Mud-Wrestling Without the Glamour for... · 8/28/08 Beveridge & Diamond, PC 3 SCOPE OF PROBLEM...
Transcript of Mud-Wrestling Without the Glamour for... · 8/28/08 Beveridge & Diamond, PC 3 SCOPE OF PROBLEM...
![Page 1: Mud-Wrestling Without the Glamour for... · 8/28/08 Beveridge & Diamond, PC 3 SCOPE OF PROBLEM sSediment sites increasing in number, size, cost. Trend likely will continue. s2004](https://reader034.fdocuments.in/reader034/viewer/2022050222/5f67b0917ae0213310191186/html5/thumbnails/1.jpg)
8/28/08 Beveridge & Diamond, PC 1
MudMud--Wrestling Without the Wrestling Without the Glamour:Glamour:Strategies for Coping With Sediment Sites
Steven M. [email protected]
![Page 2: Mud-Wrestling Without the Glamour for... · 8/28/08 Beveridge & Diamond, PC 3 SCOPE OF PROBLEM sSediment sites increasing in number, size, cost. Trend likely will continue. s2004](https://reader034.fdocuments.in/reader034/viewer/2022050222/5f67b0917ae0213310191186/html5/thumbnails/2.jpg)
8/28/08 Beveridge & Diamond, PC 2
OVERVIEWOVERVIEW
s Scope of Problems Trends in EPA Activitys Unique Challenges – Technical and
Non-Technicals My Focus Today: Non-Technical
Challenges and Coping Strategiess Information Sources
![Page 3: Mud-Wrestling Without the Glamour for... · 8/28/08 Beveridge & Diamond, PC 3 SCOPE OF PROBLEM sSediment sites increasing in number, size, cost. Trend likely will continue. s2004](https://reader034.fdocuments.in/reader034/viewer/2022050222/5f67b0917ae0213310191186/html5/thumbnails/3.jpg)
8/28/08 Beveridge & Diamond, PC 3
SCOPE OF PROBLEMSCOPE OF PROBLEM
s Sediment sites increasing in number, size, cost. Trend likely will continue.s 2004 EPA report to Congress on sediment
quality lists 96 watersheds with “Areas of Widespread Sediment Contamination,” based on nonrandom survey of sampling locations (only 9% of water body segments in U.S.).s Over 8,000 sampling stations “probably”
associated with harmful effects on aquatic life or human health.
![Page 4: Mud-Wrestling Without the Glamour for... · 8/28/08 Beveridge & Diamond, PC 3 SCOPE OF PROBLEM sSediment sites increasing in number, size, cost. Trend likely will continue. s2004](https://reader034.fdocuments.in/reader034/viewer/2022050222/5f67b0917ae0213310191186/html5/thumbnails/4.jpg)
8/28/08 Beveridge & Diamond, PC 4
SCOPE OF PROBLEMSCOPE OF PROBLEM
s 2005 EPA Contaminated Sediment Remediation Guidance reports that, partly due to sediment contamination, fish consumption advisories cover:100% of Great Lakes35% of other U.S. lake acreage24% of total U.S. river miles
![Page 5: Mud-Wrestling Without the Glamour for... · 8/28/08 Beveridge & Diamond, PC 3 SCOPE OF PROBLEM sSediment sites increasing in number, size, cost. Trend likely will continue. s2004](https://reader034.fdocuments.in/reader034/viewer/2022050222/5f67b0917ae0213310191186/html5/thumbnails/5.jpg)
8/28/08 Beveridge & Diamond, PC 5
SCOPE OF PROBLEMSCOPE OF PROBLEM
s As of 2003, EPA reported about 7 sediment “megasites” (cost > $50M)s By 2007, more than 14 sediment
megasitess Others on horizon: e.g., Lower Passaic,
Berry’s Creek, Tar Creek, Tittabawassee River, Kalamazoo Rivers Many other sites with sediment cleanup
costs between $10M and $50M (e.g., Saginaw River, Sheboygan River, Lavaca Bay)
![Page 6: Mud-Wrestling Without the Glamour for... · 8/28/08 Beveridge & Diamond, PC 3 SCOPE OF PROBLEM sSediment sites increasing in number, size, cost. Trend likely will continue. s2004](https://reader034.fdocuments.in/reader034/viewer/2022050222/5f67b0917ae0213310191186/html5/thumbnails/6.jpg)
8/28/08 Beveridge & Diamond, PC 6
SCOPE OF PROBLEMSCOPE OF PROBLEM
s Many current and future sediment sites not on NPLs Even non-mega sites present complex
