APPLICATION FOR ENVIRONMENTAL CLEARANCE For M/s. Codissia Industrial Park Ltd. At S.Nos. 96/1, 97, 98, 99/2, 101/2, 101/3, 102/2B, 131/2, 135/2, 136/2, 138, 141/2, 142/1B1, 142/2B1, 142/2B2, 142/3A, 142/3B, 143/1, 143/2, 143/3, 143/4, 144/1, 144/2, 144/3, 144/4, 145/1, 146/1, 147/1, 147/2, 147/3, 148/1, 148/2, 314, 315/1A, 315/1B, 315/2A, 315/2B, 315/3, 316/1, 316/2, 316/3, 317/2, 318/1, 318/2, 318/3, 320/1, 320/2A, 320/2B, 320/2C, 320/2D, 320/2E, 320/2F, 321/1, 321/2, 322/1 and 322/2 Kallapalayam Village, Palladam Taluk, Coimbatore District, Tamil Nadu Submitted to Submitted to the State Level Environmental Impact Assessment Authority, Tamil Nadu

Transcript of M/s. Codissia Industrial Park Ltd. - Welcome to...

APPLICATION FOR ENVIRONMENTAL CLEARANCE

For

M/s. Codissia Industrial Park Ltd.

At

S.Nos. 96/1, 97, 98, 99/2, 101/2, 101/3, 102/2B, 131/2, 135/2, 136/2, 138, 141/2, 142/1B1, 142/2B1, 142/2B2, 142/3A, 142/3B, 143/1, 143/2, 143/3, 143/4, 144/1, 144/2, 144/3, 144/4, 145/1, 146/1, 147/1, 147/2, 147/3, 148/1, 148/2, 314, 315/1A, 315/1B, 315/2A, 315/2B, 315/3, 316/1, 316/2, 316/3, 317/2, 318/1, 318/2, 318/3, 320/1, 320/2A, 320/2B, 320/2C, 320/2D, 320/2E, 320/2F, 321/1, 321/2, 322/1 and 322/2 Kallapalayam Village, Palladam Taluk, Coimbatore District, Tamil Nadu

Submitted to

Submitted to the State Level Environmental Impact Assessment

Authority, Tamil Nadu

1

Check list for submission of application for Environmental Clearance for Building

Construction Projects

S.No. Details Page

Ref.

1. Name of the promoter

Form I

Form I A

M/s. Codissia

Industrial Park Ltd.

Enclosed

Enclosed

-

4-11

11-20

2. Conceptual Plan (Descriptive report of the project) Enclosed 20-30

3. Cost of the Project Rs. 90.08 Crores. 21

4. Whether all the pages of Form I & form IA, report & plans

including Annexure have been numbered continuously &

index furnished.

Yes

-

5. Whether EIA report has been furnished & if so, whether it

has been prepared as per structure prescribed in the EIA

notification by approved accredited consultant.

Not applicable as the

project comes under

category B.

-

6. Certified copy of Documentary evidence for

ownership/Legal possession by way of long term lease of

land S. F. No. with area of each S.F. only of the project

under consideration.

Will be submitted at

the earliest.

-

7. Land use classification certificate obtained from Competent

Authority (DTCP / CMDA/Local Body).

Will be submitted at

the earliest.

-

8. In case of unclassified area, Permissibility certificate by the

competent authority for the proposed activity DTCP /

CMDA /Local Body.

N.A.

-

9. i) Approved Planning permission with S.F. Nos issued

by DTCP/ CMDA / Local Body or proof for

having applied.

ii) Approved Building Site plan or copy of the plans

submitted to the Competent Authority.

Will be submitted at

the earliest.

-

10. CRZ map duly authorized by IRS, Anna University N.A. -

11. Whether attracts CRZ notification & if so recommendation

of the State Coastal Zone Management Authority

N. A.

-

12. Specific source of water supply & approved permission

letter for drawl of water with quantity during construction &

operation from the concerned authority (Central Ground

Water Board/ CMWSSB /TWAD Board / Municipal

Corporation/ Municipality as the case may be) or proof for

having applied to the Competent Authority.

Source: From the

existing NTADCL /

TWAD line shall be

examined, to ensure

continuous water

supply.

-

13. Whether there is any litigation, if Yes, Latest orders of the

court in original, has to be attached. (Such as stay, status of

the petition etc.) No -

14. Latest Govt. orders on lease/ any other related issues

pertaining to the project to be attached. No -

15. Authenticity of baseline data on soil / water / ambient air

quality / noise as per MoEF, O.M. dt. 04.08.2009

Will be submitted at

the earliest. -

16. Break up details of the land use of the project site including

OSR area.

Enclosed as Annexure

I

31

17. Whether built up area calculated is as per the latest

Notification / Circulars of MoEF, GoI attached

Yes -

18. Project description / Number of floors / housing /

commercial /functional units.

Enclosed 45

2

19. Whether the guidelines for High rise buildings as per MoEF

, O.M. dated 7.2.2013 followed

The maximum height

of building is less than

15.25 m, hence not

applicable.

-

20. Design details for Car/ Two wheeler parking area as per

CMDA/ DTCP rules

Enclosed as Annexure

II

31

21. Calculation of water requirements for various purposes as

per CPHEEO guidelines.

Enclosed in

conceptual plan. 21

22. Details of Swimming pool if any: If so, details of water

consumption & its treatment.

No -

23. i) Details of generation & treatment of sewage during

construction & operation

ii) Design of STP & its location at the project site

marked in a map

Enclosed in

conceptual plan.

Enclosed as Annexure

IV

22

33-35

24. i) Mode of disposal of treated sewage during

construction & operation;

ii) Permission letter from the competent authority -

local body if sewage system available / PWD if

proposal to discharge into water body for

receiving the treated sewage if it disposed

outside.

During operational

phase treated sewage

water is reused for

gardening.

N.A.

-

-

25. Commitment letter from proponent that the treated sewage

water disposed for green belt development / avenue

plantation should not pollute the soil/ ground water /

adjacent canals /lakes/ponds, etc.

Enclosed 47

26. Method of calculation of quantity , Mode of collection ,

treatment & disposal of :

i) Solid waste including excavated earth, debris during

construction.

ii) Municipal Solid waste( Bio Degradable, non-

biodegradable , recyclable)

Construction debris

will be collected &

suitability used on site

as per construction

waste management

plan. Enclosed as Annexure

V.

-

36

27. Map showing details of the Duel plumping system, for toilet

flushing, with the detailed storage tank facilities proposed.

N.A. -

28. Green belt area as per CPCB guidelines minimum of 33 %

total area.

We will provide green

belt area as per CPCB

guidelines minimum

of 33 % total area.

-

29. Details of flood occurrence in area & authenticity certificate

from Revenue Officials; proposed measures in case of

occurrence of flood.

Will be submitted at

the earliest.

-

30. Details of Rain Water Harvesting, with numbers & area of

each harvesting bed.

Enclosed as Annexure

VI

36-37

31. Noise pollution control measures with size & numbers

proposed.

DG set will be

provided with suitable

acoustic enclosure to

minimize the noise.

-

32. Details of Stack height for Diesel generator sets, with

supporting calculations.

Enclosed as Annexure

VII

37

33. Energy Conservation Measures as per Energy Conservation

Building Code

Enclosed as Annexure

VIII

38

3

34. Environment Monitoring Plan during Construction &

Operation Phase

Enclosed as Annexure

IX

39-40

35. EMP budget provisions for each category of EMP Enclosed as Annexure

X

41

36. Details of Natural drainages like canal channel if any within

the site & its confluence point with areal distance from the

boundary.

N.A. -

37. Period of completion of project supported with Bar Chart

/PERT chart.

Will be submitted at

the earliest. -

38. Recent photographs with the Inbuilt date stamp of the

proposed site as on date & a certificate from competent

authority / BDO or any official under him of concerned

Panchayat Union as per case about the stage of construction.

A recent photograph is

enclosed.

46

39. Copies of Approval obtained from Tamilnadu Fire Services

& Rescue Services Department

Will be submitted at

the earliest.

-

40. Separate plan marked with different colour with the

following details.

Location of STP, compost system

Pipeline conveying the treated effluent for greenbelt

development

Pipeline conveying the treated effluent for toilet flushing

Water supply pipeline

Gas supply pipeline if proposed

Telephone cable

Power cable

Will be submitted at

the earliest.

-

41. Consultant Enclosed as Annexure

XI

41

42. NOC from Airport Authority of India Will be submitted at

the earliest. -

43. Details of fire – safety & rescue services devices/

arrangements made in case of fire – accidents etc

Enclosed as Annexure

XII 42-44

44. Details of First – Aid facilities available with trained man

power & life – saving medicines.

Enclosed as Annexure

XIII

44

45. Provision of terrace garden & maintained continuously N.A. -

46. Traffic flow study , considering other existing & planned

developments & operations in the region , adopting IRC

guidelines

Enclosed as Annexure

XIV

44

47. Maintenance of common facilities including greening , rain

water harvesting , sewage disposal , solid waste disposal &

environmental monitoring should be the responsibility of the

builder for a period of ten years

Enclosed 48

48. Installation of chute for each block for the disposal of solid

waste from each apartment directly to the common solid

waste treatment plant.

N.A.

-

49. Details of CSR activities proposed along with breakup of

cost estimate

Will be submitted at

the earliest.

-

50. Processing Fee of Rs. 3 , 00,000 in the form of DD taken in

favour of Member Secretary , SEIAA payable at Chennai

Enclosed 50

51. Full address of the Commissioner of Corporation/

Municipalities / Executive officers of town panchayat/

Block development officers of panchayat union whichever is

applicable.

Kallapalyam

Panchayat, Sulur

Taluk, Kallapalayam

Post, (NEAR

COINDIA),

Chettipalayam Via,

Coimbatore-641201.

-

4

APPENDIX I

(See paragraph – 6)

FORM 1

Basic Information

Sl.No. Item Details

1. Name of the project : M/s. Codissia Industrial Park Ltd.

2. S.No. of the Schedule : 8 (a)

3.

Proposed capacity/area/length/tonnage to be

handled/command area/lease area/number of

wells to be drilled.

: Built Up Area - 30193.49 Sq.m.

4. New/Expansion/Modernization : New

5. Existing Capacity/Area etc. : ---

6. Category of Project i.e. „A‟ or „B‟ : Category „B‟

7. Does it attract the general condition? If yes,

please specify. : No

8. Does it attract the specific condition? If yes,

please specify. : No

9. Location

Plot/Survey/Kharse No :

96/1, 97, 98, 99/2, 101/2, 101/3,

102/2B, 131/2, 135/2, 136/2, 138,

141/2, 142/1B1, 142/2B1, 142/2B2,

142/3A, 142/3B, 143/1, 143/2, 143/3,

143/4, 144/1, 144/2, 144/3, 144/4,

145/1, 146/1, 147/1, 147/2, 147/3,

148/1, 148/2, 314, 315/1A, 315/1B,

315/2A, 315/2B, 315/3, 316/1, 316/2,

316/3, 317/2, 318/1, 318/2, 318/3,

320/1, 320/2A, 320/2B, 320/2C,

320/2D, 320/2E, 320/2F, 321/1,

321/2, 322/1 and 322/2

Village : Kallapalayam Village

Tehsil : Palladam Taluk

District : Coimbatore

State : Tamil Nadu

10. Nearest railway station/airport along with

distance in kms :

Railway Station : Coimbatore (13.53

Km) & Airport: Coimbatore Airport

(11.5 Km from the Site)

11. Nearest Town, city, District Head quarters along

with distance in kms :

City: Coimbatore (16 km from the

Site)

12. Village Panchayats, Zilla Parishad, Municipal

corporation, Local Body (complete postal

addresses telephone no. to be given)

Kallapalyam Panchayat, Sulur Taluk,

Kallapalayam Post, (NEAR

COINDIA), Chettipalayam Via,

Coimbatore-641201.

13. Name of the applicant : Dr A.V.Varadharajan

14. Registered Address : G.D.Naidu Towers,Huzur

Road,Coimbatore-641018.

