TURNKEY SERVICES FOR HIGH SPEED RAILWAY. FROM VISION TO REALITY. HHR PHASE 2
KUWAIT METRO AND RAIL CONFERENCE AND EXHIBITION Kuwait, 17th April 2012 Presenter: Ms. Susana Gozalo Jáñez, MSc Civil Engineering, CEng, MICE, MCIHT Director of the Transport Strategies Department of CONSULTRANS
INTRODUCTION AND CONTENT OF THE PRESENTATION
• Turnkey Services High Speed Railway Services
• The Haramain High Speed Railway Phase 2
• Next Steps
• Multi-disciplinary: cannot be provided by a sole company
• Complex activities, latest state of the art technologies
• Risk with Contractor as owner of the technology
• Definition of scope based on performance indicators
• Payments subject to finalisation of key milestones (track laying, delivery of trainsets…)
• Client gets infrastructure, track and systems and operation and maintenance service for a fixed price
WHY TURNKEY CONTRACTS FOR HIGH SPEED RAILWAY?
The Railway will:
• double track between Makkah and Madinah;
• speeds up to 320km/h;
• standard gauge line (1435mm);
• electrified line with overhead catenaries of 25kV;
• journey time, between Makkah and Madinah, of less than 2 hours 30 minutes, with a commercial operating speed of 300km/h and 3 stops (Jeddah, KAIA, KAEC).
• It will transport 166.000 passengers per day at peak times during Pilgrimage to the two Holy Sites.
The Project
The Procurement Process
• Phase 1 Package 1 – Route Civil Works (Design & Build)
Concept design completed by Dar Al Handasah
Contract awarded to Al Rajhi Alliance on 5th February 2009
Construction is progressing
• Phase 1 Package 2 – Stations
Design – Awarded to Foster & Partners / Buro Happold / Dar Al Riyadh in March 2009.
Four stations – Makkah Central, Jeddah Central, KAEC & Madinah Central.
Build – Contract for the Four stations were awarded to
Saudi Binladin Group with Turkey’s Yapi Merkezi: Makkah and Madinah stations for SR3.2 bn and SR1.6 bn.
Saudi Oger will build the stations at Jeddah at a cost of SR2.9bn and a station at King Abdullah Economic City in Rabigh for SR1.7bn.
• Phase 2 – construction of track and systems, procurement and maintenance the Rolling Stock and operation and maintenance of the entire railway. Initial period 12 years
Procurement of Rolling Stock
Design & Build (FIDIC)
Ballasted Track
ERTMS Level 2 Signaling system
25 Kv – 60 Hz caternary system
Telecoms
Operation Control center
Depots and Workshops
• Operations and Maintenance Contract for a 12 year period with payments based on:
Performance Regime
Fares Policy
Revenue collection
The Services
AlShoula Saudi Spanish Consortium
• Creation and implementation of the high speed railway industry
• transferring the knowledge and experience to Saudi Companies
• key construction and local expertise and “know-how” of AlShoula and Al Rosan and
• the key players in the delivery of a successful high speed railway model in Spain.
The Commitment
20 years
Saudization
SRO
Suppliers
Construction Sites
Rail Training Center
Jeddah Office
Engineering In Madrid
Sub-contractors
Mobilisation
Phase 1
Package 1
Contract’s
Phase 1
Package 2
Contract’s
Internal Interfaces
Phase 2 Contract’s
Internal Interfaces Internal Interfaces
The
Government HHR Project’s
Internal Interfaces
SRO’s
representative
/ Consultant(s)
project’s
External
Interfaces
Pro
ject’
s
Exte
rnal
Inte
rfaces
Project’s
External
Interfaces
Phases
Interfaces
• External Interfaces:
Phase 1 Package 1: Infrastructure
Phase 1 Package 2: Stations
Municipalities
Ministries
Utility Companies
• Internal Interfaces:
Head Office in Jeddah
Head Office in Madrid
Subcontractors
Workbases
• INTERFACE MANAGEMENT PLAN
Interface Management
• Commitment of the Saudi – Spanish AlShoula Consortium:
To abide to Nitaqat Law
70-75% of saudization target for year 12 of Operation and Maintenance
Through Recruitment and Retention and Training Policies
Subcontractors will have to abide to Nitaqat Law and targets for Saudization
To be started as of Contract Signature
Railway School and agreements with local Universities
The aim is to make the railway profession an attractive one to young people
Saudization
Challenges
Presenter: Ms. Susana Gozalo Jáñez,
MSc Civil Engineering, CEng, MICE, MCIHT
Director of the Transport Strategies Department of CONSULTRANS
[email protected]; +34915754616; www.consultrans.es
TURNKEY SERVICES FOR HIGH SPEED RAILWAY. FROM VISION TO REALITY. HHR PHASE 2
THANK YOU VERY MUCH FOR YOUR ATTENTION