488.039 Million
488.039 Million
S.No
Contractor
%age Above/
Below/
At-Par
Contractor Bid
Cost Rs.
1
2
_________________________
Project Manager
MAK Engineering Services
In Association With WADAN
Consultants Peshawar
Director P&D
Women University Mardan
___________________
Vice Chancellor
Women University
Mardan
PACKAGE # 02
Descriptions BOQ Cost Rs.
Schedule Item (MRS-2017) 427,609,359.06
Sign & Seal of the Bidder: _____________________________________________________________
BILL OF QUANTITY
Estimated / PC-I Cost : Rs.
Total Tender Cost : Rs.
Earnest Money : Rs.
Time Limit : Rs.
NAME OF PROJECT : CONSTRUCTION OF WOMEN UNIVERSITY MARDAN.
Non-Schedule Item 46,471,725.53
GRAND TOTAL COST 474,081,084.59
Total Bid Amount in Words: ___________________________________________________________
CONSTRUCTION OF ACADEMIC BLOCK (SOCIAL SCIENCES)
GENERAL ABSTRACT OF BID COST
___________________
Package-2_Women Uni. Mardan_BOQ Page 1 of 17
MRS- 2017 N.S.I
1 1 427,609,359.06 46,471,725.53 474,081,084.59
Rs. 427,609,359.06 46,471,725.53 474,081,084.59
Rs. 427.609 46.472 474.081
S.NoMRS 2017
Item No.Description of Items Units Quantity Item Rate (Rs) Total Amount (Rs)
1 03-23-dExcavation in foundation of building,
bridges etc complete : in shingle/gravelm3 14,410.92 273.34 3,939,080.87
203-17-a+18-
a,b,c,d
Transportation of earth all types for every
1 km extra lead or part thereof beyond 8
km.(Upto 2 KM)
m3 4,323.28 272.09 1,176,321.26
3 03-22
Dressing of earthwork (done by
machinery or otherwise & left undressed)
to designed section
m2 4,113.41 9.81 40,352.55
4 03-16-a
Filling, watering and ramming earth under
floor with surplus earth from foundation,
etc
m3 7,205.46 103.30 744,324.02
5 26-15Spraying anti-termite liquid mixed with
water in the ratio of 1:40m2 4,856.44 13.59 65,999.02
6 06-05-i
Plain Cement Concrete including placing,
compacting, finishing & curing (Ratio
1:4:8)
m3 413.53 5,481.08 2,266,591.01
7 06-06-b-03
RCC in raft foundation slab, base slab of
column & ret. wall etc, not including in 06-
06. Type C(1:2:4)
m3 2,532.28 8,330.73 21,095,740.96
8 06-06-b-02
RCC in raft foundation slab, base slab of
column & ret. wall etc, not including in 06-
06 Type B (1:1.5:3)
m3 644.72 9,724.42 6,269,528.06
BILL OF QUANTITIES (BOQ)
01 : CIVIL WORK ------ S.I
1.1 - WORKS IN SUB-STRUCTURE
NOTE:
Bidding Documents are available in the office of ABC Peshawar, Ph # 091-0000000, 0332-0000000 and
can be obtained on any working day during office hours at least one day before the closing date @ Rs.
0000/- Per set.
NAME OF PROJECT : CONSTRUCTION OF WOMEN UNIVERSITY MARDAN.
S.No. # 1: CONSTRUCTION OF ACADEMIC BLOCK (SOCIAL SCIENCES)
NOTE: All other/ extra items if required on site will be paid on MRS-2017 or Market Rate Analysis.
S.No Descriptions NoEstimated Cost Rs. (M) Total Estimated
Cost Rs. (M)
Academic Block (Sciences)
TOTAL COST
In Million
GENERAL ABSTRACT OF TENDER COST
Package-2_Women Uni. Mardan_BOQ Page 2 of 17
S.NoMRS 2017
Item No.Description of Items Units Quantity Item Rate (Rs) Total Amount (Rs)
01 : CIVIL WORK ------ S.I9 06-38-b
Erecting & removing formwork to concrete
in any shape / position (Vertical)m2 512.08 552.50 282,924.20
10 06-07-b
Supply & fabricate M.S. reinforcement for
cement concrete (Hot rolled deformed
bars Grade 60)
Tonne 712.78 111,598.88 79,545,449.69
11 07-04-a-03Pacca brick work in foundation and plinth
in Cement, sand mortar 1:4m3 437.09 8,052.81 3,519,802.72
12 12-56-a
Supply and Fixing MS Sheet 16
guage(10x20 feet) box type chowkats
including fixing in position with all charges
for Hold fast, Hinges and Painting etc
m 712.65 1,160.97 827,365.27
13 12-07-c
First class deodar wood wrought joinery in
doors and windows etc. complete : 1.5"
thick
m2 479.23 14,144.77 6,778,598.13
14 12-41-a Fixing Door including chowkats Each 94.00 590.63 55,519.22
15 12-53-d-01
Supply and Fixing aluminium
door/window, Premium 4" sect. Sliding
window
m2 286.90 8,300.02 2,381,275.74
16 12-54-e-03
Supply and Fixing aluminium
bronze/black. Other items : Fly screen
shutter with separate outer frame
m2 286.90 3,653.29 1,048,128.90
17 10-26-d
### Providing and Laying marble fine
dressed stone 2-6 feet and 12" wide 1"
thick for Window sills, as per Design and
Drawings, instructions and approval of the
Engineer.
m2 48.79 2,023.17 98,710.46
18 07-30Supplying and filling sand under floor or
plugging in wellsm3 3,077.06 1,059.40 3,259,837.36
19 06-05-i
Plain Cement Concrete including placing,
compacting, finishing & curing (Ratio
1:4:8)
m3 338.48 5,481.08 1,855,235.96
20 06-05-f
Plain Cement Concrete including placing,
compacting, finishing & curing (Ratio
1:2:4)
m3 256.42 7,257.86 1,861,060.46
21 11-10-bCement plaster 3/8" thick under soffit of
RCC roof slabsm2 1,951.95 255.89 499,484.49
22 12-40
Supply and Fixing accoustic miller fibre
tile ceiling fixed with aluminium tee hung
by GI wire fixed in roof
m2 1,540.93 1,785.48 2,751,299.70
23 11-09-bCement plaster 1:4 upto 20' height 1/2"
thickm2 9,449.47 217.80 2,058,094.57
24 10-26-b
Provide & lay marble fine dressed stone
flooring on surface in white cement
complete: 1" thick (Badel, Silky black,
Sunny white, Sunny Grey or eq)
m2 3,907.95 2,136.04 8,347,537.52
25 06-24-b-03
V. Damp proof c/s plaster, 1 layer
polythene 2 coats bitumen Ratio 1:3 (0.5"
thick), (Washrooms Kitchen wall)
m2 423.43 494.25 209,280.28
26 06-22-b-01
Damp proof course of cem. conc. 1:2:4
including bitumen coat, 1 layer polythene
& 2 coats bitumen (1.5" thick)
m2 139.85 611.86 85,568.62
27 10-38-bGlazed tile 1/4" thick dado jointed in white
cement complete : Coloured Plain tilesm2 393.56 1,541.12 606,523.19
28 10-46-aP/F Ceramic Floor Tiles (Emco, National
or eq) Size : 12" x 12" (Bath Floors)m2 139.85 1,776.21 248,402.97
29 10-26-gProviding and fixing glazed tile colour
printed border 3" widem 239.59 637.98 152,853.63
30 10-26-d
Providing and Laying marble fine dressed
stone 4-5 feet and 12" wide 1" thick for
stairs steps.