15. Address for Correspondence :

Name : Dr A.V.Varadharajan

5

Designation (Owner /Partner/CEO) : Managing Director

Address :

G.D.Naidu Towers,Huzur

Road,Coimbatore-641018.

Pin Code : 641018

E-mail : [email protected]

Telephone No. : 09842288552

Fax No. : -

16.

Details of Alternative Sites examined, if any.

Location of these sites should be shown on a

topo sheet.

: No

17. Interlined Projects : No

18. Whether separate application of interlined

project has been submitted : --

19. If yes, date of submission : --

20. If no, reason : --

21.

Whether the proposal involves approval/

clearance under:

(a) The Forest (Conversation ) Act, 1980

(b) The Wildlife ( Protection ) Act, 1972

The C.R.Z. Notification, 1991

: No

22. Whether there is any Government Order / Policy

relevant / relating to the site? : No

23. Forest land involved ( hectares ) : No

24.

Whether there is any litigation pending against

the project and/or land in which the project is

propose to be set up

(a) Name of the Court

(b) Case No.

(C) Orders/directions of the Court, if any and its

relevance with the proposed project.

: No

Activity

1. Construction, operation or decommissioning of the Project involving actions, which will cause physical

changes in the locality (topography, land use, changes in water bodies, etc.)

S. No. Information/Checklist confirmation Yes/No

Details thereof (with approximate

quantities /rates, wherever possible)

with source of information data

1.1 Permanent or temporary change in land use,

land cover or topography including increase

in intensity of land use (with respect to local

land use plan)

Yes

The land that has been procured for the

purposes of the proposed Project is not

covered under the Local Planning

Authority (LPA). It has not been

indicated or listed in the Master Plan of

the LPA as well; hence it has No Land

Use. Thus, an approval from Directorate

of Town & Country Planning has to be

obtained for converting the said land

from No Land Use to land for Industrial

Development.

6

1.2 Clearance of existing land, vegetation and

buildings? No

1.3 Creation of new land uses? No

1.4 Pre-construction investigations e.g. bore

houses, soil testing? No

1.5 Construction works? Yes Construction yet to commence.

1.6 Demolition works? No

No demolition required as it is vacant

land.

1.7 Temporary sites used for construction works

or Housing of construction workers? No

1.8 Above ground buildings, structures or

Earthworks including linear structures, cut

and fill or excavation

Yes Excavated soil will be used for leveling

and backfilling.

1.9 Underground works including mining or

tunneling? No

1.10 Reclamation works? No

1.11 Dredging? No

1.12 Offshore structures? No

1.13 Production and manufacturing processes? No

1.14 Facilities for storage of goods or materials? No

1.15 Facilities for treatment or disposal of solid

waste or liquid effluents? Yes

Sewage Treatment Plant will be

proposed. For the collection and storage

of solid waste, area will be demarcated

within the premises.

1.16 Facilities for long term housing of operational

workers? No

Construction labour will be sourced

locally; hence no housing facilities are

to be provided.

1.17 New road, rail or sea traffic during

construction or operation? No

1.18 New road, rail, air waterborne or other

transport infrastructure including new or

altered routes and stations, ports, airports etc?

No Existing facilities will be utilized.

1.19 Closure or diversion of existing transport

routes or infrastructure leading to changes in

traffic movements?

No

1.20 New or diverted transmission lines or

pipelines? No

1.21 Impoundment, damming, culverting,

realignment or other changes to the hydrology

of watercourses or aquifers?

No

1.22 Stream crossings? No

1.23 Abstraction or transfers of water from ground

or surface waters? No

1.24 Changes in water bodies or the land surface

affecting drainage or run-off? No

1.25 Transport of personnel or materials for

construction, operation or decommissioning? Yes

1.26 Long-term dismantling or decommissioning

or restoration works? No

1.27 Ongoing activity during decommissioning

which could have an impact on the

environment?

No

1.28 Influx of people to an area in either

temporarily or permanently? Yes

1.29 Introduction of alien species? No

7

1.30 Loss of native species or genetic diversity? No

1.31 Any other actions? No

2. Use of Natural resources for construction or operation of the Project (such as land, water, materials or

energy, especially any resources which are non-renewable or in short supply):

S.No.

Information/checklist confirmation

Yes/No

Details thereof (with approximate

quantities /rates, wherever possible)

with source of information data

2.1 Land especially undeveloped or agricultural

land (ha) No

2.2 Water (expected source & competing users)

unit: KLD Yes

Source: NTADC-New Tirupur Area

Development Corporation

Fresh Water : 400 KLD

2.3 Minerals (MT) No

2.4 Construction material – stone, aggregates,

sand / soil (expected source – MT) No

All construction material will be bought

from authorized sellers.

2.5 Forests and timber (source – MT) No

2.6 Energy including electricity and fuels (source,

competing users) Unit: fuel (MT), energy

(MW) Yes

Power requirement: 10 MW

Source of power: TNEB

DG Set: 82.5 KVA

2.7 Any other natural resources

(use appropriate standard units) No

3. Use, storage, transport, handling or production of substances or materials, which could be harmful to

human health or the environment or raise concerns about actual or perceived risks to human health.

S.No. Information/Checklist confirmation Yes/No

Details thereof (with approximate

quantities/rates, wherever possible)

with source of information data

3.1 Use of substances or materials, which are

hazardous (as per MSIHC rules) to human

health or the environment (flora, fauna, and

water supplies)

No

3.2 Changes in occurrence of disease or affect

disease vectors (e.g. insect or water borne

diseases)

No

3.3 Affect the welfare of people e.g. by changing

living conditions? No

3.4 Vulnerable groups of people who could be

affected by the project e.g. hospital patients,

children, the elderly etc.,

No

3.5 Any other causes No

4. Production of solid wastes during construction or operation or decommissioning (MT/month)

S.No. Information/Checklist confirmation Yes/No

Details thereof (with approximate

quantities/rates, wherever possible)

with source of information data

4.1 Spoil, overburden or mine wastes No

8

4.2 Municipal waste (domestic and or commercial

wastes)

Yes

The estimated solid waste generated

from the Residential project will be

1000 Kg/day

Biodegradable: 600 Kg/day

Non-biodegradable: 400 Kg/day

4.3 Hazardous wastes (as per Hazardous Waste

Management Rules) No

No hazardous waste generation.

Used oil from DG sets will be disposed

as per TNPCB guidelines.

4.4 Other industrial process wastes No

4.5 Surplus product No

4.6 Sewage sludge or other sludge from effluent

treatment Yes

30 Kg/day Sludge will be from STP and

used as manure.

4.7 Construction or demolition wastes

Yes

Wastes arising due to construction

activity will be disposed off safely

through Authorized recyclers.

4.8 Redundant machinery or equipment No

4.9 Contaminated soils or other materials No

4.10 Agricultural wastes No

4.11 Other solid wastes No

5. Release of pollutants or any hazardous, toxic or noxious substances to air (Kg/hr)

S.No. Information/Checklist confirmation Yes/No

Details thereof (with approximate

quantities/rates, wherever possible)

with source of information data

5.1 Emissions from combustion of fossil fuels

from stationary or mobile sources No

5.2 Emissions from production processes No

5.3 Emissions from materials handling including

storage or transport No

5.4 Emissions from construction activities

including plant and equipments Yes DG Set emissions will be within

SPCB‟s norms

5.5 Dust or odours from handling of materials

including construction materials, sewage and

waste

No There will not be any odour generating

activities.

5.6 Emissions from incineration of waste No

5.7 Emissions from burning of waste in open air

(e.g. slash materials, construction debris) No

5.8 Emissions from any other sources

No

6. Generation of Noise and Vibration, and Emissions of Light and Heat:

S.No. Information/Checklist confirmation Yes/No

Details thereof

(with approximate quantities/rates,

wherever possible) with source of

information data with source of

information data

6.1 From operation of equipment e.g. engines,

ventilation plant, crushers Yes DG Set will be operated during power

failure only.

6.2 From industrial or similar processes No

9

6.3 From construction or demolition

Yes

All emissions and noise/ vibration

occurring during construction activity

will be within standards prescribed by

the SPCB.

6.4 From blasting or piling No

6.5 From construction or operational traffic

Yes

All emissions and noise occurring due

to constructional and operational traffic

will be within the SPCB‟s limit

6.6 From lighting or cooling systems No

6.7 From any other sources No

7. Risks of contamination of land or water from releases of pollutants into the ground or into sewers,

surface waters, groundwater, coastal waters or the sea:

S.No. Information/Checklist confirmation Yes/No

Details thereof

(with approximate

quantities/rates, wherever

possible) with source of

information data

7.1 From handling, storage, use or spillage of

hazardous materials No

7.2 From discharge of sewage or other effluents to

water or the land (expected mode and place of

discharge) No

Sewage will be treated in sewage

treatment plant and treated

sewage will be reused for

Gardening.

7.3 By deposition of pollutants emitted to air into the

land or into water Yes

Emission will be well within the

limit and adequate stack will be

provided.

7.4 From any other sources

No

7.5 Is there a risk of long term build up of pollutants

in the environment from these sources?

No

8. Risk of accidents during construction or operation of the Project, which could affect human health or the

environment

S.No. Information/Checklist confirmation Yes/No

Details thereof (with

approximate quantities/rates,

wherever possible) with source

of information data

8.1 From explosions, spillages, fires etc from storage,

handling, use or production of hazardous

substances

No

Not envisaged

8.2 From any other causes No

8.3 Could the project be affected by natural disasters

causing environmental damage (e.g Floods,

earthquakes, landslides, cloudburst etc)? No

9. Factors which should be considered (such as consequential development) which could lead to

environmental effects or the potential for cumulative impacts with other existing or planned activities in the

locality

10

S. No. Information/Checklist confirmation Yes/No

Details thereof (with

approximate quantities/rates,

wherever possible) with source

of information data

9.1 Lead to development of supporting facilities,

ancillary development or development stimulated

by the project which could have impact on the

environment e.g.:

• Supporting infrastructure (roads, power supply,

waste or waste water treatment, etc.)

• Housing development

• Extractive industries

• Supply industries

• Other

No

No

No

No

No

9.2 Lead to after-use of the site, which could have an

impact on the environment No

9.3 Set a precedent for later developments No

9.4 Have cumulative effects due to proximity to other

existing or planned projects with similar effects No

10. Environmental Sensitivity

S.No. Areas Name/

Identity

Aerial distance

(Within 15 km.)

Proposed project location

boundary

1 Areas protected under international conventions,

national or local legislation for their ecological,

landscape, cultural or other related value

No

2 Areas which are important or sensitive for

ecological reasons - Wetlands, watercourses or

other water bodies, coastal zone, biospheres,

mountains, forests

No

3 Areas used by protected, important or sensitive

species of flora or fauna for breeding, nesting,

foraging, resting, over wintering, migration

No

4 Inland, coastal, marine or underground waters No

5 State, National boundaries

No

6 Routes or facilities used by the public for access

to recreation or other tourist, pilgrim areas No

7 Defence installations No

8 Densely populated or built-up area

Yes

Pappampatti village (6.4 Km from

site) has population of 4143 of

which 2052 are males while 2091

are females as per Population

Census 2011.

9 Areas occupied by sensitive man-made land uses

(hospitals, schools, places of worship, community

facilities)

Yes

Major Hospitals & educational

institutions 10 to 15 km away from

the site.

10 Areas containing important, high quality or scarce

resources

(Ground water resources, surface resources,

forestry, agriculture, fisheries, tourism, minerals)

No

11

11 Areas already subjected to pollution or

environmental damage. (Those where existing

legal environmental standards are exceeded)

No

12 Areas susceptible to natural hazard which could

cause the project to present environmental

problems

(Earthquakes, subsidence, landslides, erosion,

flooding

Or extreme or adverse climatic conditions)

No

‘’I hereby given undertaking that the data and information given in the application and enclosures are true

to the best of my knowledge and belief and I am aware that if any part of the data and information

submitted is found to be false or misleading at any stage , the project will be rejected and clearance give, if

any to the project will be revoked at our risk and cost.

