My individual 2nd semester

18
Three story building with 5 small flats in Cedros De Villa, Lima, Peru Foundation G:\F2014_Semester_2\Exam Projects, 2J S-2014\Group 3\02 Lima

Transcript of My individual 2nd semester

Three story building with 5 small flats in

Cedros De Villa, Lima, PeruFoundation

G:\F2014_Semester_2\Exam Projects, 2J S-2014\Group 3\02 Lima

Vladislav Nedelev

23/6/2014 Final exam 2 semester 2

Portfolio

23/06/2014 Final exam 2 semester 3

Foundation

Materials

Documents

Time schedule

Extra

Budget

Section

Plan

Vladislav Nedelev

Final product

Cost

Regulations

Purpose

23/06/2014 Final exam 2 semester 4

Foundation

Materials

Documents

Concrete25MPA

Time schedule

Steel Reinforcement

(8-15mm)

Extra

Budget

Section

Plan

Vladislav Nedelev

Expanded Polystyrene

23/06/2014 Final exam 2 semester 5

Foundation

Materials

Documents

Time schedule

Extra

Budget

Section

Vladislav Nedelev(12)5.01 (12)5.72 (12)5.71

(24)4.04(27)5.06

Plan

23/06/2014 Final exam 2 semester 6

Foundation

Materials

Documents

Time schedule

Extra

Budget

Section

Plan

Vladislav Nedelev

(12)3.01 Foundation plan

(99)3.06 Section (99)3.07 Section

(52)1.03 Sewage

(12)5.71 Double foundation(12)5.72 KJ Colum foundation(27)5.06 Standart construction of the ground floor slab(12)5.01 KJ Foundation + Wall

(99)3.03 Elevation(99)3.04 Elevation(99)3.05 Elevation

(41)5.06 Building site layout

23/06/2014 Final exam 2 semester 7

Foundation

Materials

Documents

Time schedule

Extra

Budget

Section

Plan

Vladislav Nedelev

Sigma

83 771.51 DKK

~42 863.36 PEN

23/06/2014 Final exam 2 semester 8

Foundation

Materials

Documents

Time schedule

Extra

Budget

Section

Plan

Vladislav Nedelev

Work specification Invitation to tender

Foundation specification

Contract specification

Tender form

List of requirements,

Foundation

23/06/2014 Final exam 2 semester 9

Foundation

Materials

Documents

Time schedule

Extra

Budget

Section

Plan

Vladislav Nedelev

Timetable PDFReferences:1 & 2Timetable xlsx

Excavation for

foundation

Set up the formwork

Installing the

reinforcement

Cast concrete

for foundatio

n

Demounting and

installing formwork

Placing the

expanded polystyren

e

Installing the

reinforcement

Cast concrete

Demounting formwork

27/11/2014 15/01/2015Picture

23/06/2014 Final exam 2 semester 10

Foundation

Materials

Documents

Time schedule

Extra

Budget

Section

Plan

Vladislav Nedelev

Author

TheirrulezTano4595Holger.EllgaardMuriel Gottrop

License

CC-BY-SACC-BY-SACC-BY-SA

Public domain

Link

https://commons.wikimedia.org/wiki/File:Sheaf_of_steel_rebars.jpghttps://commons.wikimedia.org/wiki/File:02_Hormig%C3%B3n_para_muestras.jpghttps://commons.wikimedia.org/wiki/File:Frigolit_2008.jpghttps://commons.wikimedia.org/wiki/File:Tectonic_plates.png

No. slide

4443

23/06/2014 Final exam 2 semester 11

Vladislav Nedelev

Thank you for your

attention!

Foundation

Materials

Documents

Time schedule

Budget

Section

Plan

Extra

23/6/2014 Final exam 2 semester 12

23/6/2014 Final exam 2 semester 13

23/6/2014 Final exam 2 semester 14

23/6/2014 Final exam 2 semester 15

23/6/2014 Final exam 2 semester 16

23/6/2014 Final exam 2 semester 17

Formwork

Border between 2

23/6/2014 Final exam 2 semester 18