MONTGOMERY COUNTY, MARYLAND

STATEMENT OFWORKRADIO SYSTEM INFRASTRUCTUREMODERNIZATION

Page 2: Motorola SOW - Reviewed by MoCo PM 2015-09-22

7/23/2019 Motorola SOW - Reviewed by MoCo PM 2015-09-22

http://slidepdf.com/reader/full/motorola-sow-reviewed-by-moco-pm-2015-09-22 2/309

TABLE OF CONTENTS

Section J

Statement of Work...............................................................................................................................1

J.1 Project Plan (C.3.1.2)...........................................................................................................1

J.1.1 System Implementation Overvie....................................................................................1J.1.2 Sc!e"#lin$.......................................................................................................................2

J.1.3 Project %eetin$s..............................................................................................................2

J.1.& Project 'eam....................................................................................................................3

J.1.&.1 Co#nty ea" Project %ana$er..................................................................................3

J.1.&.2 %otorola ea" Project %ana$er...............................................................................

J.1.&.3 ea" System *n$ineer.............................................................................................+

J.1.&.& ,ack!a#l *n$ineer...................................................................................................-

J.1.&. re/#ency Coor"ination *n$ineer............................................................................-

J.1.&.+ Project 0en"ors an" S#contractors........................................................................

J.1. escription of Work..........................................................................................................4J.1..1 System Overvie.....................................................................................................4

J.1..2 System Implementation Overvie............................................................................4

J.1..3 escription of Work5 Sc!e"#le5 an" 6esponsiilities..............................................17

J.1..& Project Initiation an" 8ickoff...................................................................................17

J.1.. esi$n 6evie.......................................................................................................17

J.1..+ Or"er Processin$...................................................................................................1+

J.1..- %an#fact#rin$.........................................................................................................1+

J.1.. 'emplate evelopment an" leetmappin$.............................................................1+

J.1..4 actory Sta$in$......................................................................................................1-

J.1..17 actory 'estin$...................................................................................................... 1

J.1..11 Civil Work..............................................................................................................27

J.1..12 9eneral 6esponsiility %atri:................................................................................-

J.1..13 Site %atrices..........................................................................................................

J.1..1& Installation of i:e" ;etork */#ipment................................................................43

J.1..1 Systems Inte$ration an" Optimi<ation.................................................................17

J.1..1+ inal =cceptance 'estin$.....................................................................................17-

J.1..1- C#tover to ;e System Operations..................................................................... 117

J.1..1 System oc#mentation........................................................................................ 117

J.1..14 System =cceptance.............................................................................................112

J.1.+ Project Sc!e"#le..........................................................................................................113

J.1.- >#ality Plan..................................................................................................................11&

J.1.-.1 %otorola?s Commitment to >#ality ea"s to *fficient5 o@6isk Implementation..11&

J.1.-.2 Project >#ality %ana$ement.................................................................................11&

J.1. Implementation >#ality =ss#rance...............................................................................11+

J.1..1 6 + Stan"ar"......................................................................................................11+

%ont$omery Co#nty5 %arylan"Statement of Work Ase or "isclos#re of t!is proposal is s#ject

to t!e restrictions on t!e cover pa$e.

 Motorola Solutions Confidential Restricted Table of Contents i 

Page 3: Motorola SOW - Reviewed by MoCo PM 2015-09-22

7/23/2019 Motorola SOW - Reviewed by MoCo PM 2015-09-22

http://slidepdf.com/reader/full/motorola-sow-reviewed-by-moco-pm-2015-09-22 3/309

 J.1..2 =#"itin$ to t!e Stan"ar".......................................................................................11+

J.1.4 6isk %iti$ation Plan......................................................................................................11-

J.2 Comm#nications Plan.......................................................................................................114

J.2.1 Project %eetin$s...........................................................................................................114

J.2.1.1 Project 8ickoff %eetin$.........................................................................................114

J.2.1.2 C#stomer esi$n 6evie.....................................................................................127

J.2.1.3 ,i@Weekly Stat#s %eetin$s an" t!e %otorola Project %ana$er............................127J.2.1.& System 'estin$ 6es#lts........................................................................................121

J.2.1. ee"ack.............................................................................................................121

J.3 Safety Plan (C..2.+.11)...................................................................................................122

J.3.1 Intro"#ction..................................................................................................................122

J.3.2 9eneral Safety 6#les...................................................................................................123

J.3.3 *nvironment5 Bealt!5 an" Safety Policy.......................................................................123

J.3.& Safety Stan"ar"s..........................................................................................................123

J.3. 0erifyin$ *nvironment5 Bealt!5 an" Safety Compliance................................................12&

J.3.+ %otorola?s *nvironment5 Bealt!5 an" Safety %ana$ement System..............................12

J.& Covera$e =cceptance 'est Plan (C.3.)...........................................................................12+J.& Covera$e =cceptance 'est Plan (C.3.)...........................................................................12+

J.&.1 Project 2 'r#nkin$ Covera$e =cceptance 'est Plan...................................................12+

J.&.2 C='P etaile" escription...........................................................................................12+

J.&.2.1 C='P efinitions..................................................................................................12-

J.&.2.2 */#ipment Confi$#rations....................................................................................12

J.&.2.3 C='P %et!o".......................................................................................................137

J.&.2.& 6esponsiilities an" Preparation..........................................................................131

J.&.2. etaile" C='P Proce"#res...................................................................................132

J.&.2.+ C='P oc#mentation an" Covera$e =cceptance................................................13

J.&.3 S#mmary......................................................................................................................13+

J. =cceptance 'est Plan (C..2.3)........................................................................................13-

J..1 3+77 Sites on =S'6O -. (Smart).............................................................................13-

J..1.1 'alk$ro#p Call.......................................................................................................13-

J..2 Wi"e =rea 'r#nkin$ %=D'%= %i:e" Sites.............................................................13

J..2.1 'alk$ro#p Call.......................................................................................................13

J..2.2 Contin#o#s =ssi$nment Ap"atin$.........................................................................134

J..2.3 Call =lert...............................................................................................................1&7

J..2.& Private Call...........................................................................................................1&1

J..2. %#lti$ro#p Call in Wait %o"e................................................................................1&2

J..2.+ =#"io Interr#ptDInterr#pt ;ever %o"e...................................................................1&3

J..2.- ynamic %=D'%= *mer$ency =larm an" Call it! 'op of >#e#eE%= Call in>#e#e 1&&

J..2. Sec#re Operation.................................................................................................1&

J..2.4 ynamic %=D'%= 'alk$ro#p Call %o"e C!an$e...........................................1&+

J..2.17 In Call Aser =lert (*nale").................................................................................1&-

%ont$omery Co#nty5 %arylan"Statement of Work

ii  

Statement of Work: 

Page 4: Motorola SOW - Reviewed by MoCo PM 2015-09-22

7/23/2019 Motorola SOW - Reviewed by MoCo PM 2015-09-22

http://slidepdf.com/reader/full/motorola-sow-reviewed-by-moco-pm-2015-09-22 4/309

J..2.11 ynamic %=D'%= Private Call.....................................................................1&

J..2.12 %#lti$ro#p CallE'%=@Only 9ro#p.....................................................................1&4

J..2.13 C!annel Partitionin$ Operation............................................................................17

J..3 Site 'r#nkin$ %=D'%= %i:e" Sites.......................................................................11

J..3.1 Site 'r#nkin$ In"ication........................................................................................11

J..3.2 Call =lert.........................................................................................................J.@12

J..3.3 Private Call.....................................................................................................J.@13J..3.& Contin#o#s =ssi$nment Ap"atin$...................................................................J.@1&

J..3. ynamic %=D'%= *mer$ency =larm an" Call..............................................1

J..3.+ ynamic %=D'%= Private Call......................................................................1+

J..& %CC -77 'r#nke" 6eso#rces....................................................................................1-

J..&.1 Instant 'ransmit....................................................................................................1-

J..&.2 'alk$ro#p Selection an" Call................................................................................1

J..&.3 *mer$ency =larm an" Call isplay escription....................................................14

J..&.& %#lti$ro#p Call.....................................................................................................1+7

J..&. %#lti@Select Operation..........................................................................................1+1

J..&.+ 'alk$ro#p Patc!....................................................................................................1+2J..&.- =lert 'onesE'alk$ro#p..........................................................................................1+3

J..&. Call =lert...............................................................................................................1+&

J..&.4 Console Initiate" Private Call to S#scrier..........................................................1+

J..&.17 Console Priority...................................................................................................1++

J..&.11 =ctivity o$..........................................................................................................1+-

J..&.12 'alk$ro#p Selection an" CallESec#re..................................................................1+

J..&.13 P'' Anit ID=lias isplay.....................................................................................1+4

J..&.1& 'alk$ro#p Patc!ESec#re......................................................................................1-7

J..&.1 %#lti@Select Operation in Sec#re %o"e...............................................................1-1

J..&.1+ 1 efa#lt =lert 'ones =vailale for 'ransmission...............................................1-2

J..&.1- Sec#reDClear Cross@%o"e In"ication...................................................................1-3

J.. 6a"io Control %ana$er eat#res.................................................................................1-&

J...1 6a"io C!eck.........................................................................................................1-&

J...2 6a"io Snaps!ot....................................................................................................1-

J...3 ynamic 6e$ro#pin$............................................................................................1-+

J...& Selective 6a"io In!iit..........................................................................................1--

J... *mer$ency =larm isplay....................................................................................1-

J...+ 6a"io Stat#s.........................................................................................................1-4

J..+ a#lt %ana$ement.......................................................................................................17

J..+.1 Anifie" *vent %ana$erE0ies..............................................................................17

J..+.2 Station Poer =mp ail#re 6eports to t!e Anifie" *vent %ana$er.......................11

J..+.3 Core 6o#ter ail#re 6eports to t!e Anifie" *vent %ana$er..................................12

J..+.& Screen ;avi$ation................................................................................................13

J..+. In'o#c! =larm Processin$E=cknole"$e" =larm.................................................1&

J..+.+ In'o#c! =larm Processin$EAnacknole"$e" =larm.............................................1

%ont$omery Co#nty5 %arylan"Statement of Work

Table of Contents 

iii 

Page 5: Motorola SOW - Reviewed by MoCo PM 2015-09-22

7/23/2019 Motorola SOW - Reviewed by MoCo PM 2015-09-22

http://slidepdf.com/reader/full/motorola-sow-reviewed-by-moco-pm-2015-09-22 5/309

 J..+.- P!ysical Inp#tsDO#tp#tsEi$ital O#tp#ts (S% 3777)..........................................1+

J..+. 6eport 9enerator.................................................................................................1-

J..+.4 Anifie" *vent %ana$erE%OSC= %ana$ement..................................................1

J..+.17 9CP 777 %#ltiSite ControllerE*t!ernet Comm#nications ail#re etection..... .14

J..+.11 '6=8 9PSEPoer S#pply a#lt..........................................................................147

J..+.12 '6=8 9PSE9PS a#lt........................................................................................141

J..+.13 P!ysical Inp#tsDO#tp#tsEi$ital Inp#ts.................................................................142J..- System 6eliaility eat#res..........................................................................................143

J..-.1 ,ase Station I"entification....................................................................................143

J..-.2 %#ltiple Control C!annels....................................................................................14&

J..-.3 'ransmitter Poer ail#re S!#t"on....................................................................14

J..-.& 6e"#n"ant Site Controller Sitc!in$E=#tomatic Sitc!over................................14+

J..-. 6e"#n"ant Fone Controller Sitc!in$D=#tomatic Sitc!over...............................14-

J..-.+ Station ail#re......................................................................................................14

J..-.- 6e"#n"ant Console Site ink ail#re...................................................................144

J..-. 6e"#n"ant Site ink ail#re.................................................................................277

J..-.4 6e"#n"ant Fone Controller Sitc!in$E%an#al Sitc!over..................................271J..-.17 Site ailsoft.......................................................................................................... 272

J..-.11 Primary Prime Site ink ail#reESim#lcast 9*O Prime Site to Fone Core *t!ernetink 273

J..-.12 Sin$le Comparator ail#re at Primary 9*O@Prime Site.......................................27&

J.. =$ency Partitionin$ 'ests............................................................................................. 27

J...1 C!annel Partitionin$ Operation.............................................................................27

J..4 =#"io IP o$$in$..........................................................................................................27+

J..4.1 o$$in$ 'r#nkin$ 'alk$ro#p Call..........................................................................27+

J..4.2 o$$in$ Sec#re 'r#nkin$ 'alk$ro#p Call..............................................................27-

J..4.3 o$$in$ S#systemE*mer$ency *vents an" Calls@*mer$ency =larm.................27

J..4.& o$$in$ S#systemEo$$in$ Aser Can Searc! 6ecor"e" Calls y 0ario#s iel"s274

J..17 6a"io =#t!entication.................................................................................................217

J..17.1 6a"io ails =#t!entication...................................................................................217

J..17.2 6a"io S#ccessf#lly =#t!enticates........................................................................211

J..11 6eport 9eneration 'ests...........................................................................................212

J..11.1 Bistorical 6eports................................................................................................212

J..11.2 Anifie" ;etork Confi$#rator 6eportsEevice Inventory 6eport.........................213

J..12 System %ana$ement 'ests......................................................................................21&

J..12.1 FoneWatc!..........................................................................................................21&

J..12.2 Confi$#ration %ana$ementE=ccess Permissions................................................21

J..12.3 Confi$#ration %ana$ementE9eneral 'imeo#t Parameters..................................21+

J..12.& Confi$#ration %ana$ementES#scrier Capailities...........................................21-

J..12. Confi$#ration %ana$ementE'alk$ro#p Capailities.............................................21

J..12.+ Anifie" *vent %ana$erEAser =ctions Create =#"it 'rails....................................214

J..12.- =ffiliation isplay.................................................................................................227

%ont$omery Co#nty5 %arylan"Statement of Work

iv  

Statement of Work: 

Page 6: Motorola SOW - Reviewed by MoCo PM 2015-09-22

7/23/2019 Motorola SOW - Reviewed by MoCo PM 2015-09-22

http://slidepdf.com/reader/full/motorola-sow-reviewed-by-moco-pm-2015-09-22 6/309

J..12. Anifie" *vent %ana$erEia$nosticsE%#ltisite Site..............................................221

J..12.4 Provisionin$ %ana$erE*:port ata to .csv ile...................................................222

J..12.17 =#"it o$s in Provisionin$ %ana$er =pplication................................................223

J..13 ynamic System 6esilience.....................................................................................22&

J..13.1 9ateay 9P6S S#pport ;o"e 1 ail#re..............................................................22&

J..13.2 Packet ata 9ateay 1 ail#re...........................................................................22

J..13.3 Primary Core ail#reESitc!over to ,ack#p Core (0oice an" ata Services).....22+J..1& ="vance" %essa$in$ Sol#tion (=%S)......................................................................22-

J..1&.1 evice I %essa$in$ (6a"io to Smart Client)......................................................22-

J..1&.2 evice I %essa$in$ (Smart Client to 6a"io evice I).....................................22

J..1&.3 Sen" %essa$es from Smart Client to Smart Client..............................................224

J..1 ISSI 777 (If *nale")..............................................................................................237

J..1.1 %an#al 6oamin$E'alk$ro#p Call......................................................................... 237

J..1.2 =#tomatic 6oamin$E'alk$ro#p Call for Bome 'alk$ro#p.....................................231

J..1.3 %an#al 6oamin$E*mer$ency =larm an" Call.....................................................232

J..1.& =#tomatic 6oamin$E*mer$ency =larm an" Call for Bome 'alk$ro#p.................233

J..1. =#tomatic 6oamin$E'alk$ro#p Call for orei$n 'alk$ro#p..................................23&J..1+ Over@'!e@=ir 6ekeyin$ (O'=6) (If Option is P#rc!ase")..........................................23

J..1+.1 Clear Bello........................................................................................................... 23

J..1+.2 #ll Ap"ate to S#scrier....................................................................................23+

J..1+.3 6a"io 6eports......................................................................................................23-

J..1+.& 8% S#mmary 6eport.........................................................................................23

J..1+. ocke" O#t..........................................................................................................234

J..1+.+ 6a"io *nale.......................................................................................................2&7

J..1+.- 6a"io In!iit.........................................................................................................2&1

J..1+. 6ekey 6e/#est....................................................................................................2&2

J..1+.4 S#scrier Feroi<e..............................................................................................2&3

J..1- Over@'!e@*t!ernet 8eyin$ (If Option is P#rc!ase").................................................2&&

J..1-.1 *ncrypte" Bello #sin$ Over@'!e@*t!ernet 8eyin$...............................................2&&

J..1-.2 #ll Ap"ate to Console #sin$ O'*8....................................................................2&

J..1-.3 #ll Ap"ate to =rc!ivin$ Interface Server.............................................................2&+

J..1 Si$noff Certificate.....................................................................................................2&-

J.+ 'rainin$ Plan (C..2.+.+)..................................................................................................2&

J.+.1 Overvie......................................................................................................................2&

J.+.2 'rainin$ =pproac!........................................................................................................2&

J.+.3 Propose" Co#rses........................................................................................................27

J.+.3.1 *:ec#tive Overvie 'rainin$................................................................................27

J.+.3.2 System ="ministratorD'ec!nician 'rainin$ (P!ase I).............................................27

J.+.3.3 'ec!nician 'rainin$ (P!ase II)..............................................................................22

J.+.3.& 'ec!nician 'rainin$ (Optional)..............................................................................22

J.+.3. *n" Aser ispatc! Console 'rainin$E'rain@t!e@'rainer........................................23

J.+.3.+ *n" Aser 6a"io 'rainin$E'rain@t!e@'rainer..........................................................2&

%ont$omery Co#nty5 %arylan"Statement of Work

Table of Contents 

Page 7: Motorola SOW - Reviewed by MoCo PM 2015-09-22

7/23/2019 Motorola SOW - Reviewed by MoCo PM 2015-09-22

http://slidepdf.com/reader/full/motorola-sow-reviewed-by-moco-pm-2015-09-22 7/309

 J.+.3.- o$$in$ 6ecor"er 'rainin$...................................................................................2

J.+.3. %icroave 'rainin$..............................................................................................2+

J.+.& Co#rse escriptions.....................................................................................................2-

J.+.&.1 =S'6O 2 I0G it! % Core System Overvie (=CS-1&277)............................2-

J.+.&.2 omain Controller ="ministration for =S'6O 2..................................................2+7

J.+.&.3 =S'6O 2 I0G Intro"#ction to 6a"io System %ana$ement =pplications

(=CS-13271)....................................................................................................................... 2+2J.+.&.& =S'6O 2 I0G 6a"io System ="ministrator Works!op (=CS-1&172)............. .2+&

J.+.&. =S'6O 2 I0G 'r#nke" System Interfacin$ SmartFone 3+77 Systems it!Smart 2+-

J.+.&.+ %CC -777 Series ispatc! Consoles Overvie (CO;71&)..................................2+

J.+.&.- %CC -777 Series ispatc! Consoles Works!op (CO;712)................................2-7

J.+.&. =S'6O 2 I0G 9'6 777 6epeater Site Works!op (=CS-1&27)...................2-2

J.+.&.4 =P CPS Pro$rammin$ an" 'emplate ,#il"in$....................................................2-&

J.+.&.17 =S'6O 2 'e:t %essa$in$ Service 'rainin$ (=CS-211).....................................2-+

J.+.&.11 =S'6O 2 I0G Sec#re Comm#nications Works!op.........................................2--

J.+.&.12 %CC -77 ispatc! Console Operator 'rainin$ (*A'71+)..................................2-J.+.&.13 %CC -77 ispatc! Console ="ministrator 'rainin$ (*A'71-)...........................27

J.+.&.1& =P Portale an" =P %oileE'rain@t!e@'rainer................................................21

J.+.&.1 0erint o$$in$ 6ecor"er =#"io o$..................................................................... 2&

J.+.&.1+ =0I=' %icroave E *clipse an" Pro0ision 'rainin$.............................................2+

J.+. '!e Interactive *n" Aser 'ool 8it.................................................................................2

J.- C#tover 6ollack Plan (C.17.2.3).....................................................................................24

J.-.1 P!ase IEPre@C#tover Preparation................................................................................247

J.-.1.1 Preliminary C#tover Plan O#tline..........................................................................247

J.-.1.2 I"entification of Prere/#isitesDConstraintsD=ss#mptions.......................................247

J.-.1.3 Overvie of t!e Propose" Smart %i$ration........................................................241J.-.1.& etaile" 'imelineDSe/#ence of *vents.................................................................242

J.-.1. Post@C#tover Strate$yES!ort@'erm an" on$@'erm S#pport 6e/#irements...... ...242

J.-.2 P!ase IIEC#tover *:ec#tion.........................................................................................242

J.-.2.1 'r#nkin$ Infrastr#ct#re.........................................................................................242

J.-.2.2 ,ri"$in$ t!e C#rrent Infrastr#ct#re it! t!e ;e System Infrastr#ct#re...............243

J.-.3 P!ase IIIEPost@C#tover =ctivities.................................................................................24

J.-.& Concl#sion...................................................................................................................24

 =ttac!ment =H Project 2 6a"io System Payment Sc!e"#le.24+

 =ttac!ment ,H Project 2 6a"io System Infrastr#c#tre Project @ C!an$e orm.24

%ont$omery Co#nty5 %arylan"Statement of Work

vi  

Statement of Work: 

Page 8: Motorola SOW - Reviewed by MoCo PM 2015-09-22

7/23/2019 Motorola SOW - Reviewed by MoCo PM 2015-09-22

http://slidepdf.com/reader/full/motorola-sow-reviewed-by-moco-pm-2015-09-22 8/309

SECTION J

STATEMENT OF WORKJ.1 PROJECT PLAN (C.3.1.2)

Motorola’s team of project managers, engineers, and service personnel will be the County’s partnerfor the entire life of the system, from planning and designing the system in the proposal stage, todeploying and integrating the network as quickly, efficiently, and cost-effectively as possible withoutsubordinating quality, cost, or schedule.

s shown in !igure ".# -#, Motorola’s project approach is based on the industry standard $rojectManagement %ody of &nowledge '$M%(&) process, a standard developed by the $rojectManagement *nstitute '$M*). +he $M%(& encompasses generally accepted project managementmethodologies and processes. Motorola’s $roject Management organiation strongly encourages $M*certification, and Motorola requires it as a qualification to run comple projects.

Figure J.1-1: Motorola’s services framework incorporates the PMI model and PM!" processes to provide alow-risk implementation of Montgomer# $ount#’s comple% s#stem

Motorols’a approach allows it to control risk, schedule, and costs throughout the term of the contractand partner with the County to meet the scheduled goals and implementation of the system. +hese$roject Management and ystem *ntegration skills and processes will be applied to the successfulimplementation of the County’s system, following this detailed tatement of /ork '(/).

(n top of Motorola’s project management foundation, Motorola has created a ystem *ntegration '*) process to manage communication systems projects. Motorola’s * process has been successfullyutilied to implement over #,000 public safety standards-based voice and data networks.

J.1.1 Sy!"# I#$%"#"&!'!& O*"+*"

!igure ".# -1 below is an overview of activities and deliverables for major phases of the systemimplementation process that begins after contract eecution.

%ont$omery Co#nty5 %arylan"Statement of Work Ase or "isclos#re of t!is proposal is s#ject

to t!e restrictions on t!e cover pa$e.

 Motorola Solutions Confidential Restricted Table of Contents i 

Page 9: Motorola SOW - Reviewed by MoCo PM 2015-09-22

7/23/2019 Motorola SOW - Reviewed by MoCo PM 2015-09-22

http://slidepdf.com/reader/full/motorola-sow-reviewed-by-moco-pm-2015-09-22 9/309

 

Figure J.1-&: '#stem implementation overview

J.1.2 S-"/0%&

Central to the project implementation is the project schedule. +he schedule tracks tasks, milestones,start-end dates, predecessors and critical path, and owners based on a /ork %reakdown tructure'/%) that is agreed to between the County and Motorola. +he responsibility matri in +able " -# outlines responsibilities of Motorola and the County regarding the project schedule.

(a)le J-1: Pro*ect scheduling

(ask Motorola $ount#W,S

%aintain Sc!e"#le

Sc!e"#le revie "#rin$ eekly stat#smeetin$

J.1.3 P+"-! M""!&

Motorola and the County will participate in critical meetings during the project implementation thatwill assure a low-risk, on-time installation. +able " -1 outlines the meetings and the responsibilities.

(a)le J-&: Pro*ect meetings

(ask +esponsi)ilit# ,elivera)le

Project 8ickoff %eetin$ Co#nty an"%otorola

6evie of 6P5 response an" actionitems for preparation for C6

C6 ill lock "on "esi$n5 testin$plans5 sc!e"#le5 project plan5 an"c#tover.

Co#nty an"%otorola

Complete" "esi$n an" concept#al =cceptance 'est Plan

%ont$omery Co#nty5 %arylan"Statement of Work

2  

Statement of Work: 

Page 10: Motorola SOW - Reviewed by MoCo PM 2015-09-22

7/23/2019 Motorola SOW - Reviewed by MoCo PM 2015-09-22

http://slidepdf.com/reader/full/motorola-sow-reviewed-by-moco-pm-2015-09-22 10/309

(ask +esponsi)ilit# ,elivera)le

Project Sc!e"#le reviee" on aieekly asis as an a$en"a itemto t!e Project Stat#s %eetin$s.

Co#nty an"%otorola

6eviee" an" #p"ate" ProjectSc!e"#le

J.1. P+"-! T"'#

+he $roject +eam will manage the day to day activities of the project and will be made up ofMotorola 2mployees, Motorola ubcontract vendors and their employees working in conjunctionwith the County.

Figure J.1-: Montgomer# $ount# P& +adio Moderni/ation Pro*ect (eam

J.1.4.1 County Lead Project Manager

+he County will designate a $roject Manager who will direct the County efforts and serve as the primary point of contact for Motorola. +he County $roject Manager will have significant authority tomake certain decisions relative to the project, on behalf of the County, and will have direct access toCounty eecutive management for resolving problems beyond his3her immediate authority. +heCounty’s 4ead $roject Manager’s responsibilities include are included in +able " -5.

%ont$omery Co#nty5 %arylan"Statement of Work

Statement of Work: 3

Page 11: Motorola SOW - Reviewed by MoCo PM 2015-09-22

7/23/2019 Motorola SOW - Reviewed by MoCo PM 2015-09-22

http://slidepdf.com/reader/full/motorola-sow-reviewed-by-moco-pm-2015-09-22 11/309

 (a)le J-: $ount# 0ead Pro*ect Manager +esponsi)ilities

(ask +esponsi)ilit#

Project Oners!ip   Primary point of Contact for t!e Co#nty.

Project Comm#nication   %aintain project comm#nications it! %otorola?s Project

%ana$er.

Participate in eekly conference meetin$sDcalls.

Provi"e timely responses to iss#es relate" to projectpro$ress raise" y %otorola?s Project %ana$er.

*ns#re t!at all appropriate Co#nty personnel atten"

an"Dor actively participate in Pro$ress 6evies5conference calls5 an" ot!er project meetin$s.

Project Sc!e"#le 6evie t!e preliminary Project Sc!e"#le it! %otorola?s

Project %ana$er an" assist %otorola in "evelopin$ a"etaile" Project Sc!e"#le.

Project Implementation   %onitor t!e project to ens#re t!at s#pport reso#rces are

availale as sc!e"#le".

Otain all CC licenses5 ac/#ire lan" for $reen fiel" sites

(if nee"e")5 enter into leasin$ a$reement it! t!ir"@partyone" sites5 an" any ot!er a$reements re/#ire" to $ain#se of sites.

%ont$omery Co#nty5 %arylan"Statement of Work

Statement of Work: 

Page 12: Motorola SOW - Reviewed by MoCo PM 2015-09-22

7/23/2019 Motorola SOW - Reviewed by MoCo PM 2015-09-22

http://slidepdf.com/reader/full/motorola-sow-reviewed-by-moco-pm-2015-09-22 12/309

J.1.4.2 Motorola Lead Project Manager

Motorola will designate a $roject Manager who will direct Motorola’s efforts and serve as the primary point of contact for the County. +he Motorola 4ead $roject Manager’s responsibilitiesinclude are included in +able " -6.

(a)le J-: Motorola 0ead Pro*ect Manager +esponsi)ilities

(ask +esponsi)ilit#

Project Oners!ip   Primary point of Contact for t!e Co#nty.

Si$nificant a#t!ority it!in %otorola.

%otorola *:ec#tive %$mt access.

Onsite location at Co#nty 6a"io S!op

Project Comm#nication   6#n all Weekly Stat#s reviesH

o %ana$e all a$en"a items.

o Previo#s perio" activities.

o Planne" activities.

o Project Sc!e"#le.

o Open Item Stat#sD6esol#tion.o Provi"e Written %in#tes it!in #siness "ays.

o Provi"e stat#s reports prior to eac! revie.

Iss#e mont!ly stat#s reports t!at incl#"e t!e project

stat#s5 milestones ac!ieve"5 #pcomin$ tasks5 an"report on tasks e!in" sc!e"#le5 an" act#al an"potential prolems.

Project Sc!e"#le %aintain t!e Project Sc!e"#le ase" on t!e

approve" W,S.

6eport stat#s an" "eviationsDmiti$ation.

Project Plan   %ana$ement of s#contractors.

%ana$ement of %otorola laor.

Coor"ination of activities it! t!e Co#nty.

6isk %ana$ement   Oners!ip of t!e Project 6isk Plan.

%aintain t!e action item lo$.

6esol#tion an" reportin$ of iss#es.

>#ality =ss#rance   Coor"inate all system an" acceptance tests it! t!e

Co#nty.

%aintain t!e a$ree" #pon action lo$ resol#tion an"

reportin$ of iss#es.

6+ >#ality Installations.

Sec#re fire inspection an" #il"in$ inspection

certificates for Co#nty@one" property.

%ont$omery Co#nty5 %arylan"Statement of Work

Statement of Work: 5 

Page 13: Motorola SOW - Reviewed by MoCo PM 2015-09-22

7/23/2019 Motorola SOW - Reviewed by MoCo PM 2015-09-22

http://slidepdf.com/reader/full/motorola-sow-reviewed-by-moco-pm-2015-09-22 13/309

 

J.1.4.3 Lead System Engineer

Motorola will designate a $roject 2ngineer who will be responsible for the design of the system andserve as the primary technical point of contact for the County. +he Motorola 4ead $roject 2ngineer’sresponsibilities are included in +able " -7.

(a)le J-: 0ead s#stem engineer responsi)ilities

(ask +esponsi)ilit#

esi$n Oners!ip   'ec!nical point of Contact for t!e Co#nty.

Si$nificant a#t!ority it!in %otorola.

 =ccess to pro"#ct en$ineerin$ teams.

etaile" esi$n oc#ment   oc#mentin$ t!e etaile" esi$n.

S#system esi$n of '!ir" PartiesH

o %icroave ack!a#l.

o o$$in$ recor"ers.

o ,=s.

Implementation 6 re/#ency Plan.

%W Coor"ination.

leetmappin$.

actory Sta$in$.

System Optimi<ation.

 =cceptance Plannin$ Work it! Co#nty to create test plans forH

actory 'est.

Component 'est.

#nctional 'est.

Covera$e 'est.

47 ay ,#rn@in.

%ont$omery Co#nty5 %arylan"Statement of Work

6  

Statement of Work: 

Page 14: Motorola SOW - Reviewed by MoCo PM 2015-09-22

7/23/2019 Motorola SOW - Reviewed by MoCo PM 2015-09-22

http://slidepdf.com/reader/full/motorola-sow-reviewed-by-moco-pm-2015-09-22 14/309

J.1.4.4 Backaul Engineer

Motorola will draw upon its ystem 2ngineering resources to support the backhaul design. +hisengineer will be a primary point of contact with viat 8etworks engineering as well as the County’s!iber8et technical staff. +he %ackhaul 2ngineer responsibilities are outlined in +able " -9.

(a)le J-2: ackhaul engineer responsi)ilities

(ask +esponsi)ilit#

esi$n Oners!ip   'ec!nical point of Contact for t!e Co#nty an" its

%icroave S#pplier =viat.

etaile" esi$n oc#ment   Will ork it! =viat in "evelopin$ re/#ire"

"oc#ments for t!e etaile" esi$n oc#ment as itrelates to %icroave ack!a#l.

Implementation %W re/#ency Coor"ination.

 =cceptance Plannin$   Will coor"inate activities of %otorola an" =viat

"#rin$H

o actory 'est.

o Component 'est.

o #nctional 'est.

o Covera$e 'est.

o 47 ay ,#rn@in.

J.1.4.! "re#uency Coordination Engineer

Motorola will draw upon its ystem 2ngineering :esources at its local office in Columbia, M; aswell as its 8ational Coverage <roup in chaumburg, *4 to support its coverage design. +heresponsibilities of the !requency Coordination 2ngineer are outlined in +able " -=. 

(a)le J-3: Fre4uenc# coordination engineer responsi)ilities

(ask +esponsi)ilit#

esi$n Oners!ip   'ec!nical point of Contact for t!e Co#nty for its

covera$e "esi$n.

etaile" esi$n oc#ment   Will ork in conj#nction it! ;ational Covera$e

'eam in "evelopin$ re/#ire" "oc#ments for t!eetaile" esi$n oc#ment as it relates toH

6 Covera$e.

Site "esi$n.

Implementation 6 re/#ency Coor"ination.

 =cceptance Plannin$   Will coor"inate activities of %otorola an" =viat

"#rin$ C='P Covera$e 'est

%ont$omery Co#nty5 %arylan"Statement of Work

Statement of Work: 7 

Page 15: Motorola SOW - Reviewed by MoCo PM 2015-09-22

7/23/2019 Motorola SOW - Reviewed by MoCo PM 2015-09-22

http://slidepdf.com/reader/full/motorola-sow-reviewed-by-moco-pm-2015-09-22 15/309

 

J.1.4.$ Project %endors and Su&contractors

Motorola will be working with several subcontractors and vendors to bring the County its totalsystem solution. 2ach of these vendors will supply unique skill sets and epertise. +able " ->summaries these vendors and their contribution.

(a)le J-5: 'u)contractor responsi)ilities

(ask +esponsi)ilit#

'eltronic Inc.   i:e" ;etork */#ipment Installation an"

S#scrier Installation.

 =viat ;etorks   %icroave ,ack!a#l.

Comm"e: Cons#ltin$   In ,#il"in$ Covera$e Systems.

0erint   o$$in$ 6ecor"er Sol#tions.

;IC*   o$$in$ 6ecor"er Sol#tions.

 =:is 0i"eo   0i"eo %onitorin$.

,ramic   ispatc! #rnit#re.

Pyrami" Inc   Site evelopment.

ispatc! Center Constr#ction.

 =merican 'oer Inc.   Site evelopment.

PS6I 'ec!nolo$ies Site evelopment.

S,P Cons#ltin$ C   Covera$e 'estin$.

Intellect Corp   ispatc! Center Calin$.

,ron?s Comm#nication   S#scrier Installation.

*/#ipment ecommissionin$.

0i"eo %onitorin$ Installation.

'elecomm#nicationsevelopment Corporation

Project aor.

%ont$omery Co#nty5 %arylan"Statement of Work

  

Statement of Work: 

Page 16: Motorola SOW - Reviewed by MoCo PM 2015-09-22

7/23/2019 Motorola SOW - Reviewed by MoCo PM 2015-09-22

http://slidepdf.com/reader/full/motorola-sow-reviewed-by-moco-pm-2015-09-22 16/309

J.1.4 D"-+$!& 5 W+6

+his (/ defines the principal activities and responsibilities of all parties for the implementation ofthe integrated County-wide Communications ystems for Montgomery County. +he ystem;escription provides details on the equipment implemented under this scope. ystem ;escription isincluded in this tatement of /ork. ;eviations and changes to the (/ are subject to mutual

agreement between the County and Motorola and will be addressed according to the change provisions of the Contract.

J.1.!.1 System '(er(ie)

+he following major subsystems are included as components of the $roject (/?

• >00 M@ $17 :adio ystem.

• =00 M@ $17 (verlay.

• MCC =700 Console ubsystem.

• 4ogging :ecorder ubsystem.

• $aging ubsystem.

• Microwave ubsystem.• Aideo Monitoring ubsystem.

• ite ccess and ecurity.

• Civil /ork.

• (ptional *tems, as purchased.

;ote: Anless ot!erise in"icate"5 t!e or" systemK !erein ill refer to t!e compilation of t!efore$oin$ s#systems5 interfaces5 an" ancillary systems.

J.1.!.2 System *m+lementation '(er(ie)

+he $17 :adio ystem Moderniation project schedule provides a phased approach toimplementation, with the following phases?

• $roject *nitiation and &ickoff.

• Customer ;esign :eview 'C;:).

• (rder $rocessing, Manufacturing, !leetmapping, +emplate, taging, and !actory +esting of the

$17 :adio ystem.

• Civil /ork.

• !ied 2quipment *nstallation.

• ystems *ntegration and (ptimiation.

• cceptance +esting, including factory test, installed component test, operational subsystem test,

system functional test, coverage test, A@! system test, and B0-day reliability test.

• +raining.• Cutover.

• $roject !inaliation.

%ont$omery Co#nty5 %arylan"Statement of Work

Statement of Work: !

Page 17: Motorola SOW - Reviewed by MoCo PM 2015-09-22

7/23/2019 Motorola SOW - Reviewed by MoCo PM 2015-09-22

http://slidepdf.com/reader/full/motorola-sow-reviewed-by-moco-pm-2015-09-22 17/309

 

J.1.!.3 ,escri+tion o- ork/ Scedule/ and 0es+onsi&ilities

+he work associated with each of the phases of the (/ is divided into the following tasks? +itle,(bjective, +ask ;escription, Motorola and County :esponsibilities, and Completion Criteria. +hescheduled dates of tasks are depicted in the high-level $roject chedule included this tatement of/ork. <eneral responsibilities applicable to all work are included in ection 2rror? :eference sourcenot found below.

J.1.!.4 Project *nitiation and icko--

+he project will be initiated with a $roject &ickoff meeting including key County and Motorola project participants. +he objectives of the &ickoff meeting are included in +able " -B.

(a)le J-6: "ickoff meeting

(ask Motorola $ount# ,elivera)le

Comm#nication Plan

*:c!an$e contact information.

oc#ment project personnel.

6evie 6oles.

ines of Comm#nication.

I key ork partners an" #sers.

etaile" esi$n 6evie

6evie Project Scope.

esi$n.

Implementation.

6evie ProjectSc!e"#le

6evie #ni/#e sc!e"#le re/#irements.

6evie 6eso#rces.

 =li$n e:pectations onProject Plans

6isk %ana$ement.

>#ality =ss#rance.

Comm#nications Plan.

etaile" esi$n.

 =ction o$ an" Iss#e %ana$ement.

J.1.!.! ,esign 0e(ie)

preliminary design has been provided as a part of this tatement of /ork, which serves as a baseline for the C;:. +he C;: encompasses the design finaliation of the major subsystems, such asfinaliation of site locations, coverage design, and !CC licensing tasks. +he C;: will also includefinaliation of the $roject $lan, which will include schedule and /% to include all key elements ofthe implementation with identified parties who will perform the work. s part of the $roject $lan and

:isk Mitigation $lan, the C;: will include identification of required testing during !actory taging,!unctional +esting, and Coverage +esting. Motorola will work closely with the County to develop adetailed Cutover $lan to transition to the new communications system. t the end of the C;: phase, preliminary ;etailed ;esign ;ocuments will be provided to the County showing how the equipmentwill be installed, connected, and tested. dditionally, an equipment list of all material will be includedalong with any product literature and manuals.

%ont$omery Co#nty5 %arylan"Statement of Work

"#  

Statement of Work: 

Page 18: Motorola SOW - Reviewed by MoCo PM 2015-09-22

7/23/2019 Motorola SOW - Reviewed by MoCo PM 2015-09-22

http://slidepdf.com/reader/full/motorola-sow-reviewed-by-moco-pm-2015-09-22 18/309

;raft and final versions of documents will be provided to the County for review and approval, whichwill finalie the design review process. +he responsibility matri in +able " -#0 defines thedeliverables and responsibilities for both the County and Motorola.

(a)le J-17: ,esign review

(ask Motorola $ount# ,elivera)le

Covera$e esi$n an" Sites

inal Site Selection.

Covera$e esi$n.

Covera$e maps.

re/#ency Plan

re/#ency PlanH

%icroave fre/#ency plan an"

"esi$n.

Pat! S#rveys.

re/#ency plan y site.

C#tover Plan C#tover Plan

inali<e t!e Project Sc!e"#le Project Sc!e"#le

esi$n oc#ment 6evie

'!e Preliminary esi$n oc#ment illincl#"eH

*/#ipment list (ill of materials).

System escription.

System "rain$s an"

"oc#mentation.

Complete lock "ia$rams of t!e

entire 6a"io System.

loor Plan rain$s an" rack

layo#ts.

etaile" Poer an" B0=C

re/#irements.

Site $ro#n"in$ systems.

I"entification of netork "esi$n.

;etork timin$ an" sync!roni<ation.

 =ntenna "esi$n.

ail#re mo"eD#ser impact an"

recovery.

Ap"ate t!e SOW.

Co#nty ill revie ork performe"y %otorola an" si$n an approval"oc#ment forH

esi$n 6evie. Project Sc!e"#le.

Comm#nications Plan.

6isk Plan.

>#ality Plan.

Safety Plan.

 =pproval Statement of esi$n an"Project Plans

%ont$omery Co#nty5 %arylan"Statement of Work

Statement of Work: ""

Page 19: Motorola SOW - Reviewed by MoCo PM 2015-09-22

7/23/2019 Motorola SOW - Reviewed by MoCo PM 2015-09-22

http://slidepdf.com/reader/full/motorola-sow-reviewed-by-moco-pm-2015-09-22 19/309

 J.1.!.!.1 Co(erage ,esign

Motorola and the County will work together to finalie sites for inclusion in the $17 :adio ystem.Motorola will analye the coverage and evaluate frequency compatibility to aid the County infinaliing radio sites and radio site configurations.

+he responsibility matri in +able " -## defines the deliverables and responsibilities for both theCounty and Motorola.

(a)le J-11: $overage design

(ask Motorola $ount# ,elivera)le

6evie t!e covera$e an" sitelocations.

 =$reement of site location an"confi$#ration

'!e Co#nty ill lease or p#rc!asera"io sites s#itale for t!e system.

Site =c/#isition or eases onS#itale Property

%otorola ill incorporate "esi$nlimitations ase" on Co#ntyre/#irements for CC licenses.

Incorporate licensin$ inp#t to 6"esi$n

Covera$e esi$n 6evieH

Covera$e maps for t!e 6system t!at ill#strate t!epre"icte" covera$e.

6evie all covera$e pre"ictions

it! t!e Co#nty team.

inali<e" covera$e maps for t!eP2 6a"io System %o"erni<ation

J.1.!.!.2 Micro)a(e Su&system ,esign

Motorola’s design includes a new ;igital Microwave 8etwork consisting of the followingcomponents?

Microwave $omponent

• $oint-to-$oint ;igital Microwave :adios.• Microwave ntennas.

• ntenna ystems.

• larms.

•  8etwork Management ystem.

Motorola will work with County to research frequencies, prior to coordination, and preparation of allassociated !CC license applications on behalf of the County. +able " -#1 defines the deliverables andresponsibilities for both the County and Motorola.

(a)le J-1&: Microwave su)s#stem design

(ask Motorola $ount# ,elivera)le

Con"#ct site visits at all sitesnecessary for t!e microaveack!a#l.

 =$ree" #pon reme"iation plan it! t!eCo#nty if re/#ire"

%otorola ill con"#ct pat! s#rveys.

C!anneli<ation Plan it!recommen"e" antenna centerlinemo#ntin$ !ei$!ts provi"e" to t!eCo#nty

%ont$omery Co#nty5 %arylan"Statement of Work

"2  

Statement of Work: 

Page 20: Motorola SOW - Reviewed by MoCo PM 2015-09-22

7/23/2019 Motorola SOW - Reviewed by MoCo PM 2015-09-22

http://slidepdf.com/reader/full/motorola-sow-reviewed-by-moco-pm-2015-09-22 20/309

(ask Motorola $ount# ,elivera)le

If re@licensin$ is re/#ire"5 %otorolaill prepare all re/#ire" "oc#mentsfor t!e co#nt.

CC icensin$ re/#est

S#mittal of icense 6e/#est to t!eCC.

 =pprove" icenses

J.1.!.!.3 "re#uency Plan and *ntermodulation *M nalysis

Motorola and the County will work together to finalie a frequency plan for the $17 :adio ystemModerniation. Motorola will evaluate frequency compatibility based on the frequency assetsidentified for use within the system based on the desired coverage and loading. +hese steps will be aniterative process to aid the County in finaliing the system configurations. +he responsibility matriin +able " -#5 defines the deliverables and responsibilities for the County and Motorola.

(a)le J-1: Fre4uenc# plan and intermodulation anal#sis

(ask Motorola $ount# ,elivera)le

esi$n to meet co@ an" a"jacent@

c!annel licensee protection an" ot!er

r#les as man"ate" y CC r#les (C6'itle &-).

esi$n to meet t!e 6e$ional Plannin$

Committee 27 -77 %B< 6e$ionalPlan.

ist of potential 0B fre/#encies

Co#nty ill confirm t!e list of fre/#enciesfor #se it!in t!e P2 6a"io System

 =$reement on t!e fre/#ency list

If re/#ire" icenses ill e mo"ifie" yt!e Co#nty once ra"io locations !aveeen finali<e".

 =men"e" icenses

esi$n compatiility of i"entifie"fre/#encies it!in t!e sim#lcast cells.

*val#ation of re/#encyCompatiility it! Sites

'!e site oner ill provi"e fre/#ency5antenna5 an" poer o#tp#t information for all e:istin$ site occ#pants to facilitatef#rt!er en$ineerin$ analysis.

SiteOner 

*:istin$ re/#ency5 =ntenna5 G*6P Information

I% analysis to i"entify any I% iss#es an"recommen"e" fi:es.

Comp#ter@,ase" I% =nalysis GOt!er Co#nty re/#ency6ecommen"ations

%otorola ill recommen" a fre/#encyplan.

re/#ency plan for t!e P26a"io System t!at #ses availalec!annels to meet t!e covera$ean" loa"in$ re/#irements

Provi"e all re/#ire" ra"io licensin$ orlicensin$ mo"ifications for t!e systemprior to system sta$in$.

77 D-77 %B< 'ec!nical e:!iitsan" icensin$

6esearc! an" prepare CC forms an"s#mittals nee"e" for e:istin$ an"Dor nesites or c!annels.

Provi"e to Co#nty for si$nat#rean" s#mittal

%ont$omery Co#nty5 %arylan"Statement of Work

Statement of Work: "3

Page 21: Motorola SOW - Reviewed by MoCo PM 2015-09-22

7/23/2019 Motorola SOW - Reviewed by MoCo PM 2015-09-22

http://slidepdf.com/reader/full/motorola-sow-reviewed-by-moco-pm-2015-09-22 21/309

 

(ask Motorola $ount# ,elivera)le

 =s man"ate" y CC5 Co#nty5 as t!e

licensee5 !as t!e #ltimateresponsiility for provi"in$ all re/#ire"ra"io licensin$ or licensin$mo"ifications for t!e system prior tosystem sta$in$.

%otorola ill researc! an" prepareCC forms an" s#mittals nee"e" fore:istin$ an"Dor ne sites or c!annels5an" provi"e to Co#nty for si$nat#rean" s#mittal.

Co#nty is responsile for t!e

coor"ination an" licensin$ fees for t!era"io netork.

If5 for any reason5 any of t!e

fre/#encies cannot e #se" "#e toreasons eyon" %otorola?s control5t!e costs of fre/#ency searc!es an"coor"ination5 etc. incl#"in$5 #t not

limite" to5 re@en$ineerin$5 fre/#encyre@licensin$5 sc!e"#le "elays5 re@moili<ation5 etc.5 ill e pai" for yCo#nty.

0B D 77 D -77 %B< 'ec!nicale:!iits an" icensin$

J.1.!.!.4 ,e(elo+ Cuto(er Plan

*mplementation of the Montgomery County $17 :adio ystem Moderniation will require a detailedcutover plan for a smooth transition from the eisting :adio ystem to the new :adio ystem. +able" -#6 defines the deliverables and responsibilities for both County and Motorola. Cutover $lan isincluded in ection ".#0 of this tatement of /ork.

(a)le J-1: ,evelop cutover plan

(ask Motorola $ount# ,elivera)le

*:istin$ system an" #ser information (e.$.5"ispatc! an" s#scrier)5 an" specificve!icle information5 !ic! m#st e takenin to acco#nt to "evelop a "etaile" c#toverplan.

*:istin$ System an" AserInformation

'!e P2 6a"io System %o"erni<ationc#tover plan ill e "evelope"5 takin$ intoacco#nt t!e nee" to minimi<e impact to#sers mi$ratin$ to t!e P2 6a"io System%o"erni<ation.

Preliminary C#tover Plan

%ont$omery Co#nty5 %arylan"Statement of Work

"4 

Statement of Work: 

Page 22: Motorola SOW - Reviewed by MoCo PM 2015-09-22

7/23/2019 Motorola SOW - Reviewed by MoCo PM 2015-09-22

http://slidepdf.com/reader/full/motorola-sow-reviewed-by-moco-pm-2015-09-22 22/309

J.1.!.!.! Esta&lis Project Scedule

;uring C;: the $roject chedule will be finalied through the changes mutually agreed upon between the parties during the C;:. +he resulting document defines specific project tasks to becompleted and documents the final $roject chedule for each subsystem to be implemented. +able "-#7 defines the deliverables and responsibilities for both County and Motorola. +he $roject chedulewill become the governing $roject chedule incorporated into the contract, but is subject to change on

mutual agreement of the parties.

(a)le J-1: Finali/e pro*ect schedule

(ask Motorola $ount# ,elivera)le

6evie i"entifie" implementation tasks5priorities5 inter@"epen"encies an" ot!erre/#irements

I"entify key project milestones5 in a""itionto tasks t!at ill re/#ire interr#ption ofe:istin$ comm#nications

Project Sc!e"#le 6evie

Prepare final Project Sc!e"#le Project Sc!e"#le inali<ation

6evie t!e final Project Sc!e"#le an"i"entify in ritin$ any specific "eficienciesfo#n" it!in 17 #siness "ays of receipt

Project Sc!e"#le =pproval

C!an$es after Initial Project Sc!e"#le =pproval

%#t#ally a$ree" #pon t!ro#$!t!e c!an$e or"er process.

J.1.!.!.$ cce+tance 5est Plan

Motorola will develop an cceptance +est $lan '+$) to provide an understanding of procedures fortesting functionality and performance of the system. +he tests will validate the functional performance of the system.

n +$ will be finalied as a part of the C;: process. +he +$ includes the acceptance criteria toensure the equipment operates according to specifications identified in the contract. +able " -#9 defines the deliverables and responsibilities for both the County and Motorola.

(a)le J-12: 8cceptance test plan

(ask Motorola $ount# ,elivera)le

6evie t!e overall approac! to testin$incl#"in$ !ar"are5 softare5 an" finalsystem acceptance criteria.

6evie ='P an" %et!o"olo$y.

Provi"e relate" information re/#este" y%otorola to assist %otorola in completin$t!e ='P.

Information s#pplie" asre/#este".

Create aseline ='P "oc#ment forCo#nty 6evie.

Co#nty i"entifies any "eficienciesit!in 17 #siness "ays

S#mit a final ='P "oc#ment to Co#ntyfor approval.

inal ='P

6evie an" approve t!e final ='P. =pproval of inal ='P

%ont$omery Co#nty5 %arylan"Statement of Work

Statement of Work: "5 

Page 23: Motorola SOW - Reviewed by MoCo PM 2015-09-22

7/23/2019 Motorola SOW - Reviewed by MoCo PM 2015-09-22

http://slidepdf.com/reader/full/motorola-sow-reviewed-by-moco-pm-2015-09-22 23/309

 

J.1.!.$ 'rder Processing

pon lock down of the system design at the ;etailed ;esign :eview, Motorola will place factoryorders for the system hardware that is being purchased for the $17 :adio ystem. +able " -#= definesMotorola deliverables and responsibilities.

(a)le J-13: !rder processing

(ask Motorola $ount# ,elivera)le

actory or"ers place" for all %otorola@man#fact#re" e/#ipment.

Or"ers for %otorolaman#fact#re" e/#ipment

Or"er place" for all t!ir"@party e/#ipment. '!ir"@party e/#ipment or"ers

%otorola ill e:ec#te major s#contracts. S#contracts in place

J.1.!.6 Manu-acturing

Manufacturing activities commence after order processing. +able " -#> defines Motorola deliverablesand responsibilities.

(a)le J-15: Manufacture e4uipment

(ask Motorola $ount# ,elivera)le

%an#fact#re %otorola e/#ipment.

Comm#nications SystemBar"are s!ips to actorySta$in$ area

'rack t!ir"@party e/#ipment s#ppliers.

Comm#nications SystemBar"are s!ips to actorySta$in$ area

J.1.!.7 5em+late ,e(elo+ment and "leetma++ing

Concurrent with the manufacturing of the equipment within the ystem, a preliminary !leet-map and

+emplates will need to be developed for the !actory taging. fter successful completion of the!actory +est, the ystem !leetmap and +emplates will be finalied. +able " -#B defines the activitiesof !leetmapping and +emplate ;evelopment.

(a)le J-16: (emplate ,evelopment and Fleetmapping

(ask Motorola $ount# ,elivera)le

Create a leetmappin$ 'eam of %otorolaan" Co#nty #sers.

'eam name" an" estalis!esmeetin$s

6evie applicaility of c#rrent leet %apan" nee"e" c!an$es.

Aser fee"ack as tore/#irements

Prepare leetmap. Co#nty i"entifies any "eficiencies

inal leetmap prepare" an" sent toCo#nty for approval.  =pprove" leetmap

%ont$omery Co#nty5 %arylan"Statement of Work

"6  

Statement of Work: 

Page 24: Motorola SOW - Reviewed by MoCo PM 2015-09-22

7/23/2019 Motorola SOW - Reviewed by MoCo PM 2015-09-22

http://slidepdf.com/reader/full/motorola-sow-reviewed-by-moco-pm-2015-09-22 24/309

(ask Motorola $ount# ,elivera)le

%otorola ill "evelop templates for t!efolloin$ system componentsH

%CC -77 ispatc! System (#p to 17

templates) (OP'IO;).

%otorola S#scrier 'emplates

(OP'IO;).

ispatc! templates an"S#scrier */#ipment 'emplates

%otorola ill provi"e an" revietemplates an" confi$#ration "etail as"efine" y Co#nty re/#irements5 forCo#nty approval.

'emplate an" Confi$#ration"oc#mentation

Co#nty ill revie ork performe" y%otorola an" si$n an approval "oc#ment.

Written Pro$rammin$ 'emplatean" Confi$#ration =pprovalStatement

'emplate creation an" pro$rammin$ ofot!er man#fact#rers ra"ios is t!eresponsiility of Co#nty.

Pro$rammin$ ot!erman#fact#rers ra"ios

J.1.!.8 "actory Stagingtaging activities commence after the Manufacturing process. Motorola’s staging facilityD CustomerCenter for ystem integration 'CCi) is located in chaumburg, *4, adjacent to Motorola’smanufacturing facility, as well as Motorola’s engineering, development, and testing teams. +hisallows Motorola to provide all the technical personnel and test equipment to conduct staging tests.

+he Motorola field personnel and the County engineers identified by the County will benefit fromattending staging by participating in the construction of the ystem as it will be installed whenshipped to the County and per the ;etailed ;esign ;ocument. +his begins the hands on training forCounty radio personnel.

+able " -10 defines Motorola deliverables and responsibilities of !actory taging.

(a)le J-&7: Factor# staging

(ask Motorola $ount# ,elivera)le

Set #p an" rack system e/#ipment on asite@y@site asis5 as prescrie" in t!eetaile" esi$n oc#ment ().

Comm#nications SystemBar"are

C#t an" lael cales accor"in$ to t!eapprove" "oc#mentation.

Calin$ matc!in$ in@fiel"installation re/#irements

ael t!e cales it! toDfrom informationto specify interconnection for fiel"installation an" f#t#re servicin$ nee"s.

Calin$ matc!in$ in@fiel"installation re/#irements

Complete t!e calin$ connection eteens# systems.

Calin$ matc!in$ in@fiel"installation re/#irements

 =ssemle re/#ire" s#systems to ass#resystem f#nctionality.

#nctional system to performSta$in$ 'ests an" =cceptance

%ont$omery Co#nty5 %arylan"Statement of Work

Statement of Work: "7 

Page 25: Motorola SOW - Reviewed by MoCo PM 2015-09-22

7/23/2019 Motorola SOW - Reviewed by MoCo PM 2015-09-22

http://slidepdf.com/reader/full/motorola-sow-reviewed-by-moco-pm-2015-09-22 25/309

 

(ask Motorola $ount# ,elivera)le

Poer@#p5 pro$ram5 an" test all sta$e"e/#ipment.

#nctional system to performSta$in$ 'ests an" =cceptance

oa" application parameters on alle/#ipment accor"in$ to inp#t fromSystem *n$ineerin$.

#nctional system to performSta$in$ 'ests an" =cceptance

Complete pro$rammin$ of t!e i:e"

;etork */#ipment.

#nctional system to perform

Sta$in$ 'ests an" =cceptance

Pro$ram t!e approve" templates into t!era"io@pro$rammin$ template tool.

#nctional system to performSta$in$ 'ests an" =cceptance

Complete pro$rammin$ of t!e samples#scriers.

#nctional system to performSta$in$ 'ests an" =cceptance

Inventory e/#ipment it! serial n#meran" installation references.

Inp#ts for C#stomer =sset%ana$ement

Complete System "oc#mentation.

System oc#mentation asspecifie"

Provi"e a m#t#ally a$ree" to actory =cceptance 'est Plan

actory 'est ,e$ins

J.1.!.19 "actory 5esting

!or factory testing, the system will be configured at CCi as it will be in the field. +he followingsubsystems will be tested at CCi?

• Master Core and :edundant Master Core ';:).

• +:( 17 >00 M@ imulcast ystem, including $rime ites, :edundant $rime ites, and :!

ites.

• +:( 17 =00 M@ imulcast, including $rime ite and :! ites.

• Microwave %ackhaul.

• MCC =700 ;ispatch Consoles and %ack-up consoles.

• A@! $aging.

+his process will allow County personnel to witness factory testing in a controlled environment, aswell as provide a smooth and easy installation in the field. Motorola will perform end-to-end systemtesting from subscriber units to the dispatch console. +able " -1#  defines the County and Motoroladeliverables and responsibilities.

(a)le J-&1: Factor# testing

T'6 M!+%' C0&!y D"%*"+'7%"

#nctional Performance 'estin$H

'!is test ill incl#"e t!e folloin$H

P!ysical inspection. '!oro#$! e:ercise of !ar"are an"

softare.

'estin$ of voice comm#nications

feat#res.

0erification of "evice an" system

recovery from fail#res.

#nctional Performance tests

%ont$omery Co#nty5 %arylan"Statement of Work

"  

Statement of Work: 

Page 26: Motorola SOW - Reviewed by MoCo PM 2015-09-22

7/23/2019 Motorola SOW - Reviewed by MoCo PM 2015-09-22

http://slidepdf.com/reader/full/motorola-sow-reviewed-by-moco-pm-2015-09-22 26/309

T'6 M!+%' C0&!y D"%*"+'7%"

aile" tests are "oc#mente"5 correcte"an" reteste". efective components ille replace" if t!ey cannot pass factorytest.

#nctional Performance tests

 =cceptance "oc#ments at t!e s#ccessf#lcompletion of t!e actory =cceptance

'estin$ perio".

Written approvals of actory

 =cceptance 'est

%otorola ill prepare all racks fors!ipment an" s!ip sta$e" e/#ipment to alocation it!in Co#nty #n"er %otorolacontrol.

*/#ipment s!ips

%otorola ill s#pply to t!e Co#nty all"oc#mentation an" as@#ilt "rain$s fromsta$in$.

Co#nty receives "oc#mentationas ell as actory 'est res#lt"ata

%ont$omery Co#nty5 %arylan"Statement of Work

Statement of Work: "!

Page 27: Motorola SOW - Reviewed by MoCo PM 2015-09-22

7/23/2019 Motorola SOW - Reviewed by MoCo PM 2015-09-22

http://slidepdf.com/reader/full/motorola-sow-reviewed-by-moco-pm-2015-09-22 27/309

 

J.1.!.11 Ci(il ork

+he following sections describes detailed work specific to each :! ite in the system. $lease refer toite 2ngineering Matri '".#.7.#5.#), ite cquisition ervices Matri '".#.7.#5.1), and the <eneralite $reparation Matri '".#.7.#5.5) in for details of additional Motorola services to be performed ateach site. 4astly, the general provisions of the <eneral :equirement Matri '".#.7.#1) and CompletionCriteria '".#.7.#1.#) apply to the work outlined in this (/, as well as the ssumptions ' ".#.7.#1.1).

*n this document a E<reenfield siteF is defined as an undeveloped site where Motorola plans to builda new radio tower in support of the County’s new $17 :adio ystem.

'!e Statement of Work (SOW) is ase" on t!e 6 sites propose" y t!e Contractor5 %otorola.'ale J @22 lists several alternate 6 Sites t!at are can"i"ate replacements for t!e propose" 6sites "efine" in t!e SOW.

(a)le J-&&: 8lternate +F 'ites

Proposed 9ew +F 'ites $andidate 8lternate 'ites

Spencerville 6" ire 'oer (AS 24 G #stin 6")

  ;#rsery at AS 24 G %14

Sli$o Creek ire Station 1+

  Worl" ,l"$ (9eor$ia =ve5 Silver Sprin$)

  Silver Sprin$ P B> (Sli$o =ve)

  Boly Cross Bospital

lemin$ =ve 9rosvenor Bo#se (I@2-7 G % 3)

6iley ocks Seneca Creek Park (On Potomac)

9eor$ia =ve ,or"ly 6" (%4- G ,or"ly 6")

*lmers Sc!ool Site C@2&5 Jer#salem 6" (Poolesville)

%@277 ire Station &7

Potomac iltration ,#il" ;e 'oer on WSSC Property

%ont$omery Co#nty5 %arylan"Statement of Work

2#  

Statement of Work: 

Page 28: Motorola SOW - Reviewed by MoCo PM 2015-09-22

7/23/2019 Motorola SOW - Reviewed by MoCo PM 2015-09-22

http://slidepdf.com/reader/full/motorola-sow-reviewed-by-moco-pm-2015-09-22 28/309

J.1.!.11.1 Site ,e(elo+ment at :0C

+able " -15 provides site details for 8:C.

(a)le J-&: 'ite Information9+$

'ite Information9+$

'ite 9ame ;6C

'ite (#pe *:istin$

'ite !wner  e"eral 9overnment

8ddress 11 6ockville Pike 6ockville5 % 272

$oordinatesat 34@72@&4 ;

on$ --@7+@&3 W

(ower ;eight 247 feet (On 'op of ,#il"in$)

'u)s#stems located at 'ite 77 %B< Sim#lcast 6 Site.

Pa$in$ 0B C!annel 6epeater Site.

+able " -16 describes the work that Motorola will be performing at the 8:C ite.

(a)le J-&: <ork to )e performed at 9+$ site

'ite <ork9+$

(#pe of <ork ,etailed ,escription

'oer Work   S#pply an" install $ro#n"in$ on t!e rooftop an" tie it to t!e

#il"in$ $ro#n".

 =ntenna an" 'ransmissionine Installation

Install 3 antennas for t!e 6 system.

Install & antennas for t!e 6 system.

Install - si"e arms for antennas.

S#pply an" install - !eavy@"#ty mo#nts for ,o$ner antennas.

S#pply an" install 3 +@foot si"e arms for antenna mo#nts.

S#pply an" install rooftop antenna mo#nts to s#pport propose"

%ont$omery Co#nty5 %arylan"Statement of Work

Statement of Work: 2"

Page 29: Motorola SOW - Reviewed by MoCo PM 2015-09-22

7/23/2019 Motorola SOW - Reviewed by MoCo PM 2015-09-22

http://slidepdf.com/reader/full/motorola-sow-reviewed-by-moco-pm-2015-09-22 29/309

 

'ite <ork9+$

(#pe of <ork ,etailed ,escription

antennas.

