MUNICIPAL CORPORATION OF GREATER MUMBAI NOVEMBER 2010 Workshop on Metropolitan Governance and...

34

Transcript of MUNICIPAL CORPORATION OF GREATER MUMBAI NOVEMBER 2010 Workshop on Metropolitan Governance and...

Page 1: MUNICIPAL CORPORATION OF GREATER MUMBAI NOVEMBER 2010 Workshop on Metropolitan Governance and Planning- Experience of Mumbai and Rio de Janeiro 29th June,
Page 2: MUNICIPAL CORPORATION OF GREATER MUMBAI NOVEMBER 2010 Workshop on Metropolitan Governance and Planning- Experience of Mumbai and Rio de Janeiro 29th June,

MUNICIPAL CORPORATION OF GREATER MUMBAI

NOVEMBER 2010

Workshop on Metropolitan Governance and Planning- Experience of

Mumbai and Rio de Janeiro 29th June , 2012

Page 3: MUNICIPAL CORPORATION OF GREATER MUMBAI NOVEMBER 2010 Workshop on Metropolitan Governance and Planning- Experience of Mumbai and Rio de Janeiro 29th June,

MUNICIPAL CORPORATION OF GREATER MUMBAI

NOVEMBER 2010

INTEGRATED SOLID WASTE MANAGEMENT PROJECT, MUMBAI

SOLID WASTE MANAGEMENT

Page 4: MUNICIPAL CORPORATION OF GREATER MUMBAI NOVEMBER 2010 Workshop on Metropolitan Governance and Planning- Experience of Mumbai and Rio de Janeiro 29th June,

MUNICIPAL CORPORATION OF GREATER MUMBAISo

lid W

aste

Man

agem

ent

• Daily waste generation— Municipal Solid Waste : 7000 ton— Construction & Demolition Waste : 2500 ton — Biomedical Waste (MPCB-Deonar) : 10 ton — Hazardous Waste (MPCB-Taloja) : 10 ton— E-Waste (MMRDA-under planning) : 30 ton

• Unsegregated MSW collected, transported and unscientifically dumped at Deonar & Mulund dumpsite

• 1900 vehicle trips daily collects Municipal Solid Waste• Slum Adoption Scheme for regular collection of waste from the

slum areas

Current Scenario- Experience

Page 5: MUNICIPAL CORPORATION OF GREATER MUMBAI NOVEMBER 2010 Workshop on Metropolitan Governance and Planning- Experience of Mumbai and Rio de Janeiro 29th June,

MUNICIPAL CORPORATION OF GREATER MUMBAISo

lid W

aste

Man

agem

ent

• Clean-up Marshal appointed for enforcement of ‘Greater Mumbai Cleanliness and Sanitation Byelaws,2006’. Fine range Rs 100 to 20,000

• People participation through 756 Advance Locality Management (ALM) for management of local waste (25tpd)

• Dry-waste sorting centre managed by NGOs at ward level (60 tpd)

• Existing Dumpsite at Gorai closed, LFG collected & flared (~450 Kw Energy)

• Existing Dumpsite at Mulund on 16 ha (total 25) and Deonar on 65 ha accommodating existing waste being closed scientifically

• Biomedical waste (about 10 tpd) independently collected, transported & disposal system on DBOOT basis for 20 years

cont’d

Page 6: MUNICIPAL CORPORATION OF GREATER MUMBAI NOVEMBER 2010 Workshop on Metropolitan Governance and Planning- Experience of Mumbai and Rio de Janeiro 29th June,

MUNICIPAL CORPORATION OF GREATER MUMBAISo

lid W

aste

Man

agem

ent

Page 7: MUNICIPAL CORPORATION OF GREATER MUMBAI NOVEMBER 2010 Workshop on Metropolitan Governance and Planning- Experience of Mumbai and Rio de Janeiro 29th June,

MUNICIPAL CORPORATION OF GREATER MUMBAISo

lid W

aste

Man

agem

ent

Land available for Waste Processing and Disposal

• Land Available : Earlier : 166 ha

(Gorai 21 ha, Mulund 25 ha, Deonar 120 ha) Now : 125 ha

(Gorai : closed, Mulund 4 ha,Deonar 55 ha, Kanjur 66 ha)

