Napa Plant Site Desalting Modeling Summary

27
Napa Plant Site Desalting Modeling Summary November 10, 2009

description

Napa Plant Site Desalting Modeling Summary. November 10, 2009. Overview. Background Approach to Salt Removal Breach Concept Field Experiments (Salt Dissolution) 2-D Modeling. Background. - PowerPoint PPT Presentation

Transcript of Napa Plant Site Desalting Modeling Summary

Page 1: Napa Plant Site  Desalting Modeling Summary

Napa Plant Site Desalting Modeling Summary

November 10, 2009

Page 2: Napa Plant Site  Desalting Modeling Summary

Overview

1. Background2. Approach to Salt Removal3. Breach Concept4. Field Experiments (Salt Dissolution)5. 2-D Modeling

Page 3: Napa Plant Site  Desalting Modeling Summary

• DFG Agreement included Cargill removal of residual salt in the plant to the extent possible to facilitate restoration

• Cargill successfully harvested and removed approximately 350,000 tons (since 2003)

• Estimated 300,000 to 350,000 tons remain in the plant– Pickle Ponds (Unit 3, B1, B2, B3) salt removed– Residual salt remains in crystallizer beds with 2 to 6-inch salt crust

• Continued harvesting not physically possible

• Cargill explored other ways to meet desalination obligation

Background

Page 4: Napa Plant Site  Desalting Modeling Summary

BackgroundApproach to Salt Removal

• Other salt pond breach successes– NSM Pond 4 - temporary, localized effects (within natural variability at 5

days; ambient at 26 days)– NPS Ponds 9 and 10 - met RWQCB requirements within 24 hrs

• Develop breach concept to minimize impacts

• Field experiments to understand salt crust dissolution– Redwood City– Napa Plant Site

• Modeling to size breach for minimal impact– 2-D Model– Validation

Page 5: Napa Plant Site  Desalting Modeling Summary

Breach Concept

Napa River

Crystallizer Bed Salt Crust

Less Saline LayerMudflat Weir

High Saline Layer

Dissolutiontons/day

Tidal Exchange Two layers exist within Site

MudflatBreach

Page 6: Napa Plant Site  Desalting Modeling Summary

• Goal: better understand expected salt dissolution mechanism and rates

• Redwood City crystallizer dissolution tests showed dissolution rate over first 12 days <0.05 in/day

• Napa dissolution tests showed: – More dissolution in higher velocity areas – Clear stratification within the test area – Middle and top salinity levels 30 to 44 ppt

Field Experiments

Page 7: Napa Plant Site  Desalting Modeling Summary

2-D Modeling • Advection/Dispersion Model• Objective: Evaluate breach concept for

desalting the South Unit given restoration breach location

• 2-Dimensional for internal Plant Site and Napa River

• 1-Dimensional for sloughs and external ponds

Page 8: Napa Plant Site  Desalting Modeling Summary

• Dissolution is the primary mechanism for salt loss • Salt dissolves at a constant rate (0.05 in/day)• Stratified high salinity layer within internal Plant

Site remains throughout simulation• Low velocities exist within internal Plant Site• External breach occurs at Mudflat elevation• Internal breaches per proposed Restoration Plan

2-D Modeling Assumptions

Page 9: Napa Plant Site  Desalting Modeling Summary

• Modeling Period (August-October 2000)– Flow (USGS Gauging Stations at Oak Knoll

Avenue and Agua Caliente)– Tides (NOAA Tide Stations at Mare Island and

mouth of Sonoma Creek)– Ambient salinity (USGS Mare Island Causeway

Station)• Seasonally variability > 20 ppt• Daily variability on the order of 5 ppt

– Salt dissolution (Schaaf & Wheeler)

2-D Modeling Input Data

Page 10: Napa Plant Site  Desalting Modeling Summary

Salt Mass Estimate

Beds Salt Mass (tons)

B1+B2 16,000

B3 32,000

Unit 3 32,000

Crystallizers 240,000

Total 320,000 Unit 3

B-2

B-3

B-1

Page 11: Napa Plant Site  Desalting Modeling Summary

-

1,000

2,000

3,000

4,000

5,000

6,000

7,000

8,000

9,000

10,000

8/16/2000 8/26/2000 9/5/2000 9/15/2000 9/25/2000 10/5/2000 10/15/2000

Date

Dis

solu

tion

Rat

e (to

n/da

y)

Rate of Salt DissolutionB-1 & B-2 Salt Mass Dissolved

Unit 3 Salt Mass Dissolved

B-3 Salt Mass Dissolved Crystallizer Beds Salt Mass Dissolved

Page 12: Napa Plant Site  Desalting Modeling Summary

Input Data -Salinity

Salinity Data Typical (1999-2005)

Seasonal Variability of 20 ppt

Average Salinity Readings at Mare Island Causeway Station

Page 13: Napa Plant Site  Desalting Modeling Summary

Input Data - Salinity

Daily Variability of 5 ppt

Page 14: Napa Plant Site  Desalting Modeling Summary

Model Results

Page 15: Napa Plant Site  Desalting Modeling Summary

Location B: Napa River Outside Mudflat

Location A: Napa River Upstream

Location C: Outside Primary Breach

Notch

CCBB22 CCBB11

CCBB77

CCBB44

CCBB33

CCBB66 CCBB55

CCBB88 CCBB99 UUnniitt 33

BB--33

BB--22

Modeling ResultsEvaluation Points

Internal

External (Breach & River)

