4
Prior Design: New Murray Middle School Sierra Sands Unified School District November 20, 2014 Total Developed Site Area: 47.96 Acres Total Campus Area: 7.47 Acres Total Enclosed Area: 98,881 SQF

Transcript of Murray Board Presentation

Basin

StaffParking

Visitor Parking

BaseballField

FootballField

Courts

Basin

MAINT. YARDTrash Enclosure

Can wash

Service Entrance

DOMESTIC WATER (900 LF TO P.O.C.)

FIRE WATER (900 LF TO P.O.C.)

SEWER (1,400 LF TO P.O.C.)

TRUE TFM 41 AL FROZEN MERCHANDISER

TRUE GDM 41 SL 54 SLIDING DOOR REFRIG

METRO C539 DS HEATED CABINETMETRO C539 DS HEATED CABINET

Bus

Dro

p-O

ff

Earthquake Fault Line

PedestrianCirculation

ParentDrop-Off

Acceleration Lane

87' -

0"

GATE

GATE

GATE

GATE

GATE

GATE

GATE

COURTYARDLOBBY

SERVICE

13' - 8 11/16"

POWER (800 LF TO P.O.C.)

ELECTRICALYARD

85' - 0"

16' - 0"

30' -

0"

ARCHITECTURE PLANNING

A105NEW Murray Middle School 200 East Drummond Ave,Ridgecrest, CA 93555

Sierra Sands Unified School DistrictSite Plan

36896October 21, 2014

1" = 80'-0"2 Site Plan

N

0 40' 160'80'

WESTBERG WHITE, INC.A . R . C . H . I . T . E . C . T . S

P . L . A . N . N . E . R . S

TC

D

D

LUA

RANEC

BERG

SN WESTIL

ES

ETIHC

ATATE

OF

S

I

NE

P

CA L I FORNI

APP NO:FILE NO:

1. FOR TYPICAL SYMBOLS AND ABBREVIATIONS, SEE SHEET G001.2. ALL ITEMS SHOWN OR NOTED ARE NEW, UNLESS INDICATED OTHERWISE AS

EXISTING.3. PROVIDE TEMPORARY 6’ HIGH CHAIN LINK FENCE ENCLOSURES WITH

LOCKABLE GATES AS REQUIRED FOR CONSTRUCTION ACCESS ATCONTRACTOR’S STAGING AREA AND AROUND ALL CONSTRUCTION SITES.CONTRACTOR AND OWNER SHALL WALK SITE AND DETERMINE FENCEPLACEMENT LOCATIONS PRIOR TO START OF CONSTRUCTION.

4. WHERE EXISTING UTILITIES ARE INDICATED IN THE GENERAL VICINITY OF NEWWORK, VERIFY EXACT LOCATION BY POT-HOLING, METAL DETECTION, ORELECTRICAL CURRENT DETECTION, PRIOR TO STARTING WORK.

5. RUN-OFF FROM PETROLEUM PRODUCTS, LIME AND MORTAR, SOILSTERILANTS, AND THE WASHING OF EQUIPMENT USED TO APPLY THESEMATERIALS, IS PROHIBITED WITHIN PLANTED AREAS.

6. ALWAYS DOWEL NEW CONCRETE WORK TOGETHER, ESPECIALLY SLABSADJACENT TO DOORWAYS, RAMPS AND STAIRS, INCLUDING THROUGHEXPANSION JOINTS, PER SHEET A002.

7. FOR SITE WORK NOT SHOWN ON ARCHITECTURAL PLANS, SEE CIVIL,PLUMBING, ELECTRICAL AND LANDSCAPING SITE PLAN SHEETS.

Basin

StaffParking

Visitor Parking

BaseballField

FootballField

Courts

Basin

MAINT. YARDTrash Enclosure

Can wash

Service Entrance

DOMESTIC WATER (900 LF TO P.O.C.)

FIRE WATER (900 LF TO P.O.C.)

SEWER (1,400 LF TO P.O.C.)

