NAPS NARORA
Transcript of NAPS NARORA
NUCLEAR POWER STATIONS IN INDIA
Following are the India’s atomic power stations operating as on today:-
S.NO. PLACE CAPACITY
1. TAPS (1 & 2) 2X160MWe
2. TAPS ( 3 & 4) 2X540MWe
3. RAPS (1 ) 1x100 MWe
4. RAPS (2) 1X200MWe
5. RAPS ( 3 & 4) 2X220MWe
6. RAPS ( 5 & 6) 2X220MWe
7. MAPS ( 1 & 2) 2X220MWe
8. NAPS( 1 & 2) 2X220MWe
9. KAPS ( 1 & 2) 2X220MWe
10. KGS ( 1 & 2) 2X220MWe
11. KGS ( 3 & 4) 2X220MWe
Following are the power stations under construction :-
S.NO. PLACE CAPACITY
1 RAPS (7 & 8 ) 2X700 MWe
2. KAPS ( 3 & 4 ) 2X700 MWe
3 KK ( 1& 2 ) 2X1000 MWe
Contents/IndexS NO. TOPIC PAGE NO.
1 INTRODUCTION TO NAPS 1
2 TECHNICAL SPECIFICATIONS 2
3 IMPORTANT DATES OF NAPS UNITS 3
4 POWER GENERATION PROCESS IN NAPS 4
5 CONTROL MAINTENANCE SECTION 8
6 STUDY OF INSTRUMENTATION IN NAPS 9
7 EQUIPMENTS IN CALIBRATION LAB 12
8 INSTRUMENTS AT NAPS 14
9 STANDRADIZATION OF SIGNALS 19
10 NAPS CONTROL ROOM 20
11 SYSTEMS IN NAPS 21
12 FLOW OF STEAM & BOILER FEED WATER 27
13 TURBINE – ROTOR ASSEMBLY 29
14 COMMUNICATION SYSTEM AT NAPS 30
15 SECURITY SYSTEM AT NAPS 30
ACKNOWLEDGEMENT
I wish to express my profound sense of respect and gratitude to Shri S.K.Sharma, Station Director , Narora Atomic Power Station, Narora
to kindly allow me to carry out vocational training at NAPS.I also express my gratefulness to Shri Ramesh Chandra, Training Supdt.,
Shri K.C.Rakesh,SO/E, Trg. Officer, NAPS Narora for constant inspiration, motivation and invaluable support I got from them.
I am thankful to the Engineers in mechanical Section of NAPS Name of Section Head, Engineers and other officers whose co-operation and
valuable interaction helped me a lot in completing the project. Finally I thank to security, administration and other staff of the station for their valuable co-operation during the training period
enabling me to achieve the goal. Name Year & Branch Institute name
fission
92U235 + on1 38Sr94 + 54Xe140 +2 0n1 + gamma(energy)
SOME IMPORTANT DATAS.NO DATA SPECIFICATION
1. Transmission Lines Five
220KV Narora-Moradabad Single Line
220KV Narora-Atrauli Single Line
220KV Narora-Shimboli Single Line
220KV Narora-Khurja Double Line
2. Stack Height 142 Meters
3. NDCT Height 128 Meters
4. NDCT Top Dia. 58 Meters
5. NDCT Base Dia. 107 Meters
6. NDCT Throat Dia. 53 Meters
7. Steam Flow 1314 Tonnes/hour
8. PHT Flow 12700 Tonnes/hour
9. Steam Pressure 48-40 kg/cm2
10. PHT Pressure 87.0 kg/cm2
11. CCW Flow 39000 Tonnes/hour
12. Coolant Tubes 306
13. No. of Fuel Bundles in one channel 12
14. Fuel Bundle Weight 15 kgs
15. Condenser Pressure 680 mm of hg
16. RB Design Pressure 1.25 kg/cm2
17. Station Load 18-20 MWe
18. Generator Power 220 MWe
19. Grid Voltage 220 KV
Schematic of PHWR including Turbine Generator Cycle
Out put system
Class IV, III, II, I Supply System FOR N- 2 FROM UT FROM SUT
BUS-D BUS-E BUS-F BUS-G BUS-H BUS -R
BUS – K1
BUS-J BUS – K BUS – L BUS – M
BUS –P BUS -Q
BUS-P1 BUS-Q1
DG 1 DG 2 DG-3
BUS –S BUS-T
ACVR 1 PMG 1 PMG 2 ACVR 2
BUS-U1 BUS-U2 BUS-U3 BUS-V3 BUS-V2 BUS-V1 5232 BAT 1 5232 BAT 2
Plant Lay Out(Remove from report)