• Challenges: To manage MSW Processing & disposal in a scientific manner in 125 ha on sustainable basis

• Work awarded on PPP-DBOOT basis for 25 years

Page 8: MUNICIPAL CORPORATION OF GREATER MUMBAI NOVEMBER 2010 Workshop on Metropolitan Governance and Planning- Experience of Mumbai and Rio de Janeiro 29th June,

MUNICIPAL CORPORATION OF GREATER MUMBAISo

lid W

aste

Man

agem

ent

Conventional Waste Management Challenges

• Limited efforts on reducing waste at source

• Lack of segregation, poor collection, illegal dumping, open dumping and burning of waste

• Limited involvement of private sector and communities

• Considers waste having no value

• Relies on Landfills & Composting

• High cost of land in Mumbai city

• Green House Gas (Methane) generation

Page 9: MUNICIPAL CORPORATION OF GREATER MUMBAI NOVEMBER 2010 Workshop on Metropolitan Governance and Planning- Experience of Mumbai and Rio de Janeiro 29th June,

MUNICIPAL CORPORATION OF GREATER MUMBAISo

lid W

aste

Man

agem

ent

Sustainable Waste Management-Solutions Reduce, Reuse and Recycle (the 3Rs) offer an

environmentally friendly alternatives to deal with growing generation of wastes and its related impact on human health, economy and natural ecosystem

1. Reduce: Choosing to use items with care to reduce the amount of waste generated at source2. Reuse : Involves the repeated use of items or parts of items which still have usable aspect3. Recycle: Use of waste itself as resources Resource recovery through waste processing

• -- Biological Processes -- Thermal Processes

Landfill Disposal: Dispose of items which cannot be used by any means

Page 10: MUNICIPAL CORPORATION OF GREATER MUMBAI NOVEMBER 2010 Workshop on Metropolitan Governance and Planning- Experience of Mumbai and Rio de Janeiro 29th June,

MUNICIPAL CORPORATION OF GREATER MUMBAISo

lid W

aste

Man

agem

ent

MCGM Initiatives…• Kanjur (66 ha):

– Bioreactor (42 ha): 3000 tpd scalable upto 6500 tpd with no extra capital works–Perpetual

– Composting (8 ha): 1000 tpd– Landfill (7 ha): for 25 yrs, 250 tpd Process rejects & remnants

• Deonar (55 ha):– Composting (16 ha) : 2000 tpd– Landfill (14 ha): for 25 yrs, 500 tpd Process rejects & remnants

• Mulund (4ha) : – Biomethanisation : 500 tpd (hotel & market waste) No landfill

• Summary– Out of total 7000 tpd MSW generation : 950 tpd recoverable

through MRF (Material recovery Facility)– 6,500 tpd Processing facility scalable upto 10,000 tpd at short

notice – Facility created can meet Mumbai need till total MSW

Generation reach 10,000 tpd

Page 11: MUNICIPAL CORPORATION OF GREATER MUMBAI NOVEMBER 2010 Workshop on Metropolitan Governance and Planning- Experience of Mumbai and Rio de Janeiro 29th June,

MUNICIPAL CORPORATION OF GREATER MUMBAISo

lid W

aste

Man

agem

ent

MCGM Initiatives…• Landfill site will be available after 15 yrs at Gorai, Deonar & Mulund

due to stabilization of existing waste, which can be mined & sold • New facilities at Kanjur, Mulund & Deonar will be in close shed, odour

& dust free, without any environment degradation or nuisance to the neighborhood

• Output from waste: - Compost : 700 tpd- Gas Generation : 4000 cum/hr ~ 8 MW Power - Recyclable/recoverable (RDF) : 950 tpd + - Bioreactor mining after maturity (compost): 1200 to 2600 tpd• Land available after 25 years for reuse : 104 ha out of 125 ha (Deonar 41 ha, Kanjur 59 ha, Mulund 4 ha)• Plus additional land from Gorai, Deonar, Mulund dumpsite: 100

ha

Page 12: MUNICIPAL CORPORATION OF GREATER MUMBAI NOVEMBER 2010 Workshop on Metropolitan Governance and Planning- Experience of Mumbai and Rio de Janeiro 29th June,