TRUE TFM 41 AL FROZEN MERCHANDISER

TRUE GDM 41 SL 54 SLIDING DOOR REFRIG

METRO C539 DS HEATED CABINETMETRO C539 DS HEATED CABINET

Bus

Dro

p-O

ff

Earthquake Fault Line

PedestrianCirculation

ParentDrop-Off

Acceleration Lane

87' -

0"

GATE

GATE

GATE

GATE

GATE

GATE

GATE

COURTYARDLOBBY

SERVICE

13' - 8 11/16"

POWER (800 LF TO P.O.C.)

ELECTRICALYARD

85' - 0"

16' - 0"

30' -

0"

ARCHITECTURE PLANNING

A105NEW Murray Middle School 200 East Drummond Ave,Ridgecrest, CA 93555

Sierra Sands Unified School DistrictSite Plan

36896October 21, 2014

1" = 80'-0"2 Site Plan

N

0 40' 160'80'Prior Design: New Murray Middle SchoolSierra Sands Unified School District November 20, 2014

Total Developed Site Area:47.96 Acres

Total Campus Area:7.47 Acres

Total Enclosed Area:98,881 SQF

Basin

StaffParking

Visitor Parking

BaseballField

FootballField

Courts

Basin

MAINT. YARDTrash Enclosure

Can wash

Service Entrance

DOMESTIC WATER (900 LF TO P.O.C.)

FIRE WATER (900 LF TO P.O.C.)

SEWER (1,400 LF TO P.O.C.)

TRUE TFM 41 AL FROZEN MERCHANDISER

TRUE GDM 41 SL 54 SLIDING DOOR REFRIG

METRO C539 DS HEATED CABINETMETRO C539 DS HEATED CABINET

Bus

Dro

p-O

ff

Earthquake Fault Line

PedestrianCirculation

ParentDrop-Off

Acceleration Lane

87' -

0"

GATE

GATE

GATE

GATE

GATE

GATE

GATE

COURTYARDLOBBY

SERVICE

13' - 8 11/16"

POWER (800 LF TO P.O.C.)

ELECTRICALYARD

85' - 0"

16' - 0"

30' -

0"

ARCHITECTURE PLANNING

A105NEW Murray Middle School 200 East Drummond Ave,Ridgecrest, CA 93555

Sierra Sands Unified School DistrictSite Plan

36896October 21, 2014

1" = 80'-0"2 Site Plan

N

0 40' 160'80'

Basin

StaffParking

Visitor Parking

BaseballField

FootballField

Courts

Basin

MAINT. YARDTrash Enclosure

Can wash

Service Entrance

DOMESTIC WATER (900 LF TO P.O.C.)

FIRE WATER (900 LF TO P.O.C.)

SEWER (1,400 LF TO P.O.C.)

TRUE TFM 41 AL FROZEN MERCHANDISER

TRUE GDM 41 SL 54 SLIDING DOOR REFRIG

METRO C539 DS HEATED CABINETMETRO C539 DS HEATED CABINET

Bus

Dro

p-O

ff

Earthquake Fault Line

PedestrianCirculation

ParentDrop-Off

Acceleration Lane

87' -

0"

GATE

GATE

GATE

GATE

GATE

GATE

GATE

COURTYARDLOBBY

SERVICE

13' - 8 11/16"

POWER (800 LF TO P.O.C.)

ELECTRICALYARD

85' - 0"

16' - 0"

30' -

0"

ARCHITECTURE PLANNING

A105NEW Murray Middle School 200 East Drummond Ave,Ridgecrest, CA 93555

Sierra Sands Unified School DistrictSite Plan

36896October 21, 2014

1" = 80'-0"2 Site Plan

N

0 40' 160'80'

WESTBERG WHITE, INC.A . R . C . H . I . T . E . C . T . S

P . L . A . N . N . E . R . S

TC

D

D

LUA

RANEC

BERG

SN WESTIL

ES

ETIHC

ATATE

OF

S

I

NE

P

CA L I FORNI

APP NO:FILE NO:

