MSP in Norway: Lessons learned the and Barents seas plans · PDF file ·...

15
MSP in Norway: Lessons learned from the Norwegian and Barents seas plans Erik Olsen

Transcript of MSP in Norway: Lessons learned the and Barents seas plans · PDF file ·...

Page 1: MSP in Norway: Lessons learned the and Barents seas plans · PDF file · 2010-04-27MSP in Norway: Lessons learned ... No new petroleum activities No drilling, March - September Norway

MSP in Norway: Lessons learned  from the Norwegian and Barents  seas plans

Erik Olsen 

Page 2: MSP in Norway: Lessons learned the and Barents seas plans · PDF file · 2010-04-27MSP in Norway: Lessons learned ... No new petroleum activities No drilling, March - September Norway

Background•

Norway is developing integrated 

area‐based management plans for  Norwegian EEZs in:

Barents Sea. Established in 2006

Norwegian Sea. Established in 2009

North Sea. Development strated

Plans are ecosystem‐based, use  the precautionary approach

Top‐down process led by the  Ministry of Environment with  collaboration from 4 other 

ministries–

Used underlying government institutes 

and agencies to develop the knowledge 

base

BarentsBarentsSeaSea

Norwegian Norwegian SeaSea

Page 3: MSP in Norway: Lessons learned the and Barents seas plans · PDF file · 2010-04-27MSP in Norway: Lessons learned ... No new petroleum activities No drilling, March - September Norway

Organization – Barents Sea

Page 4: MSP in Norway: Lessons learned the and Barents seas plans · PDF file · 2010-04-27MSP in Norway: Lessons learned ... No new petroleum activities No drilling, March - September Norway

Planning prosess

Page 5: MSP in Norway: Lessons learned the and Barents seas plans · PDF file · 2010-04-27MSP in Norway: Lessons learned ... No new petroleum activities No drilling, March - September Norway

Areas of biological importanceCod Capelin

Olsen et al., 2010 ICES JMS 

Spawning Areas Larvae areas

Page 6: MSP in Norway: Lessons learned the and Barents seas plans · PDF file · 2010-04-27MSP in Norway: Lessons learned ... No new petroleum activities No drilling, March - September Norway

Valuable area  Barents Sea

Lofoten – VesterålenMajor spawning grounds, High Biodiversity

Tromsøflaket bank areaRetention area, spawning area, sponges

Eggakanten (edge of cont. shelf)Spawning, feeding area birds + mammals

Bear IslandRetention area, benthos, seabirds

Coastal zoneSpawning, feeding seabirds and fish

Polar frontProduction, feeding fish, birds + mammals

Ice edge (variable)Production, biodiverstiy, feeding

Page 7: MSP in Norway: Lessons learned the and Barents seas plans · PDF file · 2010-04-27MSP in Norway: Lessons learned ... No new petroleum activities No drilling, March - September Norway

Barents Sea management  framework 

2006­2010

40 °35 °30 °25 °20 °15 °10 °5 °

85 °75 °65 °55 °45 °35 °25 °15 °5 °0 °-5 °-15 °-25 °-35 °-50 °-75 °

81 °

76 °

71 °

76 °

71 °

-65

°-4

0 °

-30

°-2

0 °

-15

°-5

°

45 °

50 °

55 °

60 °

65 °

80 °

Management plan areaShipping routes

Ecologically valuable areasDisputed area

Oil/gas discoveries

High intensity fishingFramework for petroleum industry

No petroleum activityNo new petroleum activities

No drilling, March - September

Norway

Russia

Spitzbergen

Franz Josef Land

Greenland

Lofoten

Polar front

Bear Island65 km zone

Ice-edge

Lofoten - Vesterålen

Tromsøflaketbank area

Olsen et al. 2007, ICES JMS, Olsen et al. 2007, ICES JMS,

No Petroleum Activities-Lofoten – Vesterålen-Eggkanten-Bear Island-Polar front-Ice-edge-Coastal zone 0 – 35km