MUNICIPAL CORPORATION OF GREATER MUMBAISo

lid W

aste

Man

agem

ent

Further Initiatives…• Implementation of Dry waste sorting centers managed by

NGOs to accept the recyclables in each ward: Estimated 250 tpd +

• Augmentation of Peoples participation through Advance Locality Management (ALM) for residential associations and decentralized processing of Houesehold / Green waste by Vermin/Windrow composting : Estimated 200 tpd +

• 3R Recycling, Reusing, and Reducing waste by decentralized processing of Biodegradable waste in its premises by Composting /Biomethanisation at Institutional Level (Corporate/Educational/ Cultural/Health Institututes, Star Hotels, Housing/

Shopping / Sports Complexes etc ): Estimated 500 tpd +• Implementation of C&D waste processing plant of PPP-BOOT

basis : Estimated 500tpd +

Page 13: MUNICIPAL CORPORATION OF GREATER MUMBAI NOVEMBER 2010 Workshop on Metropolitan Governance and Planning- Experience of Mumbai and Rio de Janeiro 29th June,

SEWERAGE AND

SLUM SANITATION

Municipal Corporation of Greater Mumbai

Page 14: MUNICIPAL CORPORATION OF GREATER MUMBAI NOVEMBER 2010 Workshop on Metropolitan Governance and Planning- Experience of Mumbai and Rio de Janeiro 29th June,

14

Mumbai Sewage Scenario-Experiences

Current Population : 12.4 Million (census 2011)

Slum Population : 6.5Million (census 2011)

Water Supply : 3350 Mld

Sewage generated : 2600 Mld

Area under Sewerage network : 62%

Sewage collected : 1700 Mld (65%)

Sewage Treated : 1) By way of Aerated lagoon: 430 Mld, meeting Effluent Discharge standards (Versova, Bhandup ,Ghatkopar)

2) Through Marine Out Falls : 880 Mld ,meeting SWII Standards except coliform, no Biological Treatment.

(Colaba, Worli, Bandra) 3) With Preliminary Treatment Only :390Mld ,not meeting effluent discharge standards (Malad)

Page 15: MUNICIPAL CORPORATION OF GREATER MUMBAI NOVEMBER 2010 Workshop on Metropolitan Governance and Planning- Experience of Mumbai and Rio de Janeiro 29th June,

LIQUID WASTE MANAGEMENT -Seven Sewerage Zones of Mumbai

Page 16: MUNICIPAL CORPORATION OF GREATER MUMBAI NOVEMBER 2010 Workshop on Metropolitan Governance and Planning- Experience of Mumbai and Rio de Janeiro 29th June,

Treatment

Challenges

Action Plan

I) Non compliance of MPCB consent standard

a) 880 Mld Sewage , plant at Colaba Worli and Bandra, will be treated with suitable biological treatment taking into consideration projected flow by 2031.

b)390Mld Sewage at Malad will be treated with suitable biological treatment and 4km long Marine Outfall, taking into consideration projected flow by 2031.

c) The Treatment as well as Pumping capacity will be upgraded suitably to meet the requirement for the flow by 2031.

IV) Availability of adequate land for treatment facility.

1.New technology with smaller foot print.

2.Treatment with Stack arrangement.

3. Land required for Worli will be acquired by removing the encroachment by way of SRA.

4)Land required for Bandra will be acquired from MSRDC

Page 17: MUNICIPAL CORPORATION OF GREATER MUMBAI NOVEMBER 2010 Workshop on Metropolitan Governance and Planning- Experience of Mumbai and Rio de Janeiro 29th June,

Challenges

Action Plan

I) Coverage in slums

1)Expansion of Sewerage networks

2)Due to paucity of place sewer lines cannot be laid in slum areas and problem will persist. For this Sewage from slums , will be collected by diversion of flow from Storm water drains to Sewer line in Dry season.

II) Unsewered Area

Phase-wise expansion of sewerage networks

Coverage

Page 18: MUNICIPAL CORPORATION OF GREATER MUMBAI NOVEMBER 2010 Workshop on Metropolitan Governance and Planning- Experience of Mumbai and Rio de Janeiro 29th June,

Action Plan – In Progress

1) Expanding existing network by conventional Open cut method and Micro tunneling.

