Ayman Alhaggar
Structural Section Head 7-2014 - Present SIAC “Industrial Construction & Engineering Company” Secon Nile Towers (Maadi) – Secon Real State– Cairo-Egypt Construction of two towers - 1st Tower: Housing tower deluxe finishing - 2nd Tower: Five star hotel (Hilton) (Billion L.E.)
Follow up the workshop and as built drawings in the sites. Analyzing and resolving field construction issues. Prepare, review and distribute RFIs. Maintain RFI Log - Maintain job files and As-built - Maintain thorough
understanding of contract documents and subcontracts. Complete required tasks daily. Coordinate between the construction and engineering teams ensuring that
the construction requirements are conveyed to the engineering teams and that the engineering deliverables satisfy the construction requirements
Ensure company procedures and standards are maintained. Review subcontractors' invoices. Attend progress meetings, discuss and suggest technical proposals. Follow up the technical and material submittals in the sites.
Senior Civil Engineer 5-2013 – 7-2014 Abouzeid Engineering Consultancy – Porto Cairo Medical Center & Villas– Cairo-Egypt Construction of Medical Center & Porto Cairo villas-(50,000,000 L.E.)
Review Shop drawings submitted by the contractor and approved. Review Request for Inspection of Formwork & Reinforcement works
(Footings, Columns, Beams, Slabs & Water Proofing work - …etc.) Review all tests from site (Compressive Strength Tests for all
concrete elements – Water Test - …etc.) Follow up the progress of the work within the site and updated on
the drawings Work scheduling for the project and updates on the work schedule for the
project with Primavera 6 Study the adoption of samples and different materials for the project Review all AS-Built works in details (Levels & Lengths & Slops &
Coordinates) Review all invoices submitted by the contractor for the project
Bachelor of Civil Engineering - Faculty of Engineering
Zagazig University Egypt (2002). Project Graduation Grade
(Excellent).
Work History
MS Office(2002 :2013) -AutoCAD (2002 :2016) -AutoCAD Structural Detailing
(2013 :2015) -Civil 3D 2013 -SAP 2000 -SAFE V12 -Primavera 6 -Water CAD V8i -Sewer Cad V5.6
Senior Structural Engineer Structural Engineer with 15 years’ experience in Supervision, Technical Works and Contracting
Skills
Education
Email [email protected] [email protected] [email protected]
Phone 0244584774
Address 12-AHMEDSABBAH ST. CAIRO, EGYPT
Mobile 01000224522 01129050066
Senior Civil Engineer 3-2010 – 2-2013Khatib&Alami - Sewerage Networks – Jeddah-Saudi Arabia Construction of Branch Sewerage Networks in North CentralDistricts of Jeddah- part (1) (995,000,000 SR)
Branch Lines from(200mm to 500mm) PVC + Main Lines(700mm,800mm,900mm)GRP
Review Shop drawings submitted by the contractor and approved. Review Request for Inspection of Excavation & Pipes& Backfilling&
Manholes and back drops - …etc.) Review all tests from site (Compaction Test – Water Test – Air Test – Light
Test - …etc.) Follow up the progress of the work within the site and updated on the
drawings Review all drawings of Pipe Jacking and Shafts and review design of shafts
and manholes. Make site visits for open trench or pipe jacking works to make sure those
activities in accordance with the schedule of the project Check coordinates of manholes and pipes with coordinates programs like
“Geographic Calculator”&” Global Mapper “and “Google Earth” Work with sewerage design programs like Sewer Cad & Civil3D 2013 Work scheduling for the project and updates on the work schedule for the
project with Primavera 6 Study the adoption of samples and different materials for the project Review all AS-Built works in details (Levels & Lengths & Slops &
Coordinates “Ain Alabd or WGS84”) Review all invoices submitted by the contractor for the project.