Date:

Place:

Signature of the Applicant

With Name and Full Address

(Project Proponent / Authorized Signatory

FORM-1 A & CONCEPTUAL PLAN

(CHECK LIST OF ENVIRONMENTAL IMPACTS)

(Project proponents are required to provide full information and wherever necessary attach

explanatory notes with the Form and submit along with proposed environmental management plan

& monitoring programme)

1. LAND ENVIRONMENT

(Attach panoramic view of the project site and the vicinity)

1.1. Will the existing land use get significantly altered from the project that is not consistent

with the surroundings? (Proposed land use must conform to the approved Master Plan /

Development Plan of the area. Change of land use if any and the statutory approval from the

competent authority are submitted). Attach Maps of (i) site location, (ii) surrounding features of

the proposed site (within 500 meters) and (iii) the site (indicating levels & contours) to

appropriate scales. If not available attach only conceptual plans.

The land that has been procured for the purposes of the proposed project is not covered under the

Local Planning Authority (LPA). It has not been indicated or listed in the Master Plan of the LPA

as well; hence it has No Land Use. Thus, an approval from Directorate of Town & Country

Planning has to be obtained for converting the said land from No Land Use to land for Industrial

Development. The conceptual plan is enclosed. Maps of (i) site location and surrounding features

of the proposed site (within 5 Kilo meters) are enclosed in conceptual plan.

12

1.2. List out all the major project requirements in terms of the land area, built up area, water

consumption, power requirement, connectivity, community facilities, parking needs etc.

The project requirements for the proposed project are:

Total site area : 643704.02 Sq. m

Build Up Area : 30193.49 Sq.m

Water consumption : 400 KLD

Power requirements : 10 MW from TNEB

Parking needs : 32186.70 Sq.m

1.3. What are the likely impacts of the proposed activity on the existing facilities adjacent to the

proposed site? (Such as open spaces, community facilities, details of the existing land use,

disturbance to the local ecology).

The proposed project is likely to attract commercial activity such as hotels, utilities and stationary

shops during the construction phase and operation phase. These activities are expected to have a

positive socio-economic impact on the local population. No significant negative impacts are likely.

1.4. Will there be any significant land disturbance resulting in erosion, subsidence &

instability? (Details of soil type, slope analysis, vulnerability to subsidence, seismicity etc may

be given).

There is no significant land disturbance resulting in erosion, subsidence and instability. The project

site, as can be seen from the topographic survey map mostly plain so there will not be any

significant land disturbance.

1.5. Will the proposal involve alteration of natural drainage systems? (Give details on a

contour map showing the natural drainage near the proposed project site)

The natural drainage system will not be altered in any way due to the proposed project.

1.6. What are the quantities of earthwork involved in the construction activity-cutting, filling,

reclamation etc. (Give details of the quantities of earthwork involved, transport of fill

materials from outside the site etc.)

As the site is relatively flat with negligible contour level difference compared to the total extent of

the site the cutting quantities are not recognizable. There will be excavations for the proposed

column foundations, the soil excavated will be used for back filling.

1.7. Give details regarding water supply, waste handling etc during the construction period.

The requirement during construction will be met NTADC-New Tirupur Area Development

Corporation. The construction waste will be disposed off regularly as suggested by authorized

recyclers.

13

1.8. Will the low lying areas & wetlands get altered? (Provide details of how low lying and

wetlands are getting modified from the proposed activity)

The proposed design plans will not affect the outside drainage patterns. The storm water from the

land will be utilized for greenbelt or drain to the nearest drainage system.

1.9. Whether construction debris & waste during construction cause health hazard? (Give

quantities of various types of wastes generated during construction including the construction

labour and the means of disposal)

No, the construction waste will not cause any health hazard. Construction debris will be collected

and suitability used on site as per construction waste management plan. And will be safely

disposed off by the authorized recyclers.

2. WATER ENVIRONMENT

2.1. Give the total quantity of water requirement for the proposed project with the breakup

of requirements for various uses. How will the water requirement met? State the sources &

quantities and furnish a water balance statement.

Water requirement for the project site is expected to be sourced from the existing NTADCL /

TWAD line shall be examined, to ensure continuous water supply. The total water requirement for

the project will be about 400 KLD. Water balance chart is given in Annexure – III.

2.2. What is the capacity (dependable flow or yield) of the proposed source of water?

The 400 KLD water demand will be met from the existing NTADCL / TWAD line shall be

examined, to ensure continuous water supply.

2.3. What is the quality of water required, in case, the supply is not from a municipal source?

(Provide physical, chemical, biological characteristics with class of water quality)

290 KLD will be required for domestic use; water will be sourced from the existing NTADCL /

TWAD line shall be examined, to ensure continuous water supply.

2.4. How much of the water requirement can be met from the recycling of treated

wastewater? (Give the details of quantities, sources and usage)

The treated sewage water of capacity 232 KLD will be used for gardening.

2.5. Will there be diversion of water from other users? (Please assess the impacts of the

project on other existing uses and quantities of consumption)

There will be no water diversion from other users.

2.6. What is the incremental pollution load from wastewater generated from the proposed

activity? (Give details of the quantities and composition of wastewater generated from the

proposed activity)

The wastewater generated from the project site will be sent to sewage treatment plant. Based on

general domestic wastewater characteristics, the BOD and COD concentrations in the wastewater

14

are expected to be in the range of 300-350 mg/L and 100-150 mg/L respectively.

2.7. Give details of the water requirements met from water harvesting? Furnish details of the

facilities created.

Through water harvesting ground water levels will be improved. The details about the rain water

harvesting plans are enclosed as Annexure – VI.

2.8. What would be the impact of the land use changes occurring due to the proposed project

on the runoff characteristics (quantitative as well as qualitative) of the area in the post

construction phase on a long term basis? Would it aggravate the problems of flooding or

water logging in any way?

The proposed project will not have any impact on the run off characteristics of the area.

2.9. What are the impacts of the proposal on the ground water? (Will there be tapping of

ground water; give the details of ground water table, recharging capacity, and approvals

obtained from competent authority, if any)

In this proposed project activity the water for the domestic uses will be sourced from the existing

NTADCL / TWAD line shall be examined, to ensure continuous water supply. Bore water will not

be extracted for the domestic and other process. So there will be no impact on the ground water.

Rain water harvesting will be implemented effectively to recharge ground water level.

2.10. What precautions/measures are taken to prevent the run-off from construction activities

polluting land & aquifers? (Give details of quantities and the measures taken to avoid the

adverse impacts)

Storm water drains will be provided along the internal roads of the site to meet the expected

increase in the runoff during the rainy season due to the impervious nature of the roof, roads and

other paved areas. In addition, all roof water will be collected and discharged into specially

designed rain water harvesting facilities.

2.11. How is the storm water from within the site managed?(State the provisions made to

avoid flooding of the area, details of the drainage facilities provided along with a site layout

indication contour levels)

As detailed, Storm water is proposed to be disposed off through percolation pit / utilized by green

belt, which are proposed to be constructed all around the complex.

2.12. Will the deployment of construction laborers particularly in the peak period lead to

unsanitary conditions around the project site (Justify with proper explanation)

No. construction labors will be hired locally and no temporary housing facility is proposed hence

not leading to any unsanitary conditions around the project site.

2.13. What on-site facilities are provided for the collection, treatment & safe disposal of

sewage? (Give details of the quantities of wastewater generation, treatment capacities with

technology & facilities for recycling and disposal)

Sewage treatment plant of capacity 240 KLD will be proposed to treat the sewage (232 KLD)

generated from the project site. Treated sewage water (232 KLD) will be reused for gardening.

15

2.14. Give details of dual plumbing system if treated waste used is used for flushing of toilets

or any other use.

Treated sewage water is used for gardening only, hence no requirement for dual plumbing system.

3. VEGETATION

3.1. Is there any threat of the project to the biodiversity? (Give a description of the local

ecosystem with its unique features, if any)

The proposed project does not affect the local ecosystem. The project site is located in an area

where only barren dry lands are present. No animals are seen in the area surrounding the site.

3.2. Will the construction involve extensive clearing or modification of vegetation? (Provide

a detailed account of the trees & vegetation affected by the project)

In the vicinity of the proposed project site there are no big trees are present. The present project site

is vacant and no sight of trees in the surroundings.

4. FAUNA

4.1. Is there likely to be any displacement of fauna- both terrestrial and aquatic or creation of

barriers for their movement? Provide the details.

The location for the proposed project is a vacant land; no fauna will be disturbed due to the

proposed project.

4.2. Any direct or indirect impacts on the avifauna of the area? Provide details.

No, there are no direct or indirect impacts on the avifauna of the area.

4.3. Prescribe measures such as corridors, fish ladders etc to mitigate adverse impacts on

fauna

There will not be adverse impacts on fauna by the proposed project and so the above said measures

are not required.

5. AIR ENVIRONMENT

5.1. Will the project increase atmospheric concentration of gases & result in heat islands?

(Give details of background air quality levels with predicted values based on dispersion

models taking into account the increased traffic generation as a result of the proposed

constructions)

The proposed project is a construction of Industrial Park project. There will be no emissions from

the proposed project. There will be a slight increase in the vehicular traffic, which might result to a

slight increase in pollution. However emissions would be well within the TNPCB limits.

16

5.2. What are the impacts on generation of dust, smoke, odorous fumes or other hazardous

gases? Give details in relation to all the meteorological parameters.

No hazardous gases are produced due to proposed construction. There will be a slight increase in

the vehicular traffic, which might result to a slight increase in dust, smoke etc.

5.3. Will the proposal create shortage of parking space for vehicles? Furnish details of the

present level of transport infrastructure and measures proposed for improvement including

the traffic management at the entry & exit to the project site.

The proposed project has planned to provide 100% parking facilities for all the vehicles in the open

space. Adequate measures will be taken to efficiently manage the traffic at the entry and exit of the

site.

5.4. Provide details of the movement patterns with internal roads, bicycle tracks, pedestrian

pathways, footpaths etc., with areas under each category.

The parking details are shown in the project layout map. The parking details are enclosed in

Annexure – II.

5.5. Will there be significant increase in traffic noise & vibrations? Give details of the sources

and the measures proposed for mitigation of the above.

Due to the proposed construction project there will be a slight vehicular traffic noise & vibrations

will be resulted and the impact by the same will be reduced by planting trees etc.

5.6. What will be the impact of DG sets & other equipment on noise levels & vibration in &

ambient air quality around the project site? Provide details.

For this project, DG set of capacity of 82.5 KVA (1 No) will be used. As per the prevailing

norms the DG sets will be covered with acoustic enclosures to reduce the noise levels. Emission of

heat and smoke is vented out through stack as per norms from statutory body.

6. AESTHETICS

6.1. Will the proposed constructions in any way result in the obstruction of a view, scenic

amenity or landscapes? Are these considerations taken into account by the proponents?

The proposed project does not obstruct any scenic view.

6.2. Will there be any adverse impacts from new constructions on the existing structures?

What are the considerations taken into account?

With the development of the proposed project there will not be adverse impacts on the surrounding area.

6.3. Whether there are any local considerations of urban form & urban design influencing

the design criteria? They may be explicitly spelt out.

17

All norms on ground coverage, FAR, height, setbacks, structural design, and other parameters will be

strictly followed.

6.4. Are there any anthropological or archaeological sites or artifacts nearby? State if any

other significant features in the vicinity of the proposed site have been considered.

There are no such sites located in the vicinity of the proposed project site.

7. SOCIO-ECONOMIC ASPECTS

7.1. Will the proposal result in any changes to the demographic structure of local population?

Provide the details.

With the proposed project there will be an inflow of population into the area. During construction

phase of the project, this project will provide temporary employment to many unskilled and semi-

skilled laborers in nearby areas. This project will also help in generation of indirect employment to

those people who render their services for the personnel directly working in the project. Thus the

direct and indirect employment generation by this project will be a positive socio-economic

development in the surroundings of the project area. The socio-economic development in the

region will lead for enhancement of quality of life of people in the region.

