1.1 ALL DIMENSIONS ON DRAWINGS ARE INDICATIVE ONLY. PRIOR TO STARTING ANY WORK ALL DIMENSIONS TO BE CHECKED ON SITE. 1.2 SCALING SHALL NOT BE MADE FROM DRAWINGS; ANY QUESTIONS, ERRORS, OR OMISSIONS FOUND SHOULD BE NOTIFIED BEFORE STARTING ANY SITE WORK. 1.3 ALL MATERIALS USED TO BE NEW, FIT FOR PURPOSE, AND SHALL COMPLY WITH RELEVANT CURRENT AUSTRALIAN STANDARDS. 1.4 SPECIFICATIONS, SCHEDULES AND CONSULTANTS DRAWINGS THAT FORM PART OF THE CONSTRUCTION DOCUMENTS REFERRED TO IN THE "BUILDING CONTRACT" SHOULD BE USED IN CONJUNCTION, TO INTERPRETE ALL ARCHITECTURAL DRAWINGS. 1.5 ALL WORKMANSHIP SHALL COMPLY WITH RELEVANT CURRENT AUSTRALIAN STANDARDS AND TO GOOD TRADE PRACTICES AND ALL EQUIPMENT TO BE SUPPLIED NECESSARY FOR THE COMPLETION OF RESPECTIVE WORKS. 1.6 ALL WORK SHALL BE IN ACCORDANCE WITH REQUIREMENTS OF THE RESPECTIVE AUTHORITY HAVING JURISDICTION OVER THE WORKS. 1.7 CONTRACTORS SHALL BE RESPECTFUL OF OTHER WORKS AND SHALL COORDINATE FOR SUCCESFUL COMPLETION OF PROJECT AS NEEDED. CONTRACTORS, AFTER THE COMPLETION OF RESPECTIVE WORKS SHOULD ALSO PROGRESSIVELY CLEAN UP AFTER. 1.8 ENSURE THAT BACKGROUNDS ARE ADEQUATE FOR THE INTENDED SUBSEQUENT FINISHES. COMMENCEMENT OF WORK ON THE BACKGROUNDS IMPLIES ACCEPTANCE BY THE SUBCONTRACTOR OF THE BACKGROUNDS ON WHICH FINISHES ARE APPLIED. 1.0 GENERAL NOTES 2.1 TREAT ALL RETAINING WALLS WITH "BITKOTE" WATERPROOFING AGENT OR SUITABLY APPROVED MATERIAL TO AUSTRALIAN STANDARDS. 2.2 DO NOT EXCAVATE SERVICES TRENCHES WITHIN A 45-DEGREE ANGLE MEASURED FROM BOTTOM OF FOOTING EDGE. 2.3 REMOVE TOPSOIL TO A MINIMUM DEPTH OF 200mm. THIS INCLUDES ALL ROOTS AND OTHER MATTER, AS REQUIRED BY THE BUILDER AND/OR CONDITION OF THE SOIL 2.4 PROVIDE ADEQUATE CLEAN FILLING SAND AND COMPACT IN LAYERS NOT TO EXCEED 300mm TO REDUCE LEVELS AS SHOWN. 2.5 TO OBTAIN MIN. SEVEN (7) BLOWS PER 300mm ON A STANDARDS PERTH SAND PENEFROMETER TEST(AS PER AS 1289 F3.3)COMPACT SAND FILLING AND SANDY SUB GRADES UNDER FOOTINGS AND SLAB. 2.0 EARTHWORKS 3.1 FOOTING AND SLAB CONSTRUCTION SHALL COMPLY WITH AS 2870. 3.2 A PROPRIETARY VAPOR BARRIER IS TO BE PROVIDED CONSISTING OF HIGH IMPACT RESISTANT POLYTHENE FILM MIN. 0.2mm THICK WHICH HAS BEEN PIGMENTED AND BRANDED BY THE MANUFACTURER. 3.3 SLAB IS TO BE CURED FOR 7 DAYS MIN. & SLAB REINFORCEMENT PLACED ON APPROVED CHAIRS FOR CRACK CONTROL IMPROVEMENT. 3.4 ALL CONCRETE SHALL CONFORM TO THE REQUIREMENTS OF AS 3600 CONCRETE STRENGTH GRADE: N20, AGGREGATE 20mm, SLUMP 80mm. 3.5 CONCRETE REINFORCEMENT AND FORMWORK TO COMPLY WITH STRUCTURAL ENGINEERS DETAILS, RELEVANT BUILDING CODES AND STANDARDS 3.0 CONCRETE ANTI-TERMITE TREATMENT TO BE PROVIDED UNDER THE BUILDING AREAS IN ACCORDANCE WITH AS 2057, AS 3660.1 AND APPENDIX D, FOR RETICULATED SYSTEMS.BUILDER TO PROVIDE "DURSBAN" (HAND SPRAYED ORGANO-PHOSPHATE) OR OTHER ANTI-TERMITE TREATMENT SIMILAR APPROVED IN ACCORDANCE WITH RELEVANT AUSTRALIAN STANDARD CODES. 3.6 TERMITE PROTECTION - 4.1 BRICK WORK SHOULD BE IN COMPLIANCE WITH : - MORTAR FOR MASONRY CONSRUCTION - AS 3700 MASONRY CODE - AS A123 MASONRY CODE 4.2 7 STANDARD COURSES = 600mm IS A GOOD BRICK GAUGE. 4.3 20MPa SHOULD BE THE MIN. COMPRESSIVE STRENGTH FOR ALL BRICKS AND AS FOLLOWS: - EXTERNAL FACE WORK: 230x110x76mm - EXTERNAL RENDER: 305x162x90mm MAXIBRICK OR VERTICORE - WINDOW SILLS: 2c FACE BRICK SPLAYED SILLS - WINDOW HEADS: SOLID FACEBRICK COURSE - INTERNAL WALLS: 305x162x90mm MAXIBRICK OR VERTICORE WITH BED JOINT AND PERPENDS FILLED 305x76x90mm LONGREACH OR JUMBO FOR COURSE ADJUSTMENT 4.4 MORTAR: 1:1:6 CEMENT:LIME:SAND MORTAR (FACE BRICK) COLOR TO MATCH EXISTING AS SELECTED 4.5 TIES SHALL BE 3.5mm DIAMETER GALVANIZED WIRE KINKED FOR AND BUILT IN EVERY 5TH COURSE AT 900mm CENTRES APPROXIMATELY, WITH ADDITIONAL TIES AT THE RATE OF 1 TIE/300mm HEIGHT OF OPENINGS AND VERTICAL CONTROL JOINTS AND WITHIN 150mm OF THE OPENINGS. BUILD TIES INTO EACH LEAF AT LEAST 50mm. VERTICAL CONTROL JOINTS SHALL BE 12mm WIDE FILLED AT COMPLETION WITH 'COMPRIBAND' CONTINUOUS FILLER STRIP 4.6 CAVITIES TO BE KEPT CLEAR OF MORTAR. PROVIDE CAVITY BOARDS. TEMPORARILY OMIT BRICKS TO ALLOW RAKING OUT OF CAVITY BOTTOMS. 4.7 FORM WEEP HOLES EVERY FOURTH PERPEND ABOVE FLASHINGS AND CAVITY 4.0 BRICKWORK MAX SPAN LINTELS SIZE BEARING (mm) (VERT x HORIZ x THICK) EACH END (mm) 900 75x10 150 1200 75x75x8 150 1500 90x90x8 150 1800 100x75x8 230 2100 125x75x8 230 2400 125x75x10 230 2500 100x100x8 230 3000 150x90x10 230 4.8 LINTELS 4.9 ALCOR/PGI FLASHINGS TO BE BUILT IN AS FOLLOWS: -CAVITY WALLS BUILT OF SLAB ON GROUND (WHERE NOT PARGED). -WHEREVER SHOWN ON DRAWINGS. -OVER LINTELS TO EXPOSED OPENINGS: FULL WIDTH OF OUTER LEAF CONTINUOUS ACROSS CAVITY 50mm INTO INNER LEAF 2c ABOVE. -OVER ROOF: FULL WIDTH OF EXTERNAL LEAF, STEPPED TO ROOF SLOPE TURNED DOWN MIN. 50mm OVER BASE FLASHING. TURN UP IN CAVITY SLOPING INWARDS AND BUILT INTO INNER LEAF 1c ABOVE. -STRUCTURE OR SERVICES WITHIN 30mm OF OUTER BRICK LEAF IN CAVITY: VERTICAL FLASHINGS CONTINUOUS 1c BELOW FL TO ABOVE STRUCTURE OR FRAME. NOMINAL 300mm WIDE. FOR HORIZONTAL STRUCTURES / SERVICES: CONTINUOUS FLASHING BUILT IN AS FOR OVER LINTELS -AT CAVITY WALLS WITH GLASS BLOCK 300mm WIDE FIXED TO GLASS BLOCK FRAME AND TURNED AWAY IN CAVITY FROM INNER LEAVE -DOOR / WINDOW STILES: FULL HEIGHT 150mm WIDE FIXED TO FRAMES INTERLEAVED WITH SILL AND HEAD FLASHING AT EACH END. -STRUCTURE OR SERVICES WITHIN 30mm OF OUTER BRICK LEAF IN CAVITY: VERTICAL FLASHINGS CONTINUOUS 1c BELOW FLR TO ABOVE STRUCTURE OR FRAME. NOMINAL 300mm WIDE. FOR HORIZONTAL STRUCTURES / SERVICES: CONTINUOUS FLASHING BUILT IN AS FOR OVER LINTELS. -AT CAVITY WALLS WITH GLASS BLOCK 300mm WIDE FIXED TO GLASS BLOCK FRAME AND TURNED AWAY IN CAVITY FROM INNER LEAVE. 4.10 REINFORCE BELOW AND OVER OPENINGS WHERE NECESSARY WITH GALVANISED WOVEN WIRE FABRIC 75mm WIDE IN CENTRE OF EACH LEAF LOCATED IN 2 COUSES BELOW SILL AND IN THE 2 COURSES ABOVE AN OPENING EXTENDING A MINIMUM OF 600mm BEYOND THE OPENING. 4.11 PROVIDE 12mm PLASTERING MARGIN BETWEEN WINDOW FRAME AND INTERNAL BRICKWORK TO BE PLASTERED. 