Project Manager for Subcontractor 8-2009 – 3-2010 Arab Contractors - roads network - Cairo-Egypt Re-positioning of Military Factory # 81_Phase 1
Make Time Schedule for the execution of the Projects. Monitoring the execution of the Projects during the periodical site visits. Control time and cost of the Projects. Check the monthly Valuations of the Contractors. Insuring applying the required specifications. Insure the quality control. Insure the safety control at the site. Distribute the work between the site Engineers. Providing regular weekly & monthly reports to the higher management for
team performance, budgets and projects status. Attend all tests in the site Check all requests submitted by the contractors Estimated cost and time frame for the new project. Identify and manage project dependencies and critical path. Proactively manage changes in project scope, identify potential crises, and
devise contingency plans. Preparing technical and material submittals. Attend progress meetings, discuss and suggest technical proposals. Ensure that the engineering deliverable satisfy the construction requirements Documenting project technical issues/conditions. Assist the Projects Manager in estimating and evaluating the Technical &
Commercial risk associated with each project.
MS Office at IBM 02-2004 OSHA-Safety Assurance 04-2007 Quality Control Assurance 06-2007 Fidic Contract Management Red
Book 05-2012 AutoCAD Structural Detailing at
CADMASTERS 08-2014
Certificates
MS Office at IBM 01-2004 - 02-2004 Fidic Contract Management Red
Book 05-2012 - 05-2012 AutoCAD Structural Detailing at
CADMASTERS 08-2014 - 08-2014
Courses
Civil Planning Engineer 12-2006 – 6-2009Primes Int. (Jeddah Municipality) –Jeddah-Saudi Arabia
Monitored and controlled excavations of infrastructure projects (Drainage, water supply, communication and electrical power lines).
Trained Municipality staff and Drainage Contractors for quality planning, quality assurance and quality control (Excavation work for infrastructure projects) in Jeddah.
Coordinating the excavation infrastructure projects in Jeddah. Applying Safety regulations to all excavations projects according to
OSHA standards. Applying Quality Standards for all excavations projects and road
constructions. Project management engineer in (Operating & maintenance
department) in Jeddah Municipality (Planning & Cost Management). Member of co-ordination team for infrastructure projects in projects
co-ordination office (PCO) in Jeddah Municipality.
Site Engineer 12-2004-12-2006Trask Group - Construction - Cairo-Egypt Different projects in Cairo
Quality assurance and Quality control. Monitored and controlled the complete project of constructing and
finishing school compound of two building five Stories each. Monitored and controlled the complete project of constructing of
private villa 350 m2 of area. Monitored and controlled the complete project of constructing and
finishing compound of 15 buildings of five Stories each. Monitored and controlled the complete project of steel structure for
aircraft maintenance hangars in accordance with Canadian petroleum Air Service Company (PAS).
Assists the Project Manager, Contracts Specialist, and Site Managers to resolve change orders and critical path issues with the sub-contractors
Ensures the timely preparation and exchange of project information between the project functional groups including engineering, procurement, accounting, individual project sites and sub-contractors
Site Engineer 11-2002-12-2004Alhaggar co. - Construction Different projects in Cairo in Military Technical College
Quality assurance and Quality control. Directed and follow up the complex building for Military Technical
College to be totally refurbished and maintained in accordance with project plans.
Supervised the complete project of constructing and finishing bowling hall.
Supervised the complete project of constructing and finishing educational workshops building.
Eng. Sayed Zaki- Project Manager
(Khatib&Alami)– Jeddah-Saudi Arabia
00966.503313853, [email protected]
Dr. Abdullah Abo Zied- CEO
(Abouzeid Engineering Consultancy)
002.0122213095
Eng.Wael Desouky- Project Manager
(Amer Group)
002.01110124725, [email protected]
Eng. Ahmed Sultan- Project Manager
002.01155350750, [email protected]
Dr.Osman Ramadan-CEO
(El Hossni Office)
002.01223985142, [email protected]
Eng. Hamdi Swilam- Project Manager
(Arabtec)
002.01148300022, [email protected]
Eng.Mostafa Mohie- Technical Office Manager
(SIAC)
002.01006971255, [email protected]