Hertfordshire County CouncilResidual Waste ContractClose of ContractMS6 – Facilities and Contract ManagementConfidential 1
MMSS 66 FFaacciilliittiieess aanndd CCoonnttrraacctt MMaannaaggeemmeenntt
6.1 CONTENTS
Document File Name: HWPP-VES-BankDoc-MS6.1 to 6.5Rev Close of Contract
Version
Date
Version
Number
Summary of
Changes Made
Updated
by
Approved
by
Status:
Draft;
Close of
Dialogue
Version; or
Submitted by
Bidder as a
Close of
Dialogue
Version
08.10.10 1 VES submission VES Draft
25.10.10 1aComments in
documentHCC Draft
17.12.10 2 Re-draft VES Draft
07.01.11 CoDNone Close of
Dialogue VersionHCC
Close of
Dialogue
Version
28.01.11 CFT Final Revision VES Final Tender
17.05.11 PB Update VESPreferred
Bidder
23.07.11 CoC Final Revision VESClose of
Contract
Hertfordshire County CouncilResidual Waste ContractClose of ContractMS6 – Facilities and Contract ManagementConfidential 2
Document File Name: HWPP-VES-BankDoc-MS6.6-Rev Close of Contract
Version
Date
Version
Number
Summary of
Changes
Made
Updated
by
Approved
by
Status:
Draft;
Close of
Dialogue
Version; or
Submitted by
Bidder as a
Close of
Dialogue Version
08.10.10 1VES
submissionVES Draft
25.10.10 1aComments in
documentHCC Draft
15.12.10 2 Re-draft VES Draft
19.01.11 3 Re-draft VES Draft
19.01.11 CoD
No further
comments
save for DN
HCCClose of
Dialogue Version
28.01.11 CFTFinal
RevisionVES Final Tender
17.01.11 PB Update VES Preferred Bidder
23.07.11 CoCFinal
RevisionVES
Close of
Contract
Hertfordshire County CouncilResidual Waste ContractClose of ContractMS6 – Facilities and Contract ManagementConfidential 3
Document File Name: HWPP-VES-BankDoc-MS6.7-Rev Close of Contract
Version DateVersion
Number
Summary of
Changes Made
Updated
by
Approved
by
Status:
Draft;
Close of
Dialogue
Version; or
Submitted
by Bidder
as a Close
of Dialogue
Version
08.10.10 1 VES submission VES Draft
25.10.10 1aComments in
documentHCC Draft
23.12.10 2 Re-draft VES Draft
07.01.11 CoD
None. Close of
Dialogue
Version
HCC
Close of
Dialogue
Version
28.01.11 CFT Final Revision VESFinal
Tender
17.01.11 PB Update VESPreferred
Bidder
23.07.11 CoC Final Revision VESClose of
Contract
Hertfordshire County CouncilResidual Waste ContractClose of ContractMS6 – Facilities and Contract ManagementConfidential 4
Contents
MS 6 Facilities and Contract Management ............................................... 1
6.1 Contents 1
6.2 Maintenance 6
6.2.1 Introduction 6
6.2.2 Programmed Maintenance 10
6.2.3 Unplanned Maintenance 22
6.3 Operation Management Systems 23
6.3.1 Introduction 23
6.3.2 Operations Plan 24
6.3.3 Quality Management System 29
6.3.4 Environmental Management System 32
6.3.5 Previous Experience 35
6.4 Health, Safety and Welfare 37
6.4.1 Introduction 37
6.4.2 Details of all Health and Safety Arrangements 38
6.4.3 Welfare Facilities 59
6.5 Resourcing 60
6.5.1 Personnel 60
6.5.2 Additional Resources 88
6.6 Visitors Centre 90
6.6.1 Introduction 90
6.6.2 Operation of the Centre 91
6.6.3 Maintenance of the Centre 113
6.7 Transfer and Haulage 114
6.7.1 Introduction 114
6.7.2 Transfer and Haulage 114
6.7.3 Site Signage 143
6.8 Additional Information 143
Hertfordshire County CouncilResidual Waste ContractClose of ContractMS6 – Facilities and Contract ManagementConfidential 5
Attachments:
Attachment MS6 2.2.1(a) - Safety Rules (Summary)
Attachment MS6 2.2.1(b) - Example of a Typical Shutdown Schedule
Attachment MS6 2.2.4(a) - AMS System
Attachment MS6 2.2.4(b) - List of Spares
Attachment MS6 2.2.5(a) - Equipment Service Life Schedule
Attachment MS6 2.2.5(b) - MPT Component Service Life
Attachment MS6 2.2.7 - MPT Maintenance Journal
Attachment MS6 3.4.3 - E-Report
Attachment MS6 4.1 - Health & Safety Policy Statement
Attachment MS6 4.2.2 - CDM Regulations 2007 Safety During ERF Planned
Shutdown Maintenance
Attachment MS6 4.2.4(a) - Permit to Work
Attachment MS6 4.2.4(b) - Assessment and Control of Contractors
Attachment MS6 4.2.4(c) - Training Procedure SYS06
Attachment MS6 4.2.6 - ERF Induction Training Checklist
Attachment MS6 4.2.11 - ERF Risk Assessments
Attachment MS6 4.2.14(a) - Example of Fire Assessment (SELCHP)
Attachment MS6 4.2.14(b) - Example of Emergency Procedure (SELCHP)
Attachment MS6 5.2 - Agreement
Attachment MS6 8 - Resources Dedicated to this Project
Hertfordshire County CouncilResidual Waste ContractClose of ContractMS6 – Facilities and Contract ManagementConfidential 6
6.2 MAINTENANCE
Words with capital letters used throughout this Method Statement are defined in
either Schedule 1 (Definitions) to the Contract or in Schedule 4 (Payment
Mechanism) to the Contract.
6.2.1 Introduction
The primary purpose of the maintenance plan is to ensure the Facility performs to
expectations in terms of its availability and reliability, through life costs and
performance characteristics and ensures that the Facility is maintained to an
acceptable level of cleanliness (Maintenance Plan). This is measured by a range
of key performance indicators (KPIs) which are compared with all operating
plants in the UK and abroad.
The Maintenance Plan will be prepared in collaboration with the technology
supplier and will be controlled by the Contractor’s group maintenance director to
ensure it contains relevant, specific and up to date information. The final
document will be prepared during construction of the Facility when the
operational Personnel are present. During commissioning the Construction Sub-
Contractor‘s start-up engineers will be accompanied by the Contractor’s start-up
team for the whole duration of the Commissioning Period. This ensures that on
handover the new operational crew are familiar with the particular requirements of
the Facility and that the detail within the Contract Manual is accurate.
Crucially, the effect on Services performance will be driven by the ability to accept
Contract Waste through planned shutdowns. Contract Waste will be delivered to
the Facility and delivered to the MPT Facility for recovery prior storage in the
Waste reception bunker for later processing in the ERF. Waste not suitable for
MPT treatment will be delivered direct to the Waste reception bunker and if the
MPT Facility is unavailable Waste will also be delivered direct to the Waste
reception bunker.
The Waste reception bunker (bunker prior to ERF) offers a capacity equivalent to
5 days of average delivery of Waste. During planned shutdown of the Facility the
Contractor may not receive Third Party Waste at the Facility in order to ensure
sufficient Contract Waste capacity within the bunker.
The Contractor will carry out refurbishment and maintenance activities as
necessary to maintain the Site and Facility in a condition such that the specified
Maintenance Requirements can be delivered safely and in accordance with
Hertfordshire County CouncilResidual Waste ContractClose of ContractMS6 – Facilities and Contract ManagementConfidential 7
Consents during operating hours without interruption except for Programmed
Maintenance.
On an annual basis and by no later than 3 months prior to the anniversary each
year, the Contractor will prepare and submit to the Authority the annual Schedule
of Programmed Maintenance with details of the duration, commencement date
and frequency of any Programmed Maintenance for the 12 months starting the
following 31st March based on the manufacturer’s recommendations and taking
into account the following:
The Contractor's experience from other energy from Waste projects
and other relevant projects;
Legal Requirements;
Facility complexity;
Technology involved;
The required availability and reliability of the Facility; and
The planned maintenance of contingency facilities that may be used
by the Contractor to divert mainly Third Party Waste and, if
necessary, Contract Waste during planned shutdowns.
The Contractor will inform the Authority of any changes to planned shutdowns,
giving the maximum notice period possible and in any case not less than 14 days
prior to a planned shutdown.
The annual Schedule of Programmed Maintenance will then be approved or
commented on by the Authority under the Review Procedure. Where practicable
the Contractor will give a minimum of 12 weeks notice of any closures or changes
to the operation of the Facility that will result from Programmed Maintenance.
In addition to this, the Contractor shall submit to the Authority a monthly Schedule
of Programmed Maintenance 20 Business Days before the end of the Contract
Month. The monthly Schedule of Programmed Maintenance shall include
information relating to the upcoming maintenance for the following Contract
Month and any implications arising from the previous Contract Month’s
Programmed Maintenance.
In accordance with PR3 Section 3.50 of Schedule 2 (Authority’s Requirements),
the Contractor will prepare a Monthly Services Report and submit it electronically
to the Authority within 5 Business Days after the Contract Month’s end. The
Hertfordshire County CouncilResidual Waste ContractClose of ContractMS6 – Facilities and Contract ManagementConfidential 8
Monthly Services Report will include the following (in addition to the Authority’s
requirements):
The status of any actions from the previous Monthly Services
Report;
A list of actions to be undertaking in the coming Month;
Details of any maintenance carried out; and
Any implications arising from the previous Contract Month’s
Programmed Maintenance.
Except in exceptional circumstances, the Contractor will comply with the monthly
Schedule of Programmed Maintenance and will ensure that all maintenance
identified within the schedule is completed by the end of each Contract Month.
In accordance with PR3 Section 3.64 of Schedule 2 (Authority’s Requirements),
the Contractor will make provisions within the annual and monthly Schedules of
Programmed Maintenance to minimise any nuisance and environmental impact
during the maintenance activities (please refer to MS1-1.4.6 and MS4-3.2.2)
The Contractor will also ensure that its maintenance and operating procedures
are sufficient to ensure compliance with Clause 26 (Maintenance) of the Contract
i.e. to ensure that the Contractor’s maintenance and operating procedures are
compliant with the Maintenance Requirements and are sufficient to ensure that:
The Services are available as required by the Contract and the
Service Requirements;
The maintenance of each component of the Assets is in accordance
with the manufacturer’s instructions or guidance; and
Assets as required by the Authority are handed back to the
Authority on the Expiry Date or Termination Date in a condition
complying with the requirements of Clause 26 of the Contract and
the Handback Requirements.
The Contractor will undertake Programmed Maintenance which includes
maintenance of all Assets to comply with the manufacturer’s requirements,
Operating Manuals, Method Statements, necessary lifecycle replacement and to
achieve the Works quality standards set out in Appendix A of Schedule 2
(Authority’s Requirements) (Works Quality Standards).
As far as is reasonably practicable, the Contractor will comply with the Works
Quality Standards requirements as follows:
Hertfordshire County CouncilResidual Waste ContractClose of ContractMS6 – Facilities and Contract ManagementConfidential 9
Structures and buildings:
– Structurally sound, secure and weatherproof;
– Free from damage and deterioration; and
– Free from dirt, discolouration, extraneous growth, pests and
vermin.
Plant and Equipment:
– Function as intended and will operate in accordance with the
manufacturers requirements;
– Structurally sound, secure and weatherproof;
– Free from damage and deterioration; and
– Free from dirt, discolouration, extraneous growth, pests and
vermin.
Road/Hard Landscape:
– Road and car parking marks will be clearly visible;
– Reasonably even and intact surfaces;
– Free from any damage;
– Free of deterioration which represents tripping hazards;
– Maintained so as not to cause damage to any vehicles using the
Facility;
– Kept reasonably free of snow, mud, waste and ice such that the
Facility is safe to use;
– Be approved as necessary by the Relevant Authorities; and
– Kept to acceptable levels of cleanliness and ensure litter is kept
to a minimum.
Fencing:
– Structurally sound, intact, secure and weatherproof; and
– Free from damage and deterioration.
Auxiliary Facility items, such as air compressors, cranes and emissions
monitoring equipment, will be subject to service agreements with the
manufacturer or supplier. Where appropriate, these agreements will include a 24
hour ‘call out’ facility.
Hertfordshire County CouncilResidual Waste ContractClose of ContractMS6 – Facilities and Contract ManagementConfidential 10
All major rotating plant will be covered by routine condition monitoring in order to
ensure that impending problems are recognised and potential breakdowns
avoided.
Programmed Maintenance shutdowns will be scheduled for each boiler and
turbine as appropriate to ensure that essential cleaning and maintenance is
carried out. This work will be undertaken by specialist sub-contractors, in
accordance with health and safety and CDM Regulations.
Maintenance Resources
The maintenance of the Facility will be controlled by the Contractor’s
maintenance manager (Maintenance Manager). The Maintenance Manager will
lead a skilled ‘in-house’ Facility maintenance team of mechanical and electrical,
control and instrumentation (‘ECI’) technicians, whose main tasks will be
Programmed Maintenance and first line Facility defect repair. The team will
comprise the following:
Maintenance Manager (one);
ECI leader (one);
C & I technician (one);
Electromechanical technicians (five); and
Apprentice (1).
6.2.2 Programmed Maintenance
Maintenance Plan for the Building, Plant and Major Equipment
Each process line of the Facility will be subject to a single planned shutdown
period of approximately 14 consecutive days each Contract Year.
Specific Tools
Specialist tools and equipment required for specific maintenance purposes will be
defined during the design stage and supplied by the equipment manufacturer /
installer. These tools will be kept in the Facility stores and their use controlled
through the Contractor’s maintenance management system.
Hertfordshire County CouncilResidual Waste ContractClose of ContractMS6 – Facilities and Contract ManagementConfidential 11
Compliance with Good Industry Practice and Legislation
The Programmed Maintenance will be carried out in a safe manner to comply
with Good Industry Practice, the requirements of Legislation and the relevant
Method Statements.
To maintain the highest safety standards each shutdown will be carried out in
accordance with the designers/fabricator’s risk assessment and subsequent
method statement in accordance with The Construction Design and Management
(CDM) Regulations.
Statutory inspections will be in accordance with the Pressure Systems
Regulations and Electricity at Work Act.
The Contractor has developed a standard approach to safe working systems for
maintenance work at the Facility. A Facility isolation system, or safety rules, will
be implemented at the Facility to support this requirement. A summary of the
safety rules is included in at Attachment MS6 2.2.1(a).
All Personnel will undergo a thorough Site safety induction to ensure they are
familiar with the Site, systems and safety requirements (see Method Statement 6,
Part 4 for further details on general health and safety).
Risk assessments and Method Statements will be developed for all routine and
‘one off’ tasks as appropriate.
Frequency and Duration of Downtime due to Maintenance
The annual Programmed Maintenance regime at the Facility will be based on
alternate single line shutdowns for a total of approximately 14 days per Contract
Year. Normally the planned shutdowns for the two lines will not overlap and the
Facility will remain open; however, where parts common to both lines has to be
maintained, it is anticipated that both lines will be shut down for a total of
approximately 5 days in average per Contract Year. Therefore, although Contract
Waste and where possible Third Party Waste will still be accepted and stored for
later processing, it is anticipated that the Facility will not be operational for
approximately 5 days per Contract Year.
Taking into consideration the Equipment Service Life Schedule (Attachment MS6
2.2.5), this schedule will accommodate an alternate year major shutdown
schedule. During a major shutdown both lines will be shut but this can be
staggered to minimise the period when both are shut at once. The overlap would
typically range from 0 to 8 days and on average 5 days. An example of shutdown
schedule is provided in Attachment MS6 2.2.1(b) 'Example of Shutdown
Hertfordshire County CouncilResidual Waste ContractClose of ContractMS6 – Facilities and Contract ManagementConfidential 12
Schedule.' There will be shut downs of specific lines during the interim years but
common plant will be available allowing one line to be in operation at all times.
Backup and Temporary Operational Procedures during Maintenance
In the run up to a Programmed Maintenance major shutdown, Third Party Waste
inputs will be managed so as to reduce the bunker level and therefore maximise
bunker capacity available to receive Waste during the shutdown. Third Party
Waste will be diverted first, then transfer station bulk deliveries and lastly local
collection vehicles.
In detailed shutdown planning the Contractor will seek to regulate the bunker to
allow as much Contract Waste to continue to be delivered as possible. In
particular, we will seek to accept continued delivery of local Refuse Collection
Vehicles (RCVs) without interruption.
Such Waste will be processed through the MPT Facility and stored in the bunker
until normal processing is resumed. However, in the event that the bunker
capacity is reached or storage would breach any Environmental Permit condition,
the Waste will be removed from the bunker and loaded into bulk haulage vehicles
for transport to alternative contingency facilities as detailed in the table below.
Table 6.1 Contingency Arrangements
Facility Service Site Address Distance
Anticipated Facility Availability and Reliability
As defined in the Schedule of Guarantees, in Attachment MS 2 2.4.1 of MS 2, the
anticipated availability and reliability of the Facility throughout its lifespan is
presented in Table 6.2 below.
Table 6.2 Planned Availability and Reliability
Hours
Year Availability Planned
Downtime
Unplanned
Downtime
% Reliability
1
2
3 onwards
In developing the above availability and reliability performance, the Contractor
has made the following assumptions:
Hertfordshire County CouncilResidual Waste ContractClose of ContractMS6 – Facilities and Contract ManagementConfidential 13
From year 3 onwards, the Facility will be affected by planned
downtime (defining availability) plus an unplanned allowance for
breakdown (defining reliability) ;
During years 1 and 2, the additional unplanned downtime is a result
of snagging and familiarisation of the Facility; and
“Year 3“ is used as the “reference year” throughout the MS.
Proposals for Groundworks Maintenance
The Contractor’s specifications for groundworks maintenance including road
surfaces, security fencing, signage and other associated Site features, are on the
basis of projected service lives typically between 10 and 25 years (depending on
the item).
In addition to maintenance of the Facility process plant, the annual Maintenance
Plan will include a programme of building and civil works. This programme will be
updated annually following building inspections and the issue of Site defect
reports.
Works are anticipated to include ongoing maintenance (e.g. building cladding
replacement or upgrades) and remedial work (e.g. road repairs, fencing repairs).
Such works will be undertaken in a proactive manner to help mitigate any
detrimental impact and help preserve the appearance of the Facility.
Full Details of the Annual Schedule of Planned Maintenance
Timetable of Scheduled Closures of the Facility
It is anticipated that this shutdown will take place in August. This will be confirmed
in the annual Schedule of Programmed Maintenance which is submitted to the
Authority 6 months in advance of the anniversary of the Planned Services
Commencement Date.
The precise timing of the shutdown will be fixed by taking into account a number
of local considerations the following:
Details of any TRIAD periods (November to February inclusive)
where electricity generation may be required to be at a premium;
Seasonal requirements of heat off-take (where applicable);
Peak season annual holiday periods for both Personnel and
maintenance Sub-Contractor Personnel (July to September
inclusive);
Hertfordshire County CouncilResidual Waste ContractClose of ContractMS6 – Facilities and Contract ManagementConfidential 14
Availability of the Contractor’s operations specialists who will
supervise or support shut down activities;
Availability of Sub-Contractor supply base; and
Any Authority considerations/requirements for the treatment of
Contract Waste.
Minimising Disruption to Delivery of Contract Waste
As detailed above, during Programmed Maintenance periods where either one or
both of the Facility’s process lines are unavailable, the Contractor will size the
Facility’s bunker and manage its available capacity in order to seek to offer the
Authority continuous availability of the bunker for the delivery of Contract Waste.
There should therefore be no disruption to the WCAs delivery pattern.
The Contractor will schedule all Programmed Maintenance works in the annual
Maintenance Plan that will be submitted to the Authority at least six months
before the start of each Contract Year. Where non-emergency work not
scheduled in the Maintenance Plan is necessary the Authority will be notified of
such work at least 12 weeks in advance in order that contingency arrangements
can be planned.
The Contractor will make use of other resources, such as bulk transporters, or
contingency facilities, as appropriate, to be able to react immediately in all Facility
shutdown circumstances and seek to ensure continuity of Services. Such
circumstances may arise where exceptional Waste arisings meaning the bunker
is full, or storage periods exceed the permitted time allowed.
Further information on the programme of preventative maintenance and the
process for monitoring maintenance requirements is described below and will be
developed into the Operating Manual when the Facility progresses to
construction.
Management of Shutdowns
Once the shutdown has been initiated at the Facility, maintenance of the line or
line(s) will be undertaken. Maintenance will be undertaken by Personnel as
identified under ‘Maintenance Resources’ section above.
Following completion of the maintenance at the Facility, the line(s) will undergo
relevant Tests to ensure the maintenance has been successful and the relevant
health and safety checks have been undertaken.
Following completion of the tests, the line(s) will be returned into service.
Hertfordshire County CouncilResidual Waste ContractClose of ContractMS6 – Facilities and Contract ManagementConfidential 15
Facility Maintenance Overall Policy and Examples
Introduction
The Contractor’s maintenance strategy will be based on the following control
systems:
Plant and Equipment condition monitoring including machinery
performance and health checks – to ensure safe efficient systems;
Preventative Programmed Maintenance and cleaning – using the
computer based maintenance management system: SAP Asset
Management System (AMS);
Defect reporting and rectification – enabling rapid response to
system faults;
Minimum downtime breakdown maintenance – skilled engineering
maintenance Personnel and Emergency call-off contracts;
Analysis of historical data - identifies failure mechanisms and allows
for system modification to improve reliability;
Planned shutdowns – routine inspection and planned refurbishment;
and
Optimum spares holdings - improved system reliability by
identification of critical equipment spares.
Site specific maintenance programmes will be developed from the manufacturer’s
recommendations whilst taking into account experience from other Contractor’s
sites such as regulatory and statutory requirements, Facility complexity,
technology involved and the value of Facility reliability.
Maintenance Resources
The skilled Facility maintenance teams will include mechanical and C&I
technicians, reporting to the Maintenance Manager. Their main tasks will be
Programmed Maintenance and first line Facility defect repairs.
Auxiliary Facility items such as air compressors, cranes and emissions monitoring
equipment will normally be subject to service agreements with the manufacturer
and/or supplier. Where appropriate, these agreements will include a 24 hour ‘call
out’ facility.
Hertfordshire County CouncilResidual Waste ContractClose of ContractMS6 – Facilities and Contract ManagementConfidential 16
All major rotating plant will be covered by routine condition monitoring in order to
ensure that impending problems are recognised and potential breakdowns
avoided.
Programmed Maintenance shutdowns will be scheduled for the boiler and turbine
as appropriate to ensure that essential cleaning and maintenance is carried out.
This work will be carried out by specialist Sub-Contractors, planned and
monitored using project management software such as Microsoft Project. Typical
work will include routine inspections, cleaning and repair of grates, boilers, fabric
filters, the turbine and generator and, where appropriate, statutory inspections in
accordance with the Pressure Systems Regulations and Electricity at Work Act.
The level of planned downtime will be regulated to accommodate known work
and also to allow for any refurbishment that may be required as result of
extensive inspection and non-destructive testing.
To maintain the highest safety standards each shutdown will be carried out in
accordance with Health and Safety and The Construction Design and
Management (CDM) Regulations.
Computer Based Asset Management System
The Facility will utilise asset management system (AMS) software, such as SAP
AMS, to deliver a total Site maintenance capability, providing an integrated
approach to the scheduling of repairs and routine maintenance. The AMS will be
fully automated to maintain Facility history and analyse plant failure modes to
support longer term maintenance decisions. The system will also include an
interlinked purchasing and stock control system.
Key features of the system are as follows:
Management of equipment records against unique numbering
system and works undertaken;
Access to all machine and assembly drawings;
Tracking of parts consumption against maintenance activities;
Allows the access, import and export of documents and data from
external sources;
Allows detail of necessary spares, tools, safety information, codes
of practice and Control Of Substances Hazardous to Health
(COSHH) information to be available for all works;
Hertfordshire County CouncilResidual Waste ContractClose of ContractMS6 – Facilities and Contract ManagementConfidential 17
Automatically allocates resources, labour and materials required for
all works;
Fully integrated spares stock with all maintenance activities;
Tracks defects and problems from ‘as found’ all the way to
‘completed’ state;
Produces purchase orders;
Provides a link between ‘work orders’ and ‘purchase orders’;
Dynamic scheduling of maintenance works over any date range;
Links jobs to safety information and other documents which can be
issued with a ‘job card’;
Provides separate lists of jobs for shutdown periods, linked to
dynamic scheduling and notifying of conflict;
Issues planned preventative maintenance jobs on resource and
materials planner;
Provides total control of assets and stock;
Provides real time information associated to maintenance spend as
orders are authorised;
Provides a comprehensive list of reports that can be used for
analysis of the maintenance function, including complete asset
history, audit trails and trending;
Provides comprehensive Personnel history;
Provides comprehensive supplier information, automatically linked
to database with component information and web based
catalogues; and
Provides a budgeting facility.
The AMS is based on a detailed asset coding structure common across the
Contractor’s sites, supporting the transfer of information and, where appropriate,
sourcing of spare parts from other plants.
A more detailed summary of the Contractor’s proposed AMS system is enclosed
as Attachment MS6 2.2.4(a).
Hertfordshire County CouncilResidual Waste ContractClose of ContractMS6 – Facilities and Contract ManagementConfidential 18
Plant Spares
Efficient stock control will be managed through the Contractor’s AMS.
Efficient stock control is a significant contributory factor in a successful
maintenance strategy and requires timely purchasing and suitable budgetary
planning and tracking.
As discussed in more detail above, integration of stock control into the AMS
enables the automatic viewing of stock levels for all assets, identifies historical
stock consumption for individual assets, identifies items necessary for conducting
planned or unplanned works and automatically re-orders necessary stock items
and produces order forms. Any stock items that have reached a critical use by
date are flagged-up and replacements re-ordered.
Spares holdings will initially be based on manufacturer’s recommendations but
lead-time, shelf life and turnover will also be taken into consideration.
Typically some 3,000 different items will be held on stock at a Contractor facility.
A substantial number of high value strategic items will also held on stock, even
though their use may be infrequent, where the impact of their availability is high.
Examples of strategic spares could include an induced draft fan motor, turbine
bearings and a crane grab.
A list of spares proposed for the Facility is enclosed as Attachment MS6 2.2.4(b).
