MUHAMMAD SAIDUR RAHMAN DIRECTOR BANGLADESH DISASTER PREPAREDNESS CENTRE (BDPC)
-
Upload
mckenzie-davenport -
Category
Documents
-
view
25 -
download
2
description
Transcript of MUHAMMAD SAIDUR RAHMAN DIRECTOR BANGLADESH DISASTER PREPAREDNESS CENTRE (BDPC)
![Page 1: MUHAMMAD SAIDUR RAHMAN DIRECTOR BANGLADESH DISASTER PREPAREDNESS CENTRE (BDPC)](https://reader036.fdocuments.in/reader036/viewer/2022081603/568136b2550346895d9e55f6/html5/thumbnails/1.jpg)
MUHAMMAD SAIDUR RAHMANMUHAMMAD SAIDUR RAHMANDIRECTORDIRECTORBANGLADESH DISASTER PREPAREDNESS CENTRE (BDPC)BANGLADESH DISASTER PREPAREDNESS CENTRE (BDPC)
Dhaka, September 2004Dhaka, September 2004
![Page 2: MUHAMMAD SAIDUR RAHMAN DIRECTOR BANGLADESH DISASTER PREPAREDNESS CENTRE (BDPC)](https://reader036.fdocuments.in/reader036/viewer/2022081603/568136b2550346895d9e55f6/html5/thumbnails/2.jpg)
STRUCTURE OF PRESENTATION
• INTRODUCTION TO HALIMA BEGUM
• FLOOD DISASTER MANAGEMENT
• OPTIONS FOR DAMAGE REDUCTION
• FLOOD RISK REDUCTION
2
![Page 3: MUHAMMAD SAIDUR RAHMAN DIRECTOR BANGLADESH DISASTER PREPAREDNESS CENTRE (BDPC)](https://reader036.fdocuments.in/reader036/viewer/2022081603/568136b2550346895d9e55f6/html5/thumbnails/3.jpg)
![Page 4: MUHAMMAD SAIDUR RAHMAN DIRECTOR BANGLADESH DISASTER PREPAREDNESS CENTRE (BDPC)](https://reader036.fdocuments.in/reader036/viewer/2022081603/568136b2550346895d9e55f6/html5/thumbnails/4.jpg)
CASE-STUDY OF HALIMA
• 4 FAMILY MEMBERS
• DOMESTIC AID AND POULTRY REARING (ON PROFIT SHARING BASIS)
• AVERAGE INCOME IS TK. 15 - 20 PER DAY
3
• WIDOW
• VICTIM OF RIVER EROSION
• LANDLESS
![Page 5: MUHAMMAD SAIDUR RAHMAN DIRECTOR BANGLADESH DISASTER PREPAREDNESS CENTRE (BDPC)](https://reader036.fdocuments.in/reader036/viewer/2022081603/568136b2550346895d9e55f6/html5/thumbnails/5.jpg)
RELIEF RECEIVED
RICE 20 Kgs
PULSE 3.75 Kgs
OIL, SALT, BISCUIT, CLOTHINGS, ETC.
