Management Review Meeting
ISO 9001:2008Quality Management
SystemNovember 2014 -15
Pearl Confectionery (Pvt.) Ltd
Presented by: Syed Noor Mustafa Shah
Flow of Presentation
• Results of Internal Quality Audits (IQA-1/2014-15)
• Comparison of results of CARs of IQA-1/2014-15 with IQA-1/2013-14
• Results of Internal Audits (BRC-1/2014-15)• Results of Internal Audits (HALAL-1/2014-15)• Tentative Time of Quality Objectives 2014-15• Status of Compliance 2014-2015 Work Plan
Results of Internal Quality Audits (IQA-1/2014-15)
15/09/2014 to 22/09/2014
Results of Internal Quality Audits (IQA-1/2014-15)
ComplianceMajor CARs 0 Minor CARs 05 Observations 0
1. Procedure not followed for the MRM Meeting agenda2. No evidence found for internal audit team3. Master list of record not found with signature and control no 4. Procedure of coating & bubble still not updated5. Procedure not followed for the IQA Plan
Results of Internal Quality Audits (IQA-1/2014-15)
Quality AssuranceMajor CARs 0 Minor CARs 11 Observations 05
1. No data record sheet or log maintained for samples of incoming raw material2. No data record found for retained flavors and colors3. 1 & 2/sep/2014 QC sheets (in-process inspection sheets) of bubble department record not
available in file4. Document Control # missing in many forms including QC in-process inspection sheets5. MSO # 363, retention sample box shows two printed MSO on it which are MSO # 316 and MSO
# 3636. Traceability not proved for complaint raised by chocolate department on the spot during the
audit7. NC (IQA-1/13-14/QAD-01) repeats for refractor meter. "Refractor meter found not to be
calibrated since the day of its purchase8. NC (IQA-1/13-14/QAD-07) repeats. "In-process inspection sheets QA/FM-03 found to be irregular,
should be conducted after define time intervals9. Records of raw materials (Colors &Flavors) were not maintained10. In coming raw material first hold/then released, reason not mentioned in the report11. NCs from last audit QAD 01, QAD 02, QAD 03 & QAD 07, repeated12. Order conforming report has no document control # and also it is not filled properly13. Color printing is not per standard but the packaging material is accepted as there is no any
remarks mentioned 14. Color sample cabinet is lacking of cleanliness (housekeeping mop found in the cabinet) and
also found some tag were not pasted correctly15. Observation (IQA-1/13-14/QAD-03) repeats. "Incoming Inspection Report QA/FM-01" should
have printed acceptable limits for the items tested instead of manually entering16. Back process Inspection report was not a controlled document
Results of Internal Quality Audits (IQA-1/2014-15)
Research & DevelopmentMajor CARs 0 Minor CARs 06 Observations 03
1. FM 01 raw material submission form no signature is found of Director Purchase
2. PUR/FM 04 is found incomplete filled3. 20/07/2015 is found in new product development form4. No signatures are found in recipe of Milk Candy5. No data maintain of recipes of different product, last data updated
on 6/5/20146. New product development form is found without signature7. Export sample (product wise) is not updated8. Concept no. and receipt no. are not found in production trial
request form9. MSO 529 Submission forms reference no. missing on Goal Bubble
Results of Internal Quality Audits (IQA-1/2014-15)
Human ResourceMajor CARs 0 Minor CARs 06 Observations 06
1. Procedure is not available at the department on audit time. It was not available in last audit
2. Labour requirement working not updated and completed. 3. Procedure no 4 and 4b is not updated. 4. Appointment letter is not found in any employee file5. PCL/FM/11 is in procedure but not found in related Documents / Record
List6. PCL/FM-19-R00 not available in procedure7. Orientation Training Record is found without printing (PCL/HR/REC-006)8. Employee Joining Report is found without printing (PCL/HR/REC-007)9. Documentation check list is found without printing (PCL/HR/REC-001)10.Signature of HR / Admin Manager is not found in attendance sheet of
trainings11.0 and negative time (-25) are found in column of require time of
Requirement Cycle Time12.The transfer letter is not found in personal file of Mr. Rehman (Production
Officer)
Results of Internal Quality Audits (IQA-1/2014-15)
Production CandyMajor CARs 0 Minor CARs 06 Observations 03
1. NC Repeats. IQA-1/13-14/CAN-06 (work instruction of lollipop not found)2. NC repeats. IQA-1/13-14/CAN-01 (drain line open in service line and dirty water was
stack).3. Production sheets have different name other than mentioned in procedure.