Facility Cleaning Programmes
In addition to Programmed Maintenance, the Contractor will undertake cleaning
through a programme of both planned and ad-hoc cleaning activities. During the
Facility construction period, a risk-based programme of planned cleaning
activities will be established to identify the required cleaning cycles of cleaning in
order to allow the Contractor to conform to its required standards of cleanliness.
The Facility will be arranged into cleaning zones and a programme of the
appropriate cycles and levels of cleaning will be produced. The programme will
be based on the nature of work undertaken in the zone, health and safety
requirements, operational suitability, and impact of visual appearance. The
cleaning programme will include the following:
The tipping hall will be kept free from Waste that will (a) impede the
safe operation of vehicles; (b) pose a risk to littering outside the
tipping hall; and (c) pose an unreasonable risk to personnel in the
tipping hall. Any Waste on the tipping hall floor (with the exception
Hertfordshire County CouncilResidual Waste ContractClose of ContractMS6 – Facilities and Contract ManagementConfidential 19
of that stored for quarantining or Waste transfer) will be regularly
swept into the bunker. The tipping hall floor will be washed down
towards the end of each Waste delivery day, and any remaining
uncontained Waste will appropriately stored;
The visitor/community centre and all public access points will be
cleaned at the end of each working weekday; and
The Site perimeter will be inspected daily to ensure that a 50 metre
distance around the Facility, subject to access constraints, is clear
from fly tipped Waste and litter emanating from the Facility or its
use.
Where litter and fly tipped Waste is brought to the attention of the Contractor by
the Authority, or the Contractor becomes aware of the litter and fly tipped waste
then in accordance with Schedule 2 (Authority’s Requirements):
a) Within 30 minutes of being notified the Contractor will contain and control such
Waste with consideration to its health and safety obligations; and
b) Within 8 hours the Contractor will remove to a suitable secure location the litter
or fly-tipped Waste and clean up any affected surrounding area; and
c) The Contractor will without delay, dispose of the litter or fly-tipped Waste via a
suitably licensed facility in accordance with the regulatory requirements.
Major Plant Life Cycles
Overall Life Expectancy
The Contractor will provide a Facility with a service life to include 25 Contract
Years plus an additional five years post handback.
In the Contractor’s experience, a number of substantial maintenance activities are
required to ensure the life of the Facility. The Contractor’s base submission
provides for a facility with a service life of 25 Contract years plus an additional
five years post-hand-back. However, in the Contractor’s experience, a sustained
programme of substantial maintenance/lifecycle renewals will provide for at least
an additional five years of performance, such that a 30 year Contract life could
actually be accommodated with five years of post-contract operations
(Attachment MS6 2.2.5(a)).
This lifespan is consistent with the Contractor’s current well-maintained older
facilities which still operate within the group. The Contractor has taken over and
operated similar ageing plants in Sheffield (previous plant) and Tyseley as well as
the more modern plants in Hampshire and Sheffield. Therefore, the Contractor is
Hertfordshire County CouncilResidual Waste ContractClose of ContractMS6 – Facilities and Contract ManagementConfidential 20
familiar with the maintenance requirements of plants in all phases of their
operational lives and the final maintenance schedule and budget will reflect the
need for heavier maintenance spend and major parts replacement as the Facility
ages.
Replacement Frequency Rate of the Main Equipment
In accordance with section 3.58 of Schedule 2 (Authority’s Requirements), the
Contractor’s Programmed Maintenance will be consistent with the design
philosophy and component life expectancy and will be commensurate to
maintaining the Facility in a robust operational status with normal wear and tear
and having a residual life at least as long as that set out in section PR4
(Handback Requirements) of Schedule 2 (Authority’s Requirements).
The description of the Contractor’s overall maintenance strategy is detailed in
section 2.2.1. Underpinning this approach to preventative Programmed
Maintenance is a detailed understanding of plant component and sub-system
performance, backed up with empirical knowledge and design system
performance data. With the provision of the specific technology employed, the
technology supplier will provide a likely maintenance spares frequency
estimation, based on assumed Waste composition and design performance that
the Contractor will use to underpin maintenance operations.
A detailed list of the main equipment replacement frequency for the Facility is
given in the technology supplier’s document attached: Attachment MS6 2.2.5(a)
‘Equipment Service Life Schedule’. Information on the service life of the MPT
components is included in Attachment MS6 2.2.5(b) 'MPT Component Service
Life.'
Maintenance of Site Infrastructure
Measures to ensure internal access roads and hard landscaping are maintained
in a suitable condition
The Contractor will monitor the condition of all hard landscaping as follows:
A scoping exercise will be undertaken for annual maintenance;
Daily Site inspections (including aspects such as monitoring of Site
litter, vandalism, trespassing and damage to perimeter fence);
In response to comments received at the weighbridge and/or tipping
hall about the state of the internal roadways; and
In response to general Personnel comments about the state of the
Facility.
Hertfordshire County CouncilResidual Waste ContractClose of ContractMS6 – Facilities and Contract ManagementConfidential 21
In all cases, where action is warranted, the Contractor will undertake remedial
works, as appropriate, to bring the state of any roadway back to a suitable level of
repair.
Measures will ensure that soft landscaping is maintained in a suitable condition.
As with the hard landscaping and roadways, the Contractor will also monitor the
state of soft landscaping at the Facility to ensure that it is maintained as follows:
To meet the expectations of members of the public and/or visitors to
the Site and reflect the professional manner in which the Site will be
operated;
So as not to cause any operational issues with the Facility; and,
So as not to cause any detrimental effect to wildlife at the Facility.
The Contractor will sub-contract all aspects of green landscape maintenance to a
suitably qualified and experienced landscape contractor. Landscape maintenance
likely to be undertaken will include: mowing; mulching; weeding; pruning;
appropriate herbicide application; watering; thinning and replacement of failures.
General
Maintenance Services Arrangements
The Contractor will employ a dedicated team to carry out all aspects of routine
daily maintenance, according to schedules to be defined and developed through
the Facility information management system. These tasks will include all aspects
of routine mechanical, electrical and control system maintenance.
Attachment MS6 2.2.7 - MPT Maintenance Journal, provides a maintenance
schedule for the MPT components.
In the event that heavy maintenance or specialist services are required (for
example, during planned shutdown), the Contractor will call on maintenance
specialists from outside the Facility staffing structure.
In the case of a routine, planned shutdown, boiler repairs will be conducted and
this will require the use of specialist crane services, scaffolding, and boiler
cleaning/repair services. Where specialist industrial cleaning is required, the
Contractor may internally sub-contract these activities to the Contractor’s
industrial site services division.
The policy for sub-contracting specialist services will be subject to review, on the
grounds of value, quality and any changes in the basis of supply.
Hertfordshire County CouncilResidual Waste ContractClose of ContractMS6 – Facilities and Contract ManagementConfidential 22
Spares Lists
The Contractor will ensure that an adequate and sufficient spares list is identified;
the items stored on Site and managed in such a manner as to provide a
comprehensive service level to Facility maintenance (Attachment MS6 2.2.4(b)).
In this respect, the AMS discussed in Section 2.2.4, ‘Computer Based Asset
Management System’ Attachment MS6 2.2.4(a) will be used to ensure availability
of spare parts so that work is not disrupted or delayed affecting Facility reliability.
The system is designed to accurately forecast probable demand for spares and
determines the parts to stock, their location and the number of items to store. It
will also show an immediate reduction of recorded inventory levels when stock is
withdrawn and will initiate the automatic re-ordering of parts from suppliers and
the generation of purchase order forms. Part requisitions derived from work
orders will drive the flow of materials to the required location with minimal
disruption.
A detailed list of stock to be held on Site to meet the two year spare parts list is
given in Attachment MS6 2.2.4(b).
Contingency Arrangements
The Contractor’s AMS will maintain Facility history, analyse plant failure modes
and re-order stock to support longer term maintenance decisions and to provide
contingency spares as required.
For details relating to Services contingency Delivery Point arrangements during
planned and unplanned shutdowns see Table 6.1 above.
6.2.3 Unplanned Maintenance
Whilst the Site, the Facility, and operations will be designed to minimise the
chance of an unplanned maintenance outage and, wherever practicable, build in
contingency measures, the Contractor will prepare and maintain a Contingency
Plan for the Services. The aim of the Contingency Plan will be to ensure that at all
times the Contractor has provided, and communicated to the Authority,
contingency measures for the Services to manage planned and unplanned
unavailability of the Site or Facility.
When developing the Contingency Plan the Contractor will seek to ensure that
contingency arrangements do not have a detrimental impact on the provision of
other aspects of the Services.
The objectives of the Contingency Plan will be:
Hertfordshire County CouncilResidual Waste ContractClose of ContractMS6 – Facilities and Contract ManagementConfidential 23
To plan Facility shutdowns and Site closures to minimise/negate
operational changes for the Waste Collection Authorities (WCA) and
help ensure Services continuity;
To ensure the Services have sufficient contingency capacity and
arrangements to ensure no or minimal effect on the WCAs and
other stakeholders in the event of unplanned Site unavailability;
To detail planned and unplanned shutdown arrangements including
the use of third party sites with documented commitments where
relevant;
To ensure that the use of sites identified in the Contingency Plan
are at least at the same standard as those employed in the
provision of this Contract and that audits are performed by the
Contractor prior to use;
To provide contingency measures for weighbridge unavailability;
To secure alternative market outlets for materials where the
materials do not satisfy the requirements of the primary markets;
To ensure that diagnostic training and maintenance training is
established for key individuals in the Contractor’s organisation to
enable the rapid diagnosis and repair during unplanned
unavailability; and
To define all communication lines and associated procedures with
the Authority/Waste Disposal Authority in the event that the
Contractor needs to activate contingency arrangements.
6.3 OPERATION MANAGEMENT SYSTEMS
6.3.1 Introduction
The Contractor will manage the Services in accordance with the Contractor’s
business management system (BMS). The BMS will include the following
management systems:
Quality;
Environmental; and
Health and safety
(Management Systems).
Hertfordshire County CouncilResidual Waste ContractClose of ContractMS6 – Facilities and Contract ManagementConfidential 24
The process of implementation and certification of the Management Systems will
be conducted in four stages:
Introduction and awareness training of the BMS for all Personnel
who have direct influence over compliance with the system
(Contract managers, Site managers, supervisors);
A series of Site inspections to assess initial compliance and raise
awareness of the process of certification throughout the workforce;
Internal audits at the Facility where formal non conformances and
observations will be raised; and
External audit conducted by a UKAS accredited certification
company at selected facilities to demonstrate compliance with the
BMS.
The BMS will be held on the Contractor’s intranet site to ensure that the most up
to date procedures are always available for reference.
The Contractor’s Representative will be responsible for implementing at a
workforce level a quality management system compliant with BS.EN.ISO
9001:2008; an environmental management system compliant with BS.EN.ISO
14001:2004; and a health and safety management system compliant with
OHSAS 18001:2007 at all times following the Services Commencement Date.
6.3.2 Operations Plan
The BMS is established and distributed on the Contractor’s parent company’s
intranet. Control is maintained via a single point of contact for system
administration. A dedicated email facility has been established for the receipt of
new procedures, change requests and feedback. All hard copies will be
uncontrolled. These documents are regularly reviewed for effectiveness in
operation by means of the BMS reviews and internal audits.
The Contractor will adopt the Contractor’s certified BMS manual, which will be an
integral part of the health and safety, quality and environmental management
system arrangements.
The BMS structure contains 3 tiers of documents. At the top level, Tier 1 is the
manual and all system policies. Tier 2 contains the Contractor’s group processes
and procedures. Tier 3 contains documents that are relevant for individual
business units (i.e. this Contract). Information that is required for individual sites
will be contained in local documents and/or operating manuals. Process and
Hertfordshire County CouncilResidual Waste ContractClose of ContractMS6 – Facilities and Contract ManagementConfidential 25
procedure owner responsibilities will be defined and will include requirements to
regularly review relevance and adequacy of documents in consultation with users
and related process owners.
The control of the activities undertaken by the Contractor will be carried out using
defined procedures and work instructions. This will be essential to ensure that all
activities are completed to the Authority’s, regulatory and other requirements. The
implementation of the Contractor’s policies will be achieved through operational
standards and corresponding company procedures and work instructions. The
documentation structure is simple and can be understood by reference to the
Figure 6.1 below:
Figure 6.1 Documentation Structure of the Contractors BMS
The records required to operate and maintain the Contractor’s BMS include the
following:
Audits;
Legal documents;
Aspects register;
Improvement plan;
Training records;
Management review;
Incidents and complaints register;
Risk assessments;
Health and safety records; and
Hertfordshire County CouncilResidual Waste ContractClose of ContractMS6 – Facilities and Contract ManagementConfidential 26
Contractual Authority’s Requirements.
These records will be maintained for reference purposes to demonstrate effective
operation of the system and as a basis for continuous improvement. Records will
also be maintained for relevant information not included in the management
system, such as relevant Sub-Contractor records. Each type of record will be
maintained in a suitable and secure manner that ensures that it can be retrieved
when required. Each type of record will be located according to local
arrangements and using an index system determined by the Contractor’s
Representative. Records will be disposed at the end of the retention period in a
secure manner.
BMS Administrator
Control of Tiers 1 and 2 of the BMS will be maintained via the Contractor’s parent
company QHSE (Quality, Health and Safety, and Environment) department.
The Contractor’s Representative will be responsible for the administration of the
BMS at Tier 3 level and will utilise the Contractor’s parent company QHSE
managers as appropriate. The Contractor's Representative will appoint a QHSE
manager who will act as the quality manager and environmental manager in
respect of Schedule 2 (Authority’s Requirements) PR3 3.66 and 3.70 (QHSE
Manager).
Staff, senior managers and frontline managers and supervisors will be
responsible for maintaining the BMS at a workforce level. Each manager will have
yearly quality objectives and targets which will be an integral part of their overall
performance for the year.
Contractor’s Representative
In relation to the management systems, the Contractor’s Representative,
supported by the QHSE Manager will be responsible for ensuring that the
following is undertaken:
Allocating sufficient funds and other resources to meet the
requirements of the Contractor QHSE policies and relevant
Legislation;
Ensuring that arrangements exist to enable Personnel to
understand the QHSE policies and their responsibilities for QHSE
matters and that these are fulfilled;
Hertfordshire County CouncilResidual Waste ContractClose of ContractMS6 – Facilities and Contract ManagementConfidential 27
Ensuring there are arrangements for the assessment of risks to the
health and safety of Personnel and any other person affected by the
Contractor’s work activities are in place;
Providing safe plant and equipment, working conditions and safe
systems of work;
Ensuring that Personnel at all levels are properly trained in the
relevant regulations, rules, codes of practice, procedures, standard
operating practices (SOPs) and systems of work and that these are
complied with;
Ensuring that competent supervision is available;
Ensuring that plant and equipment is regularly inspected and
examined and, where necessary, tested in accordance with both
legislative and company requirements;
Ensuring the provision and maintenance of appropriate Personal
protective equipment (PPE) and training in its correct use;
Ensuring the adequacy of fire precautionary measures and
contingency arrangements in the event of an emergency e.g. fire
fighting, provision of first aid;
Maintaining monitoring systems to provide information on safety
performance;
Periodically reviewing QHSE performance in conjunction with
business unit directors in order to ensure that policies are properly
implemented;
Ensuring that remedial action is taken promptly following
inspections and audits; and
Ensuring that proper accident/incident records are maintained at
each location.
QHSE Department
The Contractor’s Representative will be supported by the QHSE Manager as well
as the Contractor’s parent company in-house QHSE department which will
include a QHSE director, QHSE systems manager, QHSE manager, QHSE
continuous improvement manager and internal systems auditors.
The Contractor’s Representative, supported by the QHSE Manager, will be
responsible for the following:
Hertfordshire County CouncilResidual Waste ContractClose of ContractMS6 – Facilities and Contract ManagementConfidential 28
Ensuring that the management system is properly established,
implemented and maintained;
Reporting on the system’s performance and highlighting any
improvements needed; and
Liaising with external parties on matters pertaining to the
management system.
The QHSE Manager will be responsible for the following:
Management of the QHSE audit function;
Delivering and maintaining an effective audit programme that:
– Confirms and sustains compliance;
– Identifies areas for improvement;
– Is relevant to business requirements;
Providing advice and guidance on QHSE issues; and
Working with QHSE system managers to implement improvements.
The QHSE Manager will report to the Contractor’s Representative the following
information on a monthly basis:
Completed internal/external audits;
Audit findings;
Outstanding and overdue non-conformances; and
Audits scheduled.
The Contractor’s QHSE Manager will be responsible for the following:
Providing line management with professional advice to help them
meet their responsibilities;
Identifying unsafe plant and working practices, systems and
procedures and making recommendations for remedying any
defects found;
Investigating the circumstances of accidents, dangerous
occurrences or incidents, making recommendations on the
prevention of further accidents and reporting to line management
and the QHSE director;
Hertfordshire County CouncilResidual Waste ContractClose of ContractMS6 – Facilities and Contract ManagementConfidential 29
Assisting management in the preparation and implementation of
written procedures;
Advising management on the health and safety aspects of any new
plant, equipment or substance;
Assisting in the identification of training needs and making
recommendations to management and the QHSE director; and
Liaising with line management and customers where necessary on
the safety aspects of the disposal of Waste.
Training
At Services Commencement Date or during the induction process, Personnel will
be issued with the Contractor’s training manual. The manual will include details
on the BMS and its use, including the Performance Standards that both the
Services and Personnel must meet. This manual will also include health and
safety and environmental literature and general company information.
All training will be recorded on the Contractor’s approved training records and
held on file at the Facility. This data will be cross checked with training
requirements and other metrics such as personal accident information to highlight
when Personnel need to undertake training, be retrained or attend a refresher
course. All training will be undertaken by a competent trainer.
Training relating to health and safety is detailed in Method Statement 6, Part
4.2.6.
Key Subcontractors
The Contractual relationship with key Sub-Contractors is covered in Section 5.2
of this MS, with details on how these Sub-Contracts will be controlled by the
Contractor. The standard of the element of the service provided by the key Sub-
Contractor will be at the same level as that of the Contractor. The control of
standards from those Sub-Contractors is covered in the BMS.
6.3.3 Quality Management System
The Contractor will operate an integrated management system which includes the
quality management system (QMS). The QMS will be integrated into the
accredited BMS that is operated by the Contractor’s parent company.
The main objectives of the QMS will be as follows:
Hertfordshire County CouncilResidual Waste ContractClose of ContractMS6 – Facilities and Contract ManagementConfidential 30
Deliver the Services to the standard agreed between the Authority
and the Contractor;
Ensure the delivery of the Services is adequately documented;
Monitor and assess the performance of the Services; and
Ensure continuous improvement in line with the principles of best
value and the Authority’s requirements.
The Services will be accredited to ISO 9001:2000 from the Services
Commencement Date. The Contractor’s Representative, assisted by the
Contractor’s QHSE team, will be responsible for obtaining certification.
Implementing the Quality Management System
The Contractor will develop quality performance standards for the Services. Local
quality assurance procedures will be drafted shortly before the Services
Commencement Date in line with Schedule 2 (Authority’s Requirements), and will
be incorporated into the Contract Manual. These quality assurance systems will
be used to check and review compliance with Legislation, the Authority’s
Requirements, government guidance, and best practice.
The Contractor’s Representative will hold overall responsibility for the QMS and
will be kept informed of developments through meetings with operational
managers, including safety committee meetings.
The Contractor will establish quarterly QHSE meetings to communicate, analyse,
and discuss relevant issues pertaining to QHSE such as corporate objectives and
targets, business line and Site specific issues.
The establishment of safety committees, frequency of management and
representative inspections, the establishment of objectives and targets to ensure
review and thus continual improvement will be laid down through the Contractor’s
BMS which will provide a framework and specific procedures in relation to QHSE
management.
The Contract Manual
The Contractor will develop a Contract manual as required by both ISO
9001:2000 and the Authority. The Contract Manual will be reviewed at the annual
review.
The Contract Manual will include the following:
Contract details such as contact names;
Hertfordshire County CouncilResidual Waste ContractClose of ContractMS6 – Facilities and Contract ManagementConfidential 31
Details of the Contractor and the Services;
Policy statements: health and safety, quality and environment;
COSHH assessments;
Risk assessments;
Health and safety ‘work safely booklets’;
Pictorial training aids on quality and health and safety;
Health and safety cards (e.g. leptospirosis and needlestick injuries);
Work instructions; and
All relevant forms.
This Contract Manual will be controlled by the QHSE Manager and will be a live
document amended from time-to-time to support the operational and legal
demands of the Contract.
Copies of the Contract Manual will be held by the Contractor’s Representative,
business unit managers, and the QHSE Manager. These copies will be controlled
by the Contractor’s Representative and annual audits will be carried out by the
QHSE Manager to ensure that all forms are updated and then used.
The Contract Manual will:
Ensure that all managers use the same forms and same process for
any safety, human resources and pay related matters;
Allow all managers to have an accessible and updated point of
reference;
Complement the Contractor’s management system to comply with
the local requirements; and
Allow a very clear and easy audit process by the Contractor, the
Authority or any external body.
As a controlled document, the Contract Manual will promote initiatives throughout
the Contract, and enable a proactive approach to new demands which will arise
during the life of the Contract.
QMS Audit
The performance of the QMS will be monitored and improved by the following:
Internal audits and inspections;
Hertfordshire County CouncilResidual Waste ContractClose of ContractMS6 – Facilities and Contract ManagementConfidential 32
Regulator inspections;
Certification body audits;
Complaints and non-conformances;
Planning and setting of objectives and targets for continual
improvement; and
Statistical analysis.
The QHSE Manager will be responsible for the management of the QHSE audits,
in addition to delivering and maintaining an effective audit programme that:
Confirms and sustains compliance;
Identifies areas for improvement; and
Is relevant to business requirements.
In accordance with the Authority’s requirements for continuous improvement,
managers will ensure the following:
Regular audits of the QMS (at least every 6 Contract Months),the
findings of which will be reported to the Authority;
Regular audits of key Sub-Contractors’ QMSs (at least every 6
Contract Months), the findings of which will be reported to the
Authority and the Sub-Contractors;
A review of the QMS at intervals agreed with the Authority; and
The Contractor will liaise with the Authority on matters relating to
quality assurance.
During the Contract Period, the Contractor’s Representative will undertake
regular inspections of services at the Facility to ensure they comply with the
Contractor’s BMS.
In addition to the inspections, the regional management systems team will
undertake at least one formal ISO 9001:2000 required audit each year. The QMS
will be independently certified by a UKAS accredited certification body (currently
Det Norske Veritas Quality Assurance Ltd (DNV)).
6.3.4 Environmental Management System
Note: this section covers the operational period only; construction management
systems are set out in MS1 – 6.2.4
Hertfordshire County CouncilResidual Waste ContractClose of ContractMS6 – Facilities and Contract ManagementConfidential 33
Implementation of the Environmental Management System
The Contractor will operate an integrated management system which includes the
environmental management system (EMS). The Contractor’s Representative and
the QHSE Manager will work with the Authority and the Contractor's regional
management systems team to ensure that all potential environmental impacts are
appropriately identified, assessed and managed. The Contract Manual, as
referred to in section 3.3.2 above, will include procedures to ensure that potential
environmental impacts are managed and environmental targets implemented and
monitored.
The Contractor’s Representative will hold overall responsibility for the EMS for
the Contract. The service will be certified to ISO 14001:2004 standard following
the Services Commencement Date. The Site EMS will form part of the group
EMS.
EMS Audit
The QHSE Manager will be responsible for the management of the QHSE audits,
in addition to delivering and maintaining an effective audit programme that:
Confirms and sustains compliance;
Identifies areas for improvement; and
Is relevant to business requirements.
In accordance with the Authority’s requirements for continuous improvement the
QHSE Manager will ensure the following:
Regular audits of the EMS (at least every 6 Contract Months), the
findings of which will be reported to the Authority;
Regular audits of key Sub-Contractors’ EMSs (at least every 6
Contract Months), the findings of which will be reported to the
Authority and the Sub-Contractors;
A review of the EMS at intervals agreed with the Authority; and
The Contractor will liaise with the Authority on matters relating to
environmental management.
During the Contract, the Contractor’s Representative will undertake regular
inspections of services at the Facility to ensure they comply with the Contractor’s
EMS.
Hertfordshire County CouncilResidual Waste ContractClose of ContractMS6 – Facilities and Contract ManagementConfidential 34
In addition to these inspections, the regional management systems team will
undertake at least one formal ISO 14001:2004 required audit each year. The
EMS will be independently certified by a UKAS accredited certification body
(currently Det Norske Veritas Quality Assurance Ltd (DNV)).
Environmental Aspects and Impacts
The assessment of all potential environmental impacts that could result from the
performance of the Services will be covered within the Contractor’s ‘e-report’
(Attachment MS6 3.4.3), where environmental data is reported annually for all
environmental related activities, which will be available for inspection upon
request.
Project Personnel
The Contractor’s Representative will have overall responsibility for the
implementation of the EMS.
As referred to above, the Contractor will employ a QHSE Manager who will have
day-to-day responsibility for working with the regional management systems team
and Contract management team for setting up, developing and implementing the
EMS.
All business unit managers, for example the shift team leader, will have day-to-
day responsibility for ensuring that their teams adhere to the management
systems and procedures, which will address environmental concerns. These
Contract specific procedures will be contained within the Contract Manual.
Training
The Contractor proposes to run the following environmental training courses for
appropriate Personnel:
Environmental auditing;
Hazardous Waste Regulations;
Chemistry of Waste;
Environmental awareness; and
Awareness of specific Contractor issues.
The Contractor will also run an environment focus course, which is a one day
awareness session with the aim of providing the necessary tools to better
understand how the Services impact upon the environment and what can be
Hertfordshire County CouncilResidual Waste ContractClose of ContractMS6 – Facilities and Contract ManagementConfidential 35
done to minimise this impact and to improve general operational environmental
performance.
An environmental Legislation course will also be offered to appropriate
Personnel, which comprises a two day course with the objective of providing
Personnel with the necessary knowledge in current environmental and Waste
Legislation and the application to the Services.
6.3.5 Previous Experience
Internationally the Contractor operates in excess of 100 thermal treatment
facilities (6 MSW energy recovery facilities, and 1 HTI – high temperature
incinerator, in the UK) and in excess of 30 mechanical and biological treatment
facilities on mixed Waste (MBT – mechanical pre-treatment and mechanical
biological treatment), as well as around 40 MRF – materials recycling facilities -
on dry separately collected recyclables, 10 of which are in the UK. Furthermore,
the Contractor is currently constructing an 87,500tpa MBT facility in Southwark in
London due to commence operations in 2011.
