NATIONAL NUCLEAR POWER PROGRAMME OF BANGLADESH
Khondaker M. Asaduzzaman
Secretary,
Ministry of Science and Technology
&
Mohammad Shawkat Akbar, Ph D
Project Director, RNPP (First Phase) Project &
Director, NPED, BAEC
Technical Meeting on Topical Issues in the Development of Nuclear Power Infrastructure, 3-6 February 2015, Vienna, Austria
• The Perspective Plan of Bangladesh: 2010 – 2021 and ‘Power System Master Plan 2010’ outlined the construction of 2000 MW(e) Nuclear Capacity by 2021 and 4000 MW(e) by 2030
• The National Parliament passed a resolution in 2010 : “In order to overcome the increasing power crisis in the country nuclear power plant shall be established immediately”;
• Government formed high-level committees in 2010 to perform the tasks recommended in the IAEA Nuclear Energy Series Publications for the development of Policy Documents and Infrastructure Development – THE NEPIO ;
4 4 4
Prime Minister
Working Group
Secretary MOST
Technical Committee
Working Sub-Groups (Ministry)
Development of Human Resources
Funding and Financing
National Participation
Nuclear Fuel Cycle, Waste Management and
Environ Monitoring
Coordination Committee
Nuclear Power and Energy Division (NPED)
Ownership, Project
execution & Management
Legal and Regulatory
International Obligations
Development of Human
Resources
Grid System
Development
Funding and Financing
Nuclear FC, WM and Environ
Monitoring
National Participation & Procurement
NEPIO
Minister MOST
National Committee
Sub-Committees on RNPP (BAEC)
Legal and Regulatory Aspects, International
Obligations
Heavy Equipment Transportation Planning
Ownership, Project execution and Project
Management
Grid System
BAERA
• The government/NEPIO identified general and specific activities to be carried out and provided directives to all concerned Ministries, Departments, Divisions, Directorates and Agencies to perform their respective functions to facilitate implementation of Nuclear Power programme;
• The NEPIO recommended the ownership pattern, implementation modality, funding sources, form of Cooperation of Vendor country in the development of infrastructure and construction of “Rooppur NPP” and accordingly these issues have been resolved;
• The Governments of Bangladesh and Russian Federation signed a Cooperation Agreement on Cooperation Concerning the Construction of a Nuclear Power Plant in 2011;
• The Governments of Bangladesh and Russian Federation signed an Agreement on Export Credit for financing of preparatory stage of construction of Rooppur NPP in 2013;
• The “Bangladesh Atomic Energy Regulatory Act-2012” passed by the government on 31 May 2012;
• An bilateral Agreement on cooperation in the field of nuclear and radiation safety in the use of nuclear energy for peaceful purposes signed in February 2012 between the Nuclear Regulatory Authority, Russian Federation and the MOST, Bangladesh;
• An independent nuclear regulatory authority - Bangladesh Atomic Energy Regulatory Authority established on 12 February, 2013;
• The DoE, Bangladesh developed and approved the ToR of the EIA of Rooppur NPP Project;
• The government approved a project development document on Construction of Rooppur NPP (First Phase) on 2 April, 2013;
• The Rooppur NPP Project (First Phase) is considered as the Fast Track Project under supervision of the Hon’ble Prime Minister;
• A high level Joint Coordinating Committee between the governments of Bangladesh and Russian Federation formed to monitor the progress of “Rooppur NPP” project;
• Building of the Second NPP of the country at the southern part is also an active consideration of the government;
9
• Conducted by a team of international expert Lead by IAEA
After Bangladesh request, the IAEA conducted the INIR MISSION to Review the Status of the National Nuclear Infrastructure in Bangladesh during 9-15 November, 2011
• The mission reviewed the 19 issues of Phase 1 and Phase 2
INIR Mission
Identify Gaps
Integrated Work Plan
TC project implementation
10
Bilateral Assistance
National Action Plan
The IWP has been prepared and the areas of the IAEA assistance, bilateral assistance of the vendor for the period 2012 – 2015 has been considered
• An Integrated Work Plan (IWP) for Infrastructure Building for the period 2012 - 15 developed identifying possible activities /programmes and areas of bilateral assistance in May 2012.
• The IWP is developed identifying the IAEA assistance focusing on Management, Funding & Financing and regulatory aspect in early stage: 2012 – 2013 and the IAEA assistance for other infrastructure issues for period 2014 – 2015;
• The vendor’s assistance (Russian) programme has been focused on the infrastructure issues closely related to the technology areas and the work plan for the period 2015-2016 has been finalized.
• BAEC had conducted essential activities for Rooppur NPP build as an owner organization through its NPED Division;
• A project Construction of Rooppur Nuclear Power Plant (First Phase) approved and is under execution for completion of all activities to obtain site license and construction license;
• The Project Team established; Government sanctioned 97 posts of different level for the project;
• Steps taken towards establishing the Rooppur NPP Operating Organization - a state-own company entitled, “Bangladesh Nuclear Power Company Limited”.
