MRPL ONGC
-
Upload
national-institute-of-technology-surathkal -
Category
Business
-
view
34 -
download
0
description
Transcript of MRPL ONGC
![Page 1: MRPL ONGC](https://reader036.fdocuments.in/reader036/viewer/2022070301/546814bbaf7959a2358b46fd/html5/thumbnails/1.jpg)
Mangalore Refinery and Petrochemicals Ltd.Mangalore Refinery and Petrochemicals Ltd.Mangalore Refinery and Petrochemicals Ltd.Mangalore Refinery and Petrochemicals Ltd.
Mangalore Refinery and Petrochemicals
Limited
![Page 2: MRPL ONGC](https://reader036.fdocuments.in/reader036/viewer/2022070301/546814bbaf7959a2358b46fd/html5/thumbnails/2.jpg)
Mangalore Refinery and Petrochemicals Limited
BRIEF HISTORY
Founded as Joint sector refinery by HPCL and A.V.Birla group in 1987
Located at the west coast of Karnataka ONGC took over in Mar’03 Phase-1 Refinery was commissioned during March
1996 Phase-2 Refinery was commissioned during
September 1999
![Page 3: MRPL ONGC](https://reader036.fdocuments.in/reader036/viewer/2022070301/546814bbaf7959a2358b46fd/html5/thumbnails/3.jpg)
Mangalore Refinery and Petrochemicals Limited
Vision Statement
• “To be a world-class Refining & Petrochemicals Company, with a strong emphasis on Productivity, Customer Satisfaction, Safety, Health & Environment Management, Corporate Social Responsibility and Care for Employees”
![Page 4: MRPL ONGC](https://reader036.fdocuments.in/reader036/viewer/2022070301/546814bbaf7959a2358b46fd/html5/thumbnails/4.jpg)
Mangalore Refinery and Petrochemicals Limited
MRPL – Equity Structure
![Page 5: MRPL ONGC](https://reader036.fdocuments.in/reader036/viewer/2022070301/546814bbaf7959a2358b46fd/html5/thumbnails/5.jpg)
Mangalore Refinery and Petrochemicals Limited
Physical Performance
5
12.5512.58 12.50 12.64 12.82 14.40
2007-08 2008-09 2009-10 2010-11 2011-12 2012-13
Crude throughput
Capacity Utilization for 2010-11 :107%
MMT
![Page 6: MRPL ONGC](https://reader036.fdocuments.in/reader036/viewer/2022070301/546814bbaf7959a2358b46fd/html5/thumbnails/6.jpg)
Mangalore Refinery and Petrochemicals Limited
Financial Performance
2007-08 2008-09 2009-10 2010-11 2011-12 2012-13
12721193
1112 1177
909 757
Rs Crore
In Crores
![Page 7: MRPL ONGC](https://reader036.fdocuments.in/reader036/viewer/2022070301/546814bbaf7959a2358b46fd/html5/thumbnails/7.jpg)
Mangalore Refinery and Petrochemicals Limited
Current Process Configuration
![Page 8: MRPL ONGC](https://reader036.fdocuments.in/reader036/viewer/2022070301/546814bbaf7959a2358b46fd/html5/thumbnails/8.jpg)
Mangalore Refinery and Petrochemicals Limited
CRUDE UNITCRUDE UNIT
CAPACITY LICENSORPHASE-1 3.69 MMTPA EILPHASE-2 6.0 MMTPA EIL
![Page 9: MRPL ONGC](https://reader036.fdocuments.in/reader036/viewer/2022070301/546814bbaf7959a2358b46fd/html5/thumbnails/9.jpg)
Mangalore Refinery and Petrochemicals Limited
HYDROCRACKERHYDROCRACKER
CAPACITY LICENSORPHASE-1 1.0 MMTPA UOPPHASE-2 1.2 MMTPA UOP
![Page 10: MRPL ONGC](https://reader036.fdocuments.in/reader036/viewer/2022070301/546814bbaf7959a2358b46fd/html5/thumbnails/10.jpg)
Mangalore Refinery and Petrochemicals Limited
CCR-Platformer CCR-Platformer
CAPACITY LICENSORPHASE-1 0.36 MMTPA UOPPHASE-2 0.36 MMTPA UOP
![Page 11: MRPL ONGC](https://reader036.fdocuments.in/reader036/viewer/2022070301/546814bbaf7959a2358b46fd/html5/thumbnails/11.jpg)
Mangalore Refinery and Petrochemicals Limited
CAPACITY LICENSORPHASE-1 0.76 MMTPA ABB LUMUSPHASE-2 0.76 MMTPA ABB LUMUS
Visbreaker
![Page 12: MRPL ONGC](https://reader036.fdocuments.in/reader036/viewer/2022070301/546814bbaf7959a2358b46fd/html5/thumbnails/12.jpg)