The Contractor operates a number of reference facilities (see MS1 Reference
Projects) that are similar in size and operation to the MPT Facility proposal.
Notably the Rostock MBT facility in Germany is similar in size and configuration
to the MPT Facility proposal. The development is also underpinned by site
performance testing and supplier discussions regarding guaranteed performance.
The actual MPT Facility proposed relies on knowledge of mechanical treatment
learnt at a number of facilities over a number of years to provide a proven robust
yet innovative design for the MPT Facility.
The thermal treatment and energy recovery technology proposed is based on the
wide Contractor experience of energy recovery facility technologies.
Methods of Transferring the Know-how
The Contractor has several internal ‘tools’ for transmitting and sharing best
practice, lessons learned on different operations and for exchanging knowledge
between technical specialists.
Mechanical Treatment Group
A bi-monthly meeting of MRF managers and technical experts is held in the UK
consolidating and sharing the information between the 10 UK MRFs – this
mechanical sorting group accesses the wider group knowledge on sorting to
Hertfordshire County CouncilResidual Waste ContractClose of ContractMS6 – Facilities and Contract ManagementConfidential 36
ensure we install the optimum sorting equipment at all times as the various
technologies develop.
ERF Managers Group
A bi-monthly meeting of energy recovery facility managers and technical experts
is held in the UK 7 energy recovery facilities (6 MSW and 1 HTI). This group
shares information on operating, environmental and financial performance across
the operations in order to drive out best practice.
Central (International) Group
A monthly international technical meeting is held to share know-how between
operations in Germany, France, Italy, Scandinavia, UK, Asia, the US and
Australia.
The gathered information is centralised by the Contractor’s international technical
team and shared via an intranet resource known as VESTECH.
Virtual Technical Network - VESTECH
The Contractor’s knowledge management relies on around 450 dedicated
researchers and 450 in the field expert operators on the technical grid, where
information is shared by file transfer and online forums.
Innovation
The Contractor’s philosophy is very much to live by its claims and has invested
significant monies in the research
area which underpins the above
developments. For Contractor
innovation is not just a marketing
statement. The Contractor’s group
has deployed research teams
internationally in North America,
Australia, and Europe with centres
of research specialising in
resources and Waste, energy and
environment.
Research and Development
The CREED centre in Paris alone houses 200 engineers and scientists who work
on Waste and energy treatment development and the technologies. This resource
Hertfordshire County CouncilResidual Waste ContractClose of ContractMS6 – Facilities and Contract ManagementConfidential 37
pulls together knowledge from all the Contractor’s group business lines including
water, energy and transport meaning additional technology transfer can be
delivered.
Summary
All in all the Contractor consolidates its extensive experience of Waste streams,
operational performance of technology and facility flexibility to provide the
confidence to customers that proposed technical solutions will be delivered and
are flexible into the long term.
6.4 HEALTH, SAFETY AND WELFARE
6.4.1 Introduction
As stated in Method Statement 6, Part 3, the Contractor will manage the Services
in accordance with the Contractor’s business management system (BMS), which
includes the Contractor’s safety management system (SMS). Attachment MS6
4.1 is the Contractor’s Health and Safety Policy.
The Contractor will adopt safe working practices as detailed in this Method
Statement to ensure compliance with all applicable current and future Legislation
and the Contractor’s SMS.
The Contractor’s Representative will work with the Authority and the Contractor's
regional management systems team to ensure that all potential health and safety
issues are appropriately identified, assessed and managed. The Contract
Manual, as referred to in Method Statement 6, part 3.3.2 will include procedures
to ensure that potential health and safety impacts are managed and targets
implemented and monitored.
The Contractor will ensure that the Works comply with Good Industry Practice,
relevant Legislation, Authority’s Policies, requirements of relevant authorities,
recognised standards, recommendations, codes of practice and guidance such
as guidance published by the Health and Safety Executive (HSE) on Health and
Safety in Waste Management and Recycling Industries.
The Contractor will adopt the full health and safety system of the Contractor’s
group to minimise risk, maintain good levels of safety practices and minimise
negative effects such as accidents, near misses and dangerous occurrences.
This approach will be rolled out as an integral part of the management of the
Facility covering all phases of the Project, i.e. the Works, Services and handback
phases.
Hertfordshire County CouncilResidual Waste ContractClose of ContractMS6 – Facilities and Contract ManagementConfidential 38
In accordance with Schedule 2 (Authority’s Requirements), the Works will be
suitably housed and protected such that Waste delivery vehicle operators, the
Authority’s staff or visitors cannot gain access to areas or parts of the Site that
could cause harm or a risk to their health and safety.
The Contractor will also design and construct the internal road and pedestrian
area layout within the Site to allow safe movement of vehicles and pedestrians
and with regard to health and safety Legislation and Good Industry Practice.
In accordance with Schedule 2 (Authority’s Requirements) the Contractor will
undertake the following:
Liaise with the Health and Safety Executive on all relevant matters;
Co-ordinate its health and safety plans with the Authority’s health
and safety policies;
Take all necessary steps, and provide the Authority with such
information as the Authority reasonably requires to satisfy itself that
all necessary steps are being taken, to identify and control risks to
the health and safety of persons involved in the Works; and
Fulfil CDM requirements.
The Contractor will supply a copy of its general statement of safety policy to the
Authority, for approval no later than one hundred and twenty (120) Business Days
prior to the Services Commencement Date and will review its policy and safe
working procedures whenever necessary in the light of changing Legislation,
working practices, accidents or similar events and inform the Authority of any
consequent revisions.
The Contractor’s methodology for fire assessment and fire strategy is addressed
in Method Statement 6, part 8.1 (Fire Safety).
6.4.2 Details of all Health and Safety Arrangements
Health and Safety Policy
A statement on the Contractor’s health and safety policy is presented overleaf.
Hertfordshire County CouncilResidual Waste ContractClose of ContractMS6 – Facilities and Contract ManagementConfidential 39
Figure 6.2 Health and Safety Policy
Hertfordshire County CouncilResidual Waste ContractClose of ContractMS6 – Facilities and Contract ManagementConfidential 40
Application of CDM Regulations in Operating Phase
The Project will be notifiable under the Construction (Design and Management)
Regulations 2007 (CDM). Accordingly, it will need to be notified to the Health and
Safety Executive before construction begins. A CDM Co-ordinator (Call-safe
Services) has been appointed by the Contractor to make this notification at a later
date.
At this stage the Contractor’s design seeks to eliminate hazards and risks, and
where they are unavoidable, provide information about remaining risks. The
overall aim is to avoid foreseeable risks to the health and safety of a person
involved in either constructing or working within the building. Therefore, as far as
possible, the amount of construction and maintenance work required to be
undertaken at height has been reduced, the amount of off-site prefabrication has
been maximised and the building has been designed to separate the most
sensitive users from the most hazardous areas (for example, the operational
traffic has been separated from visitors and Personnel).
The Contractor’s guidance on CDM regulations is provided in Attachment MS6
4.2.2.
Safety Management Systems
Once the Facility is operational, the Contractor will achieve BS OHSAS 18001
certification within one year of the Services Commencement Date and will be
certified by a UKAS accredited certification body (currently Det Norske Veritas
Quality Assurance Ltd (DNV)).
BS OHSAS 18001 certification will be maintained throughout the duration of the
Contract.
Arrangements for Inspections and Audits
Facility supervisors will undertake a monthly observation/inspection of working
practices at the Facility to ensure that procedures and policies are complied with,
that high standards of health and safety are maintained and potential
weaknesses in the system are identified.
The Contractor’s operations manager will also undertake a monthly inspection to
include traffic management, fire provisions, Site signage and compliance with
safety rules and regulations.
The above inspections/observations will be carried out using set checklists that
incorporate topical Waste management issues.
Hertfordshire County CouncilResidual Waste ContractClose of ContractMS6 – Facilities and Contract ManagementConfidential 41
The Contractor will provide training in behavioural safety techniques to all
Personnel to enable them to challenge unsafe behaviours observed on Site.
Unsafe behaviours will be reported internally, with systems and procedures being
reviewed accordingly. Near-miss reporting programmes will be put in place to
enable Personnel, along with visitors, to contribute to the overall safety of the
Facility.
In addition to day to day general on-site risk management monitoring the
Contractor will undertake risk management surveys on an annual basis. The
surveys will incorporate consideration of areas including general health and
safety, environmental management, Site security, visitor safety and vehicular
transport movements. The Site will be assessed for legal compliance, local
management controls and implementation of best practice. All documentation and
systems will be audited and a Site inspection undertaken. A full report will be
produced from each visit and will be available to the Authority on request. Health
and safety records will be available for Authority inspection as and when required.
The QHSE Manager will undertake regular inspections of the Facility and
Services to complement the above inspections and to ensure compliance with the
Contractor’s SMS.
All managers may monitor and review audit findings and status of non-
conformances/observations in real-time via the RIVO Safeguard audit database.
In addition to the inspections and internal reports, the regional management
systems team will undertake at least one formal BH OHSAS 18001 audit each
year.
The “Permit to Work“ and the “Assessment and Control of Contractors” are
enclosed in Attachment MS6 4.2.4(a) and Attachment MS6 4.2.4(b).
Specific Tier 2 health and safety procedures which have been developed are
detailed below.
Accident Prevention
This procedure will define the requirements to investigate accidents, incidents
and near-misses, relating to individuals, vehicles and property damage, and the
associated reporting requirements. The procedure will be underpinned by a
number of technical documents addressing accidents/near misses/incidents,
reporting notifiable accidents and vehicle accidents.
Hertfordshire County CouncilResidual Waste ContractClose of ContractMS6 – Facilities and Contract ManagementConfidential 42
Sub-Contractor Management
This procedure will define the requirements to ensure that all issues relating to
Sub-Contractor management are managed safely and with minimal adverse
environmental impact. Fixed-term Sub-Contractors (such as security and
cleaning) will be given the same level of duty of care as the Contractor’s
Personnel and managed accordingly.
Control of Substances Hazardous to Health
This procedure will define the requirements to ensure that all issues relating to
the control of hazardous substances are managed safely.
The Contractor will undertake thorough risk and COSHH assessments of the
Waste management operations with all recommendations implemented through
the quality assured management procedures.
All chemical substances used by the Contractor’s Personnel will have had a
COSHH assessment carried out and the details will be retained at the Facility.
Generic COSHH assessments will be made available through the Contractor's
intranet site with the Facility creating its own specific assessment in liaison with
the QHSE Manager.
The Contractor will use an approved supplier list for any chemical substances
required.
Electrical
This procedure will define the requirements to ensure that all issues relating to
electricity are managed safely.
Electrical equipment will accord with the Contractor’s standards, the requirements
of the Electricity at Work Regulations 1989, the latest governing edition of the IEE
Wiring Regulations and any specific guidance codes or standards for the
particular item of Equipment. All electrical panels and switch-rooms will be clearly
signed with an electrical hazard warning. They will be kept locked when not being
worked on. Annual calibration and tests on all electrical test equipment will be
traceable to current standards.
Emergency Preparedness
This procedure will define the requirements to ensure that all issues relating to
Emergency preparedness are managed safely and environmental risks are
minimised. The Contractor will identify potential Emergency situations, take steps
to prevent their occurrence and, in the event of an Emergency, have plans for
Hertfordshire County CouncilResidual Waste ContractClose of ContractMS6 – Facilities and Contract ManagementConfidential 43
dealing with them which cause minimum losses to people, plant, process or the
environment.
If any incident occurs on Site, Personnel will ensure that the management is
informed in accordance with local procedures.
The Contractor will instigate a thorough process for reporting and recording any
incidents, accidents (no matter how trivial) and near misses, i.e. incidents with a
potential to cause injury or environmental harm.
Any serious incident will be responded to by the Contractor’s Crisis and
Emergency Procedure (refer to section 4.2.8 for further details) which is
controlled by its most senior managers.
Machinery
This procedure will define the requirements to ensure that all issues relating to
the provision and use of work equipment and machinery are managed safely.
This standard will cover machinery and work equipment (Provision and Use of
Work Equipment Regulations 1998 (PUWER)) and lifting equipment (Lifting
Operations and Lifting Equipment Regulations 1998 (LOLER)).
Noise
This procedure will define the requirements to ensure that all issues relating to
noise are managed in compliance with the 2005 Noise at Work Regulations and
European Directive 2003/10/EC.
Occupational Health
This procedure will define the requirements to ensure that all issues relating to
Personnel occupational health are managed safely through maintenance and
promotion of health, and improvement in the working environment conducive to
improving safety and health.
Permits to Work
This procedure will define the requirements to ensure that all issues relating to
permits to work are managed safely.
Permits to work will be used to control ‘high hazard’ activities undertaken by
Sub-Contractors or Personnel where a standard work instruction or work method
statement does not address the risk.
Any Personnel or Sub-Contractor carrying out hot work will follow hot work
procedures as follows:
Hertfordshire County CouncilResidual Waste ContractClose of ContractMS6 – Facilities and Contract ManagementConfidential 44
Inform the relevant contact on Site that hot work will be taking
place;
Ensure an extinguisher and fire blanket are available;
Ensure all flammables including oily deposits and liquids have been
removed;
Ensure the area is adequately ventilated;
Remove all loose combustible material such as paper, tissues, rags
etc so that none are within 10 metres of the area in which hot work
is taking place;
Provide, where practical, a screen to prevent ejection of hot parts;
Ensure gas bottles are securely fastened onto a trolley;
Keep alert during the hot work process to ensure sparks or hot
ejected material do not make contact with any combustible material;
Provide a fire watch for a period of half an hour at the end of any
hot work to check that the area is free from debris and smouldering;
and
Inform the Site contact that hot work has ceased.
Personal Safety
This procedure will define the individual’s personal requirements for ensuring
their own safety. This standard will apply to Display Screen Equipment (DSE),
Personal Protective Equipment (PPE), ergonomics, first aid policy, home working,
young people at work, safe driving and Site rules.
Appropriate PPE will be provided to all Personnel and visitors, entering the plant
area, and will be worn as appropriate. Approved gloves, safety shoes, high
visibility clothing, safety glasses and ear defenders will be worn in designated
areas. This will also include specialised respiratory protective equipment (RPE)
and PPE equipment such as breathing apparatus and fall arrest equipment.
Pressure Systems
The aim of this document will be to prevent serious injury from the hazard of
stored energy as a result of the failure of a pressure system or one of its
component parts in compliance with the current Pressure Systems Safety
Regulations 2000 (PSSR).
Hertfordshire County CouncilResidual Waste ContractClose of ContractMS6 – Facilities and Contract ManagementConfidential 45
Transport
This procedure will define the requirements to ensure that transport and
mechanical handling equipment operations are managed safely and in
accordance with the Contractor’s and legislative requirements. This standard will
apply to transport operations and workplace transport management.
Working on Highways
This procedure will outline the working practices that must be followed to meet
the best practice and legislative requirements such as the New Roads and
Streetworks Act 1991 and mobile lane closure technique.
This policy will apply to the following activities: litter picking, sweeping, response
work, grass cutting, tree cutting, and hedge cutting activities on the hard shoulder
and roadside verges.
Workplace
This specification will apply to the construction, design and maintenance of the
physical working environment which can affect the potential for accidents,
including features and issues that are common to every workplace and more
specific hazards related to use e.g. office and the Facility building.
Manual Handling
Manual handling will be included in all induction training. More in-depth manual
handling training may be required for certain job roles. Manual handling risk
assessors and manual handling instructors will be appropriately trained, including
a three-day manual handling ‘Train the Trainer’ course, linking in with in-house
standards. All operational Personnel and managers will receive manual handling
awareness training. Extended training will be available for 'at risk' Personnel in
job specific situations.
Risk Assessments
All activities\tasks undertaken by Personnel or Sub-Contractors will have a risk
assessment performed first to identify any hazards which may be likely to cause
injury, damage or environmental harm. Once the risk assessment has been
completed, any actions required to make the activity safe and avoid
environmental damage will be completed before the job begins.
Safe Systems of Work/Standard Operating Procedures
Safe systems of work (SSOW) and/or standard operating procedures (SOP) will
be produced for all activities being undertaken by Personnel or Sub-Contractors,
Hertfordshire County CouncilResidual Waste ContractClose of ContractMS6 – Facilities and Contract ManagementConfidential 46
where a risk assessment has identified that a hazard remains once all possible
actions to reduce the hazard have been completed.
To ensure that an integrated approach is taken the documentation outlined in the
table below will be implemented.
Table 6.3 Procedure Titles
Procedure TitleReference
Number
Policy Manual Management System Manual
Health & Safety Legislation & Other Requirements SYS 01
Health & Safety, Legal and Other Requirements Register
Environmental, Legal and Other Requirements Register
Management Review SYS 02
Objectives and Targets for Continuous Improvement SYS 03
Continuous Improvement – Quality, Health, Safety and Environment
(QHSE) System Audits
SYS 04
Document Control and Records Management SYS 05
Training SYS 06
Non Conformances Complaints and Preventive Action SYS 07
Identification and Evaluation of Environmental Aspects & Impacts SYS 08
QHSE Alert SYS 10
Calibration and Maintenance of Testing and Measuring Equipment SYS 11
Design, Validation and Verification SYS 12
Accident Incident Management Plan SYS 14
Monitoring and Review of Location Health, Safety and Environment SYS 15
Permitting SYS 17
Duty of Care and Hazardous/Special Waste Documentation SYS 18
E Report SYS 19
Business Unit Manual SYS 20
Collection, Handling, Transportation and Unloading of Clinical Waste
(except for Community Healthcare and Sharps Litter)
SYS 21
Collection, Handling, Transportation and Unloading of Community
Healthcare Waste
SYS 22
Collection, Handling, Transportation and Unloading of Sharps Litter from
Street Cleansing Activities on behalf of the Local Council
SYS 23
QHSE Due Diligence SYS 24
The Training Procedure, SYS 06 is attached under Attachment MS6 4.2.4(c).
The Contractor’s current SOPs will be modified to ensure they are compatible
with any revised work activities generated by the Contract. Each SOP will include
the following information:
The aim and purpose of the work;
Hertfordshire County CouncilResidual Waste ContractClose of ContractMS6 – Facilities and Contract ManagementConfidential 47
The names of the responsible parties;
A description of the work;
The risk assessment conclusions;
Risk controls to be implemented;
Safety regulations and their application to this procedure; and
Training requirements.
Health and Safety Resources
The Contractor’s Representative will hold overall responsibility for health and
safety within the Contract and will be kept informed of health and safety
developments through board meetings and meetings with operational managers,
including safety committee meetings.
The Contractor’s Representative will be responsible for ensuring that the
following is undertaken:
Allocating sufficient funds and other resources to meet the
requirements of the health and safety policies and relevant
Legislation;
Ensuring that arrangements exist to enable Personnel to
understand the health and safety policies and that their
responsibilities are fulfilled;
Ensuring that arrangements for the assessment of risks to the
health and safety of Personnel and any other person affected by the
Contractor’s work activities are in place;
Providing safe plant and equipment, working conditions and safe
systems of work;
Ensuring that Personnel at all levels are properly trained in the
relevant regulations, rules, codes of practice, procedures, standard
operating practices (SOPs) and systems of work and that these are
complied with;
Ensuring that competent supervision is available;
Ensuring that plant and equipment is regularly inspected and
examined and, where necessary, tested in accordance with both
legislative and Contractor requirements;
Hertfordshire County CouncilResidual Waste ContractClose of ContractMS6 – Facilities and Contract ManagementConfidential 48
Ensuring the provision and maintenance of appropriate Personal
Protective Equipment (PPE) and training in its correct use;
Ensuring the adequacy of fire precautionary measures and
contingency arrangements in the event of an emergency e.g. fire
fighting, provision of first aid;
Maintaining monitoring systems to provide information on safety
performance;
Periodically reviewing health and safety performance in conjunction
with business unit directors in order to ensure that the health and
safety policy is properly implemented;
Ensuring that remedial action is taken promptly following
inspections and audits; and
Ensuring that proper accident/incident records are maintained at
each location.
In relation to dissemination of information, reasonable attempts will be made to
recruit a representative of Personnel safety from the workforce. If no recognised
trade union safety representatives are in place are available or recognised,
training will be provided to these individuals in the form of the IOSH passport to
safety training course and health and safety for representatives training that is
delivered through Campus Veolia. This will enable the Contractor to establish
quarterly health and safety meetings to communicate, analyse, discuss relevant
issues pertaining to health and safety such as corporate objectives and targets,
business line and Site specific issues.
The establishment of safety committees, frequency of management and
representative inspections, the establishment of objectives and targets to ensure
review and thus continual improvement are laid down through the existing BMS
(see section 3.2 for more details) that provides the Contractor’s framework and
specific procedures in relation to health and safety management.
Staff Health and Safety Training and First Aid Policy
Training
All Personnel will receive training in health and safety matters to enable them to
carry out their responsibilities.
The Contractor will employ a full time dedicated health and safety trainer (the
‘Health & Safety Trainer’) to control, organise, deliver and develop the training of
Hertfordshire County CouncilResidual Waste ContractClose of ContractMS6 – Facilities and Contract ManagementConfidential 49
all Personnel. The Health & Safety Trainer will also be responsible for the health
and safety matters as required by the Health and Safety at Work Act 1974 and
will complete and file training records kept for all Personnel in the performance of
the Works and/or Services. The Health & Safety Trainer will be responsible for
developing and maintaining an accurate training database.
Induction training will be given by the Health & Safety Trainer to all new
Personnel (both temporary and full time) relating to the duties they are to perform.
All new Personnel will also receive an employee handbook, which will contain the
Contractor’s relevant training manuals and health and safety policy.
The training and the induction will be delivered in the first two days of
employment. The proposed health and safety training includes the following:
Fire training;
Risk assessment;
IOSH ‘Managing Safely’;
Behavioural safety in the workplace;
Dangerous Goods;
Health and safety for facilitators;
Confined spaces training;
Health and safety for representatives;
Manual handling;
DSE assessors;
IOSH Safety for Senior Executives;
VE IOSH Passport Core; and
Train the Trainer in manual handling.
Selected supervisors will also be required to attend the following courses:
Permit to Work Course;
Electrical Isolation Course;
Accident Investigation Course;
COSHH Assessment Course; and
Noise at Work Course.
Hertfordshire County CouncilResidual Waste ContractClose of ContractMS6 – Facilities and Contract ManagementConfidential 50
For all health and safety training, training plans will be developed and used by the
Health & Safety Trainer and/or Contractor approved trainers to standardise the
content and quality of the training. All health and safety training will be carried out
by the Health & Safety Trainer and/or authorised trainers, who will have received
training in instruction techniques. An example of an ERF Induction Training
Checklist is presented in Attachment MS6 4.2.6.
All critical health and safety training will have a test/assessment process in order
to assess the knowledge/skill gained from the training.
The health and safety training and review system to be employed by the
Contractor is presented schematically in Figure 6.3:
Figure 6.3 The Contractors Health and Safety Training and Review System
Notes:
COSHH: Control Of Substances Hazardous to Health
RA: Risk Assessment
SOPs: Standard Operating Procedures
TBT: Tool Box Talks
QHSE: Quality, Health, Safety and Environment
Training on the specific Authority’s Requirements will be given in the form of ‘tool
box talks’ presented by the management team (to a format prepared and
Hertfordshire County CouncilResidual Waste ContractClose of ContractMS6 – Facilities and Contract ManagementConfidential 51
approved by the Health & Safety Trainer) and in practical demonstrations e.g.
safe lifting techniques.
As a minimum, the Facility managers will be trained to the standard or hold the
IOSH ‘Managing Safely’ qualification. Specific training needs analysis will be in
place for all Personnel and will be pertinent to their specific roles. The Contract
will benefit from the support of the Contractor’s regional management systems
team including several NEBOSH qualified health and safety professionals.
The Contractor will make use of the Contractor’s group dedicated in-house
training facility ('Campus Veolia'). The facility is accredited to carry out the IOSH
4-day 'Managing Safely' course for managers and supervisors and the IOSH
Core 1-day course for operatives. Specialist training will be used in key safety
subjects. The Contractor will adopt an approved supplier list for professional
external training, e.g. NEBOSH safety training suppliers for the National General
Certificate, NEBOSH Diploma and Oxford Brooks University Safety Diploma.
The Contractor will use trained trainers provided by Contractor approved
suppliers to train its Personnel on a case-by-case basis following the introduction
of new plant and Equipment.
The Contractor will adopt the Contractor’s group hazard based safety campaign
to ensure all Personnel are regularly reminded of the hazards encountered during
their day-to-day activities. A series of hard hitting posters will be used to illustrate
what potentially could occur on the Site. The posters will be updated every two
months to ensure that the message is regularly refreshed and placed throughout
the Facility to ensure full coverage. The campaign of safety communication will
continue for the duration of the Contract. The health and safety related subjects
will change according to the data produced from RIVO Safeguard to concentrate
on current issues.
A regular newsletter will be produced containing at least one dedicated section on
health and safety, in which topical issues will be addressed; for example, ‘slips,
trips and falls’ in the winter edition.
First Aid Policy
The Contractor will provide adequate first aid facilities and an appropriately
qualified first aider for treatment of Personnel and visitors. This will include, as
appropriate, eye baths and decontamination facilities for all authorised Personnel
and visitors.
The Contractor will undertake a first aid risk assessment in line with the Health
and Safety (First Aid) Regulations 1981 and ensure that the outcomes from the
Hertfordshire County CouncilResidual Waste ContractClose of ContractMS6 – Facilities and Contract ManagementConfidential 52
risk assessment are fully implemented, monitored and enforced as soon as
practicable.
Provision of Appropriate PPE
The Contractor’s Representative will be responsible for ensuring the provision
and maintenance of appropriate Personal Protective Equipment (PPE) and
training in its correct use.
PPE will be provided to all Personnel and visitors, entering the plant area, and will
be worn as appropriate. Approved gloves, safety shoes, high visibility clothing,
safety glasses and ear defenders will be worn in designated areas. This will also
include specialised respiratory protective equipment (RPE) and PPE equipment
such as breathing apparatus and fall arrest equipment.
Emergency Notification Procedures
In the event on an Emergency, the Contractor will adopt its internally developed
‘Crisis and Emergency Procedure’ as illustrated in the flow charts below (Figure
6.4 and 6.5).