No NEW Petroleum Activities-Coastal zone 35 – 50 km

No drilling March - August-Coastal zone 50 - 65 km-Tromsøflaket

Page 8: MSP in Norway: Lessons learned the and Barents seas plans · PDF file · 2010-04-27MSP in Norway: Lessons learned ... No new petroleum activities No drilling, March - September Norway

The Norwegian Sea plan

Similar organization to the Barents Sea plan

Similar structure of development, 3 phases  starting with describing the environment 

and conducting EIAs

of the human impacts

Started in 2006, ratified by Stortinget (parliament) in 2009

Page 9: MSP in Norway: Lessons learned the and Barents seas plans · PDF file · 2010-04-27MSP in Norway: Lessons learned ... No new petroleum activities No drilling, March - September Norway

Valuable areas  Norwegian Sea 

Jan MayenHigh production, seabirds, mammals

Arctic frontHigh production, seabirds, mammals

Coastal zoneSpawning area, seabirds, mammals, kelp

Eggakanten continental shelf breakSpawning, feeding fish, birds + mammals

Sklinna BankSpawning area, retention area

IverryggenCold-water coral reefs, MPA(?)

Halten BankSpawning area, retention area

Sula and FroanCold-water coral reefs, seabirds, mammals

RemmanKelp, MPA(?)

Møre bank areaSpawning, kelp, seabirds, whales, MPA(?)

Page 10: MSP in Norway: Lessons learned the and Barents seas plans · PDF file · 2010-04-27MSP in Norway: Lessons learned ... No new petroleum activities No drilling, March - September Norway

Something Fishy with how the  oil industry analyzed the effects  of large oil spills on the 

ecosystem….

Even a (modelled) worst case  spill could only kill 5­6% of a  year class.

Page 11: MSP in Norway: Lessons learned the and Barents seas plans · PDF file · 2010-04-27MSP in Norway: Lessons learned ... No new petroleum activities No drilling, March - September Norway

How are Environmental  consequences of a spill evaluated?

Current practice is through the use of  Risk Assessment:

Use best available knowledge to  estimate a value of all parameters 

included in the analysis

Variability and heterogenity is typically  handled by using average values or 

multiple simulations

Uncertainty is not communicated  directly, but handled by 

Adding security factors

Choosing conservative values

Page 12: MSP in Norway: Lessons learned the and Barents seas plans · PDF file · 2010-04-27MSP in Norway: Lessons learned ... No new petroleum activities No drilling, March - September Norway

At low population sizes stock  aggregate in core areas

Distribution of herring larvae 1968- 77 (proxy for spawning grounds)This is where the entire stock spawned in 1972.

A single large spill could have affected the whole year-class with dramatic longterm (decades) consequences..

Page 13: MSP in Norway: Lessons learned the and Barents seas plans · PDF file · 2010-04-27MSP in Norway: Lessons learned ... No new petroleum activities No drilling, March - September Norway

Norwegian Sea   petroleum 

framework

No new petroleum activities (to  be revised in 2014)

Seasonal restrictions on drilling

Active petroleum licenses

Seasonal restrictions on seismic  exploration inshore of 500m

Page 14: MSP in Norway: Lessons learned the and Barents seas plans · PDF file · 2010-04-27MSP in Norway: Lessons learned ... No new petroleum activities No drilling, March - September Norway

Implementation

Annual reporting on:–

State of the environment

Achievement of goals

Knowledge base

Revision of the plan every 4  years, the first time in 2010  (Barents Sea) and 2014 

(Norwegian Sea)–

Allows for a changing enviroment

Allows politicians to change their  mind!

Page 15: MSP in Norway: Lessons learned the and Barents seas plans · PDF file · 2010-04-27MSP in Norway: Lessons learned ... No new petroleum activities No drilling, March - September Norway

Quantitative value­setting of  areas

In both plans to date value‐ setting has been based on 

expert judgement only

A project is under way to  map, quantify and integrate 

the value of the marine  environment

Semi‐quantitative process 

Developing a web‐based GIS  application to be used for 

managers