Muthuga Roof

1
Emergency escape steel staircase Emergency escape steel staircase A C D 01 02 03 04 05 06 07 08 09 4422 5075 5082 5143 3175 3655 4770 6800 4092 6133 TANK SLAB TRUSS 1 TRUSS 1 TRUSS 1 TRUSS 1 TRUSS 1 TRUSS 1 TRUSS 1 TRUSS 1 TRUSS 1 TRUSS 1 TRUSS 1 TRUSS 1 TRUSS 1 HIPPED TRUSS E HIPPED TRUSS E CLIENT PROPOSED RESIDENTIAL PROJECT THE CROFT LIMITED APARTMENTS L/R N0. DAGORETTI/KINOO/6155 CONSULTING CIVIL STRUCTURAL ENGINEER P.O BOX 25371-00100, NAIROBI BOSKO ENGINEERING LTD [email protected] TEL: 254 717865382/735190997 DRAWING TITLE ARCHITECT Drawn by Designed by D.O.O B.O.O Checked by N.B Approved by D.O.O Date Scale July 2015 AS INDICATED ON THE DRAWING Job No. ACAD File: Status CO REV NOTES: 1. All dimensions are in millimeters 2. Use class class 25 for bases &beams , class 25 for columns and 20 for the slab 3.Read this drawing in conjunction with relevant Architectural drawings. 4. Minimum cover for concrete is: a. Foundation = 50mm b. Columns = 25mm c. Beams = 25mm d. Slabs = 25mm 5. All reinforcement to be twisted bars B.S 4449. 6. All steel reinforcement must be approved by the Structural Engineer STR01-MUTH Drawing No.02/2015/MUTH P.O BOX 12531-00400NAIROBI HK CONSULT P.O BOX 2378-00606 NAIROBI C0 C1 C2 C3 C4 REV REVISION SIGN DATE APPROVED 01-MUTH ROOF LAYOUT & TYPICAL RIBBED SLAB Emergency escape steel staircase Emergency escape steel staircase LIFT A C D 01 02 03 04 05 06 07 08 09 4422 5075 5082 5143 3175 3655 4770 6800 4092 6133 8X(1Y16-01 + 1Y16-02 PER RIB)B1 7X(1Y16-03 + IY16-04 PER RIB) B1 7X(IY16-05 + IY16-06 PER RIB)B1 8X(1Y16-07 + 1Y16-08 PER RIB)B1 7X(IY16-09 + 1Y16-10 PER RIB) B1 8X(1Y16-11 + 1Y16-12 PER RIB)B1 7X(1Y16-13 + 1Y16-14 PER RIB)B1 15X(2T16-17 A.S PER RIB)T1 15X(2T16-18 A.S PER RIB)T1 15X(2T16-19 A.S PER RIB)T1 15X(2T16-20 A.S PER RIB)T1 15X(2T16-21 A.S PER RIB)T1 15X(2T16-22 A.S PER RIB)T1 15X(2T16-23 A.S PER RIB)T1 11X(2T16-23 A.S PER RIB)T1 3Y10-24-250T2 3Y10-25-250T2 3Y10-26-250T2 3Y10-27-250T2 3Y10-24-250T2 3Y10-25-250T2 3Y10-26-250T2 3Y10-27-250T2 6Y12-28-250B2 11Y12-29-250B1 6Y12-28-250B2 11Y12-29-250B1 19Y12-30-250B2 6Y12-31-250B2 3Y10-32-250T2 3Y10-33-250T2 3Y10-35-250T2 3Y10-34-250T2 TYPICAL RIBBED SLAB DETAIL 19Y12-37-250B1 6Y12-36-250B2 3Y10-38-300T2 3Y10-39-200T2 6Y12-41-250B1 6Y12-40-250B2 6Y12-41-250B1 6Y12-40-250B2 27Y12-42-250B1 5Y12-43-250B2 3Y10-44-300T2 3Y10-45-300T2 3Y10-46-300T2 3Y10-47-300T2 27Y12-42-250B1 5Y12-43-250B2 3Y10-45-300T2 3Y10-44-300T2 3Y10-45-300T2 8X(1Y16-15+1Y16PER RIB)B1 C10 C20 C31 C06 C16 C27 CR05 C07 C17 C28 C08' C08 C18' C18 C29' C29 C09 C19 C30 C02 C12 C22' C03 C13 C24 C04 C14 C25 C05 C15 C26 CR04 ROOF LAYOUT