Install 2 9PS antennas.

Install 1 toer@top amplifiers.

Install 17 linear feet of 3D@inc! transmission line.

Install #p to 27 linear feet of 1D2@inc! transmission line. Install #p to +&7 linear feet of -D@inc! transmission line.

Install #p to 4+7 linear feet of 1@1D&@inc! transmission line.

Install #p to +&7 linear feet of 1@D@inc! transmission line.

Perform seep tests on transmission lines.

Provi"e an" install +@ !ole !an$er locks an" attac!ment

!ar"are for s#pportin$ transmission lines on t!e antennas#pport str#ct#re every 3 feet.

Provi"e an" install #p to 2&7 linear feet of P0C sleepers an"

attac!ment !ar"are for s#pportin$ transmission lines on t!erooftop every 3 feet.

S#pply an" install 1 $ro#n" #ss ar at t!e ottom of t!eantenna s#pport str#ct#re for $ro#n"in$ 6 cales efore t!eymake !ori<ontal transit.

*:istin$ acilityImprovement Work

Coor"inate t!e installation of electrical s#@fee" it! "isconnect

into t!e e/#ipment room.

S#pply an" install 2 277@amp reaker panels it! capacity for

37 circ#its.

S#pply an" install 7 27@amp reakers in t!e "istri#tion panel

an" ire to o#tlets locate" on an avera$e it!in 3 cale feet.

Install 1 primary 'ype 1 s#r$e protector on t!e room electrical

fee" to protect t!e e/#ipment from s#r$es.

S#pply an" install 12@inc!@i"e cale r#nay (#p to 17 linearfeet) insi"e t!e e:istin$ room.

9ro#n" all metallic ojects in t!e interior of t!e e:istin$ room5 to

meet c#rrent %otorola?s Stan"ar"s an" 9#i"elines forComm#nications Sites (6+) re/#irements an" terminate neare/#ipment locations.

S#pply an" install 1 copper $ro#n" #ss ar.

S#pply an" install 1 all@mo#nte" 17@po#n" CO2 fire

e:tin$#is!er an" 1 all@mo#nte" 27@po#n" =,C fire e:tin$#is!er.

S#pply an" install L;o smokin$L *%* si$na$e at t!e site.

S#pply an" install 1 eye as! station an" 1 first ai" kit.

%iscellaneo#s Work   Crane 6ental (1 "ay). 6emove e:istin$ antennae an" linesM %W post system

acceptance.

%otorola as not ale to con"#ct a site s#rvey at t!is location to

eval#ate c#rrent site re/#irements. *:istin$ poer ack#psystems ($enerator an" APS) are ass#me" to e s#fficient an""o not re/#ire replacin$ #ntil correct si<in$ can e "etermine"ase" on "etaile" inp#t re$ar"in$ le$acy e/#ipment poer

%ont$omery Co#nty5 %arylan"Statement of Work

22  

Statement of Work: 

Page 30: Motorola SOW - Reviewed by MoCo PM 2015-09-22

7/23/2019 Motorola SOW - Reviewed by MoCo PM 2015-09-22

http://slidepdf.com/reader/full/motorola-sow-reviewed-by-moco-pm-2015-09-22 30/309

'ite <ork9+$

(#pe of <ork ,etailed ,escription

re/#irements provi"e" y Co#nty.

 '!e site =S6 isH 173-41.

J.1.!.11.2 Site ,e(elo+ment at ;ermanto)n

+able " -17 provides site details for <ermantown.

(a)le J-&: 'ite Information=ermantown

'ite Information=ermantown

'ite 9ame 9ermanton

'ite (#pe *:istin$

'ite !wner %ont$omery Co#nty5 %

8ddress2723 Oservation rive

9ermanton5 % 27-+

$oordinatesat 34@11@7& ;

on$ --@1&@ W

(ower ;eight 27 feet

'u)s#stems located at'ite

77 %B< Sim#lcast 6 Site.

-77 %B< Sim#lcast 6 Site.

Pa$in$ C!annel = Site.

 =nalo$ Conventional C!annel Site.

+able " -19 describes the work that Motorola will be performing at the <ermantown ite. +he

detailed description of work below is based on Motorola replacing the eisting shelter, generator and$ at this location per mendment 5.

(a)le J-&2: <ork to )e performed at =ermantown site

'ite <ork=ermantown

(#pe of <ork ,etailed ,escription

 =ntenna an" 'ransmission ine   Install 3 antennas for t!e 6 system.

%ont$omery Co#nty5 %arylan"Statement of Work

Statement of Work: 23

Page 31: Motorola SOW - Reviewed by MoCo PM 2015-09-22

7/23/2019 Motorola SOW - Reviewed by MoCo PM 2015-09-22

http://slidepdf.com/reader/full/motorola-sow-reviewed-by-moco-pm-2015-09-22 31/309

 

'ite <ork=ermantown

(#pe of <ork ,etailed ,escription

Installation   Install & antennas for t!e 6 system.

Install - si"e arms for antennas.

S#pply an" install - !eavy@"#ty mo#nts for ,o$ner

antennas.

Install 2 9PS antennas. Install 1 toer@top amplifier.

Install 17 linear feet of 3D@inc! transmission line.

Install #p to 27 linear feet of 1D2@inc! transmission line.

Install #p to 27 linear feet of -D@inc! transmission line.

Install #p to +47 linear feet of 1@1D&@inc! transmission line.

Install #p to &77 linear feet of 1@D@inc! transmission line.

Perform seep tests on transmission lines.

Provi"e an" install +@!ole !an$er locks an" attac!ment

!ar"are for s#pportin$ transmission lines on t!e antennas#pport str#ct#re every 3 feet.

S#pply an" install 1 $ro#n" #ss ar at t!e ottom of t!e

antenna s#pport str#ct#re for $ro#n"in$ 6 cales eforet!ey make !ori<ontal transition.

Site Components   Constr#ct 1 reinforce" concrete fo#n"ation necessary for a

12@foot : 3@foot s!elter an" $enerator room.

*:cavate 2 trenc!es for 1777 $allon elo $ro#n" P f#el

tank in 'I=D*I=@222 normal soil con"itions.

S#pply an" install 1 prefaricate" concrete s!elter an"

$enerator room 12@foot : 3 foot. S!elter incl#"es APS.

Install $enerator 

S#pply an" install 2 1777@$allon P f#el tanks5 fill it it!

f#el5 an" connect it to t!e $enerator.

S#pply an" install f#el tank monitors on t!e tanks to monitor 

lo f#el in tanks an" r#n alarm irin$ to t!e #il"in$ locate"it!in 7 feet of t!e tank.

S#pply an" install 1 127D2&7@volt5 &77@amp5 sin$le@p!ase

meter pe"estal an" !ook#p for electrical service y t!elocal #tility.

Provi"e all trenc!in$5 con"#it5 an" calin$ necessary for

#n"er$ro#n" !ook#p of poer to t!e s!elter from neary#tility termination locate" it!in 177 cale feet of t!es!elter.

%iscellaneo#s Work   6emove e:istin$ antennae an" linesM %W post systemacceptance.

%ont$omery Co#nty5 %arylan"Statement of Work

24 

Statement of Work: 

Page 32: Motorola SOW - Reviewed by MoCo PM 2015-09-22

7/23/2019 Motorola SOW - Reviewed by MoCo PM 2015-09-22

http://slidepdf.com/reader/full/motorola-sow-reviewed-by-moco-pm-2015-09-22 32/309

J.1.!.11.3 Site ,e(elo+ment at <uince 'rcard

+able " -1= provides site details for Guince (rchard.

(a)le J-&3: 'ite Information>uince !rchard

'ite Information>uince !rchard

'ite 9ame >#ince Orc!ar"

'ite (#pe *:istin$

'ite !wner P*PCO

8ddress1-171 arneston‐9ermanton 6oa"

9ermanton5 % 27-&

$oordinatesat 34@7@1+ ;

on$ --@1-@3 W

(ower ;eight 37 feet

'u)s#stems located at 'ite

77 %B< Sim#lcast 6 Site.

Pa$in$ C!annel = Site.

 =nalo$ Conventional C!annel , Site.

+able " -1> describes the work that Motorola will be performing at the Guince (rchard ite.

+he detailed description of work below is based on Motorola replacing the eisting shelter, generatorand $ at this location per mendment 5.

+able "-1>? /ork to be performed at Guince (rchard site

'ite <ork>uince !rchard

(#pe of <ork ,etailed ,escription

 =ntenna an" 'ransmissionine Installation

Install 3 antennas for t!e 6 system.

Install & antennas for t!e 6 system.

Install - si"e arms for antennas.

S#pply an" install - !eavy@"#ty mo#nts for ,o$ner antennas.

Install 2 9PS antennas.

Install 1 toer@top amplifier.

%ont$omery Co#nty5 %arylan"Statement of Work

Statement of Work: 25 

Page 33: Motorola SOW - Reviewed by MoCo PM 2015-09-22

7/23/2019 Motorola SOW - Reviewed by MoCo PM 2015-09-22

http://slidepdf.com/reader/full/motorola-sow-reviewed-by-moco-pm-2015-09-22 33/309

 

'ite <ork>uince !rchard

(#pe of <ork ,etailed ,escription

Install 17 linear feet of 3D@inc! transmission line.

Install #p to -27 linear feet of 1D2@inc! transmission line.

Install #p to -27 linear feet of -D@inc! transmission line.

Install #p to 447 linear feet of 1@1D&@inc! transmission line.

Install #p to &+7 linear feet of 1@D@inc! transmission line.

Perform seep tests on transmission lines.

Provi"e an" install +@!ole !an$er locks an" attac!ment

!ar"are for s#pportin$ transmission lines on t!e antennas#pport str#ct#re every 3 feet.

S#pply an" install 2&@inc!@i"e cale la""er to s#pport 6

transmission lines (37 linear feet).

S#pply an" install 1 $ro#n" #ss ar at t!e ottom of t!e

antenna s#pport str#ct#re for $ro#n"in$ 6 cales eforet!ey make !ori<ontal transition.

Site Components   Constr#ct 1 reinforce" concrete fo#n"ation necessary for a

12@foot : 3@foot s!elter an" $enerator room. *:cavate 2 trenc!es for 1777 $allon elo $ro#n" P f#el

tank in 'I=D*I=@222 normal soil con"itions.

S#pply an" install 1 prefaricate" concrete s!elter an"

$enerator room 12@foot : 3 foot. S!elter incl#"es APS.

Install $enerator 

S#pply an" install 2 1777@$allon P f#el tanks5 fill it it! f#el5

an" connect it to t!e $enerator.

S#pply an" install f#el tank monitors on t!e tanks to monitor

lo f#el in tanks an" r#n alarm irin$ to t!e #il"in$ locate"it!in 7 feet of t!e tank.

S#pply an" install 1 127D2&7@volt5 &77@amp5 sin$le@p!asemeter pe"estal an" !ook#p for electrical service y t!e local#tility.

Provi"e all trenc!in$5 con"#it5 an" calin$ necessary for

#n"er$ro#n" !ook#p of poer to t!e s!elter from neary#tility termination locate" it!in 177 cale feet of t!e s!elter.

%iscellaneo#s Work   6emove e:istin$ antennae an" linesM %W post system

acceptance.

%ont$omery Co#nty5 %arylan"Statement of Work

26  

Statement of Work: 

Page 34: Motorola SOW - Reviewed by MoCo PM 2015-09-22

7/23/2019 Motorola SOW - Reviewed by MoCo PM 2015-09-22

http://slidepdf.com/reader/full/motorola-sow-reviewed-by-moco-pm-2015-09-22 34/309

J.1.!.11.4 Site ,e(elo+ment at ,ickerson

+able " -1B provides site details for ;ickerson.(a)le J-&6: 'ite Information,ickerson

Site InformationNickerson

'ite 9ame ickerson

'ite (#pe *:istin$

'ite !wner P*PCO

8ddress %irant 9eneration Station%artins#r$ 6oa"5 ickerson5 % 27&2

$oordinates at 34@[email protected] ;

on$ --@2-@&4.4 W

(ower ;eight -77 feet

'u)s#stems located at 'ite 77 %B< Sim#lcast 6 Site.

Pa$in$ C!annel = Site.

 =nalo$ Conventional C!annel , Site.

%#lticast C!annel C 6eceive Site.

 represents the work that Motorola will be performing at the ;ickerson ite.

+able "-50? /ork to be performed at ;ickerson site

'ite <ork,ickerson

(#pe of <ork ,etailed ,escription =ntenna an" 'ransmissionine Installation

Install 3 antennas for t!e 6 system.

Install & antennas for t!e 6 system.

Install - si"e arms for antennas.

S#pply an" install - !eavy@"#ty mo#nts for ,o$ner antennas.

Install 2 9PS antennas.

Install 1 toer@top amplifier.

%ont$omery Co#nty5 %arylan"Statement of Work

Statement of Work: 27 

Page 35: Motorola SOW - Reviewed by MoCo PM 2015-09-22

7/23/2019 Motorola SOW - Reviewed by MoCo PM 2015-09-22

http://slidepdf.com/reader/full/motorola-sow-reviewed-by-moco-pm-2015-09-22 35/309

 

'ite <ork,ickerson

(#pe of <ork ,etailed ,escription

Install 17 linear feet of 3D@inc! transmission line.

Install #p to 337 linear feet of 1D2@inc! transmission line.

Install #p to 337 linear feet of -D@inc! transmission line.

Install #p to -17 linear feet of 1@1D&@inc! transmission line.

Install #p to -17 linear feet of 1@D@inc! transmission line.

Perform seep tests on transmission lines.

Provi"e an" install +@!ole !an$er locks an" attac!ment

!ar"are for s#pportin$ transmission lines on t!e antennas#pport str#ct#re every 3 feet.

S#pply an" install 2&@inc!@i"e cale la""er to s#pport 6

transmission lines (32 linear feet).

S#pply an" install 1 $ro#n" #ss ar at t!e ottom of t!e

antenna s#pport str#ct#re for $ro#n"in$ 6 cales efore t!eymake !ori<ontal transition.

Site Components   Constr#ct 1 reinforce" concrete fo#n"ation necessary for a 12@

foot : 3@foot s!elter an" $enerator room. *:cavate 2 trenc!es for 1777 $allon elo $ro#n" P f#el tank

in 'I=D*I=@222 normal soil con"itions.

S#pply an" install 1 prefaricate" concrete s!elter an"

$enerator room 12@foot : 3 foot. S!elter incl#"es APS.

Install $enerator 

S#pply an" install 2 1777@$allon P f#el tanks5 fill it it! f#el5

an" connect it to t!e $enerator.

S#pply an" install f#el tank monitors on t!e tanks to monitor lo

f#el in tanks an" r#n alarm irin$ to t!e #il"in$ locate" it!in7 feet of t!e tank.

S#pply an" install 1 127D2&7@volt5 &77@amp5 sin$le@p!ase meterpe"estal an" !ook#p for electrical service y t!e local #tility.

Provi"e all trenc!in$5 con"#it5 an" calin$ necessary for

#n"er$ro#n" !ook#p of poer to t!e s!elter from neary #tilitytermination locate" it!in 177 cale feet of t!e s!elter.

%iscellaneo#s Work   6emove e:istin$ antennae an" linesM %W post system

acceptance.

%ont$omery Co#nty5 %arylan"Statement of Work

2  

Statement of Work: 

Page 36: Motorola SOW - Reviewed by MoCo PM 2015-09-22

7/23/2019 Motorola SOW - Reviewed by MoCo PM 2015-09-22

http://slidepdf.com/reader/full/motorola-sow-reviewed-by-moco-pm-2015-09-22 36/309

J.1.!.11.! Site ,e(elo+ment at en)ood Country Clu&

+able " -5# provides site details for &enwood Country Club.

 (a)le J-1: 'ite Information"enwood $ountr# $lu)

'ite Information"enwood $ountr# $lu)

'ite 9ame  8enoo"

'ite (#pe  *:istin$

'ite !wner  8enoo" Co#ntry Cl#

Salem 6a"io Properties

8ddress  +71 9ol"soro 6oa"5 ,et!es"a % 271-

$oordinates 

at 3@@33 ;

on$ --@7+@& W

(ower ;eight  377 feet

'u)s#stems located at 'ite 

77 %B< Sim#lcast 6 Site.

-77 %B< Sim#lcast 6 Site.

Pa$in$ C!annel = Site.

 =nalo$ Conventional C!annel , Site.

%#lticast C!annel C 6eceive Site.

+able " -51 depicts the work that Motorola will be performing at the &enwood ite. +able "-51? /ork to be performed at &enwood Country Club site

'ite <ork"enwood $ountr# $lu)

(#pe of <ork ,etailed ,escription

 =ntenna an" 'ransmissionine Installation

Install 3 antennas for t!e 6 system.

Install & antennas for t!e 6 system.

Install - si"e arms for antennas.

S#pply an" install - !eavy@"#ty mo#nts for ,o$ner antennas.

Install 2 9PS antennas.

%ont$omery Co#nty5 %arylan"Statement of Work

Statement of Work: 2!

Page 37: Motorola SOW - Reviewed by MoCo PM 2015-09-22

7/23/2019 Motorola SOW - Reviewed by MoCo PM 2015-09-22

http://slidepdf.com/reader/full/motorola-sow-reviewed-by-moco-pm-2015-09-22 37/309

 

'ite <ork"enwood $ountr# $lu)

(#pe of <ork ,etailed ,escription

Install 1 toer@top amplifier.

Install 17 linear feet of 3D@inc! transmission line.

Install #p to &7 linear feet of 1D2@inc! transmission line.

Install #p to &7 linear feet of -D@inc! transmission line.

Install #p to +& linear feet of 1@1D&@inc! transmission line.

Install #p to 3+7 linear feet of 1@D@inc! transmission line.

Perform seep tests on transmission lines.

Provi"e an" install +@!ole !an$er locks an" attac!ment

!ar"are for s#pportin$ transmission lines on t!e antennas#pport str#ct#re every 3 feet.

S#pply an" install 2&@inc!@i"e cale la""er to s#pport 6

transmission lines (237 linear feet).

S#pply an" install 1 $ro#n" #ss ar at t!e ottom of t!e

antenna s#pport str#ct#re for $ro#n"in$ 6 cales efore t!eymake !ori<ontal transition.

Site Components   Constr#ct 1 reinforce" concrete fo#n"ation necessary for a 12@foot : 3@foot s!elter an" $enerator room.

*:cavate 2 trenc!es for 1777 $allon elo $ro#n" P f#el tank

in 'I=D*I=@222 normal soil con"itions.

S#pply an" install 1 prefaricate" concrete s!elter an" $enerator 

room 12@foot : 3 foot. S!elter incl#"es APS.

Install $enerator 

S#pply an" install 2 1777@$allon P f#el tanks5 fill it it! f#el5 an"

connect it to t!e $enerator.

S#pply an" install f#el tank monitors on t!e tanks to monitor lo

f#el in tanks an" r#n alarm irin$ to t!e #il"in$ locate" it!in

7 feet of t!e tank. S#pply an" install 1 127D2&7@volt5 &77@amp5 sin$le@p!ase meter

pe"estal an" !ook#p for electrical service y t!e local #tility.

Provi"e all trenc!in$5 con"#it5 an" calin$ necessary for

#n"er$ro#n" !ook#p of poer to t!e s!elter from neary #tilitytermination locate" it!in 177 cale feet of t!e s!elter.

%iscellaneo#s Work   6emove e:istin$ antennae an" linesM %W post system

acceptance.

%ont$omery Co#nty5 %arylan"Statement of Work

3#  

Statement of Work: 

Page 38: Motorola SOW - Reviewed by MoCo PM 2015-09-22

7/23/2019 Motorola SOW - Reviewed by MoCo PM 2015-09-22

http://slidepdf.com/reader/full/motorola-sow-reviewed-by-moco-pm-2015-09-22 38/309

J.1.!.11.$ Site ,e(elo+ment at Berksire 5o)ers Site

+able " -55 provides site details for %erkshire +owers.

(a)le J-: 'ite Informationerkshire (owers site

'ite Informationerkshire (owers

'ite 9ame ,erks!ire 'oers

'ite (#pe *:istin$ System Site

'ite !wner Private

8ddress 1121 Oakleaf r5 W!ite Oak5 %

$oordinatesat 34@72@2 ;

on$ -+@4@3+ W

(ower ;eight 21& feet (#il"in$@top location)

'u)s#stems located at 'ite

77 %B< Sim#lcast 6 Site.

-77 %B< Sim#lcast 6 Site. Pa$in$ C!annel = Site.

 =nalo$ Conventional C!annel , Site.

+able " -56 represents the work that Motorola will be performing at the %erkshire +owers site. +hedetailed description of work below is based on Motorola replacing the eisting shelter, generator and$ at this location per mendment 5.

(a)le J-: <ork to )e performed at erkshire (owers site

'ite <orkerkshire (owers

(#pe of <ork ,etailed ,escription =ntenna an" 'ransmissionine Installation

Install 3 antennas for t!e 6 system.

Install & antennas for t!e 6 system.

Install - si"e arms for antennas.

S#pply an" install - !eavy@"#ty mo#nts for ,o$ner antennas.

Install 2 9PS antennas.

Install 1 toer@top amplifier.

Install 17 linear feet of 3D@inc! transmission line.

%ont$omery Co#nty5 %arylan"Statement of Work

Statement of Work: 3"

Page 39: Motorola SOW - Reviewed by MoCo PM 2015-09-22

7/23/2019 Motorola SOW - Reviewed by MoCo PM 2015-09-22

http://slidepdf.com/reader/full/motorola-sow-reviewed-by-moco-pm-2015-09-22 39/309

 

'ite <orkerkshire (owers

(#pe of <ork ,etailed ,escription

Install #p to & linear feet of 1D2@inc! transmission line.

Install #p to +&7 linear feet of -D@inc! transmission line.

Install #p to 4+7 linear feet of 1@1D&@inc! transmission line.

Install #p to & linear feet of 1@D@inc! transmission line.

Perform seep tests on transmission lines.

Provi"e an" install +@!ole !an$er locks an" attac!ment!ar"are for s#pportin$ transmission lines on t!e antennas#pport str#ct#re every 3 feet.

Provi"e an" install 2&7 linear feet of P0C sleepers an"

attac!ment !ar"are for s#pportin$ transmission lines onrooftop every 3 feet.

S#pply an" install 1 $ro#n" #ss ar at t!e ottom of t!e

antenna s#pport str#ct#re for $ro#n"in$ 6 cales eforet!ey make !ori<ontal transition.

Site Components   Constr#ct 1 reinforce" concrete fo#n"ation necessary for a

12@foot : 3@foot s!elter an" $enerator room. *:cavate 2 trenc!es for 1777 $allon elo $ro#n" P f#el

tank in 'I=D*I=@222 normal soil con"itions.

S#pply an" install 1 prefaricate" concrete s!elter an"$enerator room 12@foot : 3 foot. S!elter incl#"es APS.

Install $enerator 

S#pply an" install 2 1777@$allon P f#el tanks5 fill it it! f#el5

an" connect it to t!e $enerator. S#pply an" install f#el tank monitors on t!e tanks to monitor

lo f#el in tanks an" r#n alarm irin$ to t!e #il"in$ locate"it!in 7 feet of t!e tank.

S#pply an" install 1 127D2&7@volt5 &77@amp5 sin$le@p!ase

meter pe"estal an" !ook#p for electrical service y t!e local#tility.

Provi"e all trenc!in$5 con"#it5 an" calin$ necessary for

#n"er$ro#n" !ook#p of poer to t!e s!elter from neary

#tility termination locate" it!in 177 cale feet of t!e s!elter.

%iscellaneo#s Work   6emove e:istin$ antennae an" linesM %W post system

acceptance.

%ont$omery Co#nty5 %arylan"Statement of Work

32  

Statement of Work: 

Page 40: Motorola SOW - Reviewed by MoCo PM 2015-09-22

7/23/2019 Motorola SOW - Reviewed by MoCo PM 2015-09-22

http://slidepdf.com/reader/full/motorola-sow-reviewed-by-moco-pm-2015-09-22 40/309

J.1.!.11.6 Site ,e(elo+ment at =am+sire ;reens Site

  provides site details for @ampshire <reens

+able "-57? ite *nformationH@ampshire <reens site

'ite Information;ampshire =reens

'ite 9ame Bamps!ire 9reens

'ite (#pe *:istin$ System SiteEWater 'oer 

'ite !wner WSSC

8ddress 141+ ;e Bamps!ire =ve.5 Spencerville5 % 2747

$oordinatesat 34@7-@1&.3 ;

on$ -+@[email protected] W

(ower ;eight 3+7 feet

'u)s#stems located at 'ite

77 %B< Sim#lcast 6 Site.

Pa$in$ C!annel = Site.

 =nalo$ Conventional C!annel , Site.

%#lticast C!annel C 6eceive Site.

+able " -59 represents the work that Motorola will be performing at the @ampshire <reen site. +hecurrent antenna array is located on northern most facing of 5 balloon-shaped water tanks. 8ote thatMotorola was not able to conduct a site survey at this location to evaluate current site requirements.

(a)le J-2: <ork to )e performed at ;ampshire =reens site

'ite <ork;ampshire =reens

(#pe of <ork ,etailed ,escription =ntenna an" 'ransmissionine Installation

Install 3 antennas for t!e 6 system.

Install & antennas for t!e 6 system.

Install - si"e arms for antennas.

S#pply an" install - !eavy@"#ty mo#nts for ,o$ner antennas.

Install 2 9PS antennas.

Install 1 toer@top amplifier.

Install 17 linear feet of 3D@inc! transmission line.

%ont$omery Co#nty5 %arylan"Statement of Work

Statement of Work: 33

Page 41: Motorola SOW - Reviewed by MoCo PM 2015-09-22

7/23/2019 Motorola SOW - Reviewed by MoCo PM 2015-09-22

http://slidepdf.com/reader/full/motorola-sow-reviewed-by-moco-pm-2015-09-22 41/309

 

'ite <ork;ampshire =reens

(#pe of <ork ,etailed ,escription

Install #p to 1 linear feet of 1D2@inc! transmission line.

Install #p to 1& linear feet of -D@inc! transmission line.

Install #p to +2 linear feet of 1@1D&@inc! transmission line.

Install #p to 3+ linear feet of 1@D@inc! transmission line.

Perform seep tests on transmission lines.

Provi"e an" install +@!ole !an$er locks an" attac!ment!ar"are for s#pportin$ transmission lines on t!e antennas#pport str#ct#re every 3 feet.

S#pply an" install 2&@inc!@i"e cale la""er to s#pport 6

transmission lines (237 linear feet). S#pply an" install 1 $ro#n" #ss ar at t!e ottom of t!e antenna

s#pport str#ct#re for $ro#n"in$ 6 cales efore t!ey make!ori<ontal transition

Site Components   Constr#ct 1 reinforce" concrete fo#n"ation necessary for a 12@

foot : 3@foot s!elter an" $enerator room. *:cavate 2 trenc!es for 1777 $allon elo $ro#n" P f#el tank in

'I=D*I=@222 normal soil con"itions. S#pply an" install 1 prefaricate" concrete s!elter an" $enerator

room 12@foot : 3 foot. S!elter incl#"es APS. Install $enerator 

S#pply an" install 2 1777@$allon P f#el tanks5 fill it it! f#el5 an"

connect it to t!e $enerator. S#pply an" install f#el tank monitors on t!e tanks to monitor lo

f#el in tanks an" r#n alarm irin$ to t!e #il"in$ locate" it!in 7feet of t!e tank.

S#pply an" install 1 127D2&7@volt5 &77@amp5 sin$le@p!ase meter

pe"estal an" !ook#p for electrical service y t!e local #tility. Provi"e all trenc!in$5 con"#it5 an" calin$ necessary for

#n"er$ro#n" !ook#p of poer to t!e s!elter from neary #tilitytermination locate" it!in 177 cale feet of t!e s!elter.

%iscellaneo#s Work   6emove e:istin$ antennae an" linesM %W post system

acceptance.

J.1.!.11.7 Site ,e(elo+ment at 5akoma Park

%ont$omery Co#nty5 %arylan"Statement of Work

34 

Statement of Work: 

Page 42: Motorola SOW - Reviewed by MoCo PM 2015-09-22

7/23/2019 Motorola SOW - Reviewed by MoCo PM 2015-09-22

http://slidepdf.com/reader/full/motorola-sow-reviewed-by-moco-pm-2015-09-22 42/309

+able " -5= provides site details for +akoma $ark.

(a)le J-3: 'ite Information(akoma Park site

'ite Information(akoma Park

'ite 9ame 'akoma Park

'ite (#pe *:istin$ System Site

'ite !wner P*PCO

8ddress++71 ;e Bamps!ire =ven#e'akoma Park5 % 27-3

$oordinatesat 3@@3 ;

on$ -+@4@4 W

(ower ;eight 2&7 feet

'u)s#stems located at'ite

77 %B< Sim#lcast 6 Site

-77 %B< Sim#lcast 6 Site

Pa$in$ C!annel = Site

 =nalo$ Conventional C!annel , Site

%#lticast C!annel C 6eceive Site

 represents the work that Motorola will be performing at +akoma $ark site.

+able "-5>? /ork to be performed at +akoma $ark site

'ite <ork(akoma Park

(#pe of <ork ,etailed ,escription

 =ntenna an" 'ransmissionine Installation

Install 3 antennas for t!e 6 system.

Install & antennas for t!e 6 system.

Install - si"e arms for antennas.

S#pply an" install - !eavy@"#ty mo#nts for ,o$ner antennas.

Install 2 9PS antennas.

Install 1 toer@top amplifier. Install 17 linear feet of 3D@inc! transmission line.

Install #p to 2&3 linear feet of 1D2@inc! transmission line.

Install #p to 2&3 linear feet of -D@inc! transmission line.

Install #p to ++7 linear feet of 1@1D&@inc! transmission line.

Install #p to 3+7 linear feet of 1@D@inc! transmission line.

Perform seep tests on transmission lines.

Provi"e an" install +@!ole !an$er locks an" attac!ment !ar"are

for s#pportin$ transmission lines on t!e antenna s#pport str#ct#reevery 3 feet.

S#pply an" install 2&@inc!@i"e cale la""er to s#pport 6

transmission lines (37 linear feet).

S#pply an" install 1 $ro#n" #ss ar at t!e ottom of t!e antennas#pport str#ct#re for $ro#n"in$ 6 cales efore t!ey make!ori<ontal transition.

Site Components   Constr#ct 1 reinforce" concrete fo#n"ation necessary for a 12@foot

: 3@foot s!elter an" $enerator room. *:cavate 2 trenc!es for 1777 $allon elo $ro#n" P f#el tank in

'I=D*I=@222 normal soil con"itions. S#pply an" install 1 prefaricate" concrete s!elter an" $enerator

room 12@foot : 3 foot. S!elter incl#"es APS.

%ont$omery Co#nty5 %arylan"Statement of Work

Statement of Work: 35 

Page 43: Motorola SOW - Reviewed by MoCo PM 2015-09-22

7/23/2019 Motorola SOW - Reviewed by MoCo PM 2015-09-22

http://slidepdf.com/reader/full/motorola-sow-reviewed-by-moco-pm-2015-09-22 43/309

 

'ite <ork(akoma Park

(#pe of <ork ,etailed ,escription

Install $enerator 

S#pply an" install 2 1777@$allon P f#el tanks5 fill it it! f#el5 an"

connect it to t!e $enerator. S#pply an" install f#el tank monitors on t!e tanks to monitor lo

f#el in tanks an" r#n alarm irin$ to t!e #il"in$ locate" it!in 7

feet of t!e tank. S#pply an" install 1 127D2&7@volt5 &77@amp5 sin$le@p!ase meter

pe"estal an" !ook#p for electrical service y t!e local #tility. Provi"e all trenc!in$5 con"#it5 an" calin$ necessary for

#n"er$ro#n" !ook#p of poer to t!e s!elter from neary #tilitytermination locate" it!in 177 cale feet of t!e s!elter.

%iscellaneo#s Work   6emove e:istin$ antennae an" linesM %W post system

acceptance.

J.1.!.11.8 Site ,e(elo+ment at Sady ;ro(e

+able " -5B provides details for the hady <rove site.

(a)le J-6: 'ite Information'had# =rove site

'ite Information'had# =rove

'ite 9ame S!a"y 9rove

'ite (#pe *:istin$ System Site

'ite !wner WSSC

8ddress +27 Pleasant 6oa"5 9ait!ers#r$5 % 27--

$oordinates at 34@[email protected] ;on$ --@17@&.43 W

(ower ;eight 27 ft

'u)s#stems located at 'ite 77 %B< Sim#lcast 6 Site.

-77 %B< Sim#lcast 6 Site.

S6 6e"#n"ant %aster Site.

77 %B< =ctive Prime Site.

-77 %B< Prime Site.

%ont$omery Co#nty5 %arylan"Statement of Work

36  

Statement of Work: 

Page 44: Motorola SOW - Reviewed by MoCo PM 2015-09-22

7/23/2019 Motorola SOW - Reviewed by MoCo PM 2015-09-22

http://slidepdf.com/reader/full/motorola-sow-reviewed-by-moco-pm-2015-09-22 44/309

'ite Information'had# =rove

Pa$in$ C!annel = Site.

 =nalo$ Conventional C!annel , Site.

+able " -60 represents the work that Motorola will be performing at hady <rove site. +able "-60?/ork to be performed at hady <rove ite

'ite <ork'had# =rove

(#pe of <ork ,etailed ,escription

 =ntenna an" 'ransmissionine Installation

Install 3 antennas for t!e 6 system.

Install & antennas for t!e 6 system.

Install - si"e arms for antennas.

S#pply an" install - !eavy@"#ty mo#nts for ,o$ner antennas.

Install 2 9PS antennas.

Install 1 toer@top amplifier.

Install 17 linear feet of 3D@inc! transmission line.

Install #p to 1 linear feet of 1D2@inc! transmission line.

Install #p to 2- linear feet of -D@inc! transmission line.

Install #p to -7 linear feet of 1@1D&@inc! transmission line.

Install #p to &+7 linear feet of 1@D@inc! transmission line.

Perform seep tests on transmission lines.

Provi"e an" install +@!ole !an$er locks an" attac!ment

!ar"are for s#pportin$ transmission lines on t!e antennas#pport str#ct#re every 3 feet.

S#pply an" install 1 $ro#n" #ss ar at t!e ottom of t!e

antenna s#pport str#ct#re for $ro#n"in$ 6 cales efore t!eymake !ori<ontal transition.

Site Components   Constr#ct 1 reinforce" concrete fo#n"ation necessary for a 12@

foot : 3@foot s!elter an" $enerator room.

*:cavate 2 trenc!es for 1777 $allon elo $ro#n" P f#el tank

in 'I=D*I=@222 normal soil con"itions.

S#pply an" install 1 prefaricate" concrete s!elter an"

$enerator room 12@foot : 3 foot. S!elter incl#"es APS.

Install $enerator 

S#pply an" install 2 1777@$allon P f#el tanks5 fill it it! f#el5

an" connect it to t!e $enerator.

S#pply an" install f#el tank monitors on t!e tanks to monitor

lo f#el in tanks an" r#n alarm irin$ to t!e #il"in$ locate"it!in 7 feet of t!e tank.

S#pply an" install 1 127D2&7@volt5 &77@amp5 sin$le@p!asemeter pe"estal an" !ook#p for electrical service y t!e local#tility.

Provi"e all trenc!in$5 con"#it5 an" calin$ necessary for

#n"er$ro#n" !ook#p of poer to t!e s!elter from neary #tilitytermination locate" it!in 177 cale feet of t!e s!elter.

%iscellaneo#s Work   6emove e:istin$ antennae an" linesM %W post system

%ont$omery Co#nty5 %arylan"Statement of Work

Statement of Work: 37 

Page 45: Motorola SOW - Reviewed by MoCo PM 2015-09-22

7/23/2019 Motorola SOW - Reviewed by MoCo PM 2015-09-22

http://slidepdf.com/reader/full/motorola-sow-reviewed-by-moco-pm-2015-09-22 45/309

 

'ite <ork'had# =rove

(#pe of <ork ,etailed ,escription

acceptance.

J.1.!.11.19 Site ,e(elo+ment at MCC"

+able " -6# provides site details for the MCC! site.

(a)le J-1: 'ite InformationM$$F 'ite

'ite InformationM$$F

'ite 9ame %CC

'ite (#pe

 =n e:istin$ %ont$omery Co#nty site locate" to t!e

rear of t!e %ont$omery Co#nty Correctional acilityintake

'ite !wner State of %arylan"5 %I*%SS

8ddress 227 W!elan ane5 ,oy"s5 % 27&1

$oordinatesat 34@1&@2&.3-

on$ --@1-@3+.4&

(ower ;eight 2-7 feet

'u)s#stems located at 'ite

77 %B< Sim#lcast 6 Site.

-77 %B< Sim#lcast 6 Site.

Pa$in$ C!annel = Site.

 =nalo$ Conventional C!annel , Site.

+able " -61 represents the work that Motorola will be performing at MCC! site. +able "-61? /ork to be performed at MCC! site

'ite ,etailsM$$F 'ite

(#pe of <ork ,etailed ,escription

 =ntenna an" 'ransmissionine Installation

Install 3 antennas for t!e 6 system.

Install & antennas for t!e 6 system.

%ont$omery Co#nty5 %arylan"Statement of Work

3  

Statement of Work: 

Page 46: Motorola SOW - Reviewed by MoCo PM 2015-09-22

7/23/2019 Motorola SOW - Reviewed by MoCo PM 2015-09-22

http://slidepdf.com/reader/full/motorola-sow-reviewed-by-moco-pm-2015-09-22 46/309

'ite ,etailsM$$F 'ite

(#pe of <ork ,etailed ,escription

Install - si"e arms for antennas.

S#pply an" install - !eavy@"#ty mo#nts for ,o$ner antennas.

Install 2 9PS antennas.

Install 1 toer@top amplifier.

Install 17 linear feet of 3D@inc! transmission line.

Install #p to 1 linear feet of 1D2@inc! transmission line. Install #p to 27 linear feet of -D@inc! transmission line.

Install #p to -+ linear feet of 1@1D&@inc! transmission line.

Install #p to &+7 linear feet of 1@D@inc! transmission line.

Perform seep tests on transmission lines.

Provi"e an" install +@!ole !an$er locks an" attac!ment !ar"are

for s#pportin$ transmission lines on t!e antenna s#pport str#ct#reevery 3 feet.

S#pply an" install 2&@inc!@i"e cale la""er to s#pport 6

transmission lines (27 linear feet). S#pply an" install 1 $ro#n" #ss ar at t!e ottom of t!e antenna

s#pport str#ct#re for $ro#n"in$ 6 cales efore t!ey make!ori<ontal transition.

Site Components   Constr#ct 1 reinforce" concrete fo#n"ation necessary for a 12@foot: 3@foot s!elter an" $enerator room.

*:cavate 2 trenc!es for 1777 $allon elo $ro#n" P f#el tank in

'I=D*I=@222 normal soil con"itions. S#pply an" install 1 prefaricate" concrete s!elter an" $enerator

room 12@foot : 3 foot. S!elter incl#"es APS. Install $enerator 

S#pply an" install 2 1777@$allon P f#el tanks5 fill it it! f#el5 an"

connect it to t!e $enerator. S#pply an" install f#el tank monitors on t!e tanks to monitor lo

f#el in tanks an" r#n alarm irin$ to t!e #il"in$ locate" it!in 7feet of t!e tank.

S#pply an" install 1 127D2&7@volt5 &77@amp5 sin$le@p!ase meter

pe"estal an" !ook#p for electrical service y t!e local #tility. Provi"e all trenc!in$5 con"#it5 an" calin$ necessary for

#n"er$ro#n" !ook#p of poer to t!e s!elter from neary #tilitytermination locate" it!in 177 cale feet of t!e s!elter.

%iscellaneo#s Work   6emove e:istin$ antennae an" linesM %W post system

acceptance.

%ont$omery Co#nty5 %arylan"Statement of Work

Statement of Work: 3!

Page 47: Motorola SOW - Reviewed by MoCo PM 2015-09-22

7/23/2019 Motorola SOW - Reviewed by MoCo PM 2015-09-22

http://slidepdf.com/reader/full/motorola-sow-reviewed-by-moco-pm-2015-09-22 47/309

Page 48: Motorola SOW - Reviewed by MoCo PM 2015-09-22

7/23/2019 Motorola SOW - Reviewed by MoCo PM 2015-09-22

http://slidepdf.com/reader/full/motorola-sow-reviewed-by-moco-pm-2015-09-22 48/309

'ite <orkPenn 'hop

(#pe of <ork ,etailed ,escription

S#pply an" install - !eavy@"#ty mo#nts for ,o$ner antennas.

Install 2 9PS antennas.

Install 1 toer@top amplifier.

Install 17 linear feet of 3D@inc! transmission line.

Install #p to 3+7 linear feet of 1D2@inc! transmission line.

Install #p to 3+7 linear feet of -D@inc! transmission line.

Install #p to 447 linear feet of 1@1D&@inc! transmission line.

Install #p to 3+7 linear feet of 1@D@inc! transmission line.

Perform seep tests on transmission lines.

Provi"e an" install +@!ole !an$er locks an" attac!ment

!ar"are for s#pportin$ transmission lines on t!e antennas#pport str#ct#re every 3 feet.

S#pply an" install 2&@inc!@i"e cale la""er to s#pport 6

transmission lines (377 linear feet).

S#pply an" install 1 $ro#n" #ss ar at t!e ottom of t!e antenna

s#pport str#ct#re for $ro#n"in$ 6 cales efore t!ey make!ori<ontal transition.

Site Components   Constr#ct 1 reinforce" concrete fo#n"ation necessary for a 12@

foot : 3@foot s!elter an" $enerator room.

*:cavate 2 trenc!es for 1777 $allon elo $ro#n" P f#el tank in

'I=D*I=@222 normal soil con"itions.

S#pply an" install 1 prefaricate" concrete s!elter an" $enerator

room 12@foot : 3 foot. S!elter incl#"es APS.

Install $enerator 

S#pply an" install 2 1777@$allon P f#el tanks5 fill it it! f#el5 an"

connect it to t!e $enerator.

S#pply an" install f#el tank monitors on t!e tanks to monitor lo

f#el in tanks an" r#n alarm irin$ to t!e #il"in$ locate" it!in 7feet of t!e tank.

S#pply an" install 1 127D2&7@volt5 &77@amp5 sin$le@p!ase meter

pe"estal an" !ook#p for electrical service y t!e local #tility.

Provi"e all trenc!in$5 con"#it5 an" calin$ necessary for

#n"er$ro#n" !ook#p of poer to t!e s!elter from neary #tilitytermination locate" it!in 177 cale feet of t!e s!elter.

%iscellaneo#s Work   6emove e:istin$ antennae an" linesM %W post system

acceptance.

%ont$omery Co#nty5 %arylan"Statement of Work

Statement of Work: 4"

Page 49: Motorola SOW - Reviewed by MoCo PM 2015-09-22

7/23/2019 Motorola SOW - Reviewed by MoCo PM 2015-09-22

http://slidepdf.com/reader/full/motorola-sow-reviewed-by-moco-pm-2015-09-22 49/309

 J.1.!.11.12 Site ,e(elo+ment at E'B

+able " -67 provides site details for the 2(% site.

(a)le J-: 'ite Information?! 'ite

'ite Information?!

'ite 9ame *O,

'ite (#pe *:istin$ Site E ;e to %ont$omery Co#nty System

'ite !wner %ont$omery Co#nty

8ddress 171 %onroe St. 6ockville5 %

$oordinates at 34@7&@4.& ;

on$ --@[email protected] W

(ower ;eight 222 feet

'u)s#stems located at 'ite 77 %B< Sim#lcast 6 Site. %#lticast C!annel C 'ransmit Site.

+able " -69 represents the work that Motorola will be performing at 2(% ite. Motorola was not ableto conduct a site survey at this location to evaluate site requirements and it is assumed that eistingEshelterF space, generator, and $ capacity are sufficient to accept the proposed equipment.

(a)le J-2: <ork to )e performed at ?! site

'ite <ork?!

(#pe of <ork ,etailed ,escription

 =ntenna an"'ransmission ine

Installation

Install 3 antennas for t!e 6 system.

Install & antennas for t!e 6 system.

Install - si"e arms for antennas. S#pply an" install - !eavy@"#ty mo#nts for ,o$ner antennas.

Install 2 9PS antennas.

Install 1 toer@top amplifier.

Install 17 linear feet of 3D@inc! transmission line.

Install #p to 17 linear feet of 1D2@inc! transmission line.

Install #p to 7& linear feet of -D@inc! transmission line.

Install #p to -+ linear feet of 1@1D&@inc! transmission line.

%ont$omery Co#nty5 %arylan"Statement of Work

42  

Statement of Work: 

Page 50: Motorola SOW - Reviewed by MoCo PM 2015-09-22

7/23/2019 Motorola SOW - Reviewed by MoCo PM 2015-09-22

http://slidepdf.com/reader/full/motorola-sow-reviewed-by-moco-pm-2015-09-22 50/309

Perform seep tests on transmission lines.

Provi"e an" install +@!ole !an$er locks an" attac!ment !ar"are for

s#pportin$ transmission lines on t!e antenna s#pport str#ct#re every3 feet.

S#pply an" install 2&@inc!@i"e cale la""er to s#pport 6

transmission lines (277 linear feet). S#pply an" install 1 $ro#n" #ss ar at t!e ottom of t!e antenna

s#pport str#ct#re for $ro#n"in$ 6 cales efore t!ey make !ori<ontal

transition*:istin$ acilityImprovement Work

Coor"inate t!e installation of electrical s#@fee" it! "isconnect into

t!e e/#ipment room. S#pply an" install 2 277@amp reaker panels it! capacity for 37

circ#its. S#pply an" install 7 27@amp reakers in t!e "istri#tion panel an" ire

to o#tlets locate" on an avera$e it!in 3 cale feet. Install - @o#tlet "istri#tion ars an" ire eac! o#tlet to in"ivi"#al

reaker. Install 1 primary 'ype 1 s#r$e protector on t!e room electrical fee" to

protect t!e e/#ipment from s#r$es. S#pply an" install 12@inc!@i"e cale r#nay (#p to 17 linear feet)

insi"e t!e e:istin$ room.

S#pply an" install 1 cale entry panel it! + ports. 9ro#n" all metallic ojects in t!e interior of t!e e:istin$ room5 to meet

c#rrent %otorola?s Stan"ar"s an" 9#i"elines for Comm#nications Sites(6+) re/#irements an" terminate near e/#ipment locations.

S#pply an" install 1 copper $ro#n" #ss ar.

S#pply an" install 1 all@mo#nte" 17@po#n" CO2 fire e:tin$#is!er an"

1 all@mo#nte" 27@po#n" =,C fire e:tin$#is!er. S#pply an" install L;o smokin$L *%* si$na$e at t!e site.

S#pply an" install 1 eye as! station an" 1 first ai" kit.

%iscellaneo#s Work   If re/#ire"5 remove e:istin$ antennae an" linesM %W post system

acceptance. *:istin$ poer ack#p systems ($enerator an" APS) are ass#me" to

e s#fficient an" "o not re/#ire replacin$ #ntil correct si<in$ can e"etermine" ase" on "etaile" inp#t re$ar"in$ le$acy e/#ipment poerre/#irements provi"e" y Co#nty.

%ont$omery Co#nty5 %arylan"Statement of Work

Statement of Work: 43

Page 51: Motorola SOW - Reviewed by MoCo PM 2015-09-22

7/23/2019 Motorola SOW - Reviewed by MoCo PM 2015-09-22

http://slidepdf.com/reader/full/motorola-sow-reviewed-by-moco-pm-2015-09-22 51/309

Page 52: Motorola SOW - Reviewed by MoCo PM 2015-09-22

7/23/2019 Motorola SOW - Reviewed by MoCo PM 2015-09-22

http://slidepdf.com/reader/full/motorola-sow-reviewed-by-moco-pm-2015-09-22 52/309

+able " -6> represents the work that Motorola will be performing at the ;amascus site.

(a)le J-5: <ork to )e performed at ,amascus site

'ite <ork,amascus

(#pe of <ork ,etailed ,escription

Site Compo#n"   Provi"e eart! fill to raise s#rface level in t!e site compo#n"

(not to e:cee" +7 c#ic yar"s). S#pply an" install $ravel s#rfacin$ to a "ept! of + inc!es5

#n"erlain it! $eote:tile faric it!in t!e fence" in sitecompo#n" area5 an" a 3@foot pat! aro#n" it (not to e:cee"+7 s/#are feet).

Site Components Installation   Constr#ct 1 reinforce" concrete fo#n"ation necessary for a

12@foot : 1+@foot s!elter.

*:cavate 2 trenc!es for 1777 $allon elo $ro#n" i/#i"

Propane (P) f#el tank in 'I=D*I=@222 normal soil con"itions.

Constr#ct 1 fo#n"ation for t!e 7 kW $enerator it!

reinforcin$ steel necessary for fo#n"ations.

S#pply an" install 1 prefaricate" concrete s!elter 12@foot :1+@foot.

S#pply an" install 2 1777@$allon P f#el tanks5 fill it it! f#el5

an" connect it to t!e $enerator.

S#pply an" install f#el tank monitors on t!e tanks to monitor

lo f#el in tanks an" r#n alarm irin$ to t!e #il"in$ locate"it!in 7 feet of t!e tank.

S#pply an" install 1 stan"y poer $enerator (7 kW) locate"

it!in 27 feet of t!e ='S5 incl#"in$ interconnection irin$eteen t!e $enerator5 transfer sitc!5 an" site electricalservice mains.

S#pply an" install 1 127D2&7@volt5 277@amp5 sin$le@p!ase

meter pe"estal an" !ook#p for electrical service y t!e local#tility.

S#pply an" install a perimeter $ro#n"in$ system aro#n" t!e

compo#n" an" s!elter. '!e $ro#n" system is to tie to t!efence an" all ne metal str#ct#res it!in t!e compo#n" tomeet c#rrent %otorola?s 6+ stan"ar"s.

Con"#ct 1 t!ree@point $ro#n" resistance test of t!e site.

S!o#l" any improvements to $ro#n"in$ system e necessaryafter $ro#n" testin$5 t!e cost of s#c! improvements s!all et!e responsiility of Co#nty.

S#pply an" install 1 freestan"in$ 2&@inc!@i"e caleDice

ri"$e from t!e toer to t!e s!elter (#p to 27 linear feet).

 =ntenna an" 'ransmissionine Installation

Install 3 antennas for t!e 6 system.

Install 1 antenna for t!e 6 system.

Install & si"e arms for antennas.

S#pply an" install & !eavy@"#ty mo#nts for ,o$ner antennas.

Install 2 9PS antennas.

Install 1 toer@top amplifier.

%ont$omery Co#nty5 %arylan"Statement of Work

Statement of Work: 45 

Page 53: Motorola SOW - Reviewed by MoCo PM 2015-09-22

7/23/2019 Motorola SOW - Reviewed by MoCo PM 2015-09-22

http://slidepdf.com/reader/full/motorola-sow-reviewed-by-moco-pm-2015-09-22 53/309

Page 54: Motorola SOW - Reviewed by MoCo PM 2015-09-22

7/23/2019 Motorola SOW - Reviewed by MoCo PM 2015-09-22

http://slidepdf.com/reader/full/motorola-sow-reviewed-by-moco-pm-2015-09-22 54/309

J.1.!.11.14 Site ,e(elo+ment at Potomac "iltration

+able " -6B provides details for the $otomac !iltration site.

(a)le J-6: 'ite InformationPotomac Filtration site

'ite InformationPotomac Filtration

'ite 9ame Potomac iltration

'ite (#pe *:istin$ Site E ;e to %ont$omery Co#nty System

'ite !wner WSSC

8ddressWSSC Potomac 6iver iltration Plant

11+7 6iver 6oa"5 Potomac5 %

$oordinatesat 34@ [email protected] ;

on$ --@[email protected] W

(ower ;eight 177 ft (,#il"in$ 'op ocation)

'u)s#stems located at 'ite 77 %B< Sim#lcast 6 Site

'ite 'cope 'ummar#

• +he proposed equipment will be located in the recently vacated equipment room assigned to

 82J+24.• 2isting +ower to be used for antennas I #00-foot rooftop.

• +he site upgrades will include a $ and a new roof-mounted @AC unit.

%ont$omery Co#nty5 %arylan"Statement of Work

Statement of Work: 47 

Page 55: Motorola SOW - Reviewed by MoCo PM 2015-09-22

7/23/2019 Motorola SOW - Reviewed by MoCo PM 2015-09-22

http://slidepdf.com/reader/full/motorola-sow-reviewed-by-moco-pm-2015-09-22 55/309

 

+able " -70 represents the work that Motorola will be performing at the $otomac !iltration ite.

(a)le J-7: <ork to )e performed at Potomac Filtration site

'ite <orkPotomac Filtration

(#pe of <ork ,etailed ,escription

 =ntenna an" 'ransmission

ine Installation

Install 3 antennas for t!e 6 system.

Install 2 antennas for t!e 6 system.

Install - si"e arms for antennas.

S#pply an" install !eavy@"#ty mo#nts for ,o$ner antennas.

Install 2 9PS antennas.

Install 1 toer@top amplifier.

Install 17 linear feet of 3D@inc! transmission line.

Install #p to 327 linear feet of 1D2@inc! transmission line.

Install #p to 2+7 linear feet of -D@inc! transmission line.

Install #p to 347 linear feet of 1@1D&@inc! transmission line.

Perform seep tests on transmission lines.

Provi"e an" install +@!ole !an$er locks an" attac!ment

!ar"are for s#pportin$ transmission lines on t!e antennas#pport str#ct#re every 3 feet.

Provi"e an" install 327 linear feet of P0C sleepers an"

attac!ment !ar"are for s#pportin$ transmission lines onrooftop every 3 feet.

S#pply an" install 1 $ro#n" #ss ar at t!e ottom of t!e

antenna s#pport str#ct#re for $ro#n"in$ 6 cales efore t!eymake !ori<ontal transition.

*:istin$ acility ImprovementWork

Coor"inate t!e installation of electrical s#@fee" it! "isconnect

into t!e e/#ipment room.

S#pply an" install 2 277@amp reaker panels it! capacity for37 circ#its.

S#pply an" install 7 27@amp reakers in t!e "istri#tion panel

an" ire to o#tlets locate" on an avera$e it!in 3 cale feet.

Install - @o#tlet "istri#tion ars an" ire eac! o#tlet to

in"ivi"#al reaker.

Install 1 ne sin$le@p!ase APS e/#ipment an" ire o#tp#t to

APS "istri#tion panel.

Install 1 primary 'ype 1 s#r$e protector on t!e room electrical

fee" to protect t!e e/#ipment from s#r$es.

Install 1 a#tomatic transfer sitc! an" connect it to $enerator

an" electric main.

S#pply an" install 1 cale entry panel it! 12 ports.

9ro#n" all metallic ojects in t!e interior of t!e e:istin$ room5 to

meet c#rrent %otorola?s Stan"ar"s an" 9#i"elines forComm#nications Sites (6+) re/#irements an" terminate neare/#ipment locations.

S#pply an" install 1 copper $ro#n" #ss ar.

S#pply an" install 1 all@mo#nte" 17@po#n" CO2 fire

%ont$omery Co#nty5 %arylan"Statement of Work

4  

Statement of Work: 

Page 56: Motorola SOW - Reviewed by MoCo PM 2015-09-22

7/23/2019 Motorola SOW - Reviewed by MoCo PM 2015-09-22

http://slidepdf.com/reader/full/motorola-sow-reviewed-by-moco-pm-2015-09-22 56/309

'ite <orkPotomac Filtration

e:tin$#is!er an" 1 all@mo#nte" 27@po#n" =,C firee:tin$#is!er.

S#pply an" install L;o smokin$L *%* si$na$e at t!e site.

S#pply an" install 1 eye as! station an" 1 first ai" kit.

S#pply 1 &@ton air@con"itionin$ #nit it! lo amient an"

compressor anti@cycle controls5 ret#rn an" s#pply $rilles5inte$ral kW resistance !eat strips5 an" as!ale "#st f ilters.

Install air@con"itionin$ #nit controls an" ire to reaker panel

locate" it!in 7 cale feet of t!e air@con"itionin$ #nit.

S#pply 780=5 127D2&70 primary an" 127D2&70 secon"ary5 fo#r 

in"in$5 sin$le@p!ase5 +7B< transformer.

Install isolation transformer incl#"in$ oltin$ "on an" irin$ to

"isconnect locate" it!in 27.

%iscellaneo#s Work   6emove e:istin$ le$acy antenna an" %W

6ooftop Penetration

6ooftop o$ Bo#se

%ont$omery Co#nty5 %arylan"Statement of Work

Statement of Work: 4!

Page 57: Motorola SOW - Reviewed by MoCo PM 2015-09-22

7/23/2019 Motorola SOW - Reviewed by MoCo PM 2015-09-22

http://slidepdf.com/reader/full/motorola-sow-reviewed-by-moco-pm-2015-09-22 57/309

 

J.1.!.11.1! Site ,e(elo+ment at Sligo Creek

+able " -7# provides details for the ligo Creek site.

(a)le J-1: 'ite Information'ligo $reek site

'ite Information'ligo $reek

'ite 9ame Sli$o Creek

'ite (#pe *:istin$ Site E ;e to %ont$omery Co#nty System

'ite !wner%arylan" ;ational Capital Park an" Plannin$Commission

8ddress

Sli$o Creek Parkay5 Silver Sprin$5 % 27471

(a"jacent to t!e Sli$o Creek 9olf Co#rse)

 =S6 1723

$oordinatesat 34@[email protected] ;

on$ --@71@&.7 W

(ower ;eight 2&+ ft

'u)s#stems located at 'ite 77 %B< Sim#lcast 6 Site.

'ite 'cope 'ummar#

• +he eisting compound will require epansion 'circa #000 sq. ft) in order to place the shelter with

internal generator and buried 4$< tanks.

•  8ew fenced compound3epansion sie I approimate #000 sq. ft.

Clearing type I @eavy.• :oad length requiring improvement I #0 feet.

•  8ew power run I#00 feet, 2lectrical service type I nderground, 600-amp - #103160-volt, single-

 phase

•  8ew shelter with internal generator I #1-foot 5>-foot.

•  8ew fuel tank sie I 1000 gallons, +ype I $ropane under-ground.

•  8ew generator, +ype I *ndoor.

• 2isting tower to be used for antennas I 170K elf upported +ower.

%ont$omery Co#nty5 %arylan"Statement of Work

5#  

Statement of Work: 

Page 58: Motorola SOW - Reviewed by MoCo PM 2015-09-22

7/23/2019 Motorola SOW - Reviewed by MoCo PM 2015-09-22

http://slidepdf.com/reader/full/motorola-sow-reviewed-by-moco-pm-2015-09-22 58/309

+able " -71 represents the work that Motorola will be performing at the ligo Creek site.

(a)le J-&: <ork to )e performed at 'ligo $reek site

'ite <ork'ligo $reek

(#pe of <ork ,etailed ,escription

Site Compo#n"   Perform tree clearin$5 $r#in$5 an" "isposal of ve$etation in t!e site

compo#n" area an" a 27@foot pat! aro#n" it (14+77 s/#are feet).

Perform tree clearin$5 $r#in$5 an" "isposal of ve$etation in a 1@foot i"e access roa" to t!e site (not to e:cee"17 feet in len$t!).

9ra"e t!e site compo#n" an" 17@foot pat! aro#n" it to provi"e a

level5 soli"5 #n"ist#re" s#rface for installation of site components(not to e:cee" 1&&77 s/#are feet).

Provi"e eart! fill to raise s#rface level in t!e site compo#n" (not to

e:cee" +7 c#ic yar"s). S#pply an" install $ravel s#rfacin$ to a "ept! of + inc!es5 #n"erlain

it! $eote:tile faric it!in t!e fence" in site compo#n" area5 an" a3@foot pat! aro#n" it (not to e:cee" 1123+ s/#are feet).

Provi"e a 1@foot i"e access roa" (not to e:cee" 17 feet in len$t!)5

incl#"in$ s#rface $ra"in$ an" $ravelin$

Constr#ct sales aro#n" t!e compo#n" to control soil erosion (not toe:cee" 277 linear feet).

Provi"e silt fence aro#n" t!e compo#n" to control soil erosion (not to

e:cee" +77 linear feet). Install stra ale se"iment arriers to control soil erosion (not to

e:cee" 277 linear feet). S#pply an" install @foot !i$! c!ain link fencin$ it! a

17@foot i"e $ate aro#n" t!e s!elter compo#n" (not to e:cee" &77linear feet).

Perform site to#c!#p (fertili<e5 see"5 an" stra) "ist#re" areas not

covere" it! $ravel after completion of constr#ction ork.

Site ComponentsInstallation

Constr#ct 1 reinforce" concrete fo#n"ation necessary for a 12@foot :

3@foot s!elter an" $enerator room.

*:cavate 2 trenc!es for 1777 $allon elo $ro#n" i/#i" Propane(P) f#el tank in 'I=D*I=@222 normal soil con"itions.

S#pply an" install 1 prefaricate" concrete s!elter an" $enerator

room 12@foot : 3 foot. S!elter incl#"es APS. S#pply an" install 2 1777@$allon P f#el tanks5 fill it it! f#el5 an"

connect it to t!e $enerator. S#pply an" install f#el tank monitors on t!e tanks to monitor lo f#el

in tanks an" r#n alarm irin$ to t!e #il"in$ locate" it!in 7 feet oft!e tank.

S#pply an" install 1 127D2&7@volt5 &77@amp5 sin$le@p!ase meter

pe"estal an" !ook#p for electrical service y t!e local #tility. Provi"e all trenc!in$5 con"#it5 an" calin$ necessary for #n"er$ro#n"

!ook#p of poer to t!e s!elter from neary #tility termination locate"177 cale feet of t!e s!elter.

S#pply an" install a perimeter $ro#n"in$ system aro#n" t!e

compo#n" an" s!elter. '!e $ro#n" system is to tie to t!e fence an"all ne metal str#ct#res it!in t!e compo#n" to meet c#rrent%otorola?s 6+ stan"ar"s.

Con"#ct 1 t!ree@point $ro#n" resistance test of t!e site. S!o#l" any

improvements to $ro#n"in$ system e necessary after $ro#n"testin$5 t!e cost of s#c! improvements s!all e t!e responsiility of

%ont$omery Co#nty5 %arylan"Statement of Work

Statement of Work: 5"

Page 59: Motorola SOW - Reviewed by MoCo PM 2015-09-22

7/23/2019 Motorola SOW - Reviewed by MoCo PM 2015-09-22

http://slidepdf.com/reader/full/motorola-sow-reviewed-by-moco-pm-2015-09-22 59/309

Page 60: Motorola SOW - Reviewed by MoCo PM 2015-09-22

7/23/2019 Motorola SOW - Reviewed by MoCo PM 2015-09-22

http://slidepdf.com/reader/full/motorola-sow-reviewed-by-moco-pm-2015-09-22 60/309

J.1.!.11.1$ Site ,e(elo+ment at Elmer>s Scool

+able " -75 provides details for the 2lmers chool site.

(a)le J-: 'ite Information?lmers 'chool site

'ite Information?lmers 'chool

'ite 9ame *lmers Sc!ool

'ite (#pe *:istin$ Site E ;e to %ont$omery Co#nty System

'ite !wner 'oer 6oa" C

8ddress177 *lmers Sc!ool 6oa"ickersonDPoolesville5 %

 =S6 17+1-4+

$oordinatesat 34@ [email protected] ;

on$ --@ 24@+.77 W(ower ;eight 237 ft

'u)s#stems located at 'ite 77 %B< Sim#lcast 6 Site

'ite 'cope 'ummar#

• +he site will require a compound epansion of approimately #100 sq. ft. 100’ of access road

improvement, shelter with internal generator and buried 4$< tanks. 8ew fencedcompound3epansion sie I approimate #100 sq. ft.

• Clearing type I 4ight.

• :oad length requiring improvement I 100 feet.

•  8ew power run I#00 feet, 2lectrical service type I nderground, 600-amp - #103160-volt, single-

 phase.•  8ew shelter with internal generator I #1-foot 5>-foot.

•  8ew fuel tank sie I 1000 gallons- , +ype I $ropane under-ground.

•  8ew generator, +ype I *ndoor.

