Mr Hanh - CV

2
Experience GOSHU KOHSAN (VIETNAM) 2011 - Present Position: Assistant Manager Level: Project Manager 1. Main duty: Check Flow sheet and make final P&ID. Making detail design & calculation sheet of equipment, tanks, vessels, process piping and selection of suitable materials for projects. Control project schedule – scope – cost – quality from the contract signing until handover. To be responsible for quality control of the projects especially in mechanical, check fabrication of tanks & vessel based on GKC’s standard. Define scope of works, installation specification in order to select M-E contractor for projects and to ensure that all works complete fully with client’s requiements. Liaise closely with Client/ Owner engineers to provide master layout, planning, design and solve any problem to ensure quality and timely completion of the projects. Control test run and commissioning of system. Ensure the HSE and safety first at site. 2. Some projects for reference: Wastewater treatment plant: Process W.W (DDK, Tomoku, Maruzen Foods, Vina Cosmo,…), Domestic W.W Water treatment plant - RO, CEDI, Sanitary: Pharmaceutical (Metran Vitec), Cosmetics (Vina Cosmo), Foods (Maruzen Foods) Process line: Au recovery system (DDK), Die cleaning system (Lixil), Nickel plating line (On Semiconductor Binh Duong) Nguyễn Hữu Hạnh Mechanical Design & Construction - Address : 77B Cach Mang Thang Tam Str., Thuan An Dist., Binh Duong Province - Place of Birth : Tien Giang Province - Date of Birth : 22-Nov-1985 [email protected] (+84) 0933 355 177 [email protected]

Transcript of Mr Hanh - CV

Page 1: Mr Hanh - CV

Experience GOSHU KOHSAN (VIETNAM) 2011 - Present

Position: Assistant Manager

Level: Project Manager

1. Main duty:

• Check Flow sheet and make final P&ID.

• Making detail design & calculation sheet of equipment, tanks, vessels, process piping and selection of suitable materials for projects.

• Control project schedule – scope – cost – quality from the contract signing until handover.

• To be responsible for quality control of the projects especially in mechanical, check fabrication of tanks & vessel based on GKC’s standard.

• Define scope of works, installation specification in order to select M-E contractor for projects and to ensure that all works complete fully with client’s requiements.

• Liaise closely with Client/ Owner engineers to provide master layout, planning, design and solve any problem to ensure quality and timely completion of the projects.

• Control test run and commissioning of system.

• Ensure the HSE and safety first at site.

2. Some projects for reference:

• Wastewater treatment plant: Process W.W (DDK, Tomoku, Maruzen Foods, Vina Cosmo,…), Domestic W.W

• Water treatment plant - RO, CEDI, Sanitary: Pharmaceutical (Metran Vitec), Cosmetics (Vina Cosmo), Foods (Maruzen Foods)

• Process line: Au recovery system (DDK), Die cleaning system (Lixil), Nickel plating line (On Semiconductor Binh Duong)

Nguyễn Hữu Hạnh Mechanical Design & Construction

- Address : 77B Cach Mang Thang Tam Str., Thuan An Dist., Binh Duong Province

- Place of Birth : Tien Giang Province

- Date of Birth : 22-Nov-1985

[email protected] (+84) 0933 355 177

[email protected]

Page 2: Mr Hanh - CV

Nguyen Huu Hanh / RESUME P a g e | 2

FUJIKASUI ENERGY AND ENVIRONMENT TECHNOLOGY 2008 - 2010

Position: Mechanical Engineer

Level: Project Engineer

Main duty: detail design of equipment, tank, vessel, process piping.

• Wastewater treatment plant

• Scrubber system

Education University of Technical Education Ho Chi Minh City 2008

Bachelor’s Degree: Engineering Mechanics

Training Course:

• Project management – PMI® Global Standard

• Specialist skill of supervision in construction field

• EHS & Industrial hygiene and safety

Skills

Project management �����

AutoCAD design �����

English �����

MS Project, MS Office �����

Job references Expected salary: ≥ 1,200 USD

Willing to oversea training: Yes

Availability: Negotiation

Interests