Hertfordshire County CouncilResidual Waste ContractClose of ContractMS6 – Facilities and Contract ManagementConfidential 53
In the event of an Emergency arising, the Crisis and Emergency Procedure will
be implemented immediately and the Contractor’s Representative will be
informed of the situation as soon as it is practicable to do so.
During times when the Contractor’s Representative is absent and where actions
are required, a deputy will be nominated and made aware of their responsibilities
as part of the Crisis and Emergency Procedure.
The Contractor will nominate appropriate senior Personnel who may be contacted
outside normal working hours 365 days of the year throughout the Contract
Period. In the event of an Emergency or extraordinary event (e.g. fire, accident,
spillage) the nominated Personnel will be required to be on Site within two hours
of being notified.
The Contractor will operate and maintain a suitable communication system that
will be capable of being used by both the Contractor’s Personnel and the
Authority in the event of an Emergency.
In the event of an Emergency, the Contractor will make arrangements to divert
vehicles delivering Contract Waste away from the Facility to contingency Delivery
Point(s). The diversion procedures and alternative Waste management facilities
will be identified in advance in the Contingency Plan (see Table 6.1 for more
details). The Contractor will notify the Authority within one hour of any need to
Hertfordshire County CouncilResidual Waste ContractClose of ContractMS6 – Facilities and Contract ManagementConfidential 54
divert collection vehicles to contingency Delivery Point(s), together with the
anticipated period of time that such a diversion will be in place.
The procedure relating to Emergency preparedness is detailed in the BMS (see
section 3.2) which defines the requirements to ensure that all issues relating to
Emergency preparedness are managed safely and environmental risks are
minimised.
Records and Reporting Procedures
The Contractor’s established accident reporting procedure will be in place to
enable the Contractor to achieve compliance with the statutory duty to report
accidents, incidents and specified diseases to the enforcement authority under
the Reporting of Injuries, Diseases and Dangerous Occurrences Regulations
1995 (RIDDOR) (Regulations).
If an accident falls in line with the established criteria given, such as a major
injury or a lost time accident (more than three days) then the Health and Safety
Executive (HSE) will be informed within the timescales and by the mechanisms
laid down within the Regulations. All accidents which occur at work or in
connection with a work activity will be recorded in accident forms. Such details
will also be recorded on the RIVO Safeguard system.
In accordance with the Authority’s Requirements, the Contractor will report to the
Authority as soon as practicable, and in any event within two hours from the time
of the incident or accident involving:
A customer; or
The Reporting of Injuries, Diseases and Dangerous Occurrences
Regulations (RIDDOR) to the HSE.
The Contractor will provide the Authority with the following:
Any report forwarded to the HSE and inform the Authority of any
action taken by the HSE; and
Improvements made following the investigation of an accident or
near miss.
Such documents will be sent to the Authority within ten Business Days of receipt
by the Contractor.
The Contractor will maintain an official accident book at the Facility which will be
open to inspection by the Authority and will record details of any incidents or
accidents involving injury to any person.
Hertfordshire County CouncilResidual Waste ContractClose of ContractMS6 – Facilities and Contract ManagementConfidential 55
The Contractor will maintain a Site diary to record significant events during the
operation of the Facility. This will include relevant details of business and official
visitors, unauthorised access incidents, transport movements, deliveries of any
materials, servicing sub-contractors, weather, timing of orders, communications
directly relating to operations, power and/or heat generation, and any matters
which could possibly subsequently substantiate or refute visitors’ or Contractor’s
claims or complaints.
Records will be maintained for all health and safety training, including induction
details, on individual training files. These records will include training dates and
acknowledgement (by signature) of both trainer and trainee. The training records
will be kept at the Facility.
A training matrix will be utilised to identify training requirements and ensure
managers and operatives have the correct skill set.
The RIVO Safeguard computer system will be adopted to provide a company
wide recording system, allowing the swift and complete collection of data. The
system will hold all incident data in one place, and will be accessible to
authorised Personnel.
The RIVO Safeguard computer system will be used to facilitate the rapid
generation of reports and trend analyses, to accord with legislative and
contractual requirements, and readily identify those work areas where risks need
to be further reduced.
When incidents are reported, alerts will be automatically generated, prompting
managers to undertake investigations and complete reports with suggested
corrective measures. Every stage of the process will be conducted online and
progress of investigations and associated tasks will be tracked through to
completion. RIVO can be configured to notify stakeholders through email
notifications ensuring prompt communication of events.
All training records and requirements will be reviewed on at least an annual basis.
Contents of Monthly Health and Safety Report
A monthly health and safety report will be produced. The report will summarise
health and safety data from the preceding month and provide a longer term
overview of data so that effective analysis and trending of performance can be
undertaken. The key performance indicators will be as follows:
Total number of RIDDOR’s (including Personnel, members of the
public and dangerous occurrences);
Hertfordshire County CouncilResidual Waste ContractClose of ContractMS6 – Facilities and Contract ManagementConfidential 56
Analysis of the categories of the above mentioned;
Total number and breakdown of all accidents;
Numbers of near misses and incidents in that month; and
Percentage completion of actions generated as a result of accident,
incident and near miss investigations.
The monthly health and safety reports will be discussed during the
quarterly QHSE meetings to communicate, analyse and discuss
relevant issues pertaining to QHSE including Site specific issues.
Contents of Service Risk Assessments
Examples of ERF Risk Assessments are provided in Attachment MS6 4.2.11.
These examples will provide a framework for the Services risk assessments to be
developed for the Project. Risk assessments will be developed in accordance
with the BMS as detailed in section 3.2.
Contents of Health and Safety Plans for Works and Services
The contents of any health and safety plan for any works is vast and the
Contractor provides here only a selection of the contents to provide an indication
that it is fully conversant with the requirements of the CDM Regulations (as
demonstrated by the successful and award winning construction of facilities
throughout the UK).
The contents of the health and safety plans for the Works and Services will
include the following information:
Description of the Project, including a Project description,
programme details, details of the Authority, designers, CDM Co-
ordinators, consultants, the extent and location of existing records
and plans;
The Authority’s considerations and management requirements,
including the structure and organisation, safety goals, permits,
Emergency procedures, Site rules, activities on or adjacent to the
Site during the Works;
Environmental restrictions and existing on-site risk, including safety
hazards such as boundaries and access, adjacent land uses,
location of existing services, ground conditions, existing structures
and health hazards such as asbestos, existing storage of hazardous
materials, contaminated land; and
Hertfordshire County CouncilResidual Waste ContractClose of ContractMS6 – Facilities and Contract ManagementConfidential 57
Significant design and construction hazards including design
assumptions and control measures, arrangements for co-ordinating
of on-going design work and handling design changes, information
on significant risks identified during design (health and safety risks)
and materials requiring particular precautions.
Providing Information to the Authority
The Contractor’s safety performance will be measured by the agreed key
performance indicators (KPIs) on a monthly basis, e.g. the absolute number of
accidents, lost time injury severity and frequency rates, RIDDOR reportable
incidents. The Project management team will use these data to identify
weaknesses and trends related to safety and implement improvements in specific
areas.
The performance information will form the basis of a monthly health and safety
report which will be submitted to the Authority.
The Contractor will provide evidence of Personnel health and safety training for
inspection within one Business Day of receipt by the Contractor of a written
request from the Authority.
Following Financial Close, the Contractor will develop a bespoke Emergency
procedure for informing the Authority of any Emergency that meets pre-agreed
criteria.
Fire Safety
The Contractor will comply with the Authority’s Requirements and Regulatory
Reform (Fire Safety) Order 2005 which requires the Contractor to carry out a
detailed fire safety risk assessment of the Facility and operations on the Site.
The fire risk assessment will take into account health and safety issues,
protection of the environment and the requirement for business continuity. This
review will include a review of best practice and recommendations from fire
investigations on similar facilities and other related best practice industry
guidance.
The Contractor will identify and incorporate in the Works a robust fire strategy
(which incorporates the output from the detailed fire assessment referred to
above) to minimise both the cause of fire occurring and the subsequent impact of
any fire.
The fire strategy and related fire design will be submitted by the Contractor to the
Authority as a reviewable item under the Review Procedure.
Hertfordshire County CouncilResidual Waste ContractClose of ContractMS6 – Facilities and Contract ManagementConfidential 58
The risk assessment will be available for inspection by the Authority within one
Business Day of receipt by the Contractor of a written request from the Authority.
The fire risk assessment will form part of the fire plan for the Site.
The Contractor will employ a company such as Chubb Fire Limited to undertake
the fire assessment.
This fire risk assessment and fire plan will be reviewed by the Contractor’s
Representative regularly so as to keep it up-to-date and, in any event by the date
indicated on the last report or at such earlier time due to the following reasons:
There is reason to suspect that it is no longer valid; or
There has been a significant change in the matters to which it
relates including when the premises, special, technical and
organisational measures, or organisation of the work undergo
significant changes, extensions, or conversions.
By way of example and without limiting the general statement made above, the
fire risk assessment and fire plan will be reviewed by the Contractor’s
Representative at intervals of no more than twelve months or following:
Significant changes to work practices or procedures;
A significant change in the number of people present or the
characteristics of the occupants including the presence of people
with some form of disability;
Any significant structural or material changes to the premises
(including the internal layout) or to the processes or activities
conducted at the premises, including the introduction of new
equipment;
Significant changes to furniture and fixings and/or to displays or
quantities of stock;
The introduction or increase in the storage of hazardous
substances;
Any change in the fire precautions in the premises;
Any near miss or fire incident; or
The hazards and/or risks identified in each section of the fire
assessment increase the risk to life and/or property safety in and
around the areas assessed.
Hertfordshire County CouncilResidual Waste ContractClose of ContractMS6 – Facilities and Contract ManagementConfidential 59
The Contractor will ensure that the additional fire safety controls,
recommendations and actions set out in the fire assessment are effected to bring
the assessed areas up to a standard that will ensure, so far as is reasonably
practicable, the safety of all Personnel, any other person lawfully on the premises
or any person in the immediate vicinity of the premises at risk from a fire on the
premises.
On the occurrence of any fire, the Contractor will act in accordance with the
adopted fire plan.
Please refer to Attachment MS6 4.2.14(a) for an Example of a Fire Assessment
(SELCHP).
Please refer to Attachment MS6 4.2.14(b) for an Example of Emergency
Procedure (SELCHP).
6.4.3 Welfare Facilities
With regard to Personnel and visitor welfare facilities, the Contractor will comply
with the requirements laid out in the CDM Regulations or the Workplace (Health
Safety and Welfare) Regulations 1992 and the Authority’s Requirements.
The Facility will be provided with a full range of welfare facilities for Personnel
including changing rooms, running potable water, hand washing facilities, toilets
and a canteen/rest room.
All Equipment will be operated by trained operatives who will be supplied and
equipped with all safety wear and Equipment to comply with the relevant clauses
in the Health and Safety at Work, etc Act 1974 (as amended) and the
Contractor’s health and safety policy.
The Contractor will provide all necessary fire-fighting, first aid and health and
safety facilities at the Facility, commensurate with the requirements of the fire and
other statutory authorities.
The Contractor will adopt its internal ‘Occupational Health Surveillance
Procedure’, with the provision of a physiotherapy service. This service will allow
the Contractor to manage absence, accident management and returns to work.
This service will be used as a management tool to control the level of short term
sickness and identify non-justified absenteeism. The decision to implement the
nurse call centre will be based on analysis of indicators such as current and
future levels of absenteeism and accidents.
Hertfordshire County CouncilResidual Waste ContractClose of ContractMS6 – Facilities and Contract ManagementConfidential 60
The Contractor will provide visible Site displays showing the accident statistics
including the number of days without lost time accident.
Provision of Facilities for WCA Drivers
In addition to Schedule 2 (Authority’s Requirements), the Contractor will provide
reasonable access to toilets and washing facilities on the Site . The Contractor
will provide alternative facilities for the WCAs’ drivers, other than those
specifically for the visitor centre and for others accessing the Site. Such toilets
and washing facilities will as a minimum provide the following:
Tiled areas kept in a good condition and reasonably free from
damage or conspicuous deterioration;
Toilet furniture kept in a good condition and reasonably free from
damage or deterioration and which is fully functioning;
Reasonably intact seals and other waterproof joints and where the
same are reasonably free from staining or mould growth; and
Toilet cubicle partitioning to be kept in a good condition and
reasonably free from damage or deterioration and on which all
fittings, including locks and handles are functioning.
6.5 RESOURCING
6.5.1 Personnel
The Contractor will seek to employ the most competent person for each role
through adhering to all its internal policies and procedures which meet or surpass
the requirements of all relevant laws. The Contractor will also ensure that
adequate numbers of appropriately trained and competent Personnel are
provided at each Personnel level in order to meet the requirements of the
Authority’s Requirements.
Management Structure
Mobilisation during Construction Phase
During the development and construction phase of the Project, a dedicated
Project manager will be responsible for the activities up to the point when
Planning Permission is granted. At this point, the main responsibility will pass to
the Contractor’s Representative who will lead the mobilisation team and be the
link to the prime Construction Sub-Contractor.
Hertfordshire County CouncilResidual Waste ContractClose of ContractMS6 – Facilities and Contract ManagementConfidential 61
The Contractor will undertake a range of mobilisation activities, including:
Communication with various stakeholders including Waste
Collection Authorities and Authority sub-contractors to develop and
implement a specific and targeted communications plan;
Mobilisation construction phase;
Commencement of Personnel recruitment during the Facility’s
construction and appointment of the Contractor’s Representative
after Financial Close. The Contractor's Representative will be
selected on the basis of understanding the complex commercial
nature of PFI contracts and will have the ability to lead the
personnel of a major Waste management contract; and
Commencement of implementation of the Project IT system prior to
completion of the Facility. This implementation will include delivery
of a general Contractor’s IT network system, implementation of the
weighbridge system with bespoke reporting to the Authority and
implementation of quality and environmental management systems.
Operation Service
The Contractor’s management structure during the Services delivery phase of the
Contract is presented in the organogram in Figure 6.6 below.
Hertfordshire County CouncilResidual Waste ContractClose of ContractMS6 – Facilities and Contract ManagementConfidential 62
Figure 6.6 The Contractor’s Management Structure during the Service Delivery Phase of the Contract
Hertfordshire County CouncilResidual Waste ContractClose of ContractMS6 – Facilities and Contract ManagementConfidential 63
The key management positions include the Contractor’s Representative, the
operations manager, and the Maintenance Manager. The job descriptions and
operational responsibilities of these key Personnel are presented below.
Staffing Details
This section details the following information:
Personnel numbers;
Working hours;
Shift patterns;
The experience and qualification required by key Personnel;
The use of Sub-Contractors; and
The provisions of details relating to Personnel to the Authority.
The ERF will operate 7 days per week, 24 hours per day, thus many of the core
facility functions will be carried out by the ERF team. The MPT Facility will operate for
2 shifts, 5.5 days per week, although cleaning and maintenance will also take place
outside of those times. Although the teams are shown separately on resource lists
and the organisation chart the teams will overlap and share resources and
management to maximise efficiencies, provide cover and for career development.
During the Services delivery phase, the Facility will be staffed at all times by a
minimum of two Personnel, an ERF shift team leader and an ERF assistant shift team
leader (shown as Shift Plant Operator in the organogram). For the ERF the Contractor
proposes that a total of six ERF shift teams will be operating, with each shift lasting for
a period of 12 hours. Therefore, a total of six shift team leaders and six assistant shift
team leaders will be required.
There will be six operations and maintenance assistants (O&M Assistants) who will
work for eight hours per day, five days per week, and will cover one weekend in three.
The shift times for the O&M Assistants will be staggered throughout the day to ensure
that the Facility can has sufficient Personnel to cover daylight periods and times when
Waste is delivered for the staffing of the weighbridge, the Contractor will employ two
operatives to provide weekday coverage spanning the Facility opening hours, with the
O&M Assistants providing weekend cover (as previously described).
For the MPT Facility the Contractor proposes that there will be two team leaders
supervising two shifts. Each shift will have an electrical mechanical technician and 4,
O&M Assistants. There will also 2 cleaners who will provide an additional MPT Facility
cleaning shift under supervision of the ERF night shift.
Hertfordshire County CouncilResidual Waste ContractClose of ContractMS6 – Facilities and Contract ManagementConfidential 64
To carry out day-to-day maintenance tasks at the Facility, the Contractor will employ
eight full time maintenance Personnel, to include two electronic control and
instrumentation engineers, and five electrical and mechanical technicians. These
operatives will provide maintenance coverage, principally during the day (again with a
staggered shift start time), for seven-days per week.
The Contractor will sub-contract planned maintenance to specialist engineering firms
as the duration of these activities does not warrant full time Personnel being
employed.
A summary of the technical operative Personnel, including skill/educational
requirements for the posts, alongside details of proposed working hours and shift
patterns, is given in the Table 6.4 below:
Table 6.4 Summary of Key Technical Roles, Working Hours and Qualifications
Role Personnel Numbers
Working
Hours and
Shift Details
Qualifications/Training
Level
Process Operation (ERF) 6 x shift team leader
6 x shift plant operator
(6 x shift teams in total)
2 x 12 hour
shifts per
days
(07:00 –
19:00 / 19:00
– 07:00)
Technical background,
ONC qualified as minimum
+ exams in operation (e.g.
City & Guilds)
General Facility
Operations (ERF)
9 x O&M Assistants 8 hours/day
weekdays (8
hours/day,
staggered
start time)
with weekend
duty every 1
in 3 weeks
Sound education with
capability to develop (to
ASTL/STL)
Weighbridge 2 x weighbridge
operatives
Weekday
cover
(weekend
cover
provided by
O&M
Assistants)
N/A
Maintenance (ERF) 1 x lead electronic
control &
instrumentation (ECI)
technician
1 x electronic control &
instrumentation (ECI)
technician
8 hours/day
weekdays
Electrical HNC or
equivalent + time served in
practice
Hertfordshire County CouncilResidual Waste ContractClose of ContractMS6 – Facilities and Contract ManagementConfidential 65
Role Personnel Numbers
Working
Hours and
Shift Details
Qualifications/Training
Level
5 x electrical &
mechanical technicians
8 hours/day
weekdays (8
hours/day,
staggered
start time)
with weekend
duty every 1
in 3 weeks
1 x apprentice 8 hours/day
weekdays (8
hours/day,
staggered
start time)
with weekend
duty every 1
in 3 weeks
Electrical HNC or
equivalent
Process Operation (MPT) 2 x shift team leader 2 x 8 hour
shifts per
days8
(06:00 –
12:00 / 12:00
– 20:00)
Technical background,
ONC qualified as minimum
+ exams in operation (e.g.
City & Guilds)
Maintenance (MPT) 2 x electrical &
mechanical technicians
8 hours/day
weekdays (8
hours/day,
staggered
start time)
with weekend
duty every 1
in 3 weeks
General Facility
Operations (MPT)
8 x O&M Assistants 8 hours/day
weekdays (8
hours/day,
staggered
start time)
with weekend
duty every 1
in 3 weeks
Sound education with
capability to develop (to
ASTL/STL)
2 cleaners 8 hours/day
weekdays (8
hours/day,
staggered
start time)
with weekend
duty every 1
Hertfordshire County CouncilResidual Waste ContractClose of ContractMS6 – Facilities and Contract ManagementConfidential 66
Role Personnel Numbers
Working
Hours and
Shift Details
Qualifications/Training
Level
in 3 weeks
In addition to the Facility operatives, the Contractor will employ a number of
management/office Personnel, including:
Contractor’s Representative;
Operations manager;
Maintenance Manager;
MPT manager
Quality, Health, Safety, and Environmental (QHSE) & communications
officer;
Account’s clerk; and
An administrator.
The Contractor will provide the Authority with any information it reasonably requests in
relation to Personnel within two weeks on any request including the following:
Terms and conditions of employment;
Training records;
Records of any unspent convictions;
Skills and competencies of Personnel; and
The number of Personnel employed.
Staffing Capacity
The Contractor will ensure that the Facility is fully staffed by effective resourcing and,
where necessary, the implementation of contingency staffing arrangements.
Information on resourcing and contingency staffing is presented in section 5.1.6.
Job Descriptions
The main responsibilities of the key managers and technical Personnel are presented
in this Section.
Contractor’s Representative
The Contractor’s Representative will take overall accountability for the
Contract including the following:
– Facility operations;
Hertfordshire County CouncilResidual Waste ContractClose of ContractMS6 – Facilities and Contract ManagementConfidential 67
– Ensuring legal compliance;
– Working to controlling procedures and quality;
– Health and safety and environmental systems;
– Operating the Contract as a business unit; and
– Establishing the continuous improvement agenda in conjunction with
the Authority.
The Contractor’s Representative will assume responsibility for ensuring timely and
complete compliance with reporting requirements to the Authority. The Contractor’s
Representative will also be responsible to report on completion of construction of the
Facility against timetable and budget and the achievement of the Tests.
Operations Manager
The operations manager will manage all operational aspects of the
Facility and processes on Site, including the following:
– The methods and organisation of the work (including recruitment,
induction, appraisal and training of operations Personnel in
accordance with the Contractor’s procedures);
– Ensuring the plant operates within the requirements of the
Environmental Permit and other environmental Legislation;
– Liaising with the Maintenance Manager and others regarding
maintenance, planned and unplanned outages and feasibility studies,
evaluation, costing and programming of plant improvements;
– Ensuring compliance with the Contractors’ health and safety, quality
and environmental management systems, and policies and
procedures;
– Ensuring that systems are in place to maintain safe systems of work
for Contractor and Sub-Contractor Personnel; and
– Undertaking full training and development reviews of all Personnel
on an annual basis to ensure there is a programme of continuous
development and opportunities for Personnel.
Maintenance Manager
The Maintenance Manager will be responsible for the organisation and
management of the maintenance function including the in house
maintenance team, plus Contract Personnel, to achieve an efficient
Hertfordshire County CouncilResidual Waste ContractClose of ContractMS6 – Facilities and Contract ManagementConfidential 68
maintenance function, while adhering to all relevant Legislation and Site
procedures.
Other responsibilities will include the following:
– Reviewing plant defects, developing proposals for modifications
where appropriate, to maintain plant reliability and availability;
– Overseeing development of stores systems, management systems,
health and safety procedures and the Contractor’s computerised
maintenance system (CMS) to improve the organisation of all
aspects of the maintenance function;
– Planning and managing maintenance outages, including specification
of work, quality control and co-ordination between all parties
involved;
– Liaising with the Project and operations Personnel to ensure that the
maintenance effort is responsive to the overall needs of the
business; and
– Ensuring compliance with the Contractor’s quality and environmental
management system and health and safety and all relevant
Legislation during maintenance periods.
QHSE and Communications Officer
The General Manager will be supported by the Contractor’s parent company in-house
QHSE department which will include a QHSE director, QHSE systems manager,
QHSE continuous improvement manager and internal systems auditors. The various
QHSE roles and responsibilities are detailed above in section 3.2 of this Method
Statement.
The QHSE and communications officer will provide support to the Contractor’s
Representative in the following respects:
Ensuring that the management system is properly established,
implemented and maintained;
Reporting on the system’s performance and highlighting any
improvements needed; and
Liaising with external parties on matters pertaining to the management
system.
The QSHE and communications officer will manage communications related activities
for the Project. Regular meetings with the Contractor’s Representative and the
Hertfordshire County CouncilResidual Waste ContractClose of ContractMS6 – Facilities and Contract ManagementConfidential 69
Authority will cover communications activities and include aspects such as media
coverage, corporate social responsibility delivery and implementation of Services. In
this role he or she will be responsible for:
Implementing and updating the communications strategy
Building a strong and ongoing relationship with the large variety of
community groups within Hertfordshire area;
Managing the visitor centre (communication, education activities and
budget administration);
Reporting to the Authority;
Promoting corporate and social responsibility (CSR) commitments; and
Providing the media with press releases and information relating to
promotional initiatives, awareness campaigns, events and open days;
and
Maintaining the communications section of the website.
Additional Management Positions
Other managers will be employed and will take full responsibility for the delivery of
specific elements of the Services and associated operational issues, continuous
improvement agenda, QHSE management, training, vehicle plant and equipment
provision, purchasing and general administration.
Shift Team Leader
Responsibilities will include:
Ensure compliance with all aspects of the Environmental Permit;
Represent Contractor management outside normal office hours;
Supervise and deploy manpower to ensure cost effective, safe and
efficient operations within all operational procedures and also in
Emergency situations;
Provide technical supervision and assistance where necessary for
Personnel engaged in work at the Facility;
Provide effective training and monitoring of shift Personnel to ensure
Personnel are competent to undertake their duties;
Provide effective administration and application of the safety rules and
health and safety policies;
Hertfordshire County CouncilResidual Waste ContractClose of ContractMS6 – Facilities and Contract ManagementConfidential 70
Liaise with other Personnel as required to provide efficient work
scheduling and planning to ensure minimum turnaround times during
plant outages; and
Carry out other reasonable tasks and duties as requested by
management.
Shift Plant Operator/Assistant Shift Team Leader
Responsibilities will include:
Operate the plant to optimise Waste throughput and electricity
generation and to ensure that all statutory/ licensing requirements are
maintained;
To report to the shift team leader on the status of the above plant;
Carry out local plant operation as required by the situation and/or at the
request of the shift team leader;
To train assistant operators as required;
To receive telephone calls in the central control room from the Authority,
public bodies, the emergency services and members of the general
public and refer them to the correct persons at the Contractor;
To upgrade to the position of team leader after a sufficient period of
training; and
To carry out all the duties of the assistant operator as required.
Operations and Maintenance Assistants
The O&M Assistants will carry out general Facility operational duties, responsibilities
will include:
Operation of wheeled loading shovel, 360˚ excavator, teletruk &
overhead travelling cranes. including routine checks and maintenance);
Supervision of incoming household Waste;
Out loading or transfer of recyclates, Waste and residues (bottom ash &
air pollution control residues);
Off loading consumables (lime, ammonia, carbon, acid, caustic soda,
diesel oil, lubricants etc);
Hertfordshire County CouncilResidual Waste ContractClose of ContractMS6 – Facilities and Contract ManagementConfidential 71
Supporting plant operation (assisting plant operators with check-rounds,
consumable loading, cleaning, lubrication etc);
Supporting maintenance activities (assisting fitters, electricians &
technicians as required);
Receiving deliveries;
Cleaning and basic maintenance of the Facility;
Use of computerised maintenance management system (MP5); and
And other tasks within their competence as directed by the shift team
leader.