• 2isting tower to be used for antennas I 500K elf upported +ower.

• Closest transformer was numbered 50061.

+able " -76 represents the work that Motorola will be performing at the 2lmers chool :oad site.

%ont$omery Co#nty5 %arylan"Statement of Work

Statement of Work: 53

Page 61: Motorola SOW - Reviewed by MoCo PM 2015-09-22

7/23/2019 Motorola SOW - Reviewed by MoCo PM 2015-09-22

http://slidepdf.com/reader/full/motorola-sow-reviewed-by-moco-pm-2015-09-22 61/309

 (a)le J-: <ork to )e performed at ?lmers 'chool +oad site

'ite <ork?lmers 'chool

(#pe of <ork ,etailed ,escription

Site Compo#n"   Perform li$!t clearin$ of r#s!5 $r#in$5 an" "isposal of

ve$etation an" s!r# $rot! in t!e site compo#n" area an"a 27@foot pat! aro#n" it (&+2& s/#are feet).

Perform clear li$!t r#s!5 $r# roots an" "ispose ve$etation

an" s!r# $rot! in a 1@foot i"e access roa" to t!e site(not to e:cee" 277 feet in len$t!).

9ra"e t!e site compo#n" an" 17@foot pat! aro#n" it to

provi"e a level5 soli"5 #n"ist#re" s#rface for installation ofsite components (not to e:cee" 237& s/#are feet).

Provi"e eart! fill to raise s#rface level in t!e site compo#n"

(not to e:cee" +7 c#ic yar"s).

S#pply an" install $ravel s#rfacin$ to a "ept! of + inc!es5

#n"erlain it! $eote:tile faric it!in t!e fence" in sitecompo#n" area5 an" a 3@foot pat! aro#n" it (not to e:cee"11+ s/#are feet).

Provi"e a 1@foot i"e access roa" (not to e:cee" 277 feetin len$t!)5 incl#"in$ s#rface $ra"in$ an" $ravelin$

Constr#ct sales aro#n" t!e compo#n" to control soil

erosion (not to e:cee" 277 linear feet).

Provi"e silt fence aro#n" t!e compo#n" to control soil

erosion (not to e:cee" 312 linear feet).

Install stra ale se"iment arriers to control soil erosion

(not to e:cee" 277 linear feet).

S#pply an" install @foot !i$! c!ain@link fencin$ it! a ten@

foot i"e $ate aro#n" t!e s!elter compo#n" (not to e:cee"112 linear feet).

Perform site to#c!#p (fertili<e5 see"5 an" stra) "ist#re"

areas not covere" it! $ravel after completion ofconstr#ction ork. an"scapin$5 "ecorative fencin$ or anyot!er aest!etic improvement t!at may e re/#ire" y local

 j#ris"ictions !as not een incl#"e" an" ill e !an"le"t!ro#$! a ne$otiate" contract c!an$e notice.

Site Components Installation   Constr#ct 1 reinforce" concrete fo#n"ation necessary for a

12@foot : 3&@foot s!elter an" $enerator room.

*:cavate 2 trenc!es for 1777 $allon elo $ro#n" P f#el

tank in 'I=D*I=@222 normal soil con"itions.

S#pply an" install 1 prefaricate" concrete s!elter an"

$enerator room 12@foot : 3&@foot.

S#pply an" install 2 1777@$allon P f#el tanks5 fill it it! f#el5

an" connect it to t!e $enerator.

S#pply an" install f#el tank monitors on t!e tanks to monitor

lo f#el in tanks an" r#n alarm irin$ to t!e #il"in$ locate"it!in 7 feet of t!e tank.

S#pply an" install 1 127D2&7@volt5 &77@amp5 sin$le@p!ase

meter pe"estal an" !ook#p for electrical service y t!e local#tility.

%ont$omery Co#nty5 %arylan"Statement of Work

54 

Statement of Work: 

Page 62: Motorola SOW - Reviewed by MoCo PM 2015-09-22

7/23/2019 Motorola SOW - Reviewed by MoCo PM 2015-09-22

http://slidepdf.com/reader/full/motorola-sow-reviewed-by-moco-pm-2015-09-22 62/309

'ite <ork?lmers 'chool

(#pe of <ork ,etailed ,escription

Provi"e all trenc!in$5 con"#it5 an" calin$ necessary for

#n"er$ro#n" !ook#p of poer to t!e s!elter from neary#tility termination locate" it!in 177 cale feet of t!e s!elter.

S#pply an" install a perimeter $ro#n"in$ system aro#n" t!e

compo#n" an" s!elter. '!e $ro#n" system is to tie to t!e

fence an" all ne metal str#ct#res it!in t!e compo#n" tomeet c#rrent %otorola?s 6+ stan"ar"s.

Con"#ct 1 t!ree@point $ro#n" resistance test of t!e site.

S!o#l" any improvements to $ro#n"in$ system enecessary after $ro#n" testin$5 t!e cost of s#c!improvements s!all e t!e responsiility of Co#nty.

S#pply an" install 1 freestan"in$ 2&@inc!@i"e caleDice

ri"$e from t!e toer to t!e s!elter (#p to 37 linear feet).

 =ntenna an" 'ransmission ineInstallation

Install 3 antennas for t!e 6 system.

Install 1 antenna for t!e 6 system.

Install & si"e arms for antennas.

S#pply an" install & !eavy@"#ty mo#nts for ,o$nerantennas.

Install 2 9PS antennas.

Install 1 toer@top amplifier.

Install 17 linear feet of 3D@inc! transmission line.

Install #p to 2+7 linear feet of 1D2@inc! transmission line.

Install #p to 2+7 linear feet of -D@inc! transmission line.

Install #p to +47 linear feet of 1@1D&@inc! transmission line.

Perform seep tests on transmission lines.

Provi"e an" install +@!ole !an$er locks an" attac!ment

!ar"are for s#pportin$ transmission lines on t!e antennas#pport str#ct#re every 3 feet.

S#pply an" install 2&@inc!@i"e cale la""er to s#pport 6

transmission lines (237 linear feet).

S#pply an" install 1 $ro#n" #ss ar at t!e ottom of t!e

antenna s#pport str#ct#re for $ro#n"in$ 6 cales eforet!ey make !ori<ontal transition.

%iscellaneo#s Work   %277 Permittin$ an" testin$Dire %ars!all approval.

%ont$omery Co#nty5 %arylan"Statement of Work

Statement of Work: 55 

Page 63: Motorola SOW - Reviewed by MoCo PM 2015-09-22

7/23/2019 Motorola SOW - Reviewed by MoCo PM 2015-09-22

http://slidepdf.com/reader/full/motorola-sow-reviewed-by-moco-pm-2015-09-22 63/309

Page 64: Motorola SOW - Reviewed by MoCo PM 2015-09-22

7/23/2019 Motorola SOW - Reviewed by MoCo PM 2015-09-22

http://slidepdf.com/reader/full/motorola-sow-reviewed-by-moco-pm-2015-09-22 64/309

+able " -79 represents the work that Motorola will be performing at the pencerville :oad site.

(a)le J-2: <ork to )e performed at 'pencerville +oad site

'ite <ork&67 'pencerville +oad

(#pe of <ork ,etailed ,escription

Site Compo#n"   Perform me"i#m clearin$5 $r#in$5 an" "isposal of ve$etation

an" s!r# $rot! in t!e site compo#n" area an" a 27@foot pat!aro#n" it (12177 s/#are feet).

Perform me"i#m tree clearin$ ('rees #p to +K in "iameter)5

$r#in$ an" "isposal of ve$etation an" s!r# $rot! in a 1@foot i"e access roa" to t!e site (not to e:cee" 7 feet inlen$t!).

9ra"e t!e site compo#n" an" 17@foot pat! aro#n" it to provi"e a

level5 soli"5 #n"ist#re" s#rface for installation of sitecomponents (not to e:cee" 177 s/#are feet).

Provi"e eart! fill to raise s#rface level in t!e site compo#n" (not

to e:cee" +7 c#ic yar"s).

S#pply an" install $ravel s#rfacin$ to a "ept! of + inc!es5

#n"erlain it! $eote:tile faric it!in t!e fence" in sitecompo#n" area5 an" a 3@foot pat! aro#n" it (not to e:cee" --+s/#are feet).

Provi"e a 1@foot i"e access roa" (not to e:cee" 7 feet in

len$t!)5 incl#"in$ s#rface $ra"in$ an" $ravelin$

Constr#ct sales aro#n" t!e compo#n" to control soil erosion

(not to e:cee" 277 linear feet).

Provi"e silt fence aro#n" t!e compo#n" to control soil erosion

(not to e:cee" &7 linear feet).

Install stra ale se"iment arriers to control soil erosion (not to

e:cee" 277 linear feet).

S#pply an" install @foot !i$! c!ain@link fencin$ it! a ten@foot

i"e $ate aro#n" t!e s!elter compo#n" (not to e:cee" 27linear feet).

Perform site to#c!#p (fertili<e5 see"5 an" stra) "ist#re" areas

not covere" it! $ravel after completion of constr#ction ork.an"scapin$5 "ecorative fencin$ or any ot!er aest!eticimprovement t!at may e re/#ire" y local j#ris"ictions !as noteen incl#"e" an" ill e !an"le" t!ro#$! a ne$otiate" contractc!an$e notice.

Site Components Installation   Constr#ct 1 reinforce" concrete fo#n"ation necessary for a

12@foot : 3@foot s!elter an" $enerator room.

*:cavate 2 trenc!es for 1777 $allon elo $ro#n" i/#i"

Propane (P) f#el tank in 'I=D*I=@222 normal soil con"itions.

S#pply an" install 1 prefaricate" concrete s!elter an"$enerator room 12@foot : 3 foot. S!elter incl#"es APS.

S#pply an" install 2 1777@$allon i/#i" Propane (P) f#el

tank(s)5 fill it it! f#el5 an" connect it to t!e $enerator.

S#pply an" install f#el tank monitors on t!e tanks to monitor lo

f#el in tanks an" r#n alarm irin$ to t!e #il"in$ locate" it!in7 feet of t!e tank.

S#pply an" install 1 127D2&7@volt5 &77@amp5 sin$le@p!ase meter

%ont$omery Co#nty5 %arylan"Statement of Work

Statement of Work: 57 

Page 65: Motorola SOW - Reviewed by MoCo PM 2015-09-22

7/23/2019 Motorola SOW - Reviewed by MoCo PM 2015-09-22

http://slidepdf.com/reader/full/motorola-sow-reviewed-by-moco-pm-2015-09-22 65/309

 

'ite <ork&67 'pencerville +oad

(#pe of <ork ,etailed ,escription

pe"estal an" !ook#p for electrical service y t!e local #tility.

Provi"e all trenc!in$5 con"#it5 an" calin$ necessary for

#n"er$ro#n" !ook#p of poer to t!e s!elter from neary #tilitytermination locate" #p to 1777 cale feet of t!e s!elter.

S#pply an" install a perimeter $ro#n"in$ system aro#n" t!e

compo#n" an" s!elter. '!e $ro#n" system is to tie to t!e fencean" all ne metal str#ct#res it!in t!e compo#n" to meetc#rrent %otorola?s 6+ stan"ar"s.

Con"#ct 1 t!ree@point $ro#n" resistance test of t!e site. S!o#l"

any improvements to $ro#n"in$ system e necessary after$ro#n" testin$5 t!e cost of s#c! improvements s!all e t!eresponsiility of Co#nty.

S#pply an" install 1 freestan"in$ 2&@inc!@i"e caleDice ri"$e

from t!e toer to t!e s!elter (#p to 37 linear feet).

'oer Work   Constr#ct pier an" pa" type toer fo#n"ations incl#"in$

e:cavation5 rear an" concrete (not to e:cee" +7 c#ic yar"s).

*rect ne 17@foot self@s#pporte" toer. S#pply an" install $ro#n"in$ for t!e toer ase for self@

s#pporte" toers

 =ntenna an" 'ransmissionine Installation

Install 3 antennas for t!e 6 system.

Install 1 antenna for t!e 6 system.

Install & si"e arms for antennas.

S#pply an" install 3 !eavy@"#ty mo#nt(s) for ,o$ner antennas.

S#pply an" install @3 +@foot si"e arm(s) for antenna mo#nts.

Install 2 9PS antennas.

Install 1 toer@top amplifier.

Install 17 linear feet of 3D@inc! transmission line. Install #p to 27 linear feet of 1D2@inc! transmission line.

Install #p to 27 linear feet of -D@inc! transmission line.

Install #p to &7 linear feet of 1@1D&@inc! transmission line.

Perform seep tests on transmission lines.

Provi"e an" install +@!ole !an$er locks an" attac!ment

!ar"are for s#pportin$ transmission lines on t!e antennas#pport str#ct#re every 3 feet.

S#pply an" install 1 $ro#n" #ss ar at t!e ottom of t!e

antenna s#pport str#ct#re for $ro#n"in$ 6 cales efore t!eymake !ori<ontal transition.

%iscellaneo#s Work   %277 Permittin$ an" testin$Dire %ars!all approval

%ont$omery Co#nty5 %arylan"Statement of Work

5  

Statement of Work: 

Page 66: Motorola SOW - Reviewed by MoCo PM 2015-09-22

7/23/2019 Motorola SOW - Reviewed by MoCo PM 2015-09-22

http://slidepdf.com/reader/full/motorola-sow-reviewed-by-moco-pm-2015-09-22 66/309

J.1.!.11.17 Site ,e(elo+ment at 0iley>s Lock 0oad Site

+able " -7= provides details for the :iley’s 4ock :oad site.

(a)le J-3: 'ite Information+ile#’s 0ock +oad 'ite

'ite Information1& +ile#’s 0ock +d

'ite 9ame 1332 6iley?s ock 6"

'ite (#pe ;e E 9reenfiel" Site

'ite !wner %arylan" ;ational Capital Parks

8ddress1332 6iley?s ock 6"

Poolesville5 %

$oordinatesat 34@&@ 2-.4& ;

on$ --@27@2-.& W

(ower ;eight 147 ft

'u)s#stems located at 'ite 77 %B< Sim#lcast 6 Site

'ite 'cope 'ummar#

• n approimate 6B00 sq. ft. compound, shelter with internal generator, buried 4$< tanks and

#B0’ self-supported tower is proposed

•  8ew fenced compound3epansion sie I =0-foot =0-foot.

• Clearing type I 4ight.

• :oad length requiring improvement I 70 feet.

•  8ew power run I up to #000 feet, 2lectrical service type I nderground, 600-amp - #103160-volt,

single-phase.•  8ew shelter with internal generator I #1-foot 5>-foot.

•  8ew fuel tank sie I 1000 gallons- , +ype I $ropane under-ground.

•  8ew generator, +ype I *ndoor.

•  8ew tower to be used for antennas I #B0-foot self-supported tower.

•  8ew tower foundation sie I 90 cubic yard, +ype I $ier and pad.

• $ower pole was blocked from view by signage.

%ont$omery Co#nty5 %arylan"Statement of Work

Statement of Work: 5!

Page 67: Motorola SOW - Reviewed by MoCo PM 2015-09-22

7/23/2019 Motorola SOW - Reviewed by MoCo PM 2015-09-22

http://slidepdf.com/reader/full/motorola-sow-reviewed-by-moco-pm-2015-09-22 67/309

 +able " -7> represents the work that Motorola will be performing at the :iley’s 4ock :oad site.

(a)le J-5: <ork to )e performed at +ile#’s 0ock +oad site

'ite <ork+ile#’s 0ock +oad

(#pe of <ork ,etailed ,escription

Site Compo#n"   Perform li$!t clearin$ of r#s!5 $r#in$5 an" "isposal of

ve$etation an" s!r# $rot! in t!e site compo#n" area an" a 27@foot pat! aro#n" it (12177 s/#are feet).

Perform clear li$!t r#s!5 $r# roots an" "ispose ve$etation an"

s!r# $rot! in a 1@foot i"e access roa" to t!e site (not toe:cee" 7 feet in len$t!).

9ra"e t!e site compo#n" an" 17@foot pat! aro#n" it to provi"e a

level5 soli"5 #n"ist#re" s#rface for installation of site components(not to e:cee" 177 s/#are feet).

Provi"e eart! fill to raise s#rface level in t!e site compo#n" (not to

e:cee" +7 c#ic yar"s). S#pply an" install $ravel s#rfacin$ to a "ept! of + inc!es5

#n"erlain it! $eote:tile faric it!in t!e fence" in site compo#n"area5 an" a 3@foot pat! aro#n" it (not to e:cee" --+ s/#are feet).

Provi"e a 1@foot i"e access roa" (not to e:cee" 7 feet in

len$t!)5 incl#"in$ s#rface $ra"in$ an" $ravelin$ Constr#ct sales aro#n" t!e compo#n" to control soil erosion (not

to e:cee" 277 linear feet). Provi"e silt fence aro#n" t!e compo#n" to control soil erosion (not

to e:cee" &7 linear feet). Install stra ale se"iment arriers to control soil erosion (not to

e:cee" 277 linear feet). S#pply an" install @foot !i$! c!ain@link fencin$ it! a ten@foot

i"e $ate aro#n" t!e s!elter compo#n" (not to e:cee" 27 linearfeet).

Perform site to#c!#p (fertili<e5 see"5 an" stra) "ist#re" areas

not covere" it! $ravel after completion of constr#ction ork.an"scapin$5 "ecorative fencin$ or any ot!er aest!etic

improvement t!at may e re/#ire" y local j#ris"ictions !as noteen incl#"e" an" ill e !an"le" t!ro#$! a ne$otiate" contractc!an$e notice.

Site ComponentsInstallation

Constr#ct 1 reinforce" concrete fo#n"ation necessary for a 12@foot

: 3@foot s!elter an" $enerator room. *:cavate 2 trenc!es for 1777 $allon elo $ro#n" i/#i" Propane

(P) f#el tank in 'I=D*I=@222 normal soil con"itions. S#pply an" install 1 prefaricate" concrete s!elter an" $enerator

room 12@foot : 3 foot. S!elter incl#"es APS. S#pply an" install 2 1777@$allon i/#i" Propane (P) f#el tank(s)5

fill it it! f#el5 an" connect it to t!e $enerator. S#pply an" install f#el tank monitors on t!e tanks to monitor lo

f#el in tanks an" r#n alarm irin$ to t!e #il"in$ locate" it!in 7

feet of t!e tank. S#pply an" install 1 127D2&7@volt5 &77@amp5 sin$le@p!ase meter

pe"estal an" !ook#p for electrical service y t!e local #tility. Provi"e all trenc!in$5 con"#it5 an" calin$ necessary for

#n"er$ro#n" !ook#p of poer to t!e s!elter from neary #tilitytermination locate" #p to 1777 cale feet of t!e s!elter.

S#pply an" install a perimeter $ro#n"in$ system aro#n" t!e

compo#n" an" s!elter. '!e $ro#n" system is to tie to t!e fencean" all ne metal str#ct#res it!in t!e compo#n" to meet c#rrent

%ont$omery Co#nty5 %arylan"Statement of Work

6#  

Statement of Work: 

Page 68: Motorola SOW - Reviewed by MoCo PM 2015-09-22

7/23/2019 Motorola SOW - Reviewed by MoCo PM 2015-09-22

http://slidepdf.com/reader/full/motorola-sow-reviewed-by-moco-pm-2015-09-22 68/309

'ite <ork+ile#’s 0ock +oad

(#pe of <ork ,etailed ,escription

%otorola?s 6+ stan"ar"s. Con"#ct 1 t!ree@point $ro#n" resistance test of t!e site. S!o#l"

any improvements to $ro#n"in$ system e necessary after $ro#n"testin$5 t!e cost of s#c! improvements s!all e t!e responsiilityof Co#nty.

S#pply an" install 1 freestan"in$ 2&@inc!@i"e caleDice ri"$e

from t!e toer to t!e s!elter (#p to 37 linear feet).

'oer Work   Constr#ct pier an" pa" type toer fo#n"ations incl#"in$

e:cavation5 rear5 an" concrete (not to e:cee" +7 c#ic yar"s). *rect ne 147@foot self@s#pporte" toer.

S#pply an" install $ro#n"in$ for t!e toer ase for self@s#pporte"

toers

 =ntenna an" 'ransmissionine Installation

Install 3 antennas for t!e 6 system.

Install 2 antenna(s) for t!e 6 system.

Install si"e arms for antennas.

S#pply an" install 3 !eavy@"#ty mo#nt(s) for ,o$ner antennas.

S#pply an" install @3 +@foot si"e arm(s) for antenna mo#nts.

Install 2 9PS antennas.

Install 1 toer@top amplifier. Install 17 linear feet of 3D@inc! transmission line.

Install #p to &17 linear feet of 1D2@inc! transmission line.

Install #p to &17 linear feet of -D@inc! transmission line.

Install #p to &7 linear feet of 1@1D&@inc! transmission line.

Perform seep tests on transmission lines.

Provi"e an" install +@!ole !an$er locks an" attac!ment !ar"are

for s#pportin$ transmission lines on t!e antenna s#pport str#ct#reevery 3 feet.

S#pply an" install 2&@inc!@i"e cale la""er to s#pport 6

transmission lines (147 linear feet). S#pply an" install 1 $ro#n" #ss ar at t!e ottom of t!e antenna

s#pport str#ct#re for $ro#n"in$ 6 cales efore t!ey make!ori<ontal transition.

%iscellaneo#s Work   %277 Permittin$ an" testin$Dire %ars!all approval

%ont$omery Co#nty5 %arylan"Statement of Work

Statement of Work: 6"

Page 69: Motorola SOW - Reviewed by MoCo PM 2015-09-22

7/23/2019 Motorola SOW - Reviewed by MoCo PM 2015-09-22

http://slidepdf.com/reader/full/motorola-sow-reviewed-by-moco-pm-2015-09-22 69/309

 

J.1.!.11.18 Site ,e(elo+ment at ,odge Crome

(a)le J-6: 'ite Information,odge $hrome

'ite Information,odge $hrome

'ite 9ame o"$e C!rome

'ite (#pe ;e E 9reenfiel" Site

'ite !wner

an" One" y %ont$omery Co#nty

'!e facility is propose" to ecome a %ont$omeryrecyclin$ facility.

8ddress 2271 In"#strial Parkay5 Silver Sprin$5 %

$oordinatesat 34@2@&.4-1 ;

on$ -+@-@&4.&2- W

(ower ;eight 17 ft

'u)s#stems located at 'ite 77 %B< Sim#lcast 6 Site

'ite 'cope 'ummar#

• n approimate 6B00 sq. ft. compound, shelter with internal generator, buried 4$< tanks and

#B0’ self-supported tower is proposed

•  8ew fenced compound3epansion sie I =0-foot =0-foot.

• Clearing type I 4ight.

• :oad length requiring improvement I 70 feet.

•  8ew power run I up to #000 feet, 2lectrical service type I nderground, 600-amp - #103160-volt,

single-phase, 8atural <as I up to #000 feet.

•  8ew shelter w. internal generator I #1-foot 5>-foot.•  8ew fuel tank sie I 1000 gallons- , +ype I $ropane under-ground.

•  8ew generator, +ype I *ndoor.

•  8ew tower to be used for antennas I #B0-foot self-supported tower.

•  8ew tower foundation sie I 90 cubic yard, +ype I $ier and pad.

• +he closest power pole 'circa #70 linear feet distant) was overgrown with brambles and could not

 be approached closer than 50’. +he closest identifiable transformer had the number 57B5% and islocated circa 600 linear feet from the proposed location.

%ont$omery Co#nty5 %arylan"Statement of Work

62  

Statement of Work: 

Page 70: Motorola SOW - Reviewed by MoCo PM 2015-09-22

7/23/2019 Motorola SOW - Reviewed by MoCo PM 2015-09-22

http://slidepdf.com/reader/full/motorola-sow-reviewed-by-moco-pm-2015-09-22 70/309

Page 71: Motorola SOW - Reviewed by MoCo PM 2015-09-22

7/23/2019 Motorola SOW - Reviewed by MoCo PM 2015-09-22

http://slidepdf.com/reader/full/motorola-sow-reviewed-by-moco-pm-2015-09-22 71/309

Page 72: Motorola SOW - Reviewed by MoCo PM 2015-09-22

7/23/2019 Motorola SOW - Reviewed by MoCo PM 2015-09-22

http://slidepdf.com/reader/full/motorola-sow-reviewed-by-moco-pm-2015-09-22 72/309

Page 73: Motorola SOW - Reviewed by MoCo PM 2015-09-22

7/23/2019 Motorola SOW - Reviewed by MoCo PM 2015-09-22

http://slidepdf.com/reader/full/motorola-sow-reviewed-by-moco-pm-2015-09-22 73/309

 

+able " -91 represents the work that Motorola will be performing at the 1#6#6 <eorgia ve site.

(a)le J-2&: <ork to )e performed at &11 =eorgia 8ve site

'ite <ork&11 =eorgia 8ve

(#pe of <ork ,etailed ,escription

Site Compo#n"   Perform tree clearin$5 $r#in$5 an" "isposal of ve$etation in t!e

site compo#n" area an" a 27@foot pat! aro#n" it (12177 s/#are

feet). Perform tree clearin$5 $r#in$5 an" "isposal of ve$etation in a

1@foot i"e access roa" to t!e site (not to e:cee" 1777 feet inlen$t!).

9ra"e t!e site compo#n" an" 17@foot pat! aro#n" it to provi"e a

level5 soli"5 #n"ist#re" s#rface for installation of site components(not to e:cee" 177 s/#are feet).

Provi"e eart! fill to raise s#rface level in t!e site compo#n" (not to

e:cee" 127 c#ic yar"s). S#pply an" install $ravel s#rfacin$ to a "ept! of + inc!es5

#n"erlain it! $eote:tile faric it!in t!e fence" in site compo#n"area5 an" a 3@foot pat! aro#n" it (not to e:cee" --+ s/#are feet).

Provi"e a 1@foot i"e access roa" (not to e:cee" 1777 feet in

len$t!)5 incl#"in$ s#rface $ra"in$ an" $ravelin$ Constr#ct sales aro#n" t!e compo#n" to control soil erosion (not

to e:cee" 277 linear feet). Provi"e silt fence aro#n" t!e compo#n" to control soil erosion (not

to e:cee" &7 linear feet). Install stra ale se"iment arriers to control soil erosion (not to

e:cee" 277 linear feet). S#pply an" install @foot !i$! c!ain@link fencin$ it! a ten@foot

i"e $ate aro#n" t!e s!elter compo#n" (not to e:cee" 27 linearfeet).

Perform site to#c!#p (fertili<e5 see"5 an" stra) "ist#re" areas

not covere" it! $ravel after completion of constr#ction ork.an"scapin$5 "ecorative fencin$ or any ot!er aest!etic

improvement t!at may e re/#ire" y local j#ris"ictions !as noteen incl#"e" an" ill e !an"le" t!ro#$! a ne$otiate" contractc!an$e notice.

Site ComponentsInstallation

Constr#ct 1 reinforce" concrete fo#n"ation necessary for a 12@foot

: 3@foot s!elter an" $enerator room. *:cavate 2 trenc!es for 1777 $allon elo $ro#n" i/#i" Propane

(P) f#el tank in 'I=D*I=@222 normal soil con"itions. S#pply an" install 1 prefaricate" concrete s!elter an" $enerator

room 12@foot : 3 foot. S!elter incl#"es APS. S#pply an" install 2 1777@$allon i/#i" Propane (P) f#el tank(s)5

fill it it! f#el5 an" connect it to t!e $enerator. S#pply an" install f#el tank monitors on t!e tanks to monitor lo

f#el in tanks an" r#n alarm irin$ to t!e #il"in$ locate" it!in 7feet of t!e tank.

S#pply an" install 1 127D2&7@volt5 &77@amp5 sin$le@p!ase meter

pe"estal an" !ook#p for electrical service y t!e local #tility. Provi"e all trenc!in$5 con"#it5 an" calin$ necessary for

#n"er$ro#n" !ook#p of poer to t!e s!elter from neary #tilitytermination locate" #p to 1777 cale feet of t!e s!elter.

S#pply an" install a perimeter $ro#n"in$ system aro#n" t!e

compo#n" an" s!elter. '!e $ro#n" system is to tie to t!e fence

%ont$omery Co#nty5 %arylan"Statement of Work

66  

Statement of Work: 

Page 74: Motorola SOW - Reviewed by MoCo PM 2015-09-22

7/23/2019 Motorola SOW - Reviewed by MoCo PM 2015-09-22

http://slidepdf.com/reader/full/motorola-sow-reviewed-by-moco-pm-2015-09-22 74/309

Page 75: Motorola SOW - Reviewed by MoCo PM 2015-09-22

7/23/2019 Motorola SOW - Reviewed by MoCo PM 2015-09-22

http://slidepdf.com/reader/full/motorola-sow-reviewed-by-moco-pm-2015-09-22 75/309

Page 76: Motorola SOW - Reviewed by MoCo PM 2015-09-22

7/23/2019 Motorola SOW - Reviewed by MoCo PM 2015-09-22

http://slidepdf.com/reader/full/motorola-sow-reviewed-by-moco-pm-2015-09-22 76/309

+able " -96 represents the work that Motorola will be performing at the M; 100 site.

(a)le J-2 <ork to )e performed at M, &77 site

'ite <orkM,&77

(#pe of <ork ,etailed ,escription

Site Compo#n"   Perform me"i#m clearin$5 $r#in$5 an" "isposal of ve$etation

an" s!r# $rot! in t!e site compo#n" area an" a 27@foot pat!aro#n" it (12177 s/#are feet).

Perform me"i#m tree clearin$ ('rees #p to +K in "iameter)5

$r#in$ an" "isposal of ve$etation an" s!r# $rot! in a 1@footi"e access roa" to t!e site (not to e:cee" 17 feet in len$t!).

9ra"e t!e site compo#n" an" 17@foot pat! aro#n" it to provi"e a

level5 soli"5 #n"ist#re" s#rface for installation of site components(not to e:cee" 177 s/#are feet).

Provi"e eart! fill to raise s#rface level in t!e site compo#n" (not to

e:cee" +7 c#ic yar"s). S#pply an" install $ravel s#rfacin$ to a "ept! of + inc!es5

#n"erlain it! $eote:tile faric it!in t!e fence" in site compo#n"area5 an" a 3@foot pat! aro#n" it (not to e:cee" --+ s/#are feet).

Provi"e a 1@foot i"e access roa" (not to e:cee" 17 feet in

len$t!)5 incl#"in$ s#rface $ra"in$ an" $ravelin$ Constr#ct sales aro#n" t!e compo#n" to control soil erosion (not

to e:cee" 277 linear feet). Provi"e silt fence aro#n" t!e compo#n" to control soil erosion (not

to e:cee" &7 linear feet). Install stra ale se"iment arriers to control soil erosion (not to

e:cee" 277 linear feet). S#pply an" install @foot !i$! c!ain@link fencin$ it! a ten@foot

i"e $ate aro#n" t!e s!elter compo#n" (not to e:cee" 27 linearfeet).

Perform site to#c!#p (fertili<e5 see"5 an" stra) "ist#re" areas

not covere" it! $ravel after completion of constr#ction ork.an"scapin$5 "ecorative fencin$ or any ot!er aest!etic

improvement t!at may e re/#ire" y local j#ris"ictions !as noteen incl#"e" an" ill e !an"le" t!ro#$! a ne$otiate" contractc!an$e notice.

Site ComponentsInstallation

Constr#ct 1 reinforce" concrete fo#n"ation necessary for a 12@

foot : 3@foot s!elter an" $enerator room. *:cavate 2 trenc! for 1777 $allon elo $ro#n" i/#i" Propane

(P) f#el tank in 'I=D*I=@222 normal soil con"itions. S#pply an" install 1 prefaricate" concrete s!elter an" $enerator

room 12@foot : 3 foot. S!elter incl#"es APS. S#pply an" install 2 1777@$allon i/#i" Propane (P) f#el tank(s)5

fill it it! f#el5 an" connect it to t!e $enerator. S#pply an" install f#el tank monitors on t!e tanks to monitor lo

f#el in tanks an" r#n alarm irin$ to t!e #il"in$ locate" it!in 7

feet of t!e tank. S#pply an" install 1 127D2&7@volt5 &77@amp5 sin$le@p!ase meter

pe"estal an" !ook#p for electrical service y t!e local #tility. Provi"e all trenc!in$5 con"#it5 an" calin$ necessary for

#n"er$ro#n" !ook#p of poer to t!e s!elter from neary #tilitytermination locate" #p to 1777 cale feet of t!e s!elter.

S#pply an" install a perimeter $ro#n"in$ system aro#n" t!e

compo#n" an" s!elter. '!e $ro#n" system is to tie to t!e fencean" all ne metal str#ct#res it!in t!e compo#n" to meet c#rrent

%ont$omery Co#nty5 %arylan"Statement of Work

Statement of Work: 6!

Page 77: Motorola SOW - Reviewed by MoCo PM 2015-09-22

7/23/2019 Motorola SOW - Reviewed by MoCo PM 2015-09-22

http://slidepdf.com/reader/full/motorola-sow-reviewed-by-moco-pm-2015-09-22 77/309

Page 78: Motorola SOW - Reviewed by MoCo PM 2015-09-22

7/23/2019 Motorola SOW - Reviewed by MoCo PM 2015-09-22

http://slidepdf.com/reader/full/motorola-sow-reviewed-by-moco-pm-2015-09-22 78/309

J.1.!.11.22 Site ,e(elo+ment at "leming (enue

+able " -97 provides site details for !leming ve.

(a)le J-2: 'ite InformationFleming 8ve

'ite InformationFleming 8ve@Park

'ite 9ame lemin$

'ite (#pe ;e E 9reenfiel" Site

'ite !wner %arylan" ;ational Capital Parks

8ddress 4424 lemin$ =ve. ,et!es"a5 %

$oordinatesat 34@[email protected]+ ;

on$ --@[email protected]& W

(ower ;eight 17 ft'u)s#stems located at 'ite 77 %B< Sim#lcast 6 Site

'ite 'cope 'ummar#

• n approimate 6B00 sq. ft. compound, shelter with internal generator, buried 4$< tanks and

#>0’ self-supported tower are proposed to be constructed at the rear of the park closest to the pathleading over *-6B7.

•  8ew fenced compound3epansion sie I =0-foot =0-foot.

• Clearing type I 4ight.

• :oad length requiring improvement I 70 feet.

•  8ew power run I #00 feet, 2lectrical service type I nderground, 500-amp - #103160-volt,

single-phase.•  8ew shelter with internal generator I #1-foot 5>-foot.

•  8ew fuel tank sie I 1000 gallons- , +ype I $ropane under-ground.

•  8ew generator, +ype I *ndoor.

•  8ew tower to be used for antennas I #>0-foot self-supported tower.

•  8ew tower foundation sie I 90 cubic yard, +ype I $ier and pad.

• +here are 1 $2$C( power poles available? =9>65-=77 and $2$91=>95.

%ont$omery Co#nty5 %arylan"Statement of Work

Statement of Work: 7"

Page 79: Motorola SOW - Reviewed by MoCo PM 2015-09-22

7/23/2019 Motorola SOW - Reviewed by MoCo PM 2015-09-22

http://slidepdf.com/reader/full/motorola-sow-reviewed-by-moco-pm-2015-09-22 79/309

 +able " -99 represents the work that Motorola will be performing at the !leming venue site.

(a)le J-22: <ork to )e performed at Fleming 8ve site

'ite <orkFleming 8venue

(#pe of <ork ,etailed ,escription

Site Compo#n"   Perform li$!t clearin$ of r#s!5 $r#in$5 an" "isposal of

ve$etation an" s!r# $rot! in t!e site compo#n" area an" a

27@foot pat! aro#n" it (12177 s/#are feet). Perform clear li$!t r#s!5 $r# roots an" "ispose ve$etation

an" s!r# $rot! in a 1@foot i"e access roa" to t!e site(not to e:cee" 7 feet in len$t!).

9ra"e t!e site compo#n" an" 17@foot pat! aro#n" it to

provi"e a level5 soli"5 #n"ist#re" s#rface for installation ofsite components (not to e:cee" 177 s/#are feet).

Provi"e eart! fill to raise s#rface level in t!e site compo#n"

(not to e:cee" +7 c#ic yar"s).

S#pply an" install $ravel s#rfacin$ to a "ept! of + inc!es5

#n"erlain it! $eote:tile faric it!in t!e fence" in sitecompo#n" area5 an" a 3@foot pat! aro#n" it (not to e:cee"

--+ s/#are feet). Provi"e a 1@foot i"e access roa" (not to e:cee" 7 feet in

len$t!)5 incl#"in$ s#rface $ra"in$ an" $ravelin$

Constr#ct sales aro#n" t!e compo#n" to control soil erosion

(not to e:cee" 277 linear feet).

Provi"e silt fence aro#n" t!e compo#n" to control soil erosion

(not to e:cee" &7 linear feet).

Install stra ale se"iment arriers to control soil erosion (not

to e:cee" 277 linear feet).

S#pply an" install @foot !i$! c!ain@link fencin$ it! a ten@

foot i"e $ate aro#n" t!e s!elter compo#n" (not to e:cee"27 linear feet).

Perform site to#c!#p (fertili<e5 see"5 an" stra) "ist#re"

areas not covere" it! $ravel after completion of constr#ctionork. an"scapin$5 "ecorative fencin$ or any ot!er aest!eticimprovement t!at may e re/#ire" y local j#ris"ictions !asnot een incl#"e" an" ill e !an"le" t!ro#$! a ne$otiate"contract c!an$e notice.

Site Components Installation   Constr#ct 1 reinforce" concrete fo#n"ation necessary for a

12@foot : 3@foot s!elter an" $enerator room.

*:cavate 2 trenc!es for 1777 $allon elo $ro#n" i/#i"

Propane (P) f#el tank in 'I=D*I=@222 normal soil con"itions.

S#pply an" install 1 prefaricate" concrete s!elter an"

$enerator room 12@foot : 3 foot. S!elter incl#"es APS. S#pply an" install 2 1777@$allon i/#i" Propane (P) f#el

tank(s)5 fill it it! f#el5 an" connect it to t!e $enerator.

S#pply an" install f#el tank monitors on t!e tanks to monitor

lo f#el in tanks an" r#n alarm irin$ to t!e #il"in$ locate"it!in 7 feet of t!e tank.

S#pply an" install 1 127D2&7@volt5 377@amp5 sin$le@p!ase

meter pe"estal an" !ook#p for electrical service y t!e local

%ont$omery Co#nty5 %arylan"Statement of Work

72  

Statement of Work: 

Page 80: Motorola SOW - Reviewed by MoCo PM 2015-09-22

7/23/2019 Motorola SOW - Reviewed by MoCo PM 2015-09-22

http://slidepdf.com/reader/full/motorola-sow-reviewed-by-moco-pm-2015-09-22 80/309

'ite <orkFleming 8venue

(#pe of <ork ,etailed ,escription

#tility.

Provi"e all trenc!in$5 con"#it5 an" calin$ necessary for

#n"er$ro#n" !ook#p of poer to t!e s!elter from neary#tility termination locate" 177 cale feet of t!e s!elter.

S#pply an" install a perimeter $ro#n"in$ system aro#n" t!e

compo#n" an" s!elter. '!e $ro#n" system is to tie to t!efence an" all ne metal str#ct#res it!in t!e compo#n" tomeet c#rrent %otorola?s 6+ stan"ar"s.

Con"#ct 1 t!ree@point $ro#n" resistance test of t!e site.

S!o#l" any improvements to $ro#n"in$ system e necessaryafter $ro#n" testin$5 t!e cost of s#c! improvements s!all et!e responsiility of Co#nty.

S#pply an" install 1 freestan"in$ 2&@inc!@i"e caleDice

ri"$e from t!e toer to t!e s!elter (#p to 37 linear feet).

'oer Work   Constr#ct pier an" pa" type toer fo#n"ations incl#"in$

e:cavation5 rear an" concrete (not to e:cee" +7 c#icyar"s).

*rect ne 17@foot self@s#pporte" toer.

S#pply an" install $ro#n"in$ for t!e toer ase for self@

s#pporte" toers

 =ntenna an" 'ransmissionine Installation

Install 3 antennas for t!e 6 system.

Install 1 antenna for t!e 6 system.

Install & si"e arms for antennas.

S#pply an" install 3 !eavy@"#ty mo#nt(s) for ,o$ner

antennas.

S#pply an" install & +@foot si"e arms for antenna mo#nts.

Install 2 9PS antennas.

Install 1 toer@top amplifier.

Install 17 linear feet of 3D@inc! transmission line.

Install #p to 27 linear feet of 1D2@inc! transmission line.

Install #p to 27 linear feet of -D@inc! transmission line.

Install #p to &7 linear feet of 1@1D&@inc! transmission line.

Perform seep tests on transmission lines.

Provi"e an" install +@!ole !an$er locks an" attac!ment

!ar"are for s#pportin$ transmission lines on t!e antennas#pport str#ct#re every 3 feet.

S#pply an" install 1 $ro#n" #ss ar at t!e ottom of t!e

antenna s#pport str#ct#re for $ro#n"in$ 6 cales eforet!ey make !ori<ontal transition.

%iscellaneo#s Work   %277 Permittin$ an" testin$Dire %ars!all approval.

%ont$omery Co#nty5 %arylan"Statement of Work

Statement of Work: 73

Page 81: Motorola SOW - Reviewed by MoCo PM 2015-09-22

7/23/2019 Motorola SOW - Reviewed by MoCo PM 2015-09-22

http://slidepdf.com/reader/full/motorola-sow-reviewed-by-moco-pm-2015-09-22 81/309

Page 82: Motorola SOW - Reviewed by MoCo PM 2015-09-22

7/23/2019 Motorola SOW - Reviewed by MoCo PM 2015-09-22

http://slidepdf.com/reader/full/motorola-sow-reviewed-by-moco-pm-2015-09-22 82/309

+able " -9> represents the work that Motorola will be performing at the 2CC.

(a)le J-25: <ork to )e performed at the ?$$ site

'ite <ork?$$

(#pe of <ork ,etailed ,escription

 =ntenna an" ines   Provi"e an" install #p to 327 linear feet of P0C sleepers an"

attac!ment !ar"are for s#pportin$ transmission lines on

rooftop every 3 feet. S#pply an" install 1 $ro#n" #ss ar at t!e ottom of t!e

antenna s#pport str#ct#re for $ro#n"in$ 6 cales efore t!eymake !ori<ontal transition.

*:istin$ acilityImprovement

S#pply an" install 1 cale entry panel it! #p to 12 ports.

9ro#n" all metallic ojects in t!e interior of t!e e:istin$ room5

to meet c#rrent %otorola?s Stan"ar"s an" 9#i"elines forComm#nications Sites (6+) re/#irements an" terminate neare/#ipment locations.

S#pply an" install 1 copper $ro#n" #ss ar.

S#pply an" install 1 all@mo#nte" 17@po#n" CO2 fire

e:tin$#is!er an" 1 all@mo#nte" 27@po#n" =,C firee:tin$#is!er.

S#pply an" install L;o smokin$L *%* si$na$e at t!e site.

S#pply an" install 1 eye as! station an" 1 first ai" kit.

%iscellaneo#s Work   6ooftop Penetration.

6ooftop o$ Bo#se.

*:istin$ poer ack#p systems ($enerator an" APS) are

ass#me" to e s#fficient an" "o not re/#ire replacin$ #ntilcorrect si<in$ can e "etermine" ase" on "etaile" inp#tre$ar"in$ le$acy e/#ipment poer re/#irements provi"e" yCo#nty.

%ont$omery Co#nty5 %arylan"Statement of Work

Statement of Work: 75 

Page 83: Motorola SOW - Reviewed by MoCo PM 2015-09-22

7/23/2019 Motorola SOW - Reviewed by MoCo PM 2015-09-22

http://slidepdf.com/reader/full/motorola-sow-reviewed-by-moco-pm-2015-09-22 83/309

 

J.1.!.11.24 Site ,e(elo+ment at te ECC

+able " -9B  provides site details for the 2CC.

(a)le J-26: 'ite Information8?$$

'ite Information8?$$

'ite 9ame  =*CC

'ite (#pe *:istin$ %aster Site

'ite !wner %ont$omery Co#nty

8ddress 127 %arylan" =ven#e5 6ockville5 %

$oordinatesat 34@&@2.+12 ;

on$ --@4@3.+2 W

(ower ;eight 6oof 'op

'u)s#stems located at 'ite

ispatc! (,ack#p).

Pa$in$ C!annel = Prime Site.

 =nalo$ Conventional C!annel , Prime.

%#lticast C!annel C Prime.

$roposed location is on a rooftop of the current Montgomery County 2CC located at theintersection of Maryland venue and !leet treet. Motorola was not able to conduct a site survey atthis location to evaluate current site requirements

'ite 'cope 'ummar#

• 2ngineering services for site drawings and regulatory approvals.

• Loning ervices.• 2isting tower to be used for antennas I :ooftop.

%ont$omery Co#nty5 %arylan"Statement of Work

76  

Statement of Work: 

Page 84: Motorola SOW - Reviewed by MoCo PM 2015-09-22

7/23/2019 Motorola SOW - Reviewed by MoCo PM 2015-09-22

http://slidepdf.com/reader/full/motorola-sow-reviewed-by-moco-pm-2015-09-22 84/309

Page 85: Motorola SOW - Reviewed by MoCo PM 2015-09-22

7/23/2019 Motorola SOW - Reviewed by MoCo PM 2015-09-22

http://slidepdf.com/reader/full/motorola-sow-reviewed-by-moco-pm-2015-09-22 85/309

Page 86: Motorola SOW - Reviewed by MoCo PM 2015-09-22

7/23/2019 Motorola SOW - Reviewed by MoCo PM 2015-09-22

http://slidepdf.com/reader/full/motorola-sow-reviewed-by-moco-pm-2015-09-22 86/309

,escription ,elivera)le

%otorola ass#mes t!at C#stomer !as rea" t!e %arc! +5 2774

Safety =lert for Operators (S=O) iss#e" y t!e e"eral =viation =#t!ority !ic! as attac!e" to its proposal.C#stomer is responsile for eval#atin$ t!e S=O an" itsrecommen"ations an" is responsile for "eterminin$ t!eappropriate co#rse of action.

S=O oc#mentH!ttpHDD.faa.$ovDot!erQvisitDaviationQin"#stryDairlineQoperatorsDairlineQsafetyDsafoDallQsafosDme"iaD2774DS=O7477-.p"f

%otorola ears no responsiility for monitorin$ or

comm#nicatin$ == alerts or memos. C#stomer ill contin#eto monitor == alerts an" memos as it "eems appropriate.

#rt!er5 C#stomer is responsile for electin$ to install an" #se

* li$!ts on t!e comm#nication toers.

%otorola "isclaims any an" all liaility for any claims of any

nat#re arisin$ from or relate" to installation or #se of certain* li$!ts on toers.

Please note if t!e C#stomer inten"s to implement t!e ==

S=O recommen"ation5 %otorola ill e ale to provi"e aseparate /#ote as an alternative sol#tion to t!e li$!tin$ systemspecifie" t!at eaves infra@re" an" * li$!tin$ to$et!er sot!e li$!t is visile it! ni$!t vision $o$$les.

J.1.!.12.1 Com+letion Criteria

+able " -=1 is a summary of completion criteria for ite ;evelopment

(a)le J-3&: $ompletion criteria

,escription ,elivera)le

Site "evelopment complete" an" approve" y t!e

Co#nty. Site "evelopment complete" per t!e Iss#e" for

Constr#ction (IC) "rain$5 project re/#irements5 an"contract#al oli$ations (incl#"in$ c!an$es approve" yt!e c#stomer an" %otorola).

Completion s!all e confirme" y t!e Co#nty an"

Contractor.

Constr#ction complete" as

specifie" in t!e constr#ction"rain$s5 project re/#irements5an" contract.

Completion of all j#ris"ictional an" contract#al re/#ire"

testin$ an" inspections re/#ire" to e performe" y t!eContractor.

Contract#al testin$ an" inspections ill e "efine" an"

a$ree" to y %otorola an" t!e c#stomer prior to project

kickoff. '!e ven"or is solely responsile for con"#ctin$5

coor"inatin$ an" payin$ for all j#ris"ictional testin$ an"inspections.

J#ris"ictional an" contract#alre/#ire" testin$ is complete"

 = statement of ork5 also calle" t!e site "evelopment

c!ecklistK5 s!all e ritten for eac! site y %otorola. '!esite "evelopment c!ecklist s!all e a$ree" to y t!eCo#nty an" Contractor prior to ork commencin$ at a

C!eck list is reviee"

%ont$omery Co#nty5 %arylan"Statement of Work

Statement of Work: 7!

Page 87: Motorola SOW - Reviewed by MoCo PM 2015-09-22

7/23/2019 Motorola SOW - Reviewed by MoCo PM 2015-09-22

http://slidepdf.com/reader/full/motorola-sow-reviewed-by-moco-pm-2015-09-22 87/309

 

,escription ,elivera)le

$iven site.

 = site t#rnover packa$e "oc#mentin$ t!e as@#ilt

specifications of t!e site s!all e ritten y %otorola an"$iven to t!e Co#nty.

 =ll p#nc! list items s!all e complete" an" "eficiencies

correcte" prior to Co#nty inspections.

Site t#rnover is complete

%ont$omery Co#nty5 %arylan"Statement of Work

#  

Statement of Work: 

Page 88: Motorola SOW - Reviewed by MoCo PM 2015-09-22

7/23/2019 Motorola SOW - Reviewed by MoCo PM 2015-09-22

http://slidepdf.com/reader/full/motorola-sow-reviewed-by-moco-pm-2015-09-22 88/309

J.1.!.12.2 Customer 0es+onsi&ilities and ssum+tions

Customer :esponsibilities

#. Coordinate any site walks and site access with the Motorola $roject Manager.1. /ork with the Motorola project team in identification of sites as outlined in the table below?

ction Motorola County*nitial outreach to owners J J - 4ead

Meet with property owners J J - 4ead

Coordinate ite /alks J J - 4ead

!ind alternate ites J - 4ead J

! pproval J - 4ead

 8egotiate 4ease ssist as required J-4ead

!iling with M-8C$$C $repare +echnical ;ocuments pprove and submit

ubmit +ower Committeepplication

$repare +echnical ;ocuments pprove and submit

Loning meetings with the

 public

J J-4ead

(btain structural andelectrical permits

$repare +echnical ;ocuments pprove and submit

ubmit required informationto the !CC, !, 82$,local permits, etc.

$repare +echnical ;ocuments pprove and submit

ubmit required informationfor Microwave 4icensing

$repare , submit, and paylicensing fee

pprove

5. ll recurring utility costs of eisting sites including, but not limited to, generator fuel 'eceptfirst fill), electrical, +elcoN will be borne by the Customer or site owner. Motorola will reimbursethe County for the cost of utilities at new antenna sites until !inal ystem cceptance. Motorola

will supply first fill of generator fuel.6. s principal account holder the County will assist Motorola with coordination of all utility

connections.7. +he County shall pay for costs associated with utility connections.9. tility connections shall be situated at locations within or around the new communications shelter 

or equipment room. +hese locations shall be jointly agreed to by the County and Contractor.=. s applicable 'based on local jurisdictional authority), the Customer will be responsible for any

installation or up-grades of the electrical system in order to comply with 8!$ =0, rticle =0>>. $ower utilities at the closest power pole or building demarcation are assumed to be 600 amp 1

 phase service. County will provide power upgrades as required.B. Motorola assumes all eisting sites have adequate electrical service for new shelters and towers.

tility transformer, transformer upgrades, line, or pole etensions have not been included in the

contract pricing.#0. County is responsible for any required underground utility relocation.##. *f gas service is desired at a site, the County shall ensure natural gas service is available to within

#00 ft of the site compound or at a longer distance as identified in ection ".#.7.##, Civil /ork #1. +he County will supply all lease agreements. .#5. *f, as a result of 82$ studies, a jurisdictional authority should determine that a proposed

communications facility Omay have a significant environmental impactO, the cost of subsequent

%ont$omery Co#nty5 %arylan"Statement of Work

Statement of Work: "

Page 89: Motorola SOW - Reviewed by MoCo PM 2015-09-22

7/23/2019 Motorola SOW - Reviewed by MoCo PM 2015-09-22

http://slidepdf.com/reader/full/motorola-sow-reviewed-by-moco-pm-2015-09-22 89/309

 environmental impact studies and remediations shall be incurred by the County or, alternatively,another site shall be selected.

#6. +esting and removal of haardous materials encountered during site investigations or constructionwill be the responsibility of the Customer upon proper notification per ttachment $ of the :!$.

#7. +he County shall be responsible for repair of the eternal site grounding system at eistingCounty sites if required.

$roject ssumptions

#. ll work is assumed to be done during normal business hours as dictated by time one 'Mondaythru !riday, =?50 a.m. to 7?00 p.m.) or as specified in ttachment $ 'Contruction +3C’s)to the :!$.

1. *f etremely harsh or difficult weather conditions eist that delay the site work for more than aweek, Motorola will seek ecusable delays rather than risk job site safety.

5. +he new tower location will pass the ! haard study, oning, !CC and environmental permitting.

6. +he restoration of the site surroundings by fertiliing, seeding and strawing the disturbed areas bythe Contractor will be adequate. dditional landscaping or aesthetic improvements 'decorativefencing, tree plantings, stealth towers etc.) will not be required by the County.

7. waiver to oning requirements like setbacks, tower height limitations, etc. can be obtained.

9. +he soil resistivity at the site is sufficient to achieve resistance of ten '#0) ohms or less.Communications site grounding will be designed and installed per MotorolaKs tandards and<uidelines for Communications ites ':79). :79 at time of installation is the guiding document.

=. poils from the tower foundations can be dispersed on the property and will not be required to betransported to a dump location.

>. t <reenfield sites, if non-standard soil is found after geotechnical tests are performed. Countyand Motorola will mutually determine a solution or a new site location.

B. M detuning will not be required.#0. 2ach eisting site has adequate room to upgrade the tower foundations and tower, including lay

down and staging areas without encroaching on wetlands, easements, setbacks, right-of-ways or property lines.

##. Motorola shall provide one-time mobiliation costs for the construction crews. ny

remobiliation due to interruptions3delays that are out of MotorolaKs control will result inadditional costs.

%ont$omery Co#nty5 %arylan"Statement of Work

2  

Statement of Work: 

Page 90: Motorola SOW - Reviewed by MoCo PM 2015-09-22

7/23/2019 Motorola SOW - Reviewed by MoCo PM 2015-09-22

http://slidepdf.com/reader/full/motorola-sow-reviewed-by-moco-pm-2015-09-22 90/309

%ont$omery Co#nty5 %arylan"Statement of Work

Statement of Work: 3

Page 91: Motorola SOW - Reviewed by MoCo PM 2015-09-22

7/23/2019 Motorola SOW - Reviewed by MoCo PM 2015-09-22

http://slidepdf.com/reader/full/motorola-sow-reviewed-by-moco-pm-2015-09-22 91/309

J.1.!.13 Site Matrices

J.1.!.13.1 Site Engineering Matri?

8ctivit# Performed )# Motorola

   9   +   $

   =  e  r  m  a  n   t  o  w  n

   >  u

   i  n  c  e   !  r  c   h  a  r   d

   ,   i  c   k  e  r  s  o  n

   "

  e  n  w  o  o   d   $ .   $ .

     e  r   k

  s   h   i  r  e   (  o  w  e  r  s

   ;  a  m  p

  s   h   i  r  e   =  r  e  e  n  s

   (  a   k  o  m  a   P  a  r   k

   '   h  a   d  #   =  r  o  v  e

   M   $   $   F

   P  e  n

  n   '   h  o  p   +  o  a   d

   ?   !   

   ,  a  m  a  s  c  u  s

   P  o   t  o  m

  a  c   F   i   l   t  r  a   t   i  o  n

   '   l   i  g  o   $  r  e  e   k

   ?

   l  m  e  r  s   '  c   h  o  o   l

   '  p

  e  n  c  e  r  v   i   l   l  e   +   d

   +   i   l  e  #   A  s   0  o  c   k   +   d

   ,  o   d  g  e   $   h  r  o  m  e

   &   1      1   

   =  e  o  r  g   i  a   8  v  e .

   M   ,   &   7   7

   F   l  e  m   i  n  g   8  v  e .

   ?   $   $

1 Perform a =S'% * 12-@7 certifie" P!ase I*nvironmental Site =ssessment (*S=)5 to i"entify ovio#san" reasonaly likely on@site an"Dor off@site potentialso#rces of contamination t!at mi$!t pose a potential riskof leasin$ an" #il"in$ on a piece of property5 an"!et!er f#rt!er environmental investi$ations arearrante". '!is st#"y "oes not incl#"e P!ase IIassessments5 riskDcost eval#ations5 an" permittin$assistance t!at may e re/#ire" if risk factors arein"icate".

  B B B B B B B B B B B

2 Prepare site constr#ction "rain$s5 s!oin$ t!e layo#t ofvario#s ne an" e:istin$ site components.

 B B B B B B B B B B B B B B B B B B B B B B B

3 Con"#ct site alks to collect pertinent information fromt!e sites.

 B B B B B B B B B B B B B B B B B B B B B B B

& Prepare a lease e:!iit an" sketc! of t!e site tocomm#nicate to t!e property oner t!e propose" leasespace an" planne" "evelopment at t!e partic#lar sitelocation.

 B B B B B B B B B B B B B B B B B B B B B B B

%ont$omery Co#nty5 %arylan"Statement of Work Ase or "isclos#re of t!is proposal is s#ject

to t!e restrictions on t!e cover pa$e.

 

Motorola Solutions Confidential Restricted Table of Contents 

l$$$v 

Page 92: Motorola SOW - Reviewed by MoCo PM 2015-09-22

7/23/2019 Motorola SOW - Reviewed by MoCo PM 2015-09-22

http://slidepdf.com/reader/full/motorola-sow-reviewed-by-moco-pm-2015-09-22 92/309

 

8ctivit# Performed )# Motorola

   9   +   $

   =  e  r  m  a  n   t  o  w  n

   >  u   i  n  c  e   !  r  c   h  a  r   d

   ,   i  c   k  e  r  s  o  n

   "  e  n  w  o  o   d   $ .   $ .

     e  r   k  s   h   i  r  e   (  o  w  e  r  s

   ;  a  m  p  s   h   i  r  e   =  r  e  e  n  s

   (  a   k  o  m  a   P  a  r   k

   '   h  a   d  #   =  r  o  v  e

   M   $   $   F

   P  e  n  n   '   h  o  p   +  o  a   d

   ?   !   

   ,  a  m  a  s  c  u  s

   P  o   t  o  m  a  c   F   i   l   t  r  a   t   i  o  n

   '   l   i  g  o   $  r  e  e   k

   ?   l  m  e  r  s   '  c   h  o  o   l

   '  p  e  n  c  e  r  v   i   l   l  e   +   d

   +   i   l  e  #   A  s   0  o  c   k   +   d

   ,  o   d  g  e   $   h  r  o  m  e

   &   1      1      =  e  o  r  g   i  a   8  v  e .

   M   ,   &   7   7

   F   l  e  m   i  n  g   8  v  e .

   ?   $   $

   8   ?   $   $

Prepare <onin$ "rain$s t!at can e #se" to "escrie t!epropose" site installation in s#fficient "etail.

 B B B B B B B B B B B B B B B B B B B B B B B B

+ Prepare recor" "rain$s of t!e site s!oin$ t!e as@#iltinformation.

 B B B B B B B B B B B B B B B B B B B B B B B B

- Perform a o#n"ary an" topo$rap!ic s#rvey for t!eproperty on !ic! t!e comm#nication site is locate" orill e locate".

  B B B B B B B B B B B B B B B B B B

Prepare a 2CD1= letter for t!e == certifyin$ t!e acc#racyof t!e s#rveye" "ata for t!e toer E location an" toer

!ei$!t. '!e estalis!ment of a toer re/#ires aletter provi"e" to t!e e"eral =viation

 ="ministration in"icatin$ t!e !ori<ontalposition of t!e toer5 as ell as t!e !ei$!t oft!e toer. = lan" s#rvey can prepare a ==

1=D2C etter5 it! 1= or 2C ein$ in"icative of t!e acc#racy of t!e position an" !ei$!t of t!etoer. '!is letter provi"es t!e information fort!e == to map t!e toers as ostr#ctions int!eir aerona#tical "ataases. '!e ==re/#ires t!at a license" en$ineer or s#rveyorcertifies t!e s#rvey acc#racy an" t!e pl#s ormin#s acc#racy.

  B B B B B B

%ont$omery Co#nty5 %arylan"Statement of Work

6  Statement of Work: %ro&ect %lan 'C(3("(2)

Page 93: Motorola SOW - Reviewed by MoCo PM 2015-09-22

7/23/2019 Motorola SOW - Reviewed by MoCo PM 2015-09-22

http://slidepdf.com/reader/full/motorola-sow-reviewed-by-moco-pm-2015-09-22 93/309

8ctivit# Performed )# Motorola

   9   +   $

   =  e  r  m  a  n   t  o  w  n

   >  u   i  n  c  e   !  r  c   h  a  r   d

   ,   i  c   k  e  r  s  o  n

   "  e  n  w  o  o   d   $ .   $ .

     e  r   k  s   h   i  r  e   (  o  w  e  r  s

   ;  a  m  p  s   h   i  r  e   =  r  e  e  n  s

   (  a   k  o  m  a   P  a  r   k

   '   h  a   d  #   =  r  o  v  e

   M   $   $   F

   P  e  n  n   '   h  o  p   +  o  a   d

   ?   !   

   ,  a  m  a  s  c  u  s

   P  o   t  o  m  a  c   F   i   l   t  r  a   t   i  o  n

   '   l   i  g  o   $  r  e  e   k

   ?   l  m  e  r  s   '  c   h  o  o   l

   '  p  e  n  c  e  r  v   i   l   l  e   +   d

   +   i   l  e  #   A  s   0  o  c   k   +   d

   ,  o   d  g  e   $   h  r  o  m  e

   &   1      1      =  e  o  r  g   i  a   8  v  e .

   M   ,   &   7   7

   F   l  e  m   i  n  g   8  v  e .

   ?   $   $

4 Perform constr#ction stakin$ aro#n" t!e site to estalis!reference points for propose" constr#ction.

  B B B B B B

17 Prepare p!oto ren"erin$s of !o a specific site or siteso#l" look after completion.

  B B B B B B

11 Provi"e an e:pert itness for #p to 1 "ay per site toatten" or testify at p#lic meetin$s an"Dor !earin$s toprovi"e e:pert testimony to assist in otainin$ <onin$approvals.

  B B B B B B

12 Perform ;ational *nvironmental Policy =ct (;*P=)'!res!ol" Screenin$5 incl#"in$ limite" literat#re an"recor"s searc! an" rief reportin$5 as necessary toi"entify sensitive nat#ral an" c#lt#ral feat#res reference"in t!e Co"e of e"eral 6e$#lations5 (C6) 'itle &-5C!apter 15 s#section 1.137- t!at may e potentiallyimpacte" y t!e propose" constr#ction activity. ;*P=6evies @ '!is "oes not incl#"e t!e a""itional fiel"

investi$ations to "oc#ment site con"itions if it is"etermine" t!at t!e propose" comm#nication facility may!ave a si$nificant environmental impactK an" t!#s re/#irea""itional "oc#mentation5 s#mittals5 or ork.

 B B B B B B B B B B B B B B B B B B B B B B B

13 Perform fo#r point soil resistivity testin$ at t!e time of sitevisit.

  B B B B B B B B B B B B B

%ont$omery Co#nty5 %arylan"Statement of Work

  Statement of Work: 7 

Page 94: Motorola SOW - Reviewed by MoCo PM 2015-09-22

7/23/2019 Motorola SOW - Reviewed by MoCo PM 2015-09-22

http://slidepdf.com/reader/full/motorola-sow-reviewed-by-moco-pm-2015-09-22 94/309

 

8ctivit# Performed )# Motorola

   9   +   $

   =  e  r  m  a  n   t  o  w  n

   >  u   i  n  c  e   !  r  c   h  a  r   d

   ,   i  c   k  e  r  s  o  n

   "  e  n  w  o  o   d   $ .   $ .

     e  r   k  s   h   i  r  e   (  o  w  e  r  s

   ;  a  m  p  s   h   i  r  e   =  r  e  e  n  s

   (  a   k  o  m  a   P  a  r   k

   '   h  a   d  #   =  r  o  v  e

   M   $   $   F

   P  e  n  n   '   h  o  p   +  o  a   d

   ?   !   

