Name of Contractor INTEGRATED RESOURCE TIMBER …
Transcript of Name of Contractor INTEGRATED RESOURCE TIMBER …
1 Contract FS-2400-13T, Page 101 (10/19)
Superior Laurentian Eastern
Fourteen Stewardship 08/15/2025
INTEGRATED RESOURCE TIMBER CONTRACT
U.S. DEPARTMENT OF AGRICULTUREFOREST SERVICE
Unless provided otherwise herein, Forest Service agrees to sell and permit Contractor to cut and remove Included Timber and Contractor agrees to purchase, cut, and remove Included Timber and complete required stewardship projects.
IN WITNESS WHEREOF, the parties hereto have executed this contract as of the award date.
(Applicable to Contracts with Measurement before Harvest)
National Forest Ranger District Region Contract Number
Award Date Termination Date
Name of Contractor
Contract Name
The parties to this contract are The United States of America, acting through the Forest Service, United States Department ofAgriculture, hereinafter called Forest Service, and 1/ hereinafter called Contractor.
UNITED STATES OF AMERICA
(Title)
(Contractor)
(Title)
Contracting Officer
3/
(Address)
(Name)
(Name)
Two Witnesses:2/
I, _____________________________________________ , certify that I am the _________________________________________
Secretary of the corporation named as Contractor herein; that _________________________________________________________
who signed this contract on behalf of Contractor, was then ___________________________________________________________
of the corporation; that the contract was duly signed for and in behalf of the corporation by authority of its governing body, and is
within the scope of its corporate powers.
CORPORATESEAL 5/
4/
(Business Address)(Address)
By:
By:
SAMPLE
INSTRUCTIONS:
1/ If Contractor is a corporation, state a "corporation organized and existing under the laws of the State of _________________" and specify the State; if Contractor is a Limited Liability Company, state a "Limited Liability Company organized and existing under the laws of the State of ____________________________" and specify the state; if Contractor is a partnership, state a "partnership consisting of ____________________________" and specify the names of each partner; and if Contractor is a sole proprietor doing business under an assumed name, state "(n) individual doing business under the name of ________________________________ City of ____________________, State of _______________."
2/ The signatures and addresses of two witnesses are required if Contractor is other than a corporation.
3/ If Contractor is a co-partnership, the signatures should be: XYZ Company, by John Doe, a member of the firm. If Contractor is a corporation, form of signature should be: XYZ Company, by John Doe, President (or other officer or agent) and the seal of the corporation must be impressed or indicated.
4/ The certificate must be completed if Contractor is a corporation.
5/ For companies incorporated in States that require a corporate seal, if the corporation has no corporate seal that fact shall be stated, in which case a scroll or adhesive seal shall follow the corporate name.
Contract Name: Fourteen Stewardship Contract No:
SAMPLE
2 Contract FS-2400-13T, Page 102 (10/19)
AT - SPECIFIC CONDITIONS. The following conditions apply to the indicated provisions.
AT1 - Location and Area, applicable to BT.1
AT2 - Volume Estimate and Utilization Standards, applicable to BT2.1, BT2.2, BT2.4, and BT6.4
AT3- Timber Designations, applicable to BT2.3; acres are approximate:
Incompletely Measured Payment Units (BT2.36)
Clearcutting Units (BT2.31) Specified Road Clearing (BT2.32)
Overstory Removal Units (BT2.33)
Understory Removal Units (BT2.34)
Individual Trees (BT2.35)
Township 60 N Range 19 W Section 15, 21, 22, 23, 27, 28
This Contract Area of 876 acres more or less is located in:
Species ProductEstimated
Quantity *Unit of
Measure
DiameterBreastHigh
(d.b.h.)(inches)
Numberof
MinimumPieces
per TreeLength(feet)
DiameterInsideBark at
Small End(inches)
Minimum SpecificationsMerchantable Tree Piece Required to be Removed
Jack Pine
Red Pine
Spruce
Aspen
Balsam Fir
Paper Birch and Other Hardwoods
Pine
Spruce
Tamarack
Sawtimber
Sawtimber
Sawtimber
Pulpwood
Pulpwood
Pulpwood
Pulpwood
Pulpwood
Pulpwood
323.00
5,330.00
11.00
1,501.00
352.00
579.00
1,219.00
230.00
15.00
CCF
CCF
CCF
CCF
CCF
CCF
CCF
CCF
CCF
9.0
9.0
9.0
5.0
5.0
5.0
5.0
5.0
5.0
1
1
1
1
1
1
1
1
1
8
8
8
8
8
8
8
8
8
7.6
7.6
7.6
4.0
4.0
4.0
4.0
4.0
4.0
40
40
40
70
70
70
70
70
70
Softwood - OtherHardwood - Other
Grn Bio CvGrn Bio Cv
unestimatedunestimated
CCFCCF
N/AN/A
N/AN/A
N/AN/A
N/AN/A
N/AN/A
Total Quantity
Timber Subject to Agreement under CT2.11#
9,560.00 CCF
Contract Name: Fourteen Stewardship Contract No:
* Quantities not included here are described in BT2.4.