Electrical and Mechanical Technicians
Responsibilities will include:
Maintain computer based distributed control systems;
Maintain programmable logic controllers;
Maintain pressure, level, temperature, flow measurement and control
equipment, both pneumatic and electronic;
Maintain chemical analysis equipment;
Working knowledge of and experience of low voltage electrical
equipment;
Assist with mechanical defects if required;
Instrument routine calibrations and calibration records;
Fault find on E, C&I equipment;
Assist in planned maintenance planning;
Assist in compiling planned maintenance routines;
Liaise with Sub-Contractors on Site working on E, C&I equipment;
Work under the direction of the E, C&I Engineer; and
Any other broadly analogous duties which may be allocated from time to
time.
Hertfordshire County CouncilResidual Waste ContractClose of ContractMS6 – Facilities and Contract ManagementConfidential 72
Experience and Qualifications of Key Project Personnel
It will be desirable for the Contractor’s Representative to have a HND/Degree, and
desirable to have a Chartered Status in a discipline such as Waste Management,
Engineering, Environmental Sciences or General Commerce.
It will be desirable for the operations manager and Maintenance Manager to have a
HND/Degree.
The key Personnel will undergo ongoing and multi-disciplinary training during the life
of the Contract. This will be organised by a combination of the Contractor’s
operation’s divisions, the human resources department and the Contractor’s training
and development centre.
A range of skills and qualifications will be required by Facility Personnel as set out in
Table 6.5. The qualifications/skills required will be tailored to the particular job roles.
Table 6.5 Skills & Qualifications
Skills & Qualifications
Vocational Qualifications NVQ Waste Management Level 4
NVQ Assessor
Plant Operation L3
QHSE NEBOSH Diploma, & Certificate
IOSH Managing Safely
Safety Rules
Incident Management
Manual Handling
Working at Heights
Risk Assessment
Noise Monitoring
Fire Marshall,
Confined Space Awareness
Electrical Awareness,
QMS/EMS Awareness & Procedures
Environmental Awareness,
QMS/EMS Auditing,
H&S Policy Awareness,
CDM Regulations,
First Aid Accident Investigation
Technical Training Combustion
Power Plant Appreciation
Pressure Systems
Boiler Operation
Thermal Treatment
Hertfordshire County CouncilResidual Waste ContractClose of ContractMS6 – Facilities and Contract ManagementConfidential 73
Skills & Qualifications
Air Pollution Monitoring
Water Treatment
CEMs
Regulatory Knowledge PPC Permit
Waste Acceptance Criteria
Duty Of Care
Other Waste Regulations
Skills Excel , Word, MS Access, MS Project, MS Power Point
Personal Development Management
Leadership skills
Recruitment & Selection
Disciplinary Procedures
Absence Management
Appraisal Procedures
Team Building
Diversity at Work
Customer Care
Finance
Budgeting
Data Protection
Presentation Skills
Resourcing and Contingency Staffing Arrangements
The Contractor will employ sufficient and suitably trained Personnel to ensure that
Services are provided at all times and in all respects in accordance with the Contract.
The Contractor will ensure that a sufficient reserve of suitably trained Personnel is
available to meet all obligations during holidays and other absences.
As outlined in section 5.1.2 (Staffing Details), the Contractor proposes that six shift
teams will operate the ERF, with each shift lasting for a period of 12 hours. The
Facility could be operated by five shift teams, but the addition of an extra shift
guarantees that sufficient staffing is available to cover for unplanned incidents,
including long-term sickness and holidays.
Some flexibility will be provided between the ERF and the MPT Facility staffing to
assist in contingency staffing arrangements.
The Contractor will monitor staffing levels to ensure that normal operations will
continue in the event of absences (arising either as a result of annual leave or
sickness). The Contractor will also use agency staff, where appropriate.
Hertfordshire County CouncilResidual Waste ContractClose of ContractMS6 – Facilities and Contract ManagementConfidential 74
Additional support will be sought from the Contractor’s other relevant regional
functions which are located throughout the country, in particular support will be
provided to the Contractor in the following areas:
Technical and operational expertise;
Finance;
Education and communications;
Fleet and procurement;
Human resources and training and development (including a regional
human resources business partner);
Legal;
Risk and insurance;
Payroll and pensions;
Health and safety, environment and quality; and
Business and information systems.
Emergency Contacts
The Contractor will ensure that a senior member of its Personnel will be available to
provide a direct contact point for the Authority twenty four hours a day throughout the
Services Period. The Contractor will also supply a single telephone number to which
all urgent matters can be referred.
Recruitment
Recruitment will cascade through internal recruitment, local recruitment and then
wider recruitment depending on availability of suitably qualified staff. The Contractor
proposes to recruit suitably qualified and experienced staff from the local area as a
priority and will ensure at least 15 posts are filled by recruits coming from Hatfield and
the surrounding area.
All job vacancies will be advertised internally in the first instance (for a period of one
week), thereafter any job advertisements will be placed in the most appropriate
publication for the particular position, be it a suitable trade publication, or the local
newspaper. Internal notices are placed on the intranet on a daily basis as well as
being posted on notice boards to ensure that all Personnel are given the opportunity
to apply.
The Contractor will seek to provide jobs for the local area consistent with the
”promoting local jobs” approach. Therefore, the Contractor will undertake recruitment
Hertfordshire County CouncilResidual Waste ContractClose of ContractMS6 – Facilities and Contract ManagementConfidential 75
activities to identify potential candidates from the local area that can be trained as
plant operatives. The Contractor will liaise regularly with local colleges, job-centres
and local recruitment agencies. These plant operatives will be taken on with sufficient
time to gain experience of the Facility prior to the Contract “going live”.
The Contractor will notify the Authority in advance of any changes it proposes to make
to senior Personnel. The Contractor will provide the Authority with details of the
proposed replacement senior Personnel for approval prior to their appointment.
The Contractor will not recruit Personnel employed or engaged by the Authority
without obtaining prior written consent from the Authority.
In recruitment as well as performance of the Services (including dealings with Facility
users, the Authority, Personnel and members of the general public), the Contractor
will comply with, and ensure their Personnel comply with the following:
The Human Rights Act 1998 as if the Contractor were a public body (as
defined in the Human Rights Act 1998);
All Legislation relating to equal opportunities, including but without
limitations relating to disability discrimination, sex discrimination and
race relations; and
The Authority’s equal opportunities policies and procedures as may be
adopted and amended from time to time and as notified to the
Contractor.
When recruiting and staffing the Facility, the Contractor will notify all current and
potential Personnel of the requirement that they must disclose any convictions. The
Contractor will notify the Authority of any convictions immediately upon becoming
aware of them and provide copies of any unspent convictions to the Authority on
request.
Local Employment Partnership Engagement Proposals
The Contractor has over 600 staff in Hertfordshire.
In 2009, the Contractor signed up to a local employment partnership with Jobcentre
Plus, which means that the Contractor is already working with them to make job
opportunities available to the talent that may be being overlooked in the local labour
market.
Jobcentre Plus – The Contractor already includes Hertfordshire in its national
partnership and works in conjunction with them to help provide employment for
individuals who have been unemployed for significant periods of time. The Contractor
will work with the Jobcentre Plus in the following ways:-
Hertfordshire County CouncilResidual Waste ContractClose of ContractMS6 – Facilities and Contract ManagementConfidential 76
Job vacancies will be placed through Employer Direct (online, by phone or
email) and will be quickly visible to potential applicants through various
channels, including the internet and job points;
The Contractor will receive a call from a labour market and recruitment adviser
once their vacancy has been advertised for 48 hours to ensure understanding
of the Contractor’s needs;
Support through Access to Work to help retain or recruit disabled employees
who require additional support;
Sifting applications;
Providing interview rooms;
Holding open days and jobs fairs;
In-work skills solutions for their new recruits and their wider workforce;
Work trials; and
Pre-employment training programmes for a range of sectors or industries. The
training course can also be linked to a work trial.
Remploy
The Contractor has a partnership which is already in place, with Remploy to cover the
Contract.
This aims to encourage employment of people with disabilities and complex barriers
to work and in addition would satisfy the Authority’s requirement for the recruitment
and development of a more diverse workforce from the local communities in which the
Contractor operates.
The Contractor will share information with Remploy concerning selection and
recruitment procedures, working culture, success values, skills requirements and
vacancy details within the Contract.
The Contractor with Remploy will explore innovative ways to assist with the
recruitment of a more diverse workforce, including:
Offering Site visits for candidates;
Work trials;
Attending local job fairs
Support for existing staff that develop a disability or health condition through
their working life; and
Using Remploy candidates as an alternative to agency labour, with a view to
offering them permanent roles as and when they arise
Hertfordshire County CouncilResidual Waste ContractClose of ContractMS6 – Facilities and Contract ManagementConfidential 77
It is anticipated that 10 to 15 positions will be fulfilled via this route.
Staff Welfare Policy
Under the Health and Safety at Work Act, 1974, Personnel are required to take
reasonable care to ensure their own welfare and that of others whilst at work. The
Contractor also acknowledges and accepts its own statutory responsibilities and aims
to secure and maintain the health, safety and welfare of its Personnel and others. The
Contractor’s commitment to this is demonstrated by the fact that it will undertake the
following:
Reasonable measures to protect the health and safety of Personnel
whilst at work, and that of all others who may be affected by its activities;
Avoid injury to the public or damage to property which might occur as a
result of its activities;
Maintain the quality of the environment by means of the careful and
responsible implementation of its activities;
Provide and maintain plant, equipment and systems of work that are
safe;
Ensure that risk assessments of all appropriate activities are carried out,
are fully documented, and that the measures to achieve the satisfactory
control of risk, are correctly specified and implemented;
Ensure that all persons embraced by this policy are fully committed to
and trained in its requirements;
Ensure that this policy statement is displayed at the Facility, is brought
to the attention of all Personnel and is fully understood by them; and
Encourage Personnel to participate in the discussion of health and
safety matters and promote teamwork and partnership so that the aims
of this policy will be met.
The Contractor is committed to the provision of the following to its Personnel:
Adequate resources to ensure the full implementation of this policy;
Sufficient supervision, information, instruction and training to ensure the
health and safety of Personnel and others who may be affected by its
activities;
Procedures and codes of practice to ensure that all activities are carried
out in a safe and responsible manner;
Hertfordshire County CouncilResidual Waste ContractClose of ContractMS6 – Facilities and Contract ManagementConfidential 78
Monitoring compliance to this policy, codes of practice and procedures
and to regularly review these documents, to ensure the highest
practicable standards relating to health, safety and the environment; and
Medical examination of Personnel dependent upon the nature of the
work performed.
All Personnel will be expected to be fully committed to health and safety in order that
together, management and Personnel can seek to optimise performance in this area.
To this end, Personnel will take all reasonable measures to protect the health and
safety of themselves, other Personnel, members of the public, and others who may be
affected by their activities. Personnel will immediately refer to line supervision any
aspect of their work or the working environment which may, or may become, a hazard
to health and safety. Personnel will also immediately refer to line supervision in the
event that they do not understand what is expected of them with regard to health and
safety.
The Contractor will develop and annually maintain its Personnel procedures and
policies covering matters including equal opportunities, discipline, health and safety,
and grievances. These procedures will comply with all relevant Legislation and good
industry practice and shall be issued to the Authority once completed.
Uniforms and Work Wear
The Contractor will ensure that each member of Personnel is properly dressed in
appropriate uniforms and work wear. This will include the following Personal
Protection Equipment (PPE) for all Site Personnel, where required:
Safety footwear, that incorporates toe, ankle, and midsole protection;
Helmet;
Ear defender, based on noise survey’s and octave band analysis against
the assumed protection value of the hearing protection;
Hand protection, based on task undertaken;
Eyes protection in the form of goggles, over glasses; and
Overalls.
The Contractor will also provide all Personnel with identification badges that
Personnel will wear at all times while working at the Facility.
Hertfordshire County CouncilResidual Waste ContractClose of ContractMS6 – Facilities and Contract ManagementConfidential 79
Training
The Contractor will use well established induction and training programmes for
Personnel, as well as professional development initiatives. This section details the
Contractor’s training policy, its Personnel induction training, the availability of on-going
training, the use of annual and career training plans, and the performance
assessment procedures that the Contractor will follow.
The Contractor will implement its “Business Management Incentive Scheme”,
introduced in 2001 and renamed as the New Employee Bonus Plan in January 2007.
The bonus scheme runs from January to December and managers will regularly
monitor the progress of each individual and discuss their progress with them.
Induction Training
The Contractor already operates a number of similar facilities and has developed the
programme that is detailed below. The Contractor will maintain an appropriate and up-
to-date induction programme for all Personnel and will ensure that all new Personnel
undertake the induction programme prior to them commencing work on Site.
Details of Induction Training
Note: this section covers the operational period only; construction management
systems are set out in Method statement 1 – 6.3.1 and 6.4
Prior to the Commissioning Period, the Contractor’s administrative and operational
management Personnel will be trained in principles and techniques related to the
following:
Management and energy recovery of municipal Waste (Waste
characteristics, treatment procedures/processes, outlets and marketing
of recyclable, concept of integrated systems);
ISO 14001 Environmental Management System (regulations,
applications and procedures);
Knowledge of the Contractor and the jobs performed;
Health and safety: organisation and safety of operation in the areas of
the activities performed by the Facility;
Performance of each job involved in the organisation chart from
production to operation; and
Improving energy and resource efficiency for the Facility.
Hertfordshire County CouncilResidual Waste ContractClose of ContractMS6 – Facilities and Contract ManagementConfidential 80
Classroom training, followed by a phase of observation and hands-on training in other
similar Waste processing and treatment facilities in the UK, would be aimed at general
and professional training.
Induction of Management Staff (Prior to Commissioning)
The managers are a key component of the system, with the responsibility of managing
the Contract, operations and Personnel to accomplish the stated goals in compliance
with the stated rules, and to optimise and encourage the use of the production
facilities. Training will be provided for them on the basic recommendations specifically
during commissioning and throughout operation of the Facility, concerning the
following:
The management of people;
Administrative and financial management;
The management of human resources; and
Commercial relations and communication.
The training, for a period of around six days, will be aimed at:
Strengthening the managerial autonomy of the managers, to help them
to win the commitment of and develop their Personnel consistently with
the programme strategy;
Following and analysing the financial accounts; and
Determining a specific commercial approach and developing labour
relations.
Induction of Management Staff (Operations Phase)
The managers and supervisors responsible for operation and maintenance will be
trained in the following methods and tools:
Facility commissioning phase (acceptance, co-operation with teams,
Sub-Contractors, follow-up procedures);
The associated processes, equipment and procedures;
Productivity, safety and quality objectives and instructions;
Hands-on supervision (co-ordination of teams, assignment of work); and
Execution and supervision of maintenance on all the plant facilities and
systems.
Hertfordshire County CouncilResidual Waste ContractClose of ContractMS6 – Facilities and Contract ManagementConfidential 81
This training will last around 10 days. It will be very practical and hands-on, using the
data, ratios and choices made for the Facility operational programme. The following
objectives will be emphasised:
Complying with the standards, rules and procedures specified by the
Contract;
Encouraging the profitability of operation;
Optimising rational and scheduled use and operation of the equipment
and Facility flows; and
Mobilising and encouraging the responsiveness of the operational
teams.
Induction Day
All new Personnel and agency workers will go through an induction training course
prior to the first day of employment on the Services. The induction will cover the
following:
Health and safety training;
Familiarisation with the Contractor’s working practices;
Operational procedures;
Site licence and permit requirements;
Vehicles and Equipment; and
A presentation of the Contract, its specifications, the standards expected
and the Personnel structure.
When required, PPEs will also be provided to Personnel during their induction day.
The Contractor’s Representative will be responsible for organising the training
induction for new Personnel. These initial training will only be given by the
Contractor’s group trainer to ensure a consistent approach to the training.
Personnel will be given a Personnel handbook which includes a ‘Code of Conduct’,
covering: equal opportunities, health, safety and welfare, bullying, harassment,
grievance procedure, disciplinary procedure.
During the mobilisation period and prior to Services Commencement Date, the
Contractor will organise the induction for Personnel annual training plans.
Professional training will be designed to aid Personnel in the following tasks:
Hertfordshire County CouncilResidual Waste ContractClose of ContractMS6 – Facilities and Contract ManagementConfidential 82
Mastering the professional techniques and organisations corresponding
to the jobs;
Being able to use the expertise of the Contractor’s company-group; and
Preparing and co-ordinating the dissemination of professional training in
the field (for the operators).
During and after the Commissioning Period, Personnel will regularly receive advanced
training in operational tasks and missions, in particular as regards:
Complying with and guaranteeing safety and risk prevention in operation
of the ERF;
Performing first-level maintenance;
The context of the tasks and missions with respect to the nature and
content of the technical and technological processes used for
comprehensive/integrated Waste recycling and re-use, from the
standpoint of equipment operating procedures, with respect to the
standards applying to end products; and
Maintaining the procedures to ensure the quality of Works and Services.
Therefore, in addition to the induction training, the Contractor will ensure that all
Personnel are at all times properly and adequately notified, trained and instructed in
the following:
The task that the individual has to perform;
All the provisions of this Contract relevant to the duties to be performed
by that individual;
The standing instructions and procedures, where relevant, to the
Services;
All relevant health and safety hazards, rules, policies and procedures
concerning health and safety at work and all mandatory and statutory
requirements;
Fire precautions and fire procedures;
The need for Personnel to show courtesy and consideration at all times;
Improving energy and resource efficiency on the Facility in line with
mandatory standards and performance improvement targets; and
Hertfordshire County CouncilResidual Waste ContractClose of ContractMS6 – Facilities and Contract ManagementConfidential 83
All training information will be recorded within the employee’s personal
training records. The training record will be used as a way of recording
continuing professional development.
A training matrix will be developed to identify the training requirements for all
Personnel.
Career Training Plans
Continued professional training plans are aimed at ensuring the quality and
enhancement of performance and the development of each category of Personnel,
from worker to senior executive. The plans will be prepared in close collaboration with
the professionals and specialists of the Contractor.
The Contractor is committed to annual “Personal Development Plans” (PDP) for all
Personnel. The PDP is undertaken on a one-to-one basis between managers and
their staff and is intended to review performance for the previous year, set specific,
measurable, achievable, relevant and time related objectives for the forthcoming year,
as well as identifying areas for development.
The Contractor will liaise with Campus Veolia to start training technical Personnel for
the Facility one year prior to the Planned Services Commencement Date.
A range of supportive activities will be available to all Personnel as part of The
Contractor’s comprehensive support of career development and overall wellbeing.
Examples of these activities include the topics discussed in the sections below.
Apprenticeships
The Contractor’s group has pledged to recruit 250 apprentices to show the industry
that the Contractor’s group is committed to developing for the future. The Contractor’s
apprenticeship scheme is a key part of the progressive approach to career
development. The scheme incorporates a structured programme of training leading to
a recognised qualification that covers a wide range of occupations and is designed to
give hands-on work experience and allow people to study for qualifications at the
same time. The scheme means people can acquire specialist intermediate-level
technician, supervisory and craft skills at NVQ Levels.
The Contractor, supported by Campus Veolia will undertake the recruitment, selection
and interviewing for the Project as well as providing mentoring throughout the
scheme.
Mentoring
Each group of students who takes our graduate certificate in management at Campus
Veolia is given a mentor. The management course at Campus Veolia generally takes
Hertfordshire County CouncilResidual Waste ContractClose of ContractMS6 – Facilities and Contract ManagementConfidential 84
place every six months with a maximum of four pupils being mentored at one time.
Mentors are drawn from members of senior management.
Internal Promotion
The Contractor strongly believes in internal promotion, and will give Personnel the
opportunity to develop his/her role within the company. Following the initial
recruitment of job vacancies for the Project, all subsequent job vacancies will be first
advertised internally at the Facility. To ensure Personnel are given the opportunity to
apply, internal notices will be emailed to Personnel on a daily basis, jobs will be
placed on the intranet and displayed on notice boards. Thereafter, jobs will placed in
the most appropriate publication for the particular position (suitable trade publication
or local newspaper). This provides a win-win situation whereby the suitable individuals
concerned can focus on developing themselves and grow in confidence.
The Contractor is committed to providing training and learning opportunities to ensure
that Personnel will be equipped to carry out their duties and develop their skills.
Training Opportunities
The Contractor will operate a structured training plan for Personnel, the objective of
which will be to ensure that appropriate Personnel structures, resources and skills are
provided and maintained for the effective management and operation of the Services.
The Contractor will set up an ambitious social policy with several objectives that
include:
Contributing to employment by work organisation combining productivity,
quality and development of lasting, sustainable employments;
Developing the professionalism of present and future Personnel by
preparing them to master their jobs and by developing their knowledge
and technical, commercial and economic experience; and
Integrating safety in the performance of their work to decrease sharply
the number of accidents and improve working conditions by ensuring
social dialogue and permanent specialised training.
Veolia Development Centre
The Contractor’s group created the Institute de l'Environnement Urbain in 1994, in
partnership with the Chamber of Commerce and Industry of Versailles Val d'Oise
Yvelines, after observing the need for specialist training in their plants. More recently,
the Contractor opened the Veolia Environment Development Centre (VEDC), called
Campus Veolia. It has been established in response to the training requirements of
Hertfordshire County CouncilResidual Waste ContractClose of ContractMS6 – Facilities and Contract ManagementConfidential 85
the group’s UK businesses: Veolia Environmental Services, Dalkia, Veolia Water, and
Veolia Water Systems.
Access to Campus Veolia will be made available to all Personnel from the Services
Commencement Date.
The Contractor’s Representative, with the support of the Contractor’s head office, will
be responsible for identifying, implementing and organising further training required in
conjunction with Campus Veolia.
Campus Veolia offers a series of short courses as well as carrying out courses on the
following subjects:
Management development;
Customer service;
Health and safety;
Driving skills;
Environmental issues;
Human resources and HR procedures; and
Financial management.
VEDC is accredited by the Institute of Leadership and Management, EDEXCEL and
OCR. It operates courses in partnership with Kingston University and is licensed by
the Institution of Occupational Safety and Health (IOSH).
The Contractor will also arrange training on an ad hoc basis on-site when required.
Training will be proposed as required, on at least but not limited to the following
issues:
Customer care;
Health and safety;
Driving skills;
Environmental issues; and
IT.
Details of some of the key training programmes proposed are given below.
Driver Training
All drivers will be assessed by the Contractor’s parent company in-house training
provider. The road transport training unit (RTTU) of Campus Veolia will train and
Hertfordshire County CouncilResidual Waste ContractClose of ContractMS6 – Facilities and Contract ManagementConfidential 86
assess local driving assessors on a need by need basis and will provide HGV driver
training. Drivers will be required to drive with due care and attention, whilst being
courteous, at all times. Vehicles will be clearly numbered to enable any reports about
poor driving or behaviour of the crews to be quickly identified and dealt with.
Customer Service Training
The Contractor’s customer services training will include the following:
Telephone techniques;
Commercial sales programme;
Commercial awareness;
Managing customer services;
Professional sales techniques; and
Customer care and conflict resolution.
Health and Safety Training
Safety training will either be carried out by the Contractor’s ‘Health & Safety Trainer’
(see Method Statement 6 4.2.6 for more details) or an accredited training body. Safety
training requirements will be reviewed annually, at the time of a job change or for
promotional reasons. A record of all safety training will be held on the Contractor’s
Representative’s file together with appropriate certification.
The Contractor’s health and safety training will include the following:
Fire training;
Risk assessment;
IOSH ‘Managing Safely’;
Behavioural safety in the workplace;
Dangerous Goods;
Health and safety for facilitators;
Confined spaces training;
Health and safety for representatives;
Manual handling;
DSE assessors;
IOSH Safety for Senior Executives;
Hertfordshire County CouncilResidual Waste ContractClose of ContractMS6 – Facilities and Contract ManagementConfidential 87
VE IOSH Passport Core; and
Train the Trainer in manual handling.
Selected Supervisors will also be required to attend the following courses:
Permit to Work Course;
Electrical Isolation Course;
Accident Investigation Course;
COSHH Assessment Course; and
Noise at Work Course.
Human Resources Training
The Contractor’s human resources training will include training on areas such as the
following:
Recruitment and Selection Techniques;
Diversity at Work;
Appraisal Skills;
Disciplinary Procedures;
Data Protection;
Equal Opportunity; and
Absence Management.
Environmental Issues Training
The Contractor’s environmental issues training will include the following:
Environmental auditing;
Hazardous Waste Regulations;
Chemistry of Waste;
Environmental awareness;
Awareness of specific Contractor issues; and
The Contractor will also run an environment focus course, which will be
a one day awareness session with the aim of providing the necessary
tools to better understand how Services can impact the environment and
Hertfordshire County CouncilResidual Waste ContractClose of ContractMS6 – Facilities and Contract ManagementConfidential 88
what can be done to minimise that impact and to improve general
operational environmental performance.
An environmental Legislation course will also be available, which will comprise a two
day course with the objective of providing Personnel with the necessary knowledge in
current environmental and Waste Legislation and the application to the Services.
6.5.2 Additional Resources
Sub-Contracts and off take contracts: Contractual Relationship with third parties
(contract map).
The Contractor intends to let the following Sub-Contracts presented in the Contract
map below:
Table 6.6 Sub-Contractors during the operational phase
Service Category Contracting StructureContractual
RelationshipComment
Waste Treatment
Services
Services provided by
Contractor
N/A
Residual treatment
services (Flue Gas
Residues)
Services provided by
Contractor, the intention is
to dispose of fly ashes on
Arms length
contract
Please refer to VES - Attachment
MS6 5.2 Letter and
Agreement.
Residual treatment
services (Bottom
Ash Treatment)
Services provided by Arms length
contract
Please refer to signed heads of
terms with n Attachment MS3
2.3.1(b)
The Contractor underwrites the
recycling of bottom ash
Transport of
process residues
Services provided by
Contractor
A Sub-Contract is not intended by
the Contractor
Treatment of
Waste during
diversion
Existing
Contractor’s
agreement with
The Contractor suggests using its
current agreement with .