4.12 MOISTEN ALL EXTRUDED BRICKS BEFORE LAYING 4.13 BRICKWORK SETOUT ACCURATELY, PLUMB, LEVEL AND PROPERLY BONDED. RISING WORK TO BE RAKED BACK, JAMBS, REVEALS, CORNERS, PERPENDS, ETC. TO BE TRUE, PLUMB, AND IN LINE WITH PERPENDS TRUE TO LINE. SETOUT DOOR FRAMES NEAR PERPANDICULAR WALL WITH A MARGIN OF 12mm OR GREATER THAN 50mm. 4.14 PROVIDE DAMP PROOF COURSES (DPC) IN THE BOTTOM 3 COURSES OF BRICKWORK AND SLAB AND/OR FOOTINGS. DPC ADDITIVE SHALL BE CLEAR IN ALL FACEWORK. 5.0 CARPENTRY WORK 5.1 SUPPLY AND FIX ALL BULKHEADS & FALSE CEILINGS AS SHOWN ON THE DRAWINGS. 5.2 ROOF AND CEILING FRAMING SHOULD COMPLY WITH AS 1684 LIGHT TIMBER FRAMING CODE. DRAW STRAP FIRMLY OVER WALL PLATES AND SECURELY FIX TO TOP OF PLATE WITH 2x30mm GALV. CLOUTS/STRAP. 5.3 ROOF AND CEILING FRAMING SHOULD COMPLY WITH AS 1684 LIGHT TIMBER FRAMING 6.0 METAL WORK 6.1 WINDOW FRAMES TO BE RESIDENTIAL OR COMMERCIAL SECTION WITH WINDOWS. REFER TO ANY ADDENDUM. ANGLED WINDOW UNITS TO BE FACTORY MADE POWDERCOAT FINISH AS SELECTED BY OWNER. ALLOW FOR FLYSCREENS TO ALL AND FIXED AND TO BE DELIVERED ON SITE AS A COMPLETE UNIT. 6.2 CLOTHES HOIST: REFER TO ADDENDUM OR CONSULT CLIENT. 6.3 ELECTRIC AND GAS METER BOXES AS SHOWN IN DRAWINGS 7.0 ROOFING 7.1 DOWN PIPES SHALL BE TO MANUFACTURER'S SPECS. 7.2 ALLOW FOR ALL JOINTS AND JOINING MATERIALS, COLLARS, STRAPS & FASTENINGS NECESSARY TO COMPLETE WORK. 7.3 SEAL BETWEEN OVERLAPPING FLASHINGS; FLASHINGS TURNED DOWN OVER BASE OR APRON FLASHINGS; FLASHINGS OVER METAL ROOF; FLASHINGS OVER SECRET GUTTERS; AROUND ROOF PENETRATIONS ETC. 7.4 ALLOW FOR ALL ROOF PENETRATIONS, ROOF COWLS, FLASHINGS, FLUMES THROUGH ROOF. 7.5 SELECTED ROOFING MATERIAL SHALL BE INSTALLED AND FIXED IN ACCORDANCE WITH MANUFACTURERS SPECIFICATION AND RELEVANT BUILDING CODES. 7.6 GUTTER, FASCIA, DOWN PIPES, FLASHINGS SHALL BE IN LONGEST POSSIBLE LENGTHS AND SHALL MATCH EXISTING. 7.7 FIX GUTTERS & FLASHINGS TO PERMIT THERMAL MOVEMENT IN THEIR FULL LENGTH 8.0 JOINERY 8.1 SUPPLY AND BUILD TIMBER DOOR FRAMES TO EXTERNAL LOCATIONS AS SHOWN ON ARCHITECTURAL DRAWINGS. 8.2 ALL JOINERY TO BE OF THE HIGHEST QUALITY MATERIALS TO BEST TRADE PRICES AND HIGH QUALITY FINISH 8.3 EXTERNAL DOOR FRAMES SHALL BE: 110x40 DOUBLE REBATED FRAME WITH 130x40 WEATHERED THRESHOLD U.N.O. APRON FLASHINGS; FLASHINGS OVER METAL ROOF; FLASHINGS 9.0 CEILINGS 9.1 PROVIDE AND FIX ALL FLUSH STOP BEADS & CASING BEADS TO ALL CORNERS AND EDGES. 9.2 PROVIDE ALL SELECTED MOLDINGS AND CORNICES TO ALL CEILINGS AS STATED IN ARCHITECTURAL DOCUMENTS. BEST TRADE PRICES AND HIGH QUALITY FINISH 9.3 CEILINGS SHALL BE RECESSED EDGE, MIN. 8.0mm PLASTERGLASS OR GYPROCK. 9.4 FLUSH JOINTS, SCREW HEADS, AND OTHER BLEMISHES IN THE SHEETS USING APPROVED SYSTEMS TO PROVIDE A FLUSH, SMOOTH, CONTINUOUS SURFACE. 10.0 PLASTERING 10.1 NIBS IN INTERNAL CORNERS ADJACENT TO DOOR FRAMES GREATER THAN 40mm SHALL NOT BE FLUSHED UP WITH FRAMES. 10.2 PROVIDE V-JOINS IN FINISHING AND RENDERPLASTER WHERE BRICK-WORK ABUTS OR JOINS ON TO CONCRETE WORK. 10.3 INTERNAL WALL FINISHES INCLUDING CUPBOARD, BIN, FRIDGE RECESSES, ETC. (OTHER THAN FACE FINISHES OR WHERE COVERED BY FEATURE MATERIALS) FLOAT AND SET IN HARDWALL PLASTER U.N.O. 10.4 EXTERNAL WALL RENDER WHEN APPLICABLE SHALL BE 2-COAT SAND FINISH(FOR PAININTING). 10.5 PLASTERED WALLS SHALL BE NOMINAL12mm THICK CONSISTING OF 1:1:9, CEMENT:LIME:SAND RENDER, AND FINISHED WITH NOMINALLY 3mm HARDWALL PLASTER. 10.6 SUPPLY AND FIX EXTERNAL CORNER BEADS TO ALL EXTERNAL CORNERS. 10.7 PROVIDE STOP BEADS WHERE PLASTERWORK ABUTS TIMBER FRAMES, OR FACEWORK. 11.0 GLAZING 11.1 WHERE GLASS BLOCKS HAVE BEEN NOMINATED, THEY SHALL BE IN FRAMES AND INSTALLED TO MANUFACTURER'S SPECS 11.2 U.N.O CLEAR GLASS TO WINDOWS, OBSCURE GLASS TO BATHROOMS/TOILETS, REFER TO DRAWINGS- TO RELEVANT AUSTRALIAN STANDARDS. 12.0 FLOORING FINISHES 12.1 PROVIDE TIMBER FLOOR FINISHES TO NOMINATED AREAS COMPLETE WITH ALL MATERIALS, ANGLE TRIMS, ETC. TO COMPLETE THE WORKS. 12.2 PROVIDE CARPET FLOOR COVERINGS TO NOMINATED AREAS COMPLETE WITH NEW UNDERLAY SMOOTH EDGE, DIMINISHING STRIPS, ETC, TO COMPLETE THE WORKS: REFER TO DRAWINGS AND FINISHES SCHEDULE. 12.3 PROVIDE TILED FLOOR FINISHES TO NOMINATED AREAS BATHROOMS/TOILETS, REFER TO DRAWINGS- TO RELEVANT AUSTRALIAN STANDARDS. 13.0 SIGNAGE 13.1 "EMMK SERVICES" RESERVES THE RIGHT TO ERECT A BUILDER'S SIGN ON THE PROPERTY FACING THE STREET FRONTAGE IN COMPLIANCE WITH AUTHORITY REQUIREMENTS. 13.2 WHERE NECCESSARY SUPPLY AND FIX NEW UNIT AND HOUSE NUMBERS TO LETTERBOXES AS SCHEDULED. 14.0 PAVING 14.1 AS A GENERAL RULE WHEN PAVING IS PART OF THE BUILDING CONTRACT, AS A MIN. THE FOLLOWING SHALL APPLY: 14.2 PROVIDE 100mm COMPACTED LIMESTONE BASE TO DRIVEWAY TOPPED WITH 50mm CLEAN SAND AND GRADE TO FALLS. 14.3 BRICK PAVERS TO BE:TRAFFICABLE AREAS-MIN. 65mm SOLID CLAY OR CONCRETE &:PEDESTRIAN AREAS-MIN. 43mm SOLID CLAY OR CONCRETE 14.4 FOR PAVING PATTERN: REFER TO ADDENDUM 14.5 SUPPLY AND LAY ALL PAVING TO EXTERNAL AREAS AS SHOWN ON WORKING DRAWINGS. 14.6 PROVIDE BRICK EDGE-RESTRAINING FOOTING EMBEDDED IN MORTAR UNDER THE PAVING BRICK, GENERALLY,TO DRIVEWAY AREAS, PROVIDE NOM. 300x150mm CONC. FOOTING ALONG PERIMETER OF DRIVEWAY AND BED EDGE BRICK IN MORTAR. 14.7 CUT, FILL & COMPACT SAND TO REQUIRED LEVELS. SCREED TO UNIFORM THINNESS AND LEVELS. *All drawings are indicative AS SHOWN A3 STAGE EK JOK PROJECT NUMBER DRAWING NUMBER REVISION DATE DRAWN DRAWING SCALE SHEET SIZE CHECK DESIGNED DRAWN EK All dimensions should be confirmed on site prior to commencement of set-out or construction. Structural Certification is required in full. All construction must adhere to relevant Australian standards and the BCA. Do not scale from drawings. Exact location of all above and underground services to be determined on site. If Engineer is not notified in writing by client or contractor prior to set-out or construction, any costs incurred is the responsibility of the client or contractor. For all structural members -footings, load- bearing walls, please refer to structural engineer's prepared structural documents. GENERAL NOTES BY DATE REV PROPERTY DETAILS CLIENT DETAILS PROJECT DETAILS GENERAL SPECIFICATION HOME RENOVATION & ADDITION NTS A010 GENERAL NOTES 1 07-11-18 A010 QLD 4515 SOMERSET REGIONAL COUNCIL EMMK-7112018 01 A PRELIMINARY ISSUE EK 07.11.18 01 BUILDING APPROVAL EK 31.01.19 MY UNO PTY LTD

