Scheme