The Contractor will seek to
secure capacity in other
treatment plants as part of the
development of its Contingency
Plan
Transfer station
(contingency
arrangements)
NA
Funders / lead
debt and equity
providers
N/A N/A Corporate funding
Table 6. 7 Off-take contracts
Hertfordshire County CouncilResidual Waste ContractClose of ContractMS6 – Facilities and Contract ManagementConfidential 89
Service
CategoryContracting Structure
Contractual
RelationshipComment
Sale of
electricity
(anticipated) 3 – year
contract
(anticipated)
The Contractor does not intend to
enter into an off-take contract
before the start of electricity
generation. A typical off-take
contract is available on request
Sale of
Recyclates
Various outlets (as per
MS)
Depends of
material
The Contractor does not intend to
enter into contractual relationship
before Services Commencement
Date. Some materials will be sold
under existing framework
arrangements already in place with
the Contractor at the time
Treatment
(Third Party
Waste)
Veolia (UK) Ltd Arms length
contract with
the Contractor
Compliance with Clause 51 in the
Contract
Table 6.8 Sub-contractors during the development and construction phase
Service
CategoryContracting Structure
Contractual
RelationshipComment
Construction
MPT/ERF
Construction Company JV
Vinci
Construction
Contract to be
signed at
Contract Close
MOU before
CFT
Collateral warranties to the
benefit of HCC from Vinci, and
Vinci’s first tier suppliers
Draft contract & schedules and
HOT attached to the submission
Construction of
MPT process
Construction
Contract to be
signed during
planning
submission
MOU before
CFT
Collateral warranties to the
benefit of HCC
HOT attached to the submission
Design the Main
Facility
S’Pace Architecture &
Environment
Contract with
Contractor
No collateral warranty
Design and
development of
the Transfer
Station and
RHWS
Waterman Energy,
Environment & Design Ltd
Contract with
Contractor
No collateral warranty
Commissioning Contract with
Contractor
Joint appointment as per draft
appointment of Independent
Certifier
Planning Support
(EIA)
Barton Willmore Ltd Contract with
Contractor
Support to Veolia
for the permitting
ERM Contract with
Contractor
Hertfordshire County CouncilResidual Waste ContractClose of ContractMS6 – Facilities and Contract ManagementConfidential 90
6.6 VISITORS CENTRE
6.6.1 Introduction
The Contractor has extensive experience in establishing and delivering Waste
education activities under various contracts internationally and in the UK. These
activities have included the design, build and operation of visitor centres, the
development and use of educational resources and the development and
implementation of education programmes.
The Contractor’s group has successfully worked with schools in Hertfordshire,
London, the Home Counties and beyond since 1998 to raise awareness of
sustainable development, the need to reduce water wastage, Waste management and
enhance biodiversity. The professional teaching staff at the Contractor’s purpose-built
education centre in Bushey, Hertfordshire, have designed a range of lessons and
activities that focus on water and energy efficiency, Waste and biodiversity. These are
planned to meet National Curriculum and local policy requirements and are delivered
by the teaching staff either at the centre (in-reach) or in school classrooms (out-
reach). By tailoring the lessons to meet the National Curriculum and offering a choice
of venue, the centre is meeting one of its key objectives of making busy teachers’
lives easier.
The Contractor will adapt the lessons and programmes constantly to keep up with the
changing needs of schools, teachers, education business partnerships, National
Curriculum and school priorities. The Contractor aims to make it easy for schools to
achieve their learning goals and to help attain the eco-schools awards by designing
and providing teaching that relates directly to children’s experiences.
The scope of the service includes primary, secondary and tertiary education and
community activities. Over the past 11 years the Contractor has delivered education
and awareness in sustainable development to over 140000 students, teachers and
adults.
As outlined in the scope of Services, the Contractor will design, build and operate a
high profile, multi-functional visitors centre located within the Facility building (Visitors
Centre). The Visitors Centre will become part of the network of educational facilities
operated by the Contractor’s group in Hertfordshire and the Southeast, giving the
Visitors Centre access to existing staff, their experience and a wide range of
educational materials already in use.
The Visitors Centre will be used for activities to engage with schools, groups from
further and higher education, community groups, local residents, social groups and
Hertfordshire County CouncilResidual Waste ContractClose of ContractMS6 – Facilities and Contract ManagementConfidential 91
clubs, industry groups and other stakeholders with the intention of generating and
encouraging public interest and a change in behaviour towards Waste management
issues.
The aim of the Visitors Centre is for it to become an example of best practice in the
Country in engaging with stakeholders on Waste minimisation, recycling, recovery and
resource use in general.
The aim is that the Visitors Centre will:
Provide an innovative and flexible way to facilitate promotion of
sustainable Waste activities and engagement with residents,
businesses, schools, community groups, Authority’s Representatives
and any other stakeholders;
Provide a multi-purpose centre open 5 days a week including Saturday,
Sunday and Bank holidays and hours of 9am – 10pm; and
Fully address the needs of the range of user groups, with additional
information provided to help people understand written instructions,
ensuring the key areas are clearly highlighted, using plain images, short
sentences, simple punctuation and no jargon. Photos, drawings or other
illustrations will be included to make the material as helpful and as clear
as possible to the reader.
The Contractor will work with the Authority to ensure the Authority’s aims for the
Visitors Centre are met. The Contractor will:
Provide sufficient parking, welfare amenities and campaign display
areas, all with disabled access;
Provide displays and exhibitions available to community events and
educational establishments from within the Visitors Centre; and
Provide guided tours of the operational Facility twice per week and once
on Saturdays when required.
6.6.2 Operation of the Centre
The Visitors Centre shall be a free of charge facility for use by the local community
and visitors nominated by the Authority or any Authority Related Party. It will operate a
varied education programme which supports and promotes the Hertfordshire
Municipal Waste Management Strategy in parallel with the Authority’s Waste and
recycling officer as well as host temporary and/or permanent exhibition materials.
Hertfordshire County CouncilResidual Waste ContractClose of ContractMS6 – Facilities and Contract ManagementConfidential 92
Uses for the Visitors Centre
The Visitors Centre will be made available to a wide range of community groups on
the following basis:
“Educational Visits” – where the visit is Waste related, the visit will
include a tour of an appropriate nature, the presentation of suitable
educational material, with the tour being hosted by the education and
communications manager, possibly with the addition of other Facility
staff;
“Room-only visits” – where the Visitors Centre is used as a meeting
room, without the need for educational support.
“Training” – the Visitors Centre can also be made available for any
training that needs to occur (apprentices etc).
Opportunities in Hertfordshire
The Contractor will develop the use of the Visitors Centre in agreement with
Hertfordshire County Council but suggest the following outline for educational
development.
The Facility will be an important part of Hertfordshire’s environmental infrastructure
and as such the Contractor suggests for the Visitors Centre’s educational visits to be
themed on environmental awareness and in particular focus on factors which can be
demonstrated at the Facility e.g. Waste management, Waste minimisation, recycling,
power production and green energy, carbon footprint management, In conjunction
with staff and facilities at the Contractor’s other educational facility in Bushey,
Hertfordshire. In particular the Contractor will work with other organisations in
Hertfordshire to develop the programmes.
Working with WasteAware. WasteAware has produced a wealth of
educational material. With the experience of cross-referencing such
material to the National Curriculum and the sustainable curriculum for
Herts, the Contractor will devise tailored teaching programmes.
The Contractor will work with existing partnerships such as the Wildlife
Trusts and Groundwork Trust to support the delivery of an integrated
and high quality curriculum.
The Contractor’s group educational team in Hertfordshire has a tried,
tested and award-winning approach to promoting water usage
awareness which could be adapted to raise waste generation and
carbon management awareness and bring about behavioural changes.
Hertfordshire County CouncilResidual Waste ContractClose of ContractMS6 – Facilities and Contract ManagementConfidential 93
The Contractor will Identify the specific needs of individual schools, in
particular Southfield School. The approach extends to delivering lessons
in their classrooms so that they become real for students.
Encouraging community involvement and engagement in sustainable
development by making use of the education centre. The Contractor
knows from experience that adults change their attitude to water and
Waste efficiency as a result of their children learning about it (known as
the ‘pester power’ factor, as in “that man says you should not leave the
tap running”). This can be multiplied when the community is invited to
share the same learning as the children.
Developing a bespoke education resource centre dedicated to Waste
and sustainable behaviour. The Contractor has unique experience and
success in the design, development and management of a purpose-built
centre as the locus for the service delivery. This serves as a hub for both
in-reach and out-reach activities.
Visitors Centre Opening Times
The Visitors Centre at the Facility will be available 5 days a week including Saturday,
Sunday and Bank holidays and hours of 9am – 10pm.
The Contractor will maintain a booking diary for the Visitors Centre and tours. The
Authority will receive priority use of the Visitors Centre.
The Visitors Centre will be available for use by organised parties of between 8 and 40
attendees, by agreement with the Authority. Members of the public will be able to
reserve places by contacting the Contractor directly by telephone or e-mail (contact
details will be publicised near the entrance to the Facility).
Through the initial contact, a visit date will be offered, and details on the proposed
number of attendees, and any special requirements will be recorded.
The Contractor will then confirm in writing (either by post or by email) the details of the
visit to the organiser, along with information on how to access the Facility. This will
contain a copy of the Facility “Site Rules for Visitors”, providing written instructions on
how to gain access to the Facility, and a brief overview of Site operations.
When making a booking, the organiser will be asked whether the visit is to be used for
a Waste tour, or for other purposes.
In the event that a Site tour is requested, the Contractor recommends that the tour
size is restricted to a maximum of 15 attendees. In the event of school visits, the
Contractor will accept a group size of up to 40, but this must include sufficient
Hertfordshire County CouncilResidual Waste ContractClose of ContractMS6 – Facilities and Contract ManagementConfidential 94
supervisory staff to yield a maximum ratio of 9:1 young people to supervisors (or
better according to age as detailed in DCSF guidelines). In such a case, a number of
tours would still be carried out with a maximum of 10 per group (including adult
supervisors), and visitors not involved in the tour would carry out Waste education
activities in the Visitors Centre, under supervision, provided by the Contractor or the
Authority and the schools supervisory staff.
In the event that refreshments are required, the Contractor will propose a nominal
charge (that can be waived at the discretion of the Authority or the Contractor). If any
accumulated surplus results over the course of a year (after covering the cost of
provision of all refreshments), the Contractor will donate the entire surplus to a charity
proposed by the community liaison group (defined in section 5.3.4 of MS5).
Personnel will be made available to lead guided tours hosted by the Authority twice
per week at times to be agreed with the Authority. The Contractor’s Personnel will
provide a presentation and tour of the Facility explaining key operational features and
processes.
Staffing and Resourcing Arrangements
The QHSE and communications officer will manage the Visitors Centre. The
communications and education officer will be the main point of liaison with the
Authority and other partners in terms of Waste awareness and education.
The communications and education officer will be responsible for the running of the
Visitors Centre as follows:
QHSE and communications officer (QHSECO) - the QHSECO will be
responsible for the running of the Visitors Centre as follows:
– Managing and providing Personnel for the running and administration
of the Visitors Centre;
– Being the primary interface with the Authority communications and
engagement staff as well as the external spokesperson for the
Facility;
– Facilitating pre-arranged visits to the Visitors Centre;
– Ensuring accessibility to the Visitors Centre (disability, language,
equality, social exclusion);
– Making sure customer satisfaction surveys and necessary
improvements are properly undertaken, and reporting this
information to the Authority in the Annual Services Report;
Hertfordshire County CouncilResidual Waste ContractClose of ContractMS6 – Facilities and Contract ManagementConfidential 95
– Providing Waste awareness outreach work for community and
special interest groups who are unable to visit the Visitors Centre;
– Working with the Contractor’s other group environmental educational
staff in the County to develop educational materials, packages and
programmes.
– When possible, promoting the use of the Visitors Centre as a local
community space by delivering various educational and leisure
initiatives at the Visitors Centre for schools and community groups;
and
– Will represent the communications element of the Services on the
communication liaison group (defined in section 5.3.4 of MS5).
Administrator to the Facility manager – will provide the point of contact
for all Visitors Centre bookings, and will arrange visits. The administrator
will also assist with the “meet and greet” service;
Shift team leaders (STL), operations manager (OM) and Maintenance
Manager (MM) – will, as required, provide a technical tour of the Facility
for parties where a detailed knowledge or experience is required;
Contractor’s Representative – will provide a commercial/business
discussion as required, particularly where Authority Members or their
guests might be present. The Contractor’s Representative will also be
responsible for ensuring that correct staffing and resourcing is
maintained at the Visitors Centre. The Contractor’s Representative will
also lead for the Contractor on the Project Liaison Group including
regarding communications issues;
Site manager - to report on face to face, Site diary and other operational
aspects for the Site;
Reception and telephone contact personnel; and
Corporate resources - to set general guidance and policy.
The Contractor will arrange for Personnel to take the relevant WRAP
community/education courses - most notably:
Working with community sector; and
Schools recycling schemes.
Hertfordshire County CouncilResidual Waste ContractClose of ContractMS6 – Facilities and Contract ManagementConfidential 96
Any Personnel working at the Visitors Centre will be required to go through a Criminal
Record Bureau (CRB) check. This will include the front of house administrator who will
be the first person visitors see on gaining access to the building.
The QHSECO would be responsible for building a strong and ongoing relationship
with the large variety of community groups within the surrounding area with the
ultimate aim of community and not-for-profit groups co-delivering activities addressed
to the local community itself.
The QHSECO will organise regular liaison meetings at the Visitors Centre with the
Authority’s Waste and recycling communications team with the aim of developing a
concerted Waste awareness and education strategy and programme.
All Personnel that conduct or assist on tours or interacting directly with the public will
receive customer services and equality inclusion training, as well as being
appropriately qualified and vetted.
General Outline for the Visits
Following is a general presentation of the visitor experience at the Facility. Depending
on the type of visitor, this experience will differ and the tours will be adapted.
Each group of visitors will then be welcomed and invited to sign in at the reception
desk. From there, the group will be received into the visitor meeting room where a
member of the staff would introduce them to issues such as the Waste management,
sustainable development and climate change. This would be the opportunity to
present an overview of the Authority’s Waste management policies and on the steps
taken by the Authority to avoid Landfill.
According to the nature of the visitor group, the QHSECO will explain to the group the
function of the Facility. The presentation will cover technical aspects in an accessible
manner using state of the art computerised tools (see resources). At this stage, and
subject to the Authority’s agreement, the Contractor will suggest appropriate activities
(see examples of activities and additional resources) in order to engage the visitors. It
is indeed important that participants leave the Facility appreciating that their behaviour
matters, and influences the performance of the Facility. These activities will highlight
the benefits of residual Waste treatment in comparison with Landfill.
During and after the technical explanation, the group will be invited to look through the
window that gives a direct view of the silos and bunkers, and the role of the individual
components will be explained. Then the visitors will be invited to go onto the visitor
gallery which, will allow an exceptional high level point of view on the Facility including
the MPT Facility control room and reception area.
Hertfordshire County CouncilResidual Waste ContractClose of ContractMS6 – Facilities and Contract ManagementConfidential 97
In order to give visitors the best viewing experience of the Facility, a safe and
dedicated visitor route will be running through the Facility. It will be designed for
disabled access and for the passage of groups of up to 10 visitors at the same time.
The guided tours of the operational Facility will provide a direct experience for visitors
to see what happens to the residual Waste after it has been collected. The
observation gallery will thus give:
Views on to the boiler hall (including the furnace area, super heaters,
flue gas treatment systems);
Views on to the MPT hall (tipping hall and process hall)
Views in to the control rooms; and
Views of the some of the features of this Facility design – green roof,
glulam beams and mesh.
At the different stops made by the group, the QHSECO will relate the visual
experience with the explanations given in the meeting room beforehand and there will
be presentations to clarify how the plant works and where it falls within the waste
cycle.
Design, Materials and Equipment
Visitors Centre
Hertfordshire County CouncilResidual Waste ContractClose of ContractMS6 – Facilities and Contract ManagementConfidential 98
Figure 6.7 Marchwood Exhibition Panels and Quotation Bubbles
The Visitors Centre will comprise three main areas as follows:
Extensive wall graphics, exhibition panels, leaflets, merchandise and
other promotional material to take away;
A meeting / visitor room, accessible to disabled people, to accommodate
up to 40 people (with some comfort as the room is c. 140m2), equipped
with projector and drop down screens and able to run computer based
activities. The Facility will include a flat screen interactive panel which
can be linked to the operations management system of the Facility
allowing visitors to view emissions and combustion characteristics from
the Visitors Centre. Displays will also be linked to the Facility’s CCTV
cameras to allow the remote real time monitoring of key sections of the
treatment process from the meeting/visitor room; and
An additional meeting room with seating, able to accommodate up to
twenty people, including disabled visitors.
Hertfordshire County CouncilResidual Waste ContractClose of ContractMS6 – Facilities and Contract ManagementConfidential 99
Figure. 6.8 Images of the Alton MRF Conference Room
A safe and dedicated visitor route running through the Facility, enhanced by
presentations detailing how the Facility works and where it falls within the Waste
cycle, will be used to allow visitors to see all the different elements of the control room
and of the process, in sequence from the refuse arriving to its conversion into energy
for the National Grid.
Hertfordshire County CouncilResidual Waste ContractClose of ContractMS6 – Facilities and Contract ManagementConfidential 100
Figure. 6.9 – Designated Visitor Route (red area)
The construction of the meeting / visitor room will include a number of sustainable
measures:
The use of recycled materials wherever practicable;
Sanitary appliances using grey water;
Energy efficient electrical fittings;
Maximum use of natural lighting wherever possible; and
Space heating using Waste heat from the Facility.
The Visitors Centre will have one primary entranceway arranged such that visitors can
be regulated and monitored and access controlled. The Visitors Centre will be
accessible for all and access will be in accordance with the Disability Discrimination
(Premises) Regulations 2006.
The Contractor will design the Visitors Centre with safe, defined, protected walkways
and, where appropriate, viewing platforms, allowing guided tours of the operational
main Facility and providing a direct experience for the public to see what happens to
their residual Waste after it has been collected.
The Contractor will make sure that the ceilings, walls, floors and windows of the
Visitors Centre will be reasonably free of damage or deterioration.
Hertfordshire County CouncilResidual Waste ContractClose of ContractMS6 – Facilities and Contract ManagementConfidential 101
The visitor route will be designed for disabled access and the passage of groups of up
to 15 visitors at the same time (10 only for supervised groups of children). The
entrance hall will be provided with an electrically operated personnel and disabled
access fire lift with a capacity of 10 persons or 830 kg. The lift will operate from car
park/ground level to the offices and the Visitors Centre and visitor route levels.
Drawings showing the location, layout and elevations of the Visitors Centre are
included in Method Statement 1, Part 5.
Welfare Facility
The Visitors Centre will include a catering facility for the provision of hot and cold
drinks for up to 40 persons.
The Visitors Centre will also contain an appropriate number of toilets, with at least one
toilet facility that is suitable for use by a person with a disability. The Contractor will
provide reasonable access to toilets and washing facility at the Visitors Centre for
WCA drivers and for others accessing the Site. Such toilets and washing facilities
shall, as a minimum, contain the following:
Tiled areas that are kept in a good condition and reasonably free from
damage or conspicuous deterioration;
Toilet furniture that is kept in a good condition and reasonably free from
damage or deterioration and which is fully functioning;
Reasonably intact seals and other waterproof joints that are reasonably
free from staining or mould growth; and
Toilet cubicle partitioning (if applicable) which is kept in a good condition
and reasonably free from damage or deterioration and on which all
fittings, including locks and handles are functioning.
The Contractor will ensure the Visitors Centre has appropriate heating and ventilation
to maintain a temperature between nineteen and twenty three degrees Celsius when
visitors are in attendance.
The Contractor will ensure that water supplies fed from storage tanks (not designed
for potable water provision) will be clearly labelled as “not drinking water” and will not
be located in areas where unsupervised visitors have access.
Car Park
The Contractor has ensured that the Visitors Centre has sufficient parking space to
enable up to twenty visitor cars, including disabled parking, plus one fifty two seat bus
parking bay within the boundaries of the Facility.
Hertfordshire County CouncilResidual Waste ContractClose of ContractMS6 – Facilities and Contract ManagementConfidential 102
Drawings showing the location and layout of the Visitors Centre car park are included
in Method Statement 1, Part 5.
Customer Satisfaction Surveys
The Contractor is committed to ensure visitors have an experience which meets their
needs and expectations. In order to constantly improve the visiting experience the
Contractor will provide a customer satisfaction survey to every visitor.
The survey’s content will be adapted to the group visiting the Facility, as the content of
the tour will vary from one group to another. This will be especially relevant for young
people and school groups.
Questions will ask the visitor to rate his/her satisfaction on the following:
welcoming quality;
quality and relevance of the information provided;
level of interaction;
security and safety provided on-site;
resources used;
staff’s courtesy, availability and pedagogy;
length and content of the visit; and
welfare facilities.
Qualitative questions will also measure the level of visitors’ general satisfaction and
open questions will allow visitors to record extra-comments or concerns and
suggestions for improvements.
The results collected from these surveys will be reported back to the Authority. Mean
ratings as well as relevant remarks and suggestions will be summarized. The actions
already taken by the Contractor to answer visitors concerns will be included in the
report. Where the improvement could not be undertaken right away, a proposition of
improvement will be made to the Authority.
Training
The Contractor could use the Visitors Centre as a training facility.
The Facility will:
Deliver programmes using a wide range of learning methods
Constantly develop a positive culture of learning
Hertfordshire County CouncilResidual Waste ContractClose of ContractMS6 – Facilities and Contract ManagementConfidential 103
Deliver training within a safe environment and promote safe working
practices
Ensure that training is an enjoyable experience
Develop best practice initiatives
An example of some of the core training which could be available would be:
Health and Safety
Management Systems
Recruitment and Selection
Educational Displays, Equipment and Exhibitions
The Contractor will work in parallel with the Authority’s Waste and recycling officer
when considering the educational elements and services provided by the Facility.
The Contractor will also work with the Contractor’s group educational staff already
established in Hertfordshire to develop educational programmes which are relevant to
local schools and especially to the children in the neighbouring Southfield School as
well as special needs children in the County.
How we work
The Contractor’s group educational team in Hertfordshire has develop integrated,
flexible programmes to meet the National Curriculum needs of teachers [i.e. primary
schools: sustainability, science, maths, literacy, personal, social, citizenship and
health education (PSCHE)]; secondary schools: geography, science, PSCHE) and
built around the principles of sustainable development. This can be anything from a
whole school approach – including the head teacher, caretaker and governors - to
individual groups.
The Contractor will deliver fun, exciting programmes for all ages, including adults, to
show how small changes can have big impacts.
The Contractor will raise awareness of the value of water, water efficiency and
biodiversity by providing practical and realistic advice and solutions.
The Contractor will offer whole and half-day learning experiences in schools,
businesses and for other stakeholder groups that can include practical work, full
teaching, facilitated learning, a visit, or just advice.
The Contractor will deliver continuous professional development opportunities for
teachers, trainee teachers, lecturers and other teaching professionals.
Hertfordshire County CouncilResidual Waste ContractClose of ContractMS6 – Facilities and Contract ManagementConfidential 104
The Contractor will offer high standards of service and ensure the Personnel are
competent to deliver the service needed.
The Contractor’s aim is to provide a value-adding, professional service which assists
teachers in achieving the outcomes defined by the National Curriculum and local
policies.
How this will work at the New Barnfield Visitors Centre
The Contractor will adopt a similar approach in order to:
Show how different attitudes affect the environment.
Most people do not know how much Waste they generate or water they use, so
simple auditing tools can be used to measure it. By actively involving children in
understanding the problem they become part of the solution.
Move from awareness of an issue to permanently changing behaviour.
This needs to be real and based on things we all do everyday.
School Waste and water audits engage teachers, caretakers and parents and are
effective in raising awareness of the value of Waste and water and the need to
minimise resource use and conserve it. Unnecessary Waste, recycling opportunities,
dripping taps, leaking pipes, poor hygiene are all used to explore what can be done
differently. School bin and home bin audits help to understand the quantities and
types of Waste that are generated could be a useful start point for raising awareness
of the need to reduce Waste.
Integrate issues – water, Waste and energy are all part of the
sustainability challenge – why separate them?
Make it fun and reward good behaviour. The lunchbox challenge at
Veolia’s Bushey Centre encourages children to reduce their personal
Waste. The Contractor proposes to develop this at the Visitors Centre
and use it during educational visits to the Facility. All visiting
schoolchildren have to weigh their residual Waste (i.e. anything which
cannot be recycled from the Centre). Their performance is benchmarked
against that of other visiting schools, with the best performing school
receiving a reward (such as a free trip to the centre). This approach of
encouraging children to change their behaviour and use water efficiently
can be applied to energy and Waste. The growing use of carbon as a
currency can be used as an additional comparative measure.
Experiment and test – apply sound science to measure and test the
different impacts.
Hertfordshire County CouncilResidual Waste ContractClose of ContractMS6 – Facilities and Contract ManagementConfidential 105
The search for sustainable solutions is not an easy one. It entails the need to balance
sometimes conflicting demands. The way the Contractor delivers its programmes
highlights the need to use objective evaluation of the different impacts in order to lead
to sustainable solutions. The Contractor will build this into CREST programmes for
secondary and tertiary levels.
Given the proximity of Southfield School and its particular position in educating special
needs children the Contractor would pay special attention to the group of children and
develop particular materials and visit experiences to assist the children. The
Contractor believes that visits by the children or by Personnel to the school could be
of value and, in particular, help the children to adjust to the changes at New Barnfield.
The Contractor will develop a suitable educational pack for this group of children to
help them understand not only the wider environmental issues but the Facility itself,
the machines, the equipment and the processes which are going on. The Contractor
feels this would assist the children at Southfield School to become comfortable with
the Facility and to understand why it is there and what it is doing. In the discussions
with Caroline Wells (Hertfordshire Special Educational Needs Support) it became
apparent that a proactive approach to helping the children understand both the
construction and operation of the Facility could be made into a positive educational
opportunity for them. Materials and approaches developed for Southfield School
would then also be available to benefit other children with similar needs.
In terms of the visitor experience for special needs children, such as at Southfield
School, the Contractor understands that a sensory experience is likely to be
particularly valuable. The Contractor would thus develop exhibits and displays which
work with the children's’ various senses to engage them with the wider educational
approach.
The Contractor would work with Southfield School and advisors (Caroline Wells’
department) to create a suitable information pack, displays and a visitor experience.
Generating publicity for the Waste teaching programmes
Having developed new teaching programmes for Waste with activities linked to the
curriculum, the Contractor will pilot them in target schools to gain feedback and
publicise the work.
The Contractor will generate further publicity by liaising with the teachers’ centre, the
educational charity SETPOINT Herts and other relevant bodies around INSET and
continuing professional development for teachers.
The Contractor will explore how could develop specialist activities such as a CREST
day for secondary schools could developed.