(i.e. procedure production sheet candy line but in physical it is mentioned as Candy line activity log sheet
4. Production planning sheet pasted at production officer's office was of date 15-9-14, but till 11:30 there was no new planning was found pasted
5. Overall lack of housekeeping issue was observed on every section6. Production sheets are 2 sheets for each product category but having same and 1
control #. (i.e. Chew Line Easy fold Wrapping Activity Log Sheet and Chew and Easy fold Wrapping Activity Log Sheet having same control no. PROD-CNF/FM05
7. Cartons (Anjou caramel) found open and damaged in export warehouse at production candy department
8. On puller machine of Dr Milk worker directly contact.9. Candy line activity lode sheet PROD-CNF/FM03/R00 DATED12/09/2014 was found
unsigned except supervisor
Results of Internal Quality Audits (IQA-1/2014-15)
Production ChocolateMajor CARs 0 Minor CARs 05 Observations 05
1. Wash basins are found unclean and worst condition & sanitizer was also absent
2. Color jars found unlabelled3. PROD-CHOC/01 is not in practice and should be obsolete4. Weight scale calibration tag was expired and un readable5. CH-206 (Biscuits for Chincko) is found adjacent of un useable
scarab6. Finished Goods was stocked without pallets7. Fire extinguisher was not available at designated place8. Broom found in coating area9. PROD-CHOC/02, 04 and 05 not updating on controlled document10.Light of fly catcher was out of order
Results of Internal Quality Audits (IQA-1/2014-15)
Engineering General StoreMajor CARs 0 Minor CARs 10 Observations 05
1. Last audit report not found2. Procedure up gradation required also only one procedure was available3. Un awareness with obsolete vs control document as obsolete documents
are found in department4. Record control system completely collapse5. Physical stock of bearing 32310 found out by 2 each bearing is Rs. 40006. Physical stock of Belt A 51 found Short by 3 each belt is Rs. 697. Bearing and belt issued without M.I.R8. No define maximum and minimum limits of stock9. Supplier performance, supplier evaluation and supplier black listing found
missing10.Tender forms not filled of individual11.Un awareness with procedures applied in department12.Documents change record is found not updated13.Retention list found unavailable14.Control document no, need to be printed on documents15.Received stamp is not using on bill
Results of Internal Quality Audits (IQA-1/2014-15)
Engineering ElectricalMajor CARs 0 Minor CARs 06 Observations 01
1. No awareness about Quality Objective of department2. Procedure up gradation required also only one procedure was
available3. Machine history is not available4. Break down analysis is absent5. Machine Accident report analysis6. Currant calibration certificate of Asia Tec is not found7. In house calibration is not performed
Results of Internal Quality Audits (IQA-1/2014-15)
Engineering MaintenanceMajor CARs 0 Minor CARs 06 Observations 06
1. Approved preventive maintenance schedule found missing2. Incomplete listing of machines (depositor & Loly Pop + Chew Line
2) Manager agreeability over preventive maintenance work not found
3. Work Instruction not available in department or in file4. Calibration (Missing in major cases, Service line one weighing scale
having expired tag of calibration, Variation issue in multiple scales)5. Machine break down analysis6. Job Order analysis found missing7. Procedure required up gradation (Internal maintenance call
procedure ISO reference no is missing)8. Machine history sheet being maintain causally & ineffectively9. Retention list is not available10.Over all unhygienic condition is found11.Unaware with Quality Policy and unaware with procedure12.Procedure is not available in department
Results of Internal Quality Audits (IQA-1/2014-15)
Supply Chain Management R.M StoreMajor CARs 0 Minor CARs 05 Observations 09
1. NC Repeat (SCM-05) - "Procedure not available.“2. NC Repeat (SCM-06) - "Purchase order not available from purchase