m2 80.92 2,023.17 163,714.92
Package-2_Women Uni. Mardan_BOQ Page 3 of 17
S.NoMRS 2017
Item No.Description of Items Units Quantity Item Rate (Rs) Total Amount (Rs)
01 : CIVIL WORK ------ S.I
31 10-41-b
Provide & lay marble fine dressed and
polished stone dado or skirting in white
cement complete : 1/2" thick (Badel, Silky
black, Sunny white, Sunny Grey or eq)
m2 40.30 1,408.99 56,782.30
32 10-26-b
Provide & lay marble fine dressed stone
flooring on surface in white cement
complete: 1" thick (Badel, Silky black,
Sunny white, Sunny Grey or eq)
m2 40.89 2,136.04 87,342.68
33 10-50 Chemical polishing of marble floor/Dado m2 4,070.06 253.49 1,031,719.51
34 12-20-a-01Extra for providing/fixing approved quality
Rim locks : ImportedEach 18.00 1,784.63 32,123.34
35 13-08-a French polishing complete: On new work m2 958.46 671.29 643,404.61
3613-09-
a+b+c
Varnishing wood work, including cleaning
& preparing surface : Three coats.m2 958.46 218.34 209,270.16
3713-30-a+(b
x 2)
Preparing surface and painting with
emulsion paint : 2nd & each subsequent
coat.
m2 8,451.72 323.25 2,732,018.49
38 13-38-(a+b)
Preparing surface & painting with
snowcem / weathershield paint : 2nd &
subsequent coats
m2 3,375.09 266.05 897,942.69
39 16-43
Supply and Fixing polystrene fill in
expansion joints & under diaphragms at
transoms.
m3 4.97 1,403.68 6,976.29
40 06-19Providing and fixing 6" wide GI sheet 18
SWG. stopper to expansion joint.m 141.46 266.99 37,768.41
41 06-06-a-03
RCC in roof slab, beam, column & other
structural members, insitu or precast.
Type C (1:2:4)
m3 1,454.36 9,538.28 13,872,092.90
42 06-06-a-02
RCC in roof slab, beam, column & other
structural members, insitu or precast.
Type B (1:1.5:3)
m3 135.93 10,561.09 1,435,568.96
43 06-07-b
Supply & fabricate M.S. reinforcement for
cement concrete (Hot rolled deformed
bars Grade 60)
Tonne 254.85 111,598.88 28,440,974.57
44 07-05-a-04Pacca brick work in ground floor Cement,
sand mortar 1:5m3 2,501.88 8,452.87 21,148,066.40
45 07-05-a-03Pacca brick work in ground floor Cement,
sand mortar 1:4m3 1.23 8,623.05 10,606.35
46 07-16-b-04Perf. pacca brick wall 1/2 brick thick in
ground floor : Cement, sand mortar 1:5m2 2,346.05 829.85 1,946,869.59
47 11-18-aCement pointing struck joints, on walls,
upto 20' height : Ratio 1:2m2 637.22 239.39 152,544.10
48 11-31
Extra cost of labour & material for red
oxide pigment in cement pointing to
match bricks
m2 637.22 24.22 15,433.47
49 12-56-a
Supply and Fixing MS Sheet 16
guage(10x20 feet) box type chowkats
including fixing in position with all charges
for Hold fast, Hinges and Painting etc
m 745.58 1,160.97 865,596.01
50 12-07-c
First class deodar wood wrought joinery in
doors and windows etc. complete : 1.5"
thick
m2 350.33 14,144.77 4,955,337.27
51 12-41-a Fixing Door including chowkats Each 96.00 590.63 56,700.48
52 12-53-d-01
Supply and Fixing aluminium
door/window, Premium 4" sect. Sliding
window
m2 278.53 8,300.02 2,311,804.57
1.2 - WORK AT GROUND FLOOR
Package-2_Women Uni. Mardan_BOQ Page 4 of 17
S.NoMRS 2017
Item No.Description of Items Units Quantity Item Rate (Rs) Total Amount (Rs)
01 : CIVIL WORK ------ S.I53 12-54-e-03
Supply and Fixing aluminium
bronze/black. Other items : Fly screen
shutter with separate outer frame
m2 278.53 3,653.29 1,017,550.86
54 10-26-d
### Providing and Laying marble fine
dressed stone 2-6 feet and 12" wide 1"
thick for Window sills, as per Design and
Drawings, instructions and approval of the
Engineer.
m2 47.40 2,023.17 95,898.26
55 07-30Supplying and filling sand under floor or
plugging in wellsm3 178.42 1,059.40 189,018.15
56 06-05-i
Plain Cement Concrete including placing,
compacting, finishing & curing (Ratio
1:4:8)
m3 14.87 5,481.08 81,503.66
57 06-05-f
Plain Cement Concrete including placing,
compacting, finishing & curing (Ratio
1:2:4)
m3 268.85 7,257.86 1,951,275.66
58 10-15-e
Provide & lay topping of concrete 1:2:4,
including surface finishing & dividing in
panels : 2" thick
m2 745.82 577.81 430,942.25
59 10-43-d
Providing and Fixing marble strip 2" wide
and 3/8" thick for dividing the floor into
panels
m 815.55 25.84 21,073.81
60 10-45
P/F Precast Concrete 7000 psi TUFF
Tiles over bed of 2" thick sand & 4" thick
brick ballast comp
m2 212.39 1,089.11 231,316.07
61 11-10-bCement plaster 3/8" thick under soffit of
RCC roof slabsm2 1,873.39 255.89 479,381.77
62 12-40
Supply and Fixing accoustic miller fibre
tile ceiling fixed with aluminium tee hung
by GI wire fixed in roof
m2 1,515.65 1,785.48 2,706,162.76
63 11-09-bCement plaster 1:4 upto 20' height 1/2"
thickm2 9,661.53 217.80 2,104,281.23
64 10-26-b
Provide & lay marble fine dressed stone
flooring on surface in white cement
complete: 1" thick (Badel, Silky black,
Sunny white, Sunny Grey or eq)
m2 3,172.28 2,136.04 6,776,116.97
65 06-24-b-03
V. Damp proof c/s plaster, 1 layer
polythene 2 coats bitumen Ratio 1:3 (0.5"
thick), (Washrooms Kitchen wall)
m2 390.26 494.25 192,886.01
66 06-22-b-01
Damp proof course of cem. conc. 1:2:4
including bitumen coat, 1 layer polythene
& 2 coats bitumen (1.5" thick)
m2 150.08 611.86 91,827.95
67 10-38-bGlazed tile 1/4" thick dado jointed in white
cement complete : Coloured Plain tilesm2 377.94 1,541.12 582,450.89
68 10-46-aP/F Ceramic Floor Tiles (Emco, National
or eq) Size : 12" x 12" (Bath Floors)m2 150.08 1,776.21 266,573.60
69 10-26-gProviding and fixing glazed tile colour
printed border 3" widem 213.37 637.98 136,125.79
70 10-26-d
Providing and Laying marble fine dressed
stone 4-5 feet and 12" wide 1" thick for
stairs steps.
