MAN POWER PLANNING
![Page 2: Mpp](https://reader036.fdocuments.in/reader036/viewer/2022062511/54bac2c44a79590c2b8b45bd/html5/thumbnails/2.jpg)
Major Human Resource Activities:
• Demand Forecasting.
• Supply Forecasting.
• Determining human recourse. requirements.
• Action Planning.
• Monitoring & Control.
![Page 3: Mpp](https://reader036.fdocuments.in/reader036/viewer/2022062511/54bac2c44a79590c2b8b45bd/html5/thumbnails/3.jpg)
Demand Forecasting.
• Process of estimating the future needs of human resource in context of corporate & functional plans & fore cast of future activity.
• Its based on Annual Budget & Corporate plans.
![Page 4: Mpp](https://reader036.fdocuments.in/reader036/viewer/2022062511/54bac2c44a79590c2b8b45bd/html5/thumbnails/4.jpg)
Manufacturing Unit Demand Forecasting is Based On:
• Sales forecast & Targets• Based on theses Production Plans are made.• No.of people ,Skills ,Levels etc are accomplished
the sales & production Targets.• With in the same org.needs demand varies on the
basis of production technology,processes & other factors.
![Page 5: Mpp](https://reader036.fdocuments.in/reader036/viewer/2022062511/54bac2c44a79590c2b8b45bd/html5/thumbnails/5.jpg)
JOB ANALYSIS
• Before carrying out H.R.P,Mgt should know what is to be performed and how?
• The whole task to be divided into & allocated into manageable work units called jobs.
• Assigning task to job is JOB Design.• The H.R requirement for given volume of
operation depends on content of jobs .
![Page 6: Mpp](https://reader036.fdocuments.in/reader036/viewer/2022062511/54bac2c44a79590c2b8b45bd/html5/thumbnails/6.jpg)
WORK STUDY.
• Its appropriate for those jobs where it is possible to measure the work,set standards norms & calculate the No.of persons required.
![Page 7: Mpp](https://reader036.fdocuments.in/reader036/viewer/2022062511/54bac2c44a79590c2b8b45bd/html5/thumbnails/7.jpg)
Methods Of Demand forecasting.
• Managerial Judgment
• Simple Statistical Models.
• Mathematical Models.
• Probabilistic Models.
![Page 8: Mpp](https://reader036.fdocuments.in/reader036/viewer/2022062511/54bac2c44a79590c2b8b45bd/html5/thumbnails/8.jpg)
Managerial Method.
• Experienced Mgrs prepare guidelines for Deptt. Mgrs.
• It involves future activity levels that will affect their deptt.
• Targets are set & desirable changes in flow of work & job design are also indicated.
![Page 9: Mpp](https://reader036.fdocuments.in/reader036/viewer/2022062511/54bac2c44a79590c2b8b45bd/html5/thumbnails/9.jpg)
Simple Statistical Models.
• Its Ratio Trend Analysis.
• Ratios between No.of workers & supervisors.
• Future ratios are forecast based on time series.
• No.of employees required for different groups/skills are calculated.
![Page 10: Mpp](https://reader036.fdocuments.in/reader036/viewer/2022062511/54bac2c44a79590c2b8b45bd/html5/thumbnails/10.jpg)
Mathematical Model
• Its through use of probabilities & correlations.
![Page 11: Mpp](https://reader036.fdocuments.in/reader036/viewer/2022062511/54bac2c44a79590c2b8b45bd/html5/thumbnails/11.jpg)
Probabilistic Models
• Employees are classified according to Org.Units,Job Categories,locations,levels,grades.
• Probability of employees moving from one classification is also considered.
• Past trend like promotions,transfers,separations are also useful in forecasting.
![Page 12: Mpp](https://reader036.fdocuments.in/reader036/viewer/2022062511/54bac2c44a79590c2b8b45bd/html5/thumbnails/12.jpg)
Supply Forecasting
• Internal sources.
• External sources.
![Page 13: Mpp](https://reader036.fdocuments.in/reader036/viewer/2022062511/54bac2c44a79590c2b8b45bd/html5/thumbnails/13.jpg)
Determining Human resource Planning
• Demand.
• a) No.Needed at the beginning of the Yr.
• b)Changes to requirements forecast during the yr.
• C) Total requirement at the end of the yr.
![Page 14: Mpp](https://reader036.fdocuments.in/reader036/viewer/2022062511/54bac2c44a79590c2b8b45bd/html5/thumbnails/14.jpg)
Supply
• No.available at the beginning of the yr.
• Transfers & Promotions
• Separations through retirements,wastage,promotions
![Page 15: Mpp](https://reader036.fdocuments.in/reader036/viewer/2022062511/54bac2c44a79590c2b8b45bd/html5/thumbnails/15.jpg)
Deficit Or Surplus.
• Losses of those recruited during the yr.
• Additional No required during the yr.
![Page 16: Mpp](https://reader036.fdocuments.in/reader036/viewer/2022062511/54bac2c44a79590c2b8b45bd/html5/thumbnails/16.jpg)
Action Planning
• Recruitment Plan
• Redeployment Plan
• Redundancy Plan
• Training Plan
• Productivity Plan
• Retention Plan
![Page 17: Mpp](https://reader036.fdocuments.in/reader036/viewer/2022062511/54bac2c44a79590c2b8b45bd/html5/thumbnails/17.jpg)
Monitoring & Control
• Zero Budgeting: An approach in which one forces unit/division managers to justify their total operation from zero budgeting.
• Ideal Approach:off loading functions like M&U,production technology,what may be considered ideal by Mgt,at times force ethical dimensions.
• Realistic Approach:Using the existing information.for Eg:A company that operates on 3yrs planning cycle may record man power levels in subunits that is easy to monitor and control.
![Page 18: Mpp](https://reader036.fdocuments.in/reader036/viewer/2022062511/54bac2c44a79590c2b8b45bd/html5/thumbnails/18.jpg)
MPP
• Stages Of Man Power Planning:
• Conception,Feasibility,Construction,commissioning operations.
• Phases Of Man Power Planning:
• Survey,source identification,recruitments,placement,induction,maintenance ,separation.
![Page 19: Mpp](https://reader036.fdocuments.in/reader036/viewer/2022062511/54bac2c44a79590c2b8b45bd/html5/thumbnails/19.jpg)
Case Study from P-
• Machine Operation:
• No.Of man power required:
• No.Of man power Actual:
![Page 20: Mpp](https://reader036.fdocuments.in/reader036/viewer/2022062511/54bac2c44a79590c2b8b45bd/html5/thumbnails/20.jpg)
Case Study from P-
• Machine Operation:
• No.of Man power equried:
• Actual Man Power:
• No.Of Company Worker:
• No.Of Contractor Worker:
![Page 21: Mpp](https://reader036.fdocuments.in/reader036/viewer/2022062511/54bac2c44a79590c2b8b45bd/html5/thumbnails/21.jpg)
Questions????????
• How to control the Contract labours?
• What is the reason of high rate of attrition now days in the industry?
• How to retain the employee?