SWIFT CONFERENCE 2006PAVEMENT DEFECTS AND REPAIR
Mounir Moughabghab PEng AAE
![Page 2: Mounir Presentation Swift](https://reader031.fdocuments.in/reader031/viewer/2022020102/55cf925d550346f57b95dbc0/html5/thumbnails/2.jpg)
Outline
1. Introduction to Pavement Defects1. Introduction to Pavement Defects
2. Pavement Quality Characteristics2. Pavement Quality Characteristics
4. PCC Pavement Defects 4. PCC Pavement Defects
5. PCC Pavement Repairs5. PCC Pavement Repairs
6. Catchbasin/Manhole Top Adjustment 6. Catchbasin/Manhole Top Adjustment
3. Asphalt Pavement Defects 3. Asphalt Pavement Defects
![Page 3: Mounir Presentation Swift](https://reader031.fdocuments.in/reader031/viewer/2022020102/55cf925d550346f57b95dbc0/html5/thumbnails/3.jpg)
Introduction to Pavement Defects
DEFECTS INFLUENCES ON PAVEMENT QUALITYRIGID PAVEMENTFLEXIBLE PAVEMENT
TYPICAL FLEXIBLE PAVEMENT DEFECTS AT TPIALONGITUDINAL CRACKSTRANSVERSE CRACKSSLIPPAGE CRACKSSHOVING AND RUTTING
TYPICAL RIGID PAVEMENT DEFECTS AT TPIASPALLING AT JOINTSCORNER CRACKSTRANSVERSE CRACKSERRATIC CRACKS
STANDARD DRAWINGS FOR REPAIR WORK
![Page 4: Mounir Presentation Swift](https://reader031.fdocuments.in/reader031/viewer/2022020102/55cf925d550346f57b95dbc0/html5/thumbnails/4.jpg)
Pavement Quality Characteristics
Defect Influence on Pavement Quality CharacteristicsPavement Defects Strength Smoothness Skid
ResistanceStructural Integrity
Surface Drainage
ΧBleeding
ΧΧΧΧRutting
ΧΧRaveling
ΧΧBlock Cracking
ΧΧMap Cracking
ΧΧAlligator Cracking
ΧΧLongitudinal Cracking
ΧΧTransverse Cracking
Asphalt Pavements
![Page 5: Mounir Presentation Swift](https://reader031.fdocuments.in/reader031/viewer/2022020102/55cf925d550346f57b95dbc0/html5/thumbnails/5.jpg)
Defect Influence on Pavement Quality CharacteristicsPavement Defects Strength Smoothness Skid
ResistanceStructural Integrity
Surface Drainage
ΧJoint Faulting
ΧΧScaling & Spalling
ΧΧEdge Cracking
ΧΧCorner Cracking
ΧΧΧSlab Cracking
Concrete Pavements
Pavement Quality Characteristics
![Page 6: Mounir Presentation Swift](https://reader031.fdocuments.in/reader031/viewer/2022020102/55cf925d550346f57b95dbc0/html5/thumbnails/6.jpg)
Defect Influence on Pavement Quality CharacteristicsPavement Defects
Strength Smoothness Skid Resistance
Structural Integrity
Surface Drainage
ΧShoulder SlopesΧCatch Basin
Heave
ΧShoulder ErosionΧΧ“Pot-Holes”ΧΧPatching
ΧFrost Heave
ΧΧΧSettlement/ Ponding
ΧRubber DepositsΧΧSurface Texture
All Pavements
Pavement Quality Characteristics
![Page 7: Mounir Presentation Swift](https://reader031.fdocuments.in/reader031/viewer/2022020102/55cf925d550346f57b95dbc0/html5/thumbnails/7.jpg)
Asphalt Pavement Defects: Slippage Crack
Taxiway DeltaConstructed 1997Observed November 1, 2000Repaired November 10, 2000
![Page 8: Mounir Presentation Swift](https://reader031.fdocuments.in/reader031/viewer/2022020102/55cf925d550346f57b95dbc0/html5/thumbnails/8.jpg)