m2 218.02 2,023.17 441,091.52
71 10-41-b
Provide & lay marble fine dressed and
polished stone dado or skirting in white
cement complete : 1/2" thick (Badel, Silky
black, Sunny white, Sunny Grey or eq)
m2 105.14 1,408.99 148,141.21
72 10-26-b
Provide & lay marble fine dressed stone
flooring on surface in white cement
complete: 1" thick (Badel, Silky black,
Sunny white, Sunny Grey or eq)
m2 129.01 2,136.04 275,570.52
73 10-50 Chemical polishing of marble floor/Dado m2 3,624.45 253.49 918,761.83
Package-2_Women Uni. Mardan_BOQ Page 5 of 17
S.NoMRS 2017
Item No.Description of Items Units Quantity Item Rate (Rs) Total Amount (Rs)
01 : CIVIL WORK ------ S.I74 12-20-a-01Extra for providing/fixing approved quality
Rim locks : ImportedEach 18.00 1,784.63 32,123.34
75 13-08-a French polishing complete: On new work m2 591.36 671.29 396,974.05
7613-09-
a+b+c
Varnishing wood work, including cleaning
& preparing surface : Three coats.m2 591.36 218.34 129,117.54
7713-30-a+(b
x 2)
Preparing surface and painting with
emulsion paint : 2nd & each subsequent
coat.
m2 8,384.19 323.25 2,710,189.42
78 16-43
Supply and Fixing polystrene fill in
expansion joints & under diaphragms at
transoms.
m3 4.97 1,403.68 6,976.29
79 06-19Providing and fixing 6" wide GI sheet 18
SWG. stopper to expansion joint.m 141.46 266.99 37,768.41
80 06-06-a-03
RCC in roof slab, beam, column & other
structural members, insitu or precast.
Type C (1:2:4)
m3 764.92 9,538.28 7,296,021.14
81 06-06-a-02
RCC in roof slab, beam, column & other
structural members, insitu or precast.
Type B (1:1.5:3)
m3 135.93 10,561.09 1,435,568.96
82 06-06-eAdd extra labour for RCC in 2nd &
subsequent storeysm3 900.84 844.24 760,525.16
83 06-07-b
Supply & fabricate M.S. reinforcement for
cement concrete (Hot rolled deformed
bars Grade 60)
Tonne 144.36 111,598.88 16,110,414.32
84 07-05-a-04Pacca brick work in ground floor Cement,
sand mortar 1:5m3 1,285.92 8,452.87 10,869,714.59
85 07-05-a-03Pacca brick work in ground floor Cement,
sand mortar 1:4m3 1.23 8,623.05 10,606.35
86 07-06-aAdd extra on item No.07-05 for brick work
in First floorm3 1,287.15 417.29 537,114.82
87 07-16-b-04Perf. pacca brick wall 1/2 brick thick in
ground floor : Cement, sand mortar 1:5m2 2,346.05 829.85 1,946,869.59
88 07-17-aAdd extra on item No. 07-16 for pacca
brick work in First floorm2 2,346.05 51.76 121,431.55
89 11-18-aCement pointing struck joints, on walls,
upto 20' height : Ratio 1:2m2 637.22 239.39 152,544.10
90 11-31
Extra cost of labour & material for red
oxide pigment in cement pointing to
match bricks
m2 637.22 24.22 15,433.47
91 12-56-a
Supply and Fixing MS Sheet 16
guage(10x20 feet) box type chowkats
including fixing in position with all charges
for Hold fast, Hinges and Painting etc
m 693.75 1,160.97 805,422.94
92 12-07-c
First class deodar wood wrought joinery in
doors and windows etc. complete : 1.5"
thick
m2 285.27 14,144.77 4,035,078.54
93 12-41-a Fixing Door including chowkats Each 94.00 590.63 55,519.22
94 12-53-d-01
Supply and Fixing aluminium
door/window, Premium 4" sect. Sliding
window
m2 287.45 8,300.02 2,385,840.75
95 12-54-e-03
Supply and Fixing aluminium
bronze/black. Other items : Fly screen
shutter with separate outer frame
m2 287.45 3,653.29 1,050,138.21
96 10-26-d
### Providing and Laying marble fine
dressed stone 2-6 feet and 12" wide 1"
thick for Window sills, as per Design and
Drawings, instructions and approval of the
Engineer.
m2 48.88 2,023.17 98,892.55
1.3 - WORK AT FIRST FLOOR
Package-2_Women Uni. Mardan_BOQ Page 6 of 17
S.NoMRS 2017
Item No.Description of Items Units Quantity Item Rate (Rs) Total Amount (Rs)
01 : CIVIL WORK ------ S.I97 06-05-f
Plain Cement Concrete including placing,
compacting, finishing & curing (Ratio
1:2:4)
m3 253.98 7,257.86 1,843,351.28
98 06-12-bExtra labour for laying concrete (plain or
reinforced) For every extra10' heightm3 253.98 397.29 100,903.71
99 11-10-bCement plaster 3/8" thick under soffit of
RCC roof slabsm2 1,856.44 255.89 475,044.43
100 12-40
Supply and Fixing accoustic miller fibre
tile ceiling fixed with aluminium tee hung
by GI wire fixed in roof
m2 388.21 1,785.48 693,141.19
101 11-09-bCement plaster 1:4 upto 20' height 1/2"
thickm2 8,056.50 217.80 1,754,705.70
102 10-26-b
Provide & lay marble fine dressed stone
flooring on surface in white cement
complete: 1" thick (Badel, Silky black,
Sunny white, Sunny Grey or eq)
m2 3,159.85 2,136.04 6,749,565.99
103 06-24-b-03
V. Damp proof c/s plaster, 1 layer
polythene 2 coats bitumen Ratio 1:3 (0.5"
thick), (Washrooms Kitchen wall)
m2 390.26 494.25 192,886.01
104 06-22-b-01
Damp proof course of cem. conc. 1:2:4
including bitumen coat, 1 layer polythene
& 2 coats bitumen (1.5" thick)
m2 150.08 611.86 91,827.95
105 10-38-bGlazed tile 1/4" thick dado jointed in white
cement complete : Coloured Plain tilesm2 377.94 1,541.12 582,450.89
106 10-46-aP/F Ceramic Floor Tiles (Emco, National
or eq) Size : 12" x 12" (Bath Floors)m2 150.08 1,776.21 266,573.60
107 10-26-gProviding and fixing glazed tile colour
printed border 3" widem 213.37 637.98 136,125.79
108 10-26-d
Providing and Laying marble fine dressed
stone 4-5 feet and 12" wide 1" thick for
stairs steps.