4
![Page 6: MUHAMMAD SAIDUR RAHMAN DIRECTOR BANGLADESH DISASTER PREPAREDNESS CENTRE (BDPC)](https://reader036.fdocuments.in/reader036/viewer/2022081603/568136b2550346895d9e55f6/html5/thumbnails/6.jpg)
AREAS OF IMPROVEMENT
• MONITORING
• COORDINATION
5
![Page 7: MUHAMMAD SAIDUR RAHMAN DIRECTOR BANGLADESH DISASTER PREPAREDNESS CENTRE (BDPC)](https://reader036.fdocuments.in/reader036/viewer/2022081603/568136b2550346895d9e55f6/html5/thumbnails/7.jpg)
1998 :FOOD, CLOTHING, HOUSE, ETC
1988 :FOOD, CLOTHING, C.I SHEET
R&R SUPPORT IN THE PAST
6
1972 - 2004
VGF, GR, FFW, CASH, ETC
![Page 8: MUHAMMAD SAIDUR RAHMAN DIRECTOR BANGLADESH DISASTER PREPAREDNESS CENTRE (BDPC)](https://reader036.fdocuments.in/reader036/viewer/2022081603/568136b2550346895d9e55f6/html5/thumbnails/8.jpg)
VICIOUS CYCLE OF DISASTER AND POVERTY
POVERTY
RELIEF AND REHABILITATION
DISASTER
VULNERABILITY (RISK)
POVERTY LINE
7
![Page 9: MUHAMMAD SAIDUR RAHMAN DIRECTOR BANGLADESH DISASTER PREPAREDNESS CENTRE (BDPC)](https://reader036.fdocuments.in/reader036/viewer/2022081603/568136b2550346895d9e55f6/html5/thumbnails/9.jpg)
OPTIONS
1. RELOCATION X
8
• FLOOD MANAGEMENT (STRUCTURAL MEASURES)
• EMPOWERMENT OF THE VULNERABLE PEOPLE
2. FLOOD PREVENTION
3. RISK REDUCTION
X
![Page 10: MUHAMMAD SAIDUR RAHMAN DIRECTOR BANGLADESH DISASTER PREPAREDNESS CENTRE (BDPC)](https://reader036.fdocuments.in/reader036/viewer/2022081603/568136b2550346895d9e55f6/html5/thumbnails/10.jpg)
RISK ?
RISK VULNERABILITYX= HAZARDCAPACITY
9
![Page 11: MUHAMMAD SAIDUR RAHMAN DIRECTOR BANGLADESH DISASTER PREPAREDNESS CENTRE (BDPC)](https://reader036.fdocuments.in/reader036/viewer/2022081603/568136b2550346895d9e55f6/html5/thumbnails/11.jpg)
COMPARISON OF RISKS
HALIMA :
RISK (V) X = (H)
(C)= 25
= 110
JASIM MANDAL :
RISK(V) 1
X = (H) 5 (C) 5
VALUES : 1 5(LOWEST HIGHEST)
5 51
![Page 12: MUHAMMAD SAIDUR RAHMAN DIRECTOR BANGLADESH DISASTER PREPAREDNESS CENTRE (BDPC)](https://reader036.fdocuments.in/reader036/viewer/2022081603/568136b2550346895d9e55f6/html5/thumbnails/12.jpg)
DISASTER
RISK VULNERABILITYX= HAZARDCAPACITY
11
![Page 13: MUHAMMAD SAIDUR RAHMAN DIRECTOR BANGLADESH DISASTER PREPAREDNESS CENTRE (BDPC)](https://reader036.fdocuments.in/reader036/viewer/2022081603/568136b2550346895d9e55f6/html5/thumbnails/13.jpg)
HOW THE MONEY IS SPENT ?
• RELIEF AND REHABILITATION • INFRASTRUCTURAL DEVELOPMENT • HIGHLY PAID CONSULTANTS
12
CAPACITY ENHANCEMENT OF THE POOR ?