   ,  a  m  a  s  c  u  s

   P  o   t  o  m  a  c   F   i   l   t  r  a   t   i  o  n

   '   l   i  g  o   $  r  e  e   k

   ?   l  m  e  r  s   '  c   h  o  o   l

   '  p  e  n  c  e  r  v   i   l   l  e   +   d

   +   i   l  e  #   A  s   0  o  c   k   +   d

   ,  o   d  g  e   $   h  r  o  m  e

   &   1      1      =  e  o  r  g   i  a   8  v  e .

   M   ,   &   7   7

   F   l  e  m   i  n  g   8  v  e .

   ?   $   $

   8   ?   $   $

1& Perform str#ct#ral mappin$ an" investi$ation5 an"str#ct#ral en$ineerin$ analysis for antenna s#pport

str#ct#re an" fo#n"ations5 if necessary5 to s#pport t!epropose" antenna system. ;o reme"iations of e:istin$con"itions !ave een incl#"e" in contract pricin$.

 B B B B B B B B B B B B B B B B B B

1 Perform :@rays of #il"in$s on !ic! antennas ill esit#ate" (#p to 1 locations of t!ree s/#are feet eac! per#il"in$) to "etermine t!e location of str#ct#ralcomponents an" rear si<in$.

  B B B B

1+ esi$n m#lti antenna s#pport platform to s#pportpropose" antennas an" "is!es.

 B B B B B

1- Provi"e toer climin$ an" toer mappin$ services fortoers #p to 37 feet to collect information ao#tstr#ct#ral memers an" e:istin$ e/#ipment.

  B B B B B B B B B B B

1 Con"#ct constr#ction inspection of fo#n"ation steel priorto po#r5 materials testin$ of concrete5 an" fiel" "ensitytests of ackfill to ens#re /#ality constr#ction.

  B B B B B B B B B B B B B B B B B B B

14 Con"#ct #p to &7@foot "eep soil orin$ test at toerlocation an" prepare $eotec!nical report of soil con"itionsat locations of t!e toer fo#n"ation.

 B B B B B B

27 Con"#ct SBPO 6evie5 =rc!eolo$ical 6evie5 C#lt#ral6eso#rce 6eport.

  B B B B B B

%ont$omery Co#nty5 %arylan"Statement of Work

  Statement of Work: %ro&ect %lan 'C(3("(2)

Page 95: Motorola SOW - Reviewed by MoCo PM 2015-09-22

7/23/2019 Motorola SOW - Reviewed by MoCo PM 2015-09-22

http://slidepdf.com/reader/full/motorola-sow-reviewed-by-moco-pm-2015-09-22 95/309

8ctivit# Performed )# Motorola

   9   +   $

   =  e  r  m  a  n   t  o  w  n

   >  u   i  n  c  e   !  r  c   h  a  r   d

   ,   i  c   k  e  r  s  o  n

   "  e  n  w  o  o   d   $ .   $ .

     e  r   k  s   h   i  r  e   (  o  w  e  r  s

   ;  a  m  p  s   h   i  r  e   =  r  e  e  n  s

   (  a   k  o  m  a   P  a  r   k

   '   h  a   d  #   =  r  o  v  e

   M   $   $   F

   P  e  n  n   '   h  o  p   +  o  a   d

   ?   !   

   ,  a  m  a  s  c  u  s

   P  o   t  o  m  a  c   F   i   l   t  r  a   t   i  o  n

   '   l   i  g  o   $  r  e  e   k

   ?   l  m  e  r  s   '  c   h  o  o   l

   '  p  e  n  c  e  r  v   i   l   l  e   +   d

   +   i   l  e  #   A  s   0  o  c   k   +   d

   ,  o   d  g  e   $   h  r  o  m  e

   &   1      1      =  e  o  r  g   i  a   8  v  e .

   M   ,   &   7   7

   F   l  e  m   i  n  g   8  v  e .

   ?   $   $

21 C!eck toer erection for pl#mness5 linearity an"ali$nment after installation.

  B B B B B B

22 Perform in"epen"ent inspection of t!e site an" t!e orkperforme" y t!e Contractor to "oc#ment t!at t!e site is#ilt an" installe" in accor"ance it! t!e Site PlansK an""oc#ment any "eviations or violations

 B B B B B B B B B B B B B B B B B B B B B B B

23 Prepare5 s#mit an" track application for local permit fees(<onin$5 electrical5 #il"in$ etc.)5 prepare == filin$s5 an"proc#re information necessary for filin$.

 B B B B B B B B B B B B B B B B B B B B B B B

%ont$omery Co#nty5 %arylan"Statement of Work

  Statement of Work: !

Page 96: Motorola SOW - Reviewed by MoCo PM 2015-09-22

7/23/2019 Motorola SOW - Reviewed by MoCo PM 2015-09-22

http://slidepdf.com/reader/full/motorola-sow-reviewed-by-moco-pm-2015-09-22 96/309

 

J.1.!.13.2 Site c#uisition Ser(ices Matri?

8ctivit#

   9   +   $

   =  e  r  m  a  n   t  o  w  n

   >  u   i  n  c  e   !  r  c   h  a  r   d

   ,   i  c   k  e  r  s  o  n

   "  e  n  w  o  o   d   $ .   $ .

     e  r   k  s   h   i  r  e   (  o  w  e  r  s

   ;  a  m  p  s   h   i  r  e   =  r  e  e  n  s

   (  a   k  o  m  a   P  a  r   k

   '   h  a   d  #   =  r  o  v  e

   M   $   $   F

   P  e  n  n   '   h  o  p   +  o  a   d

   ?   !   

   ,  a  m  a  s  c  u  s

   P  o   t  o  m  a  c   F   i   l   t  r  a   t   i  o  n

   '   l   i  g  o   $  r  e  e   k

   ?   l  m  e  r  s   '  c   h  o  o   l

   '  p  e  n  c  e  r  v   i   l   l  e   +   d

   +   i   l  e  #   A  s   0  o  c   k   +   d

   ,  o   d  g  e   $   h  r  o  m  e

   &   1      1      =  e  o  r  g   i  a   8  v  e .

   M   ,   &   7   7

   F   l  e  m   i  n  g   8  v  e .

   ?   $   $   @   8   ?   $   $

2& Provi"e a property specialist to assist Co#nty in t!e site

leasin$5 <onin$ an" permittin$. S!o#l" a""itional time orreso#rces e re/#ire" for <onin$ an" permittin$ t!#sre/#irin$ a""itional "oc#mentation5 s#mittals5 reso#rces or ork5 %otorola ill notify t!e C#stomer of s#c! action inritin$. Apon e:ec#tion of a ne$otiate" contract c!an$eor"er5 %otorola ill move forar" as re/#ire" to completet!e <onin$ an" permittin$ process.

 B B B B B B B B B

2 =ssist Co#nty in ne$otiatin$ an optionDleaseDlicense

a$reement (lease) an" ac/#irin$ clear lan" titleDsiteleaseDs!are" #se a$reement for t!e can"i"ate site.

 B B B B B B B B B B B B B B B B B B B B B B

2+ Coor"inate <onin$ an" permittin$ of t!e ne toer sites#c! t!at it is in f#ll compliance it! applicale j#ris"ictionalre/#irements.

  B B B B B B

%ont$omery Co#nty5 %arylan"Statement of Work

!#  Statement of Work: %ro&ect %lan 'C(3("(2)

Page 97: Motorola SOW - Reviewed by MoCo PM 2015-09-22

7/23/2019 Motorola SOW - Reviewed by MoCo PM 2015-09-22

http://slidepdf.com/reader/full/motorola-sow-reviewed-by-moco-pm-2015-09-22 97/309

J.1.!.13.3 ;eneral Site Pre+aration Matri?

8ctivit#

   9   ?   $

   =  e  r  m  a  n   t  o  w  n

   >  u   i  n  c  e   !  r  c   h  a  r   d

   ,   i  c   k  e  r  s  o  n

   "  e  n  w  o  o   d   $ .   $ .

     e  r   k  s   h   i  r  e   (  o  w  e  r  s

   ;  a  m  p  s   h   i  r  e   =  r  e  e  n  s

   (  a   k  o  m  a   P  a  r   k

   '   h  a   d  #   =  r  o  v  e

   M   $   $   F

   P  e  n  n   '   h  o  p   +  o  a   d

   ?   !   

   ,  a  m  a  s  c  u  s

   P  o   t  o  m  a  c   F   i   l   t  r  a   t   i  o  n

   '   l   i  g  o   $  r  e  e   k

   ?   l  m  e  r  s   '  c   h  o  o   l

   '  p  e  n  c  e  r  v   i   l   l  e   +   d

   +   i   l  e  #   A  s   0  o  c   k   +   d

   ,  o   d  g  e   $   h  r  o  m  e

   &   1      1      =  e  o  r  g   i  a   8  v  e .

   M   ,   &   7   7

   F   l  e  m   i  n  g   8  v  e .

2- Otain t!e permits s#c! as electrical5 #il"in$5 an"

constr#ction permits5 an" coor"inate any inspections it!local a#t!orities t!at may e nee"e" to complete site"evelopment ork.

 B B B B B B B B B B B B B B B B B B B B B B

2 == ilin$ =ir Space =nalysis5 == -&+7@1M CC =S6;otifications5 == -&+7@2 Part 1M CC ;otification5 ==-&+7@2 Part 2M 6; =pplicationM ocal P#lication)

  B B B

24 Provi"e one@time moili<ation costs for t!e constr#ctioncres.

 B B B B B B B B B B B B B B B B B B B B B B

%ont$omery Co#nty5 %arylan"Statement of Work

  Statement of Work: !"

Page 98: Motorola SOW - Reviewed by MoCo PM 2015-09-22

7/23/2019 Motorola SOW - Reviewed by MoCo PM 2015-09-22

http://slidepdf.com/reader/full/motorola-sow-reviewed-by-moco-pm-2015-09-22 98/309

J.1.!.14 *nstallation o- "i?ed :et)ork E#ui+ment

Motorola is in a unique position to install the !ied 8etwork 2quipment '!82) in a manner thatminimies disruption of the County’s operations, as it replaces components of the eisting Motorolainfrastructure equipment. %y modulariing the installation of subsystems, elements of the County’ssystem can be cutover while still maintaining the requirements of, coverage, reliability, andacceptance testing as well as fall back switch over outlined in the County’s :!$. +able " -=5 outlinesa modular approach to the system installation.

(a)le J-3: Modular 8pproach to F9? Installation

'u)s#stem (iming ,elivera)le

*mer$encyComm#nicationsCenter (*CC)

Completion of t!e *CC%o"erni<ation

1) ;e %aster Core E tie" into t!e e:istin$ 6Sites.

2) ;e %CC-77 ispatc! Consoles @ tie" intot!e ne %aster Core.

3) ;e Prime o$$in$ 6ecor"er installe" at t!e*CC

 =llos t!e *CC to reopen it! ne consoles5

lo$$in$ recor"ers #sin$ a ne core over t!ee:istin$ Sim#lcast netork. =llos *CC toreopen in its en"@state it! no a""itional"isr#ptions.

;o impact to #sers as s#scriers ill still

operate on e:istin$ 6 Sites.

ail Sitc! Over E =*CC o#l" still e in

operation t!ro#$! t!e e:istin$ <one controllerat t!e *CC.

Sim#lcast PrimeSites

Completion of t!e%aster Site Installation

at t!e *CC

Prime Site e/#ipment is co@locate" it!in

S!a"y 9rove 6 Site an" at t!e *CC.

Prime Site e/#ipment is tie" ack to t!e

master core t!ro#$! temporary netorkconnections #se" "#rin$ systemimplementation.

 =llos t!e links eteen t!e %aster site an"

Prime sites to e operational an" availale for reliaility testin$.

 =llos testin$ of feat#res eteen t!e Core

an" Prime sites it! no "isr#ption of t!ee:istin$ system an" #sers.

ail Sitc! Over E ;o impact

%icroave ,ack!a#l Completion civil ork ateac! site5 incl#"in$

ave $#i"e an" "is!eson t!e toer 

Install %icroave rack e/#ipment at eac! site

an" connect into t!e nely installe"ave$#i"e.

Optimi<e connection eteen prime sites an"

6 Sites

ail Sitc! Over E ;o impact

%ont$omery Co#nty5 %arylan"Statement of Work Ase or "isclos#re of t!is proposal is s#ject

to t!e restrictions on t!e cover pa$e.

 Motorola Solutions Confidential Restricted Table of Contents  $ciii 

Page 99: Motorola SOW - Reviewed by MoCo PM 2015-09-22

7/23/2019 Motorola SOW - Reviewed by MoCo PM 2015-09-22

http://slidepdf.com/reader/full/motorola-sow-reviewed-by-moco-pm-2015-09-22 99/309

 

'u)s#stem (iming ,elivera)le

6 Sites Completion of t!ePrime Sites5 civil ork

at eac! site5 microaveack!a#l5 an" 6

antenna an" lines ont!e toer 

*:istin$ S!elters @ Co@locate 6 site

e/#ipment an" estalis! netork connectionsack to t!e Prime Sites.

;e S!elters E Install 6 e/#ipment an"

estalis! netork connections ack to PrimeSites

 =llos links eteen t!e Prime Site an" 6sites it!in t!e cell to operational an"availale for reliaility testin$.

 =llos testin$ of feat#res eteen t!e 6

an" Prime sites it! no "isr#ption of t!ee:istin$ system an" #sers.

ail Sitc! Over E ;o impact

6 Site InitialC#tover 

Completion of t!e 6Site */#ipment

Installation

 =ctivate control c!annel on t!e ne system

Convert to c!annels at eac! site to t!e ne

system

 =llos yo# to test covera$e of t!e system

!ile still maintainin$ #se of t!e ol" system. ;o impact to #sers

ail Sitc! Over @ ;o impact

System C#tover  Covera$e =cceptancean" =pproval to

C#tover 

 =ctivate c!annels at eac! site per an a$ree"

plan t!at minimi<es #ser impact ot! from a$ra"e of service as ell as s#scrierrepro$rammin$ for t!e ne system

System c#tover can e t!rottle"K to matc!

t!e nee"s of t!e #sers rat!er t!an !avin$ asin$le c#t over event.

ail Sitc! Over E Ol" 6 site e/#ipment is

still availale for connection ack to t!e <onecontroller.

 =lternate*mer$encyComm#nicationsCenter (=*CC)

S#ccessf#l completionof 47 "ay ail Sitc!Over Perio" of t!e

system

Installation of ispatc! Console */#ipment

as ell as ack #p console e/#ipment

e@install netork links ack to t!e replace"

system

Installation of t!e ,ack@#p o$$in$ 6ecor"er 

!4 

Statement of Work:

Page 100: Motorola SOW - Reviewed by MoCo PM 2015-09-22

7/23/2019 Motorola SOW - Reviewed by MoCo PM 2015-09-22

http://slidepdf.com/reader/full/motorola-sow-reviewed-by-moco-pm-2015-09-22 100/309

J.1.!.14.1 *nstallation o- "i?ed :et)ork E#ui+ment

*nstallation of the !ied 8etwork 2quipment '!82) consists of the radio communicationsinfrastructure, computer, and dispatch equipment at the 2mergency Communications Center '2CC),lternate 2mergency Communications Center '2CC) and :! ites. s stated in the County’s:equirement ;ocument, installation will be performed by a factory-authoried service shop.

+able " -=6 defines the deliverables and responsibilities for both County and Motorola duringinstallation of the !ied *nfrastructure 2quipment stage.

(a)le J-3: Installation of Fi%ed network ?4uipment

(ask Motorola $ount# ,elivera)le

Participate in a man"atory project sites#rvey it! t!e Co#nty an" "eterminee:act locations of e/#ipment. '!isinformation ill e incorporate" into t!eC6 esi$n oc#ment.

inal C6 esi$n oc#ment

%otorola ill prepare t!e site for e/#ipmentinstallations per %otorola?s 6+ stan"ar"s.

Sites ill e rea"y accor"in$ to t!e ProjectSc!e"#le for e/#ipment installation.

Sites %eetin$ Site Preparation6e/#irements for Installation

9eneral Installation 6esponsiilitiesH

%otorola ill install t!e ne system

e/#ipment provi"e" in t!e */#ipmentist.

%otorola ill $ro#n" an" on" t!e site

e/#ipment to t!e $ro#n" system5 inaccor"ance it! t!e 6+ site installationstan"ar"s.

Worksites s!all e left neat an" room

sept eac! "ay.

%otorola ill remove an" "ispose of any

"eris t!at is a res#lt of t!e projectactivities from t!e site an" clean t!e siteprior to acceptance.

%otorola s!all f#rnis! all cales for

poer5 a#"io5 control5 an" microavetransmission to connect t!e s#pplie"e/#ipment to t!e poer panels orreceptacles an" t!e a#"ioDcontrol lineconnection point.

 =ll calin$ s!all e c#t to len$t!5

properly connecte" an" terminate" per

Oner installation stan"ar"s an" clearlylaele" at ot! en"s. =ll associate"p#nc! lock connections s!all eproperly laele".

%otorola s!all $ro#n" an" on" all

provi"e" e/#ipment "#rin$ installationan" is responsile for connectin$ alle/#ipment to t!e common $ro#n"system at t!e e:istin$ facilities. =ll

;e */#ipment Installationsper %otorola?s Site >#alityStan"ar"s

%ont$omery Co#nty5 %arylan"Statement of Work

 

Statement of Work: !5 

Page 101: Motorola SOW - Reviewed by MoCo PM 2015-09-22

7/23/2019 Motorola SOW - Reviewed by MoCo PM 2015-09-22

http://slidepdf.com/reader/full/motorola-sow-reviewed-by-moco-pm-2015-09-22 101/309

 

(ask Motorola $ount# ,elivera)le

cainets5 racks5 enclos#res5 telep!onecirc#it s#r$e protectors5 an"transmission line s#r$e protectorsprovi"e" s!all e connecte" to t!esin$le point $ro#n". %otorola s!allconnect all $ro#n" connections #sin$approve" non@reversile crimp or clamp

connections.

 =ll calin$5 port assi$nments5 an" p#nc!

lock connections s!all e recor"e" intot!e final system as@#ilt "oc#mentation.

%otorola ill install %aster Site an" PrimeSite */#ipment in accor"ance it! t!eesi$n 6evie Scope of Services an"*/#ipment ists.

6a"io System Installation =#"it

%otorola ill install =S'6O 2 'r#nke"6epeater Site e/#ipment in accor"anceit! t!e esi$n 6evie Scope of Servicesan" */#ipment ists.

6a"io System Installation =#"it

%otorola ill install ra"io "ispatc!5 an"lo$$in$ recor"er e/#ipment at t!e *CC5

 =*CC5 an" 6emote ocations inaccor"ance it! t!e esi$n 6evie Scopeof Services an" */#ipment ists.

6a"io System Installation =#"it

%otorola ill install 0B Conventionale/#ipment in accor"ance it! t!e esi$n6evie Scope of Services an" */#ipmentlists

6a"io System Installation =#"it

%otorola ill install t!e %OSC= alarme/#ipment an" connect all alarm points to%otorola@provi"e" e/#ipment.

 =larm sensors an" vi"eo camera s!all einstalle" per /#antities an" at locationsi"entifie" in t!e esi$n 6evie5 an"s#se/#ent Oner approve" "esi$nc!an$es. %otorola s!all provi"e anyre/#ire" cale mana$ement materials an"all re/#ire" sensor an" vi"eo cameramo#nts.

'!e Oner ill provi"e sensors to monitorall non@%otorola provi"e" e/#ipment5 s#c!as environmental alarms. %otorola illinterface t!ose sensors to t!e %OSC=system.

System =larm an" 0i"eo*/#ipment Inte$ration an"Installation =#"it

%icroave InstallationH

%otorola ill install all ne microave

an" %PS e/#ipment.

 =ll antennas an" antenna fee" lines s!alle sept for ret#rn loss an" res#ltsreviee" it! Oner.

6a"io System Installation =#"it

!6  

Statement of Work:

Page 102: Motorola SOW - Reviewed by MoCo PM 2015-09-22

7/23/2019 Motorola SOW - Reviewed by MoCo PM 2015-09-22

http://slidepdf.com/reader/full/motorola-sow-reviewed-by-moco-pm-2015-09-22 102/309

(ask Motorola $ount# ,elivera)le

%otorola ill install in #il"in$ covera$ee/#ipment to replace e:istin$ i@"irectionalamplifiers to ass#re operation it! t!e neP2 6a"io System in accor"ance it! t!eesi$n 6evie Scope of Services an"*/#ipment lists

6a"io System Installation =#"it

C Poer InstallationH %otorola s!all "eliver5 olt to t!e floor

t!e C poer system. %otorola s!allconnect t!e C poer to t!e e:istin$ =Cpoer panel or ne =C Poer panel at$reen fiel" sites !ic! is provi"e" y%otorola. %otorola s!all perform start#pservices on t!e C poer e/#ipment.

C Poer System components s!all e

installe" per /#antities an" at locationsi"entifie" in t!e esi$n 6evie5 an"s#se/#ent Oner approve" "esi$nc!an$es. %otorola s!all cale t!e

e/#ipment an" provi"e any re/#ire"cale mana$ement materials.

 =C an" C primary poer irin$ s!all note e:pose" an" s!all e installe" it!incon"#it as per ;ational *lectrical Co"e5an" any applicale ocal Co"es.

6a"io System Installation =#"it

%otorola ill remove "ecommissione"e/#ipment associate" it! t!e e:istin$tr#nke" ra"io an" place it in a Co#nty"esi$nate" location.

ecommissione" e/#ipment inreceipt of t!e Co#nty

Co#nty ill si$n installation acceptancecertificates after inspection an" c!eck o#t

of ;* on a site@y@site5 system@y@systemasis.

Si$ne" Installation =cceptanceoc#ments

%ont$omery Co#nty5 %arylan"Statement of Work

 

Statement of Work: !7 

Page 103: Motorola SOW - Reviewed by MoCo PM 2015-09-22

7/23/2019 Motorola SOW - Reviewed by MoCo PM 2015-09-22

http://slidepdf.com/reader/full/motorola-sow-reviewed-by-moco-pm-2015-09-22 103/309

 

J.1.!.14.2 *nstallation o- ,is+atc "urniture at ECC '+tional

s an option, Motorola is providing %ramic furniture, site remodeling to construct a !ire upervisor platform position, below floor re-cabling of all call taker, dispatcher, and supervisor positions, as wellas re-carpeting for the 2CC. !igure ".# -6 below provides a graphic representation of the remodeled2CC. Motorola has worked closely with %ramic and dispatch center projects of similar sie and scopeto County. Motorola is currently working with %ramic on the backup dispatch center for $rince

<eorges County, after the successful completion of their prime dispatch center.

Figure J.1-: Montgomer# $ount# ?$$ design

!  

Statement of Work:

Page 104: Motorola SOW - Reviewed by MoCo PM 2015-09-22

7/23/2019 Motorola SOW - Reviewed by MoCo PM 2015-09-22

http://slidepdf.com/reader/full/motorola-sow-reviewed-by-moco-pm-2015-09-22 104/309

,ispatch Furniture.

+able " -=7 through +able " -># outline the furniture features of each position type, includingoptional furniture requested by the County.

(a)le J-3: ,ispatch Furniture$all (aker 

$all (aker <orkstationC & Positions Furniture +e4uirement

Provi"e five () 1K @ 2&K i"e5 non@lift

s#rfaces eteen pairs of positions tos#pport printers. '!ese non@lift s#rfacesare e/#ippe" it! a $rommet on t!e topto facilitate r#nnin$ poer cor"s an" "atacales. '!e non@lift s#rfaces aree/#ippe" it! a &@position poer stripit! an e:ten"e" poer cor". '!e poerstrip connects to a APS circ#it in t!enearest PA.

'!ese positions are s#rro#n"e" on t!e

ack y a forty@ei$!t inc! (&L) !i$!so#n" asorption panel

 =t t!e >#a"K positions5 provi"e a illerCapK to close t!e space in t!e center oft!e >#a" positions

;on@lift s#rfaces eteen Call

'aker positions to s#pport printers is

provi"e". '!ese s#rfaces ill !ave a$rommet !ole in t!e top to "rop "onpoer an" "ata cales5 an" an internalpoer strip to poer t!e printers.

(a)le J-32: ,ispatch FurniturePolice ,ispatch

Police ,ispatch <orkstation C 1& positions Furniture +e4uirement

%o#ntin$ rackets at eac! en" of t!e

isplay Platform for Select an" An@Selectra"io speakers.

Positions are s#rro#n"e" on t!e ack y

a forty@ei$!t inc! (&L) !i$! so#n"asorption panel.

 =t t!e en" of eac! of t!e si: pairs of

consoles5 a R ro#n"e" stora$e cainetit! a &@position poer strip it! ane:ten"e" poer cor" is provi"e"

'!e poer strip connects to a APS circ#it

in t!e nearest PA

%ont$omery Co#nty5 %arylan"Statement of Work

 

Statement of Work: !!

Page 105: Motorola SOW - Reviewed by MoCo PM 2015-09-22

7/23/2019 Motorola SOW - Reviewed by MoCo PM 2015-09-22

http://slidepdf.com/reader/full/motorola-sow-reviewed-by-moco-pm-2015-09-22 105/309

 (a)le J-33: ,ispatch FurniturePolice 'upervisor 

Police 'upervisor <orkstation positions Furniture +e4uirement

 =""itional comp#ter e/#ipment is

!o#se" in cainet style f#rnit#re"esi$ne" to s#pport ra"io e/#ipment ont!e front (toar"s t!e operator) si"e5 it!poer strips an" $ro#n" ars

'!e acksi"e of t!e cainets are"esi$ne" it! "oors openin$ toar"s t!e6est 6ooms (on t!e floor plan) an"stora$e space for s#pplies

 %o#ntin$ rackets at eac! en" of t!e

isplay Platform for Select an" An@Selectra"io speakers.

Stora$e ooks!elf is provi"e" on t!e

S#pervisor?s platform eteen t!e leftmost position an" t!e !an"rail on t!e!eelc!air ramp.

,ooks!elf is to e 3+K Wi"e 13K eep

&K Bi$!. '!ese positions are s#rro#n"e" on t!e

ack y a forty@to inc! (&2L) !i$! so#n"asorption panel.

(a)le J-35: ,ispatch FurnitureFire ,ispatch

Fire ,ispatch <orkstation C 5 positions Furniture +e4uirement

%o#ntin$ rackets at eac! en" of t!e

isplay Platform for Select an" An@Selectra"io speakers.

%o#ntin$ arms to mo#nt fo#r of t!e C=

monitors in a to@y@to si"e@y@si"eConfi$#ration are provi"e".

Positions are s#rro#n"e" on t!e ack y

a forty@ei$!t inc! (&K) !i$! so#n"asorption panels.

'!e ei$!t () isplay Screens are

mo#nte" it! + screens si"e@y@si"e ont!e isplay Platform an" t!e remainin$to screens mo#nte"5 centere" aovet!e si: on t!e isplay Platform.

"##  

Statement of Work:

Page 106: Motorola SOW - Reviewed by MoCo PM 2015-09-22

7/23/2019 Motorola SOW - Reviewed by MoCo PM 2015-09-22

http://slidepdf.com/reader/full/motorola-sow-reviewed-by-moco-pm-2015-09-22 106/309

(a)le J-36: ,ispatch FurnitureFire 'upervisor DFrontE

Fire 'upervisor <orkstation DFrontEC& positions Furniture +e4uirement

%o#ntin$ rackets at eac! en" of t!e

isplay Platform for Select an" An@Selectra"io speakers.

Positions are s#rro#n"e" on t!e ack y

a forty@to inc! (&2L) !i$! so#n"asorption panel.

On t!e ispatc! floor in front of t!e

platform5 to (2) t!ree@"oor stora$ecainets it! "imensions of +7K Wi"e 2&K eep 31K Bi$! are provi"e".

=Docal Printer cainets are e/#ippe"

it! internal poer strip an" top$rommets to "rop poer cor"s to poerstrip.

In a""ition5 a rear $rommet to provi"e

pat!ay to r#n "ata cales to t!e insi"eof t!e a"jacent CPA cainet is provi"e".

(a)le J-57: ,ispatch FurnitureFire 'upervisor DackE

Fire 'upervisor <orkstation DackEC1 position Furniture +e4uirement

%o#ntin$ rackets at eac! en" of t!e

isplay Platform for Select an" An@Selectra"io speakers.

Positions s#rro#n"e" t!e ack y a forty@

to inc! (&2L) !i$! so#n" asorptionpanel.

On t!e ispatc! floor in front of t!e

platform5 to (2) t!ree@"oor stora$ecainets it! "imensions of +7K Wi"e 2&K eep 31K Bi$! are provi"e".

*i$!t () isplay Screens are mo#nte"

it! + screens si"e@y@si"e on t!eisplay

Platform an" t!e remainin$ to screens

are mo#nte"5 centere" aove t!e si: ont!e isplay Platform.

%ont$omery Co#nty5 %arylan"Statement of Work

 

Statement of Work: "#"

Page 107: Motorola SOW - Reviewed by MoCo PM 2015-09-22

7/23/2019 Motorola SOW - Reviewed by MoCo PM 2015-09-22

http://slidepdf.com/reader/full/motorola-sow-reviewed-by-moco-pm-2015-09-22 107/309

 (a)le J-51: !ptional Furniture

<ork 'tation !ptional Furniture

!ptional C (urnta)le 'torage

'!irty@si: inc! (3+K) to forty@inc! (&7L)

"iameter '#rntaleK type stora$e systemfor !o#sin$ vario#s in"ers an" referencematerials easily accessile to PoliceS#pervisor personnel.

'!e #nit is mo#nte" on !eavy@"#ty casterscapale of s#pportin$ t!e loa"e" ei$!t oft!e #nit an" finis!e" in t!e same materialas t!e ork s#rfaces of t!e consolef#rnit#re.

'!e #nit o#l" e place" in t!e center of

t!e Police S#pervisor platform.

!ptional - & ,rawer lateral $a)inet

'o "raer lateral file cainets finis!e" in

t!e same material as t!e ork s#rfaces oft!e console f#rnit#re.

!ptional C ,rawer 0ateral $a)inet

o#r "raer lateral file cainets finis!e" in

t!e same material as t!e ork s#rfaces oft!e console f#rnit#re.

"#2  

Statement of Work:

Page 108: Motorola SOW - Reviewed by MoCo PM 2015-09-22

7/23/2019 Motorola SOW - Reviewed by MoCo PM 2015-09-22

http://slidepdf.com/reader/full/motorola-sow-reviewed-by-moco-pm-2015-09-22 108/309

<ork 'tation !ptional Furniture

!ptional - 0ocka)le lockers for 137personnel

ockale lockers for 1-7 personnel5 !ic!

are 12K:12K:12K an" five !i$! in ros eac!it! an in"ivi"#al mail slot at t!e top5 it!separate space elo in eac!.

Of t!ese5 127 lockers o#l" e place" on

t!e ispatc! floor near t!e Policeispatc!ers positions.

Of t!ese5 7 lockers o#l" e !o#se" in a

separate room a"jacent to t!e ireispatc! positions.

!ptional - ;igher Panels 

Increase !ei$!t to fifty@one inc! (1K)

ro#n"in$ #p to a fifty@si: inc! (+K) !ei$!t. '!e constr#ction of t!ese panels o#l" e

forty@one inc! (&1K) !i$! so#n" asorptionpanels5 it! t!e remainin$ !ei$!tcompose" of tempere" $lass.

%ont$omery Co#nty5 %arylan"Statement of Work

 

Statement of Work: "#3

Page 109: Motorola SOW - Reviewed by MoCo PM 2015-09-22

7/23/2019 Motorola SOW - Reviewed by MoCo PM 2015-09-22

http://slidepdf.com/reader/full/motorola-sow-reviewed-by-moco-pm-2015-09-22 109/309

 

,ispatch $enter $onstruction D!ptionalE

*ncluded in the 2CC ;ispatch Center re-moderniation is construction work that will

• :e-align the dispatch positions, call taker positions, and supervisor positions

• :eplace all below raised floor cabling

• Construct a !ire upervisor position and ramp within the eisting floor grid structure

• :e-carpet the dispatch center floor +able " ->1 describes the deliverables and responsibilities of County and Motorola for the ;ispatchCenter Construction.

(a)le J-5&: ,ispatch $enter $onstruction ,elivera)les and +esponsi)ilities

T'6 M!+%' C0&!y D"%*"+'7%"

 =rc!itect#ral *lectrical =s #ilt"rain$s

rain$s create"

econstr#ction incl#"in$.

6emoval an" inventory of

e/#ipment for later re@#se.

#rnit#re 6emoval.

6emoval of #n#se" cales.

 =ll e/#ipment remove" from t!e"ispatc! center floor 

6e@calin$ for ne confi$#ration

Calin$ in place for all orkstationpositions it!in t!e ne confi$#ration

,#il" ire S#pervisor platform an"ramp

S#pervisor platform D ramp #ilt

Carpetin$

ispatc! Center main floor asreconfi$#re" is carpete"

Install poer to "ispatc! f#rnit#re Poer s#pplie"

6einstall C=5 *4115 an" *nterpriseorkstations5 printers an" copiers

 =fter f#rnit#re installe" all Co#ntys#pplie" e/#ipment at eac!orkstation is operational

Installation of %CC-77 Consolee/#ipment an" ,ack #p 6a"ios asspecifie" in %otorola?s ase offer.

Installation of *CC */#ipmentcomplete

Co#nty ill si$n installationacceptance certificates after inspectionan" c!eck o#t of ;* on a site@y@site5system@y@system asis.

*CC is rea"y for primary operation.

"#4 

Statement of Work:

Page 110: Motorola SOW - Reviewed by MoCo PM 2015-09-22

7/23/2019 Motorola SOW - Reviewed by MoCo PM 2015-09-22

http://slidepdf.com/reader/full/motorola-sow-reviewed-by-moco-pm-2015-09-22 110/309

J.1.!.14.3 *nstallation o- %E E#ui+ment '+tional

s an option, Motorola has included in its proposal a /A2 solution that provides a secure, high- performance voice $++ service that operates over commercial 6<35< networks and ndroid3i(devices, as well as desktop $Cs. *ncluded in the /ave solution are?

P(( ;ardware $omponents

• (ne $++ 8on-:edundant erver.

• (ne @$ 1910-16 2thernet witch.

• (ne !ortinet !irewall ppliance.

• (ne ** >000 <ateway with %roadband 4icense inter-op license

P(( 'oftware $omponents

• (ne $++ erver 4icense.

• #00 $++ Mobile Communicator 4icenses for ndroid P i(.

− (ne ;esktop Communicator and +elephony 4icense.

+able " ->5 describes County and Motorola deliverables and responsibilities.

(a)le J-5: ,ispatch $enter $onstruction

(ask Motorola $ount# ,elivera)le

Installation of all fi:e" e/#ipmentcontaine" in t!e e/#ipment list an"o#tline" in t!e System escriptionase" #pon t!e a$ree" to floorplans5 at t!e sites !ere t!ep!ysical facility improvement iscomplete an" t!e site is rea"y forinstallation

Installation =#"it

%otorola ill f#rnis! all cales forpoer5 a#"io5 control5 an" ra"iotransmission to connect t!e%otorola s#pplie" e/#ipment tot!e poer panels or receptaclesan" t!e a#"ioDcontrol lineconnection point.

Installation =#"it

#rin$ fiel" installation of t!ee/#ipment5 any re/#ire" c!an$esto t!e installation ill e note" an"assemle" it! t!e final as@#ilt?"oc#mentation of t!e system.

rain$s Complete

 =cceptance 'est Scope a$ree" toat C6

 =cceptance Plan a$ree" to an"incorporate" into t!e Project Plan.

Co#nty ill si$n installationacceptance certificates afterinspection an" c!eck o#t of ;*on a site@y@site5 system@y@system asis.

%ont$omery Co#nty5 %arylan"Statement of Work

 

Statement of Work: "#5 

Page 111: Motorola SOW - Reviewed by MoCo PM 2015-09-22

7/23/2019 Motorola SOW - Reviewed by MoCo PM 2015-09-22

http://slidepdf.com/reader/full/motorola-sow-reviewed-by-moco-pm-2015-09-22 111/309

 

J.1.!.1! Systems *ntegration and '+timi@ation

(nce all equipment is installed in place, Motorola will configure, optimie and program all systemequipment and subsystems as detailed in the ;etailed ;esign ;ocument. ;uring this phase, theystem +echnologist will perform the *nstalled Component 4evel +esting on the :! equipment.+hese tests will be witnessed by the County or its representative at the time each site is optimied foroperation within the system. 8ote that this optimiation could occur outside of the > M to 7 $Mworkday depending on schedule. +able " ->6 identifies candidate equipment for component testing.

Motorola ystem +echnologist's) will be on site for this phase and will prepare the system foracceptance testing.

+able " ->6 defines the deliverables and responsibilities for both County and Motorola duringystems *ntegration and (ptimiation.

(a)le J-5: '#stems Integration and !ptimi/ation

(ask Motorola $ount# ,elivera)le

Provi"e an" install all comm#nicationlines an" e/#ipment t!at are not%otorola@provi"e" "eliverales.

iaison s#pport it! a$encies an" Co#nty

ven"ors re/#ire" to s#pport t!e sol#tion.*ns#re t!at necessary tec!nical s#pportis availale for installation an" testin$ ofs#systems not incl#"e" in t!is offer.

Co#nty Provi"e" */#ipment an"Interfaces 6e/#ire" for Inte$ration

Install5 inte$rate5 an" test t!e !ar"are5softare5 an" interfaces as specifie" int!e System escription.

Installation an" Inte$ration of*/#ipment

Perform Component 'est5 as itnesse"y t!e co#nty an" "oc#ment res#lts in amatter a$ree" to in C6 for t!e folloin$e/#ipment

6 ,ase Stations

6 Control Stations

In"ivi"#al Component 'est6es#lts

%aintain a p#nc! list of items t!at nee"resol#tion.

%ana$e t!e resol#tion of p#nc! list items.

P#nc! ist 6esol#tion

Co#nty $ives its approval to move forar"to System =cceptance P!ase

inal =cceptance 'ests e$in.

"#6  

Statement of Work:

Page 112: Motorola SOW - Reviewed by MoCo PM 2015-09-22

7/23/2019 Motorola SOW - Reviewed by MoCo PM 2015-09-22

http://slidepdf.com/reader/full/motorola-sow-reviewed-by-moco-pm-2015-09-22 112/309

J.1.!.1$ "inal cce+tance 5esting

!inal cceptance +esting includes a !unctional cceptance test, Coverage cceptance +est, andB0 ;ay (perational %urn-in.

Motorola will submit the draft cceptance +est $lan defined during the ;esign :eview for approvalB0 calendar days prior to the beginning of cceptance +esting. +he County shall be given two weeks

written notice that the system is ready for final acceptance testing.

J.1.!.1$.1 '+erational cce+tance 5est

ystem (perational cceptance +ests will be performed after system optimiation is complete. +he(perational cceptance +ests verify the functionality tested at !actory +esting. complete list of the(perational cceptance +ests will be provided during the C;:.

*f deficiencies are found during the testing, both the deficiencies and resolutions to the deficienciesshall be agreed upon and documented. *f the documented deficiencies do not prevent productive,operational use of the system, as determined by County, the test will be deemed complete. @owever,Motorola will remain responsible for the resolution of the documented deficiencies using a punch list

as a controlling document for resolution planning.+able " ->7 defines the deliverables and responsibilities for both County and Motorola.

(a)le J-5: !perational 8cceptance (est

(ask Motorola $ount# ,elivera)le

%otorola ill perform Operational ='Ps.#rin$ eac! test5 test res#lts ill erecor"e" for revie an" approval of t!etest.

*:ec#tion of Operational =cceptance 'estin$

%otorola an" t!e Co#nty ill provi"ea"e/#ate personnel to perform t!e test.

 =cceptance test Plan

Apon s#ccessf#l completion of eac! =cceptance test on a site@y@site an"system@y@system level5 Co#nty an"%otorola ill si$n acceptance certificates"oc#mentin$ acceptance.

Written =pproval of S#ccessf#lOperational =cceptance'estin$

J.1.!.1$.2 "unctional cce+tance 5est

ystem !unctional cceptance +ests will be performed after the (perational test is complete. +he!unctional cceptance +ests verify the functionality tested at !actory +esting with representativeusers of the County. complete list of the !unctional cceptance +ests will be provided during theC;:.

*f deficiencies are found during the testing, both the deficiencies and resolutions to the deficienciesshall be agreed upon and documented. *f the documented deficiencies do not prevent productive,operational use of the system, as determined by County, the test will be deemed complete. @owever,Motorola will remain responsible for the resolution of the documented deficiencies using a punch listas a controlling document for resolution planning.

+able " ->7 defines the deliverables and responsibilities for both County and Motorola.

(a)le J-52: Functional 8cceptance (est

%ont$omery Co#nty5 %arylan"Statement of Work

 

Statement of Work: "#7 

Page 113: Motorola SOW - Reviewed by MoCo PM 2015-09-22

7/23/2019 Motorola SOW - Reviewed by MoCo PM 2015-09-22

http://slidepdf.com/reader/full/motorola-sow-reviewed-by-moco-pm-2015-09-22 113/309

 

(ask Motorola $ount# ,elivera)le

%otorola ill perform f#nctional ='Ps.#rin$ eac! test5 test res#lts ill erecor"e" for revie an" approval of t!etest.

*:ec#tion of #nctional =cceptance 'estin$

%otorola an" t!e Co#nty ill provi"ea"e/#ate personnel to perform t!e test.

 *:ec#tion of #nctional

 =cceptance 'estin$

Apon s#ccessf#l completion of eac! =cceptance test on a site@y@site an"system@y@system level5 Co#nty an"%otorola ill si$n acceptance certificates"oc#mentin$ acceptance.

Written =pproval of S#ccessf#l#nctional =cceptance 'estin$

J.1.!.1$.3 %=" cce+tance 5est

+he system acceptance +est procedure of the A@! ystem will be mutually agreed upon at ;;:.+he elements of the A@! cceptance +est include?

Criteria for successful receipt of a radio message will be evidenced by proper tones being activatedon a pager worn at the hip.

!unctional testing will include, but is not limited to?

• uccessful patching of A@! resources to the trunked talkgroups in permanent fied and

dynamic modes.

• :adio ;ispatch Console initiated pages

• C; initiated pages

+esting must occur during conditions of full foliage

County must approve A@! cceptance +esting

• (nce Motorola has completed A@! cceptance +esting, the County must approve the

testing

• *f a component fails the Contractor has ten '#0) days to rectify the failure. Cost to repair

the failed component is the responsibility of Motorola

• (nce Motorola has rectified the component failure, Motorola must demonstrate that the

failure has been resolved and obtain approval from the County that the component that previously failed is working and to the satisfaction of the County.

• A@! cceptance +esting is complete when all components have passed testing and are

approved as complete by the County.

"#  

Statement of Work:

Page 114: Motorola SOW - Reviewed by MoCo PM 2015-09-22

7/23/2019 Motorola SOW - Reviewed by MoCo PM 2015-09-22

http://slidepdf.com/reader/full/motorola-sow-reviewed-by-moco-pm-2015-09-22 114/309

J.1.!.1$.4 Co(erage cce+tance 5ests

Coverage cceptance +ests will be performed when the :! site and control equipment installationsand optimiation are complete. +he Coverage cceptance +ests verify the coverage performance ofthe $17 :adio ystem Moderniation. s part of C;: a cutover plan will be submitted to the Countyfor approval including all elements outlined in the County’s :equirement ;ocument. +able " ->= defines the deliverables and responsibilities for both County and Motorola.

(a)le J-53: $overage 8cceptance (ests

(ask Motorola $ount# ,elivera)le

'!e Covera$e ='P ill e performe" pert!e a$ree" #pon C='P %otorola illperform t!e test as o#tline" in sectionC.17.1 an" as a$ree" #pon in C6.

*:ec#tion of Covera$e =cceptance 'ests

'est res#lts ill e recor"e" for revie an"approval of t!e test.

S#scriers ill e #se" for con"#ctin$ t!ecovera$e test.

If t!e C='P "etermines t!at a""itional sitesare re/#ire" to satisfy %otorola?s covera$e$#arantee5 %otorola ill i"entify location(s)for sites to rectify t!e "eficiency. %otorolaill provi"e t!e 6 e/#ipment5 antenna an"line5 ack!a#l5 an" associate" installationat t!e i"entifie" locations. If re/#ire"5 '!eCo#nty ill e responsile for ac/#irin$Dleasin$ t!e site.

6evise" Covera$e esi$n

6 */#ipment

,ack!a#l

 =ntenna an" ine

;* Installation an"

Optimi<ation

Apon s#ccessf#l completion of t!ecovera$e acceptance test5 Co#nty an"%otorola ill si$n acceptance certificates"oc#mentin$ acceptance.

Written =pproval of S#ccessf#lCovera$e =cceptance 'estin$

J.1.!.1$.! 89 Calendar ,ay 5est

Motorola will perform a B0 calendar day operational test of the system to ensure that the hardwareand software defects have been corrected prior to final system acceptance. +he operational testsduring this time will be outlined in the !inal cceptance +esting outlined above. +able " ->> definesthe deliverables and responsibilities for both County and Motorola.

(a)le J-55: 67 $alendar ,a# !perational (est

(ask Motorola $ount# ,elivera)le

%otorola an" Co#nty ill a$ree at C6 on!at constit#tes a critical fail#re.

Written "efinition of criticalfail#re

%otorola ill perform a 47 calen"ar "ayoperational test t!at ill r#n conc#rrent it!t!e #nctional =cceptance 'est.

*:ec#tion of inal

 =cceptance 'estin$

Apon s#ccessf#l completion of t!e 47calen"ar "ay test Co#nty an" %otorola illapprove all test res#lts an" procee" toc#tover 

Co#nty confirms acceptanceof test res#lts an" approvesc#tover to ne system

%ont$omery Co#nty5 %arylan"Statement of Work

 

Statement of Work: "#!

Page 115: Motorola SOW - Reviewed by MoCo PM 2015-09-22

7/23/2019 Motorola SOW - Reviewed by MoCo PM 2015-09-22

http://slidepdf.com/reader/full/motorola-sow-reviewed-by-moco-pm-2015-09-22 115/309

 

J.1.!.16 Cuto(er to :e) System '+erations

!ollowing successful completion of all the cceptance +ests, Motorola will cut over the users to thenew communications system. +his phase will follow the approved cutover plan. +able " ->B definesthe deliverables and responsibilities for both County and Motorola.

(a)le J-56: $utover to 9ew '#stems !perations

(ask Motorola $ount# ,elivera)le

%otorola ill "evelop t!e c#tover plan an"sc!e"#le system c#tover it! Co#nty"etaile" at t!e s#system level "elineatin$eteen systems t!at affect an" "o notaffect on$oin$ operations.

Complete" C#tover C!ecklist

'!e elements of t!e C#tover Plan illincl#"e necessary laor re/#ire" y%otorola an" t!e Co#nty to e:ec#te t!eplan. = sc!e"#le an" proce"#re an" #sertransition trainin$ for eac! Co#ntyoperational $ro#p.

Complete" C#tover C!ecklist

Co#nty ill approve t!e c#tover plan an"

t!at Co#nty plannin$ for e:ec#tion of t!esystem c#tover !as occ#rre".

Written =pproval of C#tover

C!eck ist

Co#nty an" %otorola ill e:ec#te t!ec#tover plan.

C#tover to ;e SystemOperations

J.1.!.17 System ,ocumentation

Motorola provides documentation of the system configurations, physical installation, and systemtesting. ;ocumentation is created and updated during the project. 2lectronic versions of customdocumentation will be provided both in a viewable pdf format and in the documents native format.+able " -B0 defines Motorola’s deliverables for system documentation throughout the project.

(a)le J-67: '#stem ,ocumentation

(ask Motorola $ount# ,elivera)le

esi$n oc#mentation incl#"in$H

oc#mentation In"e:.

System "escription.

eliverales list.

Site Plannin$ an" Preparation %an#als.

,lock an" level "ia$rams for system an"

sites.

loor plans.

6a"io Comm#nication System 'ec!nicalata.

Covera$e maps.

System ="ministrator oc#mentation.

Installation an" C#tover Plan.

 =cceptance test proce"#res.

Pro$rammin$ parameters.

Complete" at C6

""#  

Statement of Work:

Page 116: Motorola SOW - Reviewed by MoCo PM 2015-09-22

7/23/2019 Motorola SOW - Reviewed by MoCo PM 2015-09-22

http://slidepdf.com/reader/full/motorola-sow-reviewed-by-moco-pm-2015-09-22 116/309

(ask Motorola $ount# ,elivera)le

Site en$ineerin$ an" arc!itect#ral

"rain$s incl#"in$ toer5 fo#n"ations5$eo tec!nical5 etc.

actory Sta$in$ oc#mentation incl#"in$H

Pro$rammin$ templates.

Interconnection "rain$s.

Interconnection c!arts.

%an#fact#rer?s stan"ar" operator

man#als.

Interconnection cale "escription an"

inventory.

Inventory it! serial n#mers an"

installation reference.

SoftareDfirmare version n#mers.

%an#fact#rer?s stan"ar" tec!nical

man#als.

Complete" at en" of actorySta$in$

System man#als as@#ilts incl#"in$H Stan"ar" */#ipment man#als.

System "rain$s.

i:e" */#ipment "oc#mentation.

Plan an" elevation vies of t!e

e/#ipment installation at t!e ra"io site.

*/#ipment inter@calin$ "ia$rams for

eac! site.

emarcation irin$ lists.

Pro$rammin$ an" level settin$ "ata

s!eets.

*/#ipment y siteH

o 8ey access proce"#res.

o Site inventory lists.

o 6emote si$n@on

proce"#res an" passor"s.

o Softare versions an"

e/#ipment irin$ y e/#ipment site.

6a"io licenses.

iel" ='P test s!eets an" res#lts.

6+ site a#"it.

%aintenance recor"s.

Warranty information.

Service Provi"er.

Apon system =cceptance

%otorola ill provi"e e/#ipment man#alscoverin$ ot! stan"ar" an" optionalfeat#res. '!e content of t!ese man#als isstan"ar"i<e" an" may not e specific toCo#nty

Apon inal =cceptance

%ont$omery Co#nty5 %arylan"Statement of Work

 

Statement of Work: """

Page 117: Motorola SOW - Reviewed by MoCo PM 2015-09-22

7/23/2019 Motorola SOW - Reviewed by MoCo PM 2015-09-22

http://slidepdf.com/reader/full/motorola-sow-reviewed-by-moco-pm-2015-09-22 117/309

 

J.1.!.18 System cce+tance

$ompletion $riteria

+his task is considered complete upon County approval and sign-off of the 2quipment *nstallationcceptance, !unctional cceptance +est, B0 Calendar ;ay (perational +est and Coveragecceptance +est.

uccessful completion of the acceptance tests constitutes acceptance of the software and hardware provided by Motorola. pon completion of this cceptance +est $lan, County representatives participating in and observing the tests will sign off on the +$, signifying acceptance of the system.*f no punch list items are identified during the acceptance testing process, and Motorola hascompleted all other project deliverables, County’s authoried signature will represent !inal ystemcceptance. *f a punch list of unresolved issues is created as a result of the acceptance testing, !inalystem cceptance will occur upon resolution of all items on the punch list.

+able " -B# defines the deliverables and responsibilities for both County and Motorola.

(a)le J-61: +esponsi)ilit# Matri%

(ask Motorola $ount# ,elivera)le

ecommission an" remove 6 e/#ipment. */#ipment remove" an"relocate" to a location"etermine" y Co#nty

6esolve p#nc! list items "oc#mente" atSystem C#tover.

 =pprove" P#nc! ist6esol#tion

*ns#re t!at t!e criteria "efine" to transitiont!e project to t!e %otorola ServiceOr$ani<ation !ave een complete"5incl#"in$ t!e "evelopment of a C#stomerS#pport Plan it! Co#nty.

Service 'ransition Certificatean" C#stomer S#pport Plan

 =ll "oc#ments liste" in System %an#al E=s@,#iltK oc#mentation Section ill e

s#mitte" as t!ey ecome rea"y.

System %an#al E =s@,#iltKoc#ments

inal approvals of all System %an#al E =s@,#iltK "oc#ments.

Written =pproval Statement(s)

 =cknole"$e inal Project =cceptance oncompletion of t!e criteria for inal Project

 =cceptance of t!e P2 6a"io System%o"erni<ation.

Si$ne" inal Project =cceptance oc#ments

$ompletion $riteria

+his task is considered complete when County and Motorola have signed the !inal $rojectcceptance Certificate, representing the completion of the system and acknowledgement of ystemcceptance as described in the cceptance +est $lan.

""2  

Statement of Work:

Page 118: Motorola SOW - Reviewed by MoCo PM 2015-09-22

7/23/2019 Motorola SOW - Reviewed by MoCo PM 2015-09-22

http://slidepdf.com/reader/full/motorola-sow-reviewed-by-moco-pm-2015-09-22 118/309

J.1.8 P+"-! S-"/0%"

%ont$omery Co#nty5 %arylan"Statement of Work

  Statement of Work: %ro&ect %lan 'C(3("(2) ""3

Page 119: Motorola SOW - Reviewed by MoCo PM 2015-09-22

7/23/2019 Motorola SOW - Reviewed by MoCo PM 2015-09-22

http://slidepdf.com/reader/full/motorola-sow-reviewed-by-moco-pm-2015-09-22 119/309

 ee ttachment ? $roject 17 :adio ystem $ayment chedule noting the percentage and milestones for payments.

%ont$omery Co#nty5 %arylan"Statement of Work

""4 Statement of Work: %ro&ect %lan 'C(3("(2)

Page 120: Motorola SOW - Reviewed by MoCo PM 2015-09-22

7/23/2019 Motorola SOW - Reviewed by MoCo PM 2015-09-22

http://slidepdf.com/reader/full/motorola-sow-reviewed-by-moco-pm-2015-09-22 120/309

Page 121: Motorola SOW - Reviewed by MoCo PM 2015-09-22

7/23/2019 Motorola SOW - Reviewed by MoCo PM 2015-09-22

http://slidepdf.com/reader/full/motorola-sow-reviewed-by-moco-pm-2015-09-22 121/309

 

J.1.9 :0'%!y P%'&

J.1.6.1 Motorola>s Commitment to <uality Leads to E--icient/ Lo)A0isk *m+lementation

Motorola recognies that the the Countyvalues quality improvement processes, and Motorola’s * process offers that value by incorporating quality control methodologies such as i igma and *(-

B000. Motorola invented i igma as an internal metric for measuring defects and improvingquality. ince then, it has become an industry-standard, recognied as a robust business improvementmethodology. i igma helps focus an organiation on its customer requirements, process alignment,analytical rigor, and timely eecution.

sing i igma process improvement, Motorola continues to refine its project managementmethodology to reduce its customers’ costs and mitigate project risk. ;uring the County’s project,Motorola will continually review and update its project implementation plan to ensure that it ismeeting the County’sepectations.

Motorola has multiple *( quality certifications, and its ystems *ntegration (rganiation has beengranted *( certification, as well as Motorola’s CCi, Customer upport ervice, and manufacturing.dherence to the goals of i igma and *(-B000 ensure that Motorola will provide the Countywith the most cost-effective, efficient, and reliable deployment possible.

J.1.6.2 Project <uality Management

J.1.6.2.1 <uality Commitment

Motorola believes that the establishment of a $roject Guality ssurance 'G) $rogram is an integralcomponent of ensuring that the County’s project will achieve its objectives with the level ofecellence the County epects -. +he framework for the G $rogram is designed to handle the ever-increasing compleity of government and public safety systems. %y leveraging both industry specificstandards and years of eperiences, Motorola will customie a G $lan to meet the County’s unique

 project requirements.

J.1.6.2.2 <uality ssurance Program

+he foundation for Motorola’s G $rogram is built upon its project management framework andystem *ntegration-<ates '*-<ates). *-<ates is a disciplined approach, methodology and repositoryof Motorola $roject Management and ystem *ntegration team’s activities and best practices '+able "-B1). tiliing this *-<ates approach facilitates the incorporation of Motorola’s quality managementsystem through policy and procedure so that project quality remains at the forefront throughout the project’s lifecycle.

%ont$omery Co#nty5 %arylan"Statement of Work

""6  

Statement of Work:

Page 122: Motorola SOW - Reviewed by MoCo PM 2015-09-22

7/23/2019 Motorola SOW - Reviewed by MoCo PM 2015-09-22

http://slidepdf.com/reader/full/motorola-sow-reviewed-by-moco-pm-2015-09-22 122/309

(a)le J-6&: Motorola’s 'I =ate Process

Initiating Phase 1 Planning Phase & ?%ecution Phase 'ervice !perations

G MaintenancePhase

G'!" 14

Project Selection

G'!" 1

5eaming o- Sales andPresales BusinessManagement

G'!" 13

,e(elo+ Pro+osal

G'!" 12

Su&mit Pro+osalG'!" 11

)ard

G'!" 1;

5ransition -rom Pre SalesBusiness Manager to ProjectManagement

G'!" <

,esign 0e(ie)

G'!" =

Sco+e and PlanG'!" 9

Procure and &uild

G'!" 8

*nstallation and'+timi@ation

G'!" 4

System 5esting andCuto(er

G'!"

*m+lementation Close

G'!" 3

5ransition -rom ProgramManagement to Ser(ice

G'!" 2

arranty

G'!" 1

Maintenance

Motorola’s G $lan is a set of physical guidelines and check-points created to demonstrate that thesolution’s design, integration and implementation are progressing according to the County’sepectations and recognied industry standards such as *0 B00#, +4 B000, and Motorola’s :79guidelines. +he Guality ssurance $lan is integrated into each phase of the project, including thoseoutlined in the County’s :equirement document?

#. ;esign nalysis and Aerification.1. :! Coverage nalysis and Aerification.5. ;esign Changes and ;ocument Control.6. Material hipping, :eceiving, and torage.7. ite $reparation 'if required).9. !ield *nstallation and *nspection.=. 2quipment *nventory and +racking.>. ystem +esting and Aalidation.B. oftware +esting.#0. ;eficiency :eporting and Correction.##. *mplementation and Cutover.#1. +raining and Certification.

2ach $lan is created through a collaborative and customied approach to manage the unique needs ofthe County’s projects. *t includes a comprehensive and complimentary collection of mutuallysupporting $lans, control measures, review points, tools, forms, documentation and activities. (nce

the plan is agreed upon, the $rogram Manager will be responsible for eecution, reporting, andremediating issues uncovered while eecuting the Guality $lan. s part of the bi-weekly meetings,the quality plan will be reported on by the $rogram Manager., to include issues found, remediation plans, and time to completion.

%ont$omery Co#nty5 %arylan"Statement of Work

Statement of Work: ""7 

Page 123: Motorola SOW - Reviewed by MoCo PM 2015-09-22

7/23/2019 Motorola SOW - Reviewed by MoCo PM 2015-09-22

http://slidepdf.com/reader/full/motorola-sow-reviewed-by-moco-pm-2015-09-22 123/309

 

J.1.6.2.3 ey <uality ssurance Program Bene-its

Motorola works in partnership with you to ensure that the project eceeds the County’s epectationsand provides the optimal value to the County. %y utiliing the G $rogram you can trust that?

• $roject activities are properly aligned to the County’s epectations, quality, objectives and

requirements.

• (pportunity for project schedule variability is minimied.• nepected project issues are identified, investigated and resolved as effectively as possible.

• nnecessary re-work and project delays will be avoided.

• :esults are monitored to ensure they meet or eceed relevant standards and contractual

 performance criteria.

Motorola ,ifference

Motorola has over >0 years of eperience in providing comple solutions that meet the County’srequirements. Motorola’s nationwide network of highly skilled professionals is committed to qualityand is always ready to meet the unique needs of the County’s project. dditionally, Motorola hasdemonstrated its commitment to quality by achieving specific industry quality certifications such as

*0 B00# and twice winning the prestigious Malcolm %aldrige 8ational Guality ward. s a result,Motorola is well-positioned to deliver on the County’s project epectations.

J.1.= I#$%"#"&!'!& :0'%!y A0+'&-"

J.1.7.1 0 !$ Standard

Motorola has created and maintained an industry standard for installation of Communication itescalled :79. +his standard assures that its installations, as well as those of Motorola’s subcontractorsmeet the highest and most consistent standard assuring a quality installation. CCi, or factory stagingarea, performs racking and cabling per :79. Motorola’s $remiere ervice Center, +eltronic, has all itstechnicians trained in the standard, and Motorola’s 2ngineers design to the standard. +he standardassures that a consistently high quality installation is performed for Motorola’s customers and meetsthe requirements outlined in ection C.7.7 of theCounty’s :!$.

pecific areas covered by the :79 standard include?

• ite ;esign and ;evelopment.

• helter ;esign and *nstallation.

• 2ternal <rounding.

• $ower ources.

• urge $rotection.

• Minimiing ite *nterference.

2quipment *nstallation.

J.1.7.2 uditing to te Standard

*ncluded in Motorola’s tatement of /ork is an independent audit of its compliance to the :79standard as well as third party verification of site civil work such as foundations, towers, andcompound improvements. . +his independent audit can be done in conjunction with the County’squality inspections outlined in ection C.7.7.#.1 of the :!$. +hese independent audits of Motorola’sinstallation assure that the highest installation quality is achieved. gain the results of these audits,

%ont$omery Co#nty5 %arylan"Statement of Work

""  

Statement of Work:

Page 124: Motorola SOW - Reviewed by MoCo PM 2015-09-22

7/23/2019 Motorola SOW - Reviewed by MoCo PM 2015-09-22

http://slidepdf.com/reader/full/motorola-sow-reviewed-by-moco-pm-2015-09-22 124/309

issues found, remediation, and time to complete will be a topic at each bi-weekly $roject tatus:eview.

J.1.< R6 M!'!& P%'&

• Motorola takes a total lifecycle :isk Management approach in order to determine all risk

eposure and appropriate mitigation strategy.

• :isk Management is crucial to the success of Montgomery County project because of efficient project eecution.

• +he :isk Management process is a proactive approach maimiing the positive outcome from the

 project and a complete satisfaction of County.

• +his :isk Management process takes into consideration scope, budget, quality, technical and

schedule eecution risks and action items to mitigate risks individually or in joint occurrences.

• Motorola’s risk management plan includes?

− 2valuating and updating risk continuously through the project lifecycle.

− :eviewing periodically the risk status and risk metrics at +eam meetings and project reviews.

− *ncluding all relevant stakeholders in the process, including subcontractors.

− ;eveloping mitigation activities and tracking risk activities to retirement 'as well as assessing

any residual risk that remains after completion of mitigation activities).− ssigning who is responsible for the risk process on the project.

− *dentifying the risk categories that are used for the project.

− ;efining the risk probability and risk impacts for the project.

• Motorola’s Total Risk Management: ;eciding how to approach and plan risk management

activities for the project. +his step includes defining categories, impact types, and tolerancelevels?

− Identification: 2valuating the project and identifying individual risks.

− Assessment: $erforming qualitative and quantitative risk assessment, which is the process of

assessing the impact and likelihood of occurrence of identified risks and producing a probability impact matri.

− Response: ;eveloping options and determining actions to reduce or eliminate threats

'probability or impact) to the project’s objectives.

− Monitoring and Control: *mplementing risk response plans, tracking identified risks to

ensure progress and completion, monitoring residual risks, and identifying new risks.Motorola considers a risk retired when it is no longer a concern to the project or when the risk is realied.

− Lessons Learned: 2valuating the effectiveness of the risk process throughout the project,

including the tools, the detail processes and the project’s use of the process.

Motorola’s effective management of project risks ensures a low-risk solution to County !irst:esponders.

• :isk *dentification

− +eam brainstorming.− ubject Matter 2perts 'M2) evaluating aspects of the project thereafter identifying

candidates they consider risky elements.

− :eviewing 4essons 4earned from other projects.

− ssumptions made or being made in the proposal or during (/ eecution.

− :esults of analysis, modeling, or simulation.

− nalying project metrics.

%ont$omery Co#nty5 %arylan"Statement of Work

Statement of Work: ""!