Net Scale in % of Gross Scale
Acres
466
Number SAMPLE
3 Contract FS-2400-13T, Page 103 (10/19)
AT4 - Timber Payment Rates, applicable to BT3.1 and BT4.0
AT4a - Escalated Rates, applicable for Species and Products to be Paid for at Rates Escalated under BT3.2
Contract Name: Fourteen Stewardship Contract No:
Jack PineRed PineSpruceAspenBalsam FirPaper Birch and Other HardwoodsPineSpruceTamarack
SawtimberSawtimberSawtimberPulpwoodPulpwoodPulpwood
PulpwoodPulpwoodPulpwood
CCFCCFCCFCCFCCFCCF
CCFCCFCCF
N/AN/AN/AN/AN/AN/A
N/AN/AN/A
25.49 32.68 33.90 27.62
1.00 1.00
8.20 1.00 1.00
.00 .00 .00 .00 .00 .00
.00 .00 .00
AT4b- Flat Rates, applicable for Species and Products to be Paid for at Flat Rates
For purposes of convenience in collection and bookkeeping, Bid Rates stated in AT4 include payment of deposits for contract area betterment required pursuant to 16 USC 576b. Such deposits are not included as Required Deposits defined hereunder.
Species ProductUnit of
Measure
Base
$
Advertised
$
BidPremium
$
Bid(Flat)
$
Rates per Unit of MeasureRequiredDeposits
SlashDisposal
$
Species ProductUnit of
Measure
Base
$
Advertised
$
BidPremium
$
Bid(Tentative)
$
RequiredDeposits
SlashDisposal
$BaseIndex
Rates per Unit of Measure
Not Applicable
Softwood - OtherHardwood - Other
Grn Bio CvGrn Bio Cv
CCFCCF
1.00 1.00
1.00 1.00
Timber Subject to Agreement under CT2.11#SAMPLE
4 Contract FS-2400-13T, Page 104 (10/19)
01
02
03
04
05
06
07
8
7
12
7
61
29
3
Jack PineRed PineAspenBalsam FirPaper Birch and Other HardwoodsPine
SpruceAspenBalsam FirPaper Birch and Other HardwoodsSpruce
SpruceAspenBalsam FirPaper Birch and Other HardwoodsSpruce
Jack PineRed PineSpruceAspenBalsam FirPaper Birch and Other HardwoodsPineSpruce
Jack PineRed PineAspenBalsam FirPaper Birch and Other HardwoodsPine
Jack PineRed PineAspenBalsam FirPaper Birch and Other HardwoodsPineSpruce
Jack PineRed PinePine
SawtimberSawtimberPulpwoodPulpwoodPulpwood
Pulpwood
SawtimberPulpwoodPulpwoodPulpwood
Pulpwood
SawtimberPulpwoodPulpwoodPulpwood
Pulpwood
SawtimberSawtimberSawtimberPulpwoodPulpwoodPulpwood
PulpwoodPulpwood
SawtimberSawtimberPulpwoodPulpwoodPulpwood
Pulpwood
SawtimberSawtimberPulpwoodPulpwoodPulpwood
PulpwoodPulpwood
SawtimberSawtimberPulpwood
3.00 0.00
33.00 9.00 8.00
1.00
0.00 182.00
8.00 16.00
0.00
1.00 313.00
14.00 27.00
0.00
7.00 61.00
2.00 35.00 10.00 38.00
13.00 2.00
3.00 198.00
97.00 122.00
8.00
146.00
206.00 20.00
100.00 41.00
145.00
46.00 14.00
4.00 54.00 58.00
CCFCCFCCFCCFCCF
CCF
CCFCCFCCFCCF
CCF
CCFCCFCCFCCF
CCF
CCFCCFCCFCCFCCFCCF
CCFCCF
CCFCCFCCFCCFCCF
CCF
CCFCCFCCFCCFCCF
CCFCCF
CCFCCFCCF
AT4c - Schedule of Payment Units
Pay-mentUnitNo.