7.2. Give details of the existing social infrastructure around the proposed project.

Some Industrial/residential development is seen in the surrounding of the project site.

7.3. Will the project cause adverse effects on local communities, disturbance to sacred sites or

other cultural values? What are the safeguards proposed?

No such effects will be caused on the local communities due to proposed project.

8. BUILDING MATERIALS

8.1. May involve the use of building materials with high-embodied energy. Are the

construction materials produced with energy efficient processes? (Give details of energy

conservation measures in the selection of building materials and their energy efficiency)

The proposed project is designed and developed based on energy conservation concept Energy

Conservation Measures enclosed as Annexure VIII.

8.2. Transport and handling of materials during construction may result in pollution, noise &

public nuisance. What measures are taken to minimize the impacts?

The transport and handling of material will result in pollution to the nearby areas but they will still

be within the permissible limits of residential/commercial areas. To minimize the impacts of

pollution the construction materials are proposed to be transported to the site during non peak hours

reducing noise, traffic & public nuisance.

18

8.3. Are recycled materials used in roads and structures? State the extent of savings

achieved?

Recycled materials like fly ash bricks and hollow blocks are proposed to be used for this project.

8.4. Give details of the methods of collection, segregation & disposal of the garbage generated

during the operation phases of the project.

For biodegradable wastes, composting method/buyers is proposed and the non biodegradable

wastes are disposed off through authorized recyclers.

9. ENERGY CONSERVATION

9.1. Give details of the power requirements, source of supply, backup source etc. What is the

energy consumption assumed per square foot of built-up area? How have you tried to

minimize energy consumption?

The estimated power requirement for the site is a maximum of 10 MW and this will be sourced

from TNEB.

9.2. What type of, and capacity of, power back-up to you plan to provide?

Power backup through diesel generator set of capacity 82.5 KVA (1 No.) will be provided for

essential services.

9.3. What are the characteristics of the glass you plan to use? Provide specifications of its

characteristics related to both short wave and long wave radiation?

Normal glass of 5mm thick will be used for windows and pin head 4mm thick glass for ventilators

will be used.

9.4. What passive solar architectural features are being used in the building? Illustrate the

applications made in the proposed project.

Solar street lights are proposed to reduce the power consumption.

9.5. Does the layout of streets & buildings maximize the potential for solar energy devices?

Have you considered the use of street lighting, emergency lighting and solar hot water

systems for use in the building complex? Substantiate with details.

Yes, solar energy systems will be used.

9.6. Is shading effectively used to reduce cooling/heating loads? What principles have been

used to maximize the shading of Walls on the East and the West and the Roof? How much

energy saving has been effected?

Insulated sheet cladding will be provided to reduce the heat ingress inside the building.

19

9.7. Do the structures use energy-efficient space conditioning, lighting and mechanical

systems? Provide technical details. Provide details of the transformers and motor efficiencies,

lighting intensity and air-conditioning load assumptions? Are you using CFC and HCFC free

chillers? Provide specifications.

The proposed project is designed and developed based on maximum energy efficient concept,

so all necessary arrangements will be made.

9.8. What are the likely effects of the building activity in altering the micro-climates? Provide

a self assessment on the likely impacts of the proposed construction on creation of heat island

& inversion effects?

As the proposed project is a construction of Industrial Park project, no such effects will be

created on the environment.

9.9. What are the thermal characteristics of the building envelope? (a) roof; (b) external

walls; and (c) fenestration? Give details of the material used and the U-values or the R values

of the individual components.

All the characteristics and properties of the material will be adhered to National building code

2005 codes.

9.10. What precautions & safety measures are proposed against fire hazards? Furnish details

of emergency plans.

As per local building norms and regulations of NBC the fire safety precautions are proposed.

9.11. If you are using glass as wall material provides details and specifications including

emissivity and thermal characteristics.

Glass is not used as wall material.

10. ENVIRONMENT MANAGEMENT PLAN

The Environment Management Plan would consist of all mitigation measures for each item wise

activity to be undertaken during the construction, operation and the entire life cycle to minimize

adverse environmental impacts as a result of the activities of the project. It would also delineate

the environmental monitoring plan for compliance of various environmental regulations. It will

state the steps to be taken in case of emergency such as accidents at the site including fire.

The environmental management plan would focus on possible significant impacts. As indicated the

proposed project is not expected to cause any impacts to the natural environment. However, during

site preparation and construction phases of the project some impacts to air quality through dust

emission is expected. The same can be mitigated through proper dust control measures such as

sprinkling water along the areas where vehicular traffic and earth moving equipment will be

active. Impacts to air quality from emission of exhaust gases from vehicles and equipment

could be minimized by turning of the engines instead of keeping them in idle mode. The impact

20

of emissions from on site vehicles and equipment is expected to low compared to that

caused by the emissions from vehicular traffic.

Water quality impacts are not expected as it is proposed to meet the domestic water supply

demand from the existing NTADCL / TWAD line shall be examined, to ensure continuous water

supply. Best practice for storm water management will be followed and the storm water drain

systems will be developed which will drain excess storm water into the nearby drainage system.

Wastewater generated by the project will be treated in sewage treatment plant and treated water

reused for gardening.

The contractor will take all necessary actions to ensure health and safety of construction workers.

CONCEPTUAL PLAN (DESCRIPTIVE REPORT OF THE PROJECT)

1. INTRODUCTION

M/s. Codissia Industrial Park Ltd has proposed to construct industrial park project at Survey

96/1, 97, 98, 99/2, 101/2, 101/3, 102/2B, 131/2, 135/2, 136/2, 138, 141/2, 142/1B1, 142/2B1,

142/2B2, 142/3A, 142/3B, 143/1, 143/2, 143/3, 143/4, 144/1, 144/2, 144/3, 144/4, 145/1, 146/1,

147/1, 147/2, 147/3, 148/1, 148/2, 314, 315/1A, 315/1B, 315/2A, 315/2B, 315/3, 316/1, 316/2,

316/3, 317/2, 318/1, 318/2, 318/3, 320/1, 320/2A, 320/2B, 320/2C, 320/2D, 320/2E, 320/2F,

321/1, 321/2, 322/1 and 322/2 Kallapalayam Village, Palladam Taluk, Coimbatore District.

1.1 Details of the proposed site: Following are the details regarding the proposed site.

a) Archaeological monuments

The location does not have any archaeological monuments in nearby 10km radius.

b) Biological resources

It was found during study period that the location is devoid of any endangered flora and fauna in

25 km radius.

c) Cultural Monuments

The site does not have any cultural monuments within the area of 10 km radius.

d) Defence

There is no defence installation within 10 km radius of this site.

e) Employment Generation

This project will generate the employment in the immediate surroundings of the people during

the construction period.

f) Geography

The location is geographically suitable for setting up of project, as the unit will not be disturbed

by climatic and other geographical condition.

21

g) Transportation facilities

The project site is well connected by road and rail. The nearest major railway station is

Coimbatore and Airport is Coimbatore.

h) Socio-economic

The unit will improve the economy both at International, National and State level.

I) Meteorology

Both micro and macro meteorology is found to be suitable for this project.

j) Natural disaster

The area is devoid of natural disasters like earthquake, cyclone, landslides etc.

k) Sensitive area

The location does not have any sensitive areas in nearby 10km radius.

l) Power

The power would be sourced from TNEB. The estimated power requirement for the project is

about 10 MW.

m) Highway

The proposed project site is also well connected by NH and MDRs and abuts the road in the north.

n) Land use classification

The land that has been procured for the purposes of the proposed project is not covered under the

Local Planning Authority (LPA). It has not been indicated or listed in the Master Plan of the LPA

as well; hence it has No Land Use. Thus, an approval from Directorate of Town & Country

Planning has to be obtained for converting the said land from No Land Use to land for Industrial

Development.

2 SALIENT FEATURES OF THE PROJECT

TABLE 2.1: PROJECT PROFILE Sl.No. Description Details

1. Total Site Area

643704.02 Sq. m

2. Total water demand 400 KLD

3. Power demand and source 10 MW from TNEB

4. DG Set 82.5 KVA

5. Total Estimated Cost Of Development Rs. 90.08 Crores

TABLE 2.2: AREA DETAILS FOR THE PROPOSED PROJECT

Area Break up Area in Sq.m

a) Ground coverage area 144840.15

b) Road and Physical Infrastructure Area

90122.76

22

c) Parking Area 32186.70

d) Landscaping area (33 % of the total area)

212432.2

e) OSR area (11 % of the total area)

70810.74

f) (STP & Solid waste storage Area

12874.68

g) Others/Vacant 80436.79

Total Site Area 643704.02

Table 2.3: Details of Material used during construction No. Description

1. Reinforcement Steel

2. Cement

3. Cement Blocks

4. Sand

5. Aggregate

6. Aluminum

7. Wood

Table 2.4: Details of Details of construction equipment No. Description

1. Transit mixers

2. Tipper

3. Batching plant

4. Vibrators

5. Mobile concrete pump

6. Static pump

7. Tower crane

8. Excavator

9. JCB

10. Loader

11. Compressor

3 WATER CONSUMPTION In this project, water will be used for domestic purpose. The total requirement of water for this project will

be 400 KLD. It will be met from the existing NTADCL / TWAD line shall be examined, to ensure

continuous water supply.

4 WASTEWATER DETAILS In this project, the wastewaters generated due to the domestic uses. The sewage disposal method and the details are given below:

Table: 4.1

Water balance chart and design details of STP are enclosed as Annexure III & IV respectively.

S.No. Details Quantity/day

1. Sewage 232 KLD

23

5.0 EXISTING ENVIRONMENTAL STATUS 5.1 MICROMETEOROLOGY Meteorological conditions play a vital role in planning orientation of stacks, operation and maintenance of factory and also on the environmental impact. The summary of micrometeorological data of the region pertaining to the years 2009 - 2013 is presented in Table 5.1 – 5.6. 5.2 TEMPERATURE April is the hottest month with maximum monthly mean temperature of 36.1 0 C. January is the coolest month with minimum monthly mean temperature of 19.36 0 C

Table 5.1 - AVERAGE MINIMUM TEMPERATURE (oC) FOR DIFFERENT MONTHS

(2009-2013) FROM IMD STATION COIMBATORE

Month 2009 2010 2011 2012 2013 AVG

January 18.7 20.3 19.1 18.9 19.8 19.36

February 19.9 20.8 19.4 19.9 20.9 20.18

March 22.3 23 21.9 22.9 22.9 22.6

April 24.3 25.1 23.4 24.2 24.7 24.34

May 23.8 25 23.5 24.2 24.5 24.2

June 27.7 23.5 22.7 23.2 22.5 23.92

July 27 22.6 22.3 22.8 22.2 23.38

August 26.4 22.4 22.4 22.7 22.5 23.28

September 25.8 22.6 22.4 22.7 22.6 23.22

October 25 22.5 22.5 22.4 22.4 22.96

November 23.9 21.7 20.8 21.3 22.3 22

December 22.5 20 19.5 20.5 20.1 20.52

Average 23.94 22.46 21.66 22.14 22.28

NOTE : The average temperatures have been calculated on the basis of data available

Source : Indian Meteorological Department

24

Table 5.2 - AVERAGE MAXIMUM TEMPERATURE (oC) FOR DIFFERENT MONTHS

(2009-2013) FROM IMD STATION COIMBATORE

Month 2009 2010 2011 2012 2013 AVG

January 30.2 30.6 30.7 30.2 31.7 30.68

February 33.4 33.3 32.4 32.7 32.5 32.86

March 35.2 36.2 34.8 35.7 34.7 35.32

April 36.1 37.3 34.5 36.1 36.5 36.1

May 34.5 35.3 34.2 34.8 35.3 34.82

June 39 32.9 31.1 32.4 30.6 33.2

July 37.1 31.5 31.3 31.8 30.1 32.36

August 36.3 30.9 31.3 31.2 31.6 32.26

September 35.3 31.9 31.8 32.5 31.6 32.62

October 34.1 31.7 32.3 31.5 31.8 32.28

November 30 29.1 29.3 31.2 28.9 29.7

December 29 28.9 29.7 30.8 29.9 29.66

Average 34.18 32.47 31.95 32.58 32.10

NOTE : The average temperatures have been calculated on the basis of data available