Page 125: Motorola SOW - Reviewed by MoCo PM 2015-09-22

7/23/2019 Motorola SOW - Reviewed by MoCo PM 2015-09-22

http://slidepdf.com/reader/full/motorola-sow-reviewed-by-moco-pm-2015-09-22 125/309

 − ubcontractor’s inputs and performance.

− County $roject +eam, !irst :esponder’s, and *nitial ser’s inputs.

− 2ngineering review questions and action items.

%ont$omery Co#nty5 %arylan"Statement of Work

"2#  

Statement of Work:

Page 126: Motorola SOW - Reviewed by MoCo PM 2015-09-22

7/23/2019 Motorola SOW - Reviewed by MoCo PM 2015-09-22

http://slidepdf.com/reader/full/motorola-sow-reviewed-by-moco-pm-2015-09-22 126/309

− ome typical risks encountered on a project include?

♦ +echnical performance concerns.

♦ chedule assumptions and contingencies.

♦ $rocurement issues.

♦ taffing concerns.

♦ Comple subcontracts3subcontractor relationships.

♦ nclear or changing requirements.

♦ +eam proimity and communication issues.• :isk +racking

− Continuous monitoring of the magnitude and probability of identified risks as well as the

effectiveness of the mitigation plan.

− Modifying mitigation activities and preparing contingency plans.

• :isk :eporting

− ummary :eports for management reviews?

♦ ;etailed reports plus mitigation and activity logs.

♦ :isk retirement timeline charts.

− +imely risk review with internal Motorola management team.

− :elevant risk review with County project team.

• :isk pproach− Motorola assesses and prioritie risk based on probable impact.

− Motorola assesses the coupling and decoupling of risk issues - i.e. @ow two or more risk

items if occurs in parallel would affect the project.

− +he available options for mitigation are?

♦ Assume (Accept): /illing to accept the consequences should it occurD do nothing,

monitor, or document contingency plans. +his approach is applicable for those risks thathave a very low probability or the cost of performing a mitigation activity outweighs thecost eposure impact of the risk.

♦ Avoid: +aking specific action to avoid the risk.

♦ Transfer: Choosing to transfer all or portion of it to another party who has more control

over the risk area such as another project or department.♦ Control (Mitigate): $lanning and implementing activities that attempt to reduce the

 probability of occurrence and3or reduce the impact.♦ Watc: ;oing nothing for now as there may not be enough information to decide which

of the other strategies to implement at the moment.

− !or those risks that can be mitigated, the cost3benefit ratio is evaluated and then the

appropriate mitigation option is selected.

− s mitigation activities progress and complete, Motorola reevaluates the risk and develops

new mitigation strategies, if necessary.

%ont$omery Co#nty5 %arylan"Statement of Work

Statement of Work: "2"

Page 127: Motorola SOW - Reviewed by MoCo PM 2015-09-22

7/23/2019 Motorola SOW - Reviewed by MoCo PM 2015-09-22

http://slidepdf.com/reader/full/motorola-sow-reviewed-by-moco-pm-2015-09-22 127/309

 

J.2 COMMUNICATIONS PLAN

J.2.1 P+"-! M""!&

uccessful implementation of the system requires Motorola olutions, *nc. 'Motorola) and

Montgomery County 'County) to develop a structured cadence of communication through each phaseof the project, including design, implementation, testing, and acceptance.

Motorola and the County will participate in critical meetings during the project implementation thatwill assure a low risk, on-time installation. +able " -B5 outlines the meetings and the responsibilities.

(a)le J-6: +esponsi)ilit# matri%

(ask 8ctivit# ,elivera)le

Project 8ickoff %eetin$ %ont$omery Co#ntyan" %otorola

6evie of 6P5 6esponse an" actionitems for preparation for C#stomeresi$n 6evie (C6)

C6 ill lock "on "esi$n5

testin$ plans5 sc!e"#le5 projectplan5 an" c#tover

%ont$omery Co#nty

an" %otorola

Complete" "esi$n an" concept#al

acceptance testin$ plan

Project sc!e"#le reviee" on ai@eekly asis as an a$en"aitem to t!e Project Stat#s%eetin$s.

%ont$omery Co#ntyan" %otorola

6eviee" an" #p"ate" sc!e"#le

J.2.1.1 Project icko-- Meeting

+he project will be initiated with a $roject &ickoff Meeting including key County and Motorola project participants. +he objectives of the $roject &ickoff Meeting include?

• *ntroduce and echange contact information of all project participants.• :eview roles of key participants and project review procedures.

• 2stablish a clear chain of communication and authority.

• Confirm Motorola’s proposed bi-weekly $roject tatus Meetings.

• *dentify key user groups impacted by the system implementation.

!rom input gathered in the $roject &ickoff Meeting, Motorola will review and work with the Countyto finalie the following elements of the Communications $lan?

%ont$omery Co#nty5 %arylan"Statement of Work

"22  

Statement of Work:

Page 128: Motorola SOW - Reviewed by MoCo PM 2015-09-22

7/23/2019 Motorola SOW - Reviewed by MoCo PM 2015-09-22

http://slidepdf.com/reader/full/motorola-sow-reviewed-by-moco-pm-2015-09-22 128/309

• 2stablish $roject +eam Communications methodology.

• 2stablish 2ecutive :eview %oard made consisting of user group eecutives that will receive

 bi-weekly status from the bi-weekly $roject tatus Meetings. +his group will also receive specialreviews throughout the project based on events, such as eplaining the cutover process andgaining approval of the cutover plan.

J.2.1.2 Customer ,esign 0e(ie)

+he County and Motorola will review the $17 :adio ystem Moderniation design through analysisof the system functionality, interface requirements, and end-user requirements, as mutually agreed between the County and Motorola. ;uring this phase, the $roject $lan outlined in this tatement of/ork will be further developed, and the /ork %reakdown tructure '/%) further defined andapproved by the County. +he /% becomes the basis for the project schedule, which drivescommunication of project status.

;uring the design review stage, the basis for Motorola’s project communication will be established,identifying critical elements of design, schedule, and costs. +he schedule will identify Critical $ath2lements that will be the core of reporting schedule performance. +he design and $roject $lan willidentify key risk areas that will be monitored and reviewed throughout the project.

J.2.1.3 BiAeekly Status Meetings and te Motorola Project Manager

+he $roject +eam will participate in bi-weekly $roject tatus :eviews to review the activities of the project. Major agenda items during these meetings include chedule tatus, :isk Mitigation, *ssue:esolutions and (pen tatus, and :eview of &ey ctivities within the net two-week period. +heMotorola $rogram Manager will detail all notes from these meetings and publish a report to the$roject +eam as well as the 2ecutive :eview %oard for the $roject.

;uring these meetings the $roject +eam will identify those events that will require communication of project information beyond the $roject +eam and the 2ecutive :eview %oard. +his is particularlyimportant as it relates to end users and people that will technically support operations of the system.2ffective planning and managing change for those users is critical to an effective transition to the new

system. 2amples of key areas for communications beyond the $roject +eam are identified in+able " -B6 below.

(a)le J-6: +esponsi)ilit# matri%

8ctivit# ,elivera)le

*CC ispatc! Center%o"erni<ation

etaile" sc!e"#le to #sers o#tlinin$ t!e activities5sc!e"#le an" any associate" trainin$. %akin$ s#re t!e#sers kno !at to e:pect in t!e ne confi$#ration.

6 Site */#ipment Installation =ccess plan5 impact to 6 Comm#nications Staff of t!eCo#nty5 as ell as any potential impact to #sers.

C#tover Sc!e"#le of c#tover5 it! "etails t!at comm#nicate to#sers re/#ire" instr#ctions5 !at to e:pect5 an" !o tocontact it! /#estions or prolems.

'rainin$ I"entify re/#ire" #sers to e traine" an" comm#nicate a'rainin$ Sc!e"#le for all #sers.

%ont$omery Co#nty5 %arylan"Statement of Work

Statement of Work: "23

Page 129: Motorola SOW - Reviewed by MoCo PM 2015-09-22

7/23/2019 Motorola SOW - Reviewed by MoCo PM 2015-09-22

http://slidepdf.com/reader/full/motorola-sow-reviewed-by-moco-pm-2015-09-22 129/309

 

J.2.1.4 System 5esting 0esults

;uring each phase of the system implementation, the new system will go through testing to assurethat it is operating as desired by the County. ;etailed tests plans will be developed along the way andapproved by the County. +he results from these tests will be communicated to the $roject +eam andwill be an agenda item at the appropriate %i-weekly tatus :eviews. (pen issues from test resultswill be tracked in the *ssues ;ocument and ction *tem 4og. +he log will be reported bi-weekly inthe $roject tatus :eport.

J.2.1.! "eed&ack

;uring the entire implementation Motorola and the $roject +eam will be seeking feedback fromusers, technical staff, and 2ecutive sponsors to assure that the implementation is eecuting asepected. +his feedback will allow the Communications $lan, which is a fluid document, to beadjusted to assure the most effective implementation and change management plan for theCounty and its users.

%ont$omery Co#nty5 %arylan"Statement of Work

"24 

Statement of Work:

Page 130: Motorola SOW - Reviewed by MoCo PM 2015-09-22

7/23/2019 Motorola SOW - Reviewed by MoCo PM 2015-09-22

http://slidepdf.com/reader/full/motorola-sow-reviewed-by-moco-pm-2015-09-22 130/309

J.3 SAFETY PLAN (C.4.2.8.11)

J.3.1 I&!+/0-!&

Motorola olutions, *nc.’s 'Motorola) large sites and manufacturing facilities operate 2nvironment,@ealth, and afety '2@) management systems that have been certified to the international standards*(#600# '2nvironment Management ystem) and (@#>00# '(ccupational @ealth and afetyystem). +he management systems encompass products, processes, activities, and services ofMotorola that occur at Motorola facilities and by both Motorola employees and subcontractors.

Motorola’s !ield ervices (perations '!() include a wide variety of construction, installation,maintenance, and repair activities and involve numerous Motorola employees working as programmanagers, engineers, system technicians, and other field service personnel.

+he safety and health of all employees are of prime importance to Motorola. Motorola holds in thehighest regard the safety, welfare, and health of employees and customers. *t is Motorola’s belief thataccidents injuring persons and damaging equipment cause needless human suffering, inconvenience,

and epense. Motorola provides its employees a work environment as free of recognied haards as is possible and practical. Control of potential safety and health haards and their elimination is the primary objective of Motorola’s safety program.

+he Motorola $roject Manager has primary responsibility for ensuring safety considerations areaddressed during the project implementation. +his includes identifying any Montgomery County'County)-specific safety training and policies that apply to the work areas where the $roject 17 '$17)equipment will be installed and or tested, assuring that all Motorola personnel and subcontractorsreceive the proper training prior to starting work, and establishing a specific safety plan prior to beginning installation of the system equipment. +he $roject Manager will interface with the Countyand its consultants as required to support safety audits as required.

%ont$omery Co#nty5 %arylan"Statement of Work

Statement of Work: "25 

Page 131: Motorola SOW - Reviewed by MoCo PM 2015-09-22

7/23/2019 Motorola SOW - Reviewed by MoCo PM 2015-09-22

http://slidepdf.com/reader/full/motorola-sow-reviewed-by-moco-pm-2015-09-22 131/309

 

J.3.2 G"&"+'% S'5"!y R0%"

#. ll accidents with or without injury shall be reported to the supervisor immediately.1. :eport unsafe conditions in the workplace, including defective tools or other equipment, to your

supervisor immediately. *t is the supervisor’s responsibility to review and correct unsafeconditions.

5. 2stablished safe job procedures shall be followed by all employees.6. *f unsure of how to operate machines3equipment or perform any assigned task, ask the supervisor before proceeding. +raining shall be provided to individuals that are not proficient in the use of particular machines3equipment.

7. ;o not alter machines or equipment. Mechanical safeguards shall be in place and kept in place atall times unless locked out and3or tagged out for maintenance or repair purposes.

9. $ersonal protective equipment, as directed by regulations, shall be worn or used to reduce thechance of injury.

=. se only the proper tool for the job. ;o not use defective tools or equipment if the proper tool isnot available.

>. <et assistance in lifting any item too bulky, awkward, or heavy to lift safely. 2mployees shoulduse material handling equipment, such as a cart or dolly before attempting to move any heavyitem.

B. *f a repetitive task causes discomfort, or is unsafe or unhealthy, report it to the supervisorimmediately.

#0. *n case of emergency, know?##. /hom to call.#1. /hat to do.#5. /here to go.#6. (bserve safe and healthy housekeeping practices.#7. ;o not use chemicals without a full understanding of their toic properties and without the

knowledge required in safe use.

J.3.3 E&*+&#"&!, >"'%!, '&/ S'5"!y P%-y

Motorola’s 2@ policy commits it to operating its facilities to minimie environmental impact, tocontinuously improve its 2@ processes, and to prevent pollution. +he policy supports Motorola’scorporate responsibility business principles and code of business conduct.

Motorola implements its policy through its 2@ management system, which describes how Motorolaidentifies and manages potential risks to people and the environment, improves its performance, andmonitors compliance. +he system has earned independent certification to the international standard*( #600# at Motorola’s manufacturing sites and larger design centers.

J.3. S'5"!y S!'&/'+/

Malcolm aldrige 9ational >ualit# 8wards a winner of the first Malcolm %aldrige 8ational Guality award in the nited tates of merica,Motorola takes great pride in its superior companywide management of quality processes. Motorola’scommitment to quality, continuous improvement, and global leadership in developing electronics products also etends to protecting and promoting environmental, health, and safety values. *t isMotorola’s official policy to conduct all operations responsibly and free from recognied haardsD torespect the environment, health, and safety of its employees, customers, suppliers, and community

%ont$omery Co#nty5 %arylan"Statement of Work

"26  

Statement of Work:

Page 132: Motorola SOW - Reviewed by MoCo PM 2015-09-22

7/23/2019 Motorola SOW - Reviewed by MoCo PM 2015-09-22

http://slidepdf.com/reader/full/motorola-sow-reviewed-by-moco-pm-2015-09-22 132/309

neighborsD and to comply with all applicable environmental, safety, and industrial hygiene laws andregulations of countries where Motorola conducts operations.

?nvironmental 8wareness Initiatives

Motorola offers a course on environmental awareness to all of its employees throughout the worldand has commenced detailed training of its engineers on how to incorporate environmentalconsiderations into product design, development, and manufacturing. Motorola has won numerous

awards for its efforts in protecting the environment and for its employee safety programs. Motorolahas implemented many voluntary pollution prevention projects and eliminated chlorofluorocarbons'C!Cs) from its manufacturing processes in #BB5.

*n addition to these initiatives, Motorola has established a set of worldwide standards addressingactivities that affect health, safety or the environment. +hese standards are referred to as the Motorola2@ tandards and apply to all its facilities and operations worldwide.

'afet# 'tandards

Motorola has numerous safety standards. *f potential safety issues are identified at a site, the safetystandards call for corrective actions to control or eliminate the situation. 2ach site is also asked toimplement a process for reporting accidents that result in injury3illness or damage to property.ccident investigations are conducted to identify the possible cause's) of the accident, and determineany necessary steps to prevent recurrence. Motorola also asks its independent subcontractors to participate in the evaluation and monitoring of safety activities.

n effective safety program is built around good housekeeping. ccordingly, the safety standardsinstruct each site to address housekeeping issues, such as maintenance of work areas in a clean, dryand orderly condition, safe storage of materials, adequate spacing in aisles and stairways, properlighting, and maintenance of facilities in good repair. 2ach site also establishes minimum safetystandards for walking and working surfaces to prevent accidents caused by trips and falls.

%y implementing and applying these 2@ standards on a worldwide basis, and by remainingcommitted to continuous improvement in all its activities, Motorola is working to fulfill its vision of being a global corporate leader for progressive and best-in-class environmental, health and safety

 practices. MotorolaKs culture is grounded in a respect for the dignity of people. *t is a culture thatrespects our natural environment and strives to improve the surroundings in which we live and work.

J.3.4 ?"+5y& E&*+&#"&!, >"'%!, '&/ S'5"!y C#$%'&-"

Motorola’s 2@ audit program assesses how *( #600#-certified sites are complying with thecompany’s policy, management system, and legal requirements. Motorola’s staggered audit scheduleensures each site is audited at least annually.

• Corporate-level audits of the 2@ management systemIevery three years.

• ite-level audits of the 2@ management systemIevery three years.

• ite-level audits of 2@ compliance with legal requirementsIevery three years by independent,

third-party auditors.• *( #600# surveillance auditsIevery three years by independent, third-party auditors.

Motorola records all non-compliances identified by these audits and systematically track them toensure that corrective actions are taken and the root causes corrected. Motorola’s senior leaders and board of directors review the audit results periodically.

%ont$omery Co#nty5 %arylan"Statement of Work

Statement of Work: "27 

Page 133: Motorola SOW - Reviewed by MoCo PM 2015-09-22

7/23/2019 Motorola SOW - Reviewed by MoCo PM 2015-09-22

http://slidepdf.com/reader/full/motorola-sow-reviewed-by-moco-pm-2015-09-22 133/309

 

J.3.8 M!+%'@ E&*+&#"&!, >"'%!, '&/ S'5"!y M'&'"#"&! Sy!"#

Motorola operates a rigorous 2@ management system that reduces its impacts and implements its2@ policy. *n its facilities and operations, Motorola aims to minimie environmental impact.Motorola’s2@ management system sets targets and drives continuous improvement in safety, pollution prevention, and resource conservation throughout the design, manufacturing, and

distribution of its products.+o achieve this, Motorola?

• Meets or eceeds all applicable environmental, health and safety legal and other requirements to

which Motorola subscribes in the countries where Motorola does business.

• /orks with its employees to maintain a healthy and safe workplace.

• $roactively reduces occupational injury and illness risks, and promote employee health and well-

 being.

• 2stablishes sound 2@ objectives and targets.

• $rovides transparent 2@ reports to stakeholders.

• 2ndeavors to design and manufacture its products for sustainable use of the 2arth’s resources and

to minimie its carbon footprint.• :equires suppliers to operate consistently with its upplier Code of Conduct and all applicable

2@ policies.

• Continuously evaluates 2@ performance.

• :eports progress and key issues to senior leaders and relevant stakeholders.

%ont$omery Co#nty5 %arylan"Statement of Work

"2  

Statement of Work:

Page 134: Motorola SOW - Reviewed by MoCo PM 2015-09-22

7/23/2019 Motorola SOW - Reviewed by MoCo PM 2015-09-22

http://slidepdf.com/reader/full/motorola-sow-reviewed-by-moco-pm-2015-09-22 134/309

J. CO?ERAGE ACCEPTANCE TEST PLAN (C.3.=)

J.! C'%E0;E CCEP5:CE 5ES5 PL: C.3.7

J.!.1 Project 2! 5runking Co(erage cce+tance 5est Plan

Motorola olutions, *nc. 'Motorola) is proposing a new +:(Q 17 digital trunked voice system thatmeets Montgomery County’s 'County) coverage requirements for both $hase # !;M and $hase 1+;M operating modes. Motorola proposes to test the worst-case operating mode, which is $hase 1+;M, and the following Coverage cceptance +est $lan 'C+$) shall be the vehicle used to verifythat the simulcast radio system meets or eceeds the guaranteed coverage reliability. Coverage testingwill be performed during periods of full foliage in the County, from May to (ctober.

,evelopment of $8(P

+his C+$ defines the coverage testing methods and procedures, the coverage acceptance criteria, thetest documentation, and the responsibilities of both Motorola and the County. Contract pricing andcoverage commitments are based on the plan and methodologies in this section.

Motorola and the County will conduct coverage acceptance tests to validate the coverage provided.$ortable composite service area coverage will be tested within the in-building ones for two-wayvoice communications subjective test at ;elivered udio Guality ';G) 5.6N.

Motorola will perform a voice quality coverage test throughout all accessible areas inside the County borders as well as the area in a three-mile buffer outside the County borders. :epresentatives from both Motorola and the County will jointly travel throughout the defined service area to perform two-way round-trip voice tests from each location to representatives at a dispatch console located at the2CC or the 2CC.

J.!.2 C5P ,etailed ,escri+tion

detailed description of the C+$ consists of the following elements?

• ;efinitions.

• Methods.

• :esponsibilities and $reparation.

• $rocedures.

• ;ocumentation and cceptance.

%ont$omery Co#nty5 %arylan"Statement of Work

Statement of Work: "2!

Page 135: Motorola SOW - Reviewed by MoCo PM 2015-09-22

7/23/2019 Motorola SOW - Reviewed by MoCo PM 2015-09-22

http://slidepdf.com/reader/full/motorola-sow-reviewed-by-moco-pm-2015-09-22 135/309

 

J.!.2.1 C5P ,e-initions

everal definitions are needed to accurately describe the coverage test method. /here cited, theseterms or methods are defined in the +elecommunications *ndustry ssociation '+*) +echnicalervice %ulletin +%->>C, titled E/ireless Communications ystems, $erformance in 8oise-4imitedand *nterference-4imited ituations, :ecommended Methods for +echnology-*ndependent Modeling,imulation, and AerificationF.

$overage 8rea

+he coverage area is the geographical region where communications will be provided that meet oreceed the specified Channel $erformance Criterion 'C$C) at the specified reliability for thespecified equipment configuration. +his radio system is designed to maimie coverage in the jurisdictional boundaries of Montgomery County plus a three-mile buffer area.

$hannel Performance $riterion

+he C$C is the specified minimum design performance level in a faded channel. !or this system, theC$C is as follows in 2rror? :eference source not found.

(a)le J-6: Proposed s#stem $P$

(est $P$

S#jective 0oice 'estin$ => T => 3.&

+he definition of ;G 5.6 is stated in 2rror? :eference source not found.

(a)le J-62: ,8> definitions

,8> =rade of $ircuit Performance

1 An#sale5 Speec! present #t #nrea"ale.

2 An"erstan"ale it! consi"erale effort.

re/#ent repetition "#e to noiseD"istortion.

3 Speec! #n"erstan"ale it! sli$!t effort.

Occasional repetition re/#ire" "#e to noiseD"istortion.

. 'peech understanda)le with repetition onl# rarel# re4uired.

'ome noise@distortion.

& Speec! easily #n"erstoo". Occasional noiseD"istortion.

&. Speec! easily #n"erstoo". Infre/#ent noiseD"istortion.

Speec! easily #n"erstoo".

+elia)ilit#+he reliability is the percentage of locations within the service area for in street and in-buildingcoverage, using building penetration margins as specified in the :!$, which meets or eceeds thetarget C$C. Motorola’s proposed design will provide B7R or greater area reliability meeting oreceeding the minimum C$C.

%ont$omery Co#nty5 %arylan"Statement of Work

"3#  

Statement of Work:

Page 136: Motorola SOW - Reviewed by MoCo PM 2015-09-22

7/23/2019 Motorola SOW - Reviewed by MoCo PM 2015-09-22

http://slidepdf.com/reader/full/motorola-sow-reviewed-by-moco-pm-2015-09-22 136/309

J.!.2.2 E#ui+ment Con-igurations

+his section defines the type and configuration of radio network and field unit equipment upon whichcoverage acceptance testing is based. +he Motorola coverage maps provided for coverage acceptancetesting of this system indicate the coverage areas for the following equipment configurations.

or 'o@ay Comm#nications (6o#n"@trip) C='P

:! coverage to an $J 9000 portable with remote speaker microphone using a S-wave fle-whipantenna in a swivel case at hip level for transmit and receive operation.

Montgomery County is divided into four in-building ones as specified in the :!$, along with an in-street area three miles outside the county borders.

+o test coverage in the four in-building ones 'as shown in the service area map below), the portablesubscriber will be de-rated according to the in-building one under test, and sufficient margins will beapplied based on the values specified in the :!$.

• Lone #I1> d%.

• Lone 1I#> d%.

• Lone 5I#1 d%.• Lone 6I9 d%.

• 5-mile buffer outside the county borderI0 d%.

Figure J.-: 'ervice area map showing the in-)uilding /ones

%ont$omery Co#nty5 %arylan"Statement of Work

Statement of Work: "3"

Page 137: Motorola SOW - Reviewed by MoCo PM 2015-09-22

7/23/2019 Motorola SOW - Reviewed by MoCo PM 2015-09-22

http://slidepdf.com/reader/full/motorola-sow-reviewed-by-moco-pm-2015-09-22 137/309

 +he equipment used for the C+$ shall emulate the above portable radio configurations by means ofthe portable $J 9000 radio being in a vehicle, using a magnetic, center roof mounted, unobstructed,T-wave antenna connected via coa cable. +he portable radios shall be de-rated to emulate the performance of the portable in the applicable service areas as follows in 2rror? :eference source notfound.

(a)le J-63: 8PH 2777 transmit and receive emulation

8PH 2777 Porta)le <hen (ransmitting and +eceiving

Portale =ntenna loss5 =P5 !alf ave fle:antenna5 sivel case5 at !ip level it! 6emoteSpeaker %icU

@.+ ",

Specific ,#il"in$ oss to Sim#late @+ ", for Fone&

@12 ", for Fone 3

@1 ", for Fone 2

@2 ", for Fone 1

7 ", for 3 mile #ffer 

'otal oss for Portale @1&.+ ", for Fone &

@27.+ ", for Fone 3

@2+.+ ", for Fone 2

@3+.+ ", for Fone 1

@.+ ", for 3 mile #ffer 

ifference eteen V@ave center roofmo#nte" moile antenna an" R@ave Belifle:!en #se" it! s!ort attery at !ip level in asivel case for Operation

&.& ",

Comine" Cale an" =tten#ator oss 6e/#ire"for %oile Sim#late" for Portale Covera$e

@17.2 ", for Fone &

@1+.2 ", for Fone 3

@22.2 ", for Fone 2

@3&.2 ", for Fone 1

@&.2 ", for 3 mile #ffer 

U+he loss of antenna and coa was determined using the following method?

!or the above calculations, Motorola has assumed a #1-foot coa line. *f the line is longer or shorterthan #1 feet, then this loss will be recalculated.

$rior to conducting the C+$, Motorola will verify the losses resulting from the attenuator and line. *f measurements differ from values shown above, the attenuation will be modified accordingly.

%ont$omery Co#nty5 %arylan"Statement of Work

"32  

Statement of Work:

Page 138: Motorola SOW - Reviewed by MoCo PM 2015-09-22

7/23/2019 Motorola SOW - Reviewed by MoCo PM 2015-09-22

http://slidepdf.com/reader/full/motorola-sow-reviewed-by-moco-pm-2015-09-22 138/309

J.!.2.3 C5P Metod

+he method used to test coverage is a statistical sampling of the predicted coverage area to verify thatthe minimum C$C is met or eceeded at the required reliability for the defined equipmentconfiguration. *t is impossible to verify every point within a coverage area because there are infinite pointsD therefore, coverage reliability is verified by sampling a statistically significant number ofrandomly selected locations, quasi-uniformly distributed within Montgomery County’s jurisdictional boundaries.

!or the purpose of these tests, the entire service area, including the area within and three miles beyond the County borders, will be divided into T-square mile 'maimum sie? S-mile by S-mile),evenly distributed test tiles. +he test team will separately evaluate each reasonably accessible test tile.ll accessible tiles within the service area will be tested to validate portable performance at theapplicable attenuation factor.

8ccessi)ilit# of (est (iles

+he predicted coverage area for the voice system will be divided into evenly sied square tiles. lltiles shown to be accessible by road will be tested. *f a tile is not reasonably accessible, it will beecluded from reliability calculations.

,etermine the +e4uired 9um)er of (est (iles in the $overage 8rea@ydra will determine the minimum number of test tiles required for a statistically significant test based on the 2stimate of $roportions formula. +he anticipated total number of test tiles is listed in2rror? :eference source not found.

(a)le J-65: (est tiles

$8(P'cenario@'ervice

8rea

(ile 'i/eD'4uare MilesE

(ile 'i/e

Dmiles per sideE

+e4uired num)er of (iles

Co#ntyi"e portalet!ro#$!o#t area it!inan" 3 miles eyon"

t!e co#nty or"ers

7.2 7. 317

(est 0ocation within ?ach (ile

Coverage test will be conducted at the first reasonable test location after entering the test tile.

Perform Measurements in ?ach (ile

*n each test tile, the test team's) will listen to an audio transmission, and each team will record asubjective pass3fail evaluation of the ;G for these transmissions based on the minimum C$Crequirement. :atings of the ;G will not be collected, only the pass3fail evaluation. *f a tile fails tomeet the minimum C$C on the new system, the test team in the field will retry the test in the samelocation without moving. !ailure to meet the minimum C$C on the second attempt will record the test

tile as failed. %2: and * measurement data will be collected automatically by the Aoyager testsoftware connected to a separate but identical radio3antenna arrangement for information purposesonly.

,etermine if ?ach (ile Passes or Fails the $P$ +e4uirement

ubjective pass3fail evaluation of the audio transmissions will be based on the consensus evaluationof the quality of test transmissions versus the applicable ;G description in 2rror? :eference sourcenot found ';G 5.6).

%ont$omery Co#nty5 %arylan"Statement of Work

Statement of Work: "33

Page 139: Motorola SOW - Reviewed by MoCo PM 2015-09-22

7/23/2019 Motorola SOW - Reviewed by MoCo PM 2015-09-22

http://slidepdf.com/reader/full/motorola-sow-reviewed-by-moco-pm-2015-09-22 139/309

 ,etermine the $overage 8rea +elia)ilit# for 8cceptance

fter all accessible tiles in the service area have been tested, the coverage area reliability percentagewill be determined by dividing the number of tiles that passed by the total number of tiles tested. +hecoverage acceptance test criterion is that the tested coverage area reliability must be equal to orgreater than the required reliability of B7R. hould the service area reliability fall below thesecriteria, that coverage deficiency shall be remediated and retested to show compliance.

$overage Failure ,ue to Interference*f the coverage test or a portion thereof is suspected to have failed due to eternal interference, thosetiles suspected of being affected by an interferer may be re-tested at Motorola’s discretion. *f the re-tested tiles can be shown to fail due to interference from another system which may be evidenced bythe presence of an on channel or adjacent channel carrier, an elevated noise floor, intermodulation'*M;), or other circumstances out of the control of MotorolaN, those tiles will be ecluded fromacceptance calculations. +he implementation of any possible solution would be the subject of a project change order.

J.!.2.4 0es+onsi&ilities and Pre+aration

+he following information will help set the epectations of the County and Motorola regarding

requirements for equipment, personnel, and time during the coverage test.

;epending on the total number of test teams to be used, the County will provide the following for theduration of the coverage test?

• +ransportation AehiclesI!or the C+$, this vehicle should be sied to provide transportation for

all members of a test team. *t should be suitable for the installation of the equipment necessary toutilie the <$ based testing3location equipment.

• County $articipantsIt least one County representative to drive each test vehicle and3or to be the

customer representatives for the test teams.

• dditional $ersonnelIdditional personnel for the test teams, both at the dispatch control point

and in the field.

• $ortable :adios and applicable accessories 'batteries, chargers, cases, speaker mics, etc.).;epending on the total number of test teams to be utilied, Motorola will provide the following for the duration of the coverage test?

• Motorola :epresentativeIt least one Motorola representative to navigate and to operate the <$

 based testing3location equipment.

• 4ocation 2quipmentIt least one calibrated <$-based testing3location package.

• 4aptop ComputerIt least one laptop computer equipped with the <$-based testing3location

software.

• dditional $ersonnelIdditional personnel as required for the test teams, both at the dispatch

control point and in the field.

+esting !ormsI+est log forms.

%ont$omery Co#nty5 %arylan"Statement of Work

"34 

Statement of Work:

Page 140: Motorola SOW - Reviewed by MoCo PM 2015-09-22

7/23/2019 Motorola SOW - Reviewed by MoCo PM 2015-09-22

http://slidepdf.com/reader/full/motorola-sow-reviewed-by-moco-pm-2015-09-22 140/309

%ont$omery Co#nty5 %arylan"Statement of Work

Statement of Work: "35 

Page 141: Motorola SOW - Reviewed by MoCo PM 2015-09-22

7/23/2019 Motorola SOW - Reviewed by MoCo PM 2015-09-22

http://slidepdf.com/reader/full/motorola-sow-reviewed-by-moco-pm-2015-09-22 141/309

 

Coverage acceptance testing will only be performed in the County’s operating area and within thethree-mile buffer outside of the County’s jurisdictional boundary. 8o acceptance testing will be performed in locations not described in this C+$. Motorola and the County may agree to performEinformation onlyF tests in such locationsD a quote will be provided for those additional locations.+hese information only test results will not be used as data in the evaluation for coverage acceptanceof the system.

*f any portion of the test is determined to be unreliable because of proven equipment malfunctions orfailures, Motorola will repeat only the portion of the test affected by the equipment malfunction orfailure. @owever, Motorola will repeat the entire test should the system fail to meet the requiredacceptance criterion detailed herein after remediation of said coverage acceptance test failure.

%efore starting the test, the County and Motorola will agree upon the timeframe for Motorola’ssubmission of a report containing the coverage test results. @owever, this timeframe shall be nosooner than #0 working days after the completion of the primary C+$ and3or secondary testing thatmay be required.

J.!.2.! ,etailed C5P Procedures

'u)*ective ,8> (est

subjective listening test will be performed for coverage acceptance testing of tiles to verifytwo-way communication 'round-trip) i.e., talk-out and talk-in ;G performance of the system.

+he test participants will be divided into teams, each consisting of personnel from both the Countyand Motorola. 2ach team will have members that operate a portable unit in the field and members thatare stationed at the control point location.

'imulated In-)uilding ,8> (esting

+here are four in-building ones defined in the :!$ with a different margin value for each, plus an in-street buffer area three miles outside the county borders. Motorola will perform simulated portable in- building tests as per the building penetration losses3margins specified in the :!$ for each one and

the three-mile buffer area 'refer to 2rror? :eference source not found).

(est Procedure

s the field-test teams drive through the coverage area, the test tile locations will be located by the<$ receiver. /ithin each tile, the test team will randomly select one location, which will serve as thetest location for the tile under test. *n general, the team will gather one test sample at the selectedlocation. +he test radios will be portable radios in a vehicle, using a magnetic, center roof mounted,unobstructed, T-wave antennas. +he portable radios shall be de-rated to emulate the performance ofan in-building portable radio at hip level for transmit and receive in a swivel case. (ne radio will beused for both talk-in and talk-out transmissions.

+he field test team will listen to a talk-out audio transmission at the test sample location, and will

record their pass3fail result based on their subjective evaluation of the ;G for the test sample.

%ont$omery Co#nty5 %arylan"Statement of Work

"36  

Statement of Work:

Page 142: Motorola SOW - Reviewed by MoCo PM 2015-09-22

7/23/2019 Motorola SOW - Reviewed by MoCo PM 2015-09-22

http://slidepdf.com/reader/full/motorola-sow-reviewed-by-moco-pm-2015-09-22 142/309

+eam members stationed at the control point will evaluate talk-in audio quality of transmissions fromthe test field unit in that tile. +he echange used for the voice quality check will be similar to thefollowing?

• 'Mobile +eam) EMobile +eam to ;ispatch, location V +esting #-1-5-6-7, how do you copyWF +he

fied team representatives will record the test point number and the pass3fail rating. '+his is atalk-in transmission.).

• ';ispatch +eam) E;ispatch to Mobile +eam your transmission was received and rated pass3fail.4ocation V, +esting #-1-5-6-7, how do you copyWF +he mobile team will record the test pointnumber and the pass3fail rating. '+his is a talk-out transmission.).

• 'Mobile +eam) EMobile team to ;ispatcher your transmission was received and rated as

 pass3fail.F

(ne team member in both the fied and field teams will maintain a test log to record the date, time,and pass3fail evaluation for each test sample within the given tile and then ultimately for each test tileoverall. *n the event that either the Mobile or !ied +eams rates the test as a failure, the above testwill be conducted again in the same location without the Mobile team moving. +he result of thesecond attempt will determine the result of the test tile. +he overall test tile pass3fail evaluations will be used to determine the overall coverage area reliability.

*f the Coverage +est fails, the Contractor has ten '#0) days to rectify the failure's) to achieve B7Rcoverage. *f a site move or site addition is required to meet B7R coverage, the plan to rectify will becovered in the change control process. +he necessary repairs to get acceptance of the 'previouslyfailed) Coverage +est are the ContractorKs sole responsibility, cost, and epense. (nce the Contractorhas rectified the Coverage +est failure's), the Contractor must demonstrate that thefailure's) has3have been resolved and obtain approval from the County that the Coverage +estis accepted based on B7R coverage and ;G 5.6 standards.

+ecommended Methods for 'pecific uildings 8udio >ualit# (esting

!or the Epecific %uildingsF testing listed in :!$ ection C.5.>.6, Motorola recommends thefollowing +%->>.5-C based methodology for testing ;G 5.6 system audio quality on ground floorsand above ground floors as necessary.

Specific ,#il"in$ 'est Portale Confi$#ration

n $J 9000 portable radio will be utilied in this testD the portable radio will be worn on the hip ina three-inch leather swivel case with a remote speaker microphone ':M). Motorola and the Countywill jointly select the 50 buildings during the design review process.

'!irty 2775777 S/#are@foot o#r@floor ,#il"in$s per 6P Section 3..&.2

+he building’s lowest floor that is completely above ground level will be tested. +his lowest floor testshould include 10 test points or # point every =7 feet, whichever is greatest, and evenly distributedthroughout the floor. +he 10 test points should include at least one test point at each of thefurthermost accessible locations in the northern, southern, western, and eastern corners as well as onein the center of the floor. ll test locations will be above ground level. *f necessary, a full buildingC+$ should include 10 test points per floor or one point every =7 feet per floor, whichever isgreatest, and evenly distributed throughout each of the remaining upper floors. +here should be aminimum of #00 test points per building.

'enty 2775777 S/#are@foot One@floor Information@only ,#il"in$s per 6P Section 3..&.3

+he building’s lowest floor that is completely above ground level will be tested. +his lowest floor testshould include 10 test points or # point every =7 feet, whichever is greatest and evenly distributedthroughout the floor. +he 10 test points should include at least # test point at each of the furthermost

%ont$omery Co#nty5 %arylan"Statement of Work

Statement of Work: "37 

Page 143: Motorola SOW - Reviewed by MoCo PM 2015-09-22

7/23/2019 Motorola SOW - Reviewed by MoCo PM 2015-09-22

http://slidepdf.com/reader/full/motorola-sow-reviewed-by-moco-pm-2015-09-22 143/309

 accessible locations in the northern, southern, western, and eastern corners as well as one in the center of the floor.

%ont$omery Co#nty5 %arylan"Statement of Work

"3  

Statement of Work:

Page 144: Motorola SOW - Reviewed by MoCo PM 2015-09-22

7/23/2019 Motorola SOW - Reviewed by MoCo PM 2015-09-22

http://slidepdf.com/reader/full/motorola-sow-reviewed-by-moco-pm-2015-09-22 144/309

Specific ,#il"in$ 'est 6esponsiilities an" Preparation

+he following information will help set the epectations for the County and Motorola regardingrequirements for equipment, personnel, and time during any elected *nformational Critical %uildingand pecial rea testing.

;ependent upon the total number of test teams to be utilied, the County will provide the followingfor the duration of the critical building test?

• Critical %uilding !loor $lansI$rior to conducting the critical building test, the County shall

 provide floor plans of the buildings under test.

• Montgomery County $articipantsIt least two County representatives to evaluate the ;G in the

field and at the dispatch control point.

• dditional $ersonnelIdditional personnel for the test teams, both at the dispatch control point

and in the field.

• $ortable :adios and applicable accessories 'batteries, chargers, cases, speaker mics, etc.).

;ependent upon the total number of test teams to be utilied, Motorola will provide the following forthe duration of the coverage test?

• Motorola :epresentativeIt least one Motorola representative to evaluate ;G and to help withthe building test point layouts.

• dditional $ersonnelIdditional personnel as required for the test teams, both at the dispatch

control point and in the field.

• +esting !ormsI+est log forms.

J.!.2.$ C5P ,ocumentation and Co(erage cce+tance

;uring subjective ;G testing, a test log will be kept by each mobile test team and at the dispatchcontrol point by the dispatch test team. +he pass3fail evaluations for each test tile will be recorded onthe test logs. copy of the test logs will be provided to the County at the conclusion of the coveragetest.

Motorola will submit to the County a report detailing the coverage test results. +his report willinclude a form, which is to be signed by both the County and Motorola, indicating the test was performed in accordance with this C+$ and the results of the test indicate the acceptance or non-acceptance of the coverage portion of the system.

8cceptance $riteria

+he acceptance criteria, as defined in 2rror? :eference source not found, is based on the coverage predictions provided with the tatement of /ork and is valid only for the proposed configuration. +hetarget percentage reflects the total number of tiles within the County and the three-mile buffer outsidethe County’s borders that are predicted to meet the target C$C. +his includes painted and unpaintedareas within the service area. Changes in site configurations or coverage parameters could require

adjustments to the coverage acceptance criteria.

(a)le J-66: (arget acceptance criteria

$8(P 'cenario 8PH 2777 $omposite $overage

'%= 6o#n"@trip S#jective 0oice 4

%ont$omery Co#nty5 %arylan"Statement of Work

Statement of Work: "3!

Page 145: Motorola SOW - Reviewed by MoCo PM 2015-09-22

7/23/2019 Motorola SOW - Reviewed by MoCo PM 2015-09-22

http://slidepdf.com/reader/full/motorola-sow-reviewed-by-moco-pm-2015-09-22 145/309

 

J.!.3 Summary

+he C+$ quantifies the coverage area, defines the coverage requirements, eplains how thecoverage area will be tested, and ensures that all parties understand their responsibilities. *t allows theuser the peace of mind that the new system will meet or eceed the coverage predictions.

%ont$omery Co#nty5 %arylan"Statement of Work

"4#  

Statement of Work:

Page 146: Motorola SOW - Reviewed by MoCo PM 2015-09-22

7/23/2019 Motorola SOW - Reviewed by MoCo PM 2015-09-22

http://slidepdf.com/reader/full/motorola-sow-reviewed-by-moco-pm-2015-09-22 146/309

J.8 ACCEPTANCE TEST PLAN (C.=.2.3)

 =S'6OX 2 A;C'IO;= =CC*P'=;C* '*S' P=;

J.8.1 38;; S!" & ASTRO 9. (S#'+!)

J.$.1.1 5alkgrou+ Call

1. ,?'$+IP(I!9

'!e 'alk$ro#p is t!e primary level of or$ani<ation for comm#nications on a tr#nke" 6a"io System. 6a"iosit! 'alk$ro#p call capaility ill e ale tocomm#nicate it! ot!er memers of t!e same'alk$ro#p. '!is provi"es t!e effect of a privatec!annel "on to t!e 'alk$ro#p level.'!is test ill "emonstrate t!at a 'alk$ro#ptransmission initiate" y a ra"io #ser ill only e!ear" y system #sers t!at !ave t!e same'alk$ro#p selecte". =s it! ot!er types of calls5'alk$ro#p calls can take place from any!ere in t!esystem.

'?(P

6=IO@1 @ '=896OAP 16=IO@2 @ '=896OAP 16=IO@3 @ '=896OAP 2

6=IO@& @ '=896OAP 2

?+'I!9 1.77

&. (?'(

Step 1. Initiate a Wi"e =rea Call it! 6=IO@1 in'=896OAP 1.

Step 2. Oserve t!at only 6=IO@2 ill e ale tomonitor an" respon" to t!e call.

Step 3. Initiate a Wi"e =rea Call it! 6=IO@3 in

'=896OAP 2.

Step &. Oserve t!at only 6=IO@& ill e ale tomonitor an" respon" t!e call.

PassKKKK FailKKKK 

%ont$omery Co#nty5 %arylan"Statement of Work

Statement of Work: "4"

Page 147: Motorola SOW - Reviewed by MoCo PM 2015-09-22

7/23/2019 Motorola SOW - Reviewed by MoCo PM 2015-09-22

http://slidepdf.com/reader/full/motorola-sow-reviewed-by-moco-pm-2015-09-22 147/309

 

J.8.2 W/" A+"' T+0&6& FDMATDMA M"/ S!"

J.$.2.1 5alkgrou+ Call

1. ,?'$+IP(I!9

'!e 'alk$ro#p is t!e primary level of or$ani<ation for comm#nications on a tr#nke" 6a"io System. 6a"iosit! 'alk$ro#p call capaility ill e ale tocomm#nicate it! ot!er memers of t!e same'alk$ro#p. '!is provi"es t!e effect of a privatec!annel "on to t!e 'alk$ro#p level.'!is test ill "emonstrate t!at a 'alk$ro#ptransmission initiate" y a ra"io #ser ill only e!ear" y system #sers t!at !ave t!e same'alk$ro#p selecte". =s it! ot!er types of calls5'alk$ro#p calls can take place from any!ere in t!esystem.

'?(P

6=IO@1 @ '=896OAP 16=IO@2 @ '=896OAP 16=IO@3 @ '=896OAP 26=IO@& @ '=896OAP 2

?+'I!9 1.77

&. (?'(

Step 1. Initiate a Wi"e =rea Call it! 6=IO@1 in'=896OAP 1.

Step 2. Oserve t!at only 6=IO@2 ill e ale tomonitor an" respon" to t!e call.

Step 3. Initiate a Wi"e =rea Call it! 6=IO@3 in'=896OAP 2.

Step &. Oserve t!at only 6=IO@& ill e ale tomonitor an" respon" t!e call.

PassKKKK FailKKKK 

%ont$omery Co#nty5 %arylan"Statement of Work

"42  

Statement of Work:

Page 148: Motorola SOW - Reviewed by MoCo PM 2015-09-22

7/23/2019 Motorola SOW - Reviewed by MoCo PM 2015-09-22

http://slidepdf.com/reader/full/motorola-sow-reviewed-by-moco-pm-2015-09-22 148/309

<ide 8rea (runking F,M8@(,M8 Mi%ed 'ites

J.$.2.2 Continuous ssignment +dating

1. ,?'$+IP(I!9

W!en a talk$ro#p is assi$ne" a voice c!annel5 t!e

site controller contin#es to transmit t!e c!annelassi$nment on t!e control c!annel for t!e "#ration of t!e talk$ro#p call. 6a"ios comin$ into #se on t!esystem are a#tomatically sent to voice c!annels it!conversations in pro$ress involvin$ t!eir selecte"talk$ro#ps.

'?(P

6=IO@1 @ '=896OAP 16=IO@2 @ '=896OAP 1

6=IO@3 @ '=896OAP 1

?+'I!9 1.717

&. (?'(

Step 1. '#rn O 6=IO@1.

Step 2. Initiate a 'alk$ro#p Call #sin$ 6=IO@2 an"verify 6=IO@3 !ears t!e a#"io.

Step 3. W!ile t!e 'alk$ro#p Call is in pro$ress5 t#rnO; 6=IO@1.

Step &. Oserve 6=IO@15 !ic! as j#st ro#$!tack into service5 joins t!e 'alk$ro#p Callalrea"y in pro$ress.

Step . *n" t!e talk$ro#p call.

Step +. Sitc! 6=IO@1 to anot!er talk$ro#p.

Step -. Initiate a 'alk$ro#p Call from 6=IO@2 to6=IO@3.

Step . W!ile t!e 'alk$ro#p Call is in pro$ress5 set6=IO@1 ack to '=896OAP 1.

Step 4. Oserve t!at 6=IO@1 joins t!e 'alk$ro#pCall alrea"y in pro$ress.

PassKKKK FailKKKK 

%ont$omery Co#nty5 %arylan"Statement of Work

Statement of Work: "43

Page 149: Motorola SOW - Reviewed by MoCo PM 2015-09-22

7/23/2019 Motorola SOW - Reviewed by MoCo PM 2015-09-22

http://slidepdf.com/reader/full/motorola-sow-reviewed-by-moco-pm-2015-09-22 149/309

 

<ide 8rea (runking F,M8@(,M8 Mi%ed 'ites

J.$.2.3 Call lert

1. ,?'$+IP(I!9

Call =lert is a tone pa$e t!at allos a #ser to

selectively alert anot!er ra"io #nit. '!e initiatin$ra"io ill receive notification from t!e tr#nke"system as to !et!er or not t!e pa$e as receive"y t!e tar$et ra"io. Anits receivin$ a Call =lert illso#n" an alert tone. =s it! ot!er types of calls5 Call

 =lerts can take place from any!ere in t!e system.

'?(P

6=IO@1 @ '=896OAP 16=IO@2 @ '=896OAP 2

6=IO@3 @ '=896OAP 3

?+'I!9 1.717

&. (?'(

Step 1. Asin$ 6=IO@15 press t!e pa$e #tton.

Step 2. *nter t!e #nit I of 6=IO@2 it! t!ekeypa"5 or scroll to t!e location !ere t!isI is store"

Step 3. Press t!e P'' to initiate t!e call alert. 0erifyt!at t!e 6=IO@1 #ser receives a#"ilein"ication t!at t!e Call =lert as sent.

Step &. 0erify t!at 6=IO@2 #ser receives ana#"ile in"ication of an incomin$ Call =lertas sent #t 6=IO@3 "oes not.

Step . 0erify 6=IO@1 $ets an a#"ile in"icationt!at t!e Call =lert as s#ccessf#lly receive"at t!e tar$et ra"io.

Step +. '#rn off 6=IO@2. Sen" a Call =lert from6=IO@1 to 6=IO@2.

Step -. 0erify t!at t!e 6=IO@1 #ser receivesa#"ile in"ication t!at t!e Call =lert assent.

Step . 0erify 6=IO@1 receives a L;o =cknole"$ementL in"ication t!at t!e Call

 =lert as not receive" at t!e tar$et ra"io.

PassKKKK FailKKKK 

%ont$omery Co#nty5 %arylan"Statement of Work

"44 

Statement of Work:

Page 150: Motorola SOW - Reviewed by MoCo PM 2015-09-22

7/23/2019 Motorola SOW - Reviewed by MoCo PM 2015-09-22

http://slidepdf.com/reader/full/motorola-sow-reviewed-by-moco-pm-2015-09-22 150/309

<ide 8rea (runking F,M8@(,M8 Mi%ed 'ites

J.$.2.4 Pri(ate Call

1. ,?'$+IP(I!9

Private Call is a selective callin$ feat#re t!at allos

a ra"io #ser to carry on one@to@one conversation t!atis only !ear" y t!e to parties involve". S#scrier#nits receivin$ a private call ill so#n" an alert tone.

 =s it! ot!er types of calls5 Private Calls can takeplace from any!ere in t!e system.

'?(P

6=IO@1 @ '=896OAP 16=IO@2 @ '=896OAP 16=IO@3 @ '=896OAP 1

?+'I!9 1.7&7

&. (?'(

Step 1. Asin$ 6=IO@15 press t!e Private Call (Call)#tton.

Step 2. *nter t!e #nit I of 6=IO@2 it! t!ekeypa"5 or scroll to t!e location !ere t!isI is store".

Step 3. Press t!e P'' to initiate t!e Private Call.

Step &. 0erify t!at 6=IO@2 !ears tones an" t!e"isplay in"icates t!at a Private Call !aseen receive"5 #t 6=IO@3 receives noin"ications.

Step . =nser t!e call at 6=IO@2 y pressin$ t!ePrivate Call (Call)D6espon" #tton. If6=IO@2 !as a "isplay5 verify it s!os t!eI n#mer or =lias of t!e callin$ #nit.

Step +. Press t!e P'' sitc! on 6=IO@2 an"respon" to t!e Private Call. ;ote t!at if yo#"o not press t!e Private Call #tton eforepressin$ P''5 yo#r a#"io ill e !ear" y allmemers of t!e talk$ro#p5 an" not j#st yt!e ra"io initiatin$ t!e Private Call.

Step -. 0erify t!at 6=IO@2 can comm#nicate it!

6=IO@1.

Step . 0erify t!at 6=IO@3 "oes not monitor t!ePrivate Call.

Step 4. *n" t!e Private Call y pressin$ t!e L!omeLkey an" ret#rn to normal talk$ro#poperation.

PassKKKK FailKKKK 

%ont$omery Co#nty5 %arylan"Statement of Work

Statement of Work: "45 

Page 151: Motorola SOW - Reviewed by MoCo PM 2015-09-22

7/23/2019 Motorola SOW - Reviewed by MoCo PM 2015-09-22

http://slidepdf.com/reader/full/motorola-sow-reviewed-by-moco-pm-2015-09-22 151/309

 

<ide 8rea (runking F,M8@(,M8 Mi%ed 'ites

J.$.2.! Multigrou+ Call in ait Mode

1. ,?'$+IP(I!9

'!is tr#nkin$ feat#re allos an e/#ippe" ra"io #ser

to transmit an anno#ncement to several "ifferenttalk$ro#ps sim#ltaneo#sly. '!e m#lti$ro#p (='9) callcan e fla$$e" for Wait %o"e in t!e Provisionin$%ana$er (P%) "ataase forcin$ all attac!e"talk$ro#ps to finis! calls in pro$ress efore t!etr#nke" system ill process t!e m#lti$ro#p call. '!esystem "oes not permit inactive5 attac!e" talk$ro#psto initiate 'alk$ro#p Calls "#rin$ t!e LaitLtimeframe. =s it! ot!er types of calls5 m#lti$ro#pcalls can take place from any!ere in t!e system.

'?(P

6=IO@1 @ '=896OAP 16=IO@2 @ '=896OAP 26=IO@3 @ 6=;O% (;ot part of %9)6=IO@& @ ='9 1

U '=896OAP 1 an" '=896OAP 2 are memersof ='9 1.

U 6=;O% is any talk$ro#p not a memer of ='9 1.

U %#lti$ro#ps are set #p t!ro#$! ot! t!e

Provisionin$ %ana$er (P%) an" t!e S#scrierPro$rammin$ softare.

?+'I!9 1.7&7

&. (?'(

Step 1. 0erify ='9 1 is set for t!e Wait mo"e.

Step 2. Asin$ 6=IO@15 initiate a call on'=896OAP 1.

Step 3. W!ile 6=IO@1 is keye"5 attempt to initiate am#lti$ro#p call #sin$ 6=IO@& on ='9 1.0erify 6=IO@& receives a #sy toneeca#se one of t!e talk$ro#ps attac!e" to

 ='9 1 is involve" in a 'alk$ro#p Call.

Step &. 8ey 6=IO@2 an" verify t!at a #sy tone isreceive" eca#se t!e ='9 1 call is in /#e#e.

Step . ekey 6=IO@1 an" verify 6=IO@&receives a callack.

Step +. 8ey 6=IO@& an" verify ot! 6=IO@1 an"6=IO@2 !ear t!e m#lti$ro#p call !ile6=IO@3 "oes not #nm#te.

PassKKKK FailKKKK 

%ont$omery Co#nty5 %arylan"Statement of Work

"46  

Statement of Work:

Page 152: Motorola SOW - Reviewed by MoCo PM 2015-09-22

7/23/2019 Motorola SOW - Reviewed by MoCo PM 2015-09-22

http://slidepdf.com/reader/full/motorola-sow-reviewed-by-moco-pm-2015-09-22 152/309

<ide 8rea (runking F,M8@(,M8 Mi%ed 'ites

J.$.2.$ udio *nterru+t*nterru+t :e(er Mode

1. ,?'$+IP(I!9

 = ra"io P'' re/#est may e receive" for a $ro#p

alrea"y active an" c#rrently ein$ so#rce" yanot!er ra"io #nit. '!e talk$ro#p can e fla$$e" toeit!er allo or "isallo t!e ne P''. If alloe"5 t!elatest P'' re/#est ill e $rante" an" ecome t!eso#rce of t!e call.

'?(P

6=IO@1 @ '=896OAP 16=IO@2 @ '=896OAP 16=IO@3 @ '=896OAP 1

?+'I!9 1.7&7

&. (?'(

Step 1. 0erify '=896OAP 1s template is set #pas =#"io Interr#pt ;ever.

Step 2. Asin$ 6=IO@15 initiate a call on'=896OAP 1.

Step 3. 0erify ot! 6=IO@2 an" 6=IO@3 monitort!e a#"io.

Step &. Asin$ 6=IO@35 initiate a call on'=896OAP 1.

Step . 0erify t!at 6=IO@3 receives a reject an"t!at 6=IO@2 contin#es to listen to 6=IO@

1.

Step +. ekey ot! 6a"ios.

PassKKKK FailKKKK 

%ont$omery Co#nty5 %arylan"Statement of Work

Statement of Work: "47 

Page 153: Motorola SOW - Reviewed by MoCo PM 2015-09-22

7/23/2019 Motorola SOW - Reviewed by MoCo PM 2015-09-22

http://slidepdf.com/reader/full/motorola-sow-reviewed-by-moco-pm-2015-09-22 153/309

 

<ide 8rea (runking F,M8@(,M8 Mi%ed 'ites

J.$.2.6 ,ynamic ",M5,M Emergency larm and Call )it 5o+ o- <ueueD",M Call in<ueue

1. ,?'$+IP(I!9

Asers in life t!reatenin$ sit#ations can #se t!e*mer$ency #tton on t!e ra"io to imme"iately sen"a si$nal to t!e "ispatc!er an" e assi$ne" t!e ne:tavailale voice c!annel if t!e %=D'%= mo"e oft!e call can e s#pporte" y t!e availale reso#rce.Ot!erise5 t!e first call in t!e /#e#e t!at can #se t!eavailale reso#rce is assi$ne". =n *mer$ency Callcan e set to eit!er 'op of >#e#e or 6#t!lessPreemption operation. 'o accomplis! t!is5 an*mer$ency =larm an" Call ill e initiate" from as#scrier5 !ic! ill e receive" y a s#scrieraffiliate" at any site of any <one in t!e system. In t!iscase5 t!e first availale reso#rce C=;;O' s#pportt!e emer$ency call mo"e.

;O'*H If t!e s#scrier "oes not !ave t!e isplayoption5 t!e *mer$ency I ill not e "isplaye". =llra"ios an" talk$ro#ps s!o#l" start it! "efa#ltpriorities. efa#lt is 17. SI'* 1 m#st e '%=capale.

'?(P

6=IO@1 ('%=) @ '=896OAP 16=IO@2 ('%=) @ '=896OAP 26=IO@3 ('%=) @ '=896OAP 36=IO@& ('%=) @ '=896OAP &6=IO@ (%=@only) @ '=896OAP 1;oteH '=896OAP 15 '=896OAP 25'=896OAP 35 an" '=896OAP & arepro$ramme" for LynamicL.

?+'I!9 1.717

&. (?'(

Step 1. 0erify t!e emer$ency type for '=896OAP1s template m#st e set #p as 'op of>#e#e.

Step 2. Sim#late a #sy system y "isalin$ allc!annels at SI'* 1 it! t!e e:ception of t!econtrol c!annel an" one voice c!annel.

Step 3. Initiate a call it! ot! 6=IO@2 an"6=IO@& an" !ol" t!e P'' sitc!es #ntilinstr#cte" to release.

Step &. 8ey 6=IO@3 an" verify t!e ra"io receives a#sy tone. 6elease t!e P'' sitc! on6=IO@3.

Step . Asin$ 6=IO@1 sen" an *mer$ency Call ypressin$ t!e emer$ency sitc! an" t!en t!eP'' sitc!. Oserve t!at 6=IO@1 cannottransmit "#e to t!e voice c!annel ein$#sy.

Step +. 6elease t!e P'' sitc! on [email protected] t!at 6=IO@3 receives t!e callack efore 6=IO@1 an" is ale to procee"it! t!e call eca#se t!e availale c!annel

reso#rce is alrea"y #sy it! one '%= callan" can only s#pport anot!er '%= call.

Step -. ekey 6=IO@& an" 6=IO@3.

Step . Oserve t!at 6=IO@1 receives t!e callackan" is ale to procee" it! t!e call.

Step 4. Oserve t!at t!e "isplay on 6=IO@"enotes an emer$ency an" t!e #nit I of6=IO@1.

Step 17. ekey 6=IO@1 an" e:it t!e *mer$ency

mo"e y !ol"in$ "on t!e *mer$ency#tton on 6=IO@1 #ntil an alert toneso#n"s. 0erify 6=IO@1 ret#rns to normaloperation.

PassKKKK FailKKKK 

%ont$omery Co#nty5 %arylan"Statement of Work

"4  

Statement of Work:

Page 154: Motorola SOW - Reviewed by MoCo PM 2015-09-22

7/23/2019 Motorola SOW - Reviewed by MoCo PM 2015-09-22

http://slidepdf.com/reader/full/motorola-sow-reviewed-by-moco-pm-2015-09-22 154/309

<ide 8rea (runking F,M8@(,M8 Mi%ed 'ites

J.$.2.7 Secure '+eration

1. ,?'$+IP(I!9

i$ital encryption is #se" to scramle a transmission

so only properly e/#ippe" an" confi$#re" ra"ios canmonitor t!e conversation. = L8eyL is #se" to encryptt!e transmit a#"io. Only ra"ios it! t!e same L8eyLcan "ecrypt t!e a#"io an" listen to it.

'?(P

6=IO@1 @ '=896OAP 1 (S*CA6* ' %O*)6=IO@2 @ '=896OAP 1 (S*CA6* ' %O*)6=IO@3 @ '=896OAP 1 (S*CA6* %O* an"no5 or incorrect key)

6=IO@& @ '=896OAP 1 (Clear ' %o"e)

;oteH '!e i"entical sec#re mo"e m#st epro$ramme" into 6=IO@15 6=IO@25 6=IO@& an"t!at 6=IO@3 !as no sec#re co"e loa"e" or !as a#ni/#e sec#re co"e from t!e ot!er testin$ ra"ios.

?+'I!9 1.7&7

&. (?'(

Step 1. Initiate a sec#re i"e area call it! 6=IO@1 on '=896OAP 1. 8eep t!is call inpro$ress #ntil instr#cte" to en" t!e call.

Step 2. Oserve t!at 6=IO@2 ill e ale tomonitor t!e call.

Step 3. Oserve t!at 6=IO@3 "oes not receive t!ecall.

Step &. Oserve t!at 6=IO@& ill also receive t!ecall even it! t!e sec#re sitc! set to t!enon@sec#re mo"e of operation.

Step . *n" t!e call from 6=IO@1.

Step +. 6espon" it! 6=IO@2 an" verify t!at6=IO@1 receives t!e response a#"io #t6=IO@3 cannot.

PassKKKK FailKKKK 

%ont$omery Co#nty5 %arylan"Statement of Work

Statement of Work: "4!

Page 155: Motorola SOW - Reviewed by MoCo PM 2015-09-22

7/23/2019 Motorola SOW - Reviewed by MoCo PM 2015-09-22

http://slidepdf.com/reader/full/motorola-sow-reviewed-by-moco-pm-2015-09-22 155/309

 

<ide 8rea (runking F,M8@(,M8 Mi%ed 'ites

J.$.2.8 ,ynamic ",M5,M 5alkgrou+ Call Mode Cange

1. ,?'$+IP(I!9

'!e 'alk$ro#p is t!e primary level of or$ani<ation for 

comm#nications on a tr#nke" 6a"io System. 6a"iosit! 'alk$ro#p Call capaility ill e ale tocomm#nicate it! ot!er memers of t!e same'alk$ro#p. '!is provi"es t!e effect of a privatec!annel "on to t!e 'alk$ro#p level. '!e%=D'%= mo"e of t!e call "epen"s on 'alk$ro#ppro$rammin$5 t!e capailities of ra"ios re$istere" tot!e talk$ro#p an" t!e capailities of t!e sites at!ic! t!ey are re$istere". '!e %=D'%= mo"eof a LynamicL 'alk$ro#p call "epen"s on t!ecapailities of t!e ra"ios re$istere" to t!e 'alk$ro#p.

 = '%= to %= mo"e c!an$e is prece"e" ytransmission tr#nkin$. = call in t!e %= mo"e

remains in t!at mo"e #ntil t!e call "rops. =n %=call ill not e transmission tr#nke" an" c!an$e" toa '%= call.

;oteH '!e %=D'%= mo"e of a call cannotc!an$e "#rin$ a P''. '=896OAP 1 an"'=896OAP 2 are pro$ramme" for LynamicL.

'?(P

6=IO@1 ('%=) @ '=896OAP 1

6=IO@2 ('%=) @ '=896OAP 16=IO@3 ('%=) @ '=896OAP 26=IO@ (%=@only) @ '=896OAP 1

?+'I!9 1.717

&. (?'(

Step 1. '#rn off 6=IO@.

Step 2. Initiate a i"e area call it! 6=IO@1 on'=896OAP 1. 8eep t!e call in pro$ress#ntil instr#cte" to en" it.