m2 80.92 2,023.17 163,714.92
109 10-41-b
Provide & lay marble fine dressed and
polished stone dado or skirting in white
cement complete : 1/2" thick (Badel, Silky
black, Sunny white, Sunny Grey or eq)
m2 36.59 1,408.99 51,554.94
110 10-26-b
Provide & lay marble fine dressed stone
flooring on surface in white cement
complete: 1" thick (Badel, Silky black,
Sunny white, Sunny Grey or eq)
m2 129.01 2,136.04 275,570.52
111 10-50 Chemical polishing of marble floor/Dado m2 3,406.36 253.49 863,478.20
112 10-18
Extra labour for each storey above ground
for mosaic, conglomerate, tiles, stone &
wood floor
m2 4,048.31 45.39 183,752.79
113 12-20-a-01Extra for providing/fixing approved quality
Rim locks : ImportedEach 18.00 1,784.63 32,123.34
114 13-08-a French polishing complete: On new work m2 570.54 671.29 382,997.80
11513-09-
a+b+c
Varnishing wood work, including cleaning
& preparing surface : Three coats.m2 570.54 218.34 124,571.70
11613-30-a+(b
x 2)
Preparing surface and painting with
emulsion paint : 2nd & each subsequent
coat.
m2 7,114.64 323.25 2,299,807.38
117 16-43
Supply and Fixing polystrene fill in
expansion joints & under diaphragms at
transoms.
m3 4.97 1,403.68 6,976.29
118 06-19Providing and fixing 6" wide GI sheet 18
SWG. stopper to expansion joint.m 141.46 266.99 37,768.41
1.4 - WORK AT SECOND FLOOR
Package-2_Women Uni. Mardan_BOQ Page 7 of 17
S.NoMRS 2017
Item No.Description of Items Units Quantity Item Rate (Rs) Total Amount (Rs)
01 : CIVIL WORK ------ S.I119 06-06-a-03
RCC in roof slab, beam, column & other
structural members, insitu or precast.
Type C (1:2:4)
m3 764.92 9,538.28 7,296,021.14
120 06-06-a-02
RCC in roof slab, beam, column & other
structural members, insitu or precast.
Type B (1:1.5:3)
m3 135.93 10,561.09 1,435,568.96
121 06-06-ex2Add extra labour for RCC in 2nd &
subsequent storeysm3 900.84 1,688.48 1,521,050.32
122 06-07-b
Supply & fabricate M.S. reinforcement for
cement concrete (Hot rolled deformed
bars Grade 60)
Tonne 144.36 111,598.88 16,110,414.32
123 07-05-a-04Pacca brick work in ground floor Cement,
sand mortar 1:5m3 1,285.92 8,452.87 10,869,714.59
124 07-05-a-03Pacca brick work in ground floor Cement,
sand mortar 1:4m3 1.23 8,623.05 10,606.35
125 07-06-bAdd extra on item No.07-05 for brick work
in in Second floorm3 1,287.15 794.71 1,022,910.98
126 07-16-b-04Perf. pacca brick wall 1/2 brick thick in
ground floor : Cement, sand mortar 1:5m2 2,346.05 829.85 1,946,869.59
127 07-17-bAdd extra on item No. 07-16 for pacca
brick work in Second floorm2 2,346.05 109.26 256,329.42
128 11-18-aCement pointing struck joints, on walls,
upto 20' height : Ratio 1:2m2 637.22 239.39 152,544.10
129 11-31
Extra cost of labour & material for red
oxide pigment in cement pointing to
match bricks
m2 637.22 24.22 15,433.47
130 12-56-a
Supply and Fixing MS Sheet 16
guage(10x20 feet) box type chowkats
including fixing in position with all charges
for Hold fast, Hinges and Painting etc
m 693.75 1,160.97 805,422.94
131 12-07-c
First class deodar wood wrought joinery in
doors and windows etc. complete : 1.5"
thick
m2 285.27 14,144.77 4,035,078.54
132 12-41-a Fixing Door including chowkats Each 94.00 590.63 55,519.22
133 12-53-d-01
Supply and Fixing aluminium
door/window, Premium 4" sect. Sliding
window
m2 287.45 8,300.02 2,385,840.75
134 12-54-e-03
Supply and Fixing aluminium
bronze/black. Other items : Fly screen
shutter with separate outer frame
m2 287.45 3,653.29 1,050,138.21
135 10-26-d
### Providing and Laying marble fine
dressed stone 2-6 feet and 12" wide 1"
thick for Window sills, as per Design and
Drawings, instructions and approval of the
Engineer.
m2 48.88 2,023.17 98,892.55
136 06-05-f
Plain Cement Concrete including placing,
compacting, finishing & curing (Ratio
1:2:4)
m3 253.98 7,257.86 1,843,351.28
137 06-12-bExtra labour for laying concrete (plain or
reinforced) For every extra10' heightm3 253.98 397.29 100,903.71
138 11-10-bCement plaster 3/8" thick under soffit of
RCC roof slabsm2 1,856.44 255.89 475,044.43
139 12-40
Supply and Fixing accoustic miller fibre
tile ceiling fixed with aluminium tee hung
by GI wire fixed in roof
m2 388.21 1,785.48 693,141.19
140 11-09-bCement plaster 1:4 upto 20' height 1/2"
thickm2 8,056.50 217.80 1,754,705.70
141 11-28
Extra for lime, mud or cement plaster &
pointing from 20' & above for each
additional 10' height
m2 9,912.94 28.20 279,544.91
142 10-26-b
Provide & lay marble fine dressed stone
flooring on surface in white cement
complete: 1" thick (Badel, Silky black,
Sunny white, Sunny Grey or eq)
m2 3,159.85 2,136.04 6,749,565.99
Package-2_Women Uni. Mardan_BOQ Page 8 of 17
S.NoMRS 2017
Item No.Description of Items Units Quantity Item Rate (Rs) Total Amount (Rs)
01 : CIVIL WORK ------ S.I143 06-24-b-03
V. Damp proof c/s plaster, 1 layer
polythene 2 coats bitumen Ratio 1:3 (0.5"
thick), (Washrooms Kitchen wall)
m2 390.26 494.25 192,886.01
144 06-22-b-01
Damp proof course of cem. conc. 1:2:4
including bitumen coat, 1 layer polythene
& 2 coats bitumen (1.5" thick)
m2 150.08 611.86 91,827.95
145 10-38-bGlazed tile 1/4" thick dado jointed in white
cement complete : Coloured Plain tilesm2 377.94 1,541.12 582,450.89
146 10-46-aP/F Ceramic Floor Tiles (Emco, National
or eq) Size : 12" x 12" (Bath Floors)m2 150.08 1,776.21 266,573.60
147 10-26-gProviding and fixing glazed tile colour
printed border 3" widem 213.37 637.98 136,125.79
148 10-26-d
Providing and Laying marble fine dressed
stone 4-5 feet and 12" wide 1" thick for
stairs steps.