![Page 14: MUHAMMAD SAIDUR RAHMAN DIRECTOR BANGLADESH DISASTER PREPAREDNESS CENTRE (BDPC)](https://reader036.fdocuments.in/reader036/viewer/2022081603/568136b2550346895d9e55f6/html5/thumbnails/14.jpg)
BASIC REQUIREMENT
SUSTAINED LIVELIHOOD
CAPACITY ENHANCEMENT
13
![Page 15: MUHAMMAD SAIDUR RAHMAN DIRECTOR BANGLADESH DISASTER PREPAREDNESS CENTRE (BDPC)](https://reader036.fdocuments.in/reader036/viewer/2022081603/568136b2550346895d9e55f6/html5/thumbnails/15.jpg)
RISK REDUCTION THROUGH SUSTAINABLE LIVELIHOOD SUPPORT
• VULNERABILITY AND CAPACITY ASSESSMENT
• DEVELOPMENT OF BUSINESS PLAN (FAMILY LEVEL)
• SKILL AND CAPACITY DEVELOPMENT
• INCOME GENERATING SUPPORT (AT LOW OR NO INTEREST)
• LINKAGE WITH SERVICE PROVIDERS
14
![Page 16: MUHAMMAD SAIDUR RAHMAN DIRECTOR BANGLADESH DISASTER PREPAREDNESS CENTRE (BDPC)](https://reader036.fdocuments.in/reader036/viewer/2022081603/568136b2550346895d9e55f6/html5/thumbnails/16.jpg)
• INVESTMENT OF A PART OF PROFIT FOR RISK REDUCTION (MINOR STRUCTURAL IMPROVEMENT)
• DISSEMINATION OF EARLY WARNING
• FAMILY AND COMMUNITY LEVEL PREPAREDNESS
• EVACUATION PLAN
• FAMILY AND COMMUNITY RESPONSE PLANS
15
![Page 17: MUHAMMAD SAIDUR RAHMAN DIRECTOR BANGLADESH DISASTER PREPAREDNESS CENTRE (BDPC)](https://reader036.fdocuments.in/reader036/viewer/2022081603/568136b2550346895d9e55f6/html5/thumbnails/17.jpg)
PROPOSED STRUCTURE
AGENCY : DRR (MFDM)
IMPLEMENTATION : UDMC (Through PIC)
SUPERVISION : CHANGE AGENTS (IMAMS, TRACHERS, TBAs)
RESOURCES : GoB - 80 %
DEV. PARTNERS - 20 %
16
![Page 18: MUHAMMAD SAIDUR RAHMAN DIRECTOR BANGLADESH DISASTER PREPAREDNESS CENTRE (BDPC)](https://reader036.fdocuments.in/reader036/viewer/2022081603/568136b2550346895d9e55f6/html5/thumbnails/18.jpg)
PROJECT OUTPUT
17
XRISK REDUCTION
SUPPORT
![Page 19: MUHAMMAD SAIDUR RAHMAN DIRECTOR BANGLADESH DISASTER PREPAREDNESS CENTRE (BDPC)](https://reader036.fdocuments.in/reader036/viewer/2022081603/568136b2550346895d9e55f6/html5/thumbnails/19.jpg)
18
Progression of Household Well-being
![Page 20: MUHAMMAD SAIDUR RAHMAN DIRECTOR BANGLADESH DISASTER PREPAREDNESS CENTRE (BDPC)](https://reader036.fdocuments.in/reader036/viewer/2022081603/568136b2550346895d9e55f6/html5/thumbnails/20.jpg)
OUTPUT Contd.
• REDUCTION OF RISK
• EMPOWERMENT OF THE POOR
• ALLEVIATION OF POVERTY
• ACHIEVEMENT OF MDG
19
![Page 21: MUHAMMAD SAIDUR RAHMAN DIRECTOR BANGLADESH DISASTER PREPAREDNESS CENTRE (BDPC)](https://reader036.fdocuments.in/reader036/viewer/2022081603/568136b2550346895d9e55f6/html5/thumbnails/21.jpg)
SMART
20
SUSTAINABLE
MEASURABLE
ACHIEVABLE
REPLICABLE
TIME-BOUND
![Page 22: MUHAMMAD SAIDUR RAHMAN DIRECTOR BANGLADESH DISASTER PREPAREDNESS CENTRE (BDPC)](https://reader036.fdocuments.in/reader036/viewer/2022081603/568136b2550346895d9e55f6/html5/thumbnails/22.jpg)
21
CHALLENGE ?
• CHANGE OF MIND-SETS OF MAJOR STAKEHOLDERS
• A BELIEF IN THE POTENTIAL POWER OF THE POOR
• INTEGRATION OF RISK MANAGEMENT INTO DEVELOPMENT PLANNING
• SUSTAINED POLITICAL COMMITMENT
![Page 23: MUHAMMAD SAIDUR RAHMAN DIRECTOR BANGLADESH DISASTER PREPAREDNESS CENTRE (BDPC)](https://reader036.fdocuments.in/reader036/viewer/2022081603/568136b2550346895d9e55f6/html5/thumbnails/23.jpg)