Transcript of MY...ANTI-TERMITE TREATMENT TO BE PROVIDED UNDER THE BUILDING AREAS IN ACCORDANCE WITH AS 2057, AS...

Page 1: MY...ANTI-TERMITE TREATMENT TO BE PROVIDED UNDER THE BUILDING AREAS IN ACCORDANCE WITH AS 2057, AS 3660.1 AND APPENDIX D, FOR RETICULATED SYSTEMS.BUILDER TO PROVIDE "DURSBAN" (HAND

1.1 ALL DIMENSIONS ON DRAWINGS ARE INDICATIVE ONLY. PRIOR TO STARTING ANY WORK ALL DIMENSIONS TO BE CHECKED ON SITE.1.2 SCALING SHALL NOT BE MADE FROM DRAWINGS; ANY QUESTIONS, ERRORS, OR OMISSIONS FOUND SHOULD BE NOTIFIED BEFORE STARTING ANY SITE WORK.1.3 ALL MATERIALS USED TO BE NEW, FIT FOR PURPOSE, AND SHALL COMPLY WITH RELEVANT CURRENT AUSTRALIAN STANDARDS.1.4 SPECIFICATIONS, SCHEDULES AND CONSULTANTS DRAWINGS THAT FORM PART OF THE CONSTRUCTION DOCUMENTS REFERRED TO IN THE "BUILDING CONTRACT" SHOULD BE USED IN CONJUNCTION, TO INTERPRETE ALL ARCHITECTURAL DRAWINGS. 1.5 ALL WORKMANSHIP SHALL COMPLY WITH RELEVANT CURRENT AUSTRALIAN STANDARDS AND TO GOOD TRADE PRACTICES AND ALL EQUIPMENT TO BE SUPPLIED NECESSARY FOR THE COMPLETION OF RESPECTIVE WORKS.1.6 ALL WORK SHALL BE IN ACCORDANCE WITH REQUIREMENTS OF THE RESPECTIVE AUTHORITY HAVING JURISDICTION OVER THE WORKS. 1.7 CONTRACTORS SHALL BE RESPECTFUL OF OTHER WORKS AND SHALL COORDINATE FOR SUCCESFUL COMPLETION OF PROJECT AS NEEDED. CONTRACTORS, AFTER THE COMPLETION OF RESPECTIVE WORKS SHOULD ALSO PROGRESSIVELY CLEAN UP AFTER. 1.8 ENSURE THAT BACKGROUNDS ARE ADEQUATE FOR THE INTENDED SUBSEQUENT FINISHES. COMMENCEMENT OF WORK ON THE BACKGROUNDS IMPLIES ACCEPTANCE BY THE SUBCONTRACTOR OF THE BACKGROUNDS ON WHICH FINISHES ARE APPLIED.

1.0 GENERAL NOTES

2.1 TREAT ALL RETAINING WALLS WITH "BITKOTE" WATERPROOFING AGENT OR SUITABLY APPROVED MATERIAL TO AUSTRALIAN STANDARDS.2.2 DO NOT EXCAVATE SERVICES TRENCHES WITHIN A 45-DEGREE ANGLE MEASURED FROM BOTTOM OF FOOTING EDGE. 2.3 REMOVE TOPSOIL TO A MINIMUM DEPTH OF 200mm. THIS INCLUDES ALL ROOTS AND OTHER MATTER, AS REQUIRED BY THE BUILDER AND/OR CONDITION OF THE SOIL 2.4 PROVIDE ADEQUATE CLEAN FILLING SAND AND COMPACT IN LAYERS NOT TO EXCEED 300mm TO REDUCE LEVELS AS SHOWN.2.5 TO OBTAIN MIN. SEVEN (7) BLOWS PER 300mm ON A STANDARDS PERTH SAND PENEFROMETER TEST(AS PER AS 1289 F3.3)COMPACT SAND FILLING AND SANDY SUB GRADES UNDER FOOTINGS AND SLAB.

2.0 EARTHWORKS

3.1 FOOTING AND SLAB CONSTRUCTION SHALL COMPLY WITH AS 2870. 3.2 A PROPRIETARY VAPOR BARRIER IS TO BE PROVIDED CONSISTING OF HIGH IMPACT RESISTANT POLYTHENE FILM MIN. 0.2mm THICK WHICH HAS BEEN PIGMENTED AND BRANDED BY THE MANUFACTURER.3.3 SLAB IS TO BE CURED FOR 7 DAYS MIN. & SLAB REINFORCEMENT PLACED ON APPROVED CHAIRS FOR CRACK CONTROL IMPROVEMENT.3.4 ALL CONCRETE SHALL CONFORM TO THE REQUIREMENTS OF AS 3600 CONCRETE STRENGTH GRADE: N20, AGGREGATE 20mm, SLUMP 80mm.3.5 CONCRETE REINFORCEMENT AND FORMWORK TO COMPLY WITH STRUCTURAL ENGINEERS DETAILS, RELEVANT BUILDING CODES AND STANDARDS

3.0 CONCRETE

ANTI-TERMITE TREATMENT TO BE PROVIDED UNDER THE BUILDING AREAS IN ACCORDANCE WITH AS 2057, AS 3660.1 AND APPENDIX D, FOR RETICULATED SYSTEMS.BUILDER TO PROVIDE "DURSBAN" (HAND SPRAYED ORGANO-PHOSPHATE) OR OTHER ANTI-TERMITE TREATMENT SIMILAR APPROVED IN ACCORDANCE WITH RELEVANT AUSTRALIAN STANDARD CODES.

