    Risk Management inDesign and BuildHospital Projects

    Supervisor: Prof. Dr. K.C.Iyer

    Presented by: Archana . N

    2011CC!"0!

  • 7/27/2019 MTP1.pptx

    2/9

    IntroductionConstruction is an art of convertin# p$ans and specifications into physica$

    structures and faci$ities under different contractin# syste%s.

    &raditiona$ construction de$ivery syste%s' bein# too s$o( and e)pensive'

    contractors and o(ners are turnin# to(ards Desi#n * +ui$d syste%s.

    ,ospita$ pro-ects bein# co%p$e) in nature due to on#oin# deve$op%ents in

    hea$th care p$annin# and techno$o#y and $on# desi#n and construction

    periods' Desi#n * +ui$d concepts is %ore preferred by o(ner (hen they

    tend to transfer %ost riss to contractors.

  • 7/27/2019 MTP1.pptx

    3/9

    Need for StudyA sin#$e entity acceptin# the responsibi$ity for desi#n and construction

    %eans it is assu%in# a$$ the riss invo$ved.

    /ac of fa%i$iarity of Desi#n * +ui$d syste%s in India is due to the $ess

    co#niance of these riss invo$ved. &his in turn $eads to e)tra ordinary

    c$ai%s and e)tension of ti%e fro% contractor forcin# o(ner to be$ieve

    that Desi#n * +ui$d (as probab$y not a correct option.

    ,ence is %ana#e%ent in Desi#n * +ui$d pro-ect is necessary to obtain

    the ey indices ensurin# #ood profitabi$ity or botto% $ine.

  • 7/27/2019 MTP1.pptx

    4/9

    /iterature SurveyAs pro-ect co%petition beco%es hi#her' contractors have to device %ore a(areness

    of ris and strate#ie on assessin#' %ode$in#' ana$yin# and %iti#atin# the riss

    3..3#unsan%i' 3. A. Sa$ao' and 3. 4. A-ayi ' 20115'

    6uantitative fau$t7tree ana$ysis usin# 8uy arith%etic operations a$$o(s the e)perts

    to $in#uistica$$y assess the probabi$ity of occurrence of basic events' (hich in turn

    he$ps in estab$ishin# %ore effective ris response strate#ies 4oha%ed Abde$#a(ad'

    A%inah obinson 8aye' 20115.

    is ana$ysts tend to assu%e probabi$ity distributions of basic events' (hich adds

    further uncertainty to the ana$ysis. &his cou$d be overco%e by usin# fuy arith%etic

    operations for probabi$ity distributions. 4oha%ed Abde$#a(ad ' A%inah obinson

    8aye ' 8ernando 4artine' 20105.

  • 7/27/2019 MTP1.pptx

    5/9

    3b-ectives and Scope3b-ectives:

    &o identify critica$ riss in a Desi#n * +ui$d ,ospita$ Pro-ect.

    &o deve$op a fuy fau$t tree %ode$ to identify root causes ofthese critica$ riss

    &o assess probabi$ity of fai$ure of the desi#n7bui$d process due

    to the above critica$ riss.

    Scope :

    &he scope of the pro-ect is restricted to the riss invo$ved (ith the

    contractors of Desi#n * +ui$d pro-ects.

  • 7/27/2019 MTP1.pptx

    6/9

    4ethodo$o#y

  • 7/27/2019 MTP1.pptx

    7/9

  • 7/27/2019 MTP1.pptx

    8/9

    eferences:

    Abdelgawad, Mohamed & Fayek, Aminah Robinson. Fuzzy Reliability Analyzer (2011.

    !uantitati"e Assessment o# Risk $"ents in the %onstrution 'ndustry sing Fuzzy Fault)

    *ree Analysis. +ournal o# %onstrution $ngineering and Management.

    gunsanmi, $. , -alako, A., Aayi, M. (2011 Risk %lassi#iation Model #or /esign

    and uild roets. +ournal o# $ngineering roet and rodution Management

    Mohamed Abdelgawad , Aminah Robinson Fayek , Fernando Martinez, 2010 .

    !uantitati"e Assessment o# orizontal /iretional /rilling roet Risk sing Fuzzy Fault

    *ree Analysis .%onstrution Researh %ongress 2010

    3arimiazari, Amirreza., Mousa"i, 4eda., Mousa"i, - Farid., osseini, -eyedbagher (2011.

    $56ert -ystems with A66liations Risk assessment model seletion in onstrution

    industry. %onstrution Management and $onomis

  • 7/27/2019 MTP1.pptx

    9/9

    6uestions on first presentation:esearch p$an

    Desi#n bui$d in hospita$ pro-ects777 ob-ective

    %ention 99,ospita$ -ust an e#