description

roof

Transcript of Muthuga Roof

Page 1: Muthuga Roof

Emergencyescape steelstaircase

Emergencyescape steelstaircase

A C D

01

02

03

04

05

06

07

08

09

4422 5075

5082

5143

3175

3655

4770

680

040

9261

33

TANK SLABT

RU

SS

1

TR

US

S 1

TR

US

S 1

TR

US

S 1

TR

US

S 1

TR

US

S 1

TR

US

S 1

TR

US

S 1

TR

US

S 1

TR

US

S 1

TR

US

S 1

TR

US

S 1

TR

US

S 1

HIPPED TRUSS E

HIPPED TRUSS E

CLIENT

PROPOSED RESIDENTIAL

PROJECT

THE CROFT LIMITED

APARTMENTS

L/R N0. DAGORETTI/KINOO/6155

CONSULTING CIVIL STRUCTURAL ENGINEER

P.O BOX 25371-00100, NAIROBI

BOSKO ENGINEERING LTD

[email protected]

TEL: 254 717865382/735190997

DRAWING TITLE

ARCHITECT

Drawn byDesigned byD.O.O B.O.O

Checked byN.B

Approved byD.O.O

DateScaleJuly 2015

AS INDICATED ON THE DRAWING

Job No. ACAD File:

Status CO REV

NOTES:

1. All dimensions are in millimeters

2. Use class class 25 for bases &beams ,

class 25 for columns and 20 for the slab

3.Read this drawing in conjunction

with relevant Architectural drawings.

4. Minimum cover for concrete is:

a. Foundation = 50mm

b. Columns = 25mm

c. Beams = 25mm

d. Slabs = 25mm

5. All reinforcement to be twisted bars

B.S 4449.

6. All steel reinforcement must be

approved by the Structural Engineer

STR01-MUTH

Drawing No.02/2015/MUTH

P.O BOX 12531-00400NAIROBI

HK CONSULT

P.O BOX 2378-00606NAIROBI

C0

C1

C2

C3

C4

REV REVISION SIGN DATE APPROVED

01-MUTH

ROOF LAYOUT & TYPICALRIBBED SLAB

Emergencyescape steelstaircase

Emergencyescape steelstaircase

LIFT

A C D

01

02

03

04

05

06

07

08

09

4422 5075

5082

5143

3175

3655

4770

680

040

9261

33

8X(1Y16-01 + 1Y16-02 PER RIB)B1

7X(1Y16-03 + IY16-04 PER RIB) B1

7X(IY16-05 + IY16-06 PER RIB)B1

8X(1Y16-07 + 1Y16-08 PER RIB)B1

7X(IY16-09 + 1Y16-10 PER RIB) B1

8X(1Y16-11 + 1Y16-12 PER RIB)B1

7X(1Y16-13 + 1Y16-14 PER RIB)B1

15X(2T16-17 A.S PER RIB)T1

15X(2T16-18 A.S PER RIB)T1

15X(2T16-19 A.S PER RIB)T1

15X(2T16-20 A.S PER RIB)T1

15X(2T16-21 A.S PER RIB)T1

15X(2T16-22 A.S PER RIB)T1

15X(2T16-23 A.S PER RIB)T1

11X(2T16-23 A.S PER RIB)T1

3Y10-24-250T2

3Y10-25-250T2

3Y10-26-250T2

3Y10-27-250T2

3Y10-24-250T2

3Y10-25-250T2

3Y10-26-250T2

3Y10-27-250T2

6Y12-28-250B2

11Y1

2-29

-250

B1

6Y12-28-250B2

11Y1

2-29

-250

B119

Y12-

30-2

50B2

6Y12-31-250B23Y10-32-250T2

3Y10-33-250T2

3Y10-35-250T2

3Y10-34-250T2

TYPICAL RIBBEDSLAB DETAIL

19Y1

2-37

-250

B1

6Y12-36-250B2

3Y10-38-300T2

3Y10-39-200T2

6Y12

-41-

250

B1

6Y12-40-250B2

6Y12

-41-

250

B1

6Y12-40-250B2

27Y1

2-42

-250

B1

5Y12-43-250B2

3Y10-44-300T2

3Y10-45-300T2

3Y10-46-300T2

3Y10-47-300T2

27Y1

2-42

-250

B1

5Y12-43-250B2

3Y10-45-300T2

3Y10-44-300T2

3Y10-45-300T2

8X(1Y16-15+1Y16PER RIB)B1

C10 C20 C31

C06 C16 C27 CR05

C07 C17 C28

C08'

C08

C18'

C18

C29'

C29

C09 C19 C30

C02 C12 C22'

C03 C13 C24

C04 C14 C25

C05 C15 C26 CR04

ROOF LAYOUT