m2 80.92 2,023.17 163,714.92
149 10-41-b
Provide & lay marble fine dressed and
polished stone dado or skirting in white
cement complete : 1/2" thick (Badel, Silky
black, Sunny white, Sunny Grey or eq)
m2 36.59 1,408.99 51,554.94
150 10-26-b
Provide & lay marble fine dressed stone
flooring on surface in white cement
complete: 1" thick (Badel, Silky black,
Sunny white, Sunny Grey or eq)
m2 129.01 2,136.04 275,570.52
151 10-50 Chemical polishing of marble floor/Dado m2 3,406.36 253.49 863,478.20
152 10-18x2
Extra labour for each storey above ground
for mosaic, conglomerate, tiles, stone &
wood floor
m2 4,048.31 90.78 367,505.58
153 12-20-a-01Extra for providing/fixing approved quality
Rim locks : ImportedEach 18.00 1,784.63 32,123.34
154 13-08-a French polishing complete: On new work m2 570.54 671.29 382,997.80
15513-09-
a+b+c
Varnishing wood work, including cleaning
& preparing surface : Three coats.m2 570.54 218.34 124,571.70
15613-30-a+(b
x 2)
Preparing surface and painting with
emulsion paint : 2nd & each subsequent
coat.
m2 7,114.64 323.25 2,299,807.38
157 13-37
Extra labour for painting, varnishing etc
from 20' height & above, for every
additional 10'
m2 7,738.20 10.89 84,269.00
158 16-43
Supply and Fixing polystrene fill in
expansion joints & under diaphragms at
transoms.
m3 4.97 1,403.68 6,976.29
159 06-19Providing and fixing 6" wide GI sheet 18
SWG. stopper to expansion joint.m 141.46 266.99 37,768.41
160 06-06-a-03
RCC in roof slab, beam, column & other
structural members, insitu or precast.
Type C (1:2:4)
m3 116.31 9,538.28 1,109,397.35
161 06-06-a-02
RCC in roof slab, beam, column & other
structural members, insitu or precast.
Type B (1:1.5:3)
m3 19.88 10,561.09 209,954.47
162 06-05-f
Plain Cement Concrete including placing,
compacting, finishing & curing (Ratio
1:2:4)
m3 28.48 7,257.86 206,703.85
163 06-06-ex3Add extra labour for RCC in 2nd &
subsequent storeysm3 136.19 2,532.72 344,931.14
164 06-07-c
Supply & fabricate M.S. reinforcement for
cement concrete (Hot rolled deformed
bars Grade 40)
Tonne 13.09 107,564.41 1,408,018.13
1.5 - WORK AT TOP ROOF
Package-2_Women Uni. Mardan_BOQ Page 9 of 17
S.NoMRS 2017
Item No.Description of Items Units Quantity Item Rate (Rs) Total Amount (Rs)
01 : CIVIL WORK ------ S.I165 07-05-a-04Pacca brick work in ground floor Cement,
sand mortar 1:5m3 391.13 8,452.87 3,306,171.04
166 07-06-cAdd extra on item No.07-05 for brick work
in Third floorm3 391.13 1,172.14 458,459.12
167 07-16-b-04Perf. pacca brick wall 1/2 brick thick in
ground floor : Cement, sand mortar 1:5m2 1,575.79 829.85 1,307,669.33
168 07-17-cAdd extra on item No. 07-16 for pacca
brick work in Third floorm2 1,575.79 168.72 265,867.29
169 11-18-aCement pointing struck joints, on walls,
upto 20' height : Ratio 1:2m2 40.15 239.39 9,611.51
170 11-31
Extra cost of labour & material for red
oxide pigment in cement pointing to
match bricks
m2 40.15 24.22 972.43
171 12-53-d-01
Supply and Fixing aluminium
door/window, Premium 4" sect. Sliding
window
m2 41.82 8,300.02 347,106.84
172 12-54-e-03
Supply and Fixing aluminium
bronze/black. Other items : Fly screen
shutter with separate outer frame
m2 33.46 3,653.29 122,239.08
173 10-26-d
### Providing and Laying marble fine
dressed stone 2-6 feet and 12" wide 1"
thick for Window sills, as per Design and
Drawings, instructions and approval of the
Engineer.
m2 5.58 2,023.17 11,289.29
174 06-19Providing and fixing 6" wide GI sheet 18
SWG. stopper to expansion joint.m 103.66 266.99 27,676.18
175 25-47-a
Supplying and Fixing 18 SWG MS Sheet
Door with angle iron frame
(1.5"x1.5"x1/8"), bolt, hinges, paint etc
complete
m2 13.01 5,412.20 70,412.72
176 11-10-cCement plaster 3/8" thick under soffit of
RCC roof slabsm2 852.86 237.75 202,767.47
177 11-09-bCement plaster 1:4 upto 20' height 1/2"
thickm2 2,958.09 217.80 644,272.00
178 11-28x2
Extra for lime, mud or cement plaster &
pointing from 20' & above for each
additional 10' height
m2 3,810.95 56.40 214,937.58
179 09-05
Single layer of tiles 10"x5"x1.25" laid over
4" earth and 1" mud plaster on top of RC
roof slab
m2 3,654.18 1,401.62 5,121,771.77
180 09-45
Providing and Laying Prestressed Roof
of Slab/Girder, 2" thick PCC 1:2:4 with
chicken mesh, polythene, mud, tar
m2 3,654.18 2,229.74 8,147,871.31
181 09-15 Khuras on roof 2'x2'x6" Each 65.00 639.59 41,573.35
18213-30-a+(b
x 2)
Preparing surface and painting with
emulsion paint : 2nd & each subsequent
coat.
m2 749.91 323.25 242,408.41
183 13-38-(a+b)
Preparing surface & painting with
snowcem / weathershield paint : 2nd &
subsequent coats
m2 2,554.46 266.05 679,614.08
184 13-37x2
Extra labour for painting, varnishing etc
from 20' height & above, for every
additional 10'
m2 3,304.37 21.78 71,969.18
185 14-70-a
### uPVC Rain Water Down pipe type B
110mm dia including testing with all
accessories (using Dadex or eq) complete
in all respect as per Design and Drawings,
instructions and approval of the Engineer.
m 1,189.02 1,162.54 1,382,283.31
413,509,441.00Sub Total of Sect. # 01- S.I Rs.
02 : INTERNAL ELECTRIFICATION
Package-2_Women Uni. Mardan_BOQ Page 10 of 17
S.NoMRS 2017
Item No.Description of Items Units Quantity Item Rate (Rs) Total Amount (Rs)
01 : CIVIL WORK ------ S.I
NOTE
The Contractor should note that only
material Listed in Anouxer " A" from
the approval manufactures shall be
allowed to be used on this project.
Where more than one manufactures is
specified against any item the
contractor shall provide samples /
literature ect of the item to the
Engineer In Encharg for selection and
approval . Contractor should be bound
to provide certificate of material which
material they used at side .