3.6 TERMITE PROTECTION -

4.1 BRICK WORK SHOULD BE IN COMPLIANCE WITH : - MORTAR FOR MASONRY CONSRUCTION - AS 3700 MASONRY CODE - AS A123 MASONRY CODE4.2 7 STANDARD COURSES = 600mm IS A GOOD BRICK GAUGE.4.3 20MPa SHOULD BE THE MIN. COMPRESSIVE STRENGTH FOR ALL BRICKS AND AS FOLLOWS: - EXTERNAL FACE WORK: 230x110x76mm - EXTERNAL RENDER: 305x162x90mm MAXIBRICK OR VERTICORE - WINDOW SILLS: 2c FACE BRICK SPLAYED SILLS - WINDOW HEADS: SOLID FACEBRICK COURSE - INTERNAL WALLS: 305x162x90mm MAXIBRICK OR VERTICORE WITH BED JOINT AND PERPENDS FILLED 305x76x90mm LONGREACH OR JUMBO FOR COURSE ADJUSTMENT4.4 MORTAR: 1:1:6 CEMENT:LIME:SAND MORTAR (FACE BRICK) COLOR TO MATCH EXISTING AS SELECTED4.5 TIES SHALL BE 3.5mm DIAMETER GALVANIZED WIRE KINKED FOR AND BUILT IN EVERY 5TH COURSE AT 900mm CENTRES APPROXIMATELY, WITH ADDITIONAL TIES AT THE RATE OF 1 TIE/300mm HEIGHT OF OPENINGS AND VERTICAL CONTROL JOINTS AND WITHIN 150mm OF THE OPENINGS. BUILD TIES INTO EACH LEAF AT LEAST 50mm. VERTICAL CONTROL JOINTS SHALL BE 12mm WIDE FILLED AT COMPLETION WITH 'COMPRIBAND' CONTINUOUS FILLER STRIP 4.6 CAVITIES TO BE KEPT CLEAR OF MORTAR. PROVIDE CAVITY BOARDS. TEMPORARILY OMIT BRICKS TO ALLOW RAKING OUT OF CAVITY BOTTOMS.4.7 FORM WEEP HOLES EVERY FOURTH PERPEND ABOVE FLASHINGS AND CAVITY

4.0 BRICKWORK

MAX SPAN LINTELS SIZE BEARING(mm) (VERT x HORIZ x THICK) EACH END (mm)900 75x10 1501200 75x75x8 1501500 90x90x8 1501800 100x75x8 2302100 125x75x8 2302400 125x75x10 2302500 100x100x8 2303000 150x90x10 230

4.8 LINTELS

4.9 ALCOR/PGI FLASHINGS TO BE BUILT IN AS FOLLOWS: -CAVITY WALLS BUILT OF SLAB ON GROUND (WHERE NOT PARGED). -WHEREVER SHOWN ON DRAWINGS. -OVER LINTELS TO EXPOSED OPENINGS:

FULL WIDTH OF OUTER LEAF CONTINUOUS ACROSS CAVITY 50mm INTO INNER LEAF 2c ABOVE. -OVER ROOF:

FULL WIDTH OF EXTERNAL LEAF, STEPPED TO ROOF SLOPE TURNED DOWN MIN. 50mm OVER BASE FLASHING. TURN UP IN CAVITY SLOPING INWARDS AND BUILT INTO INNER LEAF 1c ABOVE. -STRUCTURE OR SERVICES WITHIN 30mm OF OUTER BRICK LEAF IN CAVITY: VERTICAL FLASHINGS CONTINUOUS 1c BELOW FL TO ABOVE STRUCTURE OR FRAME. NOMINAL 300mm WIDE. FOR HORIZONTAL STRUCTURES / SERVICES: CONTINUOUS FLASHING BUILT IN AS FOR OVER LINTELS -AT CAVITY WALLS WITH GLASS BLOCK 300mm WIDE FIXED TO GLASS BLOCK FRAME AND TURNED AWAY IN CAVITY FROM INNER LEAVE -DOOR / WINDOW STILES:

FULL HEIGHT 150mm WIDE FIXED TO FRAMES INTERLEAVED WITH SILL AND HEAD FLASHING AT EACH END. -STRUCTURE OR SERVICES WITHIN 30mm OF OUTER BRICK LEAF IN CAVITY:

VERTICAL FLASHINGS CONTINUOUS 1c BELOW FLR TO ABOVE STRUCTURE OR FRAME. NOMINAL 300mm WIDE. FOR HORIZONTAL STRUCTURES / SERVICES:

CONTINUOUS FLASHING BUILT IN AS FOR OVER LINTELS. -AT CAVITY WALLS WITH GLASS BLOCK 300mm WIDE FIXED TO GLASS BLOCK FRAME AND TURNED AWAY IN CAVITY FROM INNER LEAVE.4.10 REINFORCE BELOW AND OVER OPENINGS WHERE NECESSARY WITH GALVANISED WOVEN WIRE FABRIC 75mm WIDE IN CENTRE OF EACH LEAF LOCATED IN 2 COUSES BELOW SILL AND IN THE 2 COURSES ABOVE AN OPENING EXTENDING A MINIMUM OF 600mm BEYOND THE OPENING.4.11 PROVIDE 12mm PLASTERING MARGIN BETWEEN WINDOW FRAME AND INTERNAL BRICKWORK TO BE PLASTERED.4.12 MOISTEN ALL EXTRUDED BRICKS BEFORE LAYING4.13 BRICKWORK SETOUT ACCURATELY, PLUMB, LEVEL AND PROPERLY BONDED. RISING WORK TO BE RAKED BACK, JAMBS, REVEALS, CORNERS, PERPENDS, ETC. TO BE TRUE, PLUMB, AND IN LINE WITH PERPENDS TRUE TO LINE. SETOUT DOOR FRAMES NEAR PERPANDICULAR WALL WITH A MARGIN OF 12mm OR GREATER THAN 50mm.4.14 PROVIDE DAMP PROOF COURSES (DPC) IN THE BOTTOM 3 COURSES OF BRICKWORK AND SLAB AND/OR FOOTINGS. DPC ADDITIVE SHALL BE CLEAR IN ALL FACEWORK.

5.0 CARPENTRY WORK5.1 SUPPLY AND FIX ALL BULKHEADS & FALSE CEILINGS AS SHOWN ON THE DRAWINGS.5.2 ROOF AND CEILING FRAMING SHOULD COMPLY WITH AS 1684 LIGHT TIMBER FRAMING CODE. DRAW STRAP FIRMLY OVER WALL PLATES AND SECURELY FIX TO TOP OF PLATE WITH 2x30mm GALV. CLOUTS/STRAP.5.3 ROOF AND CEILING FRAMING SHOULD COMPLY WITH AS 1684 LIGHT TIMBER FRAMING

6.0 METAL WORK6.1 WINDOW FRAMES TO BE RESIDENTIAL OR COMMERCIAL SECTION WITH WINDOWS. REFER TO ANY ADDENDUM. ANGLED WINDOW UNITS TO BE FACTORY MADE POWDERCOAT FINISH AS SELECTED BY OWNER. ALLOW FOR FLYSCREENS TO ALL AND FIXED AND TO BE DELIVERED ON SITE AS A COMPLETE UNIT.6.2 CLOTHES HOIST: REFER TO ADDENDUM OR CONSULT CLIENT.6.3 ELECTRIC AND GAS METER BOXES AS SHOWN IN DRAWINGS

7.0 ROOFING7.1 DOWN PIPES SHALL BE TO MANUFACTURER'S SPECS.7.2 ALLOW FOR ALL JOINTS AND JOINING MATERIALS, COLLARS, STRAPS & FASTENINGS NECESSARY TO COMPLETE WORK.7.3 SEAL BETWEEN OVERLAPPING FLASHINGS; FLASHINGS TURNED DOWN OVER BASE OR APRON FLASHINGS; FLASHINGS OVER METAL ROOF; FLASHINGS OVER SECRET GUTTERS; AROUND ROOF PENETRATIONS ETC.7.4 ALLOW FOR ALL ROOF PENETRATIONS, ROOF COWLS, FLASHINGS, FLUMES THROUGH ROOF.7.5 SELECTED ROOFING MATERIAL SHALL BE INSTALLED AND FIXED IN ACCORDANCE WITH MANUFACTURERS SPECIFICATION AND RELEVANT BUILDING CODES.7.6 GUTTER, FASCIA, DOWN PIPES, FLASHINGS SHALL BE IN LONGEST POSSIBLE LENGTHS AND SHALL MATCH EXISTING.7.7 FIX GUTTERS & FLASHINGS TO PERMIT THERMAL MOVEMENT IN THEIR FULL LENGTH

8.0 JOINERY8.1 SUPPLY AND BUILD TIMBER DOOR FRAMES TO EXTERNAL LOCATIONS AS SHOWN ON ARCHITECTURAL DRAWINGS.8.2 ALL JOINERY TO BE OF THE HIGHEST QUALITY MATERIALS TO BEST TRADE PRICES AND HIGH QUALITY FINISH8.3 EXTERNAL DOOR FRAMES SHALL BE: 110x40 DOUBLE REBATED FRAME WITH 130x40 WEATHERED THRESHOLD U.N.O. APRON FLASHINGS; FLASHINGS OVER METAL ROOF; FLASHINGS

9.0 CEILINGS9.1 PROVIDE AND FIX ALL FLUSH STOP BEADS & CASING BEADS TO ALL CORNERS AND EDGES.9.2 PROVIDE ALL SELECTED MOLDINGS AND CORNICES TO ALL CEILINGS AS STATED IN ARCHITECTURAL DOCUMENTS. BEST TRADE PRICES AND HIGH QUALITY FINISH9.3 CEILINGS SHALL BE RECESSED EDGE, MIN. 8.0mm PLASTERGLASS OR GYPROCK.9.4 FLUSH JOINTS, SCREW HEADS, AND OTHER BLEMISHES IN THE SHEETS USING APPROVED SYSTEMS TO PROVIDE A FLUSH, SMOOTH, CONTINUOUS SURFACE.