Source : Indian Meteorological Department

25

Tables 5.4 - MONTHLY MEAN RELATIVE HUMIDITY (%) AT 0830 HOURS

(2009-2013) FROM IMD STATION COIMBATORE

Month 2009 2010 2011 2012 2013 AVG

January 78 80 63 65 58 68.8

February 68 77 51 27 43 53.2

March 71 71 51 44 42 55.8

April 73 73 68 61 65 68

May 79 78 69 69 68 72.6

June 61 80 70 64 67 68.4

July 67 81 73 68 59 69.6

August 70 83 59 58 78 69.6

September 76 80 62 68 70 71.2

October 73 82 72 55 59 68.2

November 90 89 63 61 62 73

December 90 86 64 50 63 70.6

Average 74.6667 80 63.75 57.5 61.17

NOTE : The average relative humidity have been calculated on the basis of data available

Source : Indian Meteorological Department

Table 5.3 - MONTHLY RAINFALL DATA (MM)

(2009-2013) FROM IMD STATION COIMBATORE

Month 2009 2010 2011 2012 2013 AVG

January 0 0.1 0.2 0.8 0 0.22

February 0 0 37.7 0.1 99 27.36

March 5.8 0 12.5 0.1 2.3 4.14

April 3.1 17.7 134.6 37.1 30.7 44.64

May 91 57.8 83.1 10 47.2 57.82

June 8.3 31.9 63 6.8 16.7 25.34

July 72.1 14.8 4.6 3 10.1 20.92

August 83.2 60.1 4.2 7.4 18.2 34.62

September 79.6 30.8 27.9 2.2 27.8 33.66

October 94.6 132.2 323.6 152.8 81.7 157

November 716.5 256.3 271.3 19.1 52.8 263.2

December 229.7 34.7 11 3.9 22.4 60.34

AVG 115.325 53.03 81.14 20.28 34.08

NOTE : The average rainfall have been calculated on the basis of data available Source : Indian Meteorological Department

26

Tables 5.5 - MONTHLY MEAN RELATIVE HUMIDITY (%) AT 1730 HOURS

(2009-2013) FROM IMD STATION COIMBATORE

Month 2009 2010 2011 2012 2013 AVG

January 35 30 39 38 30 34.4

February 23 29 31 31 34 29.6

March 27 25 26 30 36 28.8

April 37 40 47 41 42 41.4

May 55 58 56 57 53 55.8

June 64 65 68 63 71 66.2

July 61 66 67 63 71 65.6

August 66 67 68 67 66 66.8

September 70 63 65 62 70 66

October 67 71 70 65 64 67.4

November 85 73 63 48 57 65.2

December 82 60 54 43 48 57.4

Average 56 53.92 54.5 50.67 53.5

NOTE : The average relative humidity have been calculated on the basis of data available

Source : Indian Meteorological Department

Table 5.6 - MONTHLY AVERAGE WIND SPEED, 24 HRS (KMPH)

(2009-2013) FROM IMD STATION COIMBATORE

Month 2009 2010 2011 2012 2013 AVG

January 3 5 4 4 4 4

February 4 4 5 5 5 4.6

March 4 6 5 7 5 5.4

April 6 7 5 7 7 6.4

May 9 9 9 11 9 9.4

June 6 11 12 13 12 10.8

July 6 12 12 13 12 11

August 5 12 12 12 9 10

September 4 9 11 12 9 9

October 3 8 6 5 7 5.8

November 3 3 3 5 3 3.4

December 5 4 3 4 4 4

Average 4.83333 7.5 7.25 8.167 7.167

NOTE : The average temperatures have been calculated on the basis of data available Source : Indian Meteorological Department

27

6 AIR POLLUTION CONTROL MEASURES The following APC measure has been provided for the emission from the respective units.

Table: 6.1.

S. No. Air pollutant Source Control

1 SO2, NOx DG sets With acoustic enclosure

2 Dust, SO2, NOx, CO

Vehicles Black carpeted roads will be maintained properly to reduce dust, All vehicle owners will be informed to follow the emission standards fixed by Government Authorities to keep the air pollutants under control.

7 SOLID WASTES Solid waste expected to be generated from the project will be of domestic in nature. It will be

collected from designated locations and arrangement will be made for disposal of the same.

The collected solid waste will be disposed through municipality.

S.No. Particulars Quantity Kg/Day Method of Disposal

1 Biodegradable 600 Biodegradable waste will be disposed to Municipality.

2 Non Biodegradable 400

The non-biodegradable waste will be disposed to authorized recycler.

3 Sludge from STP 30 Used as manure.

28

8 ENVIRONMENTAL LITIGATION MEASURES

Table 8.1: General Environmental mitigation measures

Environmental

impact

Mitigation measures Time

frame

Implementing

organization

Responsible

organization CONSTRUCTION PHASE

Environmental Management and Monitoring

This will include institutional requirements, training, environmental management and monitoring.

During and after construction

Contractor The project proponent

Air Pollution Vehicles and machinery are to be regularly maintained so that emissions conform to National and State AAQ Standards.

Beginning with and continuing throughout construction

Contractor The project proponent

Noise Noise standard at processing sites, e.g. aggregate crushing plants, will be strictly enforced to prevent exceedances of GOI noise standards. Workers in vicinity of strong noise will wear earplugs and their working time should be limited as a safety measure.

Beginning and through construction

Contractor The project proponent

Solid waste Management

The waste generated from labour during construction shall suitably be collected and shall be disposed at suitable site.

Beginning and through construction

Contractor The project proponent

OPERATION PHASE

Air Pollution Afforestation programs – Tree Plantations.

After completion of construction

The project proponent

Noise The use of sound barriers or other measures should be considered where warranted. The public will be educated about the regulations of noise from vehicles

After completion of construction

The project proponent

Water management The water shall suitably be checked for various uses and shall be reported accordingly.

During operation The project proponent

Maintenance of Storm Water Drainage System

The urban drainage systems will be periodically checked and cleared so as to ensure adequate storm water flow.

Beginning and end of monsoon

The project proponent.

Waste Management The waste generated from toilets etc., shall be properly collected and shall be suitably disposed off.

During operation The project proponent

29

Topo Plan –5 Km Radius

SITE

30

Site Location & Setting for Park

Coimbatore

Site

Palladam

31

Annexure I

Land Use Area Break Up

Area Break up Area in Sq.m

h) Ground coverage area 144840.15

i) Road and Physical

Infrastructure Area

90122.76

j) Parking Area 32186.70

k) Landscaping area (33 % of

the total area)

212432.2

l) OSR area (11 % of the total

area)

70810.74

m) (STP & Solid waste storage

Area

12874.68

n) Others/Vacant 80436.79

Total Site Area 643704.02

Annexure II

Details of Parking

S.No Description

No. of

Parking

required

No. of

Parking

provided

Area

required per

unit (m2)

Area required

for parking (m2)

Area provided

for parking (m2)

1

Car

Parking 375 442 13.75 5156.25 6077.5

2

Two

wheeler 520 553 3 1560 1659

3 Truck 620 652 37.5 23250 24450

29966.25 32187

32

Annexure – III

WATER BALANCE CHART

Total Water Requirement : 0.4 MLD ; Source : NTADC-New Tirupur Area Development Corporation

Domestic Water Demand

290 KLD

STP Designed Capacity

240 KLD

Gardening

232 KLD

80% of total water demand

Sewage Generation

232 KLD

Treated Sewage Water

232 KLD

33

Annexure -IV

Design Calculation for Sewage Treatment Plant

Flow rate logistics:

Design capacity : 240.0 KLD

Operating Hours : 20 hrs

Average Flow Rate : 12.0 m3/hr

Quality logistics: S.No Description Unit Inlet Outlet Standards

1 pH - 6 .5- 8.5 6.5 – 7.5 5.5 – 9

2 TSS mg/l 150 – 250 <20 < 30

3 BOD mg/l 300 – 350 < 10 <20

4 COD Mg/l 600 - 700 < 100 < 250

5 Oil & Grease Mg/l 50 < 5 < 10

Bar Screen Chamber

Bar Screen Size - 2.1 m x 0.5 m x 1.6 m TH

Volume of Bar Screen Chamber V - 1.68 cum

Flow Rate Q - 12.0 cum/hr

Retention time T - V / Q

- 1.68/ 12

- 0.14 hrs

Standard retention hrs for Bar screen Chamber is 15 mins – 20 mins

Provided retention hrs is more than sufficient to recover coarse particles.

Hence the Bar Screen chamber is adequate

Sewage Collection tank:

Size of collection tank - 7.0 m x 7.0 m x 2.5 m SWD + 0.5 m FB

Volume of Collection tank V - 122.5 cum

Flow rate Q - 12.0 cum/hr

Retention time T - V / T

- 122.5 /12

- 10.20 hrs

Standard retention time for Collection tank is 8 – 10 hrs.

Air requirement for Sewage Collection sump = 80% of the volume of sewage collection sump.

Hence the air requirement = 0.8*122.5 = 98.0 m3/hr

Hence the considered sewage collection sump is adequate.

FBBR - AERATION TANK:

Size of Aeration tank - 5.3 m x 5.3m x 3.5m SWD + 0.5 m FB

Volume of Aeration tank V - 98.3 cum

Flow rate Q - 12.0 cum/hr

Volume of the Aeration Tank Required - BOD Load/(F/M * MLVSS)

BOD Load - 3.5 Kg of BOD per day

MLVSS - 80% of MLSS

MLSS - 3500 – 4000 PPM

34

F/M Ratio - 0.1 to 0.15

We have offered FBBR based Sewage Treatment Plant,

Standard Retention time for FBBR based STP is 6 hrs, but we have considered 8.2 hrs retention for

Aeration.

FBBR Media Specifications.

Color : Black

No. of. Pieces : 1, 00,000/-

Surface area : 500 m2/m3

Specific gravity : 0.94 gm/cc

Reduction of BOD : 84 kg of BOD / m3 volume of FBBR Media

Volume of Media required: 84 /6.0 = 14 m3

Air Blower Assume O2 requirement - 2 kg of O2/ 1 kg of BOD

- 1kg of BOD / 2 kg of O2

Assume BOD for sewage - 350 mg/l - 0.35 kg/m

3

BOD Load - 240 x 0.35

- 84.0kg of BOD/day

O2 requirement - 84 x 2

- 168 kg of O2/day

Oxygen transfer @ 16% of SOTR - 168 / (0.16 x 0.23x 0.65 x 0.95)

- 168 / 0.023 = 7304.34

α = 0.65; β = 0.95

Density = 1.2 => 7304.34 / 1.2 - 6086.95 m3/day

Air requirement - 6086.95/ 24

- 253.623 m3/hr

The air requirement for Aeration system = 254 m3/hr @ 4.5 m Head

Secondary Settling Tank:

Average flow rate : 12.0 m3/hr

Size of the tank : 4.0 m x 4.0 m x 3.0 m SWD + 0.5 m FB

Volume of tank : 48 m3

Retention time : 48 /12.0

: 4.0 hrs

Standard Retention time for Secondary Settling 3 to 4 hrs, But we have considered 4.0 hrs of retention time.

Filter Feed Tank

Size of the Filter feed tank - 3.8 m x 3.8 m x 2.5 m LD + 0.5 m FB

Volume of Filter Feed tank V - 36.1 cum

Flow rate Q - 12.0 cum/hr

Retention time T - V / T

- 36.14 /12.0

- 3.0 hrs

Standard retention time for Filter Feed tank is 2.0 hrs

Provided retention hrs is > or = Standard retention hrs.

