METHOD STATEMENT
GERBANG PERDANA S B(RoC No. 469478-X)
No. 3, Jalan 222,46100 P!al"n# Ja$a,Slan#o% Da%&l E'an
For Lift Works
Pa# No. 1 o* 21
R+""on No. 2.0
& 7.6.04
MSR-CIQ02-M-032-R2.0
AUTHORIZATIONANDRECORD
R!. Ds"ri#tio$%r#&r' ()
*Co$tr&"tor+
R!i,' ()
*Co$st&$t+
A##ro!' ()
*/%+D&t
1.1S"on/on#
2.0S"on/on#
I#ort&$t
' "n*o%a!"on on!a"n '%"n " !' %o%"!a%$ %o%!$ o* G%an#P%ana Sn. B'. ! 'all no! %%o&, o", %+al, &l"', o%"!%"&! "n 'ol o% a%!l$ "!'o&! a&!'o%"5a!"on.
TA1LEOFCONTENTS
Rf Ds"ri#tio$ %& No.
1.0 NRDCN............................................................................................................
2.0 SCPE / RS.......................................................................................................
3.0 R SE:ENCE /;............................................................................................
4.0
-
7/23/2019 MSR Format.doc
2/29
METHOD STATEMENT
GERBANG PERDANA S B(RoC No. 469478-X)
No. 3, Jalan 222,46100 P!al"n# Ja$a,Slan#o% Da%&l E'an
For Lift Works
Pa# No. 2 o* 21
R+""on No. 2.0
& 7.6.04
MSR-CIQ02-M-032-R2.0
1.0 Introduction
The purpose of this method statement is to describe and define the process
flow for the installation of lifts.To ensure that the work is carried out in a
controlled and systematic manner conforming to the specific requirements.
2.0 Scope Of Work
The works covers supply,install and commissioning of the lifts.All materials
and works shall comply with the tender specifications,approved drawings and
samples.
!.0 Work Se"uence F#o$
Kindly refer to A%%&'I (1)
MSR FORMAT CM-MSR-01 (B)
-
7/23/2019 MSR Format.doc
3/29
METHOD STATEMENT
GERBANG PERDANA S B(RoC No. 469478-X)
No. 3, Jalan 222,46100 P!al"n# Ja$a,Slan#o% Da%&l E'an
For Lift Works
Pa# No. 3 o* 21
R+""on No. 2.0
& 7.6.04
MSR-CIQ02-M-032-R2.0
*.0 Met+od St,teent
,ndin/ Oer of ift S+,ft() And ift M,c+ine Roo()
Requirement for handing over the lift shaft(s for commencement of lift
installation are as follows !"
a #tages of floors to be handed over for lift installation shall be
scheduled in accordance with T$#%&s programme and builder master
work programme approved by 'am att #dn.%hd.
b #caffolding to be erected in the lift shaft(s.
c #eparator beams shall be installed if required.
d )rotections shall be provided to prevent seepage of water into the lift
shaft(s.
e To remove all formworks, timbers, or steel bars sticking out along the
internal shaft wall.
f To clear all debris, water and unwanted material in the lift pit(s.
g Kerbs shall be provided at every lift entrance to prevent water from
flowing into the lift shaft(s.
h Temporary power supply for lightings, power hand tools and light
power machinery shall be provided.
i *ift door opening, lift well entrance and trap door hole shall be
protected at all time during construction.
+ A covered storage area at site will be allocated to lift equipment upon
the delivery of equipment. All items shall be stacked up properly andin safest possible way during storage to keep away from rain and
MSR FORMAT CM-MSR-01 (B)
-
7/23/2019 MSR Format.doc
4/29
METHOD STATEMENT
GERBANG PERDANA S B(RoC No. 469478-X)
No. 3, Jalan 222,46100 P!al"n# Ja$a,Slan#o% Da%&l E'an
For Lift Works
Pa# No. 4 o* 21
R+""on No. 2.0
& 7.6.04
MSR-CIQ02-M-032-R2.0
ground dirt and electronic parts shall be protected from rain, dust and
dirt before installation.
MSR FORMAT CM-MSR-01 (B)
-
7/23/2019 MSR Format.doc
5/29
-
7/23/2019 MSR Format.doc
6/29
METHOD STATEMENT
GERBANG PERDANA S B(RoC No. 469478-X)
No. 3, Jalan 222,46100 P!al"n# Ja$a,Slan#o% Da%&l E'an
For Lift Works
Pa# No. 6 o* 21
R+""on No. 2.0
& 7.6.04
MSR-CIQ02-M-032-R2.0
*.0 Appro,# of %#uin/ Reu#t - Se"uence !
