Mungcharoen Green Power Co.,Ltd The Energy Long Live For Surin Province.
-
Upload
george-obrien -
Category
Documents
-
view
221 -
download
2
Transcript of Mungcharoen Green Power Co.,Ltd The Energy Long Live For Surin Province.
![Page 1: Mungcharoen Green Power Co.,Ltd The Energy Long Live For Surin Province.](https://reader037.fdocuments.in/reader037/viewer/2022110101/56649e635503460f94b5f4fd/html5/thumbnails/1.jpg)
Mungcharoen Green Power
Co.,LtdThe Energy Long Live For Surin
Province
![Page 2: Mungcharoen Green Power Co.,Ltd The Energy Long Live For Surin Province.](https://reader037.fdocuments.in/reader037/viewer/2022110101/56649e635503460f94b5f4fd/html5/thumbnails/2.jpg)
Company Profile
![Page 3: Mungcharoen Green Power Co.,Ltd The Energy Long Live For Surin Province.](https://reader037.fdocuments.in/reader037/viewer/2022110101/56649e635503460f94b5f4fd/html5/thumbnails/3.jpg)
Our company background from Thailand energy policy, This energy policy has major
objectives to promote alternative energy to
complement and strengthen Thai Electricity system by using own resources from
biomass such as Rice husk, Sugar cane-bagasse corn
leaves, plam shell and woodchip, to reduce the
import of fossil fuels and to replace Thai supply of fossils fuels which is forecasted to
run short in the next 30 years
![Page 4: Mungcharoen Green Power Co.,Ltd The Energy Long Live For Surin Province.](https://reader037.fdocuments.in/reader037/viewer/2022110101/56649e635503460f94b5f4fd/html5/thumbnails/4.jpg)
Mungcharoen Green power has developed Rice Husk Power Plant
since 2004 in Surin Province, Northern part of Thailand.
The project started construction in January 2005 and completed in November 2006. The Project start commercial operation on
January 23,2007
![Page 5: Mungcharoen Green Power Co.,Ltd The Energy Long Live For Surin Province.](https://reader037.fdocuments.in/reader037/viewer/2022110101/56649e635503460f94b5f4fd/html5/thumbnails/5.jpg)
Mungcharoen Green Power Co.,Ltd is Located at 333 Moo 7, Surin-Sikhoraphum Road, Tumbon Burusi, Muang District, Surin Province
Company Location
![Page 6: Mungcharoen Green Power Co.,Ltd The Energy Long Live For Surin Province.](https://reader037.fdocuments.in/reader037/viewer/2022110101/56649e635503460f94b5f4fd/html5/thumbnails/6.jpg)
A200,000 ลบ.ม.
B400,000 ลบ.ม.
C180,000 ลบ.ม. D60,000 ลบ.ม.
Factory Layout
Factory building
4 Water storage pond
![Page 7: Mungcharoen Green Power Co.,Ltd The Energy Long Live For Surin Province.](https://reader037.fdocuments.in/reader037/viewer/2022110101/56649e635503460f94b5f4fd/html5/thumbnails/7.jpg)
1 day Silo
Boiler PlantSTG House
Cooling Tower
Water Treatment Plant
Earth Pond
Factory Building Plant
![Page 8: Mungcharoen Green Power Co.,Ltd The Energy Long Live For Surin Province.](https://reader037.fdocuments.in/reader037/viewer/2022110101/56649e635503460f94b5f4fd/html5/thumbnails/8.jpg)
Process Electric Generation
Design plant, we use rice husk is main fuel in process electrical generation for emergency case can use other biomass in process
The rice husk for supply plant 80% from Mungcharoen Rice mill and 20% from alliance
![Page 9: Mungcharoen Green Power Co.,Ltd The Energy Long Live For Surin Province.](https://reader037.fdocuments.in/reader037/viewer/2022110101/56649e635503460f94b5f4fd/html5/thumbnails/9.jpg)
Process Electric Generation
Fuel consumption in 85,000 Ton/Year for generate
Electricity 65 Million
kWh / year
![Page 10: Mungcharoen Green Power Co.,Ltd The Energy Long Live For Surin Province.](https://reader037.fdocuments.in/reader037/viewer/2022110101/56649e635503460f94b5f4fd/html5/thumbnails/10.jpg)
Process Electric Generation
For steam generation, we use Biomass Fire Boiler design by “ERK German” capacity 55 TPH to generated medium pressure super heated steam 40 Bar , 435 degree ‘C
Furnace and combustor, we use technology from German by use combustor type “Step Grate”
![Page 11: Mungcharoen Green Power Co.,Ltd The Energy Long Live For Surin Province.](https://reader037.fdocuments.in/reader037/viewer/2022110101/56649e635503460f94b5f4fd/html5/thumbnails/11.jpg)
Process Electric Generation
Turbine type “Full Condensing Steam Turbine” from HTC capacity 9,900 kW rate speed 8,540 RPM with “Gear reduction”
Electricity generation by use Synchronous Generator type “Automatic Voltage Regulator (AVR)” capacity 11,560 KVA (9,900 kW at PF 0.85) and generate voltage 11,000 V
![Page 12: Mungcharoen Green Power Co.,Ltd The Energy Long Live For Surin Province.](https://reader037.fdocuments.in/reader037/viewer/2022110101/56649e635503460f94b5f4fd/html5/thumbnails/12.jpg)
The electricity sell to the EGAT Public Company Limited “Firm”, and connect to grids with PEA line Feeder # 5
Grid Connection
![Page 13: Mungcharoen Green Power Co.,Ltd The Energy Long Live For Surin Province.](https://reader037.fdocuments.in/reader037/viewer/2022110101/56649e635503460f94b5f4fd/html5/thumbnails/13.jpg)
Product
ElectricityMungcharoen Green power generated 9.9 MW of electric power. 8 MW of electric power to be sold to EGAT.