problems and high costss E.g., Bayou d’Inde, Calcasieu Parish, La:
~ 5 miles of bayou, marshes, and mud flats~ EPA did RI; sampling data poor~ 4.5 years for PRPs to complete FS (CAS)~ $25 million remedy if agencies accept
recommendations
![Page 7: Mud-Wrestling Without the Glamour for... · 8/28/08 Beveridge & Diamond, PC 3 SCOPE OF PROBLEM sSediment sites increasing in number, size, cost. Trend likely will continue. s2004](https://reader034.fdocuments.in/reader034/viewer/2022050222/5f67b0917ae0213310191186/html5/thumbnails/7.jpg)
8/28/08 Beveridge & Diamond, PC 7
EPA ACTIVITY AT SEDIMENT SITESEPA ACTIVITY AT SEDIMENT SITES
s Apr. 1998: Contaminated Sediment Management Strategys Feb. 2002: 11 Sediment
Management Principless Dec. 2005: 220-page Contaminated
Sediment Remediation guidance
![Page 8: Mud-Wrestling Without the Glamour for... · 8/28/08 Beveridge & Diamond, PC 3 SCOPE OF PROBLEM sSediment sites increasing in number, size, cost. Trend likely will continue. s2004](https://reader034.fdocuments.in/reader034/viewer/2022050222/5f67b0917ae0213310191186/html5/thumbnails/8.jpg)
8/28/08 Beveridge & Diamond, PC 8
EPA ACTIVITY AT SEDIMENT SITESEPA ACTIVITY AT SEDIMENT SITES
s More than 60 Tier 1 Sites (>10K cy to be removed or >5 acres to be capped) (# Tier 1 sites fluctuates)~ EPA tracking over 98 areas within
these sites~ Mostly PCBs, metals, PAHs~ 50% had removal as sole remedy~ 33% included capping or MNR~ <10% had capping or MNR as sole
remedy
![Page 9: Mud-Wrestling Without the Glamour for... · 8/28/08 Beveridge & Diamond, PC 3 SCOPE OF PROBLEM sSediment sites increasing in number, size, cost. Trend likely will continue. s2004](https://reader034.fdocuments.in/reader034/viewer/2022050222/5f67b0917ae0213310191186/html5/thumbnails/9.jpg)
8/28/08 Beveridge & Diamond, PC 9
EPA ACTIVITY AT SEDIMENT SITESEPA ACTIVITY AT SEDIMENT SITES
s Projects just keep getting larger~ Hudson: 2.6M cy dredging, $450M~ Lower Fox (OUs 2-5): Initially 7.3M cy
dredging, now 3.5M cy dredging + 650 acres of cap or sand cover, $600M
~ Lower Passaic: FFS evaluated dredging alternatives ranging from 1M-11M cy, with costs ranging from $0.9B-$2.3B
![Page 10: Mud-Wrestling Without the Glamour for... · 8/28/08 Beveridge & Diamond, PC 3 SCOPE OF PROBLEM sSediment sites increasing in number, size, cost. Trend likely will continue. s2004](https://reader034.fdocuments.in/reader034/viewer/2022050222/5f67b0917ae0213310191186/html5/thumbnails/10.jpg)
8/28/08 Beveridge & Diamond, PC 10
EPA PERSPECTIVESEPA PERSPECTIVES
s Headquarters vs. Regions~ Contaminated Sediments Technical
Advisory Group~ National Remedy Review Board
s Sediment PCBs and TSCAs RPMs and Project Coordinatorss EPA vs. States; learning curvess Implications for site strategies
![Page 11: Mud-Wrestling Without the Glamour for... · 8/28/08 Beveridge & Diamond, PC 3 SCOPE OF PROBLEM sSediment sites increasing in number, size, cost. Trend likely will continue. s2004](https://reader034.fdocuments.in/reader034/viewer/2022050222/5f67b0917ae0213310191186/html5/thumbnails/11.jpg)
8/28/08 Beveridge & Diamond, PC 11
UNIQUE CHALLENGESUNIQUE CHALLENGES
s Human health – fish consumption advisories, direct contact, links to natural resource damagess Ecological health – bottom of food
chain, bioaccumulation risks, links to natural resource damagess Exceptional need for risk
management, including risk of remedy
![Page 12: Mud-Wrestling Without the Glamour for... · 8/28/08 Beveridge & Diamond, PC 3 SCOPE OF PROBLEM sSediment sites increasing in number, size, cost. Trend likely will continue. s2004](https://reader034.fdocuments.in/reader034/viewer/2022050222/5f67b0917ae0213310191186/html5/thumbnails/12.jpg)
8/28/08 Beveridge & Diamond, PC 12
UNIQUE CHALLENGES (cont.)UNIQUE CHALLENGES (cont.)