1. FOR TYPICAL SYMBOLS AND ABBREVIATIONS, SEE SHEET G001.2. ALL ITEMS SHOWN OR NOTED ARE NEW, UNLESS INDICATED OTHERWISE AS

EXISTING.3. PROVIDE TEMPORARY 6’ HIGH CHAIN LINK FENCE ENCLOSURES WITH

LOCKABLE GATES AS REQUIRED FOR CONSTRUCTION ACCESS ATCONTRACTOR’S STAGING AREA AND AROUND ALL CONSTRUCTION SITES.CONTRACTOR AND OWNER SHALL WALK SITE AND DETERMINE FENCEPLACEMENT LOCATIONS PRIOR TO START OF CONSTRUCTION.

4. WHERE EXISTING UTILITIES ARE INDICATED IN THE GENERAL VICINITY OF NEWWORK, VERIFY EXACT LOCATION BY POT-HOLING, METAL DETECTION, ORELECTRICAL CURRENT DETECTION, PRIOR TO STARTING WORK.

5. RUN-OFF FROM PETROLEUM PRODUCTS, LIME AND MORTAR, SOILSTERILANTS, AND THE WASHING OF EQUIPMENT USED TO APPLY THESEMATERIALS, IS PROHIBITED WITHIN PLANTED AREAS.

6. ALWAYS DOWEL NEW CONCRETE WORK TOGETHER, ESPECIALLY SLABSADJACENT TO DOORWAYS, RAMPS AND STAIRS, INCLUDING THROUGHEXPANSION JOINTS, PER SHEET A002.

7. FOR SITE WORK NOT SHOWN ON ARCHITECTURAL PLANS, SEE CIVIL,PLUMBING, ELECTRICAL AND LANDSCAPING SITE PLAN SHEETS.

Basin

StaffParking

Visitor Parking

BaseballField

FootballField

Courts

Basin

MAINT. YARDTrash Enclosure

Can wash

Service Entrance

DOMESTIC WATER (900 LF TO P.O.C.)

FIRE WATER (900 LF TO P.O.C.)

SEWER (1,400 LF TO P.O.C.)

TRUE TFM 41 AL FROZEN MERCHANDISER

TRUE GDM 41 SL 54 SLIDING DOOR REFRIG

METRO C539 DS HEATED CABINETMETRO C539 DS HEATED CABINET

Bus

Dro

p-O

ff

Earthquake Fault Line

PedestrianCirculation

ParentDrop-Off

Acceleration Lane

87' -

0"

GATE

GATE

GATE

GATE

GATE

GATE

GATE

COURTYARDLOBBY

SERVICE

13' - 8 11/16"

POWER (800 LF TO P.O.C.)

ELECTRICALYARD

85' - 0"

16' - 0"

30' -

0"

ARCHITECTURE PLANNING

A105NEW Murray Middle School 200 East Drummond Ave,Ridgecrest, CA 93555

Sierra Sands Unified School DistrictSite Plan

36896October 21, 2014

1" = 80'-0"2 Site Plan

N

0 40' 160'80'Current Design: New Murray Middle SchoolSierra Sands Unified School District November 20, 2014

Total Developed Site Area:25.62 Acres

Total Campus Area:3.83 Acres

Total Enclosed Area:68,825 SQF

Future Expansion and Event Parking:

18.51 Acres

Current Design vs Prior Design

47% LESS site development

49% LESS campus area

30% LESS building SF

Basin

StaffParking

Visitor Parking

BaseballField

FootballField

Courts

Basin

MAINT. YARDTrash Enclosure

Can wash

Service Entrance

DOMESTIC WATER (900 LF TO P.O.C.)

FIRE WATER (900 LF TO P.O.C.)

SEWER (1,400 LF TO P.O.C.)