Hertfordshire County CouncilResidual Waste ContractClose of ContractMS6 – Facilities and Contract ManagementConfidential 106
The Contractor will incorporate a general marketing plan and promote and link the
offering with the existing water programme, channels and network.
Together with Hertfordshire County Council the Contractor will create a truly
sustainable society which minimises Waste, optimises energy and values water.
There will be displays relating to the Facility as well as general Waste information in
the Visitors Centre as well as along the visitor route.
Educational Displays/Activities
The Contractor will develop the following education packs within 12 months following
the Commencement Date:
Schools Presentation Kit;
Educational Pack; and
Activity Pack for Children.
The packs will be used for Visitors Centre activities and will be made available on
request to schools and other relevant stakeholders in the County.
The Waste education strategy for the Project will be based on the existing work by the
Contractor’s Sheffield Waste education officer, where a school Waste
awareness programme (SWEP) was rolled out to schools in Sheffield which included
an extensive range of sessions and activities for schools.
The opportunity now exists for the Contractor to consolidate and ‘repackage’ the work
and role out a professional, consistent and corporate Waste education programme to
be used across the entire Contractor’s contracts within 12 months following the
Commencement Date as follows:
An interactive, informative education outreach programme that inspires
and educates teachers and children;
A programme that appeals to children aged 5 to 11 (Key Stage 1 and
Key Stage 2); and
A ‘flexible’ programme that can be adapted to suit individual contract
requirements.
Schools Presentation Kit
The Contractor will produce a schools presentation kit within 12 months following the
Commencement Date. The schools presentation kit is a complete toolkit for
communications and education officers to conduct school presentations. The kit, to be
used as part of the Project, will include the following:
Hertfordshire County CouncilResidual Waste ContractClose of ContractMS6 – Facilities and Contract ManagementConfidential 107
Props for delivering school presentations (e.g. 3D characters, bins and
role play outfits for children); and
A4 ring binder training pack (with CD Rom) including lesson plans,
PowerPoint presentations, training video, worksheets and interactive
whiteboard worksheets.
The work involved in developing the kit will be as follows:
Design and illustrate a group of characters to support school
presentations and other elements within the programme;
Characters to be based on materials i.e. plastic, paper, aluminium to
support key messages within the presentations;
Consider developing ‘human-form’ characters to represent typical
‘human-behaviour’ with recycling (e.g. currently has
‘Wasteful William’);
Characters to be used across all elements/literature within the
programme;
Manufacture required props for school presentations;
Produce 3D models of characters for use in school presentations;
Produce or purchase other supporting props i.e. bins, bin men and
women outfits;
Design and produce training pack;
Design folder, page templates, divider inserts and PowerPoint template;
Agree and develop content of training pack i.e. introduction and
guidance notes; structured lesson plans that can be offered to schools;
supporting PowerPoint presentations; worksheets and interactive white
board worksheets;
Produce a 10 minute training video on ‘how to deliver a school
presentation’;
Produce CD Rom with all materials; and
Produce and print A4 ring binder folder with CD Rom pocket and inserts.
Educational Pack
The Contractor will produce an educational pack within 12 months following the
Commencement Date (Educational Pack). The Educational Pack will be issued to
Hertfordshire County CouncilResidual Waste ContractClose of ContractMS6 – Facilities and Contract ManagementConfidential 108
schools that request information on recycling and also as follow up material for
schools that receive a schools presentation. The information will also be available on
the Contractor’s website within the education section.
The pack will be an adaptation of the training pack described above and will include
the following:
A4 ring binder educational pack (inserts and CD Rom) including
introduction and teacher notes; lesson plans; PowerPoint presentations;
worksheets; interactive whiteboard worksheets and activity packs for
children; and
With prior approval by the Authority, the Contractor will also offer
schools the following extras: classroom posters, giant classroom
interactive games and web micro site with interactive multi-media
games.
The work involved with developing the kit will be as follows:
Design and produce the Educational Pack;
Adapt ‘Training Pack’ designs for folder, page templates, divider inserts
and PowerPoint template;
Adapt and develop content of pack i.e. introduction and teacher notes;
lesson plans; supporting PowerPoint presentations; worksheets;
interactive whiteboard worksheets and localised information;
Develop particular version appropriate to children at Southfield School;
Produce CD Rom with all materials;
Produce and print A4 ring binder folder with CD Rom pocket and inserts;
Update education section on website with new contents;
Design and print classroom posters that promote recycling key
messages;
Design and develop ‘giant’ interactive games for teachers’ use;
Rebrand ‘Eco-Star’ (see below for details) with new characters; utilise
existing and develop new interactive, multi-media games (develop
interactive whiteboard worksheets); and
Any optional extras.
Hertfordshire County CouncilResidual Waste ContractClose of ContractMS6 – Facilities and Contract ManagementConfidential 109
Activity Pack for Children
The Contractor will produce an activity pack within 12 months following the
Commencement Date (Activity Pack). The Activity Pack for children can be included
with the Educational Pack that is sent or handed out after school presentations. The
Activity Pack will help to engage children and encourage them to remember to take
action on recycling at home. The Activity Pack will include the following:
12 page, A4 activity book/comic with games, activities, interesting facts
and challenges based on recycling; and
A toy/gift item e.g. stickers, stationery, pencil cases or note books.
The work involved with developing the kit will be as follows:
Design and print the 12 page A4 activity book/comic; and
Source a suitable toy/gift.
Additional Education Materials
The use of the interactive website will be promoted by the Contractor at the Visitors
Centre and will allow participative learning and creates the ideal environment to
introduce children to the Waste management principles of ‘reduce, reuse, recycle’.
The Contractor has developed the Eco-Star website as a fun and effective method for
young children to learn about Waste.
The website is aimed at Key Stage 2 (7 to 11 year
olds) and assists with Education for Sustainable
Development (ESD). The activities include ‘did you
know’ fact-finding, games and ‘true or false’
scenarios aimed at imparting information about
reducing waste and increasing recycling. Activities
are supported by teachers’ notes and lesson plans
with many linking with National Curriculum for school and home.
The screenshot illustrates the interactive environment. The website can be seen at
www.eco-star.com.
Not-for-Profit Organisations
Not-for-profit organisations will not only be one of the primary audiences, but could
also become a key partner in delivering activities, for instance by designing and
delivering activities for hard to reach communities in Hertfordshire such as people with
disabilities. The Contractor will seek to develop such partnerships for the Project.
Hertfordshire County CouncilResidual Waste ContractClose of ContractMS6 – Facilities and Contract ManagementConfidential 110
The communications and education officer will be responsible for building a strong
and ongoing relationship with a large variety of community groups, with the ultimate
aim of community and not-for-profit groups co-delivering activities addressed to the
local community itself.
The Visitors Centre will be used as an area to provide details of existing community
groups in Hertfordshire, as well as a venue to promote and host events run by local
not-for-profit organisations to create a stronger relationship with community groups.
Events
The Contractor will seek to promote and organise educational events in partnership
with the Authority.
Special events will be organised at the Visitors Centre such as ‘Real Nappy’ or ‘Home
Composting’ events within 12 months from the Commencement Date where such
products will be sold and advertised. The Visitors Centre will also organise
conferences, workshops and visits.
Equipment
The Contractor will be using electronic media to provide an experience that should be
expected from a 21st Century Waste management facility.
The displays will be easily and quickly changed to reflect advances in technology,
operations and environmental focus and future requirements.
The Contractor will provide a large flat screen display, and a minimum of two
additional dedicated computer terminals in the exhibition hall.
Two separate offices will be made available, with computer terminals, to allow
additional flexibility in the operation of the Visitors Centre (e.g. for lone working, self-
study, small break-out groups).
The Contractor will provide computer-based information on the construction and
operation of the Facility, providing detailed insight in to the workings of the Facility and
its operations. The positioning of the windows in the exhibition hall, will form a viewing
gallery which will allow groups to view directly the wider aspects of the process, and
be able to put this in to context with the operations described on the computer screen.
The Contractor will also provide computer-based information on the “upstream” Waste
management operations (including collection systems), other types of Waste
management facility, and the process outputs from the Facility.
The large flat-screen display will provide real-time Facility processing information,
including the processing rate of Waste, temperatures in the furnace, superheater
Hertfordshire County CouncilResidual Waste ContractClose of ContractMS6 – Facilities and Contract ManagementConfidential 111
steam temperatures and pressures, and electricity generation. It will also be capable
of connection to a series of webcams about the Facility and the surrounding Site.
These will provide more detailed views of inaccessible parts, or where it would not be
safe to take visitors because of operations or the environment in which they take
place.
The Contractor will provide educational materials to link in with various expected
visitor groups, and will update these materials as the visitor demographics evolves
through the Contract Period.
Visitors Centre During Construction
The Contractor will provide accommodation and PPE to suit 40 visitors during the
construction phase. The Contractor will also provide 20 car park spaces which can be
reserved for visitors, in the area of the visitor accommodation. The car parking space
will alternatively be able to accommodate a coach. The visitor centre will relocate to
the permanent Facility Visitors Centre once it has been commissioned and is safe to
use.
Provisions will be made to cater for visitors to attend the Site during the construction
works. Car parking will be provided for ten additional vehicles, and will be sited away
from the main compound areas, and adjacent to the reception area in the Site offices.
On entering the construction Site offices, all visitors must register at the reception by
following the signing in procedure. All visitors will be inducted by a member of the
Contractor’s Site team. Any groups of visitors will have to book at a pre-arranged
appointment time to ensure a member of the Contractor’s Site team is available to
conduct the induction.
Within the Site offices, a meeting room will be available to cater for visitors. This will
also act as an information room where details of the Project will be displayed, and
photographs of the Works progress to date.
Visitors to enter the Site Works area will be accompanied at all times by a responsible
member of the Contractor’s Site team. All pedestrians must keep to the well
maintained and signposted pedestrian routes, which will be physically segregated
from vehicular routes and haul roads.
Suitable welfare facilities will be provided for visitors, as for office staff and Site
personnel.
The orientation of the offices will be such that it will be possible to view out of the
windows from the second level of Site offices, and overlook a part of the Site Works.
Hertfordshire County CouncilResidual Waste ContractClose of ContractMS6 – Facilities and Contract ManagementConfidential 112
The following is a summary list of the provisions made for visitors and Site personnel,
during the construction phase:
Clearly visible and well signed access route to the Site offices from the
main roads in the area
A clearly displayed Site notice board at the Site entrance
Adequate portacabin facilities for use as offices and meeting rooms, for
the Contractor and visitors
1 meeting room complete with all furnishings suitable for 20 persons
minimum for use by the Contractor or the Authority or Hertfordshire
County Council.
Connections to electricity network, water main, phone, fax, foul and
surface water drainage network
Secure portacabins for use as a visitor/conference room, kitchen and
offices suitability partitioned and complete with all furnishings and
connections to power, water, foul, phone
First aid room, changing rooms, toilets and mess rooms
Signposts to access the construction site
Site lighting as necessary
The Contractor will make staff available on a pre-arranged basis to host pre-arranged
visits.
The Contractor will prepare and keep regularly update a presentation that will be
available to show visitors to explain the construction and operation of the Facility. It
will provide a basic explanation of the technology and contain photographs of
significant aspects of the Facility at various stages of construction.
The meeting room will be provided with a minimum 40 inch, colour LCD or similar
screen which can be used to present photographs, drawings and presentations or
DVD material to visiting groups.
The meeting room will be provided with a connection to the Site IT network to allow
access to drawings and records for presentation purposes.
The meeting room will be available for the Contractor’s use when it is not booked for
group visits.
The Contractor will keep 40 sets of PPE for visitors as required by Site health and
safety protocols but including at least, adjustable hard hats, high visibility waist coats,
Hertfordshire County CouncilResidual Waste ContractClose of ContractMS6 – Facilities and Contract ManagementConfidential 113
protective gloves, eye protection, protective wellington boots or similar in a reasonable
variety of sizes to suite male and female visitors and disposable ear plugs. The PPE
equipment will be maintained in a clean, useable state and replaced as necessary
through the construction period. The use of PPE will depend on the access
arrangements agreed for each visit, e.g. ear plugs will not be required if the visit does
not enter a space where hearing protection is required.
6.6.3 Maintenance of the Centre
As an integral part of the Facility, The Contractor will ensure there is a high level of
maintenance and cleanliness applied to all levels of the plant and Visitors Centre to
meet the Authority’s requirements.
Floors, surfaces, furniture, fixtures and fittings in areas which visitors can gain access
(or office areas which can be directly viewed) within the Facility, including the
entrance foyer, Visitors Centre, and the Facility control room, will be cleaned to a level
meeting the standards of cleanliness as set out by the British Institute of Cleaning
Sciences in their Cleaning Standards Specifications (or revisions to these during the
life of the Contract).
In addition, external areas and boundary of the Facility will be kept clean and free
from litter in accordance with the guidance currently laid down in “Litter and Refuse” or
other relevant best practice guidance developed during the life of the contract. -
Guidance on Part 4 of the Environmental Protection Act 1990 as amended by the
Clean Neighbourhoods and Environment Act 2005”, published by Defra (PB number
PB11577d).
At the end of each working day (or in the event of an evening visit, immediately prior
to the visit), the Visitors Centre will be subject to a typical “office-type” clean (toilet &
kitchen cleaning, light carpet cleaning, dusting and removal of litter and used
refreshments). During these cleaning activities, an inspection will be made of the
facility to identify where heavy cleaning or facility maintenance is required.
In the event that heavy cleaning or maintenance is required, a record will be made in
a dedicated Visitors Centre maintenance & cleaning book, and remediation will be
carried out, where feasible, within 1 Business Day.
In the event that maintenance is required to IT equipment in the Visitors Centre,
remedial action will be taken to rectify the issue within 5 Business Days.
Furniture, fittings and equipment within the Visitors Centre will be inspected weekly to
ensure that it is in good repair. Unsafe items will be removed from the Visitors Centre
or, if that is not possible, a notice applied to prevent use.
Hertfordshire County CouncilResidual Waste ContractClose of ContractMS6 – Facilities and Contract ManagementConfidential 114
Remedial action will be taken within 5 Business Days of a fault being reported.
The Visitors Centre will be redecorated once every 5 years. Furniture, fittings or
equipment will be replaced at least once during the Contract Period to ensure that the
Visitors Centre is maintained as a functional and safe environment suitable for
educational purposes.
Promotion of the Visitors Centre
The Contractor will prepare, agree with the Authority and implement a
communications strategy throughout the period up to the Services Commencement
Date, which will include the promotion of the Visitors Centre.
Details regarding the promotion of the Visitors Centre will be presented as part of the
Contractor’s wider communications strategy (see Method Statement 5 Part3).
6.7 TRANSFER AND HAULAGE
6.7.1 Introduction
This section of the Method Statement comprises several elements that will reduce the
environmental and social impacts potentially arising from transport activities
associated with the Facility.
Sustainable travel plan;
Traffic management plan;
Waste transport plan;
Impacts arising from traffic, including proposed mitigation measures.
The sustainable travel plan addresses, and seeks to minimise Personnel and visitor
related traffic, identifies both incoming and outgoing traffic movements and routes,
and proposes measures to minimise the impacts of these on the local and wider
environment.
The Contractor will promote a culture of continuous improvement across the
operations which engage all Personnel to strive to minimise travel and reduce the
environmental impact of transport operations, where practically possible.
6.7.2 Transfer and Haulage
Sustainable Travel Plan
A Framework Travel Plan (FTP) is provided in Attachment MS5 2.14.2 to demonstrate
the Contractor’s commitment to reducing the impact of staff travel to work on the
Hertfordshire County CouncilResidual Waste ContractClose of ContractMS6 – Facilities and Contract ManagementConfidential 115
environment. It forms part of the Contractor’s broader approach to carbon
management for the proposed Facility on Travellers Lane in Hatfield. The following
summarises the FTP.
A full Travel Plan (TP) will be produced within six months of occupation of the Site.
The TP will provide a context in which the transport needs of the site can be
accommodated, to achieve the operational requirements of the business, whilst
aiming to encourage sustainable travel choices for Personnel and visitors. Set out
within the plan will be proposals to minimise unnecessary travel and encourage
Personnel to consider other options to the car for travel to the workplace. The TP will
set out measures aimed at reducing the numbers of single occupancy car journeys
people make to the Site, encourage car sharing, journeys by public transport, walking
and cycling.
The FTP supplied provides a statement as to the content and management of the full
TP that will be prepared within 6 months of occupation of the site. The TP will be
produced in conjunction with the travel plan officer at the Authority.
The key objective of the TP is to achieve the following outcomes:
To raise staff awareness of travel issues and the benefits of sustainable
travel including improved health, fitness and reduced cost and offer
more travel choice to staff and visitors;
To facilitate a change towards a sustainable use of transport through the
provision of alternative options to the private car;
To encourage the use of public transport, cycling and walking;
To provide a framework for monitoring and reviewing staff travel to work;
To set out targets and indicators for sustainable staff travel; and
To reduce the overall carbon footprint of the integrated Waste treatment
Facility (IWTF).
The FTP identifies the key individuals who will be responsible for the governance and
implementation of the plan, and describes the survey data that will be obtained and
used as baseline information to determine targets and measures to reduce non
essential car travel. This baseline information will also be used as the basis for the
calculation of annual carbon emissions footprint, which will be used monitor year on
year improvements against CO2 reduction targets.
The benefits of the successful implementation of the FTP will be to reduce carbon
emissions associated with transportation as well as potentially benefiting employees’
Hertfordshire County CouncilResidual Waste ContractClose of ContractMS6 – Facilities and Contract ManagementConfidential 116
health and wellbeing through walking and cycling, and encouraging good working
relationships amongst work colleagues.
As part of the TP the Contractor will encourage visitors to minimise their travel impact.
This will be done by encouraging car shares, group visits using coaches, and the use
of Hatfield railway station and bus routes to nearby bus stops (a short walk from the
Facility), if appropriate.
The TP will be primarily developed to reduce vehicle movements associated with
Contractor’s Personnel and visitor travel to and from the Facility, however, there will
be periods where Sub-Contractors will be travelling to the site (such as during any
Programmed Maintenance periods for the turbine and boilers where specialist Sub-
Contractors will be used). The Contractor will seek to influence Sub-Contractors to
implement sustainability initiatives such as those included within the FTP.
It should be noted that, with regard to sustainability, the Facility design aims to
achieve a BREEAM “Excellent” rating, and aspects of the TP, such as the provision of
bicycle sheds and showering facilities, will contribute to this BREEAM rating.
Traffic Management Plan
In co-ordination with the Authority, the Contractor will develop a cost effective traffic
management plan to co-ordinate and optimise vehicle movements and vehicle
queuing at the Facility and help to ensure that possible disruption caused to other
road users is considered and mitigated where appropriate. The Contractor’s Site
manager and the Authority’s Representative will meet on a regular basis and update
the traffic management plan as required. The Contractor has experience of employing
similar arrangements, with demonstrable success at other energy recovery facilities in
the UK, and draws upon this experience of working in close partnership with local
authorities when developing a traffic management plan.
The development of the traffic management plan will include discussing and agreeing
the following programmes with the Authority:
Details of haulage arrangements and transportation routes for process
materials arising from the Facility;
Details of the required vehicle resources;
Detail of the types and numbers of vehicles;
Number of hourly, daily and annual traffic movements at the Site;
Availability of the Facility;
Programmed Maintenance;
Hertfordshire County CouncilResidual Waste ContractClose of ContractMS6 – Facilities and Contract ManagementConfidential 117
Definition of materials to be delivered;
Turnaround times;
Opening times (as set by the Consents);
Queuing arrangements;
Emergency procedures;
Security arrangements;
Environmental impact; and
Contingency Plans.
Objectives related to haulage of Waste that the Contractor will deliver are to:
Minimise vehicle miles travelled and double handling, increase fuel
efficiency, and reduce carbon footprint across the County: by
implementation of the proximity principle, routing optimisation,
minimising the number of trips generated through maximising payloads
and utilising the back haulage of payloads where possible;
Minimise road traffic accidents and fuel consumption: by ensuring the
Contractor’s drivers have undertaken appropriate driver training and use
the latest fuel efficient mobile plant and road going vehicles (e.g. EURO
5 engines, or EURO 6 when introduced);
Minimise non-biogenic carbon emissions (where practicable and
sustainable): through the use of bio-fuel for the vehicle fleet;
Facilitate safe and efficient movement of traffic over the weighbridges
and through the Facility: by optimising the design and operation of the
Facility;
Avoiding queuing on the Site and on the highway (where possible): by
phasing the delivery of consumables and dispatch of process materials
out of peak hours;
Optimise vehicle utilisation and weights per load: by establishing and
operating vehicle tracking systems and on-board weighing capabilities;
Maximise availability, reliability and continuous operational performance
in terms of environmental impacts, sustainability goals and positive
Services perception: by operating high standard system-based vehicle
maintenance programmes, including trailers and containers;
Hertfordshire County CouncilResidual Waste ContractClose of ContractMS6 – Facilities and Contract ManagementConfidential 118
Minimise nuisance to Southfield School where possible;
Minimise nuisance from dust and litter: by transporting Waste and
process products in enclosed containers or sheeted vehicles;
Allow the WCAs the flexibility to optimise collection and delivery
efficiencies by: designing the Facility’s tipping hall to accommodate the
largest road legal rigid and articulated Waste collection vehicles; and
Minimise confusion of traffic routes within the Site: by providing
appropriate clear signage.
The Contractor will take account of the following traffic issues in relation to the Facility:
Health and safety implications;
Volume of traffic;
Point of access;
Effect on the local environment and the highway capacity; and
Nuisance (noise, dust, litter and fumes).
When the Facility becomes unavailable due to the annual Facility shut down for
maintenance or if an unplanned event occurs, the Contractor will liaise with the
Authority to minimise disruption to collections. The Contractor will notify the Authority
of any need to divert vehicles to contingency Delivery Points within one hour of the
Contractor’s awareness of the unplanned event, with notice of the anticipated duration
of such diversion.
The following provides further details for the Contractor’s traffic management plan
Proposed Routes to and from the Facility
The Contractor has provided a Facility design that will effectively segregate
operational and non-operational traffic within the Ste in order to minimise vehicle
movement risks between Waste vehicles and passenger cars (Figure 6.10 below).
Hertfordshire County CouncilResidual Waste ContractClose of ContractMS6 – Facilities and Contract ManagementConfidential 119
Figure 6.10 Segregated Traffic
Further, it is noted that the entrance to the Site is shared with the Southfield School.
The Contractor has therefore included an access junction upgrade to mitigate the
increased traffic and has involved the local highway authority in the Project.
Hertfordshire County CouncilResidual Waste ContractClose of ContractMS6 – Facilities and Contract ManagementConfidential 120
Overall, the Site provides good connections to the wider road network. Access is via
Travellers Lane, which in turn connects to the A1001 via a five arm roundabout. The
A1001 in turn provides connections to the A1(M) at Junction 2 to the west, and the
A1000 to the east of the site. It is noted that initial discussions have taken place with
Hertfordshire County Council Highways Department, who have not raised any
significant concerns over the use of the Site for Waste treatment; however a full traffic
assessment will need to be prepared during the planning process so that this can be
properly assessed. Improvements to the Site access arrangements with Travellers
Lane are required and have been included by the Contractor in its proposals (refer to
Attachment MS5 2.14.3), to ensure the Facility does not adversely impact the
adjacent Southfield School. The initial work carried out by Stomor and SBA, along
with consultee comments, suggest there are no highway and transportation reasons
why the proposed Facility cannot be implemented.
Proposed Routes to the Facility
The Contractor proposes to restrict vehicle access to the Facility, for Waste delivery
and process residue/consumables vehicles, to certain routes in agreement with the
Authority, WCAs and Sub-Contractors. In general it will be recommended that HGV
and RCV use trunk roads and other primary roads wherever possible. All routes will
be discussed in detail with the Authority before finalisation. In the selection of vehicle
routes, consideration will be given to identifying routes which reduce the number of
predictable stop/starts (i.e. junctions) to keep acceleration and breaking to a minimum
and keep emissions, including carbon, to a minimum. Routes will be identified that do
not pass significantly through minor road and residential areas reducing the likelihood
of nuisance such noise and vibration.
The Contractor will have no direct control over the Authority vehicles entering the Site.
However, The Contractor is keen to work with the Waste Disposal Authority (WDA)
and Waste Collection Authorities (WCAs) or their Sub-Contractors to ensure that road
impacts are effectively mitigated.
Specifically, it will be critical to ensure that Waste deliveries are effectively managed
to ensure that the phasing of vehicle movements are well spaced, reducing the
potential for queuing. This will also have the benefit of reducing peak traffic flows on
the surrounding road network.
The Contractor proposes to ensure that wherever possible, vehicles should arrive at
the Site from the A1(M) Northbound, turning on to South Way (A1000) eastbound to
Traveller’s Lane. As the motorway junction does not provide an exit for southbound
traffic, vehicles coming Eastbound from the A414, or southbound through Hatfield
would be required to use Roehyde Way (A1001) between junctions 3 and 2 of the
Hertfordshire County CouncilResidual Waste ContractClose of ContractMS6 – Facilities and Contract ManagementConfidential 121
A1(M). This route passes by the University, and residential housing, where the
University traffic has previously been an issue.
The Facility will receive Contract Waste from the ten WCAs within Hertfordshire, either
by direct delivery or via Waterdale and the new transfer stations. The exact locations
from which the Facility will receive Contract Waste via direct delivery is not yet known
and so a central point within each WCA has been used to determine likely routes to
the Facility. As stated previously these movements are not under the control of the
Contractor, however this traffic needs to be considered within the overall traffic
management plan and will be an important consideration during the planning process
when a full traffic assessment and accompanying traffic chapter within an
environmental statement will be required.
The Contractor will seek to ensure that other Third Party Waste reception times are
controlled, to minimise the potential for queuing at the Site and along the routes
approaching the Site. The majority of the Third Party Waste will be sourced from the
Contractor’s transfer station in St Albans in Hertfordshire complemented by local
Commercial Waste & Industrial Waste transfer station operators and by the
Contractor’s transfer station in Wembley if required. While the Contractor’s transfer
station in St Albans is located relatively close to the Facility, the Contractor is likely to
continue to receive Waste through the transfer station as this will allow for additional
operating fluidity in the reception of Commercial Waste both for the timing and
presentation of suitable Waste composition.
At this stage it is not possible to determine specific routes for Personnel and visitor
movements to the Facility, however it is hoped that the development and instigation of
the TP would minimise Personnel and visitor vehicle movements.
