NATIONAL ENERGY CONSERVATION AWARD 2007
description
Transcript of NATIONAL ENERGY CONSERVATION AWARD 2007
NATIONAL ENERGY CONSERVATION AWARD
2007
PRESENTED BY :
A.GANESANEXECUTIVE ENGINEER (E)BSNL ELECTRICAL DIVISIONMADURAI
THE BUREAU OF ENERGY EFFICIENCY HAS ANNOUNCED NATIONAL ENERGY CONSERVATION AWARD 2007
CTO BDLG. MADURAI
CTO BUILDING
MADURAI IS ONE OF THE TWO BUILDINGS SELECTED BY THE PCE(E) FOR NOMINATION TO THE AWARD
BUILDING PROFILE
CTO COMPLEX
CTO BUILDING CTMX BUILDING LEVEL IV BUILDING
CTO COMPLEX IS COMPRISING OF THREE BLOCKS
BUILDING PROFILE
A- CTO BUILDING
G- FLOOR PROPOSED SIGNLE WINDOW CSC
I FLOOR SFMSS EQPT+ ADMN. OFFICE+ IQ
II FLOOR OFFICE + IQ
III FLOOR O/oGM(DEV)+CONFERENCE HALL
BUILDING PROFILE
B - CTMX BUILDING
G - FLOOR CELL MSC-II + EWSD MDF
I - FLOORSTR EQUIPMENT ( IN PROG ) + INTERNET EXCHANGE
( PROPOSED )
II - FLOOR EWSD EXCHANGE - 10K
III - FLOOR ADMN. OFFICE
BUILDING PROFILE
C - LEVEL-IV BLDG.
G - FLOOR STR POWER ROOM + OUTDOOR OFFICES
I - FLOOR CELLONE CSC + STR MUX EQUIPMENT
II - FLOOR STR OFFICE + GM (DEV) OFFICE
III - FLOOR CONFERECCE HALL + STR OFFICE
ENERGY CONSUMPTION CHART
CTO COMPOUND TALLAKULAM, MADURAI Energy Consumption Chart
130000
140000
150000
160000
170000
180000
190000
200000
210000
Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec
Month
No
of
Un
its
co
ns
um
ed
(K
wh
)
2004 2005 2006
CONSUMPTION PATTERN
Consumption pattern
Window AC,Split AC,
50%
Power plant, 13%
Package AC, 13%
Lighting, 7%
Lift, 6%
Pump, 6%
Fans, 2%
Computers, 2%
Other load, 1%
Window AC,Split AC
Power plant
Package AC
Lighting
Lift
Pump
Fans
Computers
Other load
REDUCTION IN SPECIFIC ENERGY CONSUMPTION
Connected Load in KW
450
460
470
480
490
500
510
520
530
540
550
2004-05 2005-06 2006-07
Connected Load inKW
SEC (KWh/KW)
34003500
36003700
380039004000
41004200
43004400
2004-05 2005-06 2006-07
SEC (KWh/KW)
AS A RESULT OF VARIOUS ENERGY CONSERVATION MEASURES ADOPTED THE ENERGY EXPENDITURE HAS COME DOWN DESPITE INCREASE IN CONNECTED LOAD
CTO BUILDING - MADURAI
ON THE BASIS OF THE ACHIEVEMENTS OF VARIOUS ENERGY CONSERVATION MEASURES ADOPTED, THIS BUILDING HAS BEEN SELECTED FOR THE CONTEST
MAJOR ENERGY SAVING MEASURES ADOPTED
REPLACEMENT OF 54 NOS. OLD W/T A/C UNITS BY 34 NOS. NEW SPLIT A/C UNITS
REPLACEMENT OF CONVENTIONAL TYPE POWER PLANT WITH SMPS POWER PLANT
REPLACEMENT OF ( 6 X 7 TR)OLD PACKAGE A/C PLANT WITH ( 4 X 7 TR ) NEW PACKAGE A/C PLANT
REPLACEMENT OF DEFECTIVE CAPACITORS BY NEW CAPACITORS AND GOOD PF MAINTAINED
REPLACEMENT OF AC UNITS
OLD UNIT REPLACED BY NEW S/T AC UNIT
REPLACEMENT OF AC UNITS
54 NOS. OUTLIVED A/C UNITS UNITS HAVE BEEN REPLACED BY 34 NOS NEW S/T A/C UNITS RESULTING IN A SAVING OF RS.8,99,360/- PER YEAR.