10.0 PLASTERING10.1 NIBS IN INTERNAL CORNERS ADJACENT TO DOOR FRAMES GREATER THAN 40mm SHALL NOT BE FLUSHED UP WITH FRAMES.10.2 PROVIDE V-JOINS IN FINISHING AND RENDERPLASTER WHERE BRICK-WORK ABUTS OR JOINS ON TO CONCRETE WORK.10.3 INTERNAL WALL FINISHES INCLUDING CUPBOARD, BIN, FRIDGE RECESSES, ETC. (OTHER THAN FACE FINISHES OR WHERE COVERED BY FEATURE MATERIALS) FLOAT AND SET IN HARDWALL PLASTER U.N.O. 10.4 EXTERNAL WALL RENDER WHEN APPLICABLE SHALL BE 2-COAT SAND FINISH(FOR PAININTING).10.5 PLASTERED WALLS SHALL BE NOMINAL12mm THICK CONSISTING OF 1:1:9, CEMENT:LIME:SAND RENDER, AND FINISHED WITH NOMINALLY 3mm HARDWALL PLASTER.10.6 SUPPLY AND FIX EXTERNAL CORNER BEADS TO ALL EXTERNAL CORNERS.10.7 PROVIDE STOP BEADS WHERE PLASTERWORK ABUTS TIMBER FRAMES, OR FACEWORK.

11.0 GLAZING11.1 WHERE GLASS BLOCKS HAVE BEEN NOMINATED, THEY SHALL BE IN FRAMES AND INSTALLED TO MANUFACTURER'S SPECS 11.2 U.N.O CLEAR GLASS TO WINDOWS, OBSCURE GLASS TO BATHROOMS/TOILETS, REFER TO DRAWINGS- TO RELEVANT AUSTRALIAN STANDARDS.

12.0 FLOORING FINISHES12.1 PROVIDE TIMBER FLOOR FINISHES TO NOMINATED AREAS COMPLETE WITH ALL MATERIALS, ANGLE TRIMS, ETC. TO COMPLETE THE WORKS. 12.2 PROVIDE CARPET FLOOR COVERINGS TO NOMINATED AREAS COMPLETE WITH NEW UNDERLAY SMOOTH EDGE, DIMINISHING STRIPS, ETC, TO COMPLETE THE WORKS: REFER TO DRAWINGS AND FINISHES SCHEDULE. 12.3 PROVIDE TILED FLOOR FINISHES TO NOMINATED AREAS BATHROOMS/TOILETS, REFER TO DRAWINGS- TO RELEVANT AUSTRALIAN STANDARDS.

13.0 SIGNAGE13.1 "EMMK SERVICES" RESERVES THE RIGHT TO ERECT A BUILDER'S SIGN ON THE PROPERTY FACING THE STREET FRONTAGE IN COMPLIANCE WITH AUTHORITY REQUIREMENTS. 13.2 WHERE NECCESSARY SUPPLY AND FIX NEW UNIT AND HOUSE NUMBERS TO LETTERBOXES AS SCHEDULED.

14.0 PAVING14.1 AS A GENERAL RULE WHEN PAVING IS PART OF THE BUILDING CONTRACT, AS A MIN. THE FOLLOWING SHALL APPLY:14.2 PROVIDE 100mm COMPACTED LIMESTONE BASE TO DRIVEWAY TOPPED WITH 50mm CLEAN SAND AND GRADE TO FALLS. 14.3 BRICK PAVERS TO BE:TRAFFICABLE AREAS-MIN. 65mm SOLID CLAY OR CONCRETE &:PEDESTRIAN AREAS-MIN. 43mm SOLID CLAY OR CONCRETE 14.4 FOR PAVING PATTERN: REFER TO ADDENDUM14.5 SUPPLY AND LAY ALL PAVING TO EXTERNAL AREAS AS SHOWN ON WORKING DRAWINGS. 14.6 PROVIDE BRICK EDGE-RESTRAINING FOOTING EMBEDDED IN MORTAR UNDER THE PAVING BRICK, GENERALLY,TO DRIVEWAY AREAS, PROVIDE NOM. 300x150mm CONC. FOOTING ALONG PERIMETER OF DRIVEWAY AND BED EDGE BRICK IN MORTAR.14.7 CUT, FILL & COMPACT SAND TO REQUIRED LEVELS. SCREED TO UNIFORM THINNESS AND LEVELS.

*All drawings are indicative

AS SHOWN A3

STAGE

EK

JOK

PROJECT NUMBER DRAWING NUMBER REVISION

DATE DRAWN DRAWING SCALE SHEET SIZE

CHECK

DESIGNED

DRAWN

EK

All dimensions should be confirmed on site prior to commencement of set-out or construction. StructuralCertification is required in full. All construction must adhere to relevant Australian standards and the BCA.Do not scale from drawings. Exact location of all above and underground services to be determined on site. IfEngineer is not notified in writing by client or contractor prior toset-out or construction, any costs incurred is the responsibility ofthe client or contractor. For all structural members -footings, load-bearing walls, please refer to structural engineer's prepared structural documents.

GENERAL NOTES

BY DATEREV

PROPERTY DETAILS

CLIENT DETAILS

PROJECT DETAILS

GENERAL SPECIFICATION

HOME RENOVATION & ADDITION

NTSA010GENERAL NOTES1

07-11-18

A010

QLD 4515SOMERSET REGIONAL COUNCIL

EMMK-7112018 01

A PRELIMINARY ISSUE EK 07.11.1801 BUILDING APPROVAL EK 31.01.19

MY

UN

OD

esig

n an

d D

rafti

ngM

Y U

NO

Des

ign

and

Dra

fting

MY

UN

OD

esig

n an

d D

rafti

ngM

Y U

NO

Des

ign

and

Dra

fting

MY

UN

OD

esig

n an

d D

rafti

ng

Des

ign

and

Dra

fting

MY

UN

OD

esig

n an

d D

rafti

ng

MY

UN

OD

esig

n an

d D

rafti

ng

MY

UN

OM

Y U

NO

MY UNO PTY LTD

Page 2: MY...ANTI-TERMITE TREATMENT TO BE PROVIDED UNDER THE BUILDING AREAS IN ACCORDANCE WITH AS 2057, AS 3660.1 AND APPENDIX D, FOR RETICULATED SYSTEMS.BUILDER TO PROVIDE "DURSBAN" (HAND

NORTH

148780

143574

121908

122852

MT. KAAAY RD.

NEWSHED

51085

TO OM

P47505

TO O

MP

4664

5

TO OM

P54635

TO O

MP

7509

0

TO O

MP

3419

0

TO OM

P21720

PRO

POSE

DEX

TEN

SIO

N

*All drawings are indicative

AS SHOWN A3

STAGE

EK

JOK

PROJECT NUMBER DRAWING NUMBER REVISION

DATE DRAWN DRAWING SCALE SHEET SIZE

CHECK

DESIGNED

DRAWN

EK

All dimensions should be confirmed on site prior to commencement of set-out or construction. StructuralCertification is required in full. All construction must adhere to relevant Australian standards and the BCA.Do not scale from drawings. Exact location of all above and underground services to be determined on site. IfEngineer is not notified in writing by client or contractor prior toset-out or construction, any costs incurred is the responsibility ofthe client or contractor. For all structural members -footings, load-bearing walls, please refer to structural engineer's prepared structural documents.