Asphalt Pavement Defects: Shoving and Rutting
CAUSE: HIGH ASPHALT CEMENT CONTENT, LOW VOID RATIO, HIGH TACK / PRIME COAT APPLICATION RATES, HIGH SUMMER TEMPERATURE AND HEAVY WHEEL LOADS STOP AND GO
![Page 9: Mounir Presentation Swift](https://reader031.fdocuments.in/reader031/viewer/2022020102/55cf925d550346f57b95dbc0/html5/thumbnails/9.jpg)
Asphalt Pavement Defects: Shoving and Rutting
CAUSE: HIGH ASPHALT CEMENT CONTENT, LOW VOID RATIO, HIGH TACK / PRIME COAT APPLICATION RATES, HIGH SUMMER TEMPERATURE AND HEAVY WHEEL LOADS STOP AND GO
![Page 10: Mounir Presentation Swift](https://reader031.fdocuments.in/reader031/viewer/2022020102/55cf925d550346f57b95dbc0/html5/thumbnails/10.jpg)
Asphalt Pavement Defects: Slippage at Inset Lights
![Page 11: Mounir Presentation Swift](https://reader031.fdocuments.in/reader031/viewer/2022020102/55cf925d550346f57b95dbc0/html5/thumbnails/11.jpg)
Asphalt Pavement Defects: Slippage at Inset Lights
![Page 12: Mounir Presentation Swift](https://reader031.fdocuments.in/reader031/viewer/2022020102/55cf925d550346f57b95dbc0/html5/thumbnails/12.jpg)
Asphalt Pavement Defects: Slippage & Shoving over PCC
![Page 13: Mounir Presentation Swift](https://reader031.fdocuments.in/reader031/viewer/2022020102/55cf925d550346f57b95dbc0/html5/thumbnails/13.jpg)
Asphalt Pavement Defects: Cracks at Longitudinal Joints
CAUSE: WEEK LONGITUDINAL JOINTS, LATE JOINT/CRACK SEALING AND WATER INFILTRATION
![Page 14: Mounir Presentation Swift](https://reader031.fdocuments.in/reader031/viewer/2022020102/55cf925d550346f57b95dbc0/html5/thumbnails/14.jpg)
Transverse & Reflection Cracks
Asphalt Pavement Defects: Transverse Cracks over PCC
CAUSE: REFLECTION CRACKS- HMAC OVERLAY ON PCC SLABS
![Page 15: Mounir Presentation Swift](https://reader031.fdocuments.in/reader031/viewer/2022020102/55cf925d550346f57b95dbc0/html5/thumbnails/15.jpg)
CAUSE: DIFFERENTIAL SUBGRADE SUPPORT & SETTLEMENT
PCC Pavement Defects: Diagonal Cracks
![Page 16: Mounir Presentation Swift](https://reader031.fdocuments.in/reader031/viewer/2022020102/55cf925d550346f57b95dbc0/html5/thumbnails/16.jpg)
PCC Pavement Defects: Diagonal Cracks
CAUSE: DIFFERENTIAL SUBGRADE SUPPORT & SETTLEMENT
![Page 17: Mounir Presentation Swift](https://reader031.fdocuments.in/reader031/viewer/2022020102/55cf925d550346f57b95dbc0/html5/thumbnails/17.jpg)
PCC Pavement Defects: Corner & Diagonal Cracks
CAUSE: DIFFERENTIAL SUBGRADE SUPPORT & SETTLEMENT AND OVERSTRESSED CORNER
![Page 18: Mounir Presentation Swift](https://reader031.fdocuments.in/reader031/viewer/2022020102/55cf925d550346f57b95dbc0/html5/thumbnails/18.jpg)
PCC Pavement Defects: Transverse Cracks
CAUSE: LOSS OF SUBGRADE SUPPORT,
![Page 19: Mounir Presentation Swift](https://reader031.fdocuments.in/reader031/viewer/2022020102/55cf925d550346f57b95dbc0/html5/thumbnails/19.jpg)
PCC Pavement Defects: Spalling at Joints & Compression Cracks