35

Pressure Sand Filter:

Flow rate Q : 12.0 cum/hr

Filtration rate for PSF (V) : 12 m3/m2 hr

Q : A x V

A : 12.0 / 12

: 0.1 SQ.M

D : 1.0 M

Diameter to be provided is 1000 mm

Height to be provided is 1500 mm.

Filtering media: Fine Sand / Silex

Supporting media: Gravels / Pebbles

Hence the size of the vessel is = 1000 mm dia x 1500 mm HOS

Provided diameter is > or = Standard diameter.

Activated Carbon Filter:

Flow rate Q : 12.0 cum/hr

Filtration rate for ACF (V) : 12 m3/m2 hr

Q : A x V

A : 0.12 / 12

: 0.1SQ.M

D : 1.0 M

Diameter to be provided is 1000 mm

Height to be provided is 2000 mm

Filtering media: Granular Activated carbon.

Supporting media: Gravels / Pebbles.

Hence the size of the vessel is = 800 mm dia x 2000 mm HOS

Provided diameter is > or = Standard diameter.

Sludge Holding Tank:

Size of Sludge Holding Tank - 5.0m x 5.0m x 2.0m SWD + 0.5m FB

Plant Capacity - 240 KLD

Inlet BOD - 350 mg/l

BOD Load - (240 * 350)/1000 = 84 kg/day

Sludge consistency - 0.01 (1.0%)

Volume of sludge generation - 30% of BOD load

30% of BOD Load - 0.3*84 = 25.2 Kg / day

- = 25.2 m3/day

Volume of the sludge tank - 50.0

The standard retention time of sludge holding tank will be 24 hrs / one day, But here we considered more

than storage of sludge generation.

Sludge will be dewatered by filter press.

The Air required for sludge Holding tank will be = 60.0 m3/hr

The Total Blower Capacity = 412 m3/hr @ 4.5 m Head

36

Annexure V

Solid Waste Generation

S.No No. of Occupants

Per capita

value

(kg/capita/day)

Total waste

(in kg/day) 1 5000 0.2 1000

Total solid waste generation for Institution as

per CPHEEO (kg/day) 1000 Assuming 60% of biodegradable waste

(kg/day) 600 Assuming 40% of Non biodegradable waste

(kg/day) 400

S.No. Particulars

Quantity

Kg/Day Method of Disposal

1

Biodegradable

600

Biodegradable waste will be

disposed to Municipality.

2

Non Biodegradable

400

The non-biodegradable waste

will be disposed to authorized

recycler.

3 Sludge from STP

30 Used as manure.

Annexure VI

Storm Water Drainage System & Estimated Cost

(a) Design Considerations

Designing of the storm water disposal system would be a key design aspect of the proposed

Park. Considering the topographic features and the levels at the site with the corresponding

off-site drainage network, a network of storm water drains parallel to the proposed road

network has been planned to drain the storm water

(b) Design Parameters

The following factors are taken into consideration for planning of the storm water drainage

system:

(i) The pattern of natural slope of the site, its extent and direction

(ii) Strom water drained towards the ponds, thus natural drainage system in the

downstream area

(iii) The road network system envisaged and level of the roads

37

(iv) The rain fall run off from plots/units, and other covered areas into catch basin

connected to branch drain laid along the road adjacent property line. The branch drain

carries the water into lateral, which in turn carries it to the trunk drain

(v) The rainwater from open spaces and from isolated places, flow over the ground

following the natural slope and get into the nearest drain through the vertical grating

(vi) As a camber of 2.5% on the pavement is provided, the runoff from the ROW shall

flow towards the drains provided at either side of road

(vii) For design of storm water drainage system for the park, following design parameters

are considered:

(AA) Rainfall Intensity: 35mm / hr for a return period of 2 years

(BB) Runoff factor: 60% runoff factor from the total area

(CC) Minimum gradient: 1 in 300

(DD) Minimum velocity: 0.6 m /sec

(c) Proposed Drainage System

(i) The network shall be designed to drain away the runoff from the plots and the roads

would comprise of open rectangular RCC drains with PCC floor

(ii) The storm water flow will finally drain into a lead off storm water drainage system

connected to the road system

Annexure VII

Calculation of Stack Height Diesel Generator Capacity 82.5 KVA -1 No

The minimum height of stack to be provided with each generator set can be worked

out by using the following formula:

H = h+0.2 x KVA

Where, H = Total height of stack in meter

h = Height of the building in meters where the generator set is installed

KVA = Total generator capacity of the DG set in KVA.

= 9.114 + 0.2 x 82.5

= 10.9304

Required Height of Stack =10.93 m, Hence Unit will provide 11 m height stack.

38

Annexure VIII

ENERGY CONSERVATION MEASURES

Energy conservation measures proposed are provision of Compact fluorescent lamps (CFL). The usage of

CFL will reduce the energy consumption substantially and reduce the indirect impact of emissions. Various

capacities of compact fluorescent lamps are available in the market. The equivalent CFL for incandescent

lamps are presented below.

CFL and Incandescent Lamp Capacities

Incandescent lamp capacity in

watts

CFL capacity with same lumens

in watts

20 5

28 7

36 9

40 10

52 13

60 15

75 20

100 26 – 29

150 38 – 42

250 - 300 55

Maximum utilization of natural light.

CFL Lighting fixtures will be used in common areas

Solar lighting for garden and open area

Solar water heaters for 20% of total hot water requirement

MEASURE DESCRIPTION ENERGY

SAVING METHODS

ENERGY SAVING

METHODS

Energy efficient equipment Internal lighting – Use of CFL

lighting

20% of normal operation by

using CFL lamps &

electronic ballast

Pumps 25% normal operation by

using VFD drive

Renewable Energy Solar street lighting 25% normal operation by

using solar street lights

Solar water heater 20% Normal operation by

using solar heater

39

Annexure IX

Environmental Management & Monitoring Plan

Sl.

No. Environment

Potential

Impact

Expected Source Of

Potential Impact Mitigation Measures Remark

1. Air

Environment

Dust

&

Gaseous

Emission

Construction Phase

Excavation of

construction material

Due to the operation of

construction equipments.

Water Sprinkling

will be done to

settle the dust

No dust as RMC

will be brought

Tin sheet will be

erected all around

Periodic

maintenance of

construction

equipments

Impact will

be confined

to short

duration

Operational Phase

Due to operation of DG

set.

DG set installed

with acoustic

measures

Generator exhaust

will be taken

above top level of

building as per

CPCB norms.

Not

significant

as DG set

would be

used as

emergency

power back

up.

2. Water

Environment

Ground

Water,

Surface

Water

&

Storm Water

Construction Phase

Waste water generated

from labor and other

constructional activities.

Sewage will be

discharged in to

Septic Tank/ Soak

Pit /

Operational Phase

Discharge of sewage

Discharge of storm water

Sewage will be

treated in STP.

Rainwater

Harvesting will be

done

Treated

sewage

water is

used for

gardening.

3. Noise

Environment

Noise

Emission

Construction Phase

Operation of construction

equipments and vehicle

movement during site

development

Use of well

maintained

equipment fitted

with acoustic

measures

Ear plugs/muffs

for the working

staffs

Use of well

maintained

equipment

fitted with

acoustic

measures

Ear

plugs/muffs

for the

working

staffs

Operation phase

Vehicles movement

Operation of DG set

Individual acoustic

enclosures will be

provided for DG

set

No impact.

40

4. Solid Waste Soil Construction Phase

Disposal of construction

debris

Domestic waste by

labours

Construction

debris will be

collected and

suitability used on

site as per

construction waste

management plan

Operation Phase The paper and the plastic

used at the individual

level.

Food Waste/Kitchen

Waste in the form of

garbage and rubbish.

Reuse/Recycle of

the paper and

plastic waste.

Planned system for

waste collection,

segregation, and

disposal.

Solid

Waste will

be disposed

as per

guidelines

of

Municipal

Corporatio

n

5. Ecology No significant

Impact

Construction Phase

Site Development during

construction

Existing trees will

be retained or

replanted as per

the landscape plan.

Operational Phase

Increase of green cover

Suitable green belt

will be developed

as per landscaping

plan at site.

6. Traffic

Pattern

Increase of

vehicular

movements

Construction Phase

Heavy Vehicular

movement at site

Heavy Vehicular

movement will be

restricted to

daytime only and

adequate parking

facility will be

provided.

--

Operational Phase

Traffic due to commercial

once the site is

operational

Vehicular

movement will be

regulated inside

the site with

adequate roads and

parking.

--

41

Annexure X – EMP BUDGET

S.No Description Capital Cost In

Lakhs

Operational Cost

In Lakhs Per Annum

1 Environmental Monitoring 10 3

2 Sewerage System (Sewerage Network, Lift Stations/Pumping

Stations, Sewage Treatment Plant , Treated Water -Recycling

Network)

189 15

3 Storm Water Drain Network)

1. Drainage (with and without cover (based on design))

2. Rain Water Harvesting Arrangement

277 10

4 Solid Waste Management 8 2

5 Green Belt Development 50 10

TOTAL 534 40

Annexure XI

DISCLOSURE OF CONSULTANT

42

Annexure XII

FIRE PROTECTION MEASURES

This is a brief description of a number of fire protection measures, which will be used in building.

1) Fire Alarm Systems

The purpose of a fire alarm system is to alert all the occupants of the building that an emergency of fire

exists so that such occupants may put into practice the measures required by the Fire Safety Plan. All fire

alarm systems shall be maintained in full operation condition at all times. There are two main types of fire

alarm systems namely, single-stage systems and two-stage systems.

A) A single-stage system sounds a general alarm throughout the facility that may require total evacuation of

the building. Operation of the fire alarm is activated by a manual pull station, heat detector, smoke detector

or a sprinkler head.

B) A two-stage fire alarm system is designed to allow staff to investigate and take appropriate action and

may require evacuation of the fire affected area. The general alarm or second signal is reserved as a clear

indication for complete evacuation of the building where this proves necessary.

2) Exits

An exit is that part of a means of egress that leads from the floor area it serves to a public thoroughfare or to

an approved open space. Walls, floors, doors or other means provide a protected path necessary for

occupants to proceed with reasonable safety to a place of refuge. Vertical shafts accessed from above or

below grade are protected from the remainder of the building provided the doors leading to the shaft are kept

closed.

3) Fire Department Access

Fire Department access allows fire fighters and their equipment to gain access to the building. Vehicles

parked in the fire route, excessive vegetation, snow and other forms of obstructions to access routes, fire

hydrants and fire department connections are not

permitted by the Fire Code. Maintaining fire department access is an ongoing matter, in addition, access into

a building requires consideration (ie. with a key box, through preplanning, etc.).

4) Portable Extinguishers

Portable extinguishers are intended as a first-aid measure to cope with fires of limited size. The basic types

of fires are Class A, B and C. Portable extinguishers are rated for the corresponding classes of fire.

5) Standpipe and Hose Systems

A standpipe system is an arrangement of piping, valves and hose outlets installed in a building or structure

in such a manner that water can be discharged through a hose and nozzle for extinguishment of fire. The

system is connected to a water supply, which permits an adequate supply of water to the hose outlets.

6) Automatic Sprinkler Systems

An automatic sprinkler system is a series of underground and overhead piping designed in accordance with

the fire protection engineering standards. The system is connected to a water supply such as a storage tank

or municipal water supply. The system includes a controlling valve, a series of sprinkler heads and a device

for actuating an alarm when the system is in operation. The system is usually activated by heat from a fire

and discharges water over the fire area.

43

7) Water Supply

The total water supplies required for firefighting purposes may be supplied from various sources such as a

municipal water supply, storage tanks (elevated or underground), lakes, rivers, wells, swimming pools or a

combination of sources, and should be obtained within practical distances. Water supplies must be

accessible to firefighting equipment.

8) Fire Pumps

Fire pumps are used to ensure that the water required for fire fighting and automatic sprinkler and standpipe

and hose systems is available.

9) Emergency Power

Emergency power is required to ensure the continued operation of fire and life safety equipment and systems

in case of loss of normal power.