Contractor should be bound to provide
Test certificate of Engineering
University, P C S I R Laborite &
Physicists Departments all size of
Cables , all type of Breaker,Other
Material which they used at sides.
NOTE
Supply, installation, testing and
commissioning of the following items
of work (unless specifically stated
otherwise) including all material,
labour, tools, accessories, etc.
required for proper completion of each
item as per specification and drawings
and as directed by the Engineer.
Supply an Erection of single core pvc
insulated copper conductor cable
250/440V &660/1100V Payments shall
be paid actual length installed at site
Complate in all Respects As per
Instruction of Engineer In Charge
1 15-50
Wiring of light/fan/call-bell point in 3/0.029
PVC insulated bare cable in PVC pipe
recessed
Each 2,225.00 906.65 2,017,296.25
2 15-51
Wiring of 2/3-pin 5-Amp. plug point in
3/0.029 PVC insulated bare cable in PVC
pipe recessed
Each 294.00 439.49 129,210.06
Providing & Installation Of following
Sizes P V C Pipe For wiring / main sub
main Cables purpose Payments shall
paid actual lenght installed at site
Complate in all Respects As per
Instruction of Engineer In Charge
3 15-02-b-02
Supply and Erection PVC pipe for wiring
purpose complete Recessed in walls
including chase etc : 3/4" i/d
m 1,660.00 312.69 519,065.40
4 15-02-b-03
Supply and Erection PVC pipe for wiring
purpose complete Recessed in walls
including chase etc : 1" i/d
m 2,560.00 289.18 740,300.80
5 15-02-b-06
Supply and Erection PVC pipe for wiring
purpose complete Recessed in walls
including chase etc : 2" i/d
m 160.00 388.05 62,088.00
6 15-02-b-08
Supply and Erection PVC pipe for wiring
purpose complete Recessed in walls
including chase etc : 4" i/d
m 120.00 544.97 65,396.40
Package-2_Women Uni. Mardan_BOQ Page 11 of 17
S.NoMRS 2017
Item No.Description of Items Units Quantity Item Rate (Rs) Total Amount (Rs)
01 : CIVIL WORK ------ S.ISupply an Erection of single core pvc
insulated copper conductor cable
250/440V &660/1100V Payments shall
be paid actual length installed at site
Complate in all Respects As per
Instruction of Engineer In Charge
7 15-05-a
Supply and Erection single core PVC
insulated copper conductor 250/440 V
grade cable : 3/0.029"
m 7,920.00 39.47 312,602.40
8 15-05-c
Supply and Erection single core PVC
insulated copper conductor 250/440 V
grade cable : 7/0.029"
m 12,600.00 66.66 839,916.00
9 15-05-d
Supply and Erection single core PVC
insulated copper conductor 250/440 V
grade cable : 7/0.036"
m 6,480.00 100.97 654,285.60
10 15-05-e
Supply and Erection single core PVC
insulated copper conductor 250/440 V
grade cable : 7/0.044"
m 9,010.00 164.83 1,485,118.30
11 15-05-f
Supply and Erection single core PVC
insulated copper conductor 250/440 V
grade cable : 7/0.064"
m 120.00 337.86 40,543.20
12 15-07-b
Supply and Erection single core PVC
insulated & sheathed copper conductor,
660/1 100V cable : 19/0.052"
m 120.00 500.64 60,076.80
13 15-07-c
Supply and Erection single core PVC
insulated & sheathed copper conductor,
660/1 100V cable : 19/0.064"
m 140.00 629.26 88,096.40
14 15-68-c
Supply and Erection best quality AC
ceiling fan complete with GI rod, canopy,
blades & regulator : 56" sweep
Each 280.00 3,926.86 1,099,520.80
15 15-78Supply and Fixing bracket fan pak made
completeEach 40.00 3,307.00 132,280.00
16 15-77-c
Supply and fixing electric AC
exhaust/fresh air circulation(Double way)
220/230 single phase plastic frame body
and blade complete 12"x12"
Each 80.00 3,288.23 263,058.40
Supply & Erection of transpower auto
circuit breaker 3-phase , / 1 phase 400V
Complate in all Respects As per
Instruction of Engineer In Charge
17 15-71-aSupply and Erection single phase
imported auto circuit breaker 6 Amp.Each 224.00 482.60 108,102.40
18 15-71-bSupply and Erection single phase
imported auto circuit breaker 15 Amp.Each 288.00 507.00 146,016.00
19 15-71-cSupply and Erection single phase
imported auto circuit breaker 20 Amp.Each 432.00 539.54 233,081.28
20 15-70-a
Supply and Erection transpower auto
circuit breaker 3-phase, 400V fungus
moisture proofing : 30 Amp.
Each 16.00 2,302.10 36,833.60
21 15-70-b
Supply and Erection transpower auto
circuit breaker 3-phase, 400V fungus
moisture proofing : 60 Amp.
Each 16.00 3,320.80 53,132.80
22 15-70-c
Supply and Erection transpower auto
circuit breaker 3-phase, 400V fungus
moisture proofing : 100 Amp.
Each 24.00 5,482.94 131,590.56
23 15-72-b
Supply and Erection of bus bars 500
volts 3 phase AC supply with 4 copper
bars - 100 Amp with bar size1 1 1/2" X
1/8"
Each 56.00 8,260.00 462,560.00
Package-2_Women Uni. Mardan_BOQ Page 12 of 17
S.NoMRS 2017
Item No.Description of Items Units Quantity Item Rate (Rs) Total Amount (Rs)
01 : CIVIL WORK ------ S.I24 15-75-b
Supply and Erection cubical type factory
fabricated floor/wall mounting steel main
board comp. : Recessed
m2 15.60 58,286.03 909,262.07
25 15-25Supply and Erection girder clamp hook,
5/8" dia.for hanging ceiling fansEach 280.00 318.11 89,070.80
10,678,504.32
1 14-70-a
Providing and Fixing of pipe type B nikasi
system including testing in all respect 110
mm (using dadex, or eq)
m 523.00 1,162.54 608,008.42
2 14-70-b
Providing and Fixing of pipe type B nikasi
system including testing in all respect 75
mm (using dadex, or eq)
m 425.00 861.36 366,078.00
3 14-71-b
Providing and Fixing of poly dex high
pressure PPR(green including testing ect
complete 20 mm(including all special etc)
m 486.00 399.64 194,225.04
4 14-55-dProviding and Fixing GI pipe & including
specials complete 1" dia (light)m 470.00 426.59 200,497.30
5 14-55-eProviding and Fixing GI pipe & including
specials complete 3/4" dia (light)m 385.00 334.37 128,732.45
6 14-55-fProviding and Fixing GI pipe & including
specials complete 1/2" dia (light)m 325.00 255.64 83,083.00
7 14-31-b
Providing and Fixing CI floor trap
including CI grating & concrete chamber
all round : 4"x3"
Each 160.00 806.00 128,960.00
8 14-32-aProviding and Fixing 'P' trap including GI
grating & PCC chamber 4" of cast ironEach 145.00 853.50 123,757.50
9 14-24-bProviding and Fixing CP bib-cock, heavy
type : 1/2"Each 175.00 518.72 90,776.00
10 14-25Providing and Fixing 1/2" CP tee stop
cockEach 180.00 543.13 97,763.40
11 14-27Providing and Fixing CP mixing valve for
WHB, sink or showerEach 215.00 2,129.13 457,762.95
12 14-10-a
Providing and Fixing glazed earthen ware
low down flushing cistern 3 gallons
capacity : White
Each 82.00 2,299.10 188,526.20
13 14-13 Providing and Fixing CP soap dish. Each 110.00 543.13 59,744.30
14 14-17Providing and Fixing best quality 5mm
mirror 22"x16" sizeEach 110.00 1,463.81 161,019.10
15 14-15Providing and Fixing CP toilet paper
holderEach 110.00 482.13 53,034.30
16 14-16-aProviding and Fixing CP towel rail : 24"
long, 3/4" diaEach 110.00 787.13 86,584.30
17 14-18-a
Providing and Fixing best quality 5mm
glass shelf 24"x5" With chromium plated
brackets & railing
Each 110.00 612.00 67,320.00
18 14-47-cProviding and Fixing 1/2" dia connection
including check nuts etc CP connectionEach 361.00 194.43 70,189.23
19 14-41-bProviding and Fixing CP waste coupling :
1.5"Each 65.00 520.50 33,832.50
20 14-43-bProviding and Fixing waste pipe of PVC :
1.5"Each 75.00 341.83 25,637.25
21 14-03-b
Providing and Fixing glazed earthen ware
WC squatting type with built-in foot rests :
Coloured
Each 110.00 1,780.75 195,882.50
3,421,413.74
03 : INTERNAL WATER SUPPLY AND SEWERAGE SYSTEM
Sub Total of Sect. # 03- S.I Rs.
