description

MSRC FYs 2012-14 Work Program. Presentation to Coachella Valley Clean Cities July 2013. In 1990, the legislature authorized collection of $4 per vehicle surcharge Revenues directed toward reduction of motor vehicle pollution - PowerPoint PPT Presentation

Transcript of MSRC FYs 2012-14 Work Program

Page 1: MSRC FYs 2012-14 Work Program

MSRC FYs 2012-14Work Program

Presentation to Coachella Valley Clean CitiesJuly 2013

Page 2: MSRC FYs 2012-14 Work Program

Funding Investments in Clean Air

In 1990, the legislature authorized collection of $4 per vehicle surcharge

Revenues directed toward reduction of motor vehicle pollution Within SCAQMD, 40% of fees collected are subvened to

cities and counties 30% are allocated by the Mobile Source Air Pollution

Reduction Review Committee (MSRC) Approximately $14 million in Clean Transportation

Funding from MSRC distributed annually

Page 3: MSRC FYs 2012-14 Work Program

“Snapshot” of the MSRC Work Program Development Process

Work Program development kicks off with joint MSRC/MSRC-TAC Retreat

MSRC approves Work Program categories and directs MSRC-TAC to develop solicitation materials/evaluation criteria, as needed

MSRC approves solicitation materials and sends to AQMD Board for approval

MSRC-TAC reviews, scores, and ranks projects; forwards recommended project list to MSRC

MSRC deliberates on proposed work program and approves awards

MSRC forwards final work program to AQMD Governing Board for approval/disapproval

Page 4: MSRC FYs 2012-14 Work Program

Local Government Match Program

Implemented in Two Waves… Recommended Program Structure:

Consistent with previous Local Match categories (Alt-Fuel Infrastructure, EV Infrastructure, Medium & Heavy-Duty Vehicles, & Street Sweeping in the Coachella Valley)

Addition of Bicycle Programs Category (including but not limited to bike lanes, etc.)

Page 5: MSRC FYs 2012-14 Work Program

Alternative Fuel Infrastructure Program

Retains Key Features of Most Recent Infrastructure Program: Broad based incentive “matrix” offers something for almost

every entity – public/private, new & expanded, etc. Sliding scale for public versus private entity, multiple fuels &

public accessibility Increases funding increment for L/CNG station construction

Page 6: MSRC FYs 2012-14 Work Program

On-Road Vehicle Programs

Incentives for New Alternative Fuel School Bus Acquisitions “Per bus” incentive levels will be lowered to reflect actual

incremental costs Incentives for the Purchase of “Zero-Emission” & “Near Zero” Emission

Medium Heavy-Duty Trucks Provide incentives for the purchase of zero & “near-zero”

emission trucks in the 14,001 – 26,000 pound GVWR weight categories.

Near Zero Vehicle Purchases will be Required to Demonstrate the Early Retirement (i.e., scrapping) of Older Diesel or Gasoline Vehicles in Order to Qualify for an MSRC Incentive.

Scrapping Requirement would not be Applicable to the Purchase of New Zero-Emission Vehicles

Page 7: MSRC FYs 2012-14 Work Program

Off-Road Vehicle Programs

Advanced Low-emission Off-road Construction Equipment Technologies Potential to partner with the California Air Resources Board

AQIP Advanced Technology Demonstration Program Off-road Construction Equipment Technologies include, but are

not Limited to, Hybrid-Electric, Hybrid-Hydraulic, & Zero-Emission Off-Road Equipment

Zero-Emission Ground Support Equipment at Major Airports (eGSE) Provide incentives to Airlines & Cargo Handling Facilities at

Major Southland Airports to Acquire Zero-Emission Ground Support Equipment, Primarily Battery Electric (eGSE), & install Charging Infrastructure on the Airfield

Page 8: MSRC FYs 2012-14 Work Program

Off-Road Vehicle Programs, cont.