App rox.
Acres
To be Escalated under AT4a
TotalTentativePayment
$
To be Paid for at Flat Rates under AT4bTotalFlatRate
Payment$
Contract Name: Fourteen Stewardship Contract No:
54.00
206.00
355.00
168.00
574.00
572.00
116.00
Total PU Quantity And Value
Total PU Quantity And Value
Total PU Quantity And Value
Total PU Quantity And Value
Total PU Quantity And Value
Total PU Quantity And Value
Total PU Quantity And Value
.00
.00
.00
.00
.00
.00
.00
TotalRequiredDepositsfor SlashDisposal
$
CCF
CCF
CCF
CCF
CCF
CCF
CCF
Species Product Qty UOM Species Product Qty UOM
SAMPLE
4(a) Contract FS-2400-13T, Page 104(a) (10/19)
08
09
10
11
12
13
14
15
16
6
7
18
6
78
11
103
6
16
Jack PineRed PinePine
Jack PineRed PineAspenBalsam FirPine
SpruceAspenBalsam FirPaper Birch and Other HardwoodsSpruce
Jack PineRed PineAspenBalsam FirPaper Birch and Other HardwoodsPine
Jack PineRed PinePine
Red PineBalsam FirPaper Birch and Other HardwoodsPine
Red PinePine
SpruceAspenBalsam FirPaper Birch and Other HardwoodsSpruce
Jack PineRed PineSpruceAspenBalsam FirPaper Birch and Other HardwoodsPineSpruce
SawtimberSawtimberPulpwood
SawtimberSawtimberPulpwoodPulpwoodPulpwood
SawtimberPulpwoodPulpwoodPulpwood
Pulpwood
SawtimberSawtimberPulpwoodPulpwoodPulpwood
Pulpwood
SawtimberSawtimberPulpwood
SawtimberPulpwoodPulpwood
Pulpwood
SawtimberPulpwood
SawtimberPulpwoodPulpwoodPulpwood
Pulpwood
SawtimberSawtimberSawtimberPulpwoodPulpwoodPulpwood
PulpwoodPulpwood
8.00 109.00 115.00
5.00 171.00
0.00 10.00 44.00
1.00 469.00
20.00 41.00
0.00
0.00 40.00
0.00 0.00 0.00
22.00
35.00 1,216.00
127.00
33.00 10.00
144.00
2.00
2,375.00 161.00
0.00 156.00
7.00 14.00
0.00
16.00 138.00
5.00 81.00 24.00 88.00
29.00 5.00
CCFCCFCCF
CCFCCFCCFCCFCCF
CCFCCFCCFCCF
CCF
CCFCCFCCFCCFCCF
CCF
CCFCCFCCF
CCFCCFCCF
CCF
CCFCCF
CCFCCFCCFCCF
CCF
CCFCCFCCFCCFCCFCCF
CCFCCF
Pay-mentUnitNo.
App rox.