The plumbing result of the lift shaft(s shall be submitted to $ain ontractor
for approval before works can further proceed. $ain ontractor shall
undertake to carry out shaft wall rectification works if any, after the approval
of plumbing result.
3.0 F,ric,tion of 4uide R,i# Br,cket - Se"uence *
3uide rail brackets shall be custom made to meet the lift shaft(s conditions
with the plumbing result approved by $ain ontractor.
5.0 Int,## ,ndin/ oor Fr,e - Se"uence 3
The landing door frame will be installed at position described in the plumbing
result approved by $ain ontractor. %efore commencement of door frame
installation, the $ain ontractor will provide inished loor *evel marked at
the lift lobby area as well as the position for mounting of the landing board
and indicator bo-es if required.
6.0 Int,## S+,ft Wirin/ - Se"uence 5
4lectrical trunkings and wirings will be installed along the shaft wall and on
the lift motor"room floor. $aterial sample will be submitted for consultant
approval. )ower cables will run in trunkings separate from that of control
cables.
7.0 Int,## M,c+ine Roo &"uipent - Se"uence 6
)rovision of access must be made available for heavy lift equipment moving
into the lift machine room. 5oisting of the lift machine and the controllers
from the ground to the building roof is by means of tower crane. The hoisting
machine weighs about 6788 kg and has to be lifted onto concrete plinths.
5oisting hooks or beams shall be provided in the lift machine room as per
T$#% drawings to facilitate the hoisting process.
MSR FORMAT CM-MSR-01 (B)
-
7/23/2019 MSR Format.doc
7/29
-
7/23/2019 MSR Format.doc
8/29
METHOD STATEMENT
GERBANG PERDANA S B(RoC No. 469478-X)
No. 3, Jalan 222,46100 P!al"n# Ja$a,Slan#o% Da%&l E'an
For Lift Works
Pa# No. 8 o* 21
R+""on No. 2.0
& 7.6.04
MSR-CIQ02-M-032-R2.0
12. 4routin/ of ,ndin/ oor Fr,e - Se"uence 11
$ain ontractor will continue with his work to the lift lobby wall until the
door frames. All gaps between frames and wall and between wall and
indicatorbutton bo-es has to be sealed or cement filled by the $ain
ontractor. All these are to be completed in shortest possible time to avoid
interrupting of lift installation schedule.
1!.0 Int,## ,ndin/ oor %,ne# - Se"uence 12
T$#% will proceed with the installation of landing door panels after the
completion of door frame in"fill by $ain ontractor.
1*.0 Ae#: of C,r; Counter-Wei/+t Fr,e; M,c+ine Roo Wirin/ And
&tc. - Se"uence 1!
Assembly of lift car(s will be carried out at the lowest possible level such as
the main level. $ain ontractor has to construct the buffer plinths in the lift
pit(s prior to the assembly of car(s. ounter"weight frames and blocks will
be assembled at the highest possible level of lift shaft(s. $achine room
wiring will commence as soon as the equipment in the lift machine room is
installed in position.
13.0 Ropin/ And S+,ft &"uipent - Se"uence 1*
>nstallation of hoisting ropes shall commence as soon as the assembly of car
and counter"weight are completed.
15.0 ift Interior Fini+e - Se"uence 13
At this time, the scaffolding in the hoist"way(s should be dismantled. The lift
car(s should then be suspended via hoisting ropes and is able to move
manually by means of winding the hoisting motor in the lift machine room.
The interior finishes in the lift car shall commence before the testing andcommissioning of the lift(s.
MSR FORMAT CM-MSR-01 (B)
-
7/23/2019 MSR Format.doc
9/29
METHOD STATEMENT
GERBANG PERDANA S B(RoC No. 469478-X)
No. 3, Jalan 222,46100 P!al"n# Ja$a,Slan#o% Da%&l E'an
For Lift Works
Pa# No. 9 o* 21
R+""on No. 2.0
& 7.6.04
MSR-CIQ02-M-032-R2.0
12. 4routin/ of ,ndin/ oor Fr,e - Se"uence 11
$ain ontractor will continue with his work to the lift lobby wall until the
door frames. All gaps between frames and wall and between wall and
indicatorbutton bo-es has to be sealed or cement filled by the $ain
ontractor. All these are to be completed in shortest possible time to avoid
interrupting of lift installation schedule.