10) Emergency Lighting

Emergency lighting ensures that exits, corridors and principal routes providing access to exits are

illuminated in the event of loss of power.

Evacuation System

Successful and efficient evacuation depends on complete preplanning, organization, and supervision.

Planning includes these basic principles:

1. Building evacuation organization;

2. Evacuation policy and plans;

3. Detection and reporting (of fire or hazard);

4. Evacuation program coordination (of movement and evacuation);

5. Communication to direct movement and evacuation;

6. Inspection and evaluation.

Building evacuation and fire safety program

Written plan _ As soon as building occupancy begins, a written plan of fire and other emergency procedures

should be agreed upon by building management and responsible representatives of each building tenant.

The emergency evacuation plan should include:

1. An outline of the emergency evacuation organization plan and agreed-upon priorities, including

responsibilities and authorities. Building and tenant representatives should agree upon these.

2. Detection, emergency warning systems, and reporting procedures for fire and other hazards should be

provided.

3. Coordination of central building emergency evacuation control with assigned floor emergency evacuation

teams should provide for the orderly movement of persons. Pre-planning and “fire in progress” chain-of-

command instructions should be detailed, and each tenant should be required to acknowledge and comply.

4. In addition to a suitable and effective fire-detection system (automatic)

5. Building management and tenants should cooperate in an education and training program for all

emergency floor-evacuation teams, employees, and building visitors. This should include a system of

personal instruction for all building inhabitants and proper posting of instructions, placards, and evacuation

diagrams at strategic locations on every floor. Emergency fire procedure information should be prominently

posted in corridors.

44

6. One individual will be designated to establish a program, including proper documentation for regular

inspections and follow-up to maintain the detection and communication system in the best operating

condition.

7. An evacuation drill program will be established that will include periodic practice of movement of

occupants to refuge areas.

Annexure XIII

FIRST AID FACILITY PROVIDED

THE EMERGENCY CONTACT NUMBERS HAVE BEEN DISPLAYED AS “Notice” in all prominent

places of the Site.

The Site is well equipped with first aid kits and posters demonstrating first aid activities and response to

emergencies. First aid kits are located at strategic points of the Site.

Proper training will be provided to personnel on first aid and on how to respond in case of accidents &

emergencies.

ANNEXURE X IV

TRAFFIC MANAGEMENT PLAN

PROPOSED PARKING PLAN

S.No Description

No. of

Parking

required

No. of

Parking

provided

Area

required per

unit (m2)

Area required

for parking (m2)

Area provided

for parking (m2)

1

Car

Parking 375 442 13.75 5156.25 6077.5

2

Two

wheeler 520 553 3 1560 1659

3 Truck 620 652 37.5 23250 24450

29966.25 32187

TRAFFIC MANAGEMENT PLAN

The Industrial Park has proposed to provide separate entry and exit gateway which is a one-way

drive way to prevent traffic congestion of entry and exit vehicles at the entrance.

A 7.2m wide vehicular access way connecting to the roads.

To establish smooth entry and exit of vehicles, suitable geometry shall be provided at the gates. This

ensures smooth transition for merging of vehicles.

All the gates shall be manned with efficient security who can guide the entry and exit of vehicles.

Barriers are created at suitable location for speed control.

Adequate sign and guide posts for traffic as per IRC (Indian Road Congress)

Road marking, stop lines, parking lanes, slot numbers; etc will be clearly painted so as to guide the

vehicles.

45

INFRASTRUCTURE COMPONENTS PLANNED

S. No Infrastructure Components

1 Plots for production

Activities

Industrial plots

2 Common Infrastructure Road Network with Street Lighting

Water Supply System

Storm Water Drainage System

Sewage Treatment Plant

Electrical Distribution System

Landscaping

3 Social Infrastructure Fire Fighting

Hospital

Crèche

Hostel Block

4 Common Industrial

Infrastructure

Industrial Super Market

Common Ware house

5 Common Amenities Administrative Block

Training & Testing Centre

Canteen

Training Centre

46

RECENT PHOTOGRAPH

47

48

49

MATER PLAN

50

DD – SCAN COPY

Risk Assessment

Risk analysis involves the identification and assessment of risks the persons involved in the

proposed project and the neighboring populations are exposed to as a result of hazard

occurrence. This requires a thorough knowledge of failure probability, credible accident

scenario, vulnerability of population etc. Much of this information is difficult to get or

generate. Consequently, the risk analysis is often confined to maximum credible accident

studies.

In the sections below, the identification of various hazards, probable risks in the proposed

project, maximum credible accident analysis and consequences analysis, which give a broad

identification of risks involved, are addressed. Based on the risk estimation for fuel storage,

a Disaster Management Plan (DMP) has been presented.

Approach to the study

Risk involves the occurrence or potential occurrence of some accidents consisting of an

event or sequence of events. The risk assessment study covers the following:

Identification of potential hazard areas;

Identification of representative failure cases;

Visualization of the resulting scenarios in terms of fire (thermal radiation) and

explosion;

Assessment of the overall damage potential of the identified hazardous events and

the impact zones from the accidental scenarios;

Assessment of the overall suitability of the site from hazard minimization and

disaster mitigation points of view;

Furnishing specific recommendations on the minimization of the worst accident

possibilities; and

Preparation of broad Disaster Management Plan (DMP), On-site and Off-site

Emergency Plan, which includes Occupational and Health Safety Plan.

Hazard Identification

Identification of hazards in the proposed project is of primary significance in the analysis,

quantification and cost effective control of accidents involving HSD. A classical definition of

hazard states that hazard is in fact the characteristic that presents potential for an accident.

Hence, the components of the proposed project need to be thoroughly examined to assess

their potential for initiating or propagating an unplanned event/sequence of events, which

can be termed as an accident. The following two methods for hazard identification have

been employed in the study:

Identification of major hazardous units based on Manufacture, Storage and Import

of Hazardous Chemical Rules, 1989 of Government of India (GOI rules, 1989); and

Identification of hazardous units and storage units in IT/ITES SEZ based on relative

ranking technique, Fire Explosion and Toxicity Index (FE&TI)

Identification of major hazardous units

Hazardous substances may be classified into three main classes such as flammable

substances and unstable substances and toxic substances. The ratings for a large number of

chemicals/substances based on flammability, reactivity and toxicity have been given in

NFPA Codes 49 and 345 M. In the proposed project, 2X 20 KL of HSD will be stored for

generation of power in case of power failure from TNEB. The details of HSD storage and its

classification as per GOI rules are given in table 1. Hazardous characteristics of the major

flammable materials and chemicals that are employed in different processes and storages

are listed in table 2

Table 1- Applicability of GOI rules to fuel

S.No Chemical / Fuel Listed in schedule Total quantity Threshold quantity (T) for

application of rules

5,7-

9,13-15

10-12

1 HSD 3(1) 2 x 20 KL 25 MT 200 MT

Table 2- Properties of storage fuels.

Chemical/Fuel

Codes/Label TLV FBP MP FP UEL LEL

⁰C %

HSD Flammable 5mg/m3 369 338 32.96 7.5 0.6

TLV : Threshold Limit Value FBP : Final Boiling Point

MP : Melting Point FP : Flash Point

UEL : Upper Explosive Limit LEL : Lower Explosive Limit

Visualization of MCA scenarios

Maximum Credible Accident

A Maximum Credible Accident (MCA) can be characterized, as an accident with a maximum

damage potential, which is still believed to be only a probable one.

MCA analysis does not include qualification of the probability of occurrence of an accident.

Moreover, since it is not possible to indicate exactly a level of probability that is still believed

to be credible, the selection of MCA is somewhat arbitrary. In practice, the selection of

accident scenarios representative for a MCA- Analysis is done on the basis of engineering

judgment and expertise in the field of risk analysis studies, especially accident analysis.

In this study, HSD storage which is believed to cause highest level of risk for the

surroundings in terms of damage and the affected distances has been studied. For this

selection, the following factors have been taken into consideration:

Type of compound like flammable;

Quantity of HSD present in the proposed project site; and

Storage conditions such as temperature, pressure and flow.

In addition to the above factors, the location of HSD storage tanks with reference to the

adjacent activities is taken into consideration for identifying the potential escalation of an

accident. This phenomenon is known as the domino effect. Accident scenarios are

established and effect and damage calculations are carried out for Maximum Credible

Accident Analysis Studies.

Methodology

Following aspects have been studied for visualization of MCA scenarios:

Flammable characteristics of HSD;

Identification of accident scenarios;

Analysis of past accidents taken place in similar conditions to establish credibility to

identified scenarios; and

Short-listing of MCA scenarios.

Common causes of accidents

Based on the analysis of past accident information, common causes of accidents are

identified as:

Proper housekeeping;

Improper use of tools, equipments, facilities;

Unsafe or defective equipment facilities;

Lack of proper procedure;

Failure to follow prescribed procedures;

Jobs not understood

Lack of awareness of involved hazards;

Lack of guides and safety devices; and

Lack of protective equipment and clothing.

Failures of human systems

Major causes of human failures reported are due to:

Stress induced by poor equipment design, unfavorable environmental conditions,

fatigue, etc;

Lack of training in safety and loss prevention;

Indecision in critical situations; and

Inexperienced staff being employed in hazardous situations.

Often, human errors are not analyzed while accidents reporting and accident reports only

provide information about equipment and/or component failures. Hence, a great deal of

uncertainty surrounds analysis of failure of human systems and consequent damages.

Short listing of MCA scenarios

Based on the storage quantities and properties of the HSD, the hazard Identification has

been done and given as follows for carrying out MCA analysis studies.

Pool fire due to rupture, leakage and accumulation;

Toxic dispersion due to gas/ vapour leaks pool evaporation; and

General fire hazards.

Conclusion

Results of FE&TI analysis show that the storage of HSD falls into light category of fire and

explosion index with zero toxicity index.

Hazard assessment and evaluation

Introduction

An assessment of the conceptual design is conducted for the purpose of identifying and

examining hazards related to feed stock materials, major process components, utility and

support systems, environmental factors, proposed operations, facilities and safeguards.

Methodology

An assessment of the conceptual design is conducted for the purpose of identifying and

examining hazards related to feed stock materials, major process components, utility and

support systems, environmental factors, proposed operations, facilities and safeguards.

Preliminary Hazard Analysis (PHA)

A preliminary hazard analysis is carried out initially to identify the major hazards associated

with storages in the proposed project. This is followed by consequence analysis to quantify

these hazards. No major hazards with potential for any emergency situation exist in the

project site.

The other hazards related to the storage areas are given in table 3 and preliminary hazard

analysis for the proposed project is given in table 4

Maximum Credible Accident Analysis (MCAA)

Hazardous substances may be released as a result of failures or catastrophes causing

possible damage to the surrounding area.

Table 3- Preliminary hazard analysis for process and storage areas.

Equipment Process Potential hazard Provision

Diesel generator Coverts mechanical Mechanical hazards

energy into electrical

energy

and fire hazards in

1. Lube oil

system

2. Cable galleries

3. Short circuits

Power

transformers

- Fire and explosion All electrical fittings

and cables are

provided as per

standards

Switch yard control

room

- Fire in cable galleries

and switch

HSD storage Used as start-up fuel

for DG sets

Fire & explosion Leaks detection

system will be

provided

Table 4- preliminary hazard analysis in general

PHA category Description of

plausible hazard

Recommendation Provision

Environmental

factors

If there is any

leakage and

eventually of source

of ignition

- All electrical fittings

and cables will be

provided as per

standards. All motor

starters are flame

proof.

Highly inflammable

nature of fuels may

cause fire hazard in

the storage facility

A well designed fire

protection including

protein foam, dry

powder, CO2

extinguisher should

be provided

Fire extinguisher of

small size and big

size are provided at

all potential fire

hazard places. In

addition to the

above, fire hydrant

network is also

provided.