• Bangladesh Atomic Energy Regulatory Act-2012;
• Nuclear Safety and Radiation Control (NSRC) Rules-1997;
• Bangladesh Atomic Energy Regulatory (BAER) Authority established on 12 February, 2013
• The BAER Act, 2012 empowers the BAER Authority fulfilling its statutory obligations related to Authorization Process, Radiological Protection, nuclear safety, nuclear security, safeguards, Physical Protection of Nuclear Material and Installation, emergency preparedness and Response, and nuclear liability; Inspection and Enforcement
Regular Meeting with newsman and local talent peoples; Arrangement of opinion sharing meetings of local people; Round Table discussions organized by different press and media; Opinion sharing with energy journalists; Organization of national and international seminar on “Nuclear Power”
A Nuclear Industry Information Center established and made functional at Bangabandhu Sheikh Mujibur Rahman Novo Theatre, Dhaka since 01 October 2013.
Bangabandhu Sheikh Mujibur Rahman Novo Theatre
16
• Decision has been made to establish a Multi-Purpose Information Centre around Rooppur NPP site;
• The site for Multi-purpose Information Center has been selected • The Centre will be established and functional soon.
• Target Audiences of the Program
1. General public
2. Mass Media
3. Experts and Opinion Leaders
• PR-Program 1. Scientific workshops & round tables, discussion
clubs
2. Information center
3. Social networks/ Social activities
4. Expert opinions
5. Televisions (talks shows, documentaries)
6. Book “100” Facts bout Nuclear Energy
7. Communication of press releases & organization of interviews
8. Interaction with neighboring countries…etc
BAEC is regulatory conducting regulatory orientation course on nuclear science & technology (S&T) for its young professionals and also working along with the MOST to initiate a Project to establish an Advanced Institute for Nuclear S&T;
Introduction of Nuclear Engineering Department in Dhaka University in December 2012 and made it functional; Mechanical Engineering Department Bangladesh University of Engineering and Technology (BUET) has included NE course in its curriculum;
18
19
Making knowledgeable decision on NPP, formation of NEPIO, promulgation of BAERA Act and establishment of regulatory authority, finalization of funding, ownership pattern of the first NPP
Consideration to include nuclear
energy and initiatives to
implement RNPP since 1960s
PHASE 0 PHASE 1 PHASE 2 PHASE 3
Mai
nte
nan
ce a
nd
co
nti
nu
ou
s in
fras
tru
ctu
re im
pro
vem
en
t
Infr
astr
uct
ure
de
velo
pm
en
t p
rogr
amm
e
Pre-project, RNPP
definition
RNPP Construction Commissioning
Operation
Nuclear power is considered as a possible option
MILESTONE 0 Ready to include
nuclear as realistic national energy strategy option
MILESTONE 1 Ready to make
commitment to a nuclear
MILESTONE 2 Ready to negotiate the
contract.
MILESTONE 3 Ready to commission and operate first NPP
Pre-policy
2009 2013 2016 2021 - 22
RNPP Project Timeline (Sixth Five Year Planning of Bangladesh and PSMP 2010)
1960s
FE Evaluation, Site Assessment Site license, technical design documentation, PSAR, PSA, QA and construction license, priority constr. Works, signing of main Financing and General Contract for Rooppur NPP
Design
docum. and Prep. for
construction
Rooppur NPP construction & Commissioning; training of personnel for operation and maintenance, signing required contracts for fuel supply and other services, operation license
A Two -Stages Construction Approach for Construction of Rooppur NPP has been adopted taking into consideration of the domestic legal and regulatory conditions to obtain required licenses for building NPP, industrial base to support NPP construction, availability and competence of human resources for managing the NPP construction project, national resources as well as its social, economic and environmental condition to support NPP build
Preparatory Stage of Rooppur NPP Construction Main Stage of Rooppur NPP Construction
Preparatory Stage of Construction
Construction and Commissioning
Reports on FE, EIA and Site confirmation for Rooppur NPP
Tech. Docs., Design and Working Docs for Rooppur NPP
Construction and erection works of preparatory stage
Rooppur NPP Acceptance
FE Evaluation, EIA and Site Engineering Survey and Environmental studies
Site License
General Contract for Construction of NPP
Performance of First Priority Construction, erection works
Construction License
Design Approval
Development of NPP Tech. & Working Docs PSAR, QA
Operational License
Rooppur NPP Main Stage of Construction
20
13
- 2
01
6 2
01
7 –
20
21
Preparatory construction works
for Rooppur NPP
Construction License for
Rooppur NPP
Site Preparation and Pioneer base construction
Priority Construction and Erection works for
preparatory stage of Rooppur construction
Preparation for Reactor Unit construction,
excavation works
First Concrete Pouring
Excavation (NI, T-G Building and Pump Station) will be completed by 2016 FCD – First Concrete Date; ATP – Authorization to proceed
Design Docum. PSAR,
PSA, QA Program, Engr. Survey design
stage
General Contract
Main stage funding , ATP, Engineering
Partial
FE, EIA, Site Survey and Environ. Studies
Preparation of Tech. and safety
documents
Development of competency (technical and management) and
infrastructure to ensure a manageable transition of BAEC from the existing R&D based organization to NPP Owner Organization;
Development of adequate technical and management expertise and appropriate infrastructure for implementation of “Rooppur NPP” Project and smooth transition of the project to NPP Operating
Organization;
Competency development of the newly established Bangladesh
Atomic Energy Regulatory Authority with its existing resources;
Bangladesh is expecting wider cooperation from the IAEA and also its partners for NI building for successful implementation of the NPP project and programme.