1!.0 Int,## ,ndin/ oor %,ne# - Se"uence 12
T$#% will proceed with the installation of landing door panels after the
completion of door frame in"fill by $ain ontractor.
1*.0 Ae#: of C,r; Counter-Wei/+t Fr,e; M,c+ine Roo Wirin/ And
&tc. - Se"uence 1!
Assembly of lift car(s will be carried out at the lowest possible level such as
the main level. $ain ontractor has to construct the buffer plinths in the lift
pit(s prior to the assembly of car(s. ounter"weight frames and blocks will
be assembled at the highest possible level of lift shaft(s. $achine room
wiring will commence as soon as the equipment in the lift machine room is
installed in position.
13.0 Ropin/ And S+,ft &"uipent - Se"uence 1*
>nstallation of hoisting ropes shall commence as soon as the assembly of car
and counter"weight are completed.
15.0 ift Interior Fini+e - Se"uence 13
At this time, the scaffolding in the hoist"way(s should be dismantled. The lift
car(s should then be suspended via hoisting ropes and is able to move
manually by means of winding the hoisting motor in the lift machine room.The interior finishes in the lift car shall commence before the testing and
commissioning of the lift(s.
MSR FORMAT CM-MSR-01 (B)
-
7/23/2019 MSR Format.doc
10/29
METHOD STATEMENT
GERBANG PERDANA S B(RoC No. 469478-X)
No. 3, Jalan 222,46100 P!al"n# Ja$a,Slan#o% Da%&l E'an
For Lift Works
Pa# No. 10 o* 21
R+""on No. 2.0
& 7.6.04
MSR-CIQ02-M-032-R2.0
12. 4routin/ of ,ndin/ oor Fr,e - Se"uence 11
$ain ontractor will continue with his work to the lift lobby wall until the
door frames. All gaps between frames and wall and between wall and
indicatorbutton bo-es has to be sealed or cement filled by the $ain
ontractor. All these are to be completed in shortest possible time to avoid
interrupting of lift installation schedule.
1!.0 Int,## ,ndin/ oor %,ne# - Se"uence 12
T$#% will proceed with the installation of landing door panels after thecompletion of door frame in"fill by $ain ontractor.
1*.0 Ae#: of C,r; Counter-Wei/+t Fr,e; M,c+ine Roo Wirin/ And
&tc. - Se"uence 1!
Assembly of lift car(s will be carried out at the lowest possible level such as
the main level. $ain ontractor has to construct the buffer plinths in the lift
pit(s prior to the assembly of car(s. ounter"weight frames and blocks will
be assembled at the highest possible level of lift shaft(s. $achine room
wiring will commence as soon as the equipment in the lift machine room is
installed in position.
13.0 Ropin/ And S+,ft &"uipent - Se"uence 1*
>nstallation of hoisting ropes shall commence as soon as the assembly of car
and counter"weight are completed.
15.0 ift Interior Fini+e - Se"uence 13
At this time, the scaffolding in the hoist"way(s should be dismantled. The lift
car(s should then be suspended via hoisting ropes and is able to movemanually by means of winding the hoisting motor in the lift machine room.
MSR FORMAT CM-MSR-01 (B)
-
7/23/2019 MSR Format.doc
11/29
METHOD STATEMENT
GERBANG PERDANA S B(RoC No. 469478-X)
No. 3, Jalan 222,46100 P!al"n# Ja$a,Slan#o% Da%&l E'an
For Lift Works
Pa# No. 11 o* 21
R+""on No. 2.0
& 7.6.04
MSR-CIQ02-M-032-R2.0
The interior finishes in the lift car shall commence before the testing and
commissioning of the lift(s.