department.“3. NC Repeat (SCM-07) - "ISO number not found on material requirement
document raised by production.“4. NC Repeat (SCM-10) - "Damaged wrapper found on floor.“5. NC Repeat (SCM-11) - "Over stacking of wrapper found in RM store stock
area.“6. Sign not found on GRN7. QA inspection is not per standard and procedure8. GRN and RGRN are received on same paper, it is not good practice9. Some flavors have no expiry date mentioned on it10.Dirty rack, and dust found on poly bags11.No segregation of gum base and poly bags at RM store stock area12.Dust found on wrapper13.Web cobs found in RM store14.Open wiring found in RM store
Results of Internal Quality Audits (IQA-1/2014-15)Supply Chain Management Ware House
Major CARs 0 Minor CARs 04 Observations 071. Procedure not found2. Delivery Challan control number is not matching with procedure3. NC Repeat (SCM-16) - "space not sufficient and FIFO not
maintained as no evidence found.“4. NC Repeat (SCM-17) - "finished goods transfer sheet STR/FM11 not
included in procedure.“5. No sign found on delivery Challan6. QRL (quality record list) not found in department7. ISO number (Control #) not mentioned on Sale return8. Training should be conducted for new comers on all QMS
mandatory procedures9. Finished goods should be stacked on pallets10.Damage cartons found in warehouse11.Rope found in warehouse
Results of Internal Quality Audits (IQA-1/2014-15)
Supply Chain Management M.MMajor CARs 0 Minor CARs 03 Observations 02
1. NC Repeat (SCM-01) - "sales forecast is received for 2 months instead of quarterly“
2. NC Repeat (SCM-02) - "Export order forecast not found.“3. NC Repeat (SCM-04) - "ISO number (Control #) not mentioned on
min/max level sheet.”4. ISO number (Control #) not mentioned on Sale forecast5. QRL (quality record list) not found in department
Results of Internal Quality Audits (IQA-1/2014-15)
Production BubbleMajor CARs 0 Minor CARs 07 Observations 06
1. Material requisition is sent via email (excel sheet) instead of Material requisition form STR/FM 10 as per draft procedure
2. Materials received via same email (excel sheet) print out along with Material Transfer from store instead of factory requisition but control # is ok
3. Daily Stock Sheet (packaging) and Finished goods sheet are merged and named as "Export Finished Good Stock" and "Local Finished Good Stock" and also no control # is mentioned on it
4. Daily Stock Sheet (back process) is named as "Daily coated mass report" and also no control is mentioned on it
5. No maintenance work is recorded in Maintenance Register, PCL/BUB-REG01 only the document "internal maintenance call" is used to raise the complaints
6. Floor found unclean near Euromec and mixer area7. CH-43 and PF-106 canes are used in current production but there is no identification tag found on these
canes8. Procedure is only available in soft copy9. It was observed that record of orders (local/export) is received by email and is not segregated or stored
at one place10. signatures on delivery Challan are not complete (one or few signatures missing in all record)11. Daily Production Sheet, Daily Log Sheet, Daily Process Control Sheet are not in practice only the daily
Production Planning and Production Summary which is system base is maintained and named as Daily Production Report
12. Daily Summary of batches and forming is collected on new developed sheet which is maintained by supervisor and submitted to Asst. Manager Production which should be controlled
13. Wrapping Sheet is not mentioned in procedure it used to record the production of wrapping machines and it has no control #
Results of Internal Quality Audits (IQA-1/2014-15)
Production CoatingMajor CARs 0 Minor CARs 01 Observations 03
1. Work instruction is not available and clearly visible at some places2. Labeling is not done at some places for the stock of raw and