Zero-Emission Cargo Handling Equipment for Goods Movement Provide incentives to marine terminal operators & distribution

facility operators to purchase zero-emission cargo handling equipment

Opportunity to partner with SCAQMD & potentially ARB in the electrification of rubber-tired gantry cranes (eRTGs).

Page 9: MSRC FYs 2012-14 Work Program

Transportation Control Measures Programs

Event Center category already “on the street” Signal Synchronization Program

Partner with Transportation Commissions, Local Governments to implement signal synchronization projects

Goal is to leverage other sources of funding – Measure funding, CMAQ, etc.

“First Mile-Last Mile” Transportation Options at Transit Centers (with a Bicycle Focus) Addresses public transit users, especially rail, & offers options for

commute end transportation Works at “both ends” of a commute – scale of facilities may differ

depending on need

Page 10: MSRC FYs 2012-14 Work Program

FYs 2012-14 MSRC Work Program Categories

Local Government Match Program $11,000,000Alternative Fuel Vehicle Refueling Infrastructure $7,500,000Alternative Fuel School Bus Buydown $2,000,000Medium-Heavy Duty Advanced Technology Vehicles $3,500,000Advanced Low-Emission Off-Road Construction Equipment $1,500,000Zero-Emission Ground Support Equipment $3,500,000Zero-Emission Goods Movement Cargo Handling Equipment $2,000,000Event Center Transportation Services $4,000,000Signal Synchronization Program $5,000,000“First-Mile/Last-Mile” Transportation Options $2,500,000Total $42,500,000

Page 11: MSRC FYs 2012-14 Work Program

Next Steps

Several solicitations anticipated to be released in September 2013 Visit website for more information on RFPs and to sign up for automatic

notifications of funding opportunities

www.CleanTransportationFunding.org

Page 12: MSRC FYs 2012-14 Work Program

AB 118 Infrastructure Funding Programs and Opportunities

Dean Saito, South Coast AQMD

Page 13: MSRC FYs 2012-14 Work Program

AB118Background

Approved 2007Established:

ARB Air Quality Improvement Program (AQIP) - $50 million /year (statewide)CEC Alternative and Renewable Fuel & Vehicle Technology Program (ARFVT) - $100 million/year (statewide)BAR Enhanced Fleet Modernization Program (EFMP) - $30 million/year (statewide)

Page 14: MSRC FYs 2012-14 Work Program

Alternative and Renewable Fuel & Vehicle Technology Program

Develop/Deploy Alt and Renewable Fuels and Advanced Transportation TechnologiesAttainment of State Climate Change PoliciesInfrastructure Development

Expand Fuel Infrastructure, Fueling Stations and EquipmentExpand Infrastructure for Existing Fleets, Public Transit and Transportation Corridors

Page 15: MSRC FYs 2012-14 Work Program

Alternative Transportation FuelsElectricityNatural GasBiomethanePropaneHydrogenGasoline Substitute FuelsDiesel Substitute Fuels

Page 16: MSRC FYs 2012-14 Work Program

AB 118 Infrastructure Projects Funded to Date, Statewide (Millions)

Electric Vehicle Charging $17.4Hydrogen Fueling $18.7E85 Fueling $5.0Upstream Biodiesel $3.9Natural Gas Fueling $5.1Propane Fueling --

Page 17: MSRC FYs 2012-14 Work Program

Project Funding Allocationsfor 2012 – 2013 FY (millions)

Electric Vehicle Charging $7.5Hydrogen Fueling $11.0E85 Fueling $1.5Upstream Biodiesel --Natural Gas Fueling $1.5($9.6)*Propane Fueling --

* Remaining Funds from previous FY’s, California Energy Commission 2012- 2013 Investment Plan Update, Statewide

Page 18: MSRC FYs 2012-14 Work Program

Most Recent CNG Infrastructure Project Awards –SCAQMD

FirstCNG $300,000City of Santa Clarita $300,000Murrieta Valley USD $300,000Waste Management $300,000City of Anaheim $292,760California Clean Fuels $83,000(R.F. Dickson)