2) Replacing 5nos of existing satellite pumping stations. 3) Construction of new Influent and Effluent pumping

stations at Two places in Mumbai ‘s Western suburbs Malad and Versova.

4) Conditional assessment and rehabilitation of 25Kms of Man –entry Sewers.

5) Construction of about 13Kms long Collector Tunnel in Western suburb .

6) Construction of 5km long two transfer tunnel in Western suburb.

Page 19: MUNICIPAL CORPORATION OF GREATER MUMBAI NOVEMBER 2010 Workshop on Metropolitan Governance and Planning- Experience of Mumbai and Rio de Janeiro 29th June,

Cont’d

7) Construction of 3.9M dia x6.0Km long Marine outfall in Western suburb.

8) Improving level of Sewage Treatment at all 7 locations ,so as to achieve 20mg/litre BOD and 30mg/litre SS in creek/Harbour and 100mg/litreBOD and SS in West coast.

* The Consultants for the works at s.no 2 to 8 are in place and their BODR are ready for invitation of bids ,so as to complete these works by end of 2017.

Page 20: MUNICIPAL CORPORATION OF GREATER MUMBAI NOVEMBER 2010 Workshop on Metropolitan Governance and Planning- Experience of Mumbai and Rio de Janeiro 29th June,

SLUM SANITATION

1) Slum population covered by 4.44 million Community Toilet blocks2) Slum population covered 0.19 million (38,553 X 5)

by individual toilets-

3) Population served by 7.38 million (This includes 2above)

Household toilets(Formal Housing)

*52.52%of present population lives in slums on 10%of land area of Mumbai

Page 21: MUNICIPAL CORPORATION OF GREATER MUMBAI NOVEMBER 2010 Workshop on Metropolitan Governance and Planning- Experience of Mumbai and Rio de Janeiro 29th June,

Goal - Slum Sanitation Programme…

• To improve health & hygiene of slum dwellers

• To provide sustainable sanitation facilities, mainly for safe excreta disposal

• To involve prospective beneficiaries in process from selection of site to construction, O. & M. activities

• To evolve ownership concept amongst the beneficiaries

Page 22: MUNICIPAL CORPORATION OF GREATER MUMBAI NOVEMBER 2010 Workshop on Metropolitan Governance and Planning- Experience of Mumbai and Rio de Janeiro 29th June,

Salient Features of S.S.P. Toilets

• Demand driven scheme• User community to form C.B.O.• User community to pay upfront contribution of

Rs. 100 per adult, max. Rs. 500 per family• Construction of toilet block – R.C.C.• To provide separate seats for gents and ladies • To provide Bath room for gents and ladies

Page 23: MUNICIPAL CORPORATION OF GREATER MUMBAI NOVEMBER 2010 Workshop on Metropolitan Governance and Planning- Experience of Mumbai and Rio de Janeiro 29th June,

Cont’d

• To provide urinal for gents• To provide caretaker room on top of Toilet Block• Provision of 24 Hrs Water & Electric supply• Caretaker to stay in the top room round the

clock• To issue family passes to user community• C.B.O. to bear water, electricity charges &

payment of caretaker & daily maintenance

Page 24: MUNICIPAL CORPORATION OF GREATER MUMBAI NOVEMBER 2010 Workshop on Metropolitan Governance and Planning- Experience of Mumbai and Rio de Janeiro 29th June,

Program of construction of Community Toilets

YEAR Cumulative

May 2001

Cumulative May2012

No of Toilet blocks

330 510

No of seats 6050 10464

Work in Progress

265

4509

Page 25: MUNICIPAL CORPORATION OF GREATER MUMBAI NOVEMBER 2010 Workshop on Metropolitan Governance and Planning- Experience of Mumbai and Rio de Janeiro 29th June,

Pay and Use Toilet Blocks

• Pay and Use toilets constructed mainly for floating population

• Constructed on BOO basis• Users charges as per MCGM norms, generally Rs. 2

per use• Urinal facilities provided free of cost• Pay & Use toilets constructed mainly by NGOs• Water, electricity and other charges including repairs

and maintenance born by the operators

Page 26: MUNICIPAL CORPORATION OF GREATER MUMBAI NOVEMBER 2010 Workshop on Metropolitan Governance and Planning- Experience of Mumbai and Rio de Janeiro 29th June,

Mangroves Protection : Introduction

• Ministry of Environment & Forest, Govt. of India vide notification S.O.19(E) dated 6th January 2011 published the new Coastal Regulation Zone (CRZ) Notification 2011.