packaging material3. List of Records and Record Retention list is not available4. Procedure is only available in soft copy
Results of Internal Quality Audits (IQA-1/2014-15)
MarketingMajor CARs 0 Minor CARs 03 Observations 01
1. Procedure is not available at the department2. PCL/FM-17 is not signed from a long time3. No Approval is found in Art Works of clocks4. Media plan is found with cutting by marker
Results of Internal Quality Audits (IQA-1/2014-15)
Export MarketingMajor CARs 0 Minor CARs 04 Observations 01
1. Procedure is not available at the department2. No record or log is maintained for sample requisition form and
respective DHL receipt3. Complaint no. complaint resolve date and verify by signature
missing in complaint form no 2 & 3, also complaint no. 1 form was not available in file
4. CEO signature is not available in EMKT/FM/02 (Repeat NC) CAR No. 2
5. Gross weight and net weight is not found in Export order for MSO#540/1314
Results of Internal Quality Audits (IQA-1/2014-15)
Logistic (Import / Export)Major CARs 0 Minor CARs 02 Observations 00
1. Procedure is not available at the department2. Procedure is not following
Results of Internal Quality Audits (IQA-1/2014-15)
PurchaseMajor CARs 0 Minor CARs 02 Observations 04
1. Purchase order control # is mentioned as PUR/FM020 instead of PUR/FM02
2. Control # found missing in the Supplier re-evaluation record3. New Form should be prepared for the blacklisting of suppliers
which will be the evidence as it is done on the basis of price rate and quality issues via verbal approval of top management
4. Ref # of MM sheet in Rate comparative statement found misprinted as there was no matching of items found in rate comparative and MM sheet for that mentioned REF #
5. Approved supplier list frequency should be monthly6. Procedures need to be revised and also it must include other
documents or their reference which are not controlled
Results of Internal Quality Audits (IQA-1/2014-15)
Product DevelopmentMajor CARs 0 Minor CARs 01 Observations 00
1. Procedure is not following
Results of Internal Quality Audits (IQA-1/2014-15)
Information TechnologyMajor CARs 0 Minor CARs 03 Observations 03
1. Procedure up gradation required2. Servers are not in lock and Key3. PCL/IT-05, 07, 08 & 09 is not updated4. Alternate Data backup frequency PCL/IT-05 is not mentioned in
procedure5. Some Employee names and authorities signatures are misplace in
PCL/IT-04 and it should be review6. Record control system is not updated
Results of Internal Quality Audits (IQA-1/2014-15)
Sales / Corporate MarketingMajor CARs 0 Minor CARs 01 Observations 0
1. Procedure is not following
Comparison of results of CARs of IQA-1/14-15
with IQA/13-14
Comparison of results of CARs of IQA-1/ 2014 -15 with IQA/13-14
IQA/2013-14 IQA-1/2014-15Department Major Cars Minor CARs Observations Major Cars Minor CARs ObservationsCompliance 0 9 1 0 5 0
Quality Assistance 0 3 1 0 11 5R & D 0 3 0 0 6 3
Human Resource 0 5 2 0 6 6Production Candy 0 8 1 0 6 3
Production Chocolate 0 8 0 0 5 5Engineering G. Store 0 7 2 0 10 5
Engineering Elec. 0 10 2 0 6 1Engineering Maint. 0 0 0 0 6 6(S.C.M) R.M Store 0 8 0 0 5 9
(S.C.M) Ware House 0 6 0 0 4 7(S.C.M) M.M Store 0 2 0 0 3 2Production Bubble 0 0 0 0 7 6Production Coating 0 0 0 0 1 3
Local Marketing 0 0 0 0 3 1Export Marketing 0 3 3 0 4 1
Logistic (Imp / Exp) 0 0 0 0 2 0Purchase 0 7 2 0 2 4
P.D 0 0 0 0 1 0I.T 0 12 1 0 3 3
Sale / Co Marketing 0 0 0 0 1 0
Results of Internal Audits (BRC-1/2014-15)
21/07/2014
Results of Internal Audits (BRC-1/2014-15)Production Chocolate
Major CARs 0 Minor CARs 08 Observations 001. Few colors jar were lacking the tagging in flavor/color room and
also CH-21 bags were found in unhygienic condition as if there were wet in rain
2. Floor and wash basin found unclean in CCP-1 area near sugar grinding machine and cooker
3. Material Balancing sheet was absent4. No work instruction found in back process except cooker5. BRC food safety policy was not pasted in any area6. HACCP activity was not carried out since external audit also HACCP
