LINDE AG - GAS AND ENGINEERING
CONSOLIDATED
CONTRACTORS CO.
AL JUBAIL HAYCO AMMONIA PLANT
PROJECT NO.: 2410 A049
PROJECT CODE: AL JUBAIL to
METHOD
STATEMENT
FOR
CONCRETE REPAIR
111S 1099 0002
comments:
Opt.:
Name:
nit JJf1 f GRf.illP:
, ) 2 .0 $% ~ 4 > ' ' - k = ,
~ t ~
SITE MASTER
SA oD ~
T
1 3 AUG
2 13
Date:
eee -
DeG
JHP PROJECT
LINDE AG - GAS AND ENGINEERING
PO
XO
No further submission.
Document accepted as final.
Incorporate comments and
resubmit document.
Document not accepted and
rejected.
This
review does
not
constiMe acceptance or a p p r o J ~ 1 of deSlgl
details, calculatioos, analysis.
test methods
or t e n ~ s
developed
or
selected by
the
supplier
and does
not
eheve
suppti6r from full collliiance
with
spedfications and
contractual
obliaations.
Linde Engineering Middle East
Dale: 12. Aug 2013 Dept _E_N_D
Name:
Binu
Kumar
o
Issued for
Review
Approval
Rev Desrription
Page 1
of
AI
JUBAIL HYCO / AMMONIA PLANT
23.10.2012
Date
Prepared
By
Checked
By
Verified By
-
7/24/2019 MS 1099 0002 Concrete Repair
2/8
1
2
3
4
5
6
7
8
Page 2 of
LINDE
AG GAS
AND
ENGINEERING
CONSOLIDATED CONTRACTORS CO.
AL JUBAIL HAYCO/AMMONIA
PLANT
PROJECT NO : 2410 A049
PROJECT
CODE JUBAIL 10
INDEX
PURPOSE
SCOPE
DEFINITIONS
REFERENCE DOCUMENTS
RESPONSIBILITIES
PROCEDURES
RESOURCES
SAFETY
WI i umit
6f?I;,\iVr:
W d M f l l i l % w & : ~ ~ * = ~ ; ;
-
7/24/2019 MS 1099 0002 Concrete Repair
3/8
fHf tmf;l'f:
( ~ R O U V
LINDE AG - GAS AND ENGINEERING
I
CONSOLIDATED
CONTRACTORS CO.
LJUB IL
HAYCO/AMMONIA PLANT
PROJECT NO.: 2410 A049
PROJECT CODE : LJUB IL
1
1.0 Purpose
The purpose of this Method Statement is to set guidelines and
methodology to be followed while repairing poured Concrete.
2.0 Scope
j % 0 ~
'h 7
~ i : t e
This method statement covers all works related to concrete repair in the
JUABIL HJyCO AMMONIA project unless their very special cassis is not
covered in 'this method.
3.0
Responsibilities
3.1
Construction Manager - To ensure that all work is executed as per
Project procedure, standard, and specification. Also he should make
sure that all project SADARA safety requirements are applied during
construction.
3.2 Site or section engineer - Responsible for the implementation of
This procedure as describe in this method
and
to mange, coordinate all
Activates / . ,
3.3 Site Foreman - Responsible for the execution and site control of the
works
on
site.
3.4 QC Engineer - Responsible to ensure that all activities are carried out as
per the QC reqUirements of the project.
3.5 HSE Engineer - Responsible to ensure that all activities are carried out
safely and in compliance with SADARA regulations and the project
safety procedures. Also he is responsible to make sure that all permits
are obtained for any activity as SADARA requirements.
4.0
Definitions
4.1- Clint: LINDE AG - GAS ENGINEERING
4.2 Contractor: CONSOLIDATED Contractor Company
4.3 JHAP: JUBAIL HYCO\ AMMONIA PLANT PROJECT
5.0
REFERENCES
Page 3 of
5.1 AA-C-ZA-10001,001 STANDERD DRAWING CIVIL WORK
5.2 CCC-Q-PA-1230(QCP-1099-230) Quality Control plan for
Concrete work
5.4 CCC-Q-PB-1233(ITP-1099-233) lTP FOR CONCRETE WORK
-
7/24/2019 MS 1099 0002 Concrete Repair
4/8
LINDE AG - GAS AND ENGINEERING
CONSOLIDATED
CONTRACTORS CO.
