Multipurpose wood frame week5

8
MULTIPURPOSE WOOD FRAME [ Project process selection ]

description

Project process selection

Transcript of Multipurpose wood frame week5

Page 1: Multipurpose wood frame week5

MULTIPURPOSE WOOD FRAME

[ Project process selection ]

Page 2: Multipurpose wood frame week5

-What is your primary process? Why did you choose this process?

MANUFACTURING PROCESS SEQUENCE

Page 3: Multipurpose wood frame week5

-What is your secondary process? Why did you choose this process?

MANUFACTURING PROCESS SEQUENCE

Page 4: Multipurpose wood frame week5

- What is your tertiary process? Why did you choose this process?

MANUFACTURING PROCESS SEQUENCE

 Glaze

Page 5: Multipurpose wood frame week5

PRODUCT FUNCTION

-With your selected material, how is your material compatible with product geometry and manufacturing processes?

-What is the normal applied load to the material? Can your material take such load?

Page 6: Multipurpose wood frame week5

-What is the normal ambient conditions to your material?

- With your selected manufacturing process, how is your process compatible with the product geometry?

Page 7: Multipurpose wood frame week5

MANUFACTURING COSTThe material costs per part, cM is

cm=cw*wp(1+a)cw=35 bath/kgwp=0.02kg/parta=ww/wp=0.01/0.02=0.5

cm =(45 bath/kg)x(0.02 kg/part)x(1+0.5)=1.35 bath/part

The processing cost per part, cP is

cp=ct x t

ct=(50 bath/hr)t=(0.5hr/part)

cp=(50 bath/hr)x(0.5hr/part)=2.5 bath/part

total cost per part

C=cm+cp+ct=(1.35 bath/part)+(2.5 bath/part)+(50 bath/hr)=53.85 bath/part

Page 8: Multipurpose wood frame week5

END PRESENTATION