Step 3. Oserve t!at only 6=IO@2 ill e ale tomonitor an" respon" to t!e call. Oservet!at t!e c!annel is assi$ne" in t!e '%=mo"e since t!ere are no %=@only ra"iosin t!e call.

Step &. '#rn on 6=IO@. ;ote t!at 6=IO@cannot !ear t!e call5 !ic! is still in t!e

'%= mo"e.

Step . ekey 6=IO@1. Oserve t!at t!e c!annel"ekeys imme"iately.

Step +. Initiate a i"e area call it! 6=IO@1 on'=896OAP 1. 8eep t!e call in pro$ress#ntil instr#cte" to en" it.

Step -. Oserve t!at ot! 6=IO@2 an" 6=IO@ill no e ale to monitor an" respon" tot!e call. Oserve t!at t!e c!annel is noassi$ne" in t!e %= mo"e.

Step . '#rn off 6=IO@.

Step 4. ekey 6=IO@1 an" !ave 6=IO@2 initiatet!e call "#rin$ t!e !an$time. Oserve t!att!e c!annel is still assi$ne" in t!e %=mo"e.

PassKKKK FailKKKK 

%ont$omery Co#nty5 %arylan"Statement of Work

"5#  

Statement of Work:

Page 156: Motorola SOW - Reviewed by MoCo PM 2015-09-22

7/23/2019 Motorola SOW - Reviewed by MoCo PM 2015-09-22

http://slidepdf.com/reader/full/motorola-sow-reviewed-by-moco-pm-2015-09-22 156/309

<ide 8rea (runking F,M8@(,M8 Mi%ed 'ites

J.$.2.19 *n Call ser lert Ena&led

1. ,?'$+IP(I!9

In@Call Aser =lert en!ances t!e Call =lert feat#re to

allo Call =lerts to e receive" y ra"ios t!at arec#rrently involve" in voice an" "ata services. =s partof t!is feat#re5 t!e ra"io s#pports 'alk$ro#p %#tin$!ere t!e ra"io #ser can m#te all talk$ro#p voicereceive" y t!e ra"io. '!e Console ispatc!er oranot!er ra"io #ser can #nm#te t!e ra"io y sen"in$t!e ra"io a Call =lert.

;oteH 'alk$ro#p %#tin$ is a pro$rammale option int!e ra"io. '!ere are also s#@options t!at ill affectt!e time an" operation of t!e 'alk$ro#p m#tin$.

'?(P

6=IO@1 @ '=896OAP 16=IO@2 @ '=896OAP 2CO;SO*@1 @ '=896OAP 10erify t!at In@Call Aser =lert is enale" in t!e Anifie";etork Confi$#rator Wi<ar".

?+'I!9 1.7&7

&. (?'(

Step 1. 0erify t!at 6=IO@1 an" 6=IO@2 !ave'alk$ro#p %#tin$ (0%A') "isale" in t!era"ios.

Step 2. *nale 'alk$ro#p %#tin$ (0%A') on6=IO@1.

Step 3. 0erify t!at t!ere is a vis#al in"ication on6=IO@1 t!at 'alk$ro#p %#tin$ is enale".

Step &. Initiate a talk$ro#p call on '=896OAP 1from CO;SO*@1.

Step . 0erify t!at no a#"io is !ear" y 6=IO@1

an" t!at 6=IO@1 "isplays t!e I ofCO;SO*@1.

Step +. Sen" a Call =lert to 6=IO@1 from [email protected] t!at 6=IO@1 receives a Call =lertan" t!at 6=IO@2 in"icates s#ccess of Call

 =lert. 0erify t!at CO;SO*@1 a#"io is no!ear" y 6=IO@1

Step -. *n" Console talk$ro#p call.

Step . =cknole"$e Call =lert y !ittin$ !ome keyon 6=IO@1.

PassKKKK FailKKKK 

%ont$omery Co#nty5 %arylan"Statement of Work

Statement of Work: "5"

Page 157: Motorola SOW - Reviewed by MoCo PM 2015-09-22

7/23/2019 Motorola SOW - Reviewed by MoCo PM 2015-09-22

http://slidepdf.com/reader/full/motorola-sow-reviewed-by-moco-pm-2015-09-22 157/309

 

<ide 8rea (runking F,M8@(,M8 Mi%ed 'ites

J.$.2.11 ,ynamic ",M5,M Pri(ate Call

1. ,?'$+IP(I!9

Private Call is a selective callin$ feat#re t!at allos

a "ispatc!er or ra"io #ser to carry on one@to@oneconversation t!at is only !ear" y t!e to partiesinvolve". S#scrier #nits receivin$ a private call illso#n" an alert tone. =s it! ot!er types of calls5Private Calls can take place from any!ere in t!esystem. Private Calls alays occ#r in t!e LynamicLmo"e. '!e system "etermines !et!er t!e call is%= or '%= y t!e capailities of t!e to ra"iosan" t!e sites t!ey are affiliate" at.

'?(P

6=IO@1 ('%=) @ '=896OAP 16=IO@2 ('%=) @ '=896OAP 16=IO@ (%=@only) @ '=896OAP 1

?+'I!9 1.717

&. (?'(

Step 1. Asin$ 6=IO@15 press t!e Private Call (Call)#tton. *nter t!e #nit I of 6=IO@2 it! t!ekeypa"5 or scroll to t!e location !ere t!isI is store" an" press t!e P'' to initiate t!ePrivate Call.

Step 2. 0erify t!at 6=IO@2 !ears tones an" t!e"isplay in"icates t!at a Private Call !aseen receive"5 #t 6=IO@ receives noin"ications.

Step 3. =nser t!e call at 6=IO@2 y pressin$ t!ePrivate Call #tton. If 6=IO@2 !as a"isplay5 verify it s!os t!e I n#mer or

alias of 6=IO@1.

Step &. Press t!e P'' sitc! on 6=IO@2 an"respon" to t!e Private Call. ;ote t!at if yo#"o not press t!e Private Call #tton eforepressin$ P''5 yo#r a#"io ill e !ear" y allmemers of t!e talk$ro#p5 an" not y t!era"io initiatin$ t!e Private Call.

Step . 0erify t!at 6=IO@2 can comm#nicate it!6=IO@1. Oserve t!at t!e c!annel isassi$ne" in t!e '%= mo"e.

Step +. *n" t!e Private Call an" ret#rn to normaltalk$ro#p operation.

Step -. 6epeat t!e test sappin$ 6=IO@2 it!6=IO@ an" oserve t!at t!e c!annel isassi$ne" in t!e %= mo"e.

PassKKKK FailKKKK 

%ont$omery Co#nty5 %arylan"Statement of Work

"52  

Statement of Work:

Page 158: Motorola SOW - Reviewed by MoCo PM 2015-09-22

7/23/2019 Motorola SOW - Reviewed by MoCo PM 2015-09-22

http://slidepdf.com/reader/full/motorola-sow-reviewed-by-moco-pm-2015-09-22 158/309

<ide 8rea (runking F,M8@(,M8 Mi%ed 'ites

J.$.2.12 Multigrou+ CallD5,MA'nly ;rou+

1. ,?'$+IP(I!9

'!is tr#nkin$ feat#re allos an e/#ippe" ra"io #ser

to transmit an anno#ncement to several "ifferenttalk$ro#ps sim#ltaneo#sly. =s it! ot!er types ofcalls5 m#lti$ro#p calls can take place from any!erein t!e system. If t!e m#lti$ro#p is fla$$e" as '%=@only5 t!en t!e system re/#ires t!at all talk$ro#ps t!atare part of t!e m#lti$ro#p m#st e fla$$e" as '%=@only or "ynamic. If a "ynamic talk$ro#p c#rrentlyoperate" in %= mo"e is part of a '%= onlym#lti$ro#p5 t!en all t!e '%= #sers of t!e "ynamictalk$ro#p can $et t!e a#"io #t %= #sers of t!e"ynamic talk$ro#p cannot $et t!e a#"io from t!em#lti$ro#p call.

;oteH '=896OAP 5 '=896OAP + arepro$ramme" as LynamicL an" memers of ='9 3.

 ='9 3 is pro$ramme" as L'%=@onlyL.

'?(P

6=IO@1 ('%=) @ '=896OAP 6=IO@2 ('%=) @ '=896OAP +6=IO@& ('%=) @ ='9 36=IO@ (%=@only) @ '=896OAP +

?+'I!9 1.7&7

&. (?'(

Step 1. Asin$ 6=IO@&5 initiate a call on ='9 3.

Step 2. 0erify t!at 6=IO@1 an" 6=IO@2 canmonitor t!e call. Oserve t!at t!e c!annel isassi$ne" in t!e '%= mo"e.

Step 3. Oserve t!at 6=IO@ cannot monitor t!ecall eca#se it is not '%= capale.

PassKKKK FailKKKK 

%ont$omery Co#nty5 %arylan"Statement of Work

Statement of Work: "53

Page 159: Motorola SOW - Reviewed by MoCo PM 2015-09-22

7/23/2019 Motorola SOW - Reviewed by MoCo PM 2015-09-22

http://slidepdf.com/reader/full/motorola-sow-reviewed-by-moco-pm-2015-09-22 159/309

 

<ide 8rea (runking F,M8@(,M8 Mi%ed 'ites

J.$.2.13 Cannel Partitioning '+eration

1. ,?'$+IP(I!9

'!is feat#re provi"es e:cl#sive #se of "esi$nate"

6 c!annels for !i$! priority $ro#ps. '!is test ill"emonstrate t!at t!e calls elon$in$ to t!e !i$!priority $ro#p are steere" to t!e 6 c!annels t!atare "esi$nate".In t!is test case5 a secon" Aser 9ro#p (A92) ill econfi$#re". '!e Aser 9ro#p ill e assi$ne" to t!e'=896OAP profile. A92 ill e #se" for 6C!annel at SI'* 1 to e teste". '!is ill ens#ret!at A92 ill !ave e:cl#sive #se of C!annel .

;oteH In '%= operation5 ot! '%= time slots ont!e ,6 are assi$ne" to t!is Aser 9ro#p. C!annelPartitionin$ is a license" feat#re.

'?(P

6=IO@1 @ '=896OAP 16=IO@2 @ '=896OAP 6 C!annel assi$ne" to A92

?+'I!9 1.717

&. (?'(

Step 1. Initiate a talk$ro#p call on '=896OAP from 6=IO@2 on SI'* 1.

Step 2. 0erify t!at 6=IO@2 is assi$ne" 6 c!annel.

Step 3. 6elease t!e P'' an" ait for t!e talk$ro#pcall to en".

Step &. Initiate a talk$ro#p call from 6=IO@1 on'=896OAP 1 at SI'* 1.

Step . Oserve t!at t!e talk$ro#p call from 6=IO@1 is not assi$ne" 6 c!annel .

Step +. 6elease t!e P'' on 6=IO@1 an" ait #ntilt!e c!annel for t!e '=896OAP 1 call is"roppe". Initiate anot!er call on [email protected] t!at 6=IO@1 is a$ain assi$ne" to ac!annel ot!er t!an 6 c!annel .

Step -. 6epeat t!e process #ntil all c!annels !aveeen cycle" t!ro#$!. 0erify t!at 6 c!annel is not assi$ne" to t!e '=896OAP 1 call.

Step . Initiate a call on 6=IO@2 an" verify 6c!annel is assi$ne".

PassKKKK FailKKKK 

%ont$omery Co#nty5 %arylan"Statement of Work

"54 

Statement of Work:

Page 160: Motorola SOW - Reviewed by MoCo PM 2015-09-22

7/23/2019 Motorola SOW - Reviewed by MoCo PM 2015-09-22

http://slidepdf.com/reader/full/motorola-sow-reviewed-by-moco-pm-2015-09-22 160/309

J.8.3 S!" T+0&6& FDMATDMA M"/ S!"

J.$.3.1 Site 5runking *ndication

1. ,?'$+IP(I!9

W!en a remote site loses its link or "oes not !ave alink to t!e Fone Controller5 t!e affecte" site ill enter LSite 'r#nkin$L mo"e of operation. 6a"ios locke"onto t!is site ill e service" locally it!in t!is sitescovera$e area.

;O'*H If t!e s#scrier "oes not !ave t!e isplayoption5 t!e LSite 'r#nkin$L in"ication ill not e"isplaye".

'?(P

6=IO@1 @ '=896OAP 16=IO@2 @ '=896OAP 2

?+'I!9 1.717

&. (?'(

Step 1. Place SI'* 1 into t!e Site 'r#nkin$ mo"e.

Step 2. 0erify t!at 6=IO@1 an" 6=IO@2 are"isplayin$ t!e LSite 'r#nkin$L in"ication.

Step 3. 6et#rn t!e site to Wi"e =rea 'r#nkin$ #nlesst!e ne:t test re/#ires Site 'r#nkin$.

PassKKKK FailKKKK 

%ont$omery Co#nty5 %arylan"Statement of Work

Statement of Work: "55 

Page 161: Motorola SOW - Reviewed by MoCo PM 2015-09-22

7/23/2019 Motorola SOW - Reviewed by MoCo PM 2015-09-22

http://slidepdf.com/reader/full/motorola-sow-reviewed-by-moco-pm-2015-09-22 161/309

 

'ite (runking F,M8@(,M8 Mi%ed 'ites

J.$.3.2 Call lert

1. ,?'$+IP(I!9

Call =lert is a tone pa$e t!at allos a #ser to

selectively alert anot!er ra"io #nit. W!en a site is inSite 'r#nkin$5 6a"ios at t!e site ill only e ale toCall =lert ot!er ra"ios at t!e same site. '!e initiatin$ra"io ill receive notification from t!e tr#nke"system as to !et!er or not t!e pa$e as receive"y t!e tar$et ra"io.

'?(P

6=IO@1 @ '=896OAP 16=IO@2 @ '=896OAP 2

?+'I!9 1.717

&. (?'(

Step 1. Place SI'* 1 into t!e Site 'r#nkin$ mo"e.

Step 2. Asin$ 6=IO@15 press t!e pa$e #tton.

Step 3. *nter t!e Anit I of 6=IO@2 it! t!ekeypa"5 or scroll to t!e location !ere t!isI is store".

Step &. Press t!e P'' to initiate t!e Call =lert.

Step . 0erify t!at 6=IO@2 receive" t!e Call =lert.

Step +. *:it t!e Call =lert mo"e an" ret#rn to normaltalk$ro#p mo"e.

Step -. 6et#rn t!e site to Wi"e =rea 'r#nkin$ #nlesst!e ne:t test re/#ires Site 'r#nkin$.

PassKKKK FailKKKK 

%ont$omery Co#nty5 %arylan"Statement of Work

"56  

Statement of Work:

Page 162: Motorola SOW - Reviewed by MoCo PM 2015-09-22

7/23/2019 Motorola SOW - Reviewed by MoCo PM 2015-09-22

http://slidepdf.com/reader/full/motorola-sow-reviewed-by-moco-pm-2015-09-22 162/309

'ite (runking F,M8@(,M8 Mi%ed 'ites

J.$.3.3 Pri(ate Call

1. ,?'$+IP(I!9

Private Call is a selective callin$ feat#re t!at allos

a "ispatc!er or ra"io #ser to carry on one@to@oneconversation t!at is only !ear" y t!e to partiesinvolve". W!en a site is in Site 'r#nkin$5 6a"ios att!e site ill only e ale to Private Call ot!er ra"iosat t!e same site.

'?(P

6=IO@1 @ '=896OAP 16=IO@2 @ '=896OAP 16=IO@3 @ '=896OAP 1

?+'I!9 1.7&7

&. (?'(

Step 1. Place SI'* 1 into t!e Site 'r#nkin$ mo"e.

Step 2. Asin$ 6=IO@15 press t!e Private Call#tton.

Step 3. *nter t!e Anit I of 6=IO@2 it! t!ekeypa"5 or scroll to t!e location !ere t!isI is store".

Step &. Press t!e P'' to initiate t!e call.

Step . 0erify t!at at 6=IO@25 only tones are !ear"an" t!e "isplay in"icates t!at a call !aseen receive".

Step +. =nser t!e call at 6=IO@2 y pressin$ t!ePrivate CallD6espon" #tton. 0erify its"isplay s!os t!e I n#mer or alias of t!ecallin$ #nit.

Step -. Press t!e P'' sitc! on 6=IO@2 an"respon" to t!e call. ;ote t!at if yo# "o notpress t!e Private Call #tton efore pressin$P''5 yo#r a#"io ill e !ear" y allmemers of t!e talk$ro#p5 an" not y t!era"io initiatin$ t!e Private Call.

Step . 0erify only 6=IO@1 !ears t!e a#"io from6=IO@2.

Step 4. *n" t!e Private Call. 6et#rn t!e site to Wi"e =rea 'r#nkin$ #nless t!e ne:t test re/#iresSite 'r#nkin$.

PassKKKK FailKKKK 

%ont$omery Co#nty5 %arylan"Statement of Work

Statement of Work: "57 

Page 163: Motorola SOW - Reviewed by MoCo PM 2015-09-22

7/23/2019 Motorola SOW - Reviewed by MoCo PM 2015-09-22

http://slidepdf.com/reader/full/motorola-sow-reviewed-by-moco-pm-2015-09-22 163/309

 

'ite (runking F,M8@(,M8 Mi%ed 'ites

J.$.3.4 Continuous ssignment +dating

1. ,?'$+IP(I!9

W!en a talk$ro#p is assi$ne" a voice c!annel5 t!e

site controller contin#es to transmit t!e c!annelassi$nment on t!e control c!annel for t!e "#ration of t!e 'alk$ro#p Call. 6a"ios comin$ into #se on t!esystem are a#tomatically sent to voice c!annels it!conversations in pro$ress involvin$ t!eir selecte"talk$ro#ps.

'?(P

6=IO@1 @ '=896OAP 16=IO@2 @ '=896OAP 1

6=IO@3 @ '=896OAP 1

?+'I!9 1.717

&. (?'(

Step 1. Place SI'* 1 into t!e Site 'r#nkin$ mo"e.

Step 2. '#rn O 6=IO@1.

Step 3. Initiate a 'alk$ro#p Call #sin$ 6=IO@2.

Step &. W!ile t!e 'alk$ro#p Call is in pro$ress5 t#rnon 6=IO@1.

Step . Oserve t!at 6=IO@15 !ic! as j#stro#$!t ack into service5 joins t!e'alk$ro#p Call alrea"y in pro$ress.

Step +. 6elease t!e P'' of 6=IO@2. Sitc!

6=IO@1 to '=896OAP 2.

Step -. Initiate a 'alk$ro#p Call #sin$ 6=IO@2.

Step . W!ile t!e 'alk$ro#p Call is in pro$ress5 t#rn6=IO@1 ack to '=896OAP 1.

Step 4. Oserve t!at 6=IO@15 !ic! as j#st setack to '=896OAP 15 joins t!e 'alk$ro#pCall alrea"y in pro$ress.

Step 17. 6et#rn t!e site to Wi"e =rea 'r#nkin$ #nlesst!e ne:t test re/#ires Site 'r#nkin$.

PassKKKK FailKKKK 

%ont$omery Co#nty5 %arylan"Statement of Work

"5  

Statement of Work:

Page 164: Motorola SOW - Reviewed by MoCo PM 2015-09-22

7/23/2019 Motorola SOW - Reviewed by MoCo PM 2015-09-22

http://slidepdf.com/reader/full/motorola-sow-reviewed-by-moco-pm-2015-09-22 164/309

'ite (runking F,M8@(,M8 Mi%ed 'ites

J.$.3.! ,ynamic ",M5,M Emergency larm and Call

1. ,?'$+IP(I!9

Asers in life t!reatenin$ sit#ations can #se t!e

*mer$ency #tton on t!e ra"io to imme"iately sen"a si$nal to t!e "ispatc!er an" e assi$ne" t!e ne:tavailale voice c!annel if t!e %=D'%= mo"e oft!e call can e s#pporte" y t!e availale reso#rce.Ot!erise5 t!e first call in t!e /#e#e t!at can es#pporte" y t!e availale reso#rces is assi$ne". 'o"emonstrate t!is5 an *mer$ency =larm an" Call ille initiate" from a s#scrier5 !ic! ill e receive"y a s#scrier affiliate" at any site of any <one int!e system. In t!is case5 t!e first availale reso#rceC=;;O' s#pport t!e %= call mo"e.

;oteH In Site 'r#nkin$5 t!e mo"e of all calls is

"ynamically "etermine" y t!e Site Controller an"*mer$ency Call operation is alays 'op of >#e#e. If t!e s#scrier "oes not !ave t!e isplay option5 t!e*mer$ency I ill not e "isplaye".

'?(P

6=IO@1 ('%=) @ '=896OAP 16=IO@3 ('%=) @ '=896OAP 26=IO@& ('%=) @ '=896OAP 36=IO@ ('%=) @ '=896OAP &

6=IO@ (%=@only) @ '=896OAP 1

?+'I!9 1.717

&. (?'(

Step 1. Place SI'* 1 into t!e Site 'r#nkin$ mo"e.Sim#late a #sy system y "isalin$ allc!annels at SI'* 1 it! t!e e:ception of t!econtrol c!annel an" one voice c!annel.

Step 2. Initiate calls it! ot! 6=IO@3 an" 6=IO@ an" keep t!ese calls in pro$ress #ntilinstr#cte" to release.

Step 3. 8ey 6=IO@& an" verify t!e ra"io receives a#sy tone.

Step &. Asin$ 6=IO@1 sen" an *mer$ency Call ypressin$ t!e emer$ency sitc! an" t!en t!e

P'' sitc!.

Step . Oserve t!at 6=IO@1 cannot transmit "#eto t!e voice c!annel ein$ #sy. *n" t!e callon 6=IO@3.

Step +. Oserve t!at 6=IO@& receives t!e callack efore 6=IO@1 an" is ale to procee"it! t!e call eca#se t!e availale c!annelreso#rce can only s#pport a '%= call.

Step -. ekey 6=IO@ an" 6=IO@&. Oserve t!at6=IO@1 receives t!e callack an" is ale

to procee" it! t!e call.

Step . Oserve t!at t!e "isplay on 6=IO@"enotes an emer$ency an" t!e #nit I oralias of 6=IO@1.

Step 4. ekey 6=IO@1 an" en" t!e *mer$encyCall y !ol"in$ "on t!e *mer$ency #ttonon 6=IO@1 #ntil an alert tone so#n"s.0erify 6=IO@1 ret#rns to normal operation.

Step 17. 6et#rn t!e site to Wi"e =rea 'r#nkin$ #nlesst!e ne:t test re/#ires Site 'r#nkin$.

PassKKKK FailKKKK 

%ont$omery Co#nty5 %arylan"Statement of Work

Statement of Work: "5!

Page 165: Motorola SOW - Reviewed by MoCo PM 2015-09-22

7/23/2019 Motorola SOW - Reviewed by MoCo PM 2015-09-22

http://slidepdf.com/reader/full/motorola-sow-reviewed-by-moco-pm-2015-09-22 165/309

 

'ite (runking F,M8@(,M8 Mi%ed 'ites

J.$.3.$ ,ynamic ",M5,M Pri(ate Call

1. ,?'$+IP(I!9

Private Call is a selective callin$ feat#re t!at allos

a "ispatc!er or ra"io #ser to carry on one@to@oneconversation t!at is only !ear" y t!e to partiesinvolve". W!en a site is in Site 'r#nkin$5 ra"ios att!e site ill only e ale to Private Call ot!er ra"iosat t!e same site. '!e system "etermines !et!ert!e call is %= or '%= y t!e capailities of t!eto ra"ios an" t!e site for !ic! t!ey are affiliate".;O'*H If t!e s#scrier "oes not !ave t!e isplayoption5 t!e I ill not e "isplaye".

'?(P

6=IO@1 ('%=) @ '=896OAP 16=IO@2 ('%=) @ '=896OAP 16=IO@ (%=@only) @ '=896OAP 1

?+'I!9 1.717

&. (?'(

Step 1. Place SI'* 1 into Site 'r#nkin$.

Step 2. Asin$ 6=IO@15 press t!e Private Call (Call)#tton. *nter t!e #nit I of 6=IO@2 it! t!ekeypa"5 or scroll to t!e location !ere t!isI is store" an". press t!e P'' to initiate t!ePrivate Call.

Step 3. 0erify t!at 6=IO@2 !ears tones an" t!e"isplay in"icates t!at a Private Call !aseen receive"5 #t 6=IO@ receives noin"ications.

Step &. =nser t!e call at 6=IO@2 y pressin$ t!e

Private Call #tton. 0erify 6=IO@2 s!ost!e I or alias of 6=IO@1.

Step . Press t!e P'' sitc! on 6=IO@2 an"respon" to t!e Private Call. ;ote t!at if yo#"o not press t!e Private Call #tton eforepressin$ P''5 yo#r a#"io ill e !ear" y allmemers of t!e talk$ro#p5 an" not y t!era"io initiatin$ t!e Private Call.

Step +. 0erify t!at 6=IO@2 can comm#nicate it!6=IO@1. Oserve t!at t!e c!annel isassi$ne" in t!e '%= mo"e.

Step -. *n" t!e Private Call an" ret#rn to normaltalk$ro#p operation.

Step . 6epeat t!is test sappin$ 6=IO@2 it!6=IO@ an" oserve t!e c!annel isassi$ne" in t!e %= mo"e.

Step 4. 6et#rn t!e site to Wi"e =rea 'r#nkin$ #nlesst!e ne:t test re/#ires Site 'r#nkin$.

PassKKKK FailKKKK 

%ont$omery Co#nty5 %arylan"Statement of Work

"6#  

Statement of Work:

Page 166: Motorola SOW - Reviewed by MoCo PM 2015-09-22

7/23/2019 Motorola SOW - Reviewed by MoCo PM 2015-09-22

http://slidepdf.com/reader/full/motorola-sow-reviewed-by-moco-pm-2015-09-22 166/309

J.8. MCC 94;; T+0&6"/ R"0+-"

J.$.4.1 *nstant 5ransmit

1. ,?'$+IP(I!9

'!e instant transmit sitc! provi"es imme"iateoperator access to a c!annel5 in"epen"ent of itsselect stat#s (selecte" or #nselecte"). It provi"espriority over ot!er "ispatc!er transmit ars oroptional footsitc!es.

'?(P

6=IO@1 @ '=896OAP 1CO;SO*@1E'=896OAP 1 (Selecte")5

'=896OAP 2 (Anselect mo"e)

?+'I!9 1.717

&. (?'(

Step 1. Asin$ CO;SO*@15 press t!e Instant'ransmit #tton on '=896OAP 1.

Step 2. 0erify t!at t!e 'ransmit in"icator is lit.

Step 3. 0erify 6=IO@1 can monitor an" respon" tot!e call on '=896OAP 1.

Step &. On 6=IO@1 c!an$e to '=896OAP 2.

Step . Asin$ CO;SO*@15 press t!e Instant'ransmit #tton on t!e '=896OAP 2 ra"io

reso#rce.

Step +. 0erify 6=IO@1 can monitor an" respon" tot!e call on '=896OAP 2.

PassKKKK FailKKKK 

%ont$omery Co#nty5 %arylan"Statement of Work

Statement of Work: "6"

Page 167: Motorola SOW - Reviewed by MoCo PM 2015-09-22

7/23/2019 Motorola SOW - Reviewed by MoCo PM 2015-09-22

http://slidepdf.com/reader/full/motorola-sow-reviewed-by-moco-pm-2015-09-22 167/309

 

M$$ 377 (runked +esources

J.$.4.2 5alkgrou+ Selection and Call

1. ,?'$+IP(I!9

'!e 'alk$ro#p Call is t!e primary level of

or$ani<ation for comm#nications on a tr#nke" 6a"ioSystem. ispatc!ers it! 'alk$ro#p Call capailityill e ale to comm#nicate it! ot!er memers oft!e same talk$ro#p. '!is provi"es t!e effect of anassi$ne" c!annel "on to t!e talk$ro#p level. W!ena 'alk$ro#p Call is initiate" from a s#scrier #nit5t!e call is in"icate" on eac! "ispatc! operatorposition t!at !as a c!annel control reso#rceassociate" it! t!e #nits c!annelDtalk$ro#p.

'?(P

6=IO@1 @ '=896OAP 16=IO@2 @ '=896OAP 26=IO@3 @ '=896OAP 16=IO@& @ '=896OAP 2CO;SO*@1 @ '=896OAP 1CO;SO*@2 @ '=896OAP 2

?+'I!9 1.717

&. (?'(

Step 1. Initiate a i"e area call from CO;SO*@1on '=896OAP 1.

Step 2. Oserve t!at 6=IO@1 an" 6=IO@3 ill eale to monitor t!e call. ekey t!e consolean" !ave eit!er ra"io respon" to t!e call.

Step 3. Oserve t!at all consoles it! '=896OAP1 can monitor ot! si"es of t!econversation.

Step &. Initiate a i"e area call from CO;SO*@2on '=896OAP 2.

Step . Oserve t!at 6=IO@2 an" 6=IO@& ill eale to monitor t!e call. ekey t!e consolean" !ave eit!er ra"io respon" to t!e call.

Step +. Oserve t!at all consoles it! '=896OAP2 can monitor ot! si"es of t!econversation.

PassKKKK FailKKKK 

%ont$omery Co#nty5 %arylan"Statement of Work

"62  

Statement of Work:

Page 168: Motorola SOW - Reviewed by MoCo PM 2015-09-22

7/23/2019 Motorola SOW - Reviewed by MoCo PM 2015-09-22

http://slidepdf.com/reader/full/motorola-sow-reviewed-by-moco-pm-2015-09-22 168/309

M$$ 377 (runked +esources

J.$.4.3 Emergency larm and Call ,is+lay ,escri+tion

1. ,?'$+IP(I!9

Asers in life t!reatenin$ sit#ations can #se t!e

emer$ency #tton on t!e ra"io to sen" an a#"ilealarm an" a vis#al alarm si$nal to a consoleoperator in or"er to re/#est imme"iate systemaccess to a voice c!annel for an emer$ency call.

 =n emer$ency alarm e$ins after t!e ra"io #serpresses t!e ra"ios emer$ency #tton. Pressin$ t!eemer$ency #tton places t!e ra"io in Lemer$encymo"eL. 'o e$in an emer$ency call5 t!e ra"io #serm#st press t!e ra"ios P'' #tton !ile inLemer$ency mo"e.L '!e assi$ne" voice c!annel ille "e"icate" to t!e emer$ency callers talk$ro#p foran e:ten"e" perio" of time5 e/#al to t!e %essa$eBan$ 'ime pl#s t!e *mer$ency Ban$ 'ime. =s it!

ot!er call types5 emer$ency calls can operate acrosssites as ell as it!in t!e same site.

'?(P

6=IO@1 @ '=896OAP 1CO;SO*@1 @ '=896OAP 1CO;SO*@2 @ '=896OAP 1

?+'I!9 1.717

&. (?'(

Step 1. Initiate an *mer$ency =larm from 6=IO@1.

Step 2. Oserve t!e *mer$ency from 6=IO@1 isreceive" at CO;SO*@1 for '=896OAP1.

Step 3. =cknole"$e t!e *mer$ency at t!e operator position. 0erify CO;SO*@2 receivesnotification t!at t!e call !as eenacknole"$e".

Step &. Initiate a call it! 6=IO@1 to initiate an*mer$ency call.

Step . Oserve CO;SO*@1 an" CO;SO*@2 canmonitor 6=IO@1.

Step +. Clear t!e *mer$ency from CO;SO*@1 on'=896OAP 1.

Step -. *n" t!e *mer$ency =larm from 6=IO@1.

PassKKKK FailKKKK 

%ont$omery Co#nty5 %arylan"Statement of Work

Statement of Work: "63

Page 169: Motorola SOW - Reviewed by MoCo PM 2015-09-22

7/23/2019 Motorola SOW - Reviewed by MoCo PM 2015-09-22

http://slidepdf.com/reader/full/motorola-sow-reviewed-by-moco-pm-2015-09-22 169/309

 

M$$ 377 (runked +esources

J.$.4.4 Multigrou+ Call

1. ,?'$+IP(I!9

'!is tr#nkin$ feat#re allos an e/#ippe" console

operator position to transmit an anno#ncement toseveral "ifferent talk$ro#ps sim#ltaneo#sly. =s it!'alk$ro#p Calls5 m#lti$ro#p calls operate acrosssites as ell as it!in t!e same site.

'?(P

6=IO@1 @ '=896OAP 16=IO@2 @ '=896OAP 26=IO@3 @ 6=;O%CO;SO*@1 @ ='9 1

;oteH '=896OAP 1 an" '=896OAP 2 arememers of ='9 1. 6=;O% is any talk$ro#p not amemer of ='9 1.

?+'I!9 1.717

&. (?'(

Step 1. Asin$ CO;SO*@15 select t!e ='9 1reso#rce.

Step 2. Initiate t!e %#lti$ro#p Call from CO;SO*@1.

Step 3. Oserve t!at 6=IO@1 an" 6=IO@2receive t!e %#lti$ro#p Call.

Step &. 0erify t!at 6=IO@3 "oes not receive t!e%#lti$ro#p Call eca#se it is not a memerof ='9 1.

Step . =nser t!e %#lti$ro#p Call #sin$ 6=IO@1

an" oserve CO;SO*@1 receives t!eresponse.

Step +. 0erify t!at if t!e call is ansere" it!in t!erepeater !an$ time5 t!e console ill receivet!e call on t!e ='9 1 reso#rce tileMot!erise5 t!e console ill receive t!e callon t!e '=896OAP 1 tile.

Step -. 0erify t!at if t!e call is ansere" it!in t!erepeater !an$ time5 6=IO@2 ill monitort!e call.

PassKKKK FailKKKK 

%ont$omery Co#nty5 %arylan"Statement of Work

"64 

Statement of Work:

Page 170: Motorola SOW - Reviewed by MoCo PM 2015-09-22

7/23/2019 Motorola SOW - Reviewed by MoCo PM 2015-09-22

http://slidepdf.com/reader/full/motorola-sow-reviewed-by-moco-pm-2015-09-22 170/309

M$$ 377 (runked +esources

J.$.4.! MultiASelect '+eration

1. ,?'$+IP(I!9

%#lti@Select (%sel) allos t!e console operator to

$ro#p a n#mer of c!annelsDtalk$ro#ps to$et!ers#c! t!at !en t!e $eneral transmit ar is"epresse"5 all of t!e m#lti@selecte"c!annelsDtalk$ro#ps ill transmit at t!e same timeit! t!e same information. %#lti@Select is one@aycomm#nication call. If a ra"io #ser respon"s to a%#lti@Select call5 t!e talk$ro#p t!e #ser is affiliate" toill e t!e only one to !ear t!e call. '!ere is nos#per@$ro#p forme"5 so ra"io comm#nication is stillat t!e sin$le talk$ro#p level. %#lti@Select is #tili<e" tosen" an =P, to several c!annelsDtalk$ro#ps. = %#lti@Select !as a limit of tenty (27)tr#nkin$Dconventional reso#rces

'?(P

6=IO@1 @ '=896OAP 16=IO@2 @ '=896OAP 2CO;SO*@1 @ '=896OAP 15 '=896OAP 2

?+'I!9 1.717

&. (?'(

Step 1. rom CO;SO*@15 create an %sel $ro#pit! '=896OAP 1 an" '=896OAP 2.

Step 2. 'ransmit on t!e %sel #sin$ t!e %sel instanttransmit #tton.

Step 3. 0erify t!at 6=IO@1 an" 6=IO@2 !ear t!ecall.

Step &. Initiate a call it! 6=IO@1.

Step . 0erify t!e call is !ear" on CO;SO*@1 #tnot on 6=IO@2.

Step +. Initiate a call it! 6=IO@2.

Step -. 0erify t!e call is !ear" on CO;SO*@1 #tnot on 6=IO@1.

Step . On CO;SO*@15 "issolve t!e %sel.

PassKKKK FailKKKK 

%ont$omery Co#nty5 %arylan"Statement of Work

Statement of Work: "65 

Page 171: Motorola SOW - Reviewed by MoCo PM 2015-09-22

7/23/2019 Motorola SOW - Reviewed by MoCo PM 2015-09-22

http://slidepdf.com/reader/full/motorola-sow-reviewed-by-moco-pm-2015-09-22 171/309

 

M$$ 377 (runked +esources

J.$.4.$ 5alkgrou+ Patc

1. ,?'$+IP(I!9

'alk$ro#p Patc! allos a "ispatc!er to mer$e

several talk$ro#ps to$et!er on one voice c!annel toparticipate in a sin$le conversation. '!is can e#se" for sit#ations involvin$ to or more talk$ro#pst!at nee" to comm#nicate it! eac! ot!er.Asin$ t!e Patc! feat#re5 t!e console operator cantalk an" listen to all of t!e selecte" talk$ro#ps$ro#pe"M in a""ition5 t!e memers of t!e in"ivi"#altalk$ro#ps can also talk or listen to memers ofot!er talk$ro#ps. Patc!e" talk$ro#ps cancomm#nicate it! t!e console "ispatc!er an" ot!ermemers of "ifferent talk$ro#ps eca#se of t!eLs#per$ro#pL nat#re of t!e Patc! feat#re.

;O'*H If Lsec#reL an" LclearL reso#rces are patc!e"to$et!er5 one repeater for eac! mo"e may eassi$ne" per site.

'?(P

6=IO@1 @ '=896OAP 16=IO@2 @ '=896OAP 26=IO@3 @ '=896OAP 16=IO@& @ '=896OAP 2CO;SO*@1 @ '=896OAP 1 an" '=896OAP 2

;oteH =ll fo#r 6a"ios m#st !ave t!e same !ome<one.

?+'I!9 1.717

&. (?'(

Step 1. Asin$ CO;SO*@1 create a patc! eteen'=896OAP 1 an" '=896OAP 2.

Step 2. Initiate a patc! call from CO;SO*@1.

Step 3. 0erify 6=IO@15 6=IO@25 6=IO@35 an"6=IO@& can monitor t!e call.

Step &. Initiate several calls eteen t!e ra"ios an"verify s#ccessf#l comm#nication.

Step . issolve t!e patc! create" in step 1.

PassKKKK FailKKKK 

%ont$omery Co#nty5 %arylan"Statement of Work

"66  

Statement of Work:

Page 172: Motorola SOW - Reviewed by MoCo PM 2015-09-22

7/23/2019 Motorola SOW - Reviewed by MoCo PM 2015-09-22

http://slidepdf.com/reader/full/motorola-sow-reviewed-by-moco-pm-2015-09-22 172/309

M$$ 377 (runked +esources

J.$.4.6 lert 5onesD5alkgrou+

1. ,?'$+IP(I!9

Pre@"efine" alert tones can e transmitte" on t!e

selecte" 6a"io 6eso#rce to s#scriers5 !ic! canalert memers of a c!annel Dtalk$ro#p to a partic#larevent or si$nify to ra"io #sers special instr#ctionsare to follo. '!e Console !as t!e aility to sen" an

 =lert@'one si$nal on selecte" conventional ortalk$ro#p reso#rces.

'?(P

6=IO@1 @ '=896OAP 16=IO@2 @ '=896OAP 1

CO;SO*@1 @ '=896OAP 1

?+'I!9 1.77

&. (?'(

Step 1. Select '=896OAP 1 on CO;SO*@1.

Step 2. Select =lert 'one 1 an" "epress t!e =lert'one #tton.

Step 3. 0erify t!at 6=IO@1 an" 6=IO@2 !ear =lert'one 1.

Step &. 6epeat Steps 2@3 for =lert 'one 2 an" 3.

PassKKKK FailKKKK 

%ont$omery Co#nty5 %arylan"Statement of Work

Statement of Work: "67 

Page 173: Motorola SOW - Reviewed by MoCo PM 2015-09-22

7/23/2019 Motorola SOW - Reviewed by MoCo PM 2015-09-22

http://slidepdf.com/reader/full/motorola-sow-reviewed-by-moco-pm-2015-09-22 173/309

 

M$$ 377 (runked +esources

J.$.4.7 Call lert

1. ,?'$+IP(I!9

Call =lert Pa$e allos a s#scrierD"ispatc!er to

selectively alert anot!er ra"io #nit. '!e initiatin$s#scrierDconsole ill receive notification as to!et!er or not t!e call alert as receive". Anitsreceivin$ a Call =lert ill so#n" an alert tone an"s!o a vis#al alert in"ication. '!e "isplay ill alsos!o t!e in"ivi"#al I of t!e initiatin$s#scrierDconsole #nit.

'?(P

6=IO@1 @ '=896OAP 1

CO;SO*@1 @ '=896OAP 1

?+'I!9 1.77

&. (?'(

Step 1. Asin$ CO;SO*@15 select t!e call alert#tton in t!e LPrivate CallL reso#rce in"o.

Step 2. *nter t!e I of 6=IO@1 an" sen" t!e callalert to 6=IO@1.

Step 3. 0erify t!at 6=IO@1 receives t!e alert an"t!at t!e I or alias of t!e console is s!on.

Step &. '#rn off 6=IO@1.

Step . Asin$ CO;SO*@15 sen" t!e call alert to6=IO@1 a$ain.

Step +. 0erify t!at after tryin$ to pa$e 6=IO@15 t!econsole "isplays LCannot sen" call alert @tar$et not fo#n"L in t!e s#mmaryDstat#s list.

PassKKKK FailKKKK 

%ont$omery Co#nty5 %arylan"Statement of Work

"6  

Statement of Work:

Page 174: Motorola SOW - Reviewed by MoCo PM 2015-09-22

7/23/2019 Motorola SOW - Reviewed by MoCo PM 2015-09-22

http://slidepdf.com/reader/full/motorola-sow-reviewed-by-moco-pm-2015-09-22 174/309

M$$ 377 (runked +esources

J.$.4.8 Console *nitiated Pri(ate Call to Su&scri&er

1. ,?'$+IP(I!9

Private Conversation is a selective callin$ feat#re5

!ic! allos a "ispatc!er or ra"io #ser to carry onone@to@one conversation t!at is !ear" only y t!eto parties involve". S#scrier #nits receivin$ aprivate call ill so#n" an alert tone. =s it! ot!er calltypes5 Private Calls operate across sites as ell asit!in t!e same site.

'?(P

6=IO@1 @ '=896OAP 16=IO@2 @ '=896OAP 1

CO;SO*@1 @ '=896OAP 1

?+'I!9 1.7&7

&. (?'(

Step 1. Asin$ CO;SO*@15 select t!e LP6I0='*@C=L tile an" click t!e Private Call f#nction.

Step 2. Select t!e #nit to e Private Calle"5 in t!iscase 6=IO@1 (or select t!e n#merickeypa" an" enter t!e Anit I to e PrivateCalle").

Step 3. Click t!e Sen" #tton.

Step &. =nser t!e Private Call it! 6=IO@1 an"respon" to t!e console.

Step . 0erify 6=IO@2 "oes not !ear t!e private

conversation.

Step +. =fter completin$ t!e Private Call5 ret#rn tot!e normal talk$ro#p mo"e.

PassKKKK FailKKKK 

%ont$omery Co#nty5 %arylan"Statement of Work

Statement of Work: "6!

Page 175: Motorola SOW - Reviewed by MoCo PM 2015-09-22

7/23/2019 Motorola SOW - Reviewed by MoCo PM 2015-09-22

http://slidepdf.com/reader/full/motorola-sow-reviewed-by-moco-pm-2015-09-22 175/309

 

M$$ 377 (runked +esources

J.$.4.19 Console Priority

1. ,?'$+IP(I!9

Console Operator Positions !ave #ltimate control of

transmitte" a#"io on an assi$ne" voice c!annelreso#rce. '!e Console Position !as t!e capaility totake control of an assi$ne" voice c!annel for atalk$ro#p call so t!at t!e operators a#"io overri"esany s#scrier a#"io. Console priority is a feat#ret!at enales "ispatc!ers to $ain imme"iate accessto an assi$ne" voice c!annel so t!at a central pointof a#"io control e:ists.

'?(P

6=IO@1 @ '=896OAP 16=IO@2 @ '=896OAP 1CO;SO*@1 @ '=896OAP 1

?+'I!9 1.7&7

&. (?'(

Step 1. Initiate a 'alk$ro#p call from 6=IO@1 on'=896OAP 1. 8eep t!is call in pro$ress#ntil t!e test !as complete".

Step 2. Oserve t!at 6=IO@2 receives t!e call.

Step 3. W!ile t!e call is in pro$ress5 key #pCO;SO*@1 on '=896OAP 1.

Step &. Oserve t!at 6=IO@2 is no receivin$a#"io from CO;SO*@1 on '=896OAP 1.

Step . e@key CO;SO*@1.

Step +. 0erify 6=IO@2 no receives 6=IO@1a#"io.

Step -. *n" t!e '=896OAP 1 call from 6=IO@1.

PassKKKK FailKKKK 

%ont$omery Co#nty5 %arylan"Statement of Work

"7#  

Statement of Work:

Page 176: Motorola SOW - Reviewed by MoCo PM 2015-09-22

7/23/2019 Motorola SOW - Reviewed by MoCo PM 2015-09-22

http://slidepdf.com/reader/full/motorola-sow-reviewed-by-moco-pm-2015-09-22 176/309

M$$ 377 (runked +esources

J.$.4.11 cti(ity Log

1. ,?'$+IP(I!9

'!e Console activity lo$ ill s!o all traffic for t!e

reso#rce assi$ne" to t!at console to incl#"e t!etime5 ra"io alias5 '95 P'' I5 an" *mer$ency Call.

'!e "ispatc!er !as t!e capaility of selectin$ alo$$e" call it!in in t!e L=ctivity o$ Win"oL forinstant transmit on t!e correspon"in$ lo$$e"reso#rce.

'!is activity lo$ can e lo$$e" to a te:t file forarc!ival p#rposes.

;oteH '!e lo$ file in t!e ops ill only e seen if yo#first c!eck o$ =ctivity in *lite ="min application

t!en in fol"er options5 #nc!eck Bi"e Bi""en Systemiles. '!e location ill e cHYPro$ram ataY%CC-77Y%essa$e%onitoro$s.

'?(P

6=IO@1 @ '=896OAP 16=IO@2 @ '=896OAP 26=IO@3 @ '=896OAP 36=IO@& @ '=896OAP &CO;SO*@1 @ '=896OAP 15 '=896OAP 25

'=896OAP 35 '=896OAP &

?+'I!9 1.7&7

&. (?'(

Step 1. On CO;SO*@15 select t!e LS!o =ctivityo$L #tton on t!e tool ar to open t!e

 =ctivity o$ Win"o.

Step 2. Initiate calls on 6=IO@15 6=IO@25 6=IO@35 an" 6=IO@& to lo$ call information an"verify calls are "isplaye" in t!e activity lo$in"o.

Step 3. Select a lo$$e" call in t!e =ctivity o$Win"o an" verify t!at t!e C!annel ControlWin"o (CCW) at t!e top of t!e =ctivity lo$in"o c!an$es to t!e correspon"in$reso#rce. 0erify t!e "ispatc!er is capale of

respon"in$ via t!e instant transmit #tton.

Step &. Open t!e te:t file create" y t!e =ctivity o$an" verify call traffic !as een arc!ive" tot!e "oc#ment file.

PassKKKK FailKKKK 

%ont$omery Co#nty5 %arylan"Statement of Work

Statement of Work: "7"

Page 177: Motorola SOW - Reviewed by MoCo PM 2015-09-22

7/23/2019 Motorola SOW - Reviewed by MoCo PM 2015-09-22

http://slidepdf.com/reader/full/motorola-sow-reviewed-by-moco-pm-2015-09-22 177/309

 

M$$ 377 (runked +esources

J.$.4.12 5alkgrou+ Selection and CallDSecure

1. ,?'$+IP(I!9

'!e 'alk$ro#p Call is t!e primary level of

or$ani<ation for comm#nications on a tr#nke" 6a"ioSystem. ispatc!ers it! 'alk$ro#p Call capailityill e ale to comm#nicate it! ot!er memers oft!e same talk$ro#p. '!is provi"es t!e effect of anassi$ne" c!annel "on to t!e talk$ro#p level. W!ena 'alk$ro#p Call is initiate" from a s#scrier #nit5t!e call is in"icate" on eac! "ispatc! operatorposition t!at !as a c!annel control reso#rceassociate" it! t!e #nits c!annelDtalk$ro#p.i$ital encryption is #se" so only properly e/#ippe"an" confi$#re" s#scriers can monitor t!econversation. = L8eyL is #se" to encrypt t!e transmita#"io. Only ra"ios an" Consoles it! t!e same

L8eyL can "ecrypt t!e a#"io an" listen to it.

'?(P

6=IO@1 @ '=896OAP 1 (Sec#re ' %o"e)6=IO@2 @ '=896OAP 2 (Sec#re ' %o"e)6=IO@3 @ '=896OAP 2 (;o 8eys)6=IO@& @ '=896OAP 1 (Clear ' %o"e it!8eys loa"e")CO;SO*@1 @ '=896OAP 1 an" '=896OAP 2(Sec#re ' %o"e)

?+'I!9 1.77

&. (?'(

Step 1. Initiate a i"e area sec#re call fromCO;SO*@1 on '=896OAP 1.

Step 2. 0erify 6=IO@1 can monitor an" respon" tot!e sec#re call.

Step 3. 0erify 6=IO@& can monitor an" respon" tot!e sec#re call eca#se even t!o#$! it is inclear mo"e t!e correct encryption keys areloa"e" for t!e sec#re call.

Step &. Initiate a i"e area sec#re call fromCO;SO*@1 on '=896OAP 2.

Step . 0erify t!at 6=IO@2 can monitor an"respon" to t!e sec#re call. ;ote t!at6=IO@3 cannot monitor t!e call.

PassKKKK FailKKKK 

%ont$omery Co#nty5 %arylan"Statement of Work

"72  

Statement of Work:

Page 178: Motorola SOW - Reviewed by MoCo PM 2015-09-22

7/23/2019 Motorola SOW - Reviewed by MoCo PM 2015-09-22

http://slidepdf.com/reader/full/motorola-sow-reviewed-by-moco-pm-2015-09-22 178/309

M$$ 377 (runked +esources

J.$.4.13 P55 nit *,lias ,is+lay

1. ,?'$+IP(I!9

Console operator positions contain vario#s

reso#rces s#c! as talk$ro#p5 m#lti$ro#p5 Private Call!ic! enales t!e "ispatc!er to comm#nicate it!t!e s#scrier #nits. If activity occ#rs on one oft!ese operator position reso#rces5 t!e #nit I orassociate" alias of t!e initiatin$ ra"io appears at t!econsole reso#rce.

'?(P

6=IO@1 @ '=896OAP 16=IO@2 @ '=896OAP 1

CO;SO*@1 @ '=896OAP 1CO;SO*@2 @ '=896OAP 1

?+'I!9 1.717

&. (?'(

Step 1. Select t!e reso#rce for '=896OAP 1 onCO;SO*@1.

Step 2. Initiate a call on '=896OAP 1 from6=IO@2 an" oserve t!at t!e alias is seenat CO;SO*@1 in t!e reso#rce in"o asell as in t!e =ctivity o$ in"o.

Step 3. Initiate a call from 6=IO@1 an" oservet!at t!e alias of 6=IO@1 is seen atCO;SO*@1 in t!e reso#rce in"o as ellas in t!e =ctivity o$ in"o.

Step &. %o"ify 6=IO@2s alias. %ake s#re to $ive

eno#$! time for t!e alias c!an$e topropa$ate to t!e Fone Controller.

Step . Initiate a call from 6=IO@2 an" oserve t!ene alias of 6=IO@2 is seen at CO;SO*@1 in t!e list in t!e reso#rce in"o as ellas in t!e =ctivity o$ in"o.

Step +. 6et#rn 6=IO@2s alias to its ori$inal state.

PassKKKK FailKKKK 

%ont$omery Co#nty5 %arylan"Statement of Work

Statement of Work: "73

Page 179: Motorola SOW - Reviewed by MoCo PM 2015-09-22

7/23/2019 Motorola SOW - Reviewed by MoCo PM 2015-09-22

http://slidepdf.com/reader/full/motorola-sow-reviewed-by-moco-pm-2015-09-22 179/309

 

M$$ 377 (runked +esources

J.$.4.14 5alkgrou+ PatcDSecure

1. ,?'$+IP(I!9

'alk$ro#p Patc! allos a "ispatc!er to mer$e

several talk$ro#ps to$et!er on one voice c!annel toparticipate in a sin$le conversation. '!is can e#se" for sit#ations involvin$ to or more talk$ro#pst!at nee" to comm#nicate it! eac! ot!er. Asin$ t!ePatc! feat#re5 t!e console operator can talk an"listen to all of t!e selecte" talk$ro#ps $ro#pe"M ina""ition5 t!e memers of t!e in"ivi"#al talk$ro#pscan also talk or listen to memers of ot!ertalk$ro#ps. Patc!e" talk$ro#ps can comm#nicateit! t!e console "ispatc!er an" ot!er memers of"ifferent talk$ro#ps eca#se of t!e Ls#per$ro#pLnat#re of t!e Patc! feat#re.

'?(P

6=IO@1 @ '=896OAP 1 (Sec#re ' %o"e)6=IO@2 @ '=896OAP 2 (Sec#re ' %o"e)6=IO@3 @ '=896OAP 1 (;o sec#re keys loa"e")6=IO@& @ '=896OAP 2 (Clear ' %o"e it!keys loa"e")CO;SO*@1 @ '=896OAP 1 an" '=896OAP 2(Sec#re ' %o"e)

;oteH =ll fo#r 6a"ios m#st !ave t!e same !ome

<one.

?+'I!9 1.717

&. (?'(

Step 1. Asin$ CO;SO*@1 create a sec#re patc!eteen '=896OAP 1 an" '=896OAP2.

Step 2. Initiate a patc! call from CO;SO*@1.

Step 3. 0erify 6=IO@15 6=IO@25 an" 6=IO@&can monitor t!e call.

Step &. Initiate a talk$ro#p call on '=896OAP 1from 6=IO@1.

Step . Oserve t!at all ra"ios are ale to !ear6=IO@1 e:cept 6=IO@3.

Step +. issolve t!e patc!.

PassKKKK FailKKKK 

%ont$omery Co#nty5 %arylan"Statement of Work

"74 

Statement of Work:

Page 180: Motorola SOW - Reviewed by MoCo PM 2015-09-22

7/23/2019 Motorola SOW - Reviewed by MoCo PM 2015-09-22

http://slidepdf.com/reader/full/motorola-sow-reviewed-by-moco-pm-2015-09-22 180/309

M$$ 377 (runked +esources

J.$.4.1! MultiASelect '+eration in Secure Mode

1. ,?'$+IP(I!9

%#lti@Select (%sel) allos t!e console operator to

$ro#p a n#mer of c!annelsDtalk$ro#ps to$et!ers#c! t!at !en t!e $eneral transmit ar is"epresse"5 all of t!e m#lti@selecte"c!annelsDtalk$ro#ps ill transmit at t!e same timeit! t!e same information.%#lti@Select is one@ay comm#nication call. If ara"io #ser respon"s to a %#lti@Select call5 t!etalk$ro#p t!e #ser is affiliate" to ill e t!e only oneto !ear t!e call.'!ere is no s#per@$ro#p forme"5 so ra"iocomm#nication is still at t!e sin$le talk$ro#p level.%#lti@Select is #tili<e" to sen" an =P, to severalc!annelsDtalk$ro#ps. = %#lti@Select !as a limit of 27

tr#nkin$Dconventional reso#rces.

'?(P

6=IO@1 @ '=896OAP 1 (Sec#re ' %o"e)6=IO@2 @ '=896OAP 2 (Sec#re ' %o"e)6=IO@3 @ '=896OAP 1 (;o 8ey)6=IO@& @ '=896OAP 2 (Sec#re 8ey oa"e"5 #tin Clear ' mo"e)CO;SO*@1 @ '=896OAP 15 '=896OAP 2(Sec#re ' %o"e)

?+'I!9 1.717

&. (?'(

Step 1. rom CO;SO*@15 create an %sel $ro#pit! '=896OAP 1 an" '=896OAP 2.

Step 2. 'ransmit on t!e %sel #sin$ t!e %sel instanttransmit #tton.

Step 3. 0erify t!at 6=IO@15 6=IO@25 an" 6=IO@& !ear t!e call an" 6=IO@3 cannot !ear t!ecall.

Step &. Initiate a call it! 6=IO@1.

Step . 0erify t!e call is !ear" on CO;SO*@1 #tnot on 6=IO@2.

Step +. Initiate a call it! 6=IO@2.

Step -. 0erify t!e call is !ear" on CO;SO*@1 #tnot on 6=IO@1.

Step . On CO;SO*@15 "issolve t!e %sel.

PassKKKK FailKKKK 

%ont$omery Co#nty5 %arylan"Statement of Work

Statement of Work: "75 

Page 181: Motorola SOW - Reviewed by MoCo PM 2015-09-22

7/23/2019 Motorola SOW - Reviewed by MoCo PM 2015-09-22

http://slidepdf.com/reader/full/motorola-sow-reviewed-by-moco-pm-2015-09-22 181/309

 

M$$ 377 (runked +esources

J.$.4.1$ 1! ,e-ault lert 5ones (aila&le -or 5ransmission

1. ,?'$+IP(I!9

'!is test "emonstrates momentary transmission of

t!e alert tones. It also "emonstrates t!e availailityof 1 "efa#lt tones for transmission

'?(P

6=IO@1 @ '=896OAP 1CO;SO*@1@E '=896OAP 1CO;SO*@2 @ '=896OAP 1

?+'I!9 1.737

&. (?'(

Step 1. Confi$#re CO;SO*@1 for "efa#lt alert tonetransmission.

Step 2. Oserve t!at 1 "efa#lt alert tones arepresent.

Step 3. Oserve t!at t!e alert tones can e selecte"from t!e alert tone p#ll "on.

Step &. Oserve t!at t!e alert tones can e selecte"from t!e alert tone #ttons.

Step . Oserve t!at t!e tool tip pops #p !en t!emo#se is place over an alert tone #tton.

Step +. 'ransmit from any alert tone from 1 to 1 foralert tone transmission.

Step -. Oserve t!e alert tone can e !ear" ot! y6=IO@1 an" CO;SO*@2.

PassKKKK FailKKKK 

%ont$omery Co#nty5 %arylan"Statement of Work

"76  

Statement of Work:

Page 182: Motorola SOW - Reviewed by MoCo PM 2015-09-22

7/23/2019 Motorola SOW - Reviewed by MoCo PM 2015-09-22

http://slidepdf.com/reader/full/motorola-sow-reviewed-by-moco-pm-2015-09-22 182/309

M$$ 377 (runked +esources

J.$.4.16 SecureClear CrossAMode *ndication

1. ,?'$+IP(I!9

'!is test vali"ates t!e aility of t!e console to s!o

a vis#al in"ication of a Sec#re an" Clear mo"emismatc! "#rin$ t!e folloin$ con"itionsH1. 'alk$ro#p on t!e Console is in sec#re transmitmo"e #t receivin$ clear a#"io.2. 'alk$ro#p on t!e Console is in clear transmitmo"e #t receivin$ sec#re a#"io.

'?(P

6=IO@1 @ '=896OAP 1 (Sec#re ' mo"e)CO;SO*@1 @ '=896OAP 1 (Sec#re ' mo"e)

?+'I!9 1.717

&. (?'(

Step 1. Initiate a sec#re call on 6=IO@1.

Step 2. 0erify CO;SO*@1 is ale to receive a#"iofrom 6=IO@1.

Step 3. Place 6=IO@1 in clear ' mo"e.

Step &. Initiate a call on 6=IO@1.

Step . 0erify CO;SO*@1 is ale to receive a#"iofrom 6=IO@1 an" "isplays a sec#re mo"emismatc! in"ication.

Step +. Place 6=IO@1 in sec#re transmit mo"e an"

place CO;SO*@1 in clear transmit mo"e.

Step -. Initiate a sec#re call on 6=IO@1.

Step . 0erify CO;SO*@1 is ale to receive a#"iofrom 6=IO@1 an" "isplays a sec#re Cross@%o"e In"ication.

PassKKKK FailKKKK 

%ont$omery Co#nty5 %arylan"Statement of Work

Statement of Work: "77 

Page 183: Motorola SOW - Reviewed by MoCo PM 2015-09-22

7/23/2019 Motorola SOW - Reviewed by MoCo PM 2015-09-22

http://slidepdf.com/reader/full/motorola-sow-reviewed-by-moco-pm-2015-09-22 183/309

Page 184: Motorola SOW - Reviewed by MoCo PM 2015-09-22

7/23/2019 Motorola SOW - Reviewed by MoCo PM 2015-09-22

http://slidepdf.com/reader/full/motorola-sow-reviewed-by-moco-pm-2015-09-22 184/309

+adio $ontrol Manager D+$ME Features

J.$.!.2 0adio Sna+sot

1. ,?'$+IP(I!9

Snaps!ot is a 6a"io Control %ana$er (6C%)

comman" #se" to retrieve information ao#t anin"ivi"#al ra"io. Information provi"e" y t!e 6C%application in response to t!e Snaps!ot comman"incl#"es t!e serial n#mer of t!e ra"io5 c#rrenttalk$ro#pDm#lti$ro#p5 an" site affiliationsM t!e6e$ro#p5 In!iit5 an" Selector ock state of t!era"io. Snaps!ot information is taken from t!e system"ataases. '!e Snaps!ot comman" "oes not initiateany comm#nication it! t!e tar$et ra"io.

'?(P

6=IO@1 @ '=896OAP 16=IO@2 @ '=896OAP 16=IO@3 @ '=896OAP 2Y

U 6=IO@1 an" 6=IO@3 m#st e pro$ramme" it!ynamic 6e$ro#pin$ capaility.

U%ake s#re 6a"io Asers are confi$#re" it! aL6a"io Primary 'alk$ro#p =ssi$nmentL in t!e AC%.

?+'I!9 1.7&7

&. (?'(

Step 1. S#mit a ynamic 6e$ro#p comman" for6=IO@1 an" 6=IO@3 to e re$ro#pe" to'=896OAP 3.

Step 2. =t t!e 6C%5 initiate t!e Snaps!ot comman"for 6=IO@1.

Step 3. 0erify t!at t!e 6C% s!os 6=IO@1affiliate" to SI'* 1 an" t!at its c#rrent6e$ro#p state is L6e$ro#p.L

Step &. =t t!e 6C%5 revert t!e "ynamic re$ro#pin$on 6=IO@1 an" 6=IO@3.

Step . Initiate t!e Snaps!ot comman" for 6=IO@1.

Step +. 0erify 6=IO@1 s!os an affiliation to SI'*1 an" t!at its c#rrent 6e$ro#p state isLCancel 6e$ro#p.L

Step -. =t t!e 6C%5 in!iit 6=IO@2 an" t!eninitiate t!e Snaps!ot comman" for 6=IO@2.

Step . 0erify 6=IO@2 s!os an affiliation an" t!atits c#rrent In!iit state is LSelective In!iit.L

Step 4. =t t!e 6C%5 revert 6=IO@2 an" t!eninitiate t!e Snaps!ot comman" for 6=IO@2.

Step 17. 0erify 6=IO@2 s!os an affiliation an" t!atits c#rrent In!iit state is LCancel In!iit.L

PassKKKK FailKKKK 

%ont$omery Co#nty5 %arylan"Statement of Work

Statement of Work: "7!

Page 185: Motorola SOW - Reviewed by MoCo PM 2015-09-22

7/23/2019 Motorola SOW - Reviewed by MoCo PM 2015-09-22

http://slidepdf.com/reader/full/motorola-sow-reviewed-by-moco-pm-2015-09-22 185/309

 

+adio $ontrol Manager D+$ME Features

J.$.!.3 ,ynamic 0egrou+ing

1. ,?'$+IP(I!9

ynamic 6e$ro#pin$ allos t!e 6a"io Control

%ana$er (6C%) to assi$n in"ivi"#al ra"ios operatin$in "ifferent talk$ro#ps to a temporary talk$ro#p viat!e 6e$ro#p comman". ;etork mana$ers ors#pervisors can overri"e in"ivi"#al ra"io talk$ro#pselections y steerin$ re$ro#pe" s#scriers to ane talk$ro#p containin$ #sers5 !ic! nee" tocomm#nicate on a temporary asis. =fter receivin$ a6e$ro#p comman"5 a ra"io ill i$nore t!e c#rrentsettin$ of t!e talk$ro#p selector an" move to t!etar$et talk$ro#p specifie" in t!e 6e$ro#p comman".Anless t!e s#pervisor iss#es a OC8 comman"5 t!era"io #ser can "eselect t!e tar$et talk$ro#p yselectin$ anot!er talk$ro#p #sin$ t!e ra"io selector.