Proposed Routes from the Facility
Table 6.9 provides details on the outputs from the Facility that will be taken for
reprocessing elsewhere, and the destinations for these outputs
Table 6.9 Reprocessing Destinations for Facility Outputs
Output Assumption Comments
Incinerator Bottom Ash To be taken for processing
into an aggregate
If possible, bottom ash will be processed
at a new facility based on a site expected
to be within a 15 – 20 km of the New
Barnfield site. This will be explored prior
to Services Commencement. Current
position is that IBA will be treated at the
Contractor’s
a 134 km roundtrip route
Hertfordshire County CouncilResidual Waste ContractClose of ContractMS6 – Facilities and Contract ManagementConfidential 122
Output Assumption Comments
FGTR Long term storage FGTR will be disposed at a Contractor
salt mine at – a
round trip of 160 km
Metals recovered Mainly ferrous metal is re-
used in manufacturing
Metals will be processed at
Mixed plastics recovered Mainly plastic bottles is re-
used in manufacturing
Plastics will be processed at
Mixed paper and fibre Mainly used as a low
grade fibre in paper
industry
The paper mills will be
a 227 km roundtrip.
Diversion to third party
energy recovery facilities
Contractor’s contingency
facility,
, other
Contractor plants/facility
Average round trip of 134 km
The Contractor will operate the haulage of Waste; the other elements of haulage will
be sub-contracted.
The key indicative transport routes from the Site are provided in more detail below.
Incinerator Bottom Ash (Articulated Tipper)
The Contractor proposes to process the IBA from the Facility at the Contractor’s group
reprocessing facility, located in and operated by . The facility
has current capacity for Hertfordshire IBA and is on a Contractor Landfill. This facility
is currently processing the IBA from a number of treatment facilities (including
SELCHP) and is used for the purpose of this section. The Contractor may seek to
develop an alternative facility on a new site within a 10 to 15 miles radius during the
construction phase of the Project, to reduce costs and travel requirements. The
present Method Statement will be amended at the time.
The following provides the anticipated 42 miles route to
Hertfordshire County CouncilResidual Waste ContractClose of ContractMS6 – Facilities and Contract ManagementConfidential 123
Waste Transfer during Facility Shutdowns (Articulated Bulker)
5% of Contract Waste will be sent to alternative treatment facilities during the Facility
shutdown The Contractor has identified and secured capacity within it’s own facility at
.
The following provides the anticipated 42 mile route to :
Hertfordshire County CouncilResidual Waste ContractClose of ContractMS6 – Facilities and Contract ManagementConfidential 124
FGTR to Contractor’s Disposal Facility (Articulated Tanker)
FGTR will be the resulting by-product of the Facility’s air pollution control systems and
will principally consist of lime. As lime is strongly alkaline, the material will be deemed
as hazardous and will be treated/disposed of at a hazardous treatment facility. The
Contractor will dispose of FGTR at the Contractor-owned underground deep
salt mine storage facility
The following provides the anticipated 166 mile route to
Hertfordshire County CouncilResidual Waste ContractClose of ContractMS6 – Facilities and Contract ManagementConfidential 125
Recycled metals extracted from MPT
The Contractor will use , for the ferrous metals in
The Contractor will use for the non ferrous metals in
Hertfordshire County CouncilResidual Waste ContractClose of ContractMS6 – Facilities and Contract ManagementConfidential 126
Recycled plastics from MPT
The Contractor will use for the mixed plastics in for the recycling
plastics
The following provides the anticipated 197 mile route to
Hertfordshire County CouncilResidual Waste ContractClose of ContractMS6 – Facilities and Contract ManagementConfidential 127
Mixed Paper and Fibre from MPT
The Contractor will use the paper mills located in
.
The following provides the anticipated 70 mile route to
Hertfordshire County CouncilResidual Waste ContractClose of ContractMS6 – Facilities and Contract ManagementConfidential 128
Transport Arrangements for Incoming Vehicles
The design and layout of internal traffic flows at the Facility benefits from the
Contractor’s extensive experience in designing, managing and optimising traffic flow
at other facilities throughout the UK.
All vehicles will enter the Site through the proposed improved access in Travellers
Lane. The Contractor has priced for the new access into the Site. Private vehicles will
be segregated from commercial vehicles for safety reasons (Figure 6.10). Refer to
2.2.2 Waste Reception for further information.
Incoming Waste Deliveries
All Authorised Vehicles will be issued with a fob or barcode that, via the Contractor’s
weighing and information management system (WIMS) at the entrance to the Facility,
will allow the Contractor to automatically identify the vehicle against the database of
Authorised Vehicles to distinguish between authorised WCAs’ vehicles, Authority
Waste transfer vehicles, other Sub-Contractors and Third Party Waste collection
vehicles. For further details on vehicle identification see section 2.3.3 of this Method
Statement, for details of non -authorised vehicles see section 2.5 of this Method
Statement, and for details of the weighbridge operations see section 2.6 of this
Method Statement.
Collection of Process Materials
All vehicles collecting process materials from the Facility will be directed to the
weighbridge office and will be registered as for the delivery vehicles described in
section 2.5 of this Method Statement.
On completion of the weighing in process, the vehicle will be directed to the relevant
area within the Facility. After this process has been completed, the vehicle will be
directed back to the weighbridge office where the automatic control system will
complete the transaction by recording the gross weight of the vehicle and raising an
electronic weighbridge ticket.
Opening and Closing Time for the Facility
In accordance with the Authority’s Requirements, the Contractor will accept Contract
Waste delivered by an Authorised Vehicle during the opening hours of the Facility as
shown in table 6.10 below (Opening Hours).
Hertfordshire County CouncilResidual Waste ContractClose of ContractMS6 – Facilities and Contract ManagementConfidential 129
Table 6.10 Opening Hours of the Facility
Day of Week Opening Hours
Monday to Friday 05:00 – 21:00
Saturday 05:00 – 21:00
Sunday 05:00 – 21:00
The Contractor will apply for all necessary planning consents to allow 365-days per
year and 24-hours per day operation of the Facility.
The Contractor will accept Contract Waste outside the Opening Hours where
requested by the Authority provided always that such requests are reasonable and
consistent with all Consents. For the delivery of Contract Waste outside the Opening
Hours on a day which is not a Business Day, and in accordance with clause 3.27 of
Schedule 2 (Authority’s Requirements), the Contractor will accept Contract Waste for
short periods to deal with unforeseen delays in the delivery pattern of Waste collection
vehicles provided always that such requests are reasonable and consistent with all
Consents.
Prevention of Queuing Outside the Site
It has been demonstrated that electronic weighbridges can work at a theoretical rate
of 180 vehicles per hour and, during extensive trials, have been observed at a
maximum of 120 vehicles per hour. In the Contractor’s experience, 90 vehicles per
hour represent the maximum achievable rate provided no documentation or money
changes hands or there is no query. Furthermore, experience has shown that if any
delays take place, then the throughput drops to approximately 45 vehicles per hour. If
delays take place the potential for queuing increases and this may cause vehicles to
queue back on to the public highway.
To help prevent disruption to other road users, the weighbridges have been located at
sufficient distance inside the Site to allow RCVs to queue on site and clear of the
public highway. The operation of the in-weighbridges will ensure fast reception and
weighing to reduce the turnaround times. The weighbridges will be capable of
weighing vehicles up to 18 m length and at least 50 tonnes to the nearest kilogramme.
Two by-pass lanes (Fig. 6.11) will enable vehicles not requiring an ‘in’ or ‘out’ weight
(e.g. bulk haulage vehicles from the Waste transfer stations) to circumvent the
weighbridge area if required and, therefore, improve throughput. This will also enable
deliveries and cars to bypass the tipping hall. The bypass lanes will either be barrier
controlled from the weighbridge office or controlled by transponders on the bulk
haulage vehicles.
Hertfordshire County CouncilResidual Waste ContractClose of ContractMS6 – Facilities and Contract ManagementConfidential 130
A return filter lane between the out and in road has been provided to enable “road
trains” to do two tipping cycles or other vehicles to complete a second circuit of the
Site, if required, without leaving the Site.
Figure 6.11 Bypass Lanes
During operational hours, the Contractor will ensure that the main gates of the Site are
unlocked and pinned back so as to provide unfettered access to incoming and
outgoing vehicles. Any fly-tipped Waste deposited by the gates, or obstructions to this
traffic, will be cleared by the Contractor in accordance with the Authority’s
Requirements (1 hour) or as soon as is reasonably practicable outside operational
hours.
Further detail on the likelihood of queuing during the peak delivery hours and the on-
site queuing capacity provided can be found in section 2.4 of this Method Statement.
Hertfordshire County CouncilResidual Waste ContractClose of ContractMS6 – Facilities and Contract ManagementConfidential 131
Ensuring Cleanliness of Vehicles
Following the delivery of Waste to the tipping area vehicles will be visually inspected
for extraneous Waste by the Contractor’s banksman before leaving the tipping area.
When necessary, drivers will be informed of any extraneous Waste and directed to the
vehicle wash down area.
A wash-down area will be provided within the tipping area for the cleaning of Waste
delivery/collection vehicles by the crew/driver. There will be a high pressure wash
down area within the Facility for discharge of dirty water to foul sewer via interceptors.
The wash-down area will be located before the ‘out’ weighbridge. As there is no
allowance for the use of the wash-down facility in the vehicle turnaround times, it will
be necessary to monitor the time taken to clean a vehicle; this time can then be
subtracted from the vehicle’s turnaround time.
Traffic Control
As discussed above, all delivery and collection vehicles arriving at the Site will be
directed onto the ‘in’ weighbridges. At this point a red traffic light will be visible and the
barrier will be closed. The system will automatically read a vehicle mounted barcode
or a screen will direct the driver to use their fob, as provided to Authorised Vehicles. If
the vehicle is recognised as an Authorised Vehicle, a green light will show and the
barrier will be lifted allowing access to the Site. If the vehicle is not authorised, the
barrier will not be raised and the driver will be re-directed to the nearest alternative
disposal facility.
If however, the automatic system is unable to read the fob/barcode (i.e. an error or
missing) the weighbridge operator will record the driver’s name, vehicle weight and
registration before raising the barrier and will direct the driver to the holding area. The
weighbridge operator will then carry out enquiries to determine whether the vehicle
should be authorised by obtaining more details.
On entering the Site, the vehicles will be directed onto a one-way system. Cars will be
separated from the RCVs and bulkers at the Site roundabout. Signage and road
markings as described in Traffic Sign Regulations and General Directions 2002 will be
implemented throughout the Site to help establish clear priority for vehicles at
junctions and ensure safe navigation of the Site.
A traffic light system on the tipping hall doors will also be used to control the traffic
entering the tipping hall.
For vehicles delivering consumables, the drivers will be sent into the relevant area for
off-loading by the weighbridge clerk.
Hertfordshire County CouncilResidual Waste ContractClose of ContractMS6 – Facilities and Contract ManagementConfidential 132
On leaving the Site, a similar procedure will be followed: after pulling onto the ‘out’
weighbridge a red light will show and the barrier will be closed. The driver will then
use the fob/barcode once more and a weighbridge ticket will be issued to the driver.
When the driver takes the ticket, a green light will show, the barrier will be raised and
the vehicle will be allowed to leave the Site.
Procedure for using the welfare facilities
The Facility will be provided with welfare facilities for the use by drivers and crews
delivering Contract Waste
Prior to weigh in, drivers who want to drop in members of crew or wish to use the
welfare facilities will be required to park in the designated area, before the
weighbridge office. Once the use of the welfare facilities has been completed the
driver will proceed to the Facility. Crew changes will only be allowed outside the
weighbridges so that it does not affect the tare weight of the vehicles. The pedestrian
route taken by the crew is illustrated in figure 12 below:
Hertfordshire County CouncilResidual Waste ContractClose of ContractMS6 – Facilities and Contract ManagementConfidential 133
Figure 6.12 Vehicle and pedestrian access for using welfare facilities (gate house)
Haulage Arrangement for Waste during Diversion from the Facility
In the event that Contract Waste cannot be received at the Facility when closed for
maintenance or other shutdowns the Contractor will request that Waste hauled by the
Authority from the transfer stations be diverted to the contingent facility. Where the
WCAs direct deliver Contract Waste the Contractor will continue to receive Waste at
the Facility and if necessary transfer the waste to the contingency facility by
articulated haulage vehicles. The Contractor will load the articulated haulage vehicles
in the tipping hall using a loading shovel.
During this time, the vehicles required would be drawn from the Contractor’s existing
fleet or Sub-Contractors as the workload does not justify the provision of a dedicated
fleet.
Hertfordshire County CouncilResidual Waste ContractClose of ContractMS6 – Facilities and Contract ManagementConfidential 134
Type of Vehicles to be Engaged in the Operation
The Contractor anticipates the vehicle types in Table 6.11 will be engaged in the
provision of the Services. It should be noted that the Contractor will not own or
operate these vehicles, with the exception of the shovel loader. As a result, the listing
in table 6.14 is not exhaustive; other vehicles may be engaged in the provision of the
service (e.g. Sweepers).
Table 6.11 Vehicle Type Engaged in the Provision of the Service
Note: Contract Waste will be delivered by the Authority and the WCAs, Third Party
Waste will be delivered by others, the reprocessor will collect the metals and the
suppliers will deliver the FGT reagents.
The Contractor will be proactive in its fleet management to ensure that when new
vehicles are leased or bought, they include the latest EURO 5 specification engines
(and EURO 6 when introduced), to ensure optimum fuel efficiencies. Additionally, low
noise emissions and white noise reversing alarms will be selection requirements
during the vehicle procurement process. A similar approach with regard to fuel and
noise emissions will be used for all company cars and vans purchased under the
Contract. The Contractor will also influence Sub-Contractors involved in transporting
process materials from the Facility to implement sustainability initiatives. Such
initiatives, relevant to both the Contractor’s and Sub-Contractor’s fleet management,
will include the following:
Requiring vehicles to be maintained to a high operational standard and
efficiency;
Vehicle Type Max Payload Payload Type
RCV 10 tonnes Contract Waste and Third Party
Waste deliveries
Rigid bulk haulage (tipper,
hook lift containers)
16 tonnes Bottom ash and metal transfers
Articulate bulk haulage
Tipper
Walking floor
Ejector
24 tonnes Bottom ash transfer
Contract Waste and Third Party
Waste delivery/transfer
Metal collection, Contract Waste
and Third Party Waste
delivery/transfer
Articulated tanker 24 tonnes FGT reagents (Urea, Lime Activated
Carbon)
Shovel loader Waste/ash/metal loading
Hertfordshire County CouncilResidual Waste ContractClose of ContractMS6 – Facilities and Contract ManagementConfidential 135
Considering a continuous programme of driver training, including driving
techniques, to help reduce fuel consumption and associated vehicle
emissions;
Investigating the use of bio-fuel for the vehicle fleet; and
Maximising payload efficiency.
The Contractor will maintain all its vehicles to a high operational standard and
efficiency. This will be achieved through a regular maintenance programme. An
efficient working fleet may also help to reduce noise from the vehicles and minimise
vibration.
Training for Personnel will be available, such as the one day safe and fuel efficient
driving (SAFED) training or similar. This training will help to reduce fuel consumption
and associated vehicle emissions.
The Contractor will seek to maximise payload efficiencies for all vehicles leaving the
Facility, to minimise the number of trips required and, therefore, the total distances
travelled. Maximising payload efficiency will help reduce the number of vehicle trips,
thus contributing to reducing congestion, noise and carbon emissions. The Contractor
will also ensure that journey routes are well defined and that distances travelled are
minimised whilst selecting the most efficient road route. Every effort will be made to
ensure that the number of miles travelled per tonne of Contract Waste treated is kept
to a minimum. More details of the indicative routes and distances are provided in
sections 2.14.3, 4 and 5 above.
Site Signage and Notices
The Contractor’s philosophy is that signage should be clear and concise; signs should
be used in moderation to communicate key instructions.
Site entry signage will be laid out in the Contractor’s corporate format. The Contractor
will be open to discussions with the Authority regarding any further signage
requirements and in particular the use of the Contractor and the Authority’s logos
together.
Proposed Plant/Site Entry Signs
The Contractor will provide a main Site entry sign providing basic Site information.
Site details will include the following:
Office address;
Waste management licence number;
PPC/Environmental Permit number;
Hertfordshire County CouncilResidual Waste ContractClose of ContractMS6 – Facilities and Contract ManagementConfidential 136
The Contractor head office address;
Local Environment Agency contact details;
Facility opening hours for Waste reception; and
Basic Site safety signs.
Example Facility signs are provided in Figure 6.13 and Figure 6.14 below.
Figure 6.13 Example Sign: Portsmouth ERF
Figure 6.14 Example Sign: Derby Waste Transfer Station
Additional signage will be provided to ensure that visiting pedestrians and vehicles
enter the Site safely. Example signs for pedestrians’ access from Sheffield ERF and
Derby Waste Transfer Station are provided in Figure 6.15.
Hertfordshire County CouncilResidual Waste ContractClose of ContractMS6 – Facilities and Contract ManagementConfidential 137
Figure 6.15 Example Pedestrian Access Signs
Traffic Signs
The Contractor will provide on-site signage to address two principal aims as follows:
The safe and efficient movement of vehicles around the Site; and
The instruction of health and safety requirements.
The signage for the safe movement of vehicles around the Site will be provided
through a mixture of fixed metal signs and road markings in accordance with the
Traffic Sign Regulations and General Directions 2002 in order to improve recognition.
Example signs for ensuring safe movement of vehicles around the Site are provided in
Figure 6.16.
Figure 6.16 Example Sign Directing Traffic
The Contractor will define the exact nature of the signage as the design of the Facility
develops towards the submission of the planning application. The Contractor will
consider a range of issues on the Site, including the size of vehicles (and hence their
manoeuvring space), and driver visibility.
Hertfordshire County CouncilResidual Waste ContractClose of ContractMS6 – Facilities and Contract ManagementConfidential 138
In addition, the Contractor will consider the demographics of drivers.
At the Contractor’s Landfill sites in Essex, a high number of drivers with English as a
second language use the Site. As a result, site safety information is now provided in a
number of common languages, including French, German and Polish, as shown in
Figure 6.17.
Figure 6.17 The Contractor Foreign Languages Signs at Pitsea Landfill
Off-Site Signage
Where required, the Contractor will provide suitable advance signage for the Facility
on the public highway. The Contractor will agree this signage in consultation with the
Local Highway Authority. An example of a current off-site sign is shown in Figure 6.18.
Figure 6.18 The Contractor off-Site signage example
Hertfordshire County CouncilResidual Waste ContractClose of ContractMS6 – Facilities and Contract ManagementConfidential 139
Waste Transport Plan
Tables 13 and 14 provide the anticipated annual and daily vehicle movements arising
from the delivery of Contract and non Contract Waste to the Facility as well as the
collection of residues, Personnel and visitor movements and other (e.g. office),
deliveries for the Contract Year 2015/16. The Contractor’s solution balances the
Facility capacity using Commercial Waste. As the Authority’s Waste flow grows, the
level of Contract Waste will increase, thereby resulting in a reduction in the
Commercial Waste inputs (and hence vehicle numbers), and as such this represents
the period of maximum anticipated vehicle movements
This information is based on the Authority’s Waste flow forecast (issued in the ISFT
tender documents), coupled with The Contractor’s proposed technical solution (of an
MPT sized to approximately 300,000 tonnes per annum, and an ERF sized at 350,000
tonnes per annum).
Underpinning this analysis are assumed vehicle types/bulking efficiencies, assumed
operational week cycles, and estimated products/residues volumes, based on known
operational performance.
This analysis assumes the following:
Authority RCV’s for direct delivery – 8 tonne payload, with full utilisation
on Mondays-Fridays, and ¾ utilisation on Saturdays;
Authority bulkers for delivery via transfer stations - 20 tonne payload,
with full utilisation on Mondays-Fridays, and ¾ utilisation on Saturdays;
Authority RoRos for delivery of Waste from HWRCs – 5.5 tonne
payload, delivering 1/8th of the weekly Waste per day Mondays-
Saturdays, and 2/8th on Sundays;
Commercial RCVs for direct delivery – 8 tonne payload, with full
utilisation on Mondays-Fridays, and ¾ utilisation on Saturdays;
Recyclate bulkers removing product from the Facility - 20 tonne payload,
Mondays-Fridays only, volume based on 5% of MPT processed Waste;
Bottom ash bulkers removing processed product from the Facility - 27
tonne payload, Mondays-Fridays only, volume based on 23% ERF
processed Waste;
FGTR bulkers removing FGTR from the Facility - 20 tonne payload,
Mondays-Fridays only, based on 3.5% ERF processed Waste;
Hertfordshire County CouncilResidual Waste ContractClose of ContractMS6 – Facilities and Contract ManagementConfidential 140
Other consumables inputs - 20 tonne payload, Mondays-Fridays only,
based on 1% ERF processed Waste;
Staff transport – worst case scenario, assuming all Personnel use
private transport, one vehicle per staff member;
Visitors – assumed average of 2 visitors/day, Monday-Friday only; and
Other Deliveries – e.g. Post Office deliveries, assumed as 1/day,
Monday-Saturday.
Table 6.12 Estimated Annual Vehicle Deliveries (2016)
Vehicle Type Payload Tonnage
Number of
Deliveries per year
(2015/16)
Authority RCVs 8.0 tonnes/load 109,108 13,639
Authority bulkers from transfer
stations20.0 tonnes/load 140,524 7,027
Authority RoRos 5.5 tonnes/load 31,637 5,753
Commercial RCVs 8.0 tonnes/load 98,595 12,325
Recyclate bulkers 20.0 tonnes/load 28,978 1451
Bottom ash bulkers 27.0 tonnes/load 73,223 2,712
FGTR bulkers 22.0 tonnes/load 11,143 507
Other consumables haulage 20.0 tonnes/load 3,184 160
Other (Personnel, Visitors Etc) 10,036
Total including Contract Waste 51,028
Total excluding Contract Waste 24,609
Table 6.13 Estimated Daily Vehicle Deliveries (2016)
Vehicle typeDays Per
Week
Monday to
FridaySaturday Sunday
Authority RCVs 5.75 46 35 0
Authority bulkers 5.75 24 18 0
Authority RoRos 7 14 14 28
Inputs
Commercial
RCVs5.75 41 32 0
Recyclate
bulkers5 6 0 0
Bottom ash
bulkers5 10 0 0
FGTR bulkers 5 2 0 0
Outputs
Other
Consumables5 1 0 0
Other Personnel 32 16 16
Hertfordshire County CouncilResidual Waste ContractClose of ContractMS6 – Facilities and Contract ManagementConfidential 141
Vehicle typeDays Per
Week
Monday to
FridaySaturday Sunday
Visitors 2 0 0
Other (e.g. office
deliveries)1 1 0
Total 167 111 44
Personnel peaks are likely to involve equally spaced vehicle numbers from ½ hour
before to ½ hour after shift change times. It has been noted that Authority RCVs will
peak around 10-11am and Authority bulkers to peak around 3-4pm. The proposed
shift pattern for employees at the Facility (two 12 hour shifts changing at 07:00 and
19:00), will not coincide with opening and closing times (and therefore anticipated
peak hours), for the adjacent school.
Type of Vehicles to be engaged in the Operation
As explained in the sustainable travel plan and traffic management (Method
Statement 5), the Contractor anticipates the vehicle types in Table 6.14 will be
engaged in the provision of the Services. It should be noted that the Contractor will
not own or operate these vehicles, with the exception of the shovel loader. As a result,
the listing in table 6.14 is not exhaustive; other vehicles may be engaged in the
provision of the service (e.g. sweepers).
Table 6.14 Main Vehicle Types Engaged in the Provision of the Service
Prevent Undue Impact from Vehicles upon Highways
The development of the Facility in association with the road based transport
optimisation and route optimisation discussed above is not anticipated to result in a
Vehicle Type Max Payload Payload Type
RCV 10 tonnes Contract Waste and Third Party
Waste deliveries
Rigid bulk haulage (tipper, hook lift
containers)
16 tonnes Bottom ash and metal transfers
Articulate bulk haulage
Tipper
Walking floor
Ejector
24 tonnes (27 for
Bottom ash)
Bottom ash, paper and plastic
transfer
Contract Waste and Third Party
Waste delivery/transfer
Metal collection, Contract
Waste and Third Party Waste
delivery/transfer
Articulated curtain sider 24 tonnes Bailed recyclates
Articulated tanker 24 tonnes APC reagents (Urea, Lime
Activated Carbon), FGTR
Shovel loader Waste/ash/metal loading
Hertfordshire County CouncilResidual Waste ContractClose of ContractMS6 – Facilities and Contract ManagementConfidential 142
significant impact on the local road network or traffic. A full and detailed transport
assessment will be carried out under the environmental impact assessment works
undertaken as part of the planning application for the Facility.
The Contractor will implement the following measures to prevent undue impact from
vehicles upon highways surrounding the Facility:
Ensure that the vehicle used as part of the Contract will be inspected,
serviced and maintained in accordance with the manufacturer’s
recommendations;
The generation of mud, dust and detritus within the Site, and
subsequent transfer of such onto the public highway, will be minimised
by the implementation of the following:
– Internal Site roads will be hard surfaced and routinely maintained;
– During dry conditions, appropriate dust suppression techniques will
be used on Site (e.g. mobile bowser) on internal roads, yard areas
etc; and
– The main access road will be swept routinely with a mechanical road
sweeper (more frequently during dry conditions).
All vehicles transporting Waste or other materials to/from the Facility will
be adequately sheeted or the Waste/materials otherwise contained (e.g.
by netting or within secure containers); vehicles will not be permitted to
exit the Site onto the public highway before loads are adequately
contained;
The transport assessment (to be undertaken at a later stage in the
process) will identify the preferred routing for HGVs travelling to and
from the Facility; routing will focus traffic on the primary highway network
and will avoid the use of unsuitable roads (e.g. either in terms of width,
construction or alignment);
All drivers will be required to comply with specified delivery routes and
rules; and
Vehicles carrying products/residues from the Facility will be weighed on
the weighbridge, to ensure they are not overloaded before leaving the
Site. Responsibility for this will rest with the weighbridge operator.
Hertfordshire County CouncilResidual Waste ContractClose of ContractMS6 – Facilities and Contract ManagementConfidential 143
6.7.3 Site Signage
The Contractor’s philosophy is that signage should be clear and concise; signs should
be used in moderation to communicate key instructions.
6.8 ADDITIONAL INFORMATION
Please refer to Attachment MS6 8 for details about the resources that have been
dedicated to this Project.