0
10
20
30
40
50
60
OLD NEW
OLD ACUNITS
NEW ACUNITS
REPLACEMENT OF AC UNITS
Energy consumption details for W/T,S/T AC Units
Descriptions Old
After replacement
New Existing
No. of units 107 34 53
Power consumption (in KW) 2.4 2 2.4
No of working hrs/day 8 8 8
No. of days working 365 365 365
Total Energy consumption in KWh 749856 198560 371424
Total Energy consumption before replacement (for107 AC units) in KWh 749856
Total Energy consumption after replacement for(34 new units +53 old units) 87 Ac units in KWh 569984
Savings in energy 179872
Savings in cost @ Rs.5/- 899360
REPLACEMENT OF CONVENTIONAL POWER PLANT WITH SMPS POWER
PLANT
REPLACEMENT OF CONVENTIONAL POWER PLANT WITH SMPS POWER
PLANT
THE EXISTING CONVENTIONAL TYPE POWER PLANT HAS BEEN REPLACED WITH SMPS POWER PLANT RESULTING IN A SAVING OF RS.62,550/- PER YEAR
380000390000400000410000420000430000440000450000460000470000480000
EN.COSTCONV
CONV
SMPS
REPLACEMENT OF CONVENTIONAL POWER PLANT WITH SMPS POWER
PLANT
Power saving by replacing conventional power plant by SMPS power plant
DescriptionConventional Power
plant SMPS power plant
Efficiency of power plant 82.64% 95%
Output power ( KW) 7.5 7.5
Input power (KW) 9.08 7.89
Total energy consumption/year (Kwh) 79541 69116
Total cost of the energy (Rs.) 477246 414696
Savings in Energy /year (Kwh) 10425
Savings in cost/year (Rs.) 62550
REPLACEMENT OF DEFECTIVE CAPACITORS
REPLACEMENT OF DEFECTIVE CAPACITORS
THE DEFECTIVE CAPACITORS IN THE POWER FACTOR IMPROVEMENT PANEL HAVE BEEN REPLACED RESULTING IN A SAVING OF RS. 30,799/- PER YEAR.
0.974
0.976
0.978
0.98
0.982
0.984
0.986
0.988
0.99
0.992
Series1
POWER FACTOR ALWAYS > 0.98
REPLACEMENT OF PACKAGE AC UNITS
4+2 X 7 TR REPLACED WITH
3+1 X 7 TR
REPLACEMENT OF PACKAGE AC UNITS
THE EXISTING 4+2 X 7 TR PACKAGE AC PLANT HAS BEEN REPLACED WITH 3+1 X 7 TR PACKAGE AC PLANT RESULTING IN A SAVING OF RS.1028500/- 0
200000
400000
600000
800000
1000000
1200000
1400000
1600000
1800000
OLD NEW
EXPENDITURE
REPLACEMENT OF PACKAGE AC UNITS
Energy consumption details for PAC units
Description Old New
No. of units 4 3
Power consumption (in KW) 12.6 10
No of working hrs/day 18 18
No. of days working 365 365
Total Energy consumption in KWh 331128 197100
Savings in energy 134028
Cost of Energy @ Rs.5/-unit 1655640 985500
Savings in cost 670140
other savings
Cost of not providing 2 nos 7TR PAC units @ Rs.3,50,000/unit (A) 700000
Saving in energy for 1 units @18 hrs/day working for 365 days. 65700
Cost of Energy @ Rs.5/-unit (B) 328500
Total savings (A+B) 1028500
PROPOSED ENERGY SAVING MEASURES IN 2007-08
1. CHANGE OF EB TARIFF OF 21 NOS S/Q
2. REPLACEMENT OF FL. FITTINGS WITH ENERGY EFFICIENT FITTINGS
3.PROVISION OF WATER LEVEL CONTROLLER FOR PUMPS
4. CREATING AWARENESS AMONG STAFF BY CONDUCTING PROGRAMMES & THROUGH SLOGANS
CHANGE OF EB TARIFF OF S/Q
AT PRESENT 21 NOS S/Q ARE BEING FED FROM SUB STATION & ENERGY COST IS RS.5/- PER UNIT
ALL ELECTRICAL WORKS FOR GETTING SEPARATE SERVICE CONNECTION FOR S/Q ARE COMPLETED
WHEN SERVICE CONNECTION WITH RESIDENTIAL TARIFF IS EFFECTED THERE WILL BE A BI-MONTHLY SAVING OF RS 14,700/-
[ 21 S/Q X (RS 5 - RS 2.8) X 250 UNITS ]
WATER LEVEL CONTROLLER FOR PUMPS
NEARLY 225 EMPLOYEES ARE WORKING & 13 NOS PUMPS ARE AVAILABLE
ALL THE PUMPS ARE BEING OPERATED MANUALLY
THERE IS A GOOD SAVING POTENTIAL BY PROVIDING WATER LEVEL CONTROLLER FOR THE PUMPS
INSTALLATION OF ENERGY EFFICIENT LIGHT FITTINGS
598 NOS TWIN FITTINGS & 316 NOS SINGLE FLUORESCENT TUBE LIGHT FITTINGS ARE AVAILABLE
CONNECTED LOAD OF THESE FITTINGS WORKS OUT TO 60 KW
IT HAS BEEN PROPOSED TO REPLACE THE ABOVE WITH ENERGY EFFICIENT FITTINGS IN A PHASED MANNER
ON COMPLETION OF THE TASK THERE WILL BE A REDUCTION OF 18 KW OF LOAD
AWARENESS PROGRAMME
ENERGY CONSERVATION AWARENESS WILL BE CREATED THROUGH PROGRAMMES AND SLOGAN STICKERS
APPLICATION SENT
IN VIEW OF THE ABOVE MEASURES & ACHIEVEMENTS & AS PER THE INSTRUCTIONS OF THE PCE(E) & SE(E), APPLICATION FOR THE ENERGY CONSERVATION AWARD HAS BEEN SENT TO BUREAU OF ENERGY EFFICIENCY
WE HOPE THAT CTO COMPLEX MADURAI WILL RECEIVE THE ENERGY CONSERVATION AWARD FROM BUREAU OF ENERGY EFFICIENCY