AL JUBAIL HAYCO/AMMONIA PLANT
PROJECT NO.: 2410 A 49
PROJECT CODE: ALJUBAIL 10
HU:
UM1.HtHWr-
,;
-
7/24/2019 MS 1099 0002 Concrete Repair
5/8
Page 5 ofa
l
{ PUtt j t O U f
LINDE AG - G S ND ENGINEERING
CONSOLID TED CONTR CTORS CO.
iiMttK@ f.:;j , Y.->", {
AL JUBAIL
HAYCO/AMMONIA
PLANT
PROJECT
NO : 2410 A049
10
If major honeycombs apparent on any orientation
and
the
reinforcement are exposed:
1
Break out the area until a sound homogenous substrate
has been reached.
2
Wash the substrate with potable water to remove all dust
deposits.
3 Make sure the reinforcement is clean and paint it with
Zinc-Rich epoxy bonding agent for
all
rebar sides.
4
Develop a form system which permits placement from
the
top of the void with the form extending above the void by
at least a few inches.
5 Apply a shrinkage controlled fluid micro-concrete
continuously Roding to ensure a sound placement.
The
concrete shall be placed to extend above the void area.
6
Upon initial set remove the form and chip excess
concrete from the repaired surface.
7 Cure the repaired area for 48 hours.
Honey Comb
Provide
Undercut
for Key
Form
Extended
Above Void
-
7/24/2019 MS 1099 0002 Concrete Repair
6/8
Page 6 of8
n ~ t
umt
l l l t w P
LINDE AG - GAS AND ENGINEERING
CONSOLIDATED CONTRACTORS CO.
_0 '* r l , , * ~ ~ , , * , ~ ~
6.3 Cracks
AL
JUBAIL HAYCO/AMMONIA PLANT
PROJECT NO : 2410 A049
PROJECT CODE AL JUBAIL 10
- for minor (surface) cracks, repair
will
be as follow:
1. Cracks equal to or less than O.2mm (Hair crack) which
are the capillary cracks will not need any repair
2. Cracks more than 0.2mm and less than 0.5mm (line
crack) will be repaired by open the crack using the
grinder.
3. Cracks between 0.5 and
3mm
the crack should be
opened
in
V shape.
4. Wash the substrate with potable water to remove all dust
deposits
5. Thoroughly soak the substrate with potable water
approximately one hour prior to application of repair.
6. Apply approved material of fine non-shrinkage grout.
7. Cure the repaired area for 48 hours.
-
for major
(deep) cracks, repair will be as follow:
Deep cracks shall be studied on a case by case basis and the
corrective plan shall be proposed and agreed with LINDE prior
to commencement of work at site
6 4closing tie rod hole's concrete
1. Remove the plastic cones.
2.
Thoroughly soak the hole with potable water
approximately one hour prior to application of non
shrinkage grout and cement mortar.
3. Apply cement mortar in the middle and non-shrinkage
grout in the edges of a depth of 20mm.
4.
Compact the cement mortar into the tie rod hole by
trowel, and finish with a steel trowel.
5. Cure the exposed surface area for 48 hours.
\.
CEMENT NON-SHRINKAGE
MORTAR GROUT
-
7/24/2019 MS 1099 0002 Concrete Repair
7/8
Page 7 of 8
LINDE AG -
GAS
AND ENGINEERING
CONSOLIDATED CONTRACTORS CO.
AL JUBAIL HA YCO/AMMONIA PLANT
PROJECT
NO : 2410 A049
PROJECT CODE AL JUBAIL 10
6.5 Repair the edge
of joint
1. Detect poor finished surface and mark it.
f ~ H < m t t
~ a o t i i
am'
-
7/24/2019 MS 1099 0002 Concrete Repair
8/8
LINDE AG
- GAS AND ENGINEERING
CONSOLIDATED CONTRACTORS
CO.
AL
JUBAIL
HAyeO/AMMONIA PLANT
PROJECT NO : 2410 A049
rHllIYlt1f: tRt):i,W
@ r f f i M ~ =h
c: iiiJLe
7 0
RESOURCES:
Page 8
of8
7 1 Hand tools
7.2 Manpower
8.0 SAFETY
Drill.
Electrical mixer.
Trowel.
Hammer.
Chisel.
Supervisor/foreman
Mason
laborer.
All materials shall be stored handled and used in a safe and proper
manner and as advised by the material safety data sheet.
Contents
of
Material safety data sheet for a certain product shall be
explained to the workers in a Tool Box Talk prior to using this
product.
All personnel involved
in
the above activity shall follow the
construction HSE Plans/Procedure as well as SADARA relevant
HSE manuals.
All safety measures defined in the relevant procedures shall be
implemented.
In case of contact with skin rinse with plenty
of
clean water then
cleanse thoroughly with soap and water.
In case
of
contact with eyes rinse immediately with plenty
of
clean
water and seek medical advice.