Mangalore Refinery and Petrochemicals Limited
PHASE-1 34400 TPA KTIPHASE-2 34400 TPA KTI
Hydrogen Unit
![Page 13: MRPL ONGC](https://reader036.fdocuments.in/reader036/viewer/2022070301/546814bbaf7959a2358b46fd/html5/thumbnails/13.jpg)
Mangalore Refinery and Petrochemicals Limited
CAPACITY LICENSOR
PHASE-2 1.37 MMTPA TOYO
GOHDS
![Page 14: MRPL ONGC](https://reader036.fdocuments.in/reader036/viewer/2022070301/546814bbaf7959a2358b46fd/html5/thumbnails/14.jpg)
Mangalore Refinery and Petrochemicals Limited
ISOMERIZATION
Capacity LNHT – 2100 T/day
PENEX- 1500 T/DAY
Licensor - UOP
![Page 15: MRPL ONGC](https://reader036.fdocuments.in/reader036/viewer/2022070301/546814bbaf7959a2358b46fd/html5/thumbnails/15.jpg)
Mangalore Refinery and Petrochemicals Limited
MIXED XYLENE UNIT
Capacity – 2135 T/day
![Page 16: MRPL ONGC](https://reader036.fdocuments.in/reader036/viewer/2022070301/546814bbaf7959a2358b46fd/html5/thumbnails/16.jpg)
Mangalore Refinery and Petrochemicals Limited
Sulfur Recovery UnitSulfur Recovery Unit
CAPACITY LICENSORPHASE-1 35200 TPA KTIPHASE-2 70400 TPA KTI
![Page 17: MRPL ONGC](https://reader036.fdocuments.in/reader036/viewer/2022070301/546814bbaf7959a2358b46fd/html5/thumbnails/17.jpg)
Mangalore Refinery and Petrochemicals Limited
Kero Kerox UnitKero Kerox Unit
CAPACITY LICENSORPHASE-1 0.72 MMTPA UOPPHASE-2 1.15 MMTPA UOP
![Page 18: MRPL ONGC](https://reader036.fdocuments.in/reader036/viewer/2022070301/546814bbaf7959a2358b46fd/html5/thumbnails/18.jpg)
Mangalore Refinery and Petrochemicals Limited
BitumenUnitBitumenUnit
CAPACITY LICENSORPHASE-1 0.11 MMTPA PORNER
![Page 19: MRPL ONGC](https://reader036.fdocuments.in/reader036/viewer/2022070301/546814bbaf7959a2358b46fd/html5/thumbnails/19.jpg)
Mangalore Refinery and Petrochemicals Limited
70% treated effluent recycled on a continuous basis
Waste Water Treatment PlantWaste Water Treatment Plant
![Page 20: MRPL ONGC](https://reader036.fdocuments.in/reader036/viewer/2022070301/546814bbaf7959a2358b46fd/html5/thumbnails/20.jpg)
Mangalore Refinery and Petrochemicals Limited
STEAM GENERATION 7 BOILERS WITH A CAPACITY OF 980 TPH
STEAM TURBINES 5 STG’S WITH A CAPACITY OF 118.5 MW
POWER PLANT
![Page 21: MRPL ONGC](https://reader036.fdocuments.in/reader036/viewer/2022070301/546814bbaf7959a2358b46fd/html5/thumbnails/21.jpg)
Mangalore Refinery and Petrochemicals Limited
Refinery has laid Crude and product lines up to New Mangalore Port about 11 Kms away.
All weather port at Mangalore. Draft 14m. Fully laden ships with 245 m length can berth.
JETTY FACILITIES
![Page 22: MRPL ONGC](https://reader036.fdocuments.in/reader036/viewer/2022070301/546814bbaf7959a2358b46fd/html5/thumbnails/22.jpg)
Mangalore Refinery and Petrochemicals Limited
SPM – Mangala -1
![Page 23: MRPL ONGC](https://reader036.fdocuments.in/reader036/viewer/2022070301/546814bbaf7959a2358b46fd/html5/thumbnails/23.jpg)
Mangalore Refinery and Petrochemicals Limited
Fresh water from built-up weir at Nethravathi river about 43 Kms
away from the refinery.
Infrastructure
![Page 24: MRPL ONGC](https://reader036.fdocuments.in/reader036/viewer/2022070301/546814bbaf7959a2358b46fd/html5/thumbnails/24.jpg)
Mangalore Refinery and Petrochemicals Limited
24
Health & Safety Management
• The Oil Industry safety Directorate, MoP&NG, Govt. of India, adjudged MRPL as the Most Safe Refinery in last Three years
MRPL has achieved 1662 days of Accident free operation as of 20/01/2012.