s Political challenges ~Visibility; campaign fodder ~Multiple federal and state
agencies; turf battles~Local political bodies may be both
PRPs and potential beneficiaries~Potential for legislative interest
(pro and con)
![Page 13: Mud-Wrestling Without the Glamour for... · 8/28/08 Beveridge & Diamond, PC 3 SCOPE OF PROBLEM sSediment sites increasing in number, size, cost. Trend likely will continue. s2004](https://reader034.fdocuments.in/reader034/viewer/2022050222/5f67b0917ae0213310191186/html5/thumbnails/13.jpg)
8/28/08 Beveridge & Diamond, PC 13
UNIQUE CHALLENGES (cont.)UNIQUE CHALLENGES (cont.)
s Community relations challenges~National and local citizen groups~A River Runs Through It
s Private lawsuit risks (floodplains)~Rockwell/Town Branch Creek (KY)~Dow/Tittabawassee River (MI)
![Page 14: Mud-Wrestling Without the Glamour for... · 8/28/08 Beveridge & Diamond, PC 3 SCOPE OF PROBLEM sSediment sites increasing in number, size, cost. Trend likely will continue. s2004](https://reader034.fdocuments.in/reader034/viewer/2022050222/5f67b0917ae0213310191186/html5/thumbnails/14.jpg)
8/28/08 Beveridge & Diamond, PC 14
UNIQUE CHALLENGES (cont.)UNIQUE CHALLENGES (cont.)
s Atypical allocation issues~ Rivers, harbors, estuaries = “linear”
sites~ Often large geographic areas~ Like groundwater basins, but the dirt
moves too~ Multiple sources over space and time~ Geographic divisibility among sources?~ Fate and transport issues
(hydrodynamics)
![Page 15: Mud-Wrestling Without the Glamour for... · 8/28/08 Beveridge & Diamond, PC 3 SCOPE OF PROBLEM sSediment sites increasing in number, size, cost. Trend likely will continue. s2004](https://reader034.fdocuments.in/reader034/viewer/2022050222/5f67b0917ae0213310191186/html5/thumbnails/15.jpg)
8/28/08 Beveridge & Diamond, PC 15
COPING WITH THE CHALLENGESCOPING WITH THE CHALLENGES
s Topics to cover:~Coping with EPA~Coping with States~Coping with Groups~Coping with natural resource
trustees~Allocation at multiparty sediment
sites
![Page 16: Mud-Wrestling Without the Glamour for... · 8/28/08 Beveridge & Diamond, PC 3 SCOPE OF PROBLEM sSediment sites increasing in number, size, cost. Trend likely will continue. s2004](https://reader034.fdocuments.in/reader034/viewer/2022050222/5f67b0917ae0213310191186/html5/thumbnails/16.jpg)
8/28/08 Beveridge & Diamond, PC 16
COPING WITH EPACOPING WITH EPA
s EPA knocks on the door (sends a notice of potential liability) and asks if you want to come out and play.s Your response?
“This ain’t just rock salt in this shotgun”
“Talk to [Acme] Corporation”“Give me a little time, then let’s talk”
![Page 17: Mud-Wrestling Without the Glamour for... · 8/28/08 Beveridge & Diamond, PC 3 SCOPE OF PROBLEM sSediment sites increasing in number, size, cost. Trend likely will continue. s2004](https://reader034.fdocuments.in/reader034/viewer/2022050222/5f67b0917ae0213310191186/html5/thumbnails/17.jpg)
8/28/08 Beveridge & Diamond, PC 17
COPING WITH EPA (cont.)COPING WITH EPA (cont.)
