MULTI - FUNCTIONAL BE CAREFUL WHEN … · • Never exceed the maximum UDL loadings MULTI -...

2
IMPORTANT INFORMATION • Please read the instructions carefully before you start assembling to ensure you have all the components listed on the instructions. • It is much easier to assemble with 2 people • You should only require a flat headed screwdriver and a rubber mallet BE CAREFUL WHEN ASSEMBLING • Take care not to stretch or lift awkwardly • Make sure the floor is level • Use of protective gloves and footwear are recommended • Please consider the environment when disposing of all packaging WARNING • Do not stand or climb on the shelves • Not suitable for use in damp or wet conditions • Never lean any objects such as ladders or steps against the shelves • It is recommended that the units are fixed to the wall for safety • Never exceed the maximum UDL loadings MULTI - FUNCTIONAL BOLTLESS SHELVING www.storalex.com 2 x HALF HEIGHT SHELVES OR WORK BENCH 5 BAY SHELF NO NUTS NO BOLTS JUST TAP TOGETHER COMPONENT CHECK LIST ALSO MAKES 2 x Work Benches 2 x Corner Units If you are assembling as a workbenches follow all instructions but don’t use connectors to make second tier. 10 x SIDE BEAMS 5 x SUPPORT BEAMS 10 x FRONT & BACK BEAMS 8 x UPRIGHTS 4 x CONNECTORS 5 x DECKS 8 x FEET KV06 Gloves recommended Ensure floor is even Distribute levels evenly Do not use in a damp or hunid environment Distribute weight uniformly Do not use defective componentry SUPPLIED BY 0800 917 7533 [email protected] www.tufferman.co.uk

Transcript of MULTI - FUNCTIONAL BE CAREFUL WHEN … · • Never exceed the maximum UDL loadings MULTI -...

IMPORTANT INFORMATION• Please read the instructions carefully before you start assembling to ensure

you have all the components listed on the instructions.

• It is much easier to assemble with 2 people

• You should only require a flat headed screwdriver and a rubber mallet

BE CAREFUL WHEN ASSEMBLING• Take care not to stretch or lift awkwardly

• Make sure the floor is level• Use of protective gloves and footwear are recommended

• Please consider the environment when disposing of all packaging

WARNING• Do not stand or climb on the shelves

• Not suitable for use in damp or wet conditions• Never lean any objects such as ladders or steps against the shelves

• It is recommended that the units are fixed to the wall for safety• Never exceed the maximum UDL loadings

MULTI - FUNCTIONALBOLTLESS SHELVING

www.storalex.com

2 x HALF HEIGHTSHELVES OR WORK BENCH

5 BAY SHELFNO

NUTSNO

BOLTSJUSTTAP

TOGETHER

COMPONENT CHECK LIST

ALSO MAKES2 x Work Benches2 x Corner Units

If you are assembling as a workbenches follow all instructions but don’t use connectors to make second tier.

10 x SIDE BEAMS

5 x SUPPORT BEAMS

10 x FRONT & BACK BEAMS

8 x UPRIGHTS

4 x CONNECTORS

5 x DECKS

8 x FEET

KV06

Glovesrecommended

Ensure floor is even Distribute levels evenly

Do not use in a damp or hunid

environment

Distribute weight uniformly

Do not use defective componentry

SUPPLIED BY

0800 917 [email protected]

ASSEMBLY INSTRUCTIONSwww.storalex.comPLEASE READ OUTER LEAFTLET FIRST & TAKE CARE WHEN CONSTRUCTING

1

5

6

2

7 8

4

9 10

3

The arrows on the uprights must be facing upwards.

To double check the uprights are the correct way around, make sure the tabs are as in the above illustration.

Fit the plastic feet to each of the 4 uprights. You will have 4 spare feet if it is used as a single bay as this product can also make two workbenches.

UP DOWN

Insert the connectors into the uprights making sure the tabs go correctly into the slots.

Now take 1x support beam and 2x front/back beams. Slide the support beam into a front/back beam at each end creating an H shape. The support beam should be in the centre of the front/back beam. When inserting the support beam ensure the rounded edge is inserted first into the slots on the front/back beam. Repeat this for each shelf/level.

Now fix the first 2 H frames and 4 side beams onto the uprights by inserting the tabs into the slots.

When inserting the tabs into the slots you may need a screwdriver to guide them into place.

With the tabs correctly positioned tap them gently with a mallet until they are firmly in place.

When deciding the distance between the beams ensure it is sufficient to be able to insert the decks. The decks can be inserted from the side of the unit.

Once you have built the two shelf levels prepare to insert the second upright. Please note you cannot set the 2nd shelf at the top of the uprightas the upright connectors use the top slot whenconnecting the 2nd upright.

Now instert the remainder of the H frames & side beams to the upper section of the bay by repeating stage 5.

Each level should now be complete with 2x side beams 2x front/back beams and a centre support beam. Ensure the support beams are central to the front/back beams.

Insert the decks onto each level - the decks canbe inserted from the side if the levels are closetogether.

Please recycle your packaging responsibly.

Please read all illustrations in this stage before starting.