TRUE TFM 41 AL FROZEN MERCHANDISER

TRUE GDM 41 SL 54 SLIDING DOOR REFRIG

METRO C539 DS HEATED CABINETMETRO C539 DS HEATED CABINET

Bus

Dro

p-O

ff

Earthquake Fault Line

PedestrianCirculation

ParentDrop-Off

Acceleration Lane

87' -

0"

GATE

GATE

GATE

GATE

GATE

GATE

GATE

COURTYARDLOBBY

SERVICE

13' - 8 11/16"

POWER (800 LF TO P.O.C.)

ELECTRICALYARD

85' - 0"

16' - 0"

30' -

0"

ARCHITECTURE PLANNING

A105NEW Murray Middle School 200 East Drummond Ave,Ridgecrest, CA 93555

Sierra Sands Unified School DistrictSite Plan

36896October 21, 2014

1" = 80'-0"2 Site Plan

N

0 40' 160'80'

Future Expansion and Event Parking

Future Expansion and Event Parking

Site Plan: New Murray Middle SchoolSierra Sands Unified School District November 20, 2014

ARCHITECTURE PLANNING NEW Murray Middle School 200 East Drummond Ave, Ridgecrest, CA 93555 Sierra Sands Unified School DistrictSite Perspective

Basin

StaffParking

Visitor Parking

BaseballField

FootballField

Courts

Basin

MAINT. YARDTrash Enclosure

Can wash

Service Entrance

DOMESTIC WATER (900 LF TO P.O.C.)

FIRE WATER (900 LF TO P.O.C.)

SEWER (1,400 LF TO P.O.C.)

TRUE TFM 41 AL FROZEN MERCHANDISER

TRUE GDM 41 SL 54 SLIDING DOOR REFRIG

METRO C539 DS HEATED CABINETMETRO C539 DS HEATED CABINET

Bus

Dro

p-O

ff

Earthquake Fault Line

PedestrianCirculation

ParentDrop-Off

Acceleration Lane

87' -

0"

GATE

GATE

GATE

GATE

GATE

GATE

GATE

COURTYARDLOBBY

SERVICE

13' - 8 11/16"

POWER (800 LF TO P.O.C.)

ELECTRICALYARD

85' - 0"

16' - 0"

30' -

0"

ARCHITECTURE PLANNING

A105NEW Murray Middle School 200 East Drummond Ave,Ridgecrest, CA 93555

Sierra Sands Unified School DistrictSite Plan

36896October 21, 2014

1" = 80'-0"2 Site Plan

N

0 40' 160'80'

Future Expansion and Event Parking

Future Expansion and Event Parking

Perspective: New Murray Middle SchoolSierra Sands Unified School District November 20, 2014

ARCHITECTURE PLANNING NEW Murray Middle School 200 East Drummond Ave, Ridgecrest, CA 93555 Sierra Sands Unified School DistrictSite Perspective

Basin

StaffParking

Visitor Parking

BaseballField

FootballField

Courts

Basin

MAINT. YARDTrash Enclosure

Can wash

Service Entrance

DOMESTIC WATER (900 LF TO P.O.C.)

FIRE WATER (900 LF TO P.O.C.)

SEWER (1,400 LF TO P.O.C.)

TRUE TFM 41 AL FROZEN MERCHANDISER

TRUE GDM 41 SL 54 SLIDING DOOR REFRIG

METRO C539 DS HEATED CABINETMETRO C539 DS HEATED CABINET

Bus

Dro

p-O

ff

Earthquake Fault Line

PedestrianCirculation

ParentDrop-Off

Acceleration Lane

87' -

0"

GATE

GATE

GATE

GATE

GATE

GATE

GATE

COURTYARDLOBBY

SERVICE

13' - 8 11/16"

POWER (800 LF TO P.O.C.)

ELECTRICALYARD

85' - 0"

16' - 0"

30' -

0"

ARCHITECTURE PLANNING

A105NEW Murray Middle School 200 East Drummond Ave,Ridgecrest, CA 93555

Sierra Sands Unified School DistrictSite Plan

36896October 21, 2014

1" = 80'-0"2 Site Plan

N

0 40' 160'80'