Acres
To be Escalated under AT4a
TotalTentativePayment
$
To be Paid for at Flat Rates under AT4bTotalFlatRate
Payment$
Contract Name: Fourteen Stewardship Contract No:
232.00
230.00
531.00
62.00
1,378.00
189.00
2,536.00
177.00
386.00
Total PU Quantity And Value
Total PU Quantity And Value
Total PU Quantity And Value
Total PU Quantity And Value
Total PU Quantity And Value
Total PU Quantity And Value
Total PU Quantity And Value
Total PU Quantity And Value
Total PU Quantity And Value
.00
.00
.00
.00
.00
.00
.00
.00
.00
TotalRequiredDepositsfor SlashDisposal
$
CCF
CCF
CCF
CCF
CCF
CCF
CCF
CCF
CCF
SAMPLE
4(b) Contract FS-2400-13T, Page 104(b) (10/19)
17
18
19
20
21
22
23
24
10
8
32
13
16
2
3
4
Jack PineRed PineAspenBalsam FirPineSpruceTamarack
Jack PineRed PineAspenBalsam FirPine
Jack PineRed PinePine
Jack PineRed PineAspenBalsam FirPaper Birch and Other HardwoodsPine
Jack PineRed PineSpruceAspenBalsam FirPaper Birch and Other HardwoodsPineSpruceTamarack
Jack PineRed PinePine
Jack PineRed PineAspenBalsam FirPineSpruceTamarack
Jack PineRed PinePine
SawtimberSawtimberPulpwoodPulpwoodPulpwoodPulpwoodPulpwood
SawtimberSawtimberPulpwoodPulpwoodPulpwood
SawtimberSawtimberPulpwood
SawtimberSawtimberPulpwoodPulpwoodPulpwood
Pulpwood
SawtimberSawtimberSawtimberPulpwoodPulpwoodPulpwood
PulpwoodPulpwoodPulpwood
SawtimberSawtimberPulpwood
SawtimberSawtimberPulpwoodPulpwoodPulpwoodPulpwoodPulpwood
SawtimberSawtimberPulpwood
2.00 3.00 3.00
15.00 1.00
119.00 10.00
6.00 196.00
0.00 12.00 50.00
15.00 499.00
52.00
2.00 74.00
0.00 0.00 0.00
226.00
2.00 34.00
2.00 31.00 45.00 50.00
11.00 54.00
2.00
3.00 36.00 38.00
1.00 1.00 1.00 5.00 0.00
36.00 3.00
5.00 72.00 77.00
CCFCCFCCFCCFCCFCCFCCF
CCFCCFCCFCCFCCF
CCFCCFCCF
CCFCCFCCFCCFCCF
CCF
CCFCCFCCFCCFCCFCCF
CCFCCFCCF
CCFCCFCCF
CCFCCFCCFCCFCCFCCFCCF
CCFCCFCCF
Pay-mentUnitNo.
App rox.
Acres
To be Escalated under AT4a
TotalTentativePayment
$
To be Paid for at Flat Rates under AT4bTotalFlatRate
Payment$
Contract Name: Fourteen Stewardship Contract No:
153.00
264.00
566.00
302.00
231.00
77.00
47.00
154.00
Total PU Quantity And Value
Total PU Quantity And Value
Total PU Quantity And Value
Total PU Quantity And Value
Total PU Quantity And Value
Total PU Quantity And Value
Total PU Quantity And Value
Total PU Quantity And Value
.00
.00
.00
.00
.00
.00
.00
.00
TotalRequiredDepositsfor SlashDisposal
$
CCF
CCF
CCF
CCF
CCF
CCF
CCF
CCF
SAMPLE
5 Contract FS-2400-13T, Page 105 (10/19)
Contract Name: Fourteen Stewardship Contract No:
AT4d - Stewardship Rates and Credits, applicable to BT4.5 and CT6.9#
SP1 Community Brush Disposal Site Creation Acres .50
Project Number Project DescriptionUnits ofMeasure Quantity
Bid Rate$
TotalCredits
Mandatory Stewardship Projects
Priority Project DescriptionUnits ofMeasure Quantity
Bid Rate$
TotalCredits
Optional Stewardship Projects
Project Number
Not Applicable
SAMPLE
6 Contract FS-2400-13T, Page 106 (10/19)
The following definitions are established for the terms used in AT4: Base Rates are the lowest rates of payment for timber that are authorized by this contract. Base Rates remain constant throughout the life of this contract and are not subject to change by rate redetermination, except for reduction under BT3.31, BT3.32, or BT3.33. Advertised Rates are the minimum acceptable Bid Rates for timber, exclusive of Required Deposits. These rates are those indicated by appraisal, with a cost allowance made for construction of Specified Roads listed in AT7, but are never less than Base Rates. Bid Premium Rates are the amounts by which Contractor's bid is in excess of Advertised Rates. The Bid Premium Rates are constant during this contract, except as provided in BT3.31, BT3.32, and BT3.33. Bid Rates are the rates bid by Contractor (exclusive of Required Deposits for slash disposal and road maintenance) and are the sum ofAdvertised Rates and Bid Premium Rates. Until a rate redetermination becomes effective, the Bid Rate for species and products in AT4a is the Tentative Rate that