0.8 MW of electric power to be sold to Mungcharoen Rice Mill
0.8 MW of electric power to be used in the power plant.
![Page 14: Mungcharoen Green Power Co.,Ltd The Energy Long Live For Surin Province.](https://reader037.fdocuments.in/reader037/viewer/2022110101/56649e635503460f94b5f4fd/html5/thumbnails/14.jpg)
Product
Rice Husk Ash
(RHA) is by product of complete combustion of rice husk. This kind of ash is high in quality, and it is an essential raw material for steel and silica plant industries.
![Page 15: Mungcharoen Green Power Co.,Ltd The Energy Long Live For Surin Province.](https://reader037.fdocuments.in/reader037/viewer/2022110101/56649e635503460f94b5f4fd/html5/thumbnails/15.jpg)
Environmental and Management
![Page 16: Mungcharoen Green Power Co.,Ltd The Energy Long Live For Surin Province.](https://reader037.fdocuments.in/reader037/viewer/2022110101/56649e635503460f94b5f4fd/html5/thumbnails/16.jpg)
Waste Water From Process
We design to zero discharge system, and over all water not reject outer factory
![Page 17: Mungcharoen Green Power Co.,Ltd The Energy Long Live For Surin Province.](https://reader037.fdocuments.in/reader037/viewer/2022110101/56649e635503460f94b5f4fd/html5/thumbnails/17.jpg)
Use the zero discharge principle to relieve the anxiety of nearby communities. In practices, waste water is treaded to have quality in accordance with the ministry of industry standard before releasing to holding pond.
![Page 18: Mungcharoen Green Power Co.,Ltd The Energy Long Live For Surin Province.](https://reader037.fdocuments.in/reader037/viewer/2022110101/56649e635503460f94b5f4fd/html5/thumbnails/18.jpg)
Air Pollution System
Power plant use clean technology by use 2 system air treatment
Use the first cleaning by use “Cyclone Dust Collector” and second cleaning by use “ESP”
![Page 19: Mungcharoen Green Power Co.,Ltd The Energy Long Live For Surin Province.](https://reader037.fdocuments.in/reader037/viewer/2022110101/56649e635503460f94b5f4fd/html5/thumbnails/19.jpg)
2.Air pollution
Use clean technology, first step use dust collector.
For particle 10> micron 0( 01. mm )
![Page 20: Mungcharoen Green Power Co.,Ltd The Energy Long Live For Surin Province.](https://reader037.fdocuments.in/reader037/viewer/2022110101/56649e635503460f94b5f4fd/html5/thumbnails/20.jpg)
2.Air pollution
Second step use Electrostatic Precipitator (ESP).
For particle < -01. 1 micron (0.0001 - 0.001 mm )
![Page 21: Mungcharoen Green Power Co.,Ltd The Energy Long Live For Surin Province.](https://reader037.fdocuments.in/reader037/viewer/2022110101/56649e635503460f94b5f4fd/html5/thumbnails/21.jpg)
Third Party Certify
![Page 22: Mungcharoen Green Power Co.,Ltd The Energy Long Live For Surin Province.](https://reader037.fdocuments.in/reader037/viewer/2022110101/56649e635503460f94b5f4fd/html5/thumbnails/22.jpg)
We are Biomass Learning Center
![Page 23: Mungcharoen Green Power Co.,Ltd The Energy Long Live For Surin Province.](https://reader037.fdocuments.in/reader037/viewer/2022110101/56649e635503460f94b5f4fd/html5/thumbnails/23.jpg)
We are Modern Power Plant
High Efficiency and Clean Technology