MS 1099 0002 Concrete Repair

download MS 1099 0002 Concrete Repair

of 8

Transcript of MS 1099 0002 Concrete Repair

  • 7/24/2019 MS 1099 0002 Concrete Repair

    1/8

    LINDE AG - GAS AND ENGINEERING

    CONSOLIDATED

    CONTRACTORS CO.

    AL JUBAIL HAYCO AMMONIA PLANT

    PROJECT NO.: 2410 A049

    PROJECT CODE: AL JUBAIL to

    METHOD

    STATEMENT

    FOR

    CONCRETE REPAIR

    111S 1099 0002

    comments:

    Opt.:

    Name:

    nit JJf1 f GRf.illP:

    , ) 2 .0 $% ~ 4 > ' ' - k = ,

    ~ t ~

    SITE MASTER

    SA oD ~

    T

    1 3 AUG

    2 13

    Date:

    eee -

    DeG

    JHP PROJECT

    LINDE AG - GAS AND ENGINEERING

    PO

    XO

    No further submission.

    Document accepted as final.

    Incorporate comments and

    resubmit document.

    Document not accepted and

    rejected.

    This

    review does

    not

    constiMe acceptance or a p p r o J ~ 1 of deSlgl

    details, calculatioos, analysis.

    test methods

    or t e n ~ s

    developed

    or

    selected by

    the

    supplier

    and does

    not

    eheve

    suppti6r from full collliiance

    with

    spedfications and

    contractual

    obliaations.

    Linde Engineering Middle East

    Dale: 12. Aug 2013 Dept _E_N_D

    Name:

    Binu

    Kumar

    o

    Issued for

    Review

    Approval

    Rev Desrription

    Page 1

    of

    AI

    JUBAIL HYCO / AMMONIA PLANT

    23.10.2012

    Date

    Prepared

    By

    Checked

    By

    Verified By

  • 7/24/2019 MS 1099 0002 Concrete Repair

    2/8

    1

    2

    3

    4

    5

    6

    7

    8

    Page 2 of

    LINDE

    AG GAS

    AND

    ENGINEERING

    CONSOLIDATED CONTRACTORS CO.

    AL JUBAIL HAYCO/AMMONIA

    PLANT

    PROJECT NO : 2410 A049

    PROJECT

    CODE JUBAIL 10

    INDEX

    PURPOSE

    SCOPE

    DEFINITIONS

    REFERENCE DOCUMENTS

    RESPONSIBILITIES

    PROCEDURES

    RESOURCES

    SAFETY

    WI i umit

    6f?I;,\iVr:

    W d M f l l i l % w & : ~ ~ * = ~ ; ;

  • 7/24/2019 MS 1099 0002 Concrete Repair

    3/8

    fHf tmf;l'f:

    ( ~ R O U V

    LINDE AG - GAS AND ENGINEERING

    I

    CONSOLIDATED

    CONTRACTORS CO.

    LJUB IL

    HAYCO/AMMONIA PLANT

    PROJECT NO.: 2410 A049

    PROJECT CODE : LJUB IL

    1

    1.0 Purpose

    The purpose of this Method Statement is to set guidelines and

    methodology to be followed while repairing poured Concrete.

    2.0 Scope

    j % 0 ~

    'h 7

    ~ i : t e

    This method statement covers all works related to concrete repair in the

    JUABIL HJyCO AMMONIA project unless their very special cassis is not

    covered in 'this method.

    3.0

    Responsibilities

    3.1

    Construction Manager - To ensure that all work is executed as per

    Project procedure, standard, and specification. Also he should make

    sure that all project SADARA safety requirements are applied during

    construction.

    3.2 Site or section engineer - Responsible for the implementation of

    This procedure as describe in this method

    and

    to mange, coordinate all

    Activates / . ,

    3.3 Site Foreman - Responsible for the execution and site control of the

    works

    on

    site.

    3.4 QC Engineer - Responsible to ensure that all activities are carried out as

    per the QC reqUirements of the project.

    3.5 HSE Engineer - Responsible to ensure that all activities are carried out

    safely and in compliance with SADARA regulations and the project

    safety procedures. Also he is responsible to make sure that all permits

    are obtained for any activity as SADARA requirements.

    4.0

    Definitions

    4.1- Clint: LINDE AG - GAS ENGINEERING

    4.2 Contractor: CONSOLIDATED Contractor Company

    4.3 JHAP: JUBAIL HYCO\ AMMONIA PLANT PROJECT

    5.0

    REFERENCES

    Page 3 of

    5.1 AA-C-ZA-10001,001 STANDERD DRAWING CIVIL WORK

    5.2 CCC-Q-PA-1230(QCP-1099-230) Quality Control plan for

    Concrete work

    5.4 CCC-Q-PB-1233(ITP-1099-233) lTP FOR CONCRETE WORK

  • 7/24/2019 MS 1099 0002 Concrete Repair

    4/8

    LINDE AG - GAS AND ENGINEERING

    CONSOLIDATED

    CONTRACTORS CO.