is subject to quarterly adjustment under BT3.2; for species and products in AT4b, the Bid Rate is the Flat Rate. Required Deposits are deposits that Contractor may be required to pay for slash disposal (16 USC 490) and road maintenance (16 USC 537). Required Deposits may be adjusted as part of a rate redetermination or a Contract Term Extension. The table shows only Required Deposits for slash disposal; road maintenance deposits, if any, are given in CT6.816. Base Index is the specified average of the lumber or other product selling value index used as the basis for computing adjustment in rates for variance in product selling value, as provided in BT3.2. AT5 - Indices Used in Quarterly Adjustment, applicable to BT3.2
Species Index Name and Date
Contract Name: Fourteen Stewardship Contract No:
Not Applicable
All
All
Sawtimber
Pulpwood
14
10
AT6 - High Stumps, applicable to BT6.412
Species ProductMaximum Stump Height
(inches)
SAMPLE
7 Contract FS-2400-13T, Page 107 (10/19)
Maximum Amount: $ $1,000
AT14 - Contractor's Obligation per Operations Fire, applicable to BT7.41
Initial Fire Supression, applicable to BT7.3
Within 5 road miles
Fire Suppression Reinforcement, applicable to BT7.312 and BT7.313
Within 20 road miles
AT13 - Contractor Responsibility to Furnish Crews and Equipment for:
April 01 to November 15 , inclusive
AT12 - Fire Precautionary Period, applicable to BT7.2
Contract Name: Fourteen Stewardship Contract No:
Road No. Road Name Type of Work Completion Date
AT8 - Forest Service Engineering Completion Schedule, applicable to BT5.212
Not Applicable
AT7 - Specified Roads, applicable to BT5.2
Name
Design
Class
Approx.
Length
(mi./km.)
Sheet Numbers
and
Approval Date Survey Design Construction
Staking
Performance Responsibility Project
1/Road No.
1/ Indicate timing, i.e., before clearing (BC) or after clearing (AC). Applicable to BT5.212
Not Applicable
Name and Date of Governing Road Specifications:
AT9 - Reserved
AT10 - Reserved
AT11 - Reserved
SAMPLE
8 Contract FS-2400-13T, Page 108 (10/19)
CT2.11#
CT2.301#
CT2.302#
CT2.351#
CT2.352#
CT2.355#
CT4.4
CT5.31#
CT5.33#
CT6.314#
CT6.62#
CT6.63#
CT6.7#
CT6.9#
CT7.2
Performance Bond Amount:
First Period: June 15 to March 15 , inclusive
Second Period: to , inclusive
AT15 - Termination Date, applicable to BT8.2
August 15, 2025
AT16 - Normal Operating Season, applicable to BT6.31, BT6.66, BT8.21, and BT9.3
AT17 - Performance Bond, applicable to BT9.1
Contract Name: Fourteen Stewardship Contract No:
TIMBER SUBJECT TO AGREEMENT (09/2004)
PROTECTED AREAS (06/2009)
BOUNDARY TREES (10/2019)
DESIGNATION BY SPACING (09/2004)
DESIGNATION BY SPECIES AND DIAMETER (09/2004)
INDIVIDUAL TREES, CUT TREE MARKING (06/2009)
PAYMENTS NOT RECEIVED (08/2012)
ROAD MAINTENANCE REQUIREMENTS (09/2004)
SNOW REMOVAL (06/2009)
OPERATING RESTRICTIONS (06/2009)
SITE SPECIFIC WETLANDS PROTECTION MEASURES (09/2004)
TEMPORARY ROAD CLOSURE (06/2009)
SLASH DISPOSAL MEASURES (06/2009)
STEWARDSHIP PROJECTS (09/2004)
FIRE PRECAUTIONS (06/2009)
AT21 - Inapplicable Provisions
The following listed provisions are hereby made inapplicable. (Instructions: List by reference number and title.)
BT4.4
BT8.21
BT8.212
BT8.64
PAYMENTS NOT RECEIVED
CONTRACT TERM ADJUSTMENT
MARKET-RELATED CONTRACT TERM ADDITION
DEBARMENT AND SUSPENSION CERTIFICATION
AT18 - Downpayment, applicable to BT4.211
Downpayment Amount: Not Applicable
AT20 - Market-Related Contract Term Addition Producer Price Index, applicable to BT8.212
Index Name: Softwood Lumber Index Number: 0811
AT22 - List of Special Provisions in Part KT
The following listed special provisions are attached to and made a part of this contract. Provisions with reference numbers followed by # contain blanks into which data have been entered for this contract. (Instructions: List by reference number, title, and date.)
AT19 - Periodic Payment Amount, applicable to BT4.213
Periodic Payment Determination Date Amount
Initial Payment: Additional Payment:
N/A N/A
N/A N/A
SAMPLE