2
ReDig
What is ReDig?A series of Quality Control inspections conducted on gas
facilities having been recently installed or repaired (target projects within preceding 30 days).
Why ReDig?Validate internal and contractor crew compliance with
Regulatory and Company requirements.
3
History of ReDig 2004-2007 Program (Legacy KSE)
Localized initiative (LI/NYC/NE)
Region specific – inconsistent work scope design and application, varied regional results
Limited and inconsistent sample sizes – 30 to 55 sites per region
Limited audit/inspection period – 5 to 10 days in duration
Excavation and inspections conducted by outside entity
Corrective Action – localized successes, variable impact, inconsistent follow-up action
Overall lack of enterprise wide standardization
4
2008/Post Merger
Enterprise wide initiative – expanded to include UNY/DNY/NE
Enhanced sampling plan:Driven by volume of work and crews
DNY – 200 inspections
New England – 200 inspections
UNY – 150 inspections
Documented and standardized procedure involving site selection
Excavation activities remain contracted
2009 - QA/QC assumed inspection responsibilities
5
2008/Post Merger Involved Processes
New main and service installation
Replacement main and service installation
Corrosion
Leak repair
Audit/Inspection PeriodExpanded – 12 to 16 weeks
Larger volume of work for inspection
Enhanced validation of compliance findings
Standardized – Metrics, data collection, analysis, reporting and corrective action plan
7
Template Development
Standardized inspection template developed through “Cross-Regional” review process and deployed within all regions
Inspection questions developed in relation to specific processes, procedural steps and requirements
Corresponding guidance notes developed to assist QA/QC inspector
All inspection questions were weighted for the purpose of correctly analyzing/identifying actual degree of risk
16
Reporting Structure Executive Summary
In-House CrewsRegional Level
NE
DNY (LI/NYC)
UNY
Individual yards
Individual inspection form
Contractor Crews Regional level
Individual company
Individual inspection form
26
Summary 2008
Two regions exhibited risk of non-compliance in excess of 10%
Regulators met with Company Leadership to review program findings and expressed concern related to identified performance.
2009 - 2012 Overall company performance improved each year
Inherent risk in 2012 was below 4%
2013 Company goal is to realize potential risk of non-compliance at a
level of 2.5% or less