 = #ni/#e location on t!e ra"io selector is reserve"for t!e tar$et talk$ro#p folloin$ a 6e$ro#pcomman".

ynamic 6e$ro#pin$ assi$nments can e initiate"rapi"ly5 #t not instantaneo#sly. 6e$ro#pin$ is ests#ite" for planne" activities or occasional c!an$esfrom normal ro#tines. It is not inten"e" for imme"iateresponses s#c! as !i$!@spee" c!ases or for a rapi""eployment on a per inci"ent asis.

6e$ro#pe" ra"ios receivin$ a secon" 6e$ro#pcomman" ill move to t!e ne tar$et talk$ro#p

specifie" in t!e secon" comman". W!en are$ro#pe" ra"io receives a 6e$ro#p comman"5 allinformation pertainin$ to t!e previo#s 6e$ro#pcomman" is lost. = Cancel 6e$ro#p comman" or a6evert ret#rns an in"ivi"#al ra"io to its normaloperation.

'?(P

6=IO@1 @ '=896OAP 16=IO@2 @ '=896OAP 16=IO@3 @ '=896OAP 2

6=IO@& @ '=896OAP 2

?+'I!9 1.7&7

&. (?'(

Step 1. Wit! t!e 6C% open from t!e Comman"smen# item5 select t!e 6a"io Comman"sitem to open t!e comman" in"o. C!oose6e$ro#p.

Step 2. *nter '=896OAP 3 in t!e tar$et fiel".

Step 3. *nter t!e Is or aliases of 6=IO@156=IO@25 6=IO@35 an" 6=IO@&.

Step &. Once all "esire" ra"io information is entere"an" appears in t!e comman" in"o5 clickt!e 6e$ro#p #tton to initiate t!e comman".

Step . Oserve all ra"ios are re$ro#pe" an" areale to comm#nicate on '=896OAP 3.

Step +. Sitc! t!e S#scrier to t!e ynamic6e$ro#p c!annel to acknole"$e t!e $ro#pre/#est.

Step -. Oserve t!at t!e ra"ios are ale to select"ifferent talk$ro#ps an" are not locke" ontot!e re$ro#pe" mo"e. ;oteH '!e 'alk$ro#pselector kno !as to e set to t!e "ynamicre$ro#p position efore sitc!in$ to anyot!er talk$ro#p.

Step . Oserve t!at t!e 6e$ro#p task appears int!e Comman" %onitor in"o.

Step 4. Iss#e a Selector ock comman" all fo#rra"ios an" verify t!eir selectors !ave eenlocke".

Step 17. 6evert ot! comman"s an" verify t!e ra"ios!ave ret#rne" to normal operation.

PassKKKK FailKKKK 

%ont$omery Co#nty5 %arylan"Statement of Work

"#  

Statement of Work:

Page 186: Motorola SOW - Reviewed by MoCo PM 2015-09-22

7/23/2019 Motorola SOW - Reviewed by MoCo PM 2015-09-22

http://slidepdf.com/reader/full/motorola-sow-reviewed-by-moco-pm-2015-09-22 186/309

+adio $ontrol Manager D+$ME Features

J.$.!.4 Selecti(e 0adio *ni&it

1. ,?'$+IP(I!9

'!e I;BI,I' comman" iss#e" y t!e 6a"io Control

%ana$er (6C%) "isales a ra"io5 preventin$ it fromtransmittin$ or receivin$ any a#"io. =ll of t!e ra"iosf#nctionality ceases !ile a ra"io is in!iite" y t!e6C%. Once in!iite"5 t!e ra"io cannot e #se" tomonitor voice c!annels or for any ot!er ra"io #serinitiate" activity. ;ote t!at an in!iite" ra"io stillmonitors t!e control c!annel so t!at it can e re@enale" it! t!e Cancel In!iit comman". Aponreceivin$ t!e Cancel In!iit comman" from t!e6C%5 t!e ra"io ret#rns to its normal operation.

'?(P

6=IO@1 @ '=896OAP 1

?+'I!9 1.7&7

&. (?'(

Step 1. rom t!e 6a"io Control %ana$er select t!eComman"s men# an" t!en select t!e 6a"ioComman"s item in t!e men# to open t!eComman" Win"o.

Step 2. *nter t!e Is or aliases of 6=IO@1.

Step 3. Select LSelective In!iitL from t!e comman"p#ll@"on men#.

Step &. Once all "esire" ra"io information is entere"an" appears in t!e comman" in"o clickt!e s#mit #tton to initiate t!e comman".

Step . Oserve 6=IO@1 is in!iite" an" appearsto e "ea".

Step +. Oserve t!at t!e In!iit task appears in t!eComman" %onitor in"o.

Step -. Cancel t!e In!iit y selectin$ t!e task in t!eComman" %onitor in"o an" clickin$ t!e6evert #tton to s#mit t!e task.

Step . Oserve t!at t!e Cancel In!iit task appearsin t!e Comman" %onitor in"o an" t!at6=IO@1 is ret#rne" to normal operation.

PassKKKK FailKKKK 

%ont$omery Co#nty5 %arylan"Statement of Work

Statement of Work: ""

Page 187: Motorola SOW - Reviewed by MoCo PM 2015-09-22

7/23/2019 Motorola SOW - Reviewed by MoCo PM 2015-09-22

http://slidepdf.com/reader/full/motorola-sow-reviewed-by-moco-pm-2015-09-22 187/309

 

+adio $ontrol Manager D+$ME Features

J.$.!.! Emergency larm ,is+lay

1. ,?'$+IP(I!9

'!e emer$ency call information t!at is "isplaye" on

t!e 6a"io Control %ana$er (6C%) incl#"es t!e ra"ioalias of t!e ra"io t!at initiate" t!e *mer$ency =larm5t!e talk$ro#p t!at t!e ra"io as affiliate" to at t!etime t!e alarm as sent5 an" t!e time t!e alarm asreceive".

'?(P

6=IO@1 @ '=896OAP 1

One 6C% t!at !as '=896OAP 1 attac!e" is

re/#ire".

?+'I!9 1.7&7

&. (?'(

Step 1. Open t!e 6a"io Control %ana$er (6C%)in"o(s) an" verify t!at t!e *mer$ency

 =larm in"o is visile. If it is not5 $o to t!e0ie men# an" select it rin$in$ it into t!e6C% vieale area.

Step 2. Initiate an *mer$ency =larm from 6=IO@1.

Step 3. Oserve t!at t!e 6C% receives t!e*mer$ency =larm.

Step &. =cknole"$e t!e *mer$ency y selectin$t!e *mer$ency in t!e in"o an" clickin$on t!e 6espon" #tton.

Step . 0erify t!e in"o "isplays t!e ra"io alias5t!e talk$ro#p5 an" t!e time t!e alarm asreceive".

Step +. =$ain5 select t!e "isplaye" *mer$ency an"click t!e elete #tton to clear t!eemer$ency.

Step -. 6eset t!e ra"io y !ol"in$ t!e *mer$ency#tton #ntil t!e ra"io clears.

PassKKKK FailKKKK 

%ont$omery Co#nty5 %arylan"Statement of Work

"2  

Statement of Work:

Page 188: Motorola SOW - Reviewed by MoCo PM 2015-09-22

7/23/2019 Motorola SOW - Reviewed by MoCo PM 2015-09-22

http://slidepdf.com/reader/full/motorola-sow-reviewed-by-moco-pm-2015-09-22 188/309

+adio $ontrol Manager D+$ME Features

J.$.!.$ 0adio Status

1. ,?'$+IP(I!9

'!is optional feat#re allos t!e 6a"io Control

%ana$er (6C%) to vie stat#s information sent in ys#scriers. Stat#ses are #se" to in"icate t!e 6a"iooperators operational state (e.$. off "#ty). '!einformation t!at ill e "isplaye" incl#"es t!e ra"ioalias5 talk$ro#p alias5 !o#r an" min#te time stamp5stat#s n#mer or messa$e n#mer5 an" t!ec#stomer entere" translation for t!e specific stat#s.Stat#s inp#t is "isplaye" in c!ronolo$ical or"er5in"epen"ent of t!e type of stat#s n#mer.

'?(P

6=IO@1 @ '=896OAP 1

U Confi$#re 6=IO@1 in t!e mana$er to #se apartic#lar stat#s set.

U Confi$#re t!e assi$ne" stat#s set (via t!e stat#sset mana$er confi$#ration ojects) to incl#"e te:ttranslations for a fe "ifferent stat#ses.

U '!e 6C% #ser nee"s to e assi$ne" t!e "ispatc!attac!ment $ro#p t!at matc!es t!e ra"io #sersassi$ne" "ispatc! attac!ment $ro#p.

?+'I!9 1.7&7

&. (?'(

Step 1. Initiate a Stat#s transmission from 6=IO@1.

Step 2. 0erify t!e 6C% "isplays t!e proper Stat#ste:t.

PassKKKK FailKKKK 

%ont$omery Co#nty5 %arylan"Statement of Work

Statement of Work: "3

Page 189: Motorola SOW - Reviewed by MoCo PM 2015-09-22

7/23/2019 Motorola SOW - Reviewed by MoCo PM 2015-09-22

http://slidepdf.com/reader/full/motorola-sow-reviewed-by-moco-pm-2015-09-22 189/309

 

J.8.8 F'0%! M'&'"#"&!

J.$.$.1 ni-ied E(ent ManagerD%ie)s

1. ,?'$+IP(I!9

'!e Anifie" *vent %ana$er (A*%) provi"es t!ree "ifferentvies. '!e p#rpose of t!is test is to "emonstrate t!e viesavailale from t!e A*%.

or =-.1&H C#stom vies can e save" an" retrieve" yot!er ;% Client #sers. '!is test "emonstrates t!iscapaility5 as ell as "emonstratin$ an improvement in"isplay of C!annel information.

'?(P

;%client71 @ A*% session #p an" r#nnin$.

?+'I!9 1.77

&. (?'(

Step 1. '!e first vie is t!e =ctive =larms. In t!enavi$ation pane e:pan" a#lt %ana$ement an"select ;etork *vents.

Step 2. C#stomi<e t!e =ctive =larms "isplay y selectin$t!e 0ie option from t!e men# ar5 t!en selectSearc!.

Step 3. Perform a %ana$e" 6eso#rce searc! forc!annels5 site controllers5 an" ro#ters y enterin$LContainsL an" c!5 sc5 an" <77 respectively in t!esearc! fiel"s to perform t!e t!ree separatesearc!es.

Step &. or eac! of t!e t!ree searc!es a filtere" alarmvie is "isplaye" t!at contains alarms for t!eappropriate "evice in t!e searc!.

Step . '!e secon" vie is t!e P!ysical S#mmary vie.In t!e navi$ation pane5 e:pan" Fone %aps an"select P!ysical S#mmary. '!e P!ysical S#mmary0ie provi"es an a$$re$ate" alarm severitystat#s of t!e "evices locate" at all s#nets in t!eFone.

Step +. '!e t!ir" vie is t!e Service S#mmary. In t!enavi$ation pane5 #n"er Fone %aps select ServiceS#mmary. '!e Service S#mmary 0ie provi"es a/#ick s#mmary of t!e service stat#s of sites in a

Fone5 incl#"in$ access to C!annel stat#s.

Step -. In t!e main A*% in"o is an =larm S#mmary0ie pane. In t!e =larm S#mmary 0ie5 selectt!e format for t!e "esire" vie5 pie5 ta#lar orar.

Step . Create a c#stom vie. 0ie t!e =ctive =larms"isplay to see res#lt. Perform ri$!t click on t!e;etork *vents tree no"e in t!e navi$ationin"o an" select e:port f#nction. Select filtervie5 an" provi"e a tar$et location to save t!ec#stom vie tree str#ct#re on ;% Client.

Step 4. o$ o#t of t!e A*% application5 an" lo$ ack in

as a "ifferent #ser. 6etrieve t!e c#stom viesave" in step . 0ie t!e =ctive =larms "isplay tosee t!e same vie.

Step 17. ;avi$ate ;etork ataase5 select6epeaterDConventional Site5 an" from %ana$e"6eso#rces men#5 select %ana$e" 6eso#rceProperties. C!oose c!annel ta to "isplay allc!annel stat#s.

PassKKKK FailKKKK 

%ont$omery Co#nty5 %arylan"Statement of Work

"4 

Statement of Work:

Page 190: Motorola SOW - Reviewed by MoCo PM 2015-09-22

7/23/2019 Motorola SOW - Reviewed by MoCo PM 2015-09-22

http://slidepdf.com/reader/full/motorola-sow-reviewed-by-moco-pm-2015-09-22 190/309

Fault Management

J.$.$.2 Station Po)er m+ "ailure 0e+orts to te ni-ied E(ent Manager

1. ,?'$+IP(I!9

'!is test ill "emonstrate t!at t!e Anifie" *vent

%ana$er (A*%) alarms vie is ale to capt#reinformation ao#t vario#s fail#res at t!e system an"<one level.

 = station ill e keye" !ile t!e o#tp#t is #nloa"e"to sim#late a poer amp fail#re. '!e fail#res ill emonitore" on t!e A*%.

;oteH or safety5 eit!er poer "on t!e station or 'In!iit it efore "isconnectin$ or re@connectin$ t!e"#mmy loa" to prevent acci"ental keyin$ of t!estation.

;oteH '!is test s!o#l" e "one on a site it! more

t!an to c!annels. ailsoft ill occ#r if t!e test is"one on a to@c!annel site.

'?(P

6=IO@1 @ '=896OAP 16=IO@2 @ '=896OAP 2;%client71 @ A*% session #p an" r#nnin$.

U =ll 6a"ios s!o#l" e LSite ocke"L

?+'I!9 1.7&7

&. (?'(

Step 1. 0erify t!at t!e poer amp of t!e station toe teste" !as no active alarms a$ainst it.

Step 2. isconnect t!e "#mmy loa"Dantenna fromt!e station.

Step 3. %ake several talk$ro#p calls #sin$ 6=IO@1#ntil t!e test station !as een keye".

Step &. Oserve t!at an alarm in"icatin$ a Poer =mp fail#re appears on t!e A*% alarmsvie. or Smart sites5 yo# ill nee" to lookat event vie to see ca#se of alarm.

Step . 6econnect t!e "#mmy loa"Dantenna"isconnecte" in Step 3.

Step +. In appro:imately min#tes5 oserve t!ec!an$es to t!e alarm on t!e A*%5 in"icatin$t!e mo"#le is restore" to service.

PassKKKK FailKKKK 

%ont$omery Co#nty5 %arylan"Statement of Work

Statement of Work: "5 

Page 191: Motorola SOW - Reviewed by MoCo PM 2015-09-22

7/23/2019 Motorola SOW - Reviewed by MoCo PM 2015-09-22

http://slidepdf.com/reader/full/motorola-sow-reviewed-by-moco-pm-2015-09-22 191/309

 

Fault Management

J.$.$.3 Core 0outer "ailure 0e+orts to te ni-ied E(ent Manager

1. ,?'$+IP(I!9

'!is test ill "emonstrate t!at t!e Anifie" *vent

%ana$er (A*%) alarms vie is ale to capt#reinformation ao#t vario#s fail#res at t!e system an"<one level.

 = Core 6o#terD9ateay ill e poere" off tosim#late a fail#re. '!e system !ealt! ill emonitore" on A*%.

'?(P

;%client71 @ A*% session #p an" r#nnin$.

?+'I!9 1.77

&. (?'(

Step 1. 0erify t!at t!e 6o#terD9ateay to e teste""isplays it!o#t fail#res (normal) on A*%.'!e core ro#ter is containe" in t!e specifics#net t!at it is p!ysically collocate" it!int!e netork.

Step 2. Poer "on t!e 6o#terD9ateay.

Step 3. Oserve t!at an alarm in"icatin$ a6o#terD9ateay fail#re appears on t!e A*%alarms vie.

Step &. 6estore poer to t!e 6o#terD9ateay.

Step . Oserve t!e c!an$es to t!e alarm in A*%5in"icatin$ t!e 6o#terD9ateay is enalin$.

Step +. Oserve t!at alarm vie #p"ates in t!eA*%5 in"icatin$ t!e 6o#terD9ateay !asrecovere" an" is enale".

PassKKKK FailKKKK 

%ont$omery Co#nty5 %arylan"Statement of Work

"6  

Statement of Work:

Page 192: Motorola SOW - Reviewed by MoCo PM 2015-09-22

7/23/2019 Motorola SOW - Reviewed by MoCo PM 2015-09-22

http://slidepdf.com/reader/full/motorola-sow-reviewed-by-moco-pm-2015-09-22 192/309

M!'$8, Fault Management '#stem

J.$.$.4 Screen :a(igation

1. ,?'$+IP(I!9

%OSC= alarmin$ tests s!all e con"#cte" from

t!e %OSC= server an" clients if applicale. '!ealarms "emonstrate" are to e ma"e on t!e act#ale/#ipment or p#nc! lock interface5 it! ane:ception ma"e for cases !ere it is not practical tocreate an act#al alarm. '!e folloin$ ill provi"e arief intro"#ction an" "escription of t!e main "isplayscreens enco#ntere" !en navi$atin$ t!e %OSC=9AI (9rap!ic Aser Interface).

'?(P

;o prior set#p is re/#ire".

?+'I!9 1.717

&. (?'(

Step 1. o$in an" Passor" Screen @'!is is t!e first screen "isplaye" after asystem start#p. It allos a #ser it! t!eproper lo$in an" passor" to access t!e%OSC= alarm system. o$in to %OSC=#sin$ t!e appropriate #ser name an"passor".

Step 2. System Overvie Screen @'!e LSystem OvervieL screen contains sitenames a"jacent to color stat#s p#s!pins.etails of a partic#lar site can e viee" yselectin$ t!e site name p#s!pin of interest.epen"in$ on alarm stat#s5 t!e color #llet

ill flas!

Step 3. =larm S#mmary Screen @Procee" to t!e L=larm S#mmaryL screenfrom t!e LSystem OvervieL screen. '!eL=larm S#mmaryL screen provi"es a te:t"isplay of all alarms c#rrently in t!e system.On t!is screen5 yo# can c!oose eteenalarm s#mmary an" alarm !istory yselectin$ t!e L=larm S#mmaryD=larmBistoryL #tton. In a""ition5 t!e "isplay cane filtere" to s!o alarms ase" on sitename or acknole"$ement stat#s.

Step &. Comm Screen @rom t!e L=larm S#mmaryL screen accesst!e LSite CommL screen. '!e LSite CommLscreen "isplays a comine" comm#nicationstat#s for eac! site. 'o vie all t!eS%3777s it!in a site5 select t!e icon ne:tto t!e site comm. S!o#l" t!ecomm#nications pat! eteen t!e IP9ateay an" any S%3777 in t!e systeme interr#pte"5 it ill e in"icate" y analarm present on t!is screen.

Step . evice %onitorin$

rom t!e LSystem OvervieL screen5navi$ate to eac! site monitore" y%OSC= in t!e system. Once a partic#larsite p#s!pin !as een selecte"5 a siteovervie screen ill appear t!at in"icatest!e types an" /#antities of "evicesmonitore" y %OSC= at t!at site.

PassKKKK FailKKKK 

%ont$omery Co#nty5 %arylan"Statement of Work

Statement of Work: "7 

Page 193: Motorola SOW - Reviewed by MoCo PM 2015-09-22

7/23/2019 Motorola SOW - Reviewed by MoCo PM 2015-09-22

http://slidepdf.com/reader/full/motorola-sow-reviewed-by-moco-pm-2015-09-22 193/309

 

M!'$8, Fault Management '#stem

J.$.$.! *n5ouc larm ProcessingDckno)ledged larm

1. ,?'$+IP(I!9

'!is se$ment of t!e test verifies t!at t!e i@state site

alarms are processe" an" comm#nicate" to t!e%OSC= Server. '!e alarms can ori$inate from a"evice it! L!ar" ire"L p!ysical "ry contactinterfacin$ or from a "evice connecte" to t!e%OSC= S%3777 y means of an 6S232 or*t!ernet protocol interface.

'!is test ill also s!o t!e e/#al "isplay an"acknole"$in$ capailities of ot! %OSC= Serveran" Client(s).

'?(P

;o prior set#p is re/#ire".

?+'I!9 1.717

&. (?'(

Step 1. Create an alarm con"ition y sim#latin$ analarm on a "evice in t!e system ors!ortin$Dopenin$ a stat#s inp#t to any%OSC= stat#s inp#t mo"#le in t!e system.;avi$ate to t!e loest level screen t!at"epicts t!e !i$!est "e$ree of alarm "etail.

Step 2. 0erify t!at t!e colore" stat#s #llet for t!eassociate" alarm on t!e server is linkin$re" an" for 6S232 interfaces5 t!at t!eLstateL te:t is re" an" is "isplaye" for t!ecorrect alarm point an" site.

Step 3. If speakers are present5 verify t!at an

a#"ile in"ication is !ear" at t!e client.

Step &. 0erify t!at t!e alarm "isplays in re" te:t ont!e pop@#p =larm S#mmary in"o.

Step . Click it! t!e mo#se on t!e Lacknole"$eL#tton. 0erify t!at t!e a#"ile in"ication issilence".

Step +. 0erify t!at t!e te:t on t!e alarm s#mmaryin"o of t!e server c!an$es from re"(#nacknole"$e" alarm) to lack(acknole"$e" alarm).

Step -. 0erify t!at t!e colore" stat#s #llet for t!eassociate" alarm on t!e server remains re"#t stops linkin$.

Step . 6et#rn t!e alarm point to t!e normalcon"ition. 0erify t!at t!e colore" stat#s#llet for t!e associate" alarm ret#rns to$reen.

Step 4. 0erify t!at t!e te:t is remove" from t!ealarm s#mmary in"o.

Step 17. '!ese steps s!o#l" e performe" oncea$ain to verify t!e f#nctionality of t!e%OSC= client(s).

PassKKKK FailKKKK 

%ont$omery Co#nty5 %arylan"Statement of Work

"  

Statement of Work:

Page 194: Motorola SOW - Reviewed by MoCo PM 2015-09-22

7/23/2019 Motorola SOW - Reviewed by MoCo PM 2015-09-22

http://slidepdf.com/reader/full/motorola-sow-reviewed-by-moco-pm-2015-09-22 194/309

M!'$8, Fault Management '#stem

J.$.$.$ *n5ouc larm ProcessingDnackno)ledged larm

1. ,?'$+IP(I!9

'!is se$ment of t!e test verifies t!at t!e i@state site

alarms are processe" an" comm#nicate" to t!e%OSC= Server. '!e alarms can ori$inate from a"evice it! L!ar" ire"L p!ysical "ry contactinterfacin$ or from a "evice connecte" to t!e%OSC= S%3777 y means of an 6S232 or*t!ernet protocol interface.

'!is test ill also s!o t!e e/#al "isplay an"acknole"$in$ capailities of ot! %OSC= Serveran" Client(s).

'?(P

;o prior set#p is re/#ire".

?+'I!9 1.717

&. (?'(

Step 1. Create an alarm con"ition y sim#latin$ analarm on a "evice in t!e system ors!ortin$Dopenin$ a stat#s inp#t to any%OSC= stat#s inp#t mo"#le in t!e system.;avi$ate to t!e loest level screen t!at"epicts t!e !i$!est "e$ree of alarm "etail.

Step 2. 0erify t!at t!e colore" stat#s #llet for t!eassociate" alarm on t!e server is linkin$re" an" for 6S232 interfaces5 t!at t!eLstateL te:t is re" an" is "isplaye" for t!ecorrect alarm point an" site.

Step 3. If speakers are present5 verify t!at an

a#"ile in"ication is !ear" at t!e Server.

Step &. Wit!o#t acknole"$in$ t!e alarm5 ret#rn t!ealarm point to its normal con"ition.

Step . 0erify t!e te:t on t!e alarm s#mmaryin"o of t!e server !as c!an$e" from re"to l#e in"icatin$ t!e alarm t!at !as ret#rne"to normal #t remains #nacknole"$e".

Step +. 0erify t!at t!e associate" alarm #llet islinkin$ $reen an" yello5 in"icatin$ an#nacknole"$e" alarm t!at !as ret#rne" to

normal. =n a#"ile alert ill persist #ntil t!ealarm is acknole"$e".

Step -. '!ese steps s!o#l" e performe" oncea$ain to verify t!e f#nctionality of t!e%OSC= client(s).

PassKKKK FailKKKK 

%ont$omery Co#nty5 %arylan"Statement of Work

Statement of Work: "!

Page 195: Motorola SOW - Reviewed by MoCo PM 2015-09-22

7/23/2019 Motorola SOW - Reviewed by MoCo PM 2015-09-22

http://slidepdf.com/reader/full/motorola-sow-reviewed-by-moco-pm-2015-09-22 195/309

 

M!'$8, Fault Management '#stem

J.$.$.6 Pysical *n+uts'ut+utsD,igital 'ut+uts S,M 3999

1. ,?'$+IP(I!9

'!e p#rpose of t!is section is to verify t!at t!e

p!ysical inp#ts an" o#tp#ts t!at interface to t!e%OSC= IDO mo"#les are properly processe" yt!e %OSC= system. Proper processin$ can everifie" in to ays. irst5 a itness can oserve t!eIDO mo"#le * in"ications for Os y c!an$es ont!e S%3777 panel. Secon"5 a itness can oservet!e O ack in"ication on t!e In'o#c! Li$italO#tp#tL screen.

;ote t!at "i$ital o#tp#ts cannot e initiate" from t!eAnifie" *vent %ana$er Client.

O @ i$ital O#tp#ts

'?(P

;o prior set#p is re/#ire".

?+'I!9 1.7&7

&. (?'(

Step 1. Select a site to perform t!e test.

Step 2. 'ri$$er a latc!e" state of t!e o#tp#t point yselectin$ t!e LOnL #tton from t!eappropriate sites "i$ital o#tp#t screen5confirmin$ t!at t!e screen in"icationc!an$es from LOffL to LOnL for t!at point.

Step 3. 0erify a c!an$e of state y oservin$ t!e* on t!e %OSC= O mo"#le an" yoservin$ t!e control ack in"ication on t!eIn'o#c! client or server.

Step &. 6et#rn t!e o#tp#t to its LOffL con"ition. 0erify

t!at t!e LOnL in"ication on t!e In'o#c!server ret#rns to LOffL in a""ition toconfirmin$ a c!an$e of state of t!e%OSC= *.

PassKKKK FailKKKK 

%ont$omery Co#nty5 %arylan"Statement of Work

"!#  

Statement of Work:

Page 196: Motorola SOW - Reviewed by MoCo PM 2015-09-22

7/23/2019 Motorola SOW - Reviewed by MoCo PM 2015-09-22

http://slidepdf.com/reader/full/motorola-sow-reviewed-by-moco-pm-2015-09-22 196/309

M!'$8, Fault Management '#stem

J.$.$.7 0e+ort ;enerator

1. ,?'$+IP(I!9

'!e 6eport 9enerator is #se" as a stan"@alone or a

netorke" application to lo$ an" report alarms t!atare $enerate" it!in t!e Won"erare In'o#c!"ataase. =larms an" =cknole"$ements can elo$$e" an" store" accor"in$ to t!e time5 site5 ore/#ipment at !ic! t!e alarm ori$inate"5 an" t!e"etaile" s#mmary of filtere" events can t!en eforar"e" to a printer. 6eport 9enerator is capaleof =#to =rc!ivin$ on a mont!ly asis or at every175777 events5 !ic!ever occ#rs first5 an" itincl#"es #tilities to ot! compact an" repair t!ealarm "ataase.

'?(P

;o prior set#p is re/#ire".

?+'I!9 1.717

&. (?'(

Step 1. %inimi<e t!e Won"erare In'o#c! softarean" select t!e 6eport 9enerator icon fromt!e Win"os "esktop.

Step 2. Select t!e LS!o 6eportL #tton s!on int!e application.

Step 3. 0erify t!at t!e present "ate is "isplaye" asell as any past alarms for !ic! t!e 6eport9enerator is confi$#re".

Step &. Create several alarm con"itions (typically 2or 3) y sim#latin$ alarms on "evices in t!esystem or y s!ortin$Dopenin$ a stat#s inp#t

to any %OSC= stat#s inp#t mo"#le in t!esystem.

Step . 0erify t!at t!e alarms are "isplaye" on t!eWon"erare In'o#c! alarm s#mmaryscreen.

Step +. 0erify t!at t!e alarms are "isplaye" on t!e6eport 9enerator alarm !istory report.

PassKKKK FailKKKK 

%ont$omery Co#nty5 %arylan"Statement of Work

Statement of Work: "!"

Page 197: Motorola SOW - Reviewed by MoCo PM 2015-09-22

7/23/2019 Motorola SOW - Reviewed by MoCo PM 2015-09-22

http://slidepdf.com/reader/full/motorola-sow-reviewed-by-moco-pm-2015-09-22 197/309

 

M!'$8, Fault Management '#stem

J.$.$.8 ni-ied E(ent ManagerDM'SC, Management

1. ,?'$+IP(I!9

%OSC= S%3777s report alarms to t!e Anifie"

*vent %ana$er (A*%) via S;%P traps. '!e p#rposeof t!is test is to "emonstrate t!at all %OSC= siteojects are ein$ mana$e" effectively from A*%.

'?(P

;%Client71 @ A*% client session r#nnin$

?+'I!9 1.717

&. (?'(

Step 1. ;avi$ate t!ro#$! t!e A*% application tovie a site it! t!e %OSC= S%3777.

Step 2. 0erify all %OSC= "evices for t!e specificsite !ave een "iscovere" an" in"icative ofany fail#res t!at t!ey !ave in t!e activealarms vie.

PassKKKK FailKKKK 

%ont$omery Co#nty5 %arylan"Statement of Work

"!2  

Statement of Work:

Page 198: Motorola SOW - Reviewed by MoCo PM 2015-09-22

7/23/2019 Motorola SOW - Reviewed by MoCo PM 2015-09-22

http://slidepdf.com/reader/full/motorola-sow-reviewed-by-moco-pm-2015-09-22 198/309

M!'$8, Fault Management '#stem

J.$.$.19 ;CP 7999 MultiSite ControllerDEternet Communications "ailure ,etection

1. ,?'$+IP(I!9

'!e %OSC= system ill interface to t!e 9CP 777

via t!e netork !# or sitc!. Select alarmmessa$es are t!en converte" to native %OSC="ata format for transmission to t!e %OSC= alarmServer.

'?(P

;o prior set#p is re/#ire".

?+'I!9 1.7&7

&. (?'(

Step 1. C!oose t!e site to perform test.

Step 2. 0erify t!at t!ere are no c#rrent alarms fort!e c!osen primary or re"#n"ant 9CP 777.

Step 3. isconnect one of t!e 9CP 777s from t!e*t!ernet netork.

Step &. 0erify t!at t!e $rap!ic #ser interfacein"icates t!at t!e primary 9CP !as faile"S;%P comm#nications. ;ote t!at t!isfail#re "etection can take #p to 17 min#testo e "isplaye".

Step . =cknole"$e t!e alarm on a %OSC=server or client.

Step +. 6e@connect t!e *t!ernet cale previo#slyremove".

Step -. 0erify t!e comm#nications alarm clears.

PassKKKK FailKKKK 

%ont$omery Co#nty5 %arylan"Statement of Work

Statement of Work: "!3

Page 199: Motorola SOW - Reviewed by MoCo PM 2015-09-22

7/23/2019 Motorola SOW - Reviewed by MoCo PM 2015-09-22

http://slidepdf.com/reader/full/motorola-sow-reviewed-by-moco-pm-2015-09-22 199/309

 

M!'$8, Fault Management '#stem

J.$.$.11 50 ;PSDPo)er Su++ly "ault

1. ,?'$+IP(I!9

'!e %OSC= system connects to a '6=8 4177

9PS Stan"ar" via t!e 6S@232 port 4 pin connector. '!is interface re/#ires a "e"icate"%OSC= S%3777 6S@232 port. '!e %OSC= illperio"ically solicit t!e '6=8 for its stat#s an"response messa$es are sent ack to t!e %OSC=S%3777. ;e alarm messa$es5 it! respect to t!elast receive" stat#s !el" in t!e S%37775 are t!enconverte" to native %OSC= "ata format fortransmission to t!e %OSC= alarm Server. =larmmessa$es are also sent as S;%P traps from t!eS%3777s IP Interface to t!e Anifie" *vent%ana$er (A*%) application.

'?(P

;%client71 @ A*% session #p an" r#nnin$.

?+'I!9 1.717

&. (?'(

Step 1. C!oose t!e site to perform t!e test.

Step 2. 0erify t!ere are no c#rrent alarms for t!ec!osen '6=8 9PS on t!e In'o#c! an"A*% active alarms vie.

Step 3. isconnect one of t!e poer s#pply calesfrom t!e rear of t!e '6=8 9PS

Step &. 0erify t!at t!e alarm is receive" on t!e alarmmana$ers.

Step . =cknole"$e t!e alarm on t!e %OSC=server or client.

Step +. 6econnect t!e poer s#pply cale to t!erear of t!e '6=8 9PS.

Step -. 0erify t!at t!e '6=8 9PS poer stat#sret#rns to normal.

PassKKKK FailKKKK 

%ont$omery Co#nty5 %arylan"Statement of Work

"!4 

Statement of Work:

Page 200: Motorola SOW - Reviewed by MoCo PM 2015-09-22

7/23/2019 Motorola SOW - Reviewed by MoCo PM 2015-09-22

http://slidepdf.com/reader/full/motorola-sow-reviewed-by-moco-pm-2015-09-22 200/309

M!'$8, Fault Management '#stem

J.$.$.12 50 ;PSD;PS "ault

1. ,?'$+IP(I!9

'!e %OSC= system connects to a '6=8 4177

9PS Stan"ar" via t!e 6S@232 port 4 pin connector. '!is interface re/#ires a "e"icate"%OSC= 6S@232 port. '!e %OSC= illperio"ically solicit t!e '6=8 for its stat#s an"response messa$es are sent ack to t!e %OSC=S%3777. ;e alarm messa$es5 it! respect to t!elast receive" stat#s !el" in t!e S%37775 are t!enconverte" to native %OSC= "ata format fortransmission to t!e %OSC= Server. =larmmessa$es are also sent as S;%P traps from t!eS%3777s IP Interface to t!e Anifie" *vent%ana$er (A*%) application.

'?(P

;%client71 @ A*% session #p an" r#nnin$.

?+'I!9 1.717

&. (?'(

Step 1. C!oose t!e site to perform t!e test.

Step 2. 0erify t!ere are no c#rrent alarms for t!ec!osen '6=8 9PS on t!e %OSC= serveran" A*% active alarms vie.

Step 3. isconnect t!e antenna cale from t!e'6=8 9PS.

Step &. 0erify t!at t!e alarm is receive" at t!e%OSC= server an"Dor client.

Step . =cknole"$e t!e alarm on eit!er t!e%OSC= server or client.

Step +. 6econnect t!e antenna cale to t!e '6=89PS stan"ar".

Step -. 0erify t!at t!e '6=8 9PS stat#s ret#rns tonormal.

PassKKKK FailKKKK 

%ont$omery Co#nty5 %arylan"Statement of Work

Statement of Work: "!5 

Page 201: Motorola SOW - Reviewed by MoCo PM 2015-09-22

7/23/2019 Motorola SOW - Reviewed by MoCo PM 2015-09-22

http://slidepdf.com/reader/full/motorola-sow-reviewed-by-moco-pm-2015-09-22 201/309

 

M!'$8, Fault Management '#stem

J.$.$.13 Pysical *n+uts'ut+utsD,igital *n+uts

1. ,?'$+IP(I!9

'!e p#rpose of t!is section is to verify t!at t!e

p!ysical inp#ts an" o#tp#ts t!at interface to t!e%OSC= IDO mo"#le(s) are properly processe" yt!e %OSC= system. =ll alarms "emonstrate" areto e ma"e on t!e p#nc! lock. Proper processin$can e verifie" y oservin$ IDO mo"#le *in"ications for Is.

I @ i$ital Inp#tsA*% @ Anifie" *vent %ana$er 

'?(P

;%client71 @ A*% session #p an" r#nnin$.

?+'I!9 1.717

&. (?'(

Step 1. Select a site at to perform t!e test.

Step 2. S!ortDOpen t!e inp#t point an" verify t!at analarm in"ication is receive" at t!e In'o#c!Server an"Dor client(s).

Step 3. 0erify t!e active alarm is "isplaye" in t!eA*%. (%ake s#re t!e s!o all #tton !aseen selecte".)

Step &. 6et#rn t!e inp#t to its normal con"ition.0erify t!at t!e alarm in"ication c!an$es int!e A*% active alarms vie.

PassKKKK FailKKKK 

%ont$omery Co#nty5 %arylan"Statement of Work

"!6  

Statement of Work:

Page 202: Motorola SOW - Reviewed by MoCo PM 2015-09-22

7/23/2019 Motorola SOW - Reviewed by MoCo PM 2015-09-22

http://slidepdf.com/reader/full/motorola-sow-reviewed-by-moco-pm-2015-09-22 202/309

J.8.9 Sy!"# R"%'7%!y F"'!0+"

J.$.6.1 Base Station *denti-ication

1. ,?'$+IP(I!9

'!is test ill "emonstrate t!at t!e repeater(s)pro$ramme" for ,ase Station I"entification (,SI)operation at every site roa"casts t!e CC ,SI atpre"efine" intervals (#s#ally 37 min#tes). 'oaccomplis! t!is5 a service monitor ill e set #p tomonitor t!e ,SI c!annel of a ran"om site an" notet!at t!e ,ase Station I"entification is !ear".

'?(P

 = service monitor ill e re/#ire" to perform t!istest.

;oteH = properly confi$#re" s#scrier can e #se"to monitor t!e fre/#ency for t!e ,SI tones in place of a service monitor.

?+'I!9 1.77

&. (?'(

Step 1. C!oose one site to test for ,ase StationI"entification (,SI).

Step 2. Set#p t!e service monitor or s#scrier toreceive t!e fre/#ency of t!e ,SI c!annel fort!e partic#lar site.

Step 3. %onitor t!e service monitor #ntil t!e ,aseStation I"entification is roa"cast. 0erify t!att!e ,SI tones are !ear" on t!e monitore"fre/#ency.

PassKKKK FailKKKK 

%ont$omery Co#nty5 %arylan"Statement of Work

Statement of Work: "!7 

Page 203: Motorola SOW - Reviewed by MoCo PM 2015-09-22

7/23/2019 Motorola SOW - Reviewed by MoCo PM 2015-09-22

http://slidepdf.com/reader/full/motorola-sow-reviewed-by-moco-pm-2015-09-22 203/309

 

'#stem +elia)ilit# Features

J.$.6.2 Multi+le Control Cannels

1. ,?'$+IP(I!9

 = ma:im#m of fo#r c!annels are eli$ile for

assi$nment as control c!annel at eac! site. In t!eevent t!at t!e assi$ne" control c!annel fails at anyremote site5 t!e Fone Controller a#tomaticallyselects one of t!e ot!er control capale c!annels ast!e active control c!annel for t!at site. = ControlC!annel Preference evel can e #se" to rank t!econtrol capale c!annels !ere 1 is t!e !i$!estrankin$ an" & t!e loest.

'?(P

6=IO@1 @ '=896OAP 16=IO@2 @ '=896OAP 16=IO@3 @ '=896OAP 26=IO@& @ '=896OAP 2

;oteH =ll ra"ios s!o#l" e affiliate" to t!e site #n"ertest.

?+'I!9 1.717

&. (?'(

Step 1. Initiate a 'alk$ro#p Call it! 6=IO@1 on'=896OAP 1.

Step 2. Oserve t!at only 6=IO@2 ill e ale tomonitor an" respon" to t!e call.

Step 3. Initiate a 'alk$ro#p Call it! 6=IO@3 on'=896OAP 2.

Step &. Oserve t!at only 6=IO@& ill e ale tomonitor an" respon" to t!e call.

Step . Poer off t!e control c!annel at t!e site#n"er test.

Step +. Oserve t!at t!e control c!annel rotates tot!e ne:t availale c!annel capale of actin$as a control c!annel.

Step -. Initiate a 'alk$ro#p Call it! 6=IO@1 on'=896OAP 1.

Step . Oserve t!at only 6=IO@2 ill e ale tomonitor an" respon" to t!e call.

Step 4. Initiate a 'alk$ro#p Call it! 6=IO@3 on'=896OAP 2.

Step 17. Oserve t!at only 6=IO@& ill e ale tomonitor an" respon" to t!e call. Poer #pt!e c!annel previo#sly poere" off to ret#rnt!e system to normal operation.

PassKKKK FailKKKK 

%ont$omery Co#nty5 %arylan"Statement of Work

"!  

Statement of Work:

Page 204: Motorola SOW - Reviewed by MoCo PM 2015-09-22

7/23/2019 Motorola SOW - Reviewed by MoCo PM 2015-09-22

http://slidepdf.com/reader/full/motorola-sow-reviewed-by-moco-pm-2015-09-22 204/309

'#stem +elia)ilit# Features

J.$.6.3 5ransmitter Po)er "ailure Sutdo)n

1. ,?'$+IP(I!9

'!e repeaters can "etect a loss or "ecrease in

transmitter o#tp#t poer of all tr#nke" repeatersconnecte" to it. *ac! tr#nke" repeater contains aninternal attmeter element. Once t!e forar" poer!as "ecrease" past t!e t!res!ol" set5 t!e repeaterinstr#cts t!e Fone Controller to take t!e c!annel o#tof service. If reflecte" poer increases past t!et!res!ol" set5 t!e repeater ill also instr#ct t!e FoneController to take t!e c!annel o#t of service.Once t!e station t!res!ol" !as een e:cee"e" an"t!e station taken o#t of service a @min#te timer illstart. =t t!e timer e:piration5 a transmitter test illstart to perform a self@c!eck on t!e station. '!is self@c!eck lasts for 27 secon"s. If t!e station passes5 t!e

self c!eck it ill e place" ack into service.

;oteH '!is test s!o#l" e "one on a site it! moret!an to c!annels. ailsoft ill occ#r if t!e test is"one on a to@c!annel site.

'?(P

6=IO@1 @ '=896OAP 1

?+'I!9 1.717

&. (?'(

Step 1. Select a c!annel to "isconnect t!e transmitantenna connection to t!e tr#nke" repeater.('!is ill ca#se a !i$! 0SW6 con"ition)

Step 2. 8ey 6=IO@1 so t!at t!e selecte" c!annel isassi$ne"5 an" verify t!at t!e c!annel"isales "#e to an alarm con"ition. 0erifyt!at t!is alarm is reporte" at t!e Anifie"*vent %ana$er (A*%).

Step 3. Wait 37 secon"s after t!e fail#re t!enrestore t!e transmit antenna connection tot!e tr#nke" repeater.

Step &. Asin$ t!e station *s5 verify t!at t!e time ittakes from t!e correcte" connection to t!estation ein$ place" ack in service is it!in min#tes.

Step . 0erify t!e Anifie" *vent %ana$er (A*%)also reports t!e station ein$ ack inservice.

PassKKKK FailKKKK 

%ont$omery Co#nty5 %arylan"Statement of Work

Statement of Work: "!!

Page 205: Motorola SOW - Reviewed by MoCo PM 2015-09-22

7/23/2019 Motorola SOW - Reviewed by MoCo PM 2015-09-22

http://slidepdf.com/reader/full/motorola-sow-reviewed-by-moco-pm-2015-09-22 205/309

 

'#stem +elia)ilit# Features

J.$.6.4 0edundant Site Controller S)itcingDutomatic S)itco(er

1. ,?'$+IP(I!9

'!e Site Controller s#system #ses to Site

Controllers in a re"#n"ant confi$#ration. '!e ack#pSite Controller is ma"e active eit!er #pon t!e loss ofcomm#nication to t!e active Site Controller or #pona #ser initiate" comman" from t!e Site Control%ana$er.'!is test ill "emonstrate t!at on t!e loss of t!eactive site controller t!e stan"y controller illecome active an" carry on t!e site operations.

'?(P

6=IO@1 @ '=896OAP 16=IO@2 @ '=896OAP 16=IO@3 @ '=896OAP 1

?+'I!9 1.717

&. (?'(

Step 1. 0erify ot! Site Controller are availale an"in t!e ;ormal state.

Step 2. Poer off t!e active Site Controller (or in t!e*SS confi$#ration connect to t!e =ctive Sitecontroller #sin$ CSS an" perform a LresetL)an" verify t!e ack#p ecomes t!e neactive Site Controller (note events in t!eevent vieer).

Step 3. 8ey 6=IO@1 an" verify t!at 6=IO@2 an"6=IO@3 !ear t!e a#"io.

Step &. *n" t!e call from 6=IO@1.

Step . Poer #p t!e Site Controller (if it aspoere" off). 0erify t!e Site Controllerret#rns to t!e normal state.

PassKKKK FailKKKK 

%ont$omery Co#nty5 %arylan"Statement of Work

2##  

Statement of Work:

Page 206: Motorola SOW - Reviewed by MoCo PM 2015-09-22

7/23/2019 Motorola SOW - Reviewed by MoCo PM 2015-09-22

http://slidepdf.com/reader/full/motorola-sow-reviewed-by-moco-pm-2015-09-22 206/309

'#stem +elia)ilit# Features

J.$.6.! 0edundant one Controller S)itcingutomatic S)itco(er

1. ,?'$+IP(I!9

In a non@S6 confi$#ration5 t!e Fone Controller

s#system #ses to Fone Controllers in a re"#n"antconfi$#ration. '!e ack#p Fone Controller is ma"eactive eit!er #pon t!e loss of t!e active FC or #pon a#ser comman" from t!e Anifie" ;etorkConfi$#rator (A;C). In a S6 confi$#ration5 t!ereare fo#r Fone Controllers in a re"#n"antconfi$#ration. =ny one of t!e fo#r co#l" e active tokeep t!e Fone Sites in Wi"e =rea 'r#nkin$. If #sin$t!e ynamic 6esilience Fone confi$#ration t!eAnifie" *vent %ana$er ill report t!e FoneController sitc!over in ot! Anifie" *vent%ana$ers (A*%).

'?(P

6=IO@1 @ '=896OAP 16=IO@2 @ '=896OAP 16=IO@3 @ '=896OAP 1

U '!e Fone Controllers s!o#l" e s#ccessf#llysync!roni<e" efore performin$ t!is proce"#re.

?+'I!9 1.7&7

&. (?'(

Step 1. 0erify t!e state of t!e c#rrent FoneControllers is =ctive or Stan"y in t!eAnifie" ;etork Confi$#rator (A;C). ('!ereill e to Fone Controllers in sin$le Foneor fo#r in t!e case of S6 <ones.)

Step 2. 6eset t!e active Fone Controller applicationvia t!e Anifie" *vent %ana$er (A*%)"ia$nostic.

Step 3. 0erify #sin$ A;C5 A*% an" FoneWatc! (ifapplicale) t!at t!e stan"y Fone Controllerecomes active an" rin$s all sites acki"e. Wait for t!e 6a"ios to settle o#t t!e

site affiliations.

Step &. 8ey 6=IO@1 an" verify t!at 6=IO@2 an"6=IO@3 !ear t!e a#"io.

Step . *n" t!e call from 6=IO@1.

Step +. 0erify t!at Fone Controller t!at as resetcomes ack #p to a Stan"yK state.

PassKKKK FailKKKK 

%ont$omery Co#nty5 %arylan"Statement of Work

Statement of Work: 2#"

Page 207: Motorola SOW - Reviewed by MoCo PM 2015-09-22

7/23/2019 Motorola SOW - Reviewed by MoCo PM 2015-09-22

http://slidepdf.com/reader/full/motorola-sow-reviewed-by-moco-pm-2015-09-22 207/309

 

'#stem +elia)ilit# Features

J.$.6.$ Station "ailure

1. ,?'$+IP(I!9

W!en a ase station repeater at one site fails "#e to

!ar"are prolems5 t!e pen"in$ call is lost an" t!etr#nkin$ controller removes t!e c!annel from servicesystem i"e. '!is fail#re can e create" ypoerin$ "on one ase station repeater.

'?(P

6=IO@1 @ '=896OAP 16=IO@2 @ '=896OAP 1

?+'I!9 1.717

&. (?'(

Step 1. Poer "on a voice repeater for any voicec!annel.

Step 2. Initiate calls #sin$ 6=IO@1 to step t!ro#$!all availale voice c!annels.

Step 3. 0erify t!at t!e "isale" c!annel is not #se".

PassKKKK FailKKKK 

%ont$omery Co#nty5 %arylan"Statement of Work

2#2  

Statement of Work:

Page 208: Motorola SOW - Reviewed by MoCo PM 2015-09-22

7/23/2019 Motorola SOW - Reviewed by MoCo PM 2015-09-22

http://slidepdf.com/reader/full/motorola-sow-reviewed-by-moco-pm-2015-09-22 208/309

'#stem +elia)ilit# Features

J.$.6.6 0edundant Console Site Link "ailure

1. ,?'$+IP(I!9

Comm#nication eteen t!e %aster Site an" a

6emote Console Site can take place over "e"icate"re"#n"ant links. '!e to links eteen t!e %asterSite an" t!e 6emote Console Site operate in are"#n"ant mo"e. '!e system ill sitc! to t!eack#p link if t!e main =; or W=; link fails.

;oteH '!e Primary Site 6o#ter5 if f#nctional5 illalays e t!e active ro#ter. '!e Secon"ary Site6o#ter ill only take over !en t!e Primary Site6o#ter is malf#nctionin$.

'?(P

6=IO@1 @ '=896OAP 1CO;SO*@1 @ '=896OAP 1

 = ra"io an" a Console are re/#ire" to perform t!istest (6=IO@1 an" CO;SO*@1). Select a Consolesite it! re"#n"ant links to t!e %aster Site.

?+'I!9 1.717

&. (?'(

Step 1. CO;SO*@1 initiates a 'alk$ro#p call on'=896OAP 1.

Step 2. Oserve t!at 6=IO@1 is ale to receive an"respon" to t!e call.

Step 3. 6emove t!e W=; link from t!e active ro#ter(Primary Site 6o#ter) at t!e 6emoteConsole Site.

Step &. Initiate a 'alk$ro#p Call it! 6=IO@1 in'=896OAP 1.

Step . Oserve t!at CO;SO*@1 is ale to receive

an" respon" to t!e call.

Step +. 6eplace t!e W=; link connection t!at asremove" in step &.

PassKKKK FailKKKK 

%ont$omery Co#nty5 %arylan"Statement of Work

Statement of Work: 2#3

Page 209: Motorola SOW - Reviewed by MoCo PM 2015-09-22

7/23/2019 Motorola SOW - Reviewed by MoCo PM 2015-09-22

http://slidepdf.com/reader/full/motorola-sow-reviewed-by-moco-pm-2015-09-22 209/309

 

'#stem +elia)ilit# Features

J.$.6.7 0edundant Site Link "ailure

1. ,?'$+IP(I!9

Comm#nication eteen t!e %aster Site an" t!e

6emote Site can take place over "e"icate"re"#n"ant links. '!e to links eteen t!e %asterSite an" t!e 6emote Site operate in a !otDstan"ymo"e. '!e system ill sitc! to t!e ack#p link ift!e main =; or W=; link fails.

;ote t!at t!e Primary Site 6o#ter5 if f#nctional5 illalays e t!e active ro#ter. '!e Secon"ary Site6o#ter ill only take over !en t!e Primary Site6o#ter is malf#nctionin$.

'?(P

6=IO@1 @ '=896OAP 16=IO@2 @ '=896OAP 1

U '!e site ein$ teste" s!o#l" !ave re"#n"ant linksto t!e %aster Site.

?+'I!9 1.717

&. (?'(

Step 1. Initiate a 'alk$ro#p Call it! 6=IO@1 on'=896OAP 1.

Step 2. Oserve t!at 6=IO@2 is ale to monitoran" respon" to t!e call.

Step 3. 6emove t!e W=; link from t!e active ro#terat t!e Site #n"er test.

Step &. Initiate a 'alk$ro#p Call it! 6=IO@1 on'=896OAP 1.

Step . Oserve t!at 6=IO@2 is ale to monitoran" respon" to t!e call.

Step +. 6eplace t!e W=; link connection t!at asremove" in Step 3.

PassKKKK FailKKKK 

%ont$omery Co#nty5 %arylan"Statement of Work

2#4 

Statement of Work:

Page 210: Motorola SOW - Reviewed by MoCo PM 2015-09-22

7/23/2019 Motorola SOW - Reviewed by MoCo PM 2015-09-22

http://slidepdf.com/reader/full/motorola-sow-reviewed-by-moco-pm-2015-09-22 210/309

'#stem +elia)ilit# Features

J.$.6.8 0edundant one Controller S)itcingDManual S)itco(er

1. ,?'$+IP(I!9

In a non@ynamic System 6esilience (S6)

confi$#ration5 t!e Fone Controller s#system #sesto Fone Controllers in a re"#n"ant confi$#ration.'!e stan"y Fone Controller is ma"e active eit!er#pon t!e loss of t!e active Fone Controller or #pon a#ser comman" from t!e Anifie" ;etorkConfi$#rator. In a S6 confi$#ration5 t!ere are fo#rFone Controllers in a re"#n"ant confi$#ration. =nyone of t!e fo#r co#l" e active to keep t!e FoneSites in Wi"e =rea 'r#nkin$. If #sin$ S6confi$#ration t!e Anifie" *vent %ana$er (A*%) illreport t!e Fone Controller sitc!over in ot! A*%s.

'?(P

6=IO@1 @ '=896OAP 16=IO@2 @ '=896OAP 16=IO@3 @ '=896OAP 1

?+'I!9 1.717

&. (?'(

Step 1. 0erify t!e state of t!e c#rrent FoneControllers is =ctive or Stan"y in t!eAnifie" ;etork Confi$#rator (A;C). ('!ereill e to Fone Controllers in sin$le Foneor fo#r in t!e case of S6 confi$#re"<ones.)

Step 2. Asin$ t!e Anifie" ;etork Confi$#rator5sitc! t!e Stan"y Fone Controller to t!e

 =ctive state.

Step 3. 0erify #sin$ A;C5 A*% an" FoneWatc! (ifapplicale) t!at t!e stan"y Fone Controllerecomes active an" rin$s all sites ack

i"e. Wait for t!e 6a"ios to settle o#t t!esite affiliations.

Step &. 8ey 6=IO@1 an" verify t!at 6=IO@2 an"6=IO@3 !ear t!e a#"io.

Step . *n" t!e call from 6=IO@1.

Step +. 0erify t!at Fone Controller t!at asprevio#sly =ctiveK comes ack #p to an*nale"K an" Stan"yK state.

PassKKKK FailKKKK 

%ont$omery Co#nty5 %arylan"Statement of Work

Statement of Work: 2#5 

Page 211: Motorola SOW - Reviewed by MoCo PM 2015-09-22

7/23/2019 Motorola SOW - Reviewed by MoCo PM 2015-09-22

http://slidepdf.com/reader/full/motorola-sow-reviewed-by-moco-pm-2015-09-22 211/309

 

'#stem +elia)ilit# Features

J.$.6.19 Site "ailso-t

1. ,?'$+IP(I!9

ail#re of all control c!annels5 fail#re of all voice

c!annels5 or fail#re of t!e site controller ill ca#se asite (6 S#system) to enter failsoft operation.S#scriers can e pro$ramme" to operate infailsoft y talk$ro#pM to searc! its list of controlc!annel fre/#encies in failsoftM or to "isale failsoftalto$et!er. W!en a site enters failsoft5 a ra"iopro$ramme" for failsoft y talk$ro#p ill first look fora specific failsoft c!annel "ictate" y t!e selecte"talk$ro#p. Since many systems !ave "ifferentfre/#encies across sites5 if t!e ra"io is #nale to fin"t!e talk$ro#ps failsoft c!annel t!e ra"io ill instea"operate in t!e control c!annel searc! failsoft mo"e.

 = ra"io pro$ramme" or nee"in$ to searc! control

c!annels for failsoft fre/#encies ill lock onto t!efirst control c!annel in its control c!annel list.;oteH 6a"ios s!o#l" not e site locke" !en infailsoft mo"e. '!e ra"io ill not c!eck t!e f#ll list of+& control c!annels pro$ramme" into t!e ra"iosco"e pl#$. =ll ra"ios s!o#l" e pro$ramme" to !avet!e same se/#ence of control c!annel fre/#encies.;oteH '!e s#scriers %AS' e SmartFonecapale.

'?(P

6=IO@1 @ '=896OAP 16=IO@2 @ '=896OAP 16=IO@3 @ '=896OAP 26=IO@& @ '=896OAP 2U Pro$ram t!e 6a"ios for failsoft operation ytalk$ro#p. '=896OAP 1 s!o#l" #se a "ifferentc!annel for failsoft t!an '=896OAP 2 an" neit!ers!o#l" e a control c!annel.

?+'I!9 1.717

&. (?'(

Step 1. Asin$ t!e Anifie" *vent %ana$er (A*%)5place t!e s#system into failsoft mo"e.

Step 2. 0erify t!at t!e 6a"ios emit a failsoft toneappro:imately once every ten secon"s.

Step 3. Initiate a 'alk$ro#p Call from 6=IO@1 !ilein failsoft mo"e.

Step &. 0erify t!at only 6=IO@2 can !ear 6=IO@1.

Step . ekey 6=IO@1 an" poer "on t!e failsoftc!annel associate" it! '=896OAP 1.

Step +. 8ey 6=IO@1 an" verify 6=IO@2 can stillmonitor t!e call #t t!e ot!er ra"ios cannot.

Step -. ekey 6=IO@1 an" initiate a 'alk$ro#p Callfrom 6=IO@3.

Step . 0erify t!at only 6=IO@& can !ear 6=IO@3.

PassKKKK FailKKK 

%ont$omery Co#nty5 %arylan"Statement of Work

2#6  

Statement of Work:

Page 212: Motorola SOW - Reviewed by MoCo PM 2015-09-22

7/23/2019 Motorola SOW - Reviewed by MoCo PM 2015-09-22

http://slidepdf.com/reader/full/motorola-sow-reviewed-by-moco-pm-2015-09-22 212/309

'#stem +elia)ilit# Features

J.$.6.11 Primary Prime Site Link "ailureDSimulcast ;E' Prime Site to one Core Eternet Link

1. ,?'$+IP(I!9

'!is test s!os t!at in t!e event of a fail#re of t!elink eteen t!e primary prime site an" t!e <onecore5 t!e voice traffic from t!e primary prime site isrero#te" t!ro#$! t!e secon"ary prime site to t!e<one core.

'?(P

6=IO@1 @ '=896OAP 16=IO@2 @ '=896OAP 1

?+'I!9 1.77

&. (?'(

Step 1. Initiate a talk$ro#p call from 6=IO@1 on'=896OAP 1. 8eep t!e ra"io keye" #p#ntil instr#cte" to "ekey. Oserve t!at6=IO@2 receives t!e a#"io.

Step 2. Create a site link fail#re (prime site to <onecore) y "isconnectin$ t!e *t!ernet =;cale from t!e Prime Site 6o#ter at t!eprimary prime SI'* 1.

Step 3. Worst caseM oserve an a#"io !ole in from6=IO@1 to 6=IO@25 #t t!at t!e callcontin#es.

ekey 6=IO@1.

Step &. Oserve5 in t!e Anifie" *vent %ana$er5 t!att!e site link !as faile".

Step . Oserve t!at t!e SI'* 1 contin#es tooperate in Wi"e =rea 'r#nkin$.

Step +. Initiate a talk$ro#p call from 6=IO@1 on'=896OAP 1. 8eep t!e ra"io keye" #p#ntil instr#cte" to "ekey. Oserve t!at6=IO@2 receives t!e a#"io.

Step -. 6econnect t!e *t!ernet =; cale to t!ePrime Site 6o#ter at t!e primary prime SI'*1.

Step . Oserve t!at SI'* 1 contin#es to operate inWi"e =rea 'r#nkin$.

Step 4. Oserve t!at 6=IO@2 receives t!e a#"iofrom 6=IO@1.

Step 17. ekey 6=IO@1.

PassKKKK FailKKKK 

%ont$omery Co#nty5 %arylan"Statement of Work

Statement of Work: 2#7 

Page 213: Motorola SOW - Reviewed by MoCo PM 2015-09-22

7/23/2019 Motorola SOW - Reviewed by MoCo PM 2015-09-22

http://slidepdf.com/reader/full/motorola-sow-reviewed-by-moco-pm-2015-09-22 213/309

Page 214: Motorola SOW - Reviewed by MoCo PM 2015-09-22

7/23/2019 Motorola SOW - Reviewed by MoCo PM 2015-09-22

http://slidepdf.com/reader/full/motorola-sow-reviewed-by-moco-pm-2015-09-22 214/309

J.8.= A"&-y P'+!!&& T"!

J.$.7.1 Cannel Partitioning '+eration

1. ,?'$+IP(I!9

'!is feat#re provi"es e:cl#sive #se of "esi$nate"6 c!annels for !i$! priority $ro#ps. '!is test ill"emonstrate t!at t!e calls elon$in$ to t!e !i$!priority $ro#p are steere" to t!e 6 c!annels t!atare "esi$nate".In t!is test case5 a secon" Aser 9ro#p (A92) ill econfi$#re". '!e Aser 9ro#p ill e assi$ne" to t!e'=896OAP profile. A92 ill e #se" for 6C!annel at SI'* 1 to e teste". '!is ill ens#ret!at A92 ill !ave e:cl#sive #se of C!annel .

;oteH In '%= operation5 ot! '%= time slots on

t!e ,6 are assi$ne" to t!is Aser 9ro#p. C!annelPartitionin$ is a license" feat#re.

'?(P

6=IO@1 @ '=896OAP 16=IO@2 @ '=896OAP 6 C!annel assi$ne" to A92

?+'I!9 1.717

&. (?'(

Step 1. Initiate a talk$ro#p call on '=896OAP from 6=IO@2.

Step 2. 0erify t!at 6=IO@2 is assi$ne" 6 c!annel.

Step 3. 6elease t!e P'' an" ait for t!e talk$ro#pcall to en".

Step &. Initiate a talk$ro#p call from 6=IO@1 on'=896OAP 1.

Step . Oserve t!at t!e talk$ro#p call from 6=IO@1 is not assi$ne" 6 c!annel .

Step +. 6elease t!e P'' on 6=IO@1 an" ait #ntilt!e c!annel for t!e '=896OAP 1 call is"roppe". Initiate anot!er call on [email protected] t!at 6=IO@1 is a$ain assi$ne" to ac!annel ot!er t!an 6 c!annel .

Step -. 6epeat t!e process #ntil all c!annels !aveeen cycle" t!ro#$!. 0erify t!at 6 c!annel is not assi$ne" to t!e '=896OAP 1 call.

Step . Initiate a call on 6=IO@2 an" verify 6c!annel is assi$ne".

PassKKKK FailKKKK 

%ont$omery Co#nty5 %arylan"Statement of Work

Statement of Work: 2#!

Page 215: Motorola SOW - Reviewed by MoCo PM 2015-09-22

7/23/2019 Motorola SOW - Reviewed by MoCo PM 2015-09-22

http://slidepdf.com/reader/full/motorola-sow-reviewed-by-moco-pm-2015-09-22 215/309

Page 216: Motorola SOW - Reviewed by MoCo PM 2015-09-22

7/23/2019 Motorola SOW - Reviewed by MoCo PM 2015-09-22

http://slidepdf.com/reader/full/motorola-sow-reviewed-by-moco-pm-2015-09-22 216/309

8udio IP 0ogging

J.$.8.2 Logging Secure 5runking 5alkgrou+ Call

1. ,?'$+IP(I!9

'!is test ill "emonstrate t!e =rc!ivin$ Interface

Server (=IS) can e #se" to lo$ tr#nkin$ talk$ro#pcall a#"io for call in a sec#re transmit mo"e on a$iven talk$ro#p. '!e a#"io is arc!ive" in a voco"e""ecrypte" format (I%,* for 'r#nkin$ 'alk$ro#p Call)only !en t!e lo$$in$ system #ser re/#este" co"e"a#"io to e lo$$e".