plan not found available at production floor7. Drain holes were open near changing room, kitchen washroom etc
which is the main transport area for the pests8. Weight scale calibration tag was expired also un readable near
(CCP 1)
Results of Internal Audits (BRC-1/2014-15)Quality Assurance
Major CARs 0 Minor CARs 07 Observations 001. Work instructions are found pasted but not in controlled format
and also named as standard operating procedure (SOP)2. Few incoming raw material sheet not maintained as per COA (Noor
Dairies) of raw material like moisture ratios3. Procedures not functional like Sampling and monitoring & analysis4. Few documents found without Control no5. HACCP plan not functional since external BRC audit also no
validation is done to test the HACCP plan is active or not6. Microbiological testing record not available7. Testing procedures were under development
Results of Internal Audits (BRC-1/2014-15)Compliance
Major CARs 0 Minor CARs 06 Observations 001. Monthly Food safety meetings were not conducted2. Old yearly (2013-14) Training calendar not found3. Awareness session (July 2014) record of BRC missing4. Training record of HALAL of batch 1 is missing5. Controlled document stamp was missing on Chocolate procedure6. Chocolate department missing in controlled document list
Results of Internal Audits (BRC-1/2014-15)Supply Chain Management R.M Store
Major CARs 0 Minor CARs 02 Observations 051. Cat is found2. Physical quantity is no match with System3. Dead stock policy not available4. Bin cards not maintaining5. CH-14 & CH-147 storage condition was unsatisfactory6. Raw & packaging materials are found on floor7. Rejected and dead stock is also found in with running products
Results of Internal Audits (HALAL-1/2014-15)
21/08/2014 to 22/08/2014
Results of Internal Audits (Halal-1/2014-15)Quality Assurance
Major CARs 0 Minor CARs 07 Observations 001. Supplier list is available but not approved also updating date is
missing2. Halal certificate of Noor dairy for CH-100 & 101 is found without
company Stamp3. Certificate no 2 & 5 (mentioned in Halal Certificate file) are found
expired4. Approved Halal product list and Halal ingredient list not available
in Hard copy5. Staff is not aware with Halal Standard & Halal Policy 6. Product wise ingredient list not available
Results of Internal Audits (Halal-1/2014-15)Compliance
Major CARs 0 Minor CARs 07 Observations 001. Maintaining records of HCPs which have been already identified
were not found maintained.2. Training on Halal was found conducted, but it was conducted last
year on 30th August,2013 after which some of the staff have left & some newly hired, therefore the training frequency must be set at least bi-annually not annually
3. Internal audit was found conducted but related to food safety & hygiene only, HALAL was not part of the internal audit plan
4. Halal food safety policy was found evident, but not communicated to the workers & neither patched in production area or any place in factory
5. Food safety manual is in practice in which Halal requirements are missing or Separate HALAL manual absent
6. Halal objectives not found7. Schedule of audit plan not found
Tentative Time of the Quality Objectives
2014-15
Quality Objectives (2014-15) Q.A & R n D
Reduce the customer complain level as compare to last year by 10%.
4th Quarter
Production CandyImprovement in line efficiencies by 3%. 4th
QuarterProper utilization of SAP to monitor smooth process and reduce the differences of SAP and physical to 5% maximum.
2nd Quarter
Man power and utilities costs reduce by at least 10%. 4th Quarter
PurchaseTo explore the new cost effective and quality suppliers by 10%.
3rd Quarter
Supply ChainRaw Material StoreMinimizing the number of RM stores to keep the carrying cost under control by10%.
Not Agree by %age
Finished Goods/WarehouseReduce the cost of transportation to 10%.