Page 16: Napa Plant Site  Desalting Modeling Summary

Modeling Results - Salinity

Location B: Napa River Outside Mudflat

Location A: Napa River Upstream

Location C: Outside Primary Breach

Notch

CCBB22 CCBB11

CCBB77

CCBB44

CCBB33

CCBB66 CCBB55

CCBB88 CCBB99 UUnniitt 33

BB--33

BB--22

Page 17: Napa Plant Site  Desalting Modeling Summary

PaletteAbove 30

29 - 3028 - 2927 - 2826 - 2725 - 2624 - 2523 - 2422 - 2321 - 2220 - 2119 - 2018 - 1917 - 1816 - 17

Below 16Undefined Value

8/22/2000 2:00:00 AM, Time step: 146, Layer: 0

20 40 60 80 100 120 140 160 180(Grid spacing 20 meter)

480

490

500

510

520

530

540

550

560

570

580

590

600

610

620

630

640

650

660

670

680

(Grid

spa

cing

20

met

er)

Salt

70-foot Breach

Modeling Results - SalinityMaximum Salinity – after 6 days

Page 18: Napa Plant Site  Desalting Modeling Summary

PaletteAbove 30

29 - 3028 - 2927 - 2826 - 2725 - 2624 - 2523 - 2422 - 2321 - 2220 - 2119 - 2018 - 1917 - 1816 - 17

Below 16Undefined Value

8/22/2000 2:00:00 AM, Time step: 146, Layer: 0

20 40 60 80 100 120 140 160 180(Grid spacing 20 meter)

480

490

500

510

520

530

540

550

560

570

580

590

600

610

620

630

640

650

660

670

680

(Grid

spa

cing

20

met

er)

Salt

70-foot Breach

Modeling Results - Salinityafter 8 days

Page 19: Napa Plant Site  Desalting Modeling Summary

PaletteAbove 30

29 - 3028 - 2927 - 2826 - 2725 - 2624 - 2523 - 2422 - 2321 - 2220 - 2119 - 2018 - 1917 - 1816 - 17

Below 16Undefined Value

8/22/2000 2:00:00 AM, Time step: 146, Layer: 0

20 40 60 80 100 120 140 160 180(Grid spacing 20 meter)

480

490

500

510

520

530

540

550

560

570

580

590

600

610

620

630

640

650

660

670

680

(Grid

spa

cing

20

met

er)

Salt

70-foot Breach

Modeling Results - Salinityafter 28 days

Page 20: Napa Plant Site  Desalting Modeling Summary

PaletteAbove 30

29 - 3028 - 2927 - 2826 - 2725 - 2624 - 2523 - 2422 - 2321 - 2220 - 2119 - 2018 - 1917 - 1816 - 17

Below 16Undefined Value

8/22/2000 2:00:00 AM, Time step: 146, Layer: 0

20 40 60 80 100 120 140 160 180(Grid spacing 20 meter)

480

490

500

510

520

530

540

550

560

570

580

590

600

610

620

630

640

650

660

670

680

(Grid

spa

cing

20

met

er)

Salt

70-foot Breach

Modeling Results - Salinity after 42 days

Page 21: Napa Plant Site  Desalting Modeling Summary

Location B: Napa River Outside Mudflat

Location A: Napa River Upstream

Location C: Outside Primary Breach

Notch

CCBB22 CCBB11

CCBB77

CCBB44

CCBB33

CCBB66 CCBB55

CCBB88 CCBB99 UUnniitt 33

BB--33

BB--22

Loc. A

Loc. C

Loc. B

Modeling Results – Location C

Page 22: Napa Plant Site  Desalting Modeling Summary

Location B: Napa River Outside Mudflat

Location A: Napa River Upstream

Location C: Outside Primary Breach

Notch

CCBB22 CCBB11

CCBB77

CCBB44

CCBB33

CCBB66 CCBB55

CCBB88 CCBB99 UUnniitt 33

BB--33

BB--22

Loc. A

Loc. C

Loc. B

Modeling Results – Location B

Page 23: Napa Plant Site  Desalting Modeling Summary

Location B: Napa River Outside Mudflat

Location A: Napa River Upstream

Location C: Outside Primary Breach

Notch

CCBB22 CCBB11

CCBB77

CCBB44

CCBB33

CCBB66 CCBB55

CCBB88 CCBB99 UUnniitt 33

BB--33

BB--22

Loc. A

Loc. C

Loc. B

Modeling Results – Location A

Page 24: Napa Plant Site  Desalting Modeling Summary

2-D Modeling

70’ Breach

Maximum Salinity

Difference (ppt)

Max. Salinity Duration

Location C: Outside Breach

Max. Hourly 10 Once a day for three days

Max. Tidally Averaged 4 6 days

Location B: Outside Mudflat

Max. Hourly 2 Once a day for two days

Max. Tidally Averaged <2 -

Location A: Napa River

Max. Hourly <2 -

Max. Tidally Averaged <2 -

• Experience demonstrates saline brines can be released in an environmentally acceptable manner

• Field experiments clarified dissolution mechanism and rates

• Modeling results showed that Salinity within Napa River remains within natural variability

Page 25: Napa Plant Site  Desalting Modeling Summary

Questions?

Page 26: Napa Plant Site  Desalting Modeling Summary

Input Data - Flow

Flow Data Typical (1999-2005)

Page 27: Napa Plant Site  Desalting Modeling Summary

Input Data - Tidal

Tidal Data Typical per Historical Means