s Evaluate:~ Liability~ # PRPs – Opportunity to form Group?~ Potential costs~ Likely alternatives
s Individual vs. Group interestss The power of numberss Examples: Fox River, Berry’s Creek
![Page 18: Mud-Wrestling Without the Glamour for... · 8/28/08 Beveridge & Diamond, PC 3 SCOPE OF PROBLEM sSediment sites increasing in number, size, cost. Trend likely will continue. s2004](https://reader034.fdocuments.in/reader034/viewer/2022050222/5f67b0917ae0213310191186/html5/thumbnails/18.jpg)
8/28/08 Beveridge & Diamond, PC 18
COPING WITH STATESCOPING WITH STATES
s The State environmental agency sends a notice of potential liability and asks if you want to come out and play.s See factors regarding response to
EPA, plus:~ Should EPA be involved?~ Should Jawetz get his head examined?~ Tittabawassee River example
![Page 19: Mud-Wrestling Without the Glamour for... · 8/28/08 Beveridge & Diamond, PC 3 SCOPE OF PROBLEM sSediment sites increasing in number, size, cost. Trend likely will continue. s2004](https://reader034.fdocuments.in/reader034/viewer/2022050222/5f67b0917ae0213310191186/html5/thumbnails/19.jpg)
8/28/08 Beveridge & Diamond, PC 19
COPING WITH GROUPSCOPING WITH GROUPS
s In response to an earlier notice from EPA or the State, a Group has formed.s The Group sends a notice and asks if you
want to come out and play.s See factors regarding response to EPA,
plus:~ What does/will EPA/State think of me?~ What will the Group do?~ Transaction cost evaluation~ Buying peace of mind; power of numbers
![Page 20: Mud-Wrestling Without the Glamour for... · 8/28/08 Beveridge & Diamond, PC 3 SCOPE OF PROBLEM sSediment sites increasing in number, size, cost. Trend likely will continue. s2004](https://reader034.fdocuments.in/reader034/viewer/2022050222/5f67b0917ae0213310191186/html5/thumbnails/20.jpg)
8/28/08 Beveridge & Diamond, PC 20
COPING WITH NR TRUSTEESCOPING WITH NR TRUSTEES
s The natural resource trustee agencies have formed a Trustee Council. The Council sends a notice of potential liability and Pre-Assessment Screen and asks if you want to come out and play.s Your response?
![Page 21: Mud-Wrestling Without the Glamour for... · 8/28/08 Beveridge & Diamond, PC 3 SCOPE OF PROBLEM sSediment sites increasing in number, size, cost. Trend likely will continue. s2004](https://reader034.fdocuments.in/reader034/viewer/2022050222/5f67b0917ae0213310191186/html5/thumbnails/21.jpg)
8/28/08 Beveridge & Diamond, PC 21
COPING WITH NR TRUSTEES (cont.)COPING WITH NR TRUSTEES (cont.)
s See separate talk on cooperative NRDAs.
Easiest to remember: If pay when play, OK. If pay, but can’t play, not OK.
s Closely related issue: RI/FS beginning or underway. Reach out to NR Trustees?~ What will they otherwise do?~ Pros and cons
![Page 22: Mud-Wrestling Without the Glamour for... · 8/28/08 Beveridge & Diamond, PC 3 SCOPE OF PROBLEM sSediment sites increasing in number, size, cost. Trend likely will continue. s2004](https://reader034.fdocuments.in/reader034/viewer/2022050222/5f67b0917ae0213310191186/html5/thumbnails/22.jpg)
8/28/08 Beveridge & Diamond, PC 22
ALLOCATION ISSUESALLOCATION ISSUES
s Somewhat akin to groundwater plumes from multiple sources to a regional aquifer (but the dirt moves too!)s Impacts of flow direction and speed,
time, commingling, deposition, resuspension, degradation, human activities (e.g., dredging)s Multiple contaminants with differing
impacts on risks, remedy, NRD?
![Page 23: Mud-Wrestling Without the Glamour for... · 8/28/08 Beveridge & Diamond, PC 3 SCOPE OF PROBLEM sSediment sites increasing in number, size, cost. Trend likely will continue. s2004](https://reader034.fdocuments.in/reader034/viewer/2022050222/5f67b0917ae0213310191186/html5/thumbnails/23.jpg)
8/28/08 Beveridge & Diamond, PC 23
ALLOCATION ISSUES (cont.)ALLOCATION ISSUES (cont.)
s Little case law on allocation at sediment sites; potential advantages of ADRs Volume of discharges (total loadings)
usually far too simplistic (but see Fort James/Fox River NRD settlement…)s Likely need to factor in location, time, fate
and transport features (and toxicity?)s Allocations of study, remedy, NRD costs
may all differ – different factorss May need to break site down into sub-
areas to preserve manageability
![Page 24: Mud-Wrestling Without the Glamour for... · 8/28/08 Beveridge & Diamond, PC 3 SCOPE OF PROBLEM sSediment sites increasing in number, size, cost. Trend likely will continue. s2004](https://reader034.fdocuments.in/reader034/viewer/2022050222/5f67b0917ae0213310191186/html5/thumbnails/24.jpg)
8/28/08 Beveridge & Diamond, PC 24
USEFUL INFORMATION SOURCESUSEFUL INFORMATION SOURCES
s Contaminated Sediment Remediation Guidance (EPA 2005)s Superfund Sediment Resource Centers “Risk Management Strategy for PCB
Contaminated Sediments” (NAS 2001)s “Sediment Dredging at Superfund
Megasites: Assessing the Effectiveness” (NAS 2007)s Sediment Management Work Groups ABA/SEER/Sidley Austin reference list