Not Agree by %age
Reduce the delivery time b/w order and supply by10%. Not Agree by %age
Quality Objectives (2014-15) Engineering
Reduce the maintenance complaints and enhance the efficiency to 10% bya) Implement the preventive schedule. 4th
Quarterb) Improve the HVAC system 4th
Quarterc) Reduce the utilities by cost of gas and K.E.S.C by proper
management2nd
QuarterComplianceTo develop the hygiene audit system /procedure according to standard practices
4th Quarter
To monitor, benchmark and improve our business processes and performance of our production system in a continuous manner by implement the standard procedures
4th Quarter
Human ResourceTo reduce employee turnover and develop analytical reports related to turnover by 10%
4th Quarter
Quality Objectives (2014-15) Information Technology
Successful implementation of SAP Business One ERP in our company
2nd Quarter
Implementation of service module in engineering department
3rd Quarter
Implement of pay roll software 4th Quarter
Rationalize the no. of PCs in every department 2nd Quarter
SalesSales department aim to get the growth in their business increased in term of review up to 18% as compared to their achievement in year 2013 -2014
4th Quarter
Increase the no. of outlet by 50% Not Agree by %age
Increase the Co-Operate sales by 100% by increasing the sale outlet as compare to previous
Not Agree by %age
ExportTo Increase in export by at least 10% 2nd
QuarterTo explore/open at least 4 new destination 2nd
Quarter
Status of
Compliance 2014-15 Work Plan
Compliance 2014-15 Work Plan Points
1. Awareness Session 2. Internal Auditor Trainings3. Procedure Develop and Procedure
Review4. Hygiene Audit5. Internal and External Audit6. Management Review Meeting7. M.R Office (Changes and Reports)8. Record Room Management9. Intranet Website10.Q.M.S Appraisal Points
1 - Awareness Session (Status)Title Status
QMS Awareness Session (1) Done on 23rd August 2014
QMS Awareness Session (2) Done on 25th August 2014
QMS Awareness Session (3) Postponed
HALAL Awareness Session* Done on 24th of October 2014
BRC Awareness Session Planned in December
Hygiene Awareness Session Planned in December
2 - Internal Auditor Trainings (Status)
Title Status
QMS Internal Auditor Training (Batch 2) Done on 6th, 8th & 9th of September 2014
HALAL Internal Auditor Training (Batch 1*)
Done on 24th of October 2014
BRC Internal Auditor Training (Batch 1) Planned in December
3 - Procedure Develop and Procedure Review (Status)
Title Status
Procedure
Develop
Production Coating Draft is ready but it require more amendment and will be
completed in 2nd QuarterProduction Bubble
Local MarketingIn meeting it was decided Marketing Department will
provide Draft Copy in Last Week of December
Procedure Review
All Other Departments
Email send to HODs, Work in progress and will be
completed in 2nd Quarter
4 - Hygiene Audit (Status)Month Status
July Done on 16/07/2014August Done on 08/08/2014
September Done on 04/09/2014October Done on 02/10/2014
November Done on 14/11/2014December
Will be conducted Every Month on surprise basis before Co – Ordination
Meeting
JanuaryFebruary
MarchAprilMayJune
5 - Internal and External Audit (Status)
Title StatusBRC – Audit # 1 Done on 21st of July –14Halal – Audit # 1 Done on 21st & 22nd of August –14QMS – IQA # 1 Done on 15th to 22nd of September –14BRC – Audit # 2 Done on 17th to 18th of October – 14Halal – Audit # 2 Done on17th to 19th of November – 14QMS – IQA # 2 Planned on 4th to 13th December –
14BRC – External Audit Planned in January – 15Halal – Audit # 3 Planned in February – 15QMS – IQA # 3 Planned in March – 15Halal –External Audit Planned in April –15QMS – External Audit Planned in June –15
6 - Management Review Meeting (Status)
Title Status
Management Review Meeting – 1 Done on 26th of November – 14
Management Review Meeting – 2
Planned in 4th week of Jan – 15
Management Review Meeting – 3
Planned in 1st week of May – 15
7 - M.R Office (Status)Title Status
M.R Office (Changes and Reports)
Work in Progress will be completed in 2nd Quarter
8 - Record Room Management (Status)
Title Status
Timely Submission of Records and
Follow up Work in Progress will be completed in 2nd Quarter
9 - Intranet Website (Status)Title Status
Local network website for QMS Documents and Procedures
Work in Progress will be completed in 2nd Quarter
10 - Q.M.S Appraisal Points (Status)Title Status
QMS Performance (add/subtract
marks in annual appraisal)
Draft Copy is ready further meetings are arranged b/w H.R and Compliance to finalized it
THANKS FOR