MSR FORMAT CM-MSR-01 (B)
-
7/23/2019 MSR Format.doc
12/29
METHOD STATEMENT
GERBANG PERDANA S B(RoC No. 469478-X)
No. 3, Jalan 222,46100 P!al"n# Ja$a,Slan#o% Da%&l E'an
For Lift Works
Pa# No. 12 o* 21
R+""on No. 2.0
& 7.6.04
MSR-CIQ02-M-032-R2.0
3.0 M,teri,#
*ift ar, *ift #haft, 3uide Rail %rackets, *anding ?oor rames, *anding ?oor
)anels, onduits, Trunking, #haft :iring, %uffers, :hisperfle-,
*anding %oard, *anding >ndicator,
-
7/23/2019 MSR Format.doc
13/29
METHOD STATEMENT
GERBANG PERDANA S B(RoC No. 469478-X)
No. 3, Jalan 222,46100 P!al"n# Ja$a,Slan#o% Da%&l E'an
For Lift Works
Pa# No. 13 o* 21
R+""on No. 2.0
& 7.6.04
MSR-CIQ02-M-032-R2.0
7.0 S,fet: < &nironent
Titi $a+u #dn.%hd. #afety and 5ealth )olicy are governed by the attached
ompany #afety )olicy document.
These are set out under the following headings
a %,rt I " The general policy of the company towards safety.
b %,rt II" The general safety regulations enforced by the company.
c %,rt III" The organi@ation and method of implementation of the policy.
COM%A'> SAF&T> %OIC>
%,rt I
4ener,# St,teent
6 The board of ?irectors of this company and > regards the promotion, of 5ealth
and #afety at work as an essential ob+ective for $anagement and 4mployees at
all levels.
/ The ompany is ultimately accountable for implementing #afety and 5ealth
legislation and achieving the ob+ectives of the #afety and 5ealth policy. >n this
respect, it will abide by any odes of practice approved and issued by the #afety
and 5ealth Authority. The ompany will do all that is practicable to ensure safe
methods of working and safer conditions of working throughout the company,
and to protect from foreseeable ha@ards the )ublic insofar as they come into
contact with the ompany and its products. All persons in a supervisory position
are directly responsible for safe methods of conditions of working in their areaof responsibility.
MSR FORMAT CM-MSR-01 (B)
-
7/23/2019 MSR Format.doc
14/29
METHOD STATEMENT
GERBANG PERDANA S B(RoC No. 469478-X)
No. 3, Jalan 222,46100 P!al"n# Ja$a,Slan#o% Da%&l E'an
For Lift Works
Pa# No. 14 o* 21
R+""on No. 2.0
& 7.6.04
MSR-CIQ02-M-032-R2.0
8.0 S,fet: < &nironent
Titi $a+u #dn.%hd. #afety and 5ealth )olicy are governed by the attached
ompany #afety )olicy document.
These are set out under the following headings
a %,rt I " The general policy of the company towards safety.
b %,rt II" The general safety regulations enforced by the company.
c %,rt III" The organi@ation and method of implementation of the policy.
COM%A'> SAF&T> %OIC>
%,rt I
4ener,# St,teent
6 The board of ?irectors of this company and > regards the promotion, of 5ealth
and #afety at work as an essential ob+ective for $anagement and 4mployees at
all levels.
/ The ompany is ultimately accountable for implementing #afety and 5ealth
legislation and achieving the ob+ectives of the #afety and 5ealth policy. >n this
respect, it will abide by any odes of practice approved and issued by the #afety
and 5ealth Authority. The ompany will do all that is practicable to ensure safe
methods of working and safer conditions of working throughout the company,
and to protect from foreseeable ha@ards the )ublic insofar as they come intocontact with the ompany and its products. All persons in a supervisory position
MSR FORMAT CM-MSR-01 (B)
-
7/23/2019 MSR Format.doc
15/29
METHOD STATEMENT
GERBANG PERDANA S B(RoC No. 469478-X)
No. 3, Jalan 222,46100 P!al"n# Ja$a,Slan#o% Da%&l E'an
For Lift Works
Pa# No. 1> o* 21
R+""on No. 2.0
& 7.6.04
MSR-CIQ02-M-032-R2.0
are directly responsible for safe methods of conditions of working in their area
of responsibility.
MSR FORMAT CM-MSR-01 (B)
-
7/23/2019 MSR Format.doc
16/29
METHOD STATEMENT
GERBANG PERDANA S B(RoC No. 469478-X)
No. 3, Jalan 222,46100 P!al"n# Ja$a,Slan#o% Da%&l E'an
For Lift Works
Pa# No. 16 o* 21
R+""on No. 2.0
& 7.6.04
MSR-CIQ02-M-032-R2.0
10.0 S,fet: < &nironent
Titi $a+u #dn.%hd. #afety and 5ealth )olicy are governed by the attached
ompany #afety )olicy document.
