Murray Board Presentation
Transcript of Murray Board Presentation
Basin
StaffParking
Visitor Parking
BaseballField
FootballField
Courts
Basin
MAINT. YARDTrash Enclosure
Can wash
Service Entrance
DOMESTIC WATER (900 LF TO P.O.C.)
FIRE WATER (900 LF TO P.O.C.)
SEWER (1,400 LF TO P.O.C.)
TRUE TFM 41 AL FROZEN MERCHANDISER
TRUE GDM 41 SL 54 SLIDING DOOR REFRIG
METRO C539 DS HEATED CABINETMETRO C539 DS HEATED CABINET
Bus
Dro
p-O
ff
Earthquake Fault Line
PedestrianCirculation
ParentDrop-Off
Acceleration Lane
87' -
0"
GATE
GATE
GATE
GATE
GATE
GATE
GATE
COURTYARDLOBBY
SERVICE
13' - 8 11/16"
POWER (800 LF TO P.O.C.)
ELECTRICALYARD
85' - 0"
16' - 0"
30' -
0"
ARCHITECTURE PLANNING
A105NEW Murray Middle School 200 East Drummond Ave,Ridgecrest, CA 93555
Sierra Sands Unified School DistrictSite Plan
36896October 21, 2014
1" = 80'-0"2 Site Plan
N
0 40' 160'80'
WESTBERG WHITE, INC.A . R . C . H . I . T . E . C . T . S
P . L . A . N . N . E . R . S
TC
D
D
LUA
RANEC
BERG
SN WESTIL
ES
ETIHC
ATATE
OF
S
I
NE
P
CA L I FORNI
APP NO:FILE NO:
1. FOR TYPICAL SYMBOLS AND ABBREVIATIONS, SEE SHEET G001.2. ALL ITEMS SHOWN OR NOTED ARE NEW, UNLESS INDICATED OTHERWISE AS
EXISTING.3. PROVIDE TEMPORARY 6’ HIGH CHAIN LINK FENCE ENCLOSURES WITH
LOCKABLE GATES AS REQUIRED FOR CONSTRUCTION ACCESS ATCONTRACTOR’S STAGING AREA AND AROUND ALL CONSTRUCTION SITES.CONTRACTOR AND OWNER SHALL WALK SITE AND DETERMINE FENCEPLACEMENT LOCATIONS PRIOR TO START OF CONSTRUCTION.
4. WHERE EXISTING UTILITIES ARE INDICATED IN THE GENERAL VICINITY OF NEWWORK, VERIFY EXACT LOCATION BY POT-HOLING, METAL DETECTION, ORELECTRICAL CURRENT DETECTION, PRIOR TO STARTING WORK.
5. RUN-OFF FROM PETROLEUM PRODUCTS, LIME AND MORTAR, SOILSTERILANTS, AND THE WASHING OF EQUIPMENT USED TO APPLY THESEMATERIALS, IS PROHIBITED WITHIN PLANTED AREAS.
6. ALWAYS DOWEL NEW CONCRETE WORK TOGETHER, ESPECIALLY SLABSADJACENT TO DOORWAYS, RAMPS AND STAIRS, INCLUDING THROUGHEXPANSION JOINTS, PER SHEET A002.
7. FOR SITE WORK NOT SHOWN ON ARCHITECTURAL PLANS, SEE CIVIL,PLUMBING, ELECTRICAL AND LANDSCAPING SITE PLAN SHEETS.
Basin
StaffParking
Visitor Parking
BaseballField
FootballField
Courts
Basin
MAINT. YARDTrash Enclosure
Can wash
Service Entrance
DOMESTIC WATER (900 LF TO P.O.C.)
FIRE WATER (900 LF TO P.O.C.)
SEWER (1,400 LF TO P.O.C.)
