Risk Management inDesign and BuildHospital Projects
Supervisor: Prof. Dr. K.C.Iyer
Presented by: Archana . N
2011CC!"0!
-
7/27/2019 MTP1.pptx
2/9
IntroductionConstruction is an art of convertin# p$ans and specifications into physica$
structures and faci$ities under different contractin# syste%s.
&raditiona$ construction de$ivery syste%s' bein# too s$o( and e)pensive'
contractors and o(ners are turnin# to(ards Desi#n * +ui$d syste%s.
,ospita$ pro-ects bein# co%p$e) in nature due to on#oin# deve$op%ents in
hea$th care p$annin# and techno$o#y and $on# desi#n and construction
periods' Desi#n * +ui$d concepts is %ore preferred by o(ner (hen they
tend to transfer %ost riss to contractors.
-
7/27/2019 MTP1.pptx
3/9
Need for StudyA sin#$e entity acceptin# the responsibi$ity for desi#n and construction
%eans it is assu%in# a$$ the riss invo$ved.
/ac of fa%i$iarity of Desi#n * +ui$d syste%s in India is due to the $ess
co#niance of these riss invo$ved. &his in turn $eads to e)tra ordinary
c$ai%s and e)tension of ti%e fro% contractor forcin# o(ner to be$ieve
that Desi#n * +ui$d (as probab$y not a correct option.
,ence is %ana#e%ent in Desi#n * +ui$d pro-ect is necessary to obtain
the ey indices ensurin# #ood profitabi$ity or botto% $ine.
-
7/27/2019 MTP1.pptx
4/9
/iterature SurveyAs pro-ect co%petition beco%es hi#her' contractors have to device %ore a(areness
of ris and strate#ie on assessin#' %ode$in#' ana$yin# and %iti#atin# the riss
3..3#unsan%i' 3. A. Sa$ao' and 3. 4. A-ayi ' 20115'
6uantitative fau$t7tree ana$ysis usin# 8uy arith%etic operations a$$o(s the e)perts
to $in#uistica$$y assess the probabi$ity of occurrence of basic events' (hich in turn
he$ps in estab$ishin# %ore effective ris response strate#ies 4oha%ed Abde$#a(ad'
A%inah obinson 8aye' 20115.
is ana$ysts tend to assu%e probabi$ity distributions of basic events' (hich adds
further uncertainty to the ana$ysis. &his cou$d be overco%e by usin# fuy arith%etic
operations for probabi$ity distributions. 4oha%ed Abde$#a(ad ' A%inah obinson
8aye ' 8ernando 4artine' 20105.
-
7/27/2019 MTP1.pptx
5/9
3b-ectives and Scope3b-ectives:
&o identify critica$ riss in a Desi#n * +ui$d ,ospita$ Pro-ect.
&o deve$op a fuy fau$t tree %ode$ to identify root causes ofthese critica$ riss
&o assess probabi$ity of fai$ure of the desi#n7bui$d process due
to the above critica$ riss.
Scope :
&he scope of the pro-ect is restricted to the riss invo$ved (ith the
contractors of Desi#n * +ui$d pro-ects.
-
7/27/2019 MTP1.pptx
6/9
4ethodo$o#y
-
7/27/2019 MTP1.pptx
7/9
-
7/27/2019 MTP1.pptx
8/9
eferences:
Abdelgawad, Mohamed & Fayek, Aminah Robinson. Fuzzy Reliability Analyzer (2011.
!uantitati"e Assessment o# Risk $"ents in the %onstrution 'ndustry sing Fuzzy Fault)
*ree Analysis. +ournal o# %onstrution $ngineering and Management.
gunsanmi, $. , -alako, A., Aayi, M. (2011 Risk %lassi#iation Model #or /esign
and uild roets. +ournal o# $ngineering roet and rodution Management
Mohamed Abdelgawad , Aminah Robinson Fayek , Fernando Martinez, 2010 .
!uantitati"e Assessment o# orizontal /iretional /rilling roet Risk sing Fuzzy Fault
*ree Analysis .%onstrution Researh %ongress 2010
3arimiazari, Amirreza., Mousa"i, 4eda., Mousa"i, - Farid., osseini, -eyedbagher (2011.
$56ert -ystems with A66liations Risk assessment model seletion in onstrution
industry. %onstrution Management and $onomis
-
7/27/2019 MTP1.pptx
9/9
6uestions on first presentation:esearch p$an
Desi#n bui$d in hospita$ pro-ects777 ob-ective
%ention 99,ospita$ -ust an e#