NATIONAL FRAMEWORK FOR FLOOD DISASTER MANAGEMENT
IN INDONESIA
11th GEOSS ASIA – PASIFIC SYMPOSIUMKyoto, 24-26 October 2018
![Page 2: NATIONAL FRAMEWORK FOR FLOOD DISASTER ...BNPB, Kemensos, Kemenkes • Handling emergency infrastructure – Kemen PUPR After Disasters • Rehabilitation of infrastructure in disaster](https://reader033.fdocuments.in/reader033/viewer/2022041623/5e408c176ee1227ade234f94/html5/thumbnails/2.jpg)
2
OUTLINE
Disasters in Indonesia
The Disaster Management Mechanism
Current Status of Flood Early Warning Systems
Currently and Activity Plan
Follow up in The Future
![Page 3: NATIONAL FRAMEWORK FOR FLOOD DISASTER ...BNPB, Kemensos, Kemenkes • Handling emergency infrastructure – Kemen PUPR After Disasters • Rehabilitation of infrastructure in disaster](https://reader033.fdocuments.in/reader033/viewer/2022041623/5e408c176ee1227ade234f94/html5/thumbnails/3.jpg)
3
DISASTERS IN INDONESIA
Source:BNPB
Map of Disasters Risk Index in Indonesia
![Page 4: NATIONAL FRAMEWORK FOR FLOOD DISASTER ...BNPB, Kemensos, Kemenkes • Handling emergency infrastructure – Kemen PUPR After Disasters • Rehabilitation of infrastructure in disaster](https://reader033.fdocuments.in/reader033/viewer/2022041623/5e408c176ee1227ade234f94/html5/thumbnails/4.jpg)
4
Seismo-Tectonics Indonesia Flooding Threats
173 Tsunamis (1629 sd 2014) Landslides Threats
![Page 5: NATIONAL FRAMEWORK FOR FLOOD DISASTER ...BNPB, Kemensos, Kemenkes • Handling emergency infrastructure – Kemen PUPR After Disasters • Rehabilitation of infrastructure in disaster](https://reader033.fdocuments.in/reader033/viewer/2022041623/5e408c176ee1227ade234f94/html5/thumbnails/5.jpg)
5
Rank Disasters Frequency1 Flood 62582 Putting Beliung
(tornado)5061
3 Landslide 41264 Drought 6255 Forest Fire 5626 Tidal Wave/Abration 1657 Earthquake 1288 Volcanic Eruptions 529 Tsunami 5
Frequency of Disasters 2010 – Augst 2018
Source:BNPB
![Page 6: NATIONAL FRAMEWORK FOR FLOOD DISASTER ...BNPB, Kemensos, Kemenkes • Handling emergency infrastructure – Kemen PUPR After Disasters • Rehabilitation of infrastructure in disaster](https://reader033.fdocuments.in/reader033/viewer/2022041623/5e408c176ee1227ade234f94/html5/thumbnails/6.jpg)
6
§ Flood is the most disaster occurred in 2010 – Augst 2018§ So many disasters occurred in year 2017 Source:BNPB
![Page 7: NATIONAL FRAMEWORK FOR FLOOD DISASTER ...BNPB, Kemensos, Kemenkes • Handling emergency infrastructure – Kemen PUPR After Disasters • Rehabilitation of infrastructure in disaster](https://reader033.fdocuments.in/reader033/viewer/2022041623/5e408c176ee1227ade234f94/html5/thumbnails/7.jpg)
7
The Factors that Causes The Disasters
üThe high rainfallüThe land conversionüThe deforestationüThe steep slopeüThe condition of Geological
and Geotechnical local soilüThe watershed
characteristics and river morphology
üThe ring of fireüThe high temperatureüHabits of humans
![Page 8: NATIONAL FRAMEWORK FOR FLOOD DISASTER ...BNPB, Kemensos, Kemenkes • Handling emergency infrastructure – Kemen PUPR After Disasters • Rehabilitation of infrastructure in disaster](https://reader033.fdocuments.in/reader033/viewer/2022041623/5e408c176ee1227ade234f94/html5/thumbnails/8.jpg)
8
THE DISASTERS MANAGEMENT MECHANISMIN INDONESIA
Risk Management
Mitigation
PreparednessManagement in
Emergency SituationManagement during
Recovery
Before Disasters Emergency State After Disasters
Coordination CoordinationCommand
Coordination
(Flood) Disaster Management need prediction information and early warning
![Page 9: NATIONAL FRAMEWORK FOR FLOOD DISASTER ...BNPB, Kemensos, Kemenkes • Handling emergency infrastructure – Kemen PUPR After Disasters • Rehabilitation of infrastructure in disaster](https://reader033.fdocuments.in/reader033/viewer/2022041623/5e408c176ee1227ade234f94/html5/thumbnails/9.jpg)
9
Task and Functions of Ministries/ Institutions retated to Disaster Management Mechanism
Before Disasters
• Disaster information services – BNPB, BIG
• MCG information services – BMKG
• Hotspot monitoring –LAPAN
• Broadcasting of disaster information -Kemenkominfo
Emergency State
• Emergency disaster management –BNPB, Kemensos, Kemenkes
• Handling emergency infrastructure –Kemen PUPR
After Disasters
• Rehabilitation of infrastructure in disaster area – BNPB, BIG, Kemen PUPR
• Revitalization of critical river basin – KLHK
• Rehabilitation of agriculture area –Kementan
• Rehabilitation epidemic of disease - Kemenkes
Challenge: Need coordinations related to the task and functions of ministries and institutions