TRUE TFM 41 AL FROZEN MERCHANDISER
TRUE GDM 41 SL 54 SLIDING DOOR REFRIG
METRO C539 DS HEATED CABINETMETRO C539 DS HEATED CABINET
Bus
Dro
p-O
ff
Earthquake Fault Line
PedestrianCirculation
ParentDrop-Off
Acceleration Lane
87' -
0"
GATE
GATE
GATE
GATE
GATE
GATE
GATE
COURTYARDLOBBY
SERVICE
13' - 8 11/16"
POWER (800 LF TO P.O.C.)
ELECTRICALYARD
85' - 0"
16' - 0"
30' -
0"
ARCHITECTURE PLANNING
A105NEW Murray Middle School 200 East Drummond Ave,Ridgecrest, CA 93555
Sierra Sands Unified School DistrictSite Plan
36896October 21, 2014
1" = 80'-0"2 Site Plan
N
0 40' 160'80'Prior Design: New Murray Middle SchoolSierra Sands Unified School District November 20, 2014
Total Developed Site Area:47.96 Acres
Total Campus Area:7.47 Acres
Total Enclosed Area:98,881 SQF
Basin
StaffParking
Visitor Parking
BaseballField
FootballField
Courts
Basin
MAINT. YARDTrash Enclosure
Can wash
Service Entrance
DOMESTIC WATER (900 LF TO P.O.C.)
FIRE WATER (900 LF TO P.O.C.)
SEWER (1,400 LF TO P.O.C.)
TRUE TFM 41 AL FROZEN MERCHANDISER
TRUE GDM 41 SL 54 SLIDING DOOR REFRIG
METRO C539 DS HEATED CABINETMETRO C539 DS HEATED CABINET
Bus
Dro
p-O
ff
Earthquake Fault Line
PedestrianCirculation
ParentDrop-Off
Acceleration Lane
87' -
0"
GATE
GATE
GATE
GATE
GATE
GATE
GATE
COURTYARDLOBBY
SERVICE
13' - 8 11/16"
POWER (800 LF TO P.O.C.)
ELECTRICALYARD
85' - 0"
16' - 0"
30' -
0"
ARCHITECTURE PLANNING
A105NEW Murray Middle School 200 East Drummond Ave,Ridgecrest, CA 93555
Sierra Sands Unified School DistrictSite Plan
36896October 21, 2014
1" = 80'-0"2 Site Plan
N
0 40' 160'80'
Basin
StaffParking
Visitor Parking
BaseballField
FootballField
Courts
Basin
MAINT. YARDTrash Enclosure
Can wash
Service Entrance
DOMESTIC WATER (900 LF TO P.O.C.)
FIRE WATER (900 LF TO P.O.C.)
SEWER (1,400 LF TO P.O.C.)
TRUE TFM 41 AL FROZEN MERCHANDISER
TRUE GDM 41 SL 54 SLIDING DOOR REFRIG
METRO C539 DS HEATED CABINETMETRO C539 DS HEATED CABINET
Bus
Dro
p-O
ff
Earthquake Fault Line
PedestrianCirculation
ParentDrop-Off
Acceleration Lane
87' -
0"
GATE
GATE
GATE
GATE
GATE
GATE
GATE
COURTYARDLOBBY
SERVICE
13' - 8 11/16"
POWER (800 LF TO P.O.C.)
ELECTRICALYARD
85' - 0"
16' - 0"
30' -
0"
ARCHITECTURE PLANNING
A105NEW Murray Middle School 200 East Drummond Ave,Ridgecrest, CA 93555
Sierra Sands Unified School DistrictSite Plan
36896October 21, 2014
1" = 80'-0"2 Site Plan
N
0 40' 160'80'
WESTBERG WHITE, INC.A . R . C . H . I . T . E . C . T . S
P . L . A . N . N . E . R . S
TC
D
D
LUA
RANEC
BERG
SN WESTIL
ES
ETIHC
ATATE
OF
S
I
NE
P
CA L I FORNI
APP NO:FILE NO:
1. FOR TYPICAL SYMBOLS AND ABBREVIATIONS, SEE SHEET G001.2. ALL ITEMS SHOWN OR NOTED ARE NEW, UNLESS INDICATED OTHERWISE AS
EXISTING.3. PROVIDE TEMPORARY 6’ HIGH CHAIN LINK FENCE ENCLOSURES WITH
LOCKABLE GATES AS REQUIRED FOR CONSTRUCTION ACCESS ATCONTRACTOR’S STAGING AREA AND AROUND ALL CONSTRUCTION SITES.CONTRACTOR AND OWNER SHALL WALK SITE AND DETERMINE FENCEPLACEMENT LOCATIONS PRIOR TO START OF CONSTRUCTION.