These are set out under the following headings
a %,rt I " The general policy of the company towards safety.
b %,rt II" The general safety regulations enforced by the company.
c %,rt III" The organi@ation and method of implementation of the policy.
COM%A'> SAF&T> %OIC>
%,rt I
4ener,# St,teent
6 The board of ?irectors of this company and > regards the promotion, of 5ealth
and #afety at work as an essential ob+ective for $anagement and 4mployees at
all levels.
/ The ompany is ultimately accountable for implementing #afety and 5ealth
legislation and achieving the ob+ectives of the #afety and 5ealth policy. >n this
respect, it will abide by any odes of practice approved and issued by the #afety
and 5ealth Authority. The ompany will do all that is practicable to ensure safe
methods of working and safer conditions of working throughout the company,
and to protect from foreseeable ha@ards the )ublic insofar as they come into
contact with the ompany and its products. All persons in a supervisory position
are directly responsible for safe methods of conditions of working in their areaof responsibility.
MSR FORMAT CM-MSR-01 (B)
-
7/23/2019 MSR Format.doc
17/29
METHOD STATEMENT
GERBANG PERDANA S B(RoC No. 469478-X)
No. 3, Jalan 222,46100 P!al"n# Ja$a,Slan#o% Da%&l E'an
For Lift Works
Pa# No. 17 o* 21
R+""on No. 2.0
& 7.6.04
MSR-CIQ02-M-032-R2.0
11.0 S,fet: < &nironent
Titi $a+u #dn.%hd. #afety and 5ealth )olicy are governed by the attached
ompany #afety )olicy document.
These are set out under the following headings
a %,rt I " The general policy of the company towards safety.
b %,rt II" The general safety regulations enforced by the company.
c %,rt III" The organi@ation and method of implementation of the policy.
COM%A'> SAF&T> %OIC>
%,rt I
4ener,# St,teent
6 The board of ?irectors of this company and > regards the promotion, of 5ealth
and #afety at work as an essential ob+ective for $anagement and 4mployees at
all levels.
/ The ompany is ultimately accountable for implementing #afety and 5ealth
legislation and achieving the ob+ectives of the #afety and 5ealth policy. >n this
respect, it will abide by any odes of practice approved and issued by the #afety
and 5ealth Authority. The ompany will do all that is practicable to ensure safe
methods of working and safer conditions of working throughout the company,
and to protect from foreseeable ha@ards the )ublic insofar as they come intocontact with the ompany and its products. All persons in a supervisory position
MSR FORMAT CM-MSR-01 (B)
-
7/23/2019 MSR Format.doc
18/29
METHOD STATEMENT
GERBANG PERDANA S B(RoC No. 469478-X)
No. 3, Jalan 222,46100 P!al"n# Ja$a,Slan#o% Da%&l E'an
For Lift Works
Pa# No. 18 o* 21
R+""on No. 2.0
& 7.6.04
MSR-CIQ02-M-032-R2.0
are directly responsible for safe methods of conditions of working in their area
of responsibility.
MSR FORMAT CM-MSR-01 (B)
-
7/23/2019 MSR Format.doc
19/29
METHOD STATEMENT
GERBANG PERDANA S B(RoC No. 469478-X)
No. 3, Jalan 222,46100 P!al"n# Ja$a,Slan#o% Da%&l E'an
For Lift Works
Pa# No. 19 o* 21
R+""on No. 2.0
& 7.6.04
MSR-CIQ02-M-032-R2.0
12.0 S,fet: < &nironent
Titi $a+u #dn.%hd. #afety and 5ealth )olicy are governed by the attached
ompany #afety )olicy document.
These are set out under the following headings
a %,rt I " The general policy of the company towards safety.
b %,rt II" The general safety regulations enforced by the company.
c %,rt III" The organi@ation and method of implementation of the policy.
COM%A'> SAF&T> %OIC>
%,rt I
4ener,# St,teent
6 The board of ?irectors of this company and > regards the promotion, of 5ealth
and #afety at work as an essential ob+ective for $anagement and 4mployees at
all levels.
/ The ompany is ultimately accountable for implementing #afety and 5ealth
legislation and achieving the ob+ectives of the #afety and 5ealth policy. >n this
respect, it will abide by any odes of practice approved and issued by the #afety
and 5ealth Authority. The ompany will do all that is practicable to ensure safe
methods of working and safer conditions of working throughout the company,
and to protect from foreseeable ha@ards the )ublic insofar as they come into
contact with the ompany and its products. All persons in a supervisory position
are directly responsible for safe methods of conditions of working in their areaof responsibility.