CAUSE: INPROPER JOINT SEALING, DEBRIS IN JOINT PREVENT MOVEMENT
![Page 20: Mounir Presentation Swift](https://reader031.fdocuments.in/reader031/viewer/2022020102/55cf925d550346f57b95dbc0/html5/thumbnails/20.jpg)
PCC Pavement Defects: Joint Faulting/Stepping
CAUSE: LOSS OF KEYWAY SUPPORT
![Page 21: Mounir Presentation Swift](https://reader031.fdocuments.in/reader031/viewer/2022020102/55cf925d550346f57b95dbc0/html5/thumbnails/21.jpg)
GATE 522 INFIELD TERMINAL: ERRATIC CRACKS
CAUSE:SUBGRADE SETTLEMENT, FROST HEAVE, FRICTION BONDING TO SUBBASE
![Page 22: Mounir Presentation Swift](https://reader031.fdocuments.in/reader031/viewer/2022020102/55cf925d550346f57b95dbc0/html5/thumbnails/22.jpg)
PCC Pavement Defects: Causes
![Page 23: Mounir Presentation Swift](https://reader031.fdocuments.in/reader031/viewer/2022020102/55cf925d550346f57b95dbc0/html5/thumbnails/23.jpg)
PCC Pavement Defects: Causes
![Page 24: Mounir Presentation Swift](https://reader031.fdocuments.in/reader031/viewer/2022020102/55cf925d550346f57b95dbc0/html5/thumbnails/24.jpg)
< ¼ INCH (6.5 MM) LEAVE ALONE
¼ – ½ INCH (6.6 – 13 MM) ROUTE AND SEAL
3/8 – 1 INCH (9.5 – 25 MM) TIE STITCHING & ROUTE SEAL
> 1 INCH (25 MM) FULL DEPTH REPAIR
NOTES: PCC SLABS WITH MORE THAN TWO CRACKS OVER 13 MM WIDE, FULL SHOULD BE REPLACEDCORNER CRACKS LARGER THAN 13 MM SHOULD BE PARTIALLY FULL DEPTH REPLACED
PCC Pavement Repairs: General Rules
![Page 25: Mounir Presentation Swift](https://reader031.fdocuments.in/reader031/viewer/2022020102/55cf925d550346f57b95dbc0/html5/thumbnails/25.jpg)
PCC Pavement Repairs: General Guide
![Page 26: Mounir Presentation Swift](https://reader031.fdocuments.in/reader031/viewer/2022020102/55cf925d550346f57b95dbc0/html5/thumbnails/26.jpg)
PCC Pavement Repairs: General Guide
![Page 27: Mounir Presentation Swift](https://reader031.fdocuments.in/reader031/viewer/2022020102/55cf925d550346f57b95dbc0/html5/thumbnails/27.jpg)
PCC Pavement Repairs: Full Depth Repair
![Page 28: Mounir Presentation Swift](https://reader031.fdocuments.in/reader031/viewer/2022020102/55cf925d550346f57b95dbc0/html5/thumbnails/28.jpg)
PCC Pavement Repairs: Partial Depth Repair
![Page 29: Mounir Presentation Swift](https://reader031.fdocuments.in/reader031/viewer/2022020102/55cf925d550346f57b95dbc0/html5/thumbnails/29.jpg)
PCC Pavement Repairs: Cross Stitching
![Page 30: Mounir Presentation Swift](https://reader031.fdocuments.in/reader031/viewer/2022020102/55cf925d550346f57b95dbc0/html5/thumbnails/30.jpg)
PCC Pavement Repairs: Routing and Sealing
![Page 31: Mounir Presentation Swift](https://reader031.fdocuments.in/reader031/viewer/2022020102/55cf925d550346f57b95dbc0/html5/thumbnails/31.jpg)
PCC Pavement Repairs: Restoration After Trenching
![Page 32: Mounir Presentation Swift](https://reader031.fdocuments.in/reader031/viewer/2022020102/55cf925d550346f57b95dbc0/html5/thumbnails/32.jpg)
Catchbasin/Manhole Top Adjustment