4. WHERE EXISTING UTILITIES ARE INDICATED IN THE GENERAL VICINITY OF NEWWORK, VERIFY EXACT LOCATION BY POT-HOLING, METAL DETECTION, ORELECTRICAL CURRENT DETECTION, PRIOR TO STARTING WORK.
5. RUN-OFF FROM PETROLEUM PRODUCTS, LIME AND MORTAR, SOILSTERILANTS, AND THE WASHING OF EQUIPMENT USED TO APPLY THESEMATERIALS, IS PROHIBITED WITHIN PLANTED AREAS.
6. ALWAYS DOWEL NEW CONCRETE WORK TOGETHER, ESPECIALLY SLABSADJACENT TO DOORWAYS, RAMPS AND STAIRS, INCLUDING THROUGHEXPANSION JOINTS, PER SHEET A002.
7. FOR SITE WORK NOT SHOWN ON ARCHITECTURAL PLANS, SEE CIVIL,PLUMBING, ELECTRICAL AND LANDSCAPING SITE PLAN SHEETS.
Basin
StaffParking
Visitor Parking
BaseballField
FootballField
Courts
Basin
MAINT. YARDTrash Enclosure
Can wash
Service Entrance
DOMESTIC WATER (900 LF TO P.O.C.)
FIRE WATER (900 LF TO P.O.C.)
SEWER (1,400 LF TO P.O.C.)
TRUE TFM 41 AL FROZEN MERCHANDISER
TRUE GDM 41 SL 54 SLIDING DOOR REFRIG
METRO C539 DS HEATED CABINETMETRO C539 DS HEATED CABINET
Bus
Dro
p-O
ff
Earthquake Fault Line
PedestrianCirculation
ParentDrop-Off
Acceleration Lane
87' -
0"
GATE
GATE
GATE
GATE
GATE
GATE
GATE
COURTYARDLOBBY
SERVICE
13' - 8 11/16"
POWER (800 LF TO P.O.C.)
ELECTRICALYARD
85' - 0"
16' - 0"
30' -
0"
ARCHITECTURE PLANNING
A105NEW Murray Middle School 200 East Drummond Ave,Ridgecrest, CA 93555
Sierra Sands Unified School DistrictSite Plan
36896October 21, 2014
1" = 80'-0"2 Site Plan
N
0 40' 160'80'Current Design: New Murray Middle SchoolSierra Sands Unified School District November 20, 2014
Total Developed Site Area:25.62 Acres
Total Campus Area:3.83 Acres
Total Enclosed Area:68,825 SQF
Future Expansion and Event Parking:
18.51 Acres
Current Design vs Prior Design
47% LESS site development
49% LESS campus area
30% LESS building SF
Basin
StaffParking
Visitor Parking
BaseballField
FootballField
Courts
Basin
MAINT. YARDTrash Enclosure
Can wash
Service Entrance
DOMESTIC WATER (900 LF TO P.O.C.)
FIRE WATER (900 LF TO P.O.C.)
SEWER (1,400 LF TO P.O.C.)