MSR FORMAT CM-MSR-01 (B)
-
7/23/2019 MSR Format.doc
20/29
-
7/23/2019 MSR Format.doc
21/29
METHOD STATEMENT
GERBANG PERDANA S B(RoC No. 469478-X)
No. 3, Jalan 222,46100 P!al"n# Ja$a,Slan#o% Da%&l E'an
For Lift Works
Pa# No. 21 o* 21
R+""on No. 2.0
& 7.6.04
MSR-CIQ02-M-032-R2.0
are directly responsible for safe methods of conditions of working in their area
of responsibility.
MSR FORMAT CM-MSR-01 (B)
-
7/23/2019 MSR Format.doc
22/29
-
7/23/2019 MSR Format.doc
23/29
METHOD STATEMENT
GERBANG PERDANA S B(RoC No. 469478-X)
No. 3, Jalan 222,46100 P!al"n# Ja$a,Slan#o% Da%&l E'an
For Lift Works
Pa# No. 23 o* 21
R+""on No. 2.0
& 7.6.04
MSR-CIQ02-M-032-R2.0
13.0 S,fet: < &nironent
Titi $a+u #dn.%hd. #afety and 5ealth )olicy are governed by the attached
ompany #afety )olicy document.
These are set out under the following headings
a %,rt I " The general policy of the company towards safety.
b %,rt II" The general safety regulations enforced by the company.
c %,rt III" The organi@ation and method of implementation of the policy.
COM%A'> SAF&T> %OIC>
%,rt I
4ener,# St,teent
6 The board of ?irectors of this company and > regards the promotion, of 5ealth
and #afety at work as an essential ob+ective for $anagement and 4mployees at
all levels.
/ The ompany is ultimately accountable for implementing #afety and 5ealth
legislation and achieving the ob+ectives of the #afety and 5ealth policy. >n this
respect, it will abide by any odes of practice approved and issued by the #afety
and 5ealth Authority. The ompany will do all that is practicable to ensure safe
methods of working and safer conditions of working throughout the company,and to protect from foreseeable ha@ards the )ublic insofar as they come into
contact with the ompany and its products. All persons in a supervisory position
MSR FORMAT CM-MSR-01 (B)
-
7/23/2019 MSR Format.doc
24/29
METHOD STATEMENT
GERBANG PERDANA S B(RoC No. 469478-X)
No. 3, Jalan 222,46100 P!al"n# Ja$a,Slan#o% Da%&l E'an
For Lift Works
Pa# No. 24 o* 21
R+""on No. 2.0
& 7.6.04
MSR-CIQ02-M-032-R2.0
are directly responsible for safe methods of conditions of working in their area
of responsibility.
MSR FORMAT CM-MSR-01 (B)
-
7/23/2019 MSR Format.doc
25/29
METHOD STATEMENT
GERBANG PERDANA S B(RoC No. 469478-X)
No. 3, Jalan 222,46100 P!al"n# Ja$a,Slan#o% Da%&l E'an
For Lift Works
Pa# No. 2> o* 21
R+""on No. 2.0
& 7.6.04
MSR-CIQ02-M-032-R2.0
:orks $aintenance 4ngineer
The :orks $aintenance 4ngineer is responsible for the regular e-amination of
ladders, cranes, power presses, lifting tackle, machine safety devices and
guards, electrical apparatus, plant and building repair and maintenance. Any
defective equipment, plant or machine will be withdrawn from use until
rectified.
#afety Representative
)urpose
>n accordance with ompanies #afety = 5ealth )olicy, safety representative
will be elected. 4ach representative will be consulted with a view to making and
maintaining arrangements, which will enable him and employees represented, to
co"operate effectively in prompting and developing measures to ensure the
safety and health at work of all employees and checking the effectiveness of
such measures.
The appointed #afety Representative will spend as much time as is necessary
with the agreement of management dealing with matters relating to 5ealth and
#afety of employees at work in hisher area. This will include dealing with
matters referred to himher by the employees.
The person will also be involved in!
(a A progressive identification of all ha@ards involving in+ury andor damage
potential in con+unction with a member of $anagement.
(b The compilation and implementation of odes of #afe :orking )ractices
and onduct, based on identifiable ha@ards.