It is intended to give an insight into how the physical effects resulting from the release of

hazardous substances can be calculated by means of models and how vulnerability models

can be used to translate the physical effects in terms of injuries and damage to exposed

population and environment. A disastrous situation may arise due to outcome of fire,

explosion or toxic hazards in addition to other natural causes, which eventually lead to loss

of life, property and ecological imbalance.

Major hazards posed by flammable storage can be identified taking recourse to MCA

analysis. Depending upon the effective hazardous attributed and their impact on the event,

the maximum effect on the surrounding environment and the respective damage caused

can be assessed. The MCA analysis involves ordering and ranking if various sections in

terms of potential vulnerability. Inventory analysis and fire, explosion and toxicity index

(FE&TI) are the two techniques employed for hazard identification process in this study.

The results of consequence analysis are useful for getting information about all known and

unknown effects that are of importance when some failure scenario occurs in the proposed

project and also to get information as how to deal with the possible catastrophic events. It

also gives the residents in the project and people living in the vicinity of the area, an

understanding of their personal situation.

Damage criteria

The storage of HSD and unloading at the storage facility may lead to fire and explosion

hazards. The damage criteria due to accidental release of any hydrocarbon arise from fire

and explosion. The vapors of these fuels are not toxic and hence no effects of toxicity are

expected.

Tank fire will occur if the radiation intensity is high on the peripheral surface of the tank

leading to increase in internal tank pressure. Pool fire will occur when fuel collected in the

dyke due to leakage gets ignited.

Fire Damage

A flammable liquid in a pool will burn with a large turbulent diffusion flame. This

releases heat based on the heat of combustion and the burning rate of the liquid. A

part of the heat is radiated while the rest is convicted away by rising hot air and

combustion products. The radiations can heat the contents of a nearby storage or

process unit to above its ignition temperature and thus result in a spread of fire. The

radiations can also cause severe burns or fatalities of workers or fire fighters located

within a certain distance. Hence, It will be important to know beforehand the

damage potential of a flammable liquid pool likely to be created due to leakage or

catastrophic failure of a storage vessels and decide the type of protective clothing

the workers/ firefighters need, the duration of time for which they can be in the

zone, the fir extinguishing measures needed and the protection methods needed for

the nearby storage/ process vessels. The damage effects on people and equipment

due to thermal radiation intensity are presented in table 5 and table 6 respectively.

Table 5- Damage due to incident radiation intensities

S.No Incident Radiation

(kW/m2)

Type of damage intensity

Damage to equipment Damage to people

1 37.5 Damage to process

equipment

100% lethality in 1 min.

1% lethally in 10 sec

2 25.0 Minimum energy

required to ignite wood

at indefinitely long

exposure without a

flame

50% lethally in 1 min.

significant injury in 10 sec

3 19.0 Maximum thermal

radiation intensity

allowed on thermally

unprotected adjoining

equipment

-

4 12.5 Minimum energy to 1% lethally in 1 min.

ignite with a flame;

melts plastic tubing

5 4.5 - Causes pain if duration is

longer than 20 sec,

however blistering is un-

likely (first degree burns)

6 1.6 - Causes no discomfort on

long exposures

Table 6- Radiation exposure and lethality

Radiation intensity

(kW/m2)

Exposure time

(seconds)

Lethality (%) Degree of burns

1.5 -- 0 No discomfort even

after long exposure

4.5 20 0 1st

4.5 50 0 1st

8.0 20 0 1st

8.0 50 <1 3rd

8.0 60 <1 3rd

12.0 20 <1 2nd

12.0 50 8 3rd

12.5 -- 1 --

25.0 -- 50 --

37.5 -- 100 --

Scenarios considered for MCA analysis

Fuel storage

HSD is the only fuel used in the proposed project. It is used for DG set operation only

during power failure from the grid. A maximum quantity of 2 X 20 KL will be stored in

drums. In case the fuel is released while area catching fire, a steady state fire will be

occurred.

Modeling scenarios

Based on the consumption of HSD the Pool Fire failure scenario will be resulted in the mall

multiplex and accordingly the MCA analysis has been done.

Methodology adopted for modeling

It is anticipated that in the proposed project, the peak level of radiation intensity will not

occur suddenly. Based on the past experience in similar, it is found that 20-30 minutes time

will be required before a tank fire grows to full size. The assumptions for calculations are:

It is not continuous exposure;

It is assumed that no fire detection and mitigation measures are initiated;

There is not enough time available for warning the public and initiating emergency

action;

Secondary fire at public road and building is not likely to happen;

The effect of smoke on reduction of source radiation intensity has not been

considered; therefore hazard distances calculated tend to be conservative; and

Shielding effect of intervening trees or other structures has not been considered. No

lethality is expected from this level of intensity although burn injury takes place

depending on time of exposure.

Based on the above assumptions, the HSD storage with full tank storage

capacity has been considered for pool fires and the MCA analysis has been done.

Model computations- Pool Fire

The MCA analysis has been based on the distances and probable damages depending on the

damage criteria. Computations have been done for radiation intensity levels of 37.5, 25, 19,

12.5 and 4.5 kW/m2 as presented in table 7

Table 7- Occurrence of various radiation intensities- pool fire

Radiation and

effect

Capacity Radiation intensities (kW/m2)/ Distance

(m)

37.5 25.9 19.0 12.5 4.5

HSD 2 x 20 KL 15.7 19.7 23.1 29.3 52.5

The maximum quantity of storage of HSD will be 2 X 20-KL. The most credible failure is the

rupture of the pipe connecting the storage tank. For assessing the worst-case scenario, it is

assumed that the entire content of HSD leaks out into the area forming a pool and may

catch fire due to ignition from any source.

As the HSD tanks will be located only nearer to utility block of the project, even in case of

pool fire scenario, the fire will be confined to the utility block area only and will not spread

to other blocks, where the maximum number of personnel will be stationed.

Recommended approach to combat with possible accidents

Considering all possible accident scenarios as analyzed in the risk analysis, it is established

that there will not be any major potential hazards in the projects causing major damages

inside and outside the boundary. In spite of this, the project authorities should be well

prepared to handle any such eventuality as described below:

In case of explosion:

The following measures and actions are to be taken:

Evacuate the area in vicinity;

Take all necessary actions to avoid escalation of the accident;

If problem appears to be out of control, call fire brigade and police. Report to district

collector, etc.; and

Provide first aid to the victims as suggested in the Material Safety Data sheets.

Spillage due to storage tank rupture or tanker failure

This accident scenario has considerable damage potential. In such scenario the following

steps should be taken:

Contain fuel supply to the tankers;

Determine the extent of damage; and

Undertake all the emergency actions mentioned above.

Major spillage due to storage tank rupture or tanker failure

This accident scenario has considerable damage potential. In such case the following steps

have to be taken up:

Determine the extent of damage;

Contain fuel supply to HSD tanks; and

Undertake all the emergency actions mentioned above.

Accidents involving HSD

In case of leakage of oil from flanges, valves, tail ends or during transfer from

truck tanker (TTS):

Detect the source of leakage;

If possible, try to collect the leaking oil in a suitable container;

Bring portable fire extinguishers near to the area of leakage; and

Stop flow of spilled oil and prevent it from coming into contact with any

ignition source.

If HSD is ignited at the source of leak:

In addition to the above, following actions are to be taken:

Use fire extinguishers to diminish the fire;

See that the flame does not impinge on tanks or any other adjacent installation;

If impingement of flame is unavoidable, put water curtain in between and cool the

adjacent installations;

Give priority to closure of valve and stop the flow;

Best trained personnel to prevent further spread of fire;

Take all necessary actions to avoid escalation of the accidents; and

In case of fire, ensure suffocation and toxicity due to flame does not take place.

In case of fire near HSD storage tanks:

If the fire is near the storage tank areas, use water hydrant and DCP type fire

extinguishers;

Never allow fire to spread to the area below the tank, start cooling the tank by the

emergency water spray; and

Call fire brigade & police for assistance.

Disaster Management Plan

A disaster is a catastrophic situation in which suddenly, people are plunged into

helplessness and suffering, as a result, need protection, clothing, shelter, medical and social

care and other necessities of life.

Disaster can be divided into two main groups. In the first, disasters resulting from

natural phenomena like earthquakes, volcanic eruptions, storm surges, cyclones, tropical

storms, floods, avalanches, landslides, forest fires, etc. The second group includes

disastrous events occasioned by man, or man‟s impact upon the environment. Examples are

armed conflict, radiation accidents, campus fires and river pollution, air, sea, rail and road

transport accidents and can reach catastrophic dimensions in terms of human loss.

There can be no set criteria for assessing the gravity of a disaster in the abstract since

this depends to a large extent on the physical, economic and social environment in which it

occurs. What would be considered a major disaster in a developing country, ill equipped to

cope with the problems involved may not mean more than a temporary emergency

elsewhere. However, all disaster brings in their wake similar consequences that call for

immediate action, whether at the local, national or international level, for the rescue and

relief of the victims. This includes the search for the dead and injured and removal of debris

and social care, the provision of temporary shelter to the homeless food, clothing and

medical supplies and rapid re-establishment of essential services.

Objectives of Disaster Management Plan (DMP)

The disaster Management Plan is aimed to ensure safety of life, protection of

environment, protection of installation, restoration of production and salvage operations in

this same order of priorities. For effective implementation of the Disaster Management Plan,

it will be widely circulated and personnel training given through rehearsals/drills.

The disaster Management Plan would reflect the probable, consequential severalties of

the undesired event due to deteriorating conditions or through „knock on‟ effects. Further

the management should be able to demonstrate that their assessment of the consequences

uses good supporting evidence and is based on currently available and reliable information,

incident data from internal and external sources and if necessary the reports of outside

agencies.

To tackle the consequences of a major emergency inside the factory or immediate

vicinity if the factory, a Disaster Management Plan has to be formulated and this planned

emergency document is called “Disaster Management Plan”.

The objective of Disaster Management Plan is to make use of the combine resources of

the plant and the outside services to achieve the following:

Effect the rescue and medical treatment of causalities;

Safeguard other people;

Minimize damage to property and the environment;

Initially contain and ultimately bring the incident under control;

Identify any dead;

Provide for needs of relatives;

Provide authoritative information to the news media;

Secure the safe rehabilitation of affected area; and

Preserve relevant records and equipment for subsequent inquiry into the cause and

circumstances of the Emergency.

In effect, it is to optimize operational efficiency to rescue rehabilitation and render

medical help and to restore normalcy.

Social Impact Assessment

The impact of the proposed project will begin with the starting up of the construction

activities at the site. The proposed construction will provide employment to considerable

number of skilled and semi-skilled and un-skilled construction laborers. In normal

circumstances, the local people will be given preference for the unskilled activities, as there

are many construction laborers in the vicinity of the project and are expected to be available

with normal wages. Presently, a large number of skilled and semi-skilled technicians and

laborers who in-migrated from various parts of India have been engaged in many

companies on wages/contract basis. Similar technicians and skilled workers will either be

brought or sourced from the local area for construction of the proposed project.

The peak labor force required during the construction period will be about 1000

per day and it is anticipated that about two third of the labor force will be sourced from the

local area. Provision of wage employment to the local populace during construction period of

the project will benefit the local area to some extent. This will enhance the income levels of

the construction phase of the proposed project, which will be positive impact due to the

project.

In addition, the real estate in the region will get a boon and the land prices likely

to shoot-up as part of speculation.

Normally, the construction activity will benefit the local populace in a number of

ways, which include the requirement of skilled, semi-skilled and un-skilled construction

laborers, tertiary sector employment and provision of goods and services for daily needs

including transport. In line with the above, some more recommendations are given below:

Local people will be given preference;

All the guidelines under the Labour Act and Safety Rules as specified under Factories

Act, 1948 will be implemented during the construction work to avoid any accidents;

The contractor will be instructed to provide cooking fuel to the workers to prevent

damage to trees. This will be part of the contractual agreement between the project

proponent and the contractor engaged for construction; and

The construction site will be secured with fencing and will have guarded entry points.

Rehabilitation & resettlement action phase

The proposed project does not involve any Rehabilitation & Resettlement Issues, as the