GENERAL NOTES

BY DATEREV

PROPERTY DETAILS

CLIENT DETAILS

PROJECT DETAILS

PROPOSED SITE PLAN

HOME RENOVATION & ADDITION

07-11-18

A100

QLD 4515SOMERSET REGIONAL COUNCIL

EMMK-7112018 01

A PRELIMINARY ISSUE EK 07.11.1801 BUILDING APPROVAL EK 31.01.19

TOTAL SITE AREA - 17549 SQMTOTAL SITE COVERAGE - 1.58%

EXISTING RESIDENCE - 137.57SQMPROP. EXTENSION - 67.85SQMPROP. SHED - 72.0SQMTOTAL BUILT AREA - 277.42 SQM

SITE INFORMATION

EXISTINGRESIDENCE

Scale 1 : 1000A100PROPOSED SITE PLAN1

MY UNO PTY LTD

Page 3: MY...ANTI-TERMITE TREATMENT TO BE PROVIDED UNDER THE BUILDING AREAS IN ACCORDANCE WITH AS 2057, AS 3660.1 AND APPENDIX D, FOR RETICULATED SYSTEMS.BUILDER TO PROVIDE "DURSBAN" (HAND

UP

DN

9700

6300

BED

02

3000

BEDRM 2

4000

BED 03

2700

BED

03

3000

BED 02

BED 03

EX. LIVING ROOM

TOILET/BATH

EXISTING ENCLOSED VERANDAH

BIR

EXISTING DECK

1500H2100W

1500

H15

00W

1500H1500W

2400W

100

100

820D

R

820D

R

820DR

CPD 820D

R

100

900H

1500

W

2240

3600

100

2400

100

EX. KITCHEN

1500

H15

00W

4800

2400

1220H850W 2100H

1130W

ARCH

FRD

CPD

EXIS

TIN

G

SGD

100 2820 100 3880 100

100

5500 100100

*All drawings are indicative

AS SHOWN A3

STAGE

EK

JOK

PROJECT NUMBER DRAWING NUMBER REVISION

DATE DRAWN DRAWING SCALE SHEET SIZE

CHECK

DESIGNED

DRAWN

EK

All dimensions should be confirmed on site prior to commencement of set-out or construction. StructuralCertification is required in full. All construction must adhere to relevant Australian standards and the BCA.Do not scale from drawings. Exact location of all above and underground services to be determined on site. IfEngineer is not notified in writing by client or contractor prior toset-out or construction, any costs incurred is the responsibility ofthe client or contractor. For all structural members -footings, load-bearing walls, please refer to structural engineer's prepared structural documents.

GENERAL NOTES

BY DATEREV

PROPERTY DETAILS

CLIENT DETAILS

PROJECT DETAILS

EXISTING FLOOR PLAN

HOME RENOVATION & ADDITION

QLD 4515SOMERSET REGIONAL COUNCIL

A PRELIMINARY ISSUE EK 07.11.1801 BUILDING APPROVAL EK 31.01.19

01EMMK1170818 A101A

Scale 1 : 100A101AEXISTING FLOOR PLAN1

07.11.18

ABN:

MY UNO PTY LTD

Page 4: MY...ANTI-TERMITE TREATMENT TO BE PROVIDED UNDER THE BUILDING AREAS IN ACCORDANCE WITH AS 2057, AS 3660.1 AND APPENDIX D, FOR RETICULATED SYSTEMS.BUILDER TO PROVIDE "DURSBAN" (HAND

UP

A103

2

A1031A102 2

1

LIVIN

G/D

ININ

G/K

ITCHE

N A

REA

9900

LIVING/DINING/KITCHEN AREA

5800

9700

6300

BED

02

3000

BEDRM 2

4000

BATH

1200

BEDRM 1

4200

BEDRM 3

2700

BED

03

3000

600

100

BED

RM 1

3000

1200

VER

AN

DA

H

2400

2400

9700

15700

15700

LAUN

DRY

2300

3800

BED 02

BED 03

BED 01

TOILET/BATH

LAU

ND

RY

KITCHEN AREA

DINING AREA

PROPOSED VERANDAH

EXISTING VERANDAH

BIR

BIR

BATHLIVING AREA

VERANDAH TO MATCH EXISTING

EXISTING DECKING

DE

CK

ISLAND BENCH 15

00H

1500

W

2000

FR

EN

CH

D

OO

R

1500H2100W

1500

H15

00W

1500H1500W

1500H2400W

100

100100

600H3000W

820D

R

820D

R820DR

1800

H15

00W

1800

H15

00W

4600W STACKER DOOR- TO MANUFACTURER'S SPECS

820D

R

LIN 820D

R

820

CSD

100

TOILET/BATH

2820 100100

LAUNDRY

3880 100

KITCHEN AREA

5800 100

DECK

1200

100

SEWER1100

1500

OPE

NIN

G

100 100

6000

100

100

100

100

100

6000 1200

1200

1200

3000

5000

0

1200

1

E101

EXISTING RESIDENCE(IN GREY)

NEW EXTENSION

*All drawings are indicative

AS SHOWN A3

STAGE

EK

JOK

PROJECT NUMBER DRAWING NUMBER REVISION

DATE DRAWN DRAWING SCALE SHEET SIZE

CHECK

DESIGNED

DRAWN

EK

All dimensions should be confirmed on site prior to commencement of set-out or construction. StructuralCertification is required in full. All construction must adhere to relevant Australian standards and the BCA.Do not scale from drawings. Exact location of all above and underground services to be determined on site. IfEngineer is not notified in writing by client or contractor prior toset-out or construction, any costs incurred is the responsibility ofthe client or contractor. For all structural members -footings, load-bearing walls, please refer to structural engineer's prepared structural documents.

GENERAL NOTES

BY DATEREV

PROPERTY DETAILS

CLIENT DETAILS

PROJECT DETAILS

PROPOSED FLOOR PLAN

HOME RENOVATION & ADDITION

01

QLD 4515SOMERSET REGIONAL COUNCIL

EMMK1170818 A101B

Scale 1 : 100A101BGROUND FLOOR PLAN1

A PRELIMINARY ISSUE EK 07.11.1801 BUILDING APPROVAL EK 31.01.19

07.11.18

MY UNO PTY LTD

A102

Page 5: MY...ANTI-TERMITE TREATMENT TO BE PROVIDED UNDER THE BUILDING AREAS IN ACCORDANCE WITH AS 2057, AS 3660.1 AND APPENDIX D, FOR RETICULATED SYSTEMS.BUILDER TO PROVIDE "DURSBAN" (HAND

TRIM DECK ROOFING SHEET 11 DEGREE SLOPE - TO ROOF MANUFACTURER'S SPECS

NEW DECK ROOF

SELECTED ALUMINIUM WINDOWS - TO MANUFACTURER'S SPECS

EXTERNAL CLADDING - TO MANUFACTURER'S SPECS

NEW SHSPOST - TO ENG. SPECS

COLOURBOND QUAD GUTTER - TO MANUFACTURER'S SPECS

EXISTING RESIDENCE

STAINLESS STEEL WIRE BALUSTRADING

NEWEXTENSION

NEW ENTRY ROOF

ALL GUTTERS TO CONNECT TO STORMWATER DRAINAGEAS PER ASNZS-3500 AND AS/NZS 2179.1

UPPER GROUND LEVEL

LOWER GROUND LEVEL

TRIM DECK ROOFING SHEET - TO ROOF MANUFACTURER'S SPECS

EXISTING RESIDENCE

21.64°21.64°

EXISTING CLADDING

BOX CHANNEL - TO ROOF MANUFACTURER'S SPECS

2200 EXISTINGTANKNGL

ALL GUTTERS TO CONNECT TO STORMWATER DRAINAGEAS PER ASNZS-3500 AND AS/NZS 2179.1 NEW

EXTENSION

*All drawings are indicative

AS SHOWN A3

STAGE

EK

JOK

PROJECT NUMBER DRAWING NUMBER REVISION

DATE DRAWN DRAWING SCALE SHEET SIZE

CHECK

DESIGNED

DRAWN

EK

All dimensions should be confirmed on site prior to commencement of set-out or construction. StructuralCertification is required in full. All construction must adhere to relevant Australian standards and the BCA.Do not scale from drawings. Exact location of all above and underground services to be determined on site. IfEngineer is not notified in writing by client or contractor prior toset-out or construction, any costs incurred is the responsibility ofthe client or contractor. For all structural members -footings, load-bearing walls, please refer to structural engineer's prepared structural documents.