![Page 25: MRPL ONGC](https://reader036.fdocuments.in/reader036/viewer/2022070301/546814bbaf7959a2358b46fd/html5/thumbnails/25.jpg)
Mangalore Refinery and Petrochemicals Limited
25
Environment Management
• Full-fledged Environment Management & Crisis Management Cell
working round-the clock
• 6 Nos of Ambient Air Quality stations installed (3 inside refinery
and 3 outside). AAQ Monitoring by NITK, Surathkal.
• More than 70% treated effluent recycled
• Bio-remediation to treat oily sludges.
![Page 26: MRPL ONGC](https://reader036.fdocuments.in/reader036/viewer/2022070301/546814bbaf7959a2358b46fd/html5/thumbnails/26.jpg)
Mangalore Refinery and Petrochemicals Limited
26
Corporate Social Responsibility
• MRPL doing yeoman service in the following areas :– Education– Health , Provision of Drinking Water– Infrastructure development & Sanitation– Welfare activities for SC/ST Development – Women Empowerment and Welfare– Project Displaced Peoples’ Rehabilitation
Colony
![Page 27: MRPL ONGC](https://reader036.fdocuments.in/reader036/viewer/2022070301/546814bbaf7959a2358b46fd/html5/thumbnails/27.jpg)
Mangalore Refinery and Petrochemicals Limited
27
Awards & Recognitions• MRPL rated as Number one Company in terms of turnover /employee
(BT 500 2009 edition)
• MRPL has won second place in Jawaharlal Nehru Centenary Award for Energy Performance of Refineries for 2009-10 in Group-1 category.
• The “Most safe refinery for 3 years” award from OISD
• Oil Industry Safety Award’ for 2nd Best Performer in Refineries for year 2008-09
• ICRA reaffirmed Issuer rating of “Ir AAA” for lowest credit risk 2008-09. CRISIL also reaffirmed their “Cr AAA” rating.
• NABL accreditation to QC lab-recertified
• Oil& Gas Conservation Award 2010’ for Furnace and Boiler Efficiency
• Best Exporter Award (Gold)-2010’ from Federation of Karnataka Chambers of Commerce & Industry
• MRPL -Rated ‘Excellent’ in MOU performance by ONGC for 2009-10.
![Page 28: MRPL ONGC](https://reader036.fdocuments.in/reader036/viewer/2022070301/546814bbaf7959a2358b46fd/html5/thumbnails/28.jpg)
Mangalore Refinery and Petrochemicals Limited
Phase-III Refinery Upgradation and Expansion project
Objectives– Expansion of Capacity to 15 MMTPA– Up-gradation of low value products to high value
products. – To process cheaper crudes ( Sour/ Heavy & High
TAN crudes)– Production of petrochemical feed stocks Viz.
Propylene and Polypropylene – Maximize distillate yield.– Upgrading entire HSD into BS III/IV grade
![Page 29: MRPL ONGC](https://reader036.fdocuments.in/reader036/viewer/2022070301/546814bbaf7959a2358b46fd/html5/thumbnails/29.jpg)
Mangalore Refinery and Petrochemicals Limited
New Projects
Units Capacity Licensors
CDU/VDU 3.0 MMTPA EIL
PFCC 2.2 MMTPA SHAW Stone webster
DCU 3.0 MMTPA ABB
DHT 3.7 MMTPA Axens
CHT 0.65 MMTPA UOP
HGU 70000 TPA Halder Topsoe
SRU 3 x 185 TPD Siirtec Nigi
Polypropylene 440 KTPA Novelen
CPP 122 MW/1250 TPH BHEL
![Page 30: MRPL ONGC](https://reader036.fdocuments.in/reader036/viewer/2022070301/546814bbaf7959a2358b46fd/html5/thumbnails/30.jpg)
Mangalore Refinery and Petrochemicals Limited
30
• Refinery produces more than 20% black-oils which does not add value
• The major product i.e., Diesel will not be able to meet Euro III/IV norms stipulated by GOI by March, 2010.
• Not able to use low-value high TAN crude.
• Large dependence on exports thereby exposed to competition from international refineries.
• Current economic slow down and reduction in demand leading to negative refining margins
The need for Expansion & modernisation
![Page 31: MRPL ONGC](https://reader036.fdocuments.in/reader036/viewer/2022070301/546814bbaf7959a2358b46fd/html5/thumbnails/31.jpg)
Mangalore Refinery and Petrochemicals Limited
31
Phase-III Refinery Upgradation and Expansion project
MR
PL
C
on
fig
ura
tio
n a
fter
Ph
ase-
III
Pro
ject
C
om
mis
sio
nin
g
![Page 32: MRPL ONGC](https://reader036.fdocuments.in/reader036/viewer/2022070301/546814bbaf7959a2358b46fd/html5/thumbnails/32.jpg)
Mangalore Refinery and Petrochemicals Limited
Thank you