• The CRZ notification regulates the development so as to protect the natural coastal barriers like reefs, dunes, mangroves, beaches and terrestrial vegetation.The CRZ are classified into 4 categories (i.e CRZ-I, CRZ-II, CRZ-III & CRZ-IV).

Page 27: MUNICIPAL CORPORATION OF GREATER MUMBAI NOVEMBER 2010 Workshop on Metropolitan Governance and Planning- Experience of Mumbai and Rio de Janeiro 29th June,

….contd.• CRZ - I covers ecological sensitive areas

like Mangroves, mudflats, sand dunes etc…..

• Mangroves are one of the important geomorphological landforms in coastal ecosystem.

• As per the CRZ Notification in case of Mangroves area more than 1000 sqm. a buffer of 50 m along the Mangroves is to be maintained.

Page 28: MUNICIPAL CORPORATION OF GREATER MUMBAI NOVEMBER 2010 Workshop on Metropolitan Governance and Planning- Experience of Mumbai and Rio de Janeiro 29th June,

….contd.• All mangrove areas are to be mapped and

notified as protected forest and necessary protection and conservation measures for the identified mangrove area is to be initiated.

• Five times the number of mangroves destroyed/cut during the construction process shall be replanted.

• It is in form of trees and shrubs of varies species with several families, mostly found with seawater and around tidal influenced bodies, likes creeks, estuaries, wetland etc.

Page 29: MUNICIPAL CORPORATION OF GREATER MUMBAI NOVEMBER 2010 Workshop on Metropolitan Governance and Planning- Experience of Mumbai and Rio de Janeiro 29th June,

Mangroves: Silent Coastal Saviors

•Halophytic plants that grow at interface between soil and water

•Evolved around 114 million years back

•Mangue- Into the sea Groves- Garden/Forest

Page 30: MUNICIPAL CORPORATION OF GREATER MUMBAI NOVEMBER 2010 Workshop on Metropolitan Governance and Planning- Experience of Mumbai and Rio de Janeiro 29th June,

IMPORTANCE• Protection to shoreline

from seawaves, Cyclones

• Nursery for marine fauna

• Living for fisherfolks• Construction & timber• Carbon Sinks• Ecological balance• Research• Education

Page 31: MUNICIPAL CORPORATION OF GREATER MUMBAI NOVEMBER 2010 Workshop on Metropolitan Governance and Planning- Experience of Mumbai and Rio de Janeiro 29th June,

Conservation of Mangroves• Hon’ble high Court of judicature of Mumbai has

directed the State Coastal Zone Management Authority to carry out the satellite mapping of mangroves of the state of Maharashtra for their protection and conservation.

• Accordingly Maharashtra Pollution Control Board, Mumbai has entrusted the studies “Satellite mapping of mangroves of Maharashtra” using two data IRSP6, AWiSF data under phase-I to Maharashtra Remote Sensing Application (MRSAC)Center, Nagpur.

• All the mangroves area have been declared as Protected Forest by State Government of Maharashtra.

Page 32: MUNICIPAL CORPORATION OF GREATER MUMBAI NOVEMBER 2010 Workshop on Metropolitan Governance and Planning- Experience of Mumbai and Rio de Janeiro 29th June,
Page 33: MUNICIPAL CORPORATION OF GREATER MUMBAI NOVEMBER 2010 Workshop on Metropolitan Governance and Planning- Experience of Mumbai and Rio de Janeiro 29th June,

Our Role In Mangrove Conservation

• Understand mangroves

• Conduct & encourage research

• Prevention of tree cutting

• Watch on neighbourhood areas

• Follow up ‘3R Principle’

• Participation in conservation

activities

Page 34: MUNICIPAL CORPORATION OF GREATER MUMBAI NOVEMBER 2010 Workshop on Metropolitan Governance and Planning- Experience of Mumbai and Rio de Janeiro 29th June,