GENERAL NOTES

BY DATEREV

PROPERTY DETAILS

CLIENT DETAILS

PROJECT DETAILS

PROPOSED ELEVATIONS 1 of 2

HOME RENOVATION & ADDITION

01

QLD 4515

SOMERSET REGIONAL COUNCIL

EMMK1170818 A102

A PRELIMINARY ISSUE EK 07.11.1801 BUILDING APPROVAL EK 31.01.19

Scale 1 : 100A102WEST ELEVATION1

Scale 1 : 100A102NORTH ELEVATION2

07.11.18

MY UNO Design & Drafting

MY UNO PTY LTD

Page 6: MY...ANTI-TERMITE TREATMENT TO BE PROVIDED UNDER THE BUILDING AREAS IN ACCORDANCE WITH AS 2057, AS 3660.1 AND APPENDIX D, FOR RETICULATED SYSTEMS.BUILDER TO PROVIDE "DURSBAN" (HAND

EXTERNAL CLADDING -TO MANUFACTURER'S SPECS

EXISTING CLADDING

TRIM DECK ROOFING SHEET 11 DEGREE SLOPE - TO ROOF MANUFACTURER'S SPECS

SELECTED ALUMINIUM WINDOWS -TO MANUFACTURER'S SPECS

NEW SHS POST- TO ENG'S SPECS

STAINLESS WIRE BALUSTRADING- 80mm CENTRES

EXISTINGWATER TANK

EXISTING SOIL TO BE CUT AND BATTERED DOWN(COMPACTED TO SUIT SLOPE)

NGL

2200

7745

ALL GUTTERS TO CONNECT TO STORMWATER DRAINAGEAS PER ASNZS-3500 AND AS/NZS 2179.1

TRIM DECK ROOFING SHEET - TO ROOF MANUFACTURER'S SPECS

EXTERNAL CLADDING - TO MANUFACTURER'S SPECS

COLOURBOND QUAD GUTTER - TO MANUFACTURER'S SPECS

EXISTING CLADDING

EXISTING ASSYMMETRICAL TRIM DECK GABLE ROOF

NEW EXTENSION

EXISTING RESIDENCE

SELECTED ALUMINIUM WINDOW - TO MANUFACTURER'S SPECS

ALL GUTTERS TO CONNECT TO STORMWATER DRAINAGEAS PER ASNZS-3500 AND AS/NZS 2179.1

TRIM DECK ROOFING SHEET 11 DEGREE SLOPE - TO ROOF MANUFACTURER'S SPECS

*All drawings are indicative

AS SHOWN A3

STAGE

EK

JOK

PROJECT NUMBER DRAWING NUMBER REVISION

DATE DRAWN DRAWING SCALE SHEET SIZE

CHECK

DESIGNED

DRAWN

EK

All dimensions should be confirmed on site prior to commencement of set-out or construction. StructuralCertification is required in full. All construction must adhere to relevant Australian standards and the BCA.Do not scale from drawings. Exact location of all above and underground services to be determined on site. IfEngineer is not notified in writing by client or contractor prior toset-out or construction, any costs incurred is the responsibility ofthe client or contractor. For all structural members -footings, load-bearing walls, please refer to structural engineer's prepared structural documents.

GENERAL NOTES

BY DATEREV

PROPERTY DETAILS

CLIENT DETAILS

PROJECT DETAILS

PROPOSED ELEVATIONS 2 of 2

HOME RENOVATION & ADDITION

01

QLD 4515SOMERSET REGIONAL COUNCIL

EMMK1170818 A103

A PRELIMINARY ISSUE EK 07.11.1801 BUILDING APPROVAL EK 31.01.19

Scale 1 : 100A103SOUTH ELEVATION1

Scale 1 : 100A103EAST ELEVATION2

07.11.18

MY UNO PTY LTD

Page 7: MY...ANTI-TERMITE TREATMENT TO BE PROVIDED UNDER THE BUILDING AREAS IN ACCORDANCE WITH AS 2057, AS 3660.1 AND APPENDIX D, FOR RETICULATED SYSTEMS.BUILDER TO PROVIDE "DURSBAN" (HAND

*All drawings are indicative

AS SHOWN A3

STAGE

EK

JOK

PROJECT NUMBER DRAWING NUMBER REVISION

DATE DRAWN DRAWING SCALE SHEET SIZE

CHECK

DESIGNED

DRAWN

EK

All dimensions should be confirmed on site prior to commencement of set-out or construction. StructuralCertification is required in full. All construction must adhere to relevant Australian standards and the BCA.Do not scale from drawings. Exact location of all above and underground services to be determined on site. IfEngineer is not notified in writing by client or contractor prior toset-out or construction, any costs incurred is the responsibility ofthe client or contractor. For all structural members -footings, load-bearing walls, please refer to structural engineer's prepared structural documents.

GENERAL NOTES

BY DATEREV

PROPERTY DETAILS

CLIENT DETAILS

PROJECT DETAILS

3D - PROPOSED FRONT & REARVIEWS

HOME RENOVATION & ADDITION

01

QLD 4515SOMERSET REGIONAL COUNCIL

EMMK1170818 A104

A PRELIMINARY ISSUE EK 07.11.1801 BUILDING APPROVAL EK 31.01.19

ScaleA1043D - FRONT VIEW.1

ScaleA1043D - REAR VIEW2

07.11.18

MY UNO PTY LTD

MY UNO PTY LTD

Page 8: MY...ANTI-TERMITE TREATMENT TO BE PROVIDED UNDER THE BUILDING AREAS IN ACCORDANCE WITH AS 2057, AS 3660.1 AND APPENDIX D, FOR RETICULATED SYSTEMS.BUILDER TO PROVIDE "DURSBAN" (HAND

ROOF TUSSES TO ROOF MANUFACTURERS SPECS

ISLAND BENCH

125X45 TIMBER FLOOR JOISTS @ 450 CENTRES

190X75 TIMBER BEARER75X4.0 SHS POSTS IN CONCRETE PIERS

Cei

ling

Heig

ht

3000

200X50 TIMBER BEARER

125X45 TIMBER FLOOR JOISTS @ 450 CENTRES

DETAIL H3

DETAIL H1

DETAIL H2

NEW EXTENSION

AGL

190x45 TIMBER BEARER

TRIMDECK ROOF CLADDING (1200 MAX. SPAN)

COLOURBOND QUAD GUTTER 75x4.0 SHS POST

89X19 TIMBER FLOOR DECK STRIPS TO MANUFACTURERS SPECS

125X45 TIMBER FLOOR JOISTS @ 450CENTRES

200 x 50 TIMBER BEARERS (EXTERNAL DECK AREA)

190 x 75 TIMBER BEARERS (NEW EXTENSION AREA)

450

900

MPa 25 CONCRETE BORED PIER FOOTING

75x4.0 SHS POST IN CONCRETE FOOTING

MIN

IMUM

600

6

E101

R1R1R1R1R1R1R1R1R1R1R1

R1

R1

R1R1R1R1R1R1R1R1R1R1R1

6000

6000

6000

1200

0

R1 - C20012 LIPPED C-CHANNEL

R1

P1 - 75x4.0 SHS POST IN CONCRETE FOOTING

P1 P1

P1

P1 P1

P1

LEGEND

DETAIL S2

RAFTERS TO ENGINEER'S DETAILS

POST TO ENGINEER'S DETAILS

DETAIL S1

450

900

MPa 25 CONCRETE BORED PIER FOOTING

75x4.0 SHS POST IN CONCRETE FOOTING

MIN

IMUM

600

SELECTED TRIMDECK SHEET TO MANUFACTURER'S SPECS

C20012 LIPPED C-CHANNEL BOLTED TO POST & RAFTERS WITH PURLIN BOLTS & BRACKETS - TO MANUFACTURER'S SPECS

C20012 LIPPED C-CHANNEL @ 600 CENTRES

75x4.0 SHS POST

*All drawings are indicative

AS SHOWN A3

STAGE

EK

JOK

PROJECT NUMBER DRAWING NUMBER REVISION

DATE DRAWN DRAWING SCALE SHEET SIZE

CHECK

DESIGNED

DRAWN

EK

All dimensions should be confirmed on site prior to commencement of set-out or construction. StructuralCertification is required in full. All construction must adhere to relevant Australian standards and the BCA.Do not scale from drawings. Exact location of all above and underground services to be determined on site. IfEngineer is not notified in writing by client or contractor prior toset-out or construction, any costs incurred is the responsibility ofthe client or contractor. For all structural members -footings, load-bearing walls, please refer to structural engineer's prepared structural documents.

GENERAL NOTES

BY DATEREV

PROPERTY DETAILS

CLIENT DETAILS

PROJECT DETAILS

STRUCTURAL, SECTIONS ANDDETAILS

HOME RENOVATION & ADDITION

Scale 1 : 100E101HOUSE SECTION1

Scale 1 : 25E101DETAIL H12

Scale 1 : 20E101DETAIL H23

Scale 1 : 25E101DETAIL H34

PROPOSED SHED

Scale 1 : 100E101SHED STRUCTURAL PLAN5

Scale 1 : 100E101SHED SECTION6

Scale 1 : 25E101SHED DETAIL S17

Scale 1 : 25E101SHED DETAIL S28

01

QLD 4515SOMERSET REGIONAL COUNCIL

EMMK1170818 E101

A PRELIMINARY ISSUE EK 07.11.1801 BUILDING APPROVAL EK 31.01.19

07.11.18

MY UNO PTY LTD

Page 9: MY...ANTI-TERMITE TREATMENT TO BE PROVIDED UNDER THE BUILDING AREAS IN ACCORDANCE WITH AS 2057, AS 3660.1 AND APPENDIX D, FOR RETICULATED SYSTEMS.BUILDER TO PROVIDE "DURSBAN" (HAND

EXTERNALWALL STUDS

EXTERNALTOP PLATE

2/30 x 0.8 GALVSTRAPS4/• 2.8 NAILSEACH END

TYPE 2 (6.6kN)

BRACE WALLSTUD

BLOCK PIECESLARGE ENOUGHTO PREVENTSPLITTING.