    AL JUBAIL HAYCO/AMMONIA PLANT

    PROJECT NO.: 2410 A 49

    PROJECT CODE: ALJUBAIL 10

    HU:

    UM1.HtHWr-

    ,;

  • 7/24/2019 MS 1099 0002 Concrete Repair

    5/8

    Page 5 ofa

    l

    { PUtt j t O U f

    LINDE AG - G S ND ENGINEERING

    CONSOLID TED CONTR CTORS CO.

    iiMttK@ f.:;j , Y.->", {

    AL JUBAIL

    HAYCO/AMMONIA

    PLANT

    PROJECT

    NO : 2410 A049

    10

    If major honeycombs apparent on any orientation

    and

    the

    reinforcement are exposed:

    1

    Break out the area until a sound homogenous substrate

    has been reached.

    2

    Wash the substrate with potable water to remove all dust

    deposits.

    3 Make sure the reinforcement is clean and paint it with

    Zinc-Rich epoxy bonding agent for

    all

    rebar sides.

    4

    Develop a form system which permits placement from

    the

    top of the void with the form extending above the void by

    at least a few inches.

    5 Apply a shrinkage controlled fluid micro-concrete

    continuously Roding to ensure a sound placement.

    The

    concrete shall be placed to extend above the void area.

    6

    Upon initial set remove the form and chip excess

    concrete from the repaired surface.

    7 Cure the repaired area for 48 hours.

    Honey Comb

    Provide

    Undercut

    for Key

    Form

    Extended

    Above Void

  • 7/24/2019 MS 1099 0002 Concrete Repair

    6/8

    Page 6 of8

    n ~ t

    umt

    l l l t w P

    LINDE AG - GAS AND ENGINEERING

    CONSOLIDATED CONTRACTORS CO.

    _0 '* r l , , * ~ ~ , , * , ~ ~

    6.3 Cracks

    AL

    JUBAIL HAYCO/AMMONIA PLANT

    PROJECT NO : 2410 A049

    PROJECT CODE AL JUBAIL 10

    - for minor (surface) cracks, repair

    will

    be as follow:

    1. Cracks equal to or less than O.2mm (Hair crack) which

    are the capillary cracks will not need any repair

    2. Cracks more than 0.2mm and less than 0.5mm (line

    crack) will be repaired by open the crack using the

    grinder.

    3. Cracks between 0.5 and

    3mm

    the crack should be

    opened

    in

    V shape.

    4. Wash the substrate with potable water to remove all dust

    deposits

    5. Thoroughly soak the substrate with potable water

    approximately one hour prior to application of repair.

    6. Apply approved material of fine non-shrinkage grout.

    7. Cure the repaired area for 48 hours.

    -

    for major

    (deep) cracks, repair will be as follow:

    Deep cracks shall be studied on a case by case basis and the

    corrective plan shall be proposed and agreed with LINDE prior

    to commencement of work at site

    6 4closing tie rod hole's concrete

    1. Remove the plastic cones.

    2.

    Thoroughly soak the hole with potable water

    approximately one hour prior to application of non

    shrinkage grout and cement mortar.

    3. Apply cement mortar in the middle and non-shrinkage

    grout in the edges of a depth of 20mm.

    4.

    Compact the cement mortar into the tie rod hole by

    trowel, and finish with a steel trowel.

    5. Cure the exposed surface area for 48 hours.

    \.

    CEMENT NON-SHRINKAGE

    MORTAR GROUT

  • 7/24/2019 MS 1099 0002 Concrete Repair

    7/8

    Page 7 of 8

    LINDE AG -

    GAS

    AND ENGINEERING

    CONSOLIDATED CONTRACTORS CO.

    AL JUBAIL HA YCO/AMMONIA PLANT

    PROJECT

    NO : 2410 A049

    PROJECT CODE AL JUBAIL 10

    6.5 Repair the edge

    of joint

    1. Detect poor finished surface and mark it.

    f ~ H < m t t

    ~ a o t i i

    am'

  • 7/24/2019 MS 1099 0002 Concrete Repair

    8/8

    LINDE AG

    - GAS AND ENGINEERING

    CONSOLIDATED CONTRACTORS

    CO.

    AL

    JUBAIL

    HAyeO/AMMONIA PLANT

    PROJECT NO : 2410 A049

    rHllIYlt1f: tRt):i,W

    @ r f f i M ~ =h

    c: iiiJLe

    7 0

    RESOURCES:

    Page 8

    of8

    7 1 Hand tools

    7.2 Manpower

    8.0 SAFETY

    Drill.

    Electrical mixer.

    Trowel.

    Hammer.

    Chisel.

    Supervisor/foreman

    Mason

    laborer.

    All materials shall be stored handled and used in a safe and proper

    manner and as advised by the material safety data sheet.

    Contents

    of

    Material safety data sheet for a certain product shall be

    explained to the workers in a Tool Box Talk prior to using this

    product.

    All personnel involved

    in

    the above activity shall follow the

    construction HSE Plans/Procedure as well as SADARA relevant

    HSE manuals.

    All safety measures defined in the relevant procedures shall be

    implemented.

    In case of contact with skin rinse with plenty

    of

    clean water then

    cleanse thoroughly with soap and water.

    In case

    of

    contact with eyes rinse immediately with plenty

    of

    clean

    water and seek medical advice.

    All personnel involved shall wear PPE.