TRUE TFM 41 AL FROZEN MERCHANDISER
TRUE GDM 41 SL 54 SLIDING DOOR REFRIG
METRO C539 DS HEATED CABINETMETRO C539 DS HEATED CABINET
Bus
Dro
p-O
ff
Earthquake Fault Line
PedestrianCirculation
ParentDrop-Off
Acceleration Lane
87' -
0"
GATE
GATE
GATE
GATE
GATE
GATE
GATE
COURTYARDLOBBY
SERVICE
13' - 8 11/16"
POWER (800 LF TO P.O.C.)
ELECTRICALYARD
85' - 0"
16' - 0"
30' -
0"
ARCHITECTURE PLANNING
A105NEW Murray Middle School 200 East Drummond Ave,Ridgecrest, CA 93555
Sierra Sands Unified School DistrictSite Plan
36896October 21, 2014
1" = 80'-0"2 Site Plan
N
0 40' 160'80'
Future Expansion and Event Parking
Future Expansion and Event Parking
Site Plan: New Murray Middle SchoolSierra Sands Unified School District November 20, 2014
ARCHITECTURE PLANNING NEW Murray Middle School 200 East Drummond Ave, Ridgecrest, CA 93555 Sierra Sands Unified School DistrictSite Perspective
Basin
StaffParking
Visitor Parking
BaseballField
FootballField
Courts
Basin
MAINT. YARDTrash Enclosure
Can wash
Service Entrance
DOMESTIC WATER (900 LF TO P.O.C.)
FIRE WATER (900 LF TO P.O.C.)
SEWER (1,400 LF TO P.O.C.)
TRUE TFM 41 AL FROZEN MERCHANDISER
TRUE GDM 41 SL 54 SLIDING DOOR REFRIG
METRO C539 DS HEATED CABINETMETRO C539 DS HEATED CABINET
Bus
Dro
p-O
ff
Earthquake Fault Line
PedestrianCirculation
ParentDrop-Off
Acceleration Lane
87' -
0"
GATE
GATE
GATE
GATE
GATE
GATE
GATE
COURTYARDLOBBY
SERVICE
13' - 8 11/16"
POWER (800 LF TO P.O.C.)
ELECTRICALYARD
85' - 0"
16' - 0"
30' -
0"
ARCHITECTURE PLANNING
A105NEW Murray Middle School 200 East Drummond Ave,Ridgecrest, CA 93555
Sierra Sands Unified School DistrictSite Plan
36896October 21, 2014
1" = 80'-0"2 Site Plan
N
0 40' 160'80'
Future Expansion and Event Parking
Future Expansion and Event Parking
Perspective: New Murray Middle SchoolSierra Sands Unified School District November 20, 2014
ARCHITECTURE PLANNING NEW Murray Middle School 200 East Drummond Ave, Ridgecrest, CA 93555 Sierra Sands Unified School DistrictSite Perspective
Basin
StaffParking
Visitor Parking
BaseballField
FootballField
Courts
Basin
MAINT. YARDTrash Enclosure
Can wash
Service Entrance
DOMESTIC WATER (900 LF TO P.O.C.)
FIRE WATER (900 LF TO P.O.C.)
SEWER (1,400 LF TO P.O.C.)
TRUE TFM 41 AL FROZEN MERCHANDISER
TRUE GDM 41 SL 54 SLIDING DOOR REFRIG
METRO C539 DS HEATED CABINETMETRO C539 DS HEATED CABINET
Bus
Dro
p-O
ff
Earthquake Fault Line
PedestrianCirculation
ParentDrop-Off
Acceleration Lane
87' -
0"
GATE
GATE
GATE
GATE
GATE
GATE
GATE
COURTYARDLOBBY
SERVICE
13' - 8 11/16"
POWER (800 LF TO P.O.C.)
ELECTRICALYARD
85' - 0"
16' - 0"
30' -
0"
ARCHITECTURE PLANNING
A105NEW Murray Middle School 200 East Drummond Ave,Ridgecrest, CA 93555
Sierra Sands Unified School DistrictSite Plan
36896October 21, 2014
1" = 80'-0"2 Site Plan
N
0 40' 160'80'