2/No. 14 TYPE 17SCREWS

GAP

TO

TRU

SS

TYPE 1 (6.9kN)

TRUSS

TYPE 3 (6.9kN)

BRACE WALLSTUD

TRUSSBOTTOMCHORD

GAP

TO

TRU

SS

6/• 2.8mm NAILSEACH LEG.1 NAILING PLATEEACH END

BLOCK PIECESLARGE ENOUGHTO PREVENTSPLITTING.2/No. 14

TYPE 17SCREWS

90x 50 (F11) NOGGING.

BRACE WALL BLOCKINGDETAILS.1. INSTALL SUFFICIENT NUMBER OF

BLOCKING CONNECTIONS EQUAL TO ORGREATER THAN THE BRACE WALLCAPACITY.

2. THESE CONNECTIONS ARE BASED ONTIMBER JOINT GROUP JD4.

BRACING FORCES TRANSFERREDTO WALLS IN THIS DIRECTION.(TYPICAL)

S

150

METHOD "A" :M12 TOP TO BOTTOM PLATE EACH END OFSHEATHEDSECTION WITH M10 BOLTS AT 600crs MAX. BETWEEN.BETWEEN FROM BOTTOM PLATE TO FLOORFRAME/SLAB.METHOD "B" :M10 BOLTS EACH END OF SHEATHED SECTION ANDAT600crs MAX. BETWEEN FROM BOTTOM PLATE TOFLOORFRAME/SLAB.CONNECT SHEATHED PANELS TO SUB-FLOOR.

600

HORIZONTAL BUTT JOINTS PERMITTED,PROVIDED NAIL FIXED TO NOGGING ATS = 150mm crs (METHOD "A") ORS = 50mm crs (METHOD "B").

300

F14F11F8

450

STRESSGRADE

F27

STUDSPACING (mm)

MINIMUM PLYWOODTHICKNESS (mm)

PLYWOOD BRACEWALL TYPE "_._PA_" & "_._PB_"REFER TO AS1684.2 TABLE 8.18(h).RATINGS BASED ON 2.7m HIGH WALLS. REDUCTION FACTORS APPLY FOR HIGHER WALLS.NAIL PLYWOOD TO FRAME USING 30 - ∅2.8mm FLATHEAD NAILS OR EQUIVALENT.WALLS SHEATHED BOTH SIDES REQUIRED TIEDOWN TO BE DOUBLED ORINCREASED TO NEXT BOLT SIZE.

_._PA1 = METHOD "A" RATING = 6.4kN/m. PLYWOOD SHEETING ONE SIDE.

_._PA2 = METHOD "A" RATING = 12.8kN/m. PLYWOOD SHEETING BOTH SIDES.

_._PB1 = METHOD "B" RATING = 6.0kN/m. PLYWOOD SHEETING ONE SIDE.

_._PB2 = METHOD "B" RATING = 12.0kN/m. PLYWOOD SHEETING BOTH SIDES.

150

150 50

679 VERTICAL

EDGES

TOP ANDBOTTOM PLATE:- METHOD "A"- METHOD "B"

FASTENER SPACING"S" (mm)

3004.5INTERMEDIATESTUDS

467

4

S

HEIGHT CAPACITY MULTIPLIER

BRACE WALL HEIGHTCAPACITY MULTIPLIER

3.0m 0.903.3m 0.803.6m 0.753.9m 0.704.2m 0.644.5m 0.60

LENGTH CAPACITY MULTIPLIER

BRACE WALL LENGTHCAPACITY MULTIPLIER

0.60m 0.500.65m 0.580.70m 0.670.75m 0.750.80m 0.830.85m 0.92

TIE DOWN TOFLOOR (NOMINALFIXING ONLY)

30 x 0.8mm OR EQUALTENSIONEDGALVANISED STRAPS.LOOP AROUND ANDNAIL TO EACH PLATEWITH 4/30 x 2.8mm∅GALVANIZED FLATHEADNAILS.

30 x 0.8mm GALVANIZEDSTRAPS LOOPED OVERPLATE AND NAILED TOEACH SIDE OF STUDWITH 4/30 x 2.8mm∅NAILS.

1800mm MIN. to 2700mm MAX.

BRACEWALL TYPE "_._MS"METAL STRAP BRACES RATING = 3.0kN/m (2750 HIGH WALLS)REFER TO AS1684.2 TABLE 8.18(d).

30° to 60°

L

'WT' Wall TrussCFW vertical Wall Truss frame.L = 0.9m : 20kN bracing capacityL = 0.6m : 15kN bracing capacityL = 0.45m : 10kN bracing capacity

Verticals 75 x 4 SHSHorizontals 50 x 4 SHS spaced at 1.2m

crsDiagonals 50 x 4 SHS (L = 0.9m only)

10mm top & bottom plates, 2M12 chemsetbolts to slab, 2M12 bolts to floor frameover.

2980

830( 10kN )

350

( 2kN

)

'3583MC' MASONRY COLUMN.N20 concrete corefill. 2N12 verticals lapped 500with matching starter bars cogged 300 intoconcrete.

*All drawings are indicative

AS SHOWN A3

STAGE

EK

JOK

PROJECT NUMBER DRAWING NUMBER REVISION

DATE DRAWN DRAWING SCALE SHEET SIZE

CHECK

DESIGNED

DRAWN

EK

All dimensions should be confirmed on site prior to commencement of set-out or construction. StructuralCertification is required in full. All construction must adhere to relevant Australian standards and the BCA.Do not scale from drawings. Exact location of all above and underground services to be determined on site. IfEngineer is not notified in writing by client or contractor prior toset-out or construction, any costs incurred is the responsibility ofthe client or contractor. For all structural members -footings, load-bearing walls, please refer to structural engineer's prepared structural documents.

GENERAL NOTES

BY DATEREV

PROPERTY DETAILS

CLIENT DETAILS

PROJECT DETAILS

STRUCTURAL BRACING NOTES

HOME RENOVATION & ADDITION

01

QLD 4515SOMERSET REGIONAL COUNCIL

EMMK1170818 E102

A PRELIMINARY ISSUE EK 07.11.1801 BUILDING APPROVAL EK 31.01.19

NTSE102STRUCTURAL NOTES1

07.11.18

MY UNO PTY LTD

Page 10: MY...ANTI-TERMITE TREATMENT TO BE PROVIDED UNDER THE BUILDING AREAS IN ACCORDANCE WITH AS 2057, AS 3660.1 AND APPENDIX D, FOR RETICULATED SYSTEMS.BUILDER TO PROVIDE "DURSBAN" (HAND

BDIR

RACKING FORCE

BRACING STRENGTHAPPLIED =

PROVIDED =

ADIR

BRACING STRENGTH

RACKING FORCEAPPLIED =

PROVIDED =

EXISTING RESIDENCE

NEW EXTENSION

37.3kN

27.0kN

20.3kN

43.2kN

**SEE ENGINEERING SHEET E102 FOR PA1 INFORMATION

0.9PA1

0.9P

A1

0.9PA1

0.45PA1

0.9PA1

0.45PA1

0.45PA1

0.45PA1

0.9P

A10.

9PA1

0.45

PA1

0.9P

A10.

9PA1

0.9P

A1

0.45

PA1

0.9P

A1

N3

*All drawings are indicative

AS SHOWN A3

STAGE

EK

JOK

PROJECT NUMBER DRAWING NUMBER REVISION

DATE DRAWN DRAWING SCALE SHEET SIZE

CHECK

DESIGNED

DRAWN

EK

All dimensions should be confirmed on site prior to commencement of set-out or construction. StructuralCertification is required in full. All construction must adhere to relevant Australian standards and the BCA.Do not scale from drawings. Exact location of all above and underground services to be determined on site. IfEngineer is not notified in writing by client or contractor prior toset-out or construction, any costs incurred is the responsibility ofthe client or contractor. For all structural members -footings, load-bearing walls, please refer to structural engineer's prepared structural documents.

GENERAL NOTES

BY DATEREV

PROPERTY DETAILS

CLIENT DETAILS

PROJECT DETAILS

STRUCTURAL BRACING PLAN

HOME RENOVATION & ADDITION

01

QLD 4515

SOMERSET REGIONAL COUNCIL

E103

A PRELIMINARY ISSUE EK 07.11.1801 BUILDING APPROVAL EK 31.01.19

Scale 1 : 100E103BRACING PLAN1

MY UNO PTY LTD