![Page 10: NATIONAL FRAMEWORK FOR FLOOD DISASTER ...BNPB, Kemensos, Kemenkes • Handling emergency infrastructure – Kemen PUPR After Disasters • Rehabilitation of infrastructure in disaster](https://reader033.fdocuments.in/reader033/viewer/2022041623/5e408c176ee1227ade234f94/html5/thumbnails/10.jpg)
10
CURRENT STATUS OF FLOOD EARLY WARNING SYSTEM
Information flood potential forecasts are made in the legend of high, medium, low, safe and no flood event
![Page 11: NATIONAL FRAMEWORK FOR FLOOD DISASTER ...BNPB, Kemensos, Kemenkes • Handling emergency infrastructure – Kemen PUPR After Disasters • Rehabilitation of infrastructure in disaster](https://reader033.fdocuments.in/reader033/viewer/2022041623/5e408c176ee1227ade234f94/html5/thumbnails/11.jpg)
11
Flood potential forecast is the result of collaboration by 3 Agencies
Agencies ProvideBMKG Monthly rainfall forecastDirectorate General of Water Resources – Ministry of Public Works (PSDA-PUPR)
Information of flood prone areas
Geospatial Information Agency (BIG)
Base map (RBI, land system, land cover)
http://www.bmkg.go.id/iklim/
![Page 12: NATIONAL FRAMEWORK FOR FLOOD DISASTER ...BNPB, Kemensos, Kemenkes • Handling emergency infrastructure – Kemen PUPR After Disasters • Rehabilitation of infrastructure in disaster](https://reader033.fdocuments.in/reader033/viewer/2022041623/5e408c176ee1227ade234f94/html5/thumbnails/12.jpg)
12
Scheme of The Central of Hydroinformatichs Studies - PUPR (DELFT - FEWS)
![Page 13: NATIONAL FRAMEWORK FOR FLOOD DISASTER ...BNPB, Kemensos, Kemenkes • Handling emergency infrastructure – Kemen PUPR After Disasters • Rehabilitation of infrastructure in disaster](https://reader033.fdocuments.in/reader033/viewer/2022041623/5e408c176ee1227ade234f94/html5/thumbnails/13.jpg)
13
Flood Early Warning System is a software create by Deltares(Netherland) and developed by PUSAIR through the Joint Cooperation Program (JCP)
![Page 14: NATIONAL FRAMEWORK FOR FLOOD DISASTER ...BNPB, Kemensos, Kemenkes • Handling emergency infrastructure – Kemen PUPR After Disasters • Rehabilitation of infrastructure in disaster](https://reader033.fdocuments.in/reader033/viewer/2022041623/5e408c176ee1227ade234f94/html5/thumbnails/14.jpg)
14
![Page 15: NATIONAL FRAMEWORK FOR FLOOD DISASTER ...BNPB, Kemensos, Kemenkes • Handling emergency infrastructure – Kemen PUPR After Disasters • Rehabilitation of infrastructure in disaster](https://reader033.fdocuments.in/reader033/viewer/2022041623/5e408c176ee1227ade234f94/html5/thumbnails/15.jpg)
15
Data Input Forecat data PICObservation data BMKGNWP (National Weather Prediction) BMKGGWP (Global Weather Prediction) BMKGECMWF (European Centre for Medium-Range Weather Forecast)
BMKG
GFS (Global Forecast System) NASAAccess-A, R, T NASA
Historical data PICTRMM (Tropical Rainfall Measuring Mission) NASAGPM (Global Precipitation Measurement) NASARadar AWS BMKGRadar BPPTGround Station/Observasi BMKG/BBWS/BWS/Dinas PUTelemetri BBWS/BWS, Dinas PU,
PUSAIRSEBA
![Page 16: NATIONAL FRAMEWORK FOR FLOOD DISASTER ...BNPB, Kemensos, Kemenkes • Handling emergency infrastructure – Kemen PUPR After Disasters • Rehabilitation of infrastructure in disaster](https://reader033.fdocuments.in/reader033/viewer/2022041623/5e408c176ee1227ade234f94/html5/thumbnails/16.jpg)
16
Data Input and evaluation (observation)
• > 6000 rainfall station• 336 AWS• 573 ARG• 105 AAWS
![Page 17: NATIONAL FRAMEWORK FOR FLOOD DISASTER ...BNPB, Kemensos, Kemenkes • Handling emergency infrastructure – Kemen PUPR After Disasters • Rehabilitation of infrastructure in disaster](https://reader033.fdocuments.in/reader033/viewer/2022041623/5e408c176ee1227ade234f94/html5/thumbnails/17.jpg)
17
CURRENT ACTIVITY AND ACTIVITY PLANNING
BMKG PUPRCoordination with PUPR, BIG “Flood potential forecast”
Coordination with BMKG, BIG “Flood potential forecast”
Coordination with BNPB about MHEWS
JCP3 J-FEWS
JCP3 climate change Development web integration about The Central of Hydroinformatichs Studies
SATREPS (Science and TechnologyResearch Partnership for Sustainable Development) about MHEWS (proposal)
etc
etc
![Page 18: NATIONAL FRAMEWORK FOR FLOOD DISASTER ...BNPB, Kemensos, Kemenkes • Handling emergency infrastructure – Kemen PUPR After Disasters • Rehabilitation of infrastructure in disaster](https://reader033.fdocuments.in/reader033/viewer/2022041623/5e408c176ee1227ade234f94/html5/thumbnails/18.jpg)
18
FOLLOW UP (IN MY OPINION)
Need team task force from all institutions that related in disaster management mechanism• BMKG• PUPR• BIG• BNPB• etc
Team leader
INA-FEWS
1. Resources Capacity Building (Big data, AI, IoT)
2. Benchmarking3. Infrastruktur
improvement (storage, platform database, etc)
4. Financial supporting