Sub Total of Sect. # 02- S.I Rs.
Package-2_Women Uni. Mardan_BOQ Page 13 of 17
S.NoMRS 2017
Item No.Description of Items Units Quantity Item Rate (Rs) Total Amount (Rs)
01 : CIVIL WORK ------ S.I
1 NSI
Supply & Fixing Deodar wood Beading
2.5" Wide and 1/2" thick Complete, as per
Design and Drawings, instructions and
approval of the Engineer.
m 6,189.02 329.00 2,036,187.58
2 NSI
Supply & Fixing Special Quality of Main
Door Handel Locks (Italian CAL
Company) complete, as per Design and
Drawings, instructions and approval of the
Engineer.
Each 378.00 8,754.00 3,309,012.00
3 NSI
Providing, fabricating and fixing in position
2'-9" high stair Hand railling fixed in each
step comprising of 2" diameter 16 SWG
(Non Magnet grade 304) stainless steel
pipe at top, 1-1/2" SS baluster fixed after
every 4 steps or as shown in drawings,
and middel 3/4" dia. SS bars horizontally
(3 No.), 3" Dai Master at start and end
point (commercial) including cost of base
plate, rawal bolts, rawal plugs, RCC
cuttings if required complete in all
respects by instructions and approval of
the Engineer. (Floor mounted)
m 180.78 8,710.00 1,574,593.80
4 NSI
Providing, fabricating and fixing in position
3 ft high Terrace railling fixed in Position
comprising of 2" diameter 16 SWG(Non
Magnet grade 304 ) stainless steel pipe
at top, 1-1/2" SS baluster fixed as shown
in drawings, and middel 3/4" dia.SS bars
horizontally (3 No.), including cost of base
plate, rawal bolts, rawal plugs, RCC
cuttings if required complete in all
respects by instructions and approval of
the Engineer.
m 1,158.48 7,395.00 8,566,959.60
5 NSI
Providing and Fixing best quality 5mm
thick clear Glass ( Ghani Made) as
specified complete. as per instructions
and approval of the Engineer.
m2 294.68 1,345.00 396,344.60
6 NSI
Providing, fabricating and fixing in position
Stainless steel Stair railling along wall
Mounted 2" diameter 16 SWG (Non
Magnet grade 304 ) stainless steel pipe
hand rail, 3/16" x 1-1/2" M.S.flate welded
to 1-1/2" dia brass pipe (baluster) and
screwed to stainless steel pipe hand rail.
1-1/2" dia brass pipe 1/8" wall thickness 5'
c/c etc. fixing with 1/4" thick 3" dia brass
plate srewed with rawal plugs as per hand
rail & Baluter fixing details, complete in all
respects as per drawings, instructions and
approval of the Engineer.( Wall mounted )
m 135.36 2,235.00 302,529.60
7 NSI
Providing and fixing 2" dia Baker rod and
2 part polysulphide sealent in expansion
joint upto 2" wide as directed by
Engineer.
m 397.56 875.00 347,865.00
NON-SCHEDULE ITEMS
1- CIVIL WORKS ------ GF TO TOP
Package-2_Women Uni. Mardan_BOQ Page 14 of 17
S.NoMRS 2017
Item No.Description of Items Units Quantity Item Rate (Rs) Total Amount (Rs)
01 : CIVIL WORK ------ S.I
8 NSI
Providing and Fixing best quality 12 mm
thick clear Glass ( Ghani Made) as
specified complete. as per instructions
and approval of the Engineer.
m2 333.75 3,427.00 1,143,761.25
9 NSI
Providing and Fixing Floor Mouted Double
action spring Hinges . as per instructions
and approval of the Engineer.
Each 18.00 5,582.00 100,476.00
10 NSI
Providing and Fixing best quality frostrate
paper on 12 mm glass as specified
complete. as per instructions and
approval of the Engineer.
m2 139.05 959.00 133,348.95
11 NSI
Providing and Fixing handle for glass
doors as per instructions and approval of
the Engineer.
Each 36.00 1,349.00 48,564.00
12 NSI
S/F Fiberglass Shed 2 layer of imported
T.G.I mate i/c M.S square Pipe 1.5"x1.5"
SWG 18 witk vertical supporting pillars (4"
Dia) SWG 16 complete in all respect as
per the instruction of Engineer Incharge.
m2 496.63 6,953.00 3,453,068.39
13 NSI
Providing and laying waterproofing
membraine consisting of surface
preparation, clean and free from loose
particales, oil, grees, or any other
contaminant, 4mm thick torch applied
waterproofing membraine 4M" , as per
drawing, manufacturer's instructions, and
Specifications, as per approval of the
Engineer.