(c )romoting safe working practices among employees.
MSR FORMAT CM-MSR-01 (B)
-
7/23/2019 MSR Format.doc
26/29
METHOD STATEMENT
GERBANG PERDANA S B(RoC No. 469478-X)
No. 3, Jalan 222,46100 P!al"n# Ja$a,Slan#o% Da%&l E'an
For Lift Works
Pa# No. 26 o* 21
R+""on No. 2.0
& 7.6.04
MSR-CIQ02-M-032-R2.0
(d The investigation of accidents, whenever necessary and in con+unction
with $anagement.
MSR FORMAT CM-MSR-01 (B)
-
7/23/2019 MSR Format.doc
27/29
METHOD STATEMENT
GERBANG PERDANA S B(RoC No. 469478-X)
No. 3, Jalan 222,46100 P!al"n# Ja$a,Slan#o% Da%&l E'an
For Lift Works
Pa# No. 27 o* 21
R+""on No. 2.0
& 7.6.04
MSR-CIQ02-M-032-R2.0
:orks $aintenance 4ngineer
The :orks $aintenance 4ngineer is responsible for the regular e-amination of
ladders, cranes, power presses, lifting tackle, machine safety devices and
guards, electrical apparatus, plant and building repair and maintenance. Any
defective equipment, plant or machine will be withdrawn from use until
rectified.
#afety Representative
)urpose
>n accordance with ompanies #afety = 5ealth )olicy, safety representativewill be elected. 4ach representative will be consulted with a view to making and
maintaining arrangements, which will enable him and employees represented, to
co"operate effectively in prompting and developing measures to ensure the
safety and health at work of all employees and checking the effectiveness of
such measures.
The appointed #afety Representative will spend as much time as is necessary
with the agreement of management dealing with matters relating to 5ealth and
#afety of employees at work in hisher area. This will include dealing with
matters referred to himher by the employees.
The person will also be involved in!
(a A progressive identification of all ha@ards involving in+ury andor damage
potential in con+unction with a member of $anagement.
(b The compilation and implementation of odes of #afe :orking )ractices
and onduct, based on identifiable ha@ards.
(c )romoting safe working practices among employees.
(d The investigation of accidents, whenever necessary and in con+unction
with $anagement.
MSR FORMAT CM-MSR-01 (B)
-
7/23/2019 MSR Format.doc
28/29
METHOD STATEMENT
GERBANG PERDANA S B(RoC No. 469478-X)
No. 3, Jalan 222,46100 P!al"n# Ja$a,Slan#o% Da%&l E'an
For Lift Works
Pa# No. 28 o* 21
R+""on No. 2.0
& 7.6.04
MSR-CIQ02-M-032-R2.0
:orks $aintenance 4ngineer
The :orks $aintenance 4ngineer is responsible for the regular e-amination of
ladders, cranes, power presses, lifting tackle, machine safety devices and
guards, electrical apparatus, plant and building repair and maintenance. Any
defective equipment, plant or machine will be withdrawn from use until
rectified.
#afety Representative
)urpose
>n accordance with ompanies #afety = 5ealth )olicy, safety representative
will be elected. 4ach representative will be consulted with a view to making and
maintaining arrangements, which will enable him and employees represented, to
co"operate effectively in prompting and developing measures to ensure the
safety and health at work of all employees and checking the effectiveness of
such measures.
The appointed #afety Representative will spend as much time as is necessary
with the agreement of management dealing with matters relating to 5ealth and
#afety of employees at work in hisher area. This will include dealing with
matters referred to himher by the employees.
The person will also be involved in!
(a A progressive identification of all ha@ards involving in+ury andor damage
potential in con+unction with a member of $anagement.
(b The compilation and implementation of odes of #afe :orking )ractices
and onduct, based on identifiable ha@ards.
(c )romoting safe working practices among employees.
MSR FORMAT CM-MSR-01 (B)
-
7/23/2019 MSR Format.doc
29/29
METHOD STATEMENT
GERBANG PERDANA S B(RoC No. 469478-X)
No. 3, Jalan 222,46100 P!al"n# Ja$a,Slan#o% Da%&l E'an
For Lift Works
Pa# No. 29 o* 21
R+""on No. 2.0
& 7.6.04
MSR-CIQ02-M-032-R2.0
(d The investigation of accidents, whenever necessary and in con+unction
with $anagement.