m2 3,654.18 1,753.20 6,406,508.38
14 NSI
P/L of Jamboo Lawn board 1" thick of
approved Gage complete in all respect as
per Design and Drawings, instructions
and approval of the Engineer. (Roof
Treatment)
m2 3,654.18 729.90 2,667,185.98
15 NSI
Supply and laying of Double layer of
heavy duty polythene sheet 50 SWG over
Bituminious coat as per instructions and
approval of the Engineer. (Roof
Treatment)
m2 3,654.18 30.00 109,625.40
30,596,030.53
Supply an Erection of four core pvc
insulated non armored copper
conductor600 /1000 Volt grid cable
with copper Thimbles of appropriate
size, all punching both sides
identification tags and nut bolt
charges Payments shall be paid actul
lenght installed at site Complate in all
Respects As per Instruction of
Engineer In Charge
1 NSI 10 mm 4 Core PVC /PVC Cable m 70.00 990.00 69,300.00
2 NSI 16 mm 4 Core PVC /PVC Cable m 85.00 1,196.00 101,660.00
3 NSI 25 mm 4 Core PVC /PVC Cable m 90.00 1,634.00 147,060.00
4 NSI 95 mm 4 Core PVC /PVC Cable m 110.00 6,052.00 665,720.00
5 NSI 120 mm 4 Core PVC /PVC Cable m 120.00 8,150.00 978,000.00
6 NSI
Supply, Installation , Testing and
Commissioning of Fancy Calling Light
with 12 w L E D Lamp Complate in all
Respects As per Instruction of Engineer
In Charge
Each 120.00 2,690.00 322,800.00
02- INTERNAL ELECTRIFICATION
Sub Total of Sect. # 01- N.S.I Rs.
Package-2_Women Uni. Mardan_BOQ Page 15 of 17
S.NoMRS 2017
Item No.Description of Items Units Quantity Item Rate (Rs) Total Amount (Rs)
01 : CIVIL WORK ------ S.I
7 NSI
Supply & Installation Testing &
Commissioning Calling Recessed L E D
Panel Lights Fixture 33 w L E D & Driver
( Dimension 596 x 596 x 9 mm ) Comlate
in all Respects As per Instruction of
Engineer In Charge
Each 30.00 9,638.00 289,140.00
8 NSI
Supply & Installation Testing &
Commisioning Calling Recessed
Mounted L E D Down Lights Fixture 12 w
L E D & Driver Comlate in all Respects
As per Instruction of Engineer In Charge
Each 520.00 3,215.00 1,671,800.00
9 NSI
Supply & Installation Testing &
Commisioning Calling Recessed
Mounted L E D Down Lights Fixture 18 w
L E D & Driver Comlate in all Respects
As per Instruction of Engineer In Charge
Each 340.00 3,215.00 1,093,100.00
10 NSI
Supply & Installation Testing &
Commisioning Calling Mounted L E D
Lights Fixture 18 w L E D & Driver
Comlate in all Respects As per Instruction
of Engineer In Charge
Each 720.00 3,615.00 2,602,800.00
11 NSI
Supply, Installation , Testing and
Commissioning of 9 w 2 F L E D G M P
Wall Lights Complate in all Respects As
per Instruction of Engineer In Charge
Each 80.00 2,635.00 210,800.00
12 NSI
Supply, Installation , Testing and
Commissioning of Out Door Fancy Wall
Lights UP & Down Type Water Proof
with 14 w L E D With Driver Complate
in all Respects As per Instruction of
Engineer In Charge
Each 40.00 9,700.00 388,000.00
13 NSI
Supply, Installation,Testing and
Commissioning of 2' X 2' VOLDAM
Invented Sqire Shape Remot Controle
18" dia Ceailing Fsans Complate in all
Respects As per Instruction of Engineer
In Charge
Each 80.00 11,694.00 935,520.00
Supply, installation, testing &
commissioning of Switches & Socket
including appropriate size outlet box
of 16 SWG MS sheet recessed in wall,
column, partition wall etc. complete in
all respect As per Instruction of
Engineer In Charge of following sizes.
14 NSI2/3-pin 5 A 220 V switch socket
International Multi Socket Each 294.00 793.00 233,142.00
15 NSI 3-pin 15 amps 220 V switch socket Each 144.00 665.00 95,760.00
16 NSI 3-pin 20 amps 220 V switch socket Each 96.00 750.00 72,000.00
17 NSI 3 gang one way Each 75.00 435.00 32,625.00
18 NSI 4 gang one way Each 400.00 518.00 207,200.00
19 NSI 6 gang one way Each 250.00 894.00 223,500.00
20 NSI Bell press switch plate Each 30.00 550.00 16,500.00
21 NSI Fan Dimmer with Switch Each 280.00 921.00 257,880.00
22 NSI 1 gang two way Each 48.00 393.00 18,864.00
23 NSI T.V Points with T.V Sockets Each 10.00 3,000.00 30,000.00
Package-2_Women Uni. Mardan_BOQ Page 16 of 17
S.NoMRS 2017
Item No.Description of Items Units Quantity Item Rate (Rs) Total Amount (Rs)
01 : CIVIL WORK ------ S.I
24 NSI
S/E Earthling 24”x24”x1/4 copper plate
riveting Bear copper Conductor 2 x 70
mm 1.5” G.I Light gage ,Pipe Stall Net
Bolt , placing mixture of salt & chare cool
complete in all Respects 15 TO 20 Feet’s
Deeps Pitts Including the cost of E C P
Bus bar 12”long 2” wide and half inch
thick copper bus bare completed with
insulators washers nuts, bolts Complate in
all Respects As per Instruction of
Engineer In Charge
Each 8.00 47,885.00 383,080.00
25 NSI
Providing &Installation Testing
Commisioning of Sub L.T Panel Board
Lighting as per Drawing & Spification
Complate in all Respects As per
Instruction of Engineer In Charge.
Each 1.00 486,800.00 486,800.00
26 NSI
Providing &Installation Testing
Commisioning of Sub L.T Panel Board
Power as per Drawing & Spification
Complate in all Respects As per
Instruction of Engineer In Charge.
Each 1.00 604,500.00 604,500.00
27 NSI
Volt maters with selector switch v s s for
Distribution boards , 3 nos Indication
panel lights , Control fuses complete with
all respects as approved by the Engineer
Sets 56.00 6,039.00 338,184.00
Supply at site, installation following
size of perforated 16 SWG G I sheet
cable tray including joints, band,
Cover mounting brackets hanger or”
L” Type wall Brackets, Ankara Bolds
complete with all respects As per
Instruction of Engineer In Charge
28 NSI 6”x 3” cable tary Rft 1,240.00 848.00 1,051,520.00
29 NSI 12” x 12” Ladders Rft 60.00 747.00 44,820.00
13,572,075.00
1 NSI
Supply and Fixing of best quality Muslim
Shower Complete.(Faisal made or
Equivalent)
Each 110.00 1,950.00 214,500.00
2 NSI
Providing and Fixing of best quality
Imported Vanity type wash hand basin
complete
Each 110.00 18,992.00 2,089,120.00
2,303,620.00
Rs. 427,609,359.06
Rs. 46,471,725.53
Rs. 474,081,084.59
Rs. 474.081In Million
Total of Section # 1 to 3 - S.I
Total of Section # 1-3 - N.S.I
Grand Total of S.I & N.S.I
Sub Total of Sect. # 02- N.S.I Rs.
03 : INTERNAL WATER SUPPLY AND SEWERAGE SYSTEM
Sub Total of Sect. # 03- N.S.I Rs.
Package-2_Women Uni. Mardan_BOQ Page 17 of 17