'?(P

'!e =IS at %CC -77 Console site is affiliate" to'=896OAP 1 an" !as t!e appropriate sec#re keys

loa"e".6=IO@1 @ '=896OAP 1CO;SO*@1 @ '=896OAP 1

?+'I!9 1.7&7

&. (?'(

Step 1. Initiate P'' from 6=IO@1 on '=896OAP1 in a sec#re transmit mo"e.

Step 2. Oserve t!at t!e call a#"io is ein$ sent tot!e lo$$in$ system y t!e playackapplication.

Step 3. If '=896OAP 1 is marke" to receiveco"e" a#"io5 verify t!e co"e" a#"io can eplaye" ack via t!e application.

Step &. Oserve t!at t!e events for t!e'=896OAP 1 call are lo$$e" even if t!e'=896OAP 1 is not marke" to receive

co"e" a#"io.

PassKKKK FailKKKK 

%ont$omery Co#nty5 %arylan"Statement of Work

Statement of Work: 2""

Page 217: Motorola SOW - Reviewed by MoCo PM 2015-09-22

7/23/2019 Motorola SOW - Reviewed by MoCo PM 2015-09-22

http://slidepdf.com/reader/full/motorola-sow-reviewed-by-moco-pm-2015-09-22 217/309

 

8udio IP 0ogging

J.$.8.3 Logging Su&systemDEmergency E(ents and CallsAEmergency larm

1. ,?'$+IP(I!9

'!is test ill "emonstrate t!at #pon receivin$

notification from t!e Fone Controller of an*mer$ency =cknole"$eD6eco$ni<e iss#e" for areso#rce t!at t!e =IS is monitorin$5 t!e =IS illreport t!e event to t!e o$$in$ System.

'?(P

6=IO@1 '=896OAP 1CO;SO*@1 '=896OAP 1

 =IS5 lo$$in$ recor"er playack station5 an" lo$$in$recor"er system connecte" to =IS via t!e site =;

sitc!. Confi$#re an alias for 6=IO@1 an" 6=IO@2 an" allo a"e/#ate time for "ata propa$ation.

?+'I!9 1.717

&. (?'(

Step 1. Start an emer$ency alarm from 6=IO@1

Step 2. 0erify t!at a 6=IO@1 "isplays anemer$ency in"ication an" CO;SO*@1 $etst!e *mer$ency in"ication.

Step 3. 8ey #p 6=IO@1 on '=896OAP 1. 0erifyt!at CO;SO*@1 receives a#"io on'=896OAP 1.

Step &. Playack recent '=896OAP 1 callactivities

Step . 0erify t!at t!e lo$$in$ system !as recor"e"

t!e emer$ency alarm callDevents it! correct6eso#rce =lias5 In"ivi"#al =lias5 Site I5 an"t!e <one I.

PassKKKK FailKKKK 

%ont$omery Co#nty5 %arylan"Statement of Work

2"2  

Statement of Work:

Page 218: Motorola SOW - Reviewed by MoCo PM 2015-09-22

7/23/2019 Motorola SOW - Reviewed by MoCo PM 2015-09-22

http://slidepdf.com/reader/full/motorola-sow-reviewed-by-moco-pm-2015-09-22 218/309

8udio IP 0ogging

J.$.8.4 Logging Su&systemDLogging ser Can Searc 0ecorded Calls &y %arious "ields

1. ,?'$+IP(I!9

'!is test ill "emonstrate t!at t!e o$$in$ System

ill allo an a#t!ori<e" #ser to searc! recor"e"conversations an" to play ack t!e "esire"conversation. '!e s#pporte" searc! incl#"es timean" "ate searc!5 reso#rce searc! ase" on I oralias (tr#nke" talk$ro#p)5 type of call searc!5 sitesearc!5 <one searc!5 an" #ser searc!.;oteH If #sin$ t!e Inform =pplication5 t!e searc!fiel"s may e limite" to t!reeH Anit I5 6eso#rce

 =lias5 an" In"ivi"#al I.

'?(P

'!e lo$$in$ recor"er play ack station connecte" to =IS via t!e site =; sitc!. =IS it! prerecor"e"a#"ioDevents in '=896OAP 1 an" '=896OAP 2is re/#ire". =ssi$n aliases for '=896OAP 1('=896OAP 1Q=I=S) an" '=896OAP 2('=896OAP 2Q=I=S). Playack station isconfi$#re" it! Aser =cco#nt A=.

?+'I!9 1.717

&. (?'(

Step 1. 0erify t!at '=896OAP 1 an"'=896OAP 2 recor"e" a#"io Devents cane replaye" y lo$$in$ in it! A= #seracco#nt.

Step 2. Searc! for a recor"e" call y time an" "atefiel" an" play ack t!e recor"e" call fromt!e searc! res#lts.

Step 3. 0erify t!at acc#rate searc! res#lts arepro"#ce" an" t!e recor"e" call is playe"ack

Step &. Searc! for a recor"e" call y In"ivi"#al

 =lias fiel" an" play ack t!e recor"e" callfrom t!e searc! res#lts

Step . 0erify t!at acc#rate searc! res#lts arepro"#ce" an" t!e recor"e" call is playe"ack

Step +. Searc! for a recor"e" call y 6eso#rcealiases an" play ack t!e recor"e" call fromt!e searc! res#lts.

Step -. 0erify t!at acc#rate searc! res#lts arepro"#ce" an" t!e recor"e" call is playe"

ack

Step . Searc! for a recor"e" call y Site I fiel"an" play ack t!e recor"e" call from t!esearc! res#lts.

Step 4. 0erify t!at acc#rate searc! res#lts arepro"#ce" an" t!e recor"e" call is playe"ack.

PassKKKK FailKKKK 

%ont$omery Co#nty5 %arylan"Statement of Work

Statement of Work: 2"3

Page 219: Motorola SOW - Reviewed by MoCo PM 2015-09-22

7/23/2019 Motorola SOW - Reviewed by MoCo PM 2015-09-22

http://slidepdf.com/reader/full/motorola-sow-reviewed-by-moco-pm-2015-09-22 219/309

Page 220: Motorola SOW - Reviewed by MoCo PM 2015-09-22

7/23/2019 Motorola SOW - Reviewed by MoCo PM 2015-09-22

http://slidepdf.com/reader/full/motorola-sow-reviewed-by-moco-pm-2015-09-22 220/309

+adio 8uthentication

J.$.19.2 0adio Success-ully utenticates

1. ,?'$+IP(I!9

'!is test verifies t!at t!e ra"io !as performe" an"

passe" a#t!entication. '!e #ser of t!e ra"io is notnotifie" t!at a#t!entication !as een s#ccessf#l5 #tit is s!on on t!e infrastr#ct#re it! Fone Watc!.

'?(P

6=IO@1 @ '=896OAP 16=IO@2 @ '=896OAP 1

;o a#t!entication key for 6=IO@1 in =#C.System i"e =#t!entication is *nale"

?+'I!9 1.717

&. (?'(

Step 1. 80 loa" a ran"omly create" a#t!enticationkey into 6=IO@1.

Step 2. onloa" t!is a#t!entication key from t!e80 to t!e =#C.

Step 3. 0erify on =#C client t!at t!e a#t!enticationkey as receive".

Step &. Cycle poer on 6=IO@1.

Step . 0erify on Fone Watc! t!at a#t!enticationas performe".

Step +. Confirm 6=IO@1 can perform a 'alk$ro#pcall it! 6=IO@2.

PassKKKK FailKKKK 

%ont$omery Co#nty5 %arylan"Statement of Work

Statement of Work: 2"5 

Page 221: Motorola SOW - Reviewed by MoCo PM 2015-09-22

7/23/2019 Motorola SOW - Reviewed by MoCo PM 2015-09-22

http://slidepdf.com/reader/full/motorola-sow-reviewed-by-moco-pm-2015-09-22 221/309

 

J.8.11 R"$+! G"&"+'!& T"!

J.$.11.1 =istorical 0e+orts

1. ,?'$+IP(I!9

Performance reports can e create" a#tomaticallyfor "ynamic statistical information ao#t t!e air trafficactivity on t!e system. '!ese reports provi"eassistance it! system mana$ement5 reso#rceplannin$5 #sa$e allocation5 an" monitorin$. =llreports are preformatte" an" s#mmari<e air trafficactivity for a confi$#re" time span.

;oteH epen"in$ on t!e time span selecte"5 smallertime intervals may not e availale.

'?(P

;o prior set#p is re/#ire" for t!is test.

?+'I!9 1.717

&. (?'(

Step 1. rom t!e PC =pplication a#nc!er5 select a<one.

Step 2. rom t!at <ones men#5 c!oose FoneBistorical 6eports.

Step 3. rom t!e Bistorical 6eports Player in"ot!at opens5 select a report.

Step &. Asin$ t!e left mo#se #tton5 click on t!evie #tton.

Step . Oserve a in"o opens alloin$ a #ser toenter report parameters.

Step +. *nter all "esire" "ata for t!e report an"9enerate 6eport.

Step -. Oserve a in"o appears s!oin$ t!ere/#este" report.

Step . Close t!e report in"o.

Step 4. 6#n t!e folloin$ reports "#rin$ testin$H'alk$ro#p at Fone S#mmary5 Aser at Fone

S#mmary5 an" Site S#mmary.

PassKKKK FailKKKK 

%ont$omery Co#nty5 %arylan"Statement of Work

2"6  

Statement of Work:

Page 222: Motorola SOW - Reviewed by MoCo PM 2015-09-22

7/23/2019 Motorola SOW - Reviewed by MoCo PM 2015-09-22

http://slidepdf.com/reader/full/motorola-sow-reviewed-by-moco-pm-2015-09-22 222/309

+eport =eneration (ests

J.$.11.2 ni-ied :et)ork Con-igurator 0e+ortsD,e(ice *n(entory 0e+ort

1. ,?'$+IP(I!9

'!e Anifie" ;etork Confi$#rator (A;C) reports

allo t!e #ser to $enerate "ata s#mmaries to vieinformation from t!e A;C "ataase. Once t!e reportis r#n5 t!e res#lts can e viee"5 printe"5 an"e:porte". '!is test ill r#n a report t!at provi"es t!e"ata for a specific "evice.

'?(P

If t!e A;C is not open5 "o#le@click t!e A;Cs!ortc#t (A;C) on t!e "esktop5 an" a0oyenceControl client session ill la#nc!. W!en

prompte"5 #se t!e o$in "ialo$ o: to lo$in to t!eA;C #sin$ t!e appropriate #sername an" passor".

;oteH '!e o#tp#t format for t!e report ill "efa#lt toP. If a "ifferent o#tp#t format for t!e report is"esire" it ill nee" to e selecte".

?+'I!9 1.7&7

&. (?'(

Step 1. rom t!e A;C la#nc! pa$e men# ar selectt!e 'ools men# an" c!oose 6eport ="visor.(If nee"e" lo$ in it! appropriate #ser namean" passor".)

Step 2. rom t!e 6eport ="visor screen5 select t!eLInventory 6eportsL !ea"er to e:pan" t!e"rop "on men#.

Step 3. Select t!e "esire" report to r#n5 in t!is caseselect Levices y %o"elL an" c!oose L6#n6eportL.

Step &. eave t!e "efa#lt fiel" entries #ntil t!e

L0en"or ilterL fiel" is reac!e". In t!is fiel"5select BP for t!e ven"or. '!en select t!eLProc#rve Sitc! 2+@2&L sitc! mo"el for t!e L%o"el ilterL fiel". *nter a "escriptionfor t!e report if so "esire".

Step . 0erify t!e L6#n noL #tton is selecte" an"!it t!e S#mit #tton.

Step +. Select t!e L*:port 6eportL icon to save t!ereport to t!e server. Select t!e file format forsavin$ t!e report. or t!is test case5 selectP an" !it S#mit. (;ot all formats ill e

vieale on t!e client. '!e appropriateapplication o#l" e nee"e" to vie t!esave" file.)

Step -. *:pan" t!e Lonloa"sL ta on t!e left si"eof t!e screen to e:pan" t!e selection. 0erifyt!e report t!at as save" in t!e previo#sstep is liste". If it as save" as a P5 its!o#l" e availale to vie on t!e ;% client.

Step . 0ie t!e $enerate" report. (In some casest!e #ser may nee" to temporarily allo pop#ps on t!e roser) '!e report can esave" to t!e client y selectin$ LSave =CopyL icon an" applyin$ t!e appropriateinformation for filename an" location.

Step 4. 0erify t!e $enerate" report !as appropriateinformation on t!e selecte" "evices an" t!atit can e save" to t!e client.

PassKKKK FailKKKK 

%ont$omery Co#nty5 %arylan"Statement of Work

Statement of Work: 2"7 

Page 223: Motorola SOW - Reviewed by MoCo PM 2015-09-22

7/23/2019 Motorola SOW - Reviewed by MoCo PM 2015-09-22

http://slidepdf.com/reader/full/motorola-sow-reviewed-by-moco-pm-2015-09-22 223/309

 

J.8.12 Sy!"# M'&'"#"&! T"!

J.$.12.1 oneatc

1. ,?'$+IP(I!9

FoneWatc! is an a"ministration tool for monitorin$ra"io traffic on a system. = system mana$er can #seFoneWatc! to analy<e traffic patterns for loa""istri#tion5 an" tro#les!oot ra"io an" siteprolems. FoneWatc! is #se" to vie c#rrent ra"iotraffic activity for t!e system. '!is activity is"isplaye" in $rap!ical format5 color@co"e" for easyi"entification of t!e type of activity occ#rrin$ on t!esystem.

'?(P

6=IO@1 @ '=896OAP 16=IO@2 @ '=896OAP 16=IO@3 @ '=896OAP 16=IO@& @ '=896OAP 1

?+'I!9 1.717

&. (?'(

Step 1. 0erify t!at FoneWatc! !as een confi$#re"for t!e 9ri" an" %#lti Site Scroll in"os to"isplay system activity.

Step 2. rom t!e PC =pplication a#nc!er5 select a<one fol"er.

Step 3. rom it!in t!at <one5 select FoneWatc!.

Step &. Select t!e appropriate profile to e ale tovie t!e c!annel #sa$e on t!e system.

Step . Initiate several calls it! t!e ra"ios an"oserve t!at t!e appropriate c!annel #sa$einformation is "isplaye".

PassKKKK FailKKKK 

%ont$omery Co#nty5 %arylan"Statement of Work

2"  

Statement of Work:

Page 224: Motorola SOW - Reviewed by MoCo PM 2015-09-22

7/23/2019 Motorola SOW - Reviewed by MoCo PM 2015-09-22

http://slidepdf.com/reader/full/motorola-sow-reviewed-by-moco-pm-2015-09-22 224/309

'#stem Management (ests

J.$.12.2 Con-iguration ManagementDccess Permissions

1. ,?'$+IP(I!9

In =S'6O releases5 t!e 6a"io System Infrastr#ct#re

mana$ement is "one in t!e Anifie" ;etorkConfi$#rator (A;C) application. '!e Anifie" ;etorkConfi$#rator Wi<ar" (A;CW) also !elps to confi$#ret!e system y !avin$ a Aser interface into t!esystem confi$#ration.Confi$#ration parameters s#c! as In"ivi"#al an"'alk$ro#p efa#lt =ccess Permission5 an" Site

 =ccess enial 'ype can e manip#late" from t!eseapplications.

'?(P

6=IO@1 @ '=896OAP 16=IO@2 @ '=896OAP 1

?+'I!9 1.77

&. (?'(

Step 1. elete t!e "ataase recor" for 6=IO@1from t!e Provisionin$ %ana$er so t!at t!esystem "oes not !ave any knole"$e of6=IO@1. In a""ition5 "istri#te t!econfi$#ration from t!e Provisionin$ %ana$er (i.e. invoke istri#te Confi$#rationC!an$es operation).

Step 2. 0erify t!e LIn"ivi"#al efa#lt =ccessPermissionL fla$ is set to L;OL. If c!an$esare ma"e5 approve t!e jo in 0oyence5 t!enP#lis! Infrastr#ct#re ata from t!e Anifie";etork Confi$#ration Wi<ar" (A;CW).

Step 3. Initiate a call from 6=IO@1 on'=896OAP 1. 0erify t!at t!e 6a"ioSystem rejects t!e 6=IO@1 call re/#esteca#se 6=IO@1 !as not een "efine" int!e 6a"io Aser "ataase.

Step &. C!an$e t!e In"ivi"#al efa#lt =ccessPermission fla$ to Z*S. =fter approvin$ t!e

 jo in 0oyence5 P#lis! Infrastr#ct#re atafrom t!e A;CW.

Step . Initiate a call from 6=IO@1. 0erify t!at t!esystem permits t!e 6=IO@1 call re/#est

eca#se t!e system $rants ra"io access#sin$ "efa#lt settin$s.

Step +. rom t!e Provisionin$ %ana$er5 confi$#ret!e 6=IO@1 recor"s t!at as a#tomaticallycreate" as a res#lt of t!e ra"ios P''. Ina""ition5 "istri#te t!e confi$#ration from t!eProvisionin$ %ana$er (i.e. invoke istri#teConfi$#ration C!an$es operation).

Step -. 6eset t!e LIn"ivi"#al efa#lt =ccessPermissionL fla$ to ;O. =fter approvin$ t!e

 jo in 0oyence5 P#lis! Infrastr#ct#re atafrom t!e A;CW.

Step . Initiate a call from 6=IO@1. 0erify t!at t!e6a"io System permits t!e 6=IO@1 callre/#est eca#se 6=IO@1 is no a vali"#ser.

PassKKKK FailKKKK 

%ont$omery Co#nty5 %arylan"Statement of Work

Statement of Work: 2"!

Page 225: Motorola SOW - Reviewed by MoCo PM 2015-09-22

7/23/2019 Motorola SOW - Reviewed by MoCo PM 2015-09-22

http://slidepdf.com/reader/full/motorola-sow-reviewed-by-moco-pm-2015-09-22 225/309

 

'#stem Management (ests

J.$.12.3 Con-iguration ManagementD;eneral 5imeout Parameters

1. ,?'$+IP(I!9

System an" call timeo#t parameters s#c! as Private

Call 6in$5 9ro#p Call Service 'imeo#t5 Private CallBan$ 'ime5 *mer$ency Call Ban$ time5 %a:im#m9ro#p Call #ration an" %a:im#m Private Call#ration can also e manip#late" from t!e Anifie";etork Confi$#rator (A;C) Wi<ar".

or t!is test5 t!e Private Call #ration ill e limite"to one min#te. '!e call ill c!an$e to transmissiontr#nke" after t!e one@min#te timer e:pires at !ic!time t!e !an$ timers ill come into play. Once t!e#sers !ave "iscontin#e" #sin$ t!e system for t!ePrivate Call lon$ eno#$! for t!e !an$ timers toe:pire t!e system ill en" t!e call.

'?(P

6=IO@1 @ '=896OAP 16=IO@2 @ '=896OAP 1

?+'I!9 1.717

&. (?'(

Step 1. Initiate a '=896OAP 1 call from [email protected] t!at t!e 6a"io System permits t!e6=IO@1 call re/#est.

Step 2. In t!e mana$er5 confi$#re t!e L%a:im#mPrivate Call #rationL to 1 min#te an" apply.

Step 3. Initiate a Private Call from 6=IO@1 to6=IO@2. Contin#e to converse ack an"fort! #sin$ 6=IO@1 an" 6=IO@25

Step &. 0erify t!at after one min#te elapses5 t!esystem ill transmission tr#nk t!e PrivateCall eca#se t!e ma:im#m call "#ration !as

een e:cee"e". Once t!e !an$ time timer!as e:pire" t!e call ill e terminate".

Step . 6eset t!e Private Call %a:im#m Call#ration settin$ to e 17 min#tes ("efa#lt).

PassKKKK FailKKKK 

%ont$omery Co#nty5 %arylan"Statement of Work

22#  

Statement of Work:

Page 226: Motorola SOW - Reviewed by MoCo PM 2015-09-22

7/23/2019 Motorola SOW - Reviewed by MoCo PM 2015-09-22

http://slidepdf.com/reader/full/motorola-sow-reviewed-by-moco-pm-2015-09-22 226/309

'#stem Management (ests

J.$.12.4 Con-iguration ManagementDSu&scri&er Ca+a&ilities

1. ,?'$+IP(I!9

'!e Provisionin$ %ana$er (P%) controls t!e

parameters for all ra"io #sers an" "ispatc!ers on t!esystem. Wit!in t!e S#scrier section5 t!e 6a"ioAser Confi$#ration Win"o enales t!e netorkmana$er to tailor SmartFone s#scrierscapailities. %#lti$ro#p5 Sec#re5 Call =lert5 PrivateCall5 an" 'elep!one Interconnect are some of t!efeat#res t!at can e enale" or "isale". '!efeat#res t!at co#l" e #ni/#e to t!e partic#lar #serare confi$#re" "irectly in t!e 6a"io AserConfi$#ration Win"o. '!e feat#res t!at co#l" econfi$#re" t!e same for a $ro#p of #sers are place"into recor"s calle" profiles. '!e netork mana$erreferences t!e profile !ic! contains t!e "esire"

set#p for t!ese feat#res from t!e 6a"io AserConfi$#ration Win"o.

;ote @ = profile m#st alrea"y e:ist to e reference"t!ro#$! t!e 6a"io Confi$#ration Win"o #t can emo"ifie" later if nee"e".

'?(P

6=IO@1 @ '=896OAP 16=IO@2 @ '=896OAP 1

U la$ ot! ra"ios to e capale of Call =lert5 PrivateCall5 an" ispatc! Calls.

U Set t!e LAser *nale"L fla$ to Z*S for ot!6=IO@1 an" 6=IO@2.

?+'I!9 1.717

&. (?'(

Step 1. Initiate a Call =lert (P=9*) from 6=IO@1 to6=IO@2. 0erify t!at 6=IO@2 receives t!eCall =lert.

Step 2. C!an$e t!e Call =lert *nale" fla$ to ;O for 6=IO@1 via t!e P%.

Step 3. Initiate a Call =lert from 6=IO@2 to 6=IO@1. 0erify t!at 6=IO@2 receives a reject!en attemptin$ to Call =lert 6=IO@1.

Step &. C!an$e t!e Call =lert *nale" fla$ ack toZ*S for 6=IO@1 via t!e P%.

Step . Initiate a Call =lert from 6=IO@2 to 6=IO@1. 0erify t!at 6=IO@1 no receives t!e Call

 =lert.

Step +. Initiate a Private Call (C=) from 6=IO@1to 6=IO@2. 0erify t!at 6=IO@2 receivest!e Private Call.

Step -. C!an$e t!e Private Call *nale" fla$ to ;Ofor 6=IO@1 via t!e P%.

Step . Initiate a Private Call from 6=IO@2 to6=IO@1. 0erify t!at 6=IO@2 receives a

reject !en attemptin$ to Private Call6=IO@1.

Step 4. C!an$e t!e Private Call *nale" fla$ ackto Z*S for 6=IO@1 via t!e P%.

Step 17. Initiate a Private Call from 6=IO@2 to6=IO@1. 0erify t!at 6=IO@1 no receivest!e Private Call.

PassKKKK FailKKKK 

%ont$omery Co#nty5 %arylan"Statement of Work

Statement of Work: 22"

Page 227: Motorola SOW - Reviewed by MoCo PM 2015-09-22

7/23/2019 Motorola SOW - Reviewed by MoCo PM 2015-09-22

http://slidepdf.com/reader/full/motorola-sow-reviewed-by-moco-pm-2015-09-22 227/309

 

'#stem Management (ests

J.$.12.! Con-iguration ManagementD5alkgrou+ Ca+a&ilities

1. ,?'$+IP(I!9

'!e Provision %ana$er (P%) controls t!e

parameters for all ra"io #sers an" "ispatc!ers on t!esystem.

Wit!in t!e S#scrier section5 t!e 'alk$ro#pConfi$#ration Win"o enales t!e netork mana$er to tailor SmartFone 'alk$ro#p Capailities.*mer$ency5 Sec#re an" Priority %onitor are some of t!e feat#res t!at can e enale" or "isale". '!efeat#res t!at co#l" e #ni/#e to t!e partic#lar #serare confi$#re" "irectly in t!e 'alk$ro#p Confi$#rationWin"o. '!e feat#res t!at co#l" e confi$#re" t!esame for a $ro#p of #sers are place" into recor"scalle" profiles. '!e netork mana$er references t!e

profile !ic! contains t!e "esire" set#p for t!esefeat#res from t!e 'alk$ro#p Confi$#ration Win"o.

;O'*H = profile m#st alrea"y e:ist to e reference"t!ro#$! t!e 'alk$ro#p Confi$#ration Win"o #t cane mo"ifie" later if nee"e".

'?(P

6=IO@1 @ '=896OAP 16=IO@2 @ '=896OAP 1

U Set t!e L'alk$ro#p *nale"L fla$ to Z*S for'=896OAP 1 in t!e P%.

?+'I!9 1.77

&. (?'(

Step 1. Initiate a call from 6=IO@1 on'=896OAP 1. 0erify t!at 6=IO@2 !earst!e 6=IO@1 a#"io.

Step 2. C!an$e t!e 'alk$ro#p *nale" fla$ to ;Ofor '=896OAP 1 via t!e P%.

Step 3. Initiate a call from 6=IO@1 or 6=IO@2 on'=896OAP 1. 0erify t!at neit!er ra"io caninitiate a call eca#se of t!e c!an$e instat#s of t!e 9ro#p *nale" la$ of'=896OAP 1.

Step &. Initiate an *mer$ency call from 6=IO@1.

0erify t!at ot! t!e console (if present) an"6=IO@2 can !ear t!e transmission.

Step . ekey 6=IO@1.

Step +. C!an$e t!e 'alk$ro#p *nale" fla$ ack toZ*S for '=896OAP 1 via t!e P%.

Step -. Initiate a call from 6=IO@1 on'=896OAP 1. 0erify t!at ot! t!e console(if present) an" 6=IO@2 !ear 6=IO@1.

PassKKKK FailKKKK 

%ont$omery Co#nty5 %arylan"Statement of Work

222  

Statement of Work:

Page 228: Motorola SOW - Reviewed by MoCo PM 2015-09-22

7/23/2019 Motorola SOW - Reviewed by MoCo PM 2015-09-22

http://slidepdf.com/reader/full/motorola-sow-reviewed-by-moco-pm-2015-09-22 228/309

'#stem Management (ests

J.$.12.$ ni-ied E(ent ManagerDser ctions Create udit 5rails

1. ,?'$+IP(I!9

One of t!e f#nctions of t!e Anifie" *vent %ana$er

(A*%) t!at can e mana$e" #n"er Sec#rity%ana$ement is t!e Aser activity lo$5 also calle"

 =#"it 'rails5 containin$HOperations invoke" y t!e #ser.'!e name of t!e #ser !o invoke" t!e operation.ata an" time of invocation.'ar$et "eviceDoject on !ic! t!e operation asinvoke".'!e stat#s of t!e operation.'!e cate$ory of invoke" operation.

'!is test ill "emonstrate t!at Anifie" *vent%ana$er (A*%) #ser actions are lo$$e" y t!e

system. '!ese a#"it items lo$ t!e !istory of activityfor a perio" of #p to 1 year.

;oteH '!e a#"it lo$ is part of t!e A*% "ataase. ="ataase restore or reloa" of t!e A*% may affectt!e a#"it lo$ !istory.

'?(P

;%client 71 @ A*% client session active.

(;oteH If t!e =#t!entication =#"it o$ !as eencleare"5 t!ere ill only e t!e event to clear t!e lo$.)

?+'I!9 1.77

&. (?'(

Step 1. On a A*% client session5 select ="ministration from t!e men# ar an" t!enSystem ="ministration. '!e ="ministration%en# in"o opens #p.

Step 2. In t!e System ="ministration in"o5 clickon =#"it 'rails.

Step 3. 0erify t!e =#"it o$ is "isplaye". '!efolloin$ information is "isplaye" for eac!entryH Aser ;ame5 Operation5 =#"it 'ime5Severity5 Cate$ory5 an" =#"ite" Oject. Aser actions recor"e" incl#"e =#t!entication5o$o#t5 iscovery5 Sync!roni<ation5 evice

eletion5 Comman"5 'elnet5 an"%ana$eDAnmana$e.

PassKKKK FailKKKK 

%ont$omery Co#nty5 %arylan"Statement of Work

Statement of Work: 223

Page 229: Motorola SOW - Reviewed by MoCo PM 2015-09-22

7/23/2019 Motorola SOW - Reviewed by MoCo PM 2015-09-22

http://slidepdf.com/reader/full/motorola-sow-reviewed-by-moco-pm-2015-09-22 229/309

Page 230: Motorola SOW - Reviewed by MoCo PM 2015-09-22

7/23/2019 Motorola SOW - Reviewed by MoCo PM 2015-09-22

http://slidepdf.com/reader/full/motorola-sow-reviewed-by-moco-pm-2015-09-22 230/309

'#stem Management (ests

J.$.12.7 ni-ied E(ent ManagerD,iagnosticsDMultisite Site

1. ,?'$+IP(I!9

'!e p#rpose of t!is test is to "emonstrate "ia$nostic

comman"s can e sent to a 6a"io re/#ency (6)site an" t!e proper stat#s is reporte" at t!e Anifie"*vent %ana$er (A*%).

 =ll comman"s are initiate" from t!e A*%.

or t!is test5 t!e %#ltiSite confi$#rations ill e"emonstrate".

'?(P

;%client71 @ A*% session #p an" r#nnin$ in t!e;etork ataase vie.

?+'I!9 1.777

&. (?'(

Step 1. rom t!e A*%5 ri$!t click on a %#ltiSite Sitemana$e" reso#rce an" select t!e Comman"option.

Step 2. '!e comman" in"o opens for t!e%#ltisite Site mana$e" reso#rce it! t!efolloin$ comman"s availaleH Site'r#nkin$5 Site Off5 Wi"e 'r#nkin$5 an" Siteailsoft.

Step 3. Select Site 'r#nkin$ an" click t!e =pply#tton.

Step &. '!e comman" e:ec#tion stat#s is "isplaye"

in t!e comman" in"o. =fter t!e comman"is e:ec#te"5 t!e site enters site tr#nkin$mo"e. '!e event is "isplaye" in t!e ;etork*vents ,roser. =n alarm is "isplaye" in t!e

 =larms ,roser.

Step . Select Site Off an" click t!e =pply #tton.

Step +. '!e comman" e:ec#tion stat#s is "isplaye"in t!e comman" in"o. =fter t!e comman"is e:ec#te"5 t!e site enters site off mo"e.'!e event is "isplaye" in t!e ;etork*vents ,roser. =n alarm is "isplaye" in t!e

 =larms ,roser.

Step -. Select Wi"e 'r#nkin$ an" click t!e =pply#tton.

Step . '!e comman" e:ec#tion stat#s is "isplaye"in t!e comman" in"o. =fter t!e comman"is e:ec#te"5 t!e site enters i"e tr#nkin$mo"e. '!e event is "isplaye" in t!e ;etork*vents ,roser.

PassKKKK FailKKKK 

%ont$omery Co#nty5 %arylan"Statement of Work

Statement of Work: 225 

Page 231: Motorola SOW - Reviewed by MoCo PM 2015-09-22

7/23/2019 Motorola SOW - Reviewed by MoCo PM 2015-09-22

http://slidepdf.com/reader/full/motorola-sow-reviewed-by-moco-pm-2015-09-22 231/309

Page 232: Motorola SOW - Reviewed by MoCo PM 2015-09-22

7/23/2019 Motorola SOW - Reviewed by MoCo PM 2015-09-22

http://slidepdf.com/reader/full/motorola-sow-reviewed-by-moco-pm-2015-09-22 232/309

'#stem Management (ests

J.$.12.19 udit Logs in Pro(isioning Manager ++lication

1. ,?'$+IP(I!9

 =pplication level lo$$in$ allos a system a#"itor to

see c!an$es in t!e system confi$#ration "ata. '!elo$$e" event "ata can assist it! resolvin$erroneo#s system confi$#ration c!an$es5 or provi"ean a#"it trial of t!e system confi$#ration c!an$esma"e y staff.

Provisionin$ %ana$er application provi"es #serfrien"ly interface to see !en5 !at operation5 !o5oject type5 !ic! recor"s (I)5 an" !at asmo"ifie" (c#rrent val#e to #p"ate" val#e)5 an" !ic!interface as #se" to make t!e confi$#rationc!an$e. In a""ition to lo$$in$ "ata c!an$e events5t!e application also recor"s application?s

a"ministrative events s#c! as #ser lo$in5 "ata"istri#tion5 e:port5 ack#p5 restore5 etc.

'?(P

o$$in$ f#nction is alays enale" in t!eProvisionin$ %ana$er5 so t!ere is no nee" for initialset#p of t!is f#nction.

Aser acco#nt m#st !ave re/#ire" a#t!ori<ation inor"er to see an" e:port t!e lo$$e" events. Aser

performin$ t!is test m#st e memer of a#"itorsK$ro#p in =ctive irectory.

;oteH If ne #ser acco#nt is create" or e:istin$acco#nt is a""e" to t!e a#"itorsK $ro#p5 make t!esec!an$es in =ctive irectory of t!e system levelomain Controller. It avoi"s t!e nee" to ait for "atasync!roni<ation it!in t!e "omain.

?+'I!9 1.727

&. (?'(

Step 1. o$in to t!e Provisionin$ %an$er application#sin$ e roser on ;% client mac!ine.Create a ne 'alk$ro#p an" "istri#te t!epen"in$ confi$#ration c!an$es to A;C.

Step 2. 9o ack to t!e main lan"in$ pa$e of t!eProvisionin$ %ana$er application. Click t!ea#"it #tton on t!e ri$!t si"e of t!e in"o.

Step 3. I"entify lo$$e" event ros correspon"in$ to#ser?s operations performe" in Step 1.

Step &. o#le click on eac! of t!ese events.Oserve "etail information s#c! as !en5

!at operation5 !o5 oject type5 !ic!recor"s (I)5 an" !at as mo"ifie"(c#rrentD"efa#lt val#e to #p"ate" val#e)5 an"#ser interface #se".

PassKKKK FailKKKK 

%ont$omery Co#nty5 %arylan"Statement of Work

Statement of Work: 227 

Page 233: Motorola SOW - Reviewed by MoCo PM 2015-09-22

7/23/2019 Motorola SOW - Reviewed by MoCo PM 2015-09-22

http://slidepdf.com/reader/full/motorola-sow-reviewed-by-moco-pm-2015-09-22 233/309

 

J.8.13 Dy&'#- Sy!"# R"%"&-"

J.$.13.1 ;ate)ay ;P0S Su++ort :ode 1 "ailure

1. ,?'$+IP(I!9

'!is test ill "emonstrate t!at in t!e event of afail#re of t!e 9ateay 9eneral Packet 6a"ioServices (9P6S) S#pport ;o"e (99S;) in t!ePrimary Core5 t!e ,ack#p Core Packet ata9ateay ecomes active. =fter t!e 99S; fail#re5t!e Primary Core Packet ata 9ateay reports aninoperale state an" "ata f#nctionality ill contin#eto e provi"e" on t!e ,ack#p Core Packet ata9ateay.

'?(P

6=IO@1 @ '=896OAP 1Packet ata 9ateay 1H =ctivePacket ata 9ateay 2H Stan"y

?+'I!9 1.717

&. (?'(

Step 1. Sen" ino#n" "ata from 6=IO@15 an" t!ensen" o#to#n" "ata to 6=IO@1.

Step 2. P#ll t!e poer cor" to 99S; 1 in t!ePrimary Core.

Step 3. Oserve5 in t!e Primary Core Anifie" *vent%ana$er an" ,ack#p Core Anifie" *vent%ana$ers5 t!e Packet ata 9ateay 1?s

 =pplication State transition to Inoperale?.

Step &. 0erify Packet ata 9ateay 2?s

6e"#n"ancy state is =ctive? #sin$ t!eAnifie" ;etork Confi$#rator (A;C) L>#ickComman"sL or t!e Anifie" *vent %ana$erin t!e Primary an" ,ack#p Core.

Step . Oserve5 in ot! Anifie" *vent %ana$ers5t!e ink Stat#s of t!e Packet ata9ateay?s common mana$e" linkstransition t!ro#$! vario#s states to Ap?.

Step +. 0erify t!at ra"ios a#tomatically conte:tactivate.

Step -. Sen" ino#n" "ata from 6=IO@15 an" t!ensen" o#to#n" "ata to 6=IO@1.

Step . Pl#$ t!e poer cor" in to 99S; 1 in t!ePrimary Core.

PassKKKK FailKKKK 

%ont$omery Co#nty5 %arylan"Statement of Work

22  

Statement of Work:

Page 234: Motorola SOW - Reviewed by MoCo PM 2015-09-22

7/23/2019 Motorola SOW - Reviewed by MoCo PM 2015-09-22

http://slidepdf.com/reader/full/motorola-sow-reviewed-by-moco-pm-2015-09-22 234/309

,#namic '#stem +esilience

J.$.13.2 Packet ,ata ;ate)ay 1 "ailure

1. ,?'$+IP(I!9

In a system it! ynamic System 6esilience (S6)5

eac! <one !as to Packet ata 9ateays (P9) for eac! Inte$rate" 0oice G ata (I0G) an"Dor Bi$!Performance ata (BP) "ata serviceM one P9 int!e primary core5 an" one P9 in t!e ack#p core.'!e P9s sec#rely comm#nicate to a#tomaticallyselect one active P9. '!e selection al$orit!m isei$!te" to $ive preference to t!e P9 servin$ t!emost n#mer of sites or t!e P9 in t!e primary coreif t!e n#mer of servin$ sites is e/#al. '!e stan"yP9 "oes not sync!roni<e any conte:t "ataasesit! t!e active P9.

'!is test ill "emonstrate in t!e event of a Primary

Core Packet ata 9ateay fail#re5 t!e ,ack#p CorePacket ata 9ateay ecomes active. =fter t!efail#re5 "ata f#nctionality ill contin#e to e provi"e"on t!e ,ack#p Core Packet ata 9ateay.

;oteH '!is test case applies to ot! I0G an" BP.

'?(P

6=IO@1 @ '=896OAP 1Packet ata 9ateay 1H =ctive

Packet ata 9ateay 2H Stan"y

?+'I!9 1.717

&. (?'(

Step 1. Sen" ino#n" "ata from 6=IO@15 an" t!ensen" o#to#n" "ata to 6=IO@1.

Step 2. isconnect t!e *t!ernet links on t!e Packetata 6o#ter an" 6a"io ;etork 9ateay int!e Primary Core.

Step 3. Oserve5 in t!e Primary Core Anifie" *vent%ana$er an" ,ack#p Core Anifie" *vent%ana$er5 t!e Packet ata 9ateay 1?s6e"#n"ancy State transition toComm#nication ail#re?.

Step &. 0erify Packet ata 9ateay 2?s

6e"#n"ancy state is =ctive? #sin$ t!eAnifie" ;etork Confi$#rator (A;C) L>#ickComman"sL or t!e Anifie" *vent %ana$erin t!e Primary an" ,ack#p Core.

Step . Oserve5 in ot! Anifie" *vent %ana$ers5t!e ink Stat#s of t!e Packet ata9ateay?s common mana$e" linkstransition t!ro#$! vario#s states to Ap?.

Step +. =fter a s!ort perio"5 verify t!at t!e ra"ioa#tomatically conte:t activates.

Step -. Sen" ino#n" "ata from 6=IO@15 an" t!ensen" o#to#n" "ata to 6=IO@1.

Step . 6estore t!e Packet ata 6o#ter an" 6a"io;etork 9ateay links in t!e Primary Core.

PassKKKK FailKKKK 

%ont$omery Co#nty5 %arylan"Statement of Work

Statement of Work: 22!

Page 235: Motorola SOW - Reviewed by MoCo PM 2015-09-22

7/23/2019 Motorola SOW - Reviewed by MoCo PM 2015-09-22

http://slidepdf.com/reader/full/motorola-sow-reviewed-by-moco-pm-2015-09-22 235/309

 

,#namic '#stem +esilience

J.$.13.3 Primary Core "ailureDS)itco(er to Backu+ Core %oice and ,ata Ser(ices

1. ,?'$+IP(I!9

ynamic System 6esilience (S6) allos a system

to contin#e to f#nction it! minimal loss of voicean"Dor ata comm#nications "#e to t!e fail#re ofany controllin$ master site.'!is test ill "emonstrate in t!e event of a completePrimary Core fail#re5 t!e ,ack#p Core takes over inor"er to ret#rn t!e system ack to i"e areatr#nkin$. Some of t!e ,ack#p Core e/#ipmenta#tomatically takes over !ile t!e ;etork%ana$ement servers like t!e Provisionin$ %ana$erServer an" Anifie" ;etork Confi$#rator re/#ireman#al sitc!over.

'?(P

6=IO@1 @ '=896OAP 16=IO@2 @ '=896OAP 1Fone Controller 1H =ctiveFone Controller 2H Stan"yFone Controller 3H Stan"yFone Controller &H Stan"yPacket ata 9ateay 1H =ctivePacket ata 9ateay 2H Stan"yAnifie" ;etork Confi$#rator 1H =ctiveAnifie" ;etork Confi$#rator 2H Stan"y

Aser Confi$#ration %ana$erH =ctiveAser Confi$#ration %ana$er 2H Stan"ySystem Statistics Server 1H =ctiveSystem Statistics Server 2H =ctive

?+'I!9 1.7&7

&. (?'(

Step 1. Initiate a '=896OAP 1 call from [email protected] t!at 6=IO@2 receives t!e a#"io.

Step 2. Confi$#re t!e "ata application for perio"icino#n" "ata messa$es. (1 messa$e every37 secon"s) Oserve at t!e Bost PC t!at"ata messa$es are receive".

Step 3. P#ll t!e poer cor"s to t!e Primary Core=; Sitc!es 1 G 2. (=lso5 t!e re"#n"antpoer s#pply (6PS) if e/#ippe".)

Step &. In t!e Anifie" ;etork Confi$#rator (A;C)5select Fone Controllers 1 t!ro#$! & an"

c!eck t!e re"#n"ancy state #sin$ t!e >#ickComman" feat#re. (;oteH In a sin$le Fonesystem or !en t!e test is r#n on t!e Foneit! t!e primary core system servers5 t!eack#p A;C ill nee" to e man#allyenale" to r#n t!e /#ick comman".)

Step . 0erify t!at Fone Controller (FC) 3 is =ctive.(;ote t!at t!e transition of FC 3 to t!eL=ctiveL state ca#ses t!e c#rrently active FCto reset an" t!e sites ill temporarily loseWi"e =rea 'r#nkin$ !ile t!e connection toFC 3 is estalis!e".)

Step +. In t!e Anifie" ;etork Confi$#rator5 selectPacket ata 9ateays 1 an" 2 an" c!eckt!e re"#n"ancy state #sin$ t!e >#ickComman" feat#re.

Step -. 0erify t!at Packet ata 9ateay 2 is =ctive.

Step . Initiate a '=896OAP 1 call from [email protected] t!at 6=IO@2 receives t!e a#"io.

Step 4. Oserve at t!e Bost PC t!at receive" "atamessa$es !ave contin#e".

Step 17. If t!e ack#p servers ere enale" for t!etest5 t!ey s!o#l" no e "isale". 6et#rnt!e system to normal y poerin$ #p t!ecore sitc!es. 0erify t!at t!e FoneControllers comm#nicate an" t!at only oneFone Controller ill e active.

PassKKKK FailKKKK 

%ont$omery Co#nty5 %arylan"Statement of Work

23#  

Statement of Work:

Page 236: Motorola SOW - Reviewed by MoCo PM 2015-09-22

7/23/2019 Motorola SOW - Reviewed by MoCo PM 2015-09-22

http://slidepdf.com/reader/full/motorola-sow-reviewed-by-moco-pm-2015-09-22 236/309

J.8.1 A/*'&-"/ M"'& S%0!& (AMS)

J.$.14.1 ,e(ice *, Messaging 0adio to Smart Client

1. ,?'$+IP(I!9

%essa$in$ to a ra"io evice I allos t!e sen"er ofa messa$e to a""ress a messa$e to a ra"iore$ar"less of t!e #ser of t!e ra"io. W!en no #sername is lo$$e" on a ra"io5 t!e messa$e is i"entifie"y t!e sen"in$ evice I.'!is test ill "emonstrate sen"in$ a messa$e from ara"io it! no #ser name lo$$e" on to an =%S SmartClient (SC).

'?(P

PremierOne Aser =cco#ntsoneispatc!er1 it! Passor" 1

o$on Loneispatc!er1 on =%S Smart Client SC@1it! passor" LPassor"1L

6=IO@1 o$$e" off #t poere" on

?+'I!9 1.77

&. (?'(

Step 1. Compose a te:t messa$e on 6=IO@1selectin$ Loneispatc!er1L from t!e ataAsers ist as t!e a""ress ]'%S \ CO%P \;*W \ type messa$e \ =6 \ IS' \select a""ress^.

Step 2. Sen" t!e te:t messa$e from 6=IO@1 toLoneispatc!er1L ]P''^.

Step 3. 0erify Smart Client SC@1 receives t!emessa$e.

Step &. 0erify t!at t!e messa$e s!os from 6=IO@1s evice I.

PassKKKK FailKKKK 

%ont$omery Co#nty5 %arylan"Statement of Work

Statement of Work: 23"

Page 237: Motorola SOW - Reviewed by MoCo PM 2015-09-22

7/23/2019 Motorola SOW - Reviewed by MoCo PM 2015-09-22

http://slidepdf.com/reader/full/motorola-sow-reviewed-by-moco-pm-2015-09-22 237/309

 

8dvanced Messaging 'olution D8M'E

J.$.14.2 ,e(ice *, Messaging Smart Client to 0adio ,e(ice *,

1. ,?'$+IP(I!9

%essa$in$ to a ra"io evice I allos t!e sen"er of

a messa$e to a""ress a messa$e to a ra"iore$ar"less of t!e #ser of t!e ra"io. W!en no #sername is lo$$e" on a ra"io5 t!e messa$e is i"entifie"y t!e sen"in$ evice I.'!is test ill "emonstrate sen"in$ a messa$e from aS%=6' CI*;' to a ra"io evice I.

'?(P

PremierOne Aser =cco#nts@oneispatc!er1 it! passor" LPassor"1L

o$on Loneispatc!er1L on =%S Smart Client SC@1 it! passor" LPassor"1L

6=IO@1 o$$e" off #t poere" on

?+'I!9 1.77

&. (?'(

Step 1. Compose a te:t messa$e on Smart ClientSC@1 selectin$ 6=IO@1s evice I fromt!e a""ress ook as t!e a""ress.

Step 2. Sen" t!e te:t messa$e from Smart ClientSC@1 to 6=IO@1s evice I.

Step 3. 0erify 6=IO@1 receives t!e messa$e]BO%* \ '%S \ I;,^.

PassKKKK FailKKKK 

%ont$omery Co#nty5 %arylan"Statement of Work

232  

Statement of Work:

Page 238: Motorola SOW - Reviewed by MoCo PM 2015-09-22

7/23/2019 Motorola SOW - Reviewed by MoCo PM 2015-09-22

http://slidepdf.com/reader/full/motorola-sow-reviewed-by-moco-pm-2015-09-22 238/309

Page 239: Motorola SOW - Reviewed by MoCo PM 2015-09-22

7/23/2019 Motorola SOW - Reviewed by MoCo PM 2015-09-22

http://slidepdf.com/reader/full/motorola-sow-reviewed-by-moco-pm-2015-09-22 239/309

 

J.8.14 ISSI =;;; (I5 E&'7%"/)

J.$.1!.1 Manual 0oamingD5alkgrou+ Call

1. ,?'$+IP(I!9

'!is test "emonstrates t!at after a console in t!elocal system patc!es a !ome talk$ro#p it! aforei$n talk$ro#p5 !en t!e console initiates a patc!call on t!e patc!e" talk$ro#ps5 t!e call can e !ear"y a !ome ra"io in t!e local system t!at is affiliate"to t!e !ome talk$ro#p5 an" can e !ear" y a !omera"io t!at !as roame" to t!e forei$n system an" isaffiliate" to t!e forei$n talk$ro#p.'!is test ill also "emonstrate t!at a $ro#p callinitiate" from a !ome ra"io in t!e local system t!at isaffiliate" to a !ome talk$ro#p can e !ear" y a!ome ra"io t!at !as roame" to a forei$n system an"

is affiliate" to a talk$ro#p !ome to t!e forei$nsystem.

 =""itionally5 t!is test "emonstrates t!at a $ro#p callinitiate" from a !ome ra"io t!at !as roame" to aforei$n system an" is affiliate" to a talk$ro#p !ometo t!e forei$n system can e !ear" y a !ome ra"ioaffiliate" to a !ome talk$ro#p in t!e local system.

'?(P

SZS'*% 1 (!ome of '=896OAP 1)

6=IO@1 (!ome to SZS'*% 15 locate" in SZS'*%1) @ '=896OAP 1CO;SO*@1 (locate" in SZS'*% 1) @ '=896OAP15 '=896OAP 2

SZS'*% 2 (!ome of '=896OAP 2)6=IO@2 @ '=896OAP 26=IO@2 sitc!es to SZS'*% 2?s personality !enit roams to SZS'*% 2 an" is affiliate" to'=896OAP 2.

?+'I!9 1.77

&. (?'(

Step 1. Asin$ CO;SO*@15 create a patc! eteen'=896OAP 1 an" '=896OAP 2.

Step 2. Initiate a patc! call from CO;SO*@1 for t!epatc! t!at contains '=896OAP 1 an"'=896OAP 2.

Step 3. Oserve t!at 6=IO@1 an" 6=IO@2 areale to monitor an" respon" to t!e call.

Step &. Initiate a $ro#p call from 6=IO@1 on'=896OAP 1.

Step . Oserve t!at 6=IO@2 an" CO;SO*@1 areale to monitor an" respon" to t!e call.

Step +. Initiate a $ro#p call from 6=IO@2 on'=896OAP 2.

Step -. Oserve t!at 6=IO@1 an" CO;SO*@1 areale to monitor an" respon" to t!e call.

Step . issolve t!e patc! on CO;SO*@1.

PassKKKK FailKKKK 

%ont$omery Co#nty5 %arylan"Statement of Work

234 

Statement of Work:

Page 240: Motorola SOW - Reviewed by MoCo PM 2015-09-22

7/23/2019 Motorola SOW - Reviewed by MoCo PM 2015-09-22

http://slidepdf.com/reader/full/motorola-sow-reviewed-by-moco-pm-2015-09-22 240/309

I''I 5777 DIf ?na)ledE

J.$.1!.2 utomatic 0oamingD5alkgrou+ Call -or =ome 5alkgrou+

1. ,?'$+IP(I!9

'!is test ill "emonstrate t!at a $ro#p call initiate"

from a !ome ra"ioDconsole in t!e local system t!at isaffiliate" to a !ome talk$ro#p can e !ear" y a!ome ra"io t!at !as roame" to a forei$n system an"is affiliate" to t!e !ome talk$ro#p.'!is test ill also "emonstrate t!at a $ro#p callinitiate" from a !ome ra"io t!at !as roame" to aforei$n system an" is affiliate" to a talk$ro#p !ometo t!e local system can e !ear" y !ome ra"io an"console affiliate" to t!e !ome talk$ro#p in t!e localsystem.

'?(P

SZS'*% 1 (!ome of '=896OAP 1)

6=IO@1 (!ome ra"io on SZS'*% 15 !as roame" toSZS'*% 2) @ '=896OAP 16=IO@2 @ '=896OAP 1CO;SO*@1 @ '=896OAP 1

6=IO@2 an" CO;SO*@1 (!ome to SZS'*% 15locate" in SZS'*% 1) @ '=896OAP 1

SZS'*% 2

6=IO@1 @ '=896OAP 1

?+'I!9 1.7&7

&. (?'(

Step 1. Initiate a $ro#p call from 6=IO@2 on'=896OAP 1.

Step 2. Oserve t!at 6=IO@1 an" CO;SO*@1 areale to monitor an" respon" to t!e call on'=896OAP 1.

Step 3. Initiate a $ro#p call from CO;SO*@1 on'=896OAP 1.

Step &. Oserve t!at 6=IO@1 an" 6=IO@2 areale to monitor an" respon" to t!e call on'=896OAP 1

Step . Initiate a $ro#p call from 6=IO@1 on'=896OAP 1.

Step +. Oserve t!at 6=IO@2 an" CO;SO*@1 areale to monitor an" respon" to t!e call on'=896OAP 1.

PassKKKK FailKKKK 

%ont$omery Co#nty5 %arylan"Statement of Work

Statement of Work: 235 

Page 241: Motorola SOW - Reviewed by MoCo PM 2015-09-22

7/23/2019 Motorola SOW - Reviewed by MoCo PM 2015-09-22

http://slidepdf.com/reader/full/motorola-sow-reviewed-by-moco-pm-2015-09-22 241/309

 

I''I 5777 DIf ?na)ledE

J.$.1!.3 Manual 0oamingDEmergency larm and Call

1. ,?'$+IP(I!9

'!is test ill "emonstrate t!at emer$ency alarm an"

call initiate" from a !ome ra"io t!at !as roame" to aforei$n system an" is affiliate" to a talk$ro#p !ometo t!e forei$n system can e !ear" y a console t!atis affiliate" to t!e forei$n talk$ro#p in t!e localsystem. '!is test also verifies t!at t!e emer$encycan e acknole"$e" an" knocke" "on y t!econsole in t!e local system.

'?(P

SZS'*% 1

CO;SO*@1 @ '=896OAP 2

SZS'*% 2 (!ome of '=896OAP 2)6=IO@2 @ '=896OAP 2

6=IO@2 sitc!es to SZS'*% 2?s personality !enit roams to SZS'*% 2 an" is affiliate" to'=896OAP 2.CO;SO*@1 is locate" in SZS'*% 1 an" affiliate"to '=896OAP 2.

?+'I!9 1.77

&. (?'(

Step 1. Initiate an emer$ency alarm from 6=IO@2on '=896OAP 2 y !ol"in$ t!eemer$ency #tton.

Step 2. Oserve t!at CO;SO*@1 is ale to !earan" see t!e emer$ency alarm on'=896OAP 2.

Step 3. =cknole"$e t!e emer$ency alarm on'=896OAP 2 from CO;SO*@1.

Step &. 8ey 6=IO@2 to initiate an emer$ency callon '=896OAP 2.

Step . Oserve t!at CO;SO*@1 is ale to monitor an" respon" to t!e emer$ency call on'=896OAP 2.

Step +. 8nock "on t!e emer$ency fromCO;SO*@1 on '=896OAP 2.

Step -. *:it emer$ency mo"e on 6=IO@2 y!ol"in$ t!e emer$ency #tton on t!e ra"io.

PassKKKK FailKKKK 

%ont$omery Co#nty5 %arylan"Statement of Work

236  

Statement of Work:

Page 242: Motorola SOW - Reviewed by MoCo PM 2015-09-22

7/23/2019 Motorola SOW - Reviewed by MoCo PM 2015-09-22

http://slidepdf.com/reader/full/motorola-sow-reviewed-by-moco-pm-2015-09-22 242/309

I''I 5777 DIf ?na)ledE

J.$.1!.4 utomatic 0oamingDEmergency larm and Call -or =ome 5alkgrou+

1. ,?'$+IP(I!9

'!is test ill "emonstrate t!at emer$ency alarm an"

call initiate" from a !ome ra"io t!at !as roame" to aforei$n system an" is affiliate" to a talk$ro#p !ometo t!e local system can e !ear" y a console t!at isaffiliate" to t!e !ome talk$ro#p in t!e local system.'!is test also verifies t!at t!e emer$ency can eacknole"$e" an" knocke" "on y t!e console int!e local system.

'?(P

SZS'*% 1 (!ome of '=896OAP 1)

CO;SO*@1 @ '=896OAP 1

SZS'*% 26=IO@1 @ '=896OAP 1

6=IO@1 is a !ome ra"io on SZS'*% 15 !asroame" to SZS'*% 25 an" is affiliate" to'=896OAP 1.CO;SO*@1 is !ome to SZS'*% 15 locate" inSystem 1 an" affiliate" to '=896OAP 1.

?+'I!9 1.7&7

&. (?'(

Step 1. Initiate an emer$ency alarm from 6=IO@1on '=896OAP 1 y !ol"in$ t!eemer$ency #tton.

Step 2. Oserve t!at CO;SO*@1 is ale to !earan" see t!e emer$ency alarm on'=896OAP 1.

Step 3. =cknole"$e t!e emer$ency alarm on'=896OAP 1 from CO;SO*@1.

Step &. 8ey 6=IO@1 to initiate an emer$ency callon '=896OAP 1.

Step . Oserve t!at CO;SO*@1 is ale to monitor an" respon" to t!e emer$ency call on'=896OAP 1.

Step +. 8nock "on t!e emer$ency fromCO;SO*@1 on '=896OAP 1.

Step -. *:it emer$ency mo"e on 6=IO@1 y!ol"in$ t!e emer$ency #tton on t!e ra"io.

PassKKKK FailKKKK 

%ont$omery Co#nty5 %arylan"Statement of Work

Statement of Work: 237 

Page 243: Motorola SOW - Reviewed by MoCo PM 2015-09-22

7/23/2019 Motorola SOW - Reviewed by MoCo PM 2015-09-22

http://slidepdf.com/reader/full/motorola-sow-reviewed-by-moco-pm-2015-09-22 243/309

 

I''I 5777 DIf ?na)ledE

J.$.1!.! utomatic 0oamingD5alkgrou+ Call -or "oreign 5alkgrou+

1. ,?'$+IP(I!9

'!is test ill "emonstrate t!at a $ro#p call initiate"

from a !ome ra"ioDconsole in t!e local system t!at isaffiliate" to a forei$n talk$ro#p can e !ear" y a!ome ra"io t!at !as roame" to t!e forei$n systeman" is affiliate" to t!e forei$n talk$ro#p.'!is test ill also "emonstrate t!at a $ro#p callinitiate" from a !ome ra"io t!at !as roame" to aforei$n system an" is affiliate" to a talk$ro#p !ometo t!e forei$n system can e !ear" y !ome ra"ioan" console affiliate" to t!e forei$n talk$ro#p in t!elocal system.

'?(P

SZS'*% 2 (!ome of '=896OAP 2)6=IO@1 @ '=896OAP 26=IO@1 (!ome ra"io on SZS'*% 15 !as roame" toSZS'*% 2) @ '=896OAP 26=IO@2 an" CO;SO*@1 are !ome to SZS'*% 15locate" in SZS'*% 1 an" affiliate" to '=896OAP2.

SZS'*% 16=IO@2 @ '=896OAP 2CO;SO*@1 @ '=896OAP 2

?+'I!9 1.7&7

&. (?'(

Step 1. Initiate a $ro#p call from 6=IO@2 on'=896OAP 2.

Step 2. Oserve t!at 6=IO@1 an" CO;SO*@1 areale to monitor an" respon" to t!e call on'=896OAP 2.

Step 3. Initiate a $ro#p call from CO;SO*@1 on'=896OAP 2.

Step &. Oserve t!at 6=IO@1 an" 6=IO@2 areale to monitor an" respon" to t!e call on'=896OAP 2.

Step . Initiate a $ro#p call from 6=IO@1 on'=896OAP 2.

Step +. Oserve t!at 6=IO@2 an" CO;SO*@1 areale to monitor an" respon" to t!e call on'=896OAP 2.

PassKKKK FailKKKK 

%ont$omery Co#nty5 %arylan"Statement of Work

23  

Statement of Work:

Page 244: Motorola SOW - Reviewed by MoCo PM 2015-09-22

7/23/2019 Motorola SOW - Reviewed by MoCo PM 2015-09-22

http://slidepdf.com/reader/full/motorola-sow-reviewed-by-moco-pm-2015-09-22 244/309

J.8.18 O*"+T"A+ R"6"y& (OTAR) (I5 O$!& P0+-'"/)

J.$.1$.1 Clear =ello

1. ,?'$+IP(I!9

'!e 8% operator can sen" a messa$e to any ra"ioto confirm t!at ra"io is on t!e system.

;oteH '!e "evices #n"er test m#st !ave a vali" aira""ress re$istere" it! t!e 8% an" m#st eaccessile on t!e "ata system.

'?(P

6=IO@1 '=896OAP 1

6=IO@1 m#st not e confi$#re" for en!ance"sec#rity mo"e in eit!er ra"io pro$rammin$ or t!e8%.

?+'I!9 1.77

&. (?'(

Step 1. rom t!e 8% Client in"o5 select t!eSec#rity men# an" t!en t!e 6a"ios men#item.

Step 2. Select 6=IO@1 from t!e list.

Step 3. Click t!e Clear Bello #tton or ri$!t@clickan" c!oose Clear Bello.

Step &. rom t!e *vent 0ieer in t!e 8% Clientin"o5 verify t!at 6=IO@1 is s!on #n"erOperation 'ype. '!e operation is complete

!en t!e Operation Stat#s is Complete an"t!e Operation Pro$ress is 177.

PassKKKK FailKKKK 

%ont$omery Co#nty5 %arylan"Statement of Work

Statement of Work: 23!

Page 245: Motorola SOW - Reviewed by MoCo PM 2015-09-22

7/23/2019 Motorola SOW - Reviewed by MoCo PM 2015-09-22

http://slidepdf.com/reader/full/motorola-sow-reviewed-by-moco-pm-2015-09-22 245/309

 

!ver-(he-8ir +eke#ing D!(8+E DIf !ption is PurchasedE

J.$.1$.2 "ull +date to Su&scri&er

1. ,?'$+IP(I!9

'!e entire set of encryption keys (in a""ition to ot!er 

state parameters) are sent to a ra"io #sin$ t!e #llAnit Ap"ate comman".

;oteH '!e "evices #n"er test m#st !ave a vali" aira""ress re$istere" it! t!e 8% an" m#st eaccessile on t!e "ata system.

'?(P

6=IO@1 @ '=896OAP 1 (Sec#re %o"e)6=IO@2 @ '=896OAP 1 (Sec#re %o"e)

6=IO@2 ill e a reference ra"io.

;oteH It is ass#me" t!at ot! ra"ios #n"er test arec#rrent it! t!e 8%.

?+'I!9 1.77

&. (?'(

Step 1. elete ot! '*8s from t!e C86 assi$ne" tot!e talk$ro#p #n"er test5 from 6=IO@1.

Step 2. Asin$ 6=IO@15 verify !en t!e s#scrieris set to sec#re mo"e5 t!e ra"io in"icates akey fail.

Step 3. rom t!e 8% Client in"o5 select t!eSec#rity men# an" t!en t!e 6a"ios men#item.

Step &. Select 6=IO@1 from t!e list.

Step . Click t!e #ll Ap"ate #tton or ri$!t@click

an" c!oose #ll Ap"ate.

Step +. rom t!e *vent 0ieer in t!e 8% Clientin"o5 verify t!at 6=IO@1 is s!on #n"erOperation 'ype. '!e operation is complete!en t!e Operation Stat#s is Complete an"t!e Operation Pro$ress is 177. ;ote t!at aarm start operation ill occ#r if t!e '*8selecte" for t!e O'=6 session is one of t!e'*8s assi$ne" to C86.

Step -. ;o t!at 6=IO@1 contains t!e keys in t!eC865 verify sec#re comm#nications

eteen 6=IO@1 an" 6=IO@2.

PassKKKK FailKKKK 

%ont$omery Co#nty5 %arylan"Statement of Work

24#  

Statement of Work:

Page 246: Motorola SOW - Reviewed by MoCo PM 2015-09-22

7/23/2019 Motorola SOW - Reviewed by MoCo PM 2015-09-22

http://slidepdf.com/reader/full/motorola-sow-reviewed-by-moco-pm-2015-09-22 246/309

Page 247: Motorola SOW - Reviewed by MoCo PM 2015-09-22

7/23/2019 Motorola SOW - Reviewed by MoCo PM 2015-09-22

http://slidepdf.com/reader/full/motorola-sow-reviewed-by-moco-pm-2015-09-22 247/309

 

!ver-(he-8ir +eke#ing D!(8+E DIf !ption is PurchasedE

J.$.1$.4 M" Summary 0e+ort

1. ,?'$+IP(I!9

'!e 8% $ives t!e capaility to $enerate to types

of reports of s#scrier recor"sH t!e etaile" 0ie6eport an" t!e S#mmari<e" 6eport.

 = S#mmary 6eport is also availale t!at contains as#mmary of m#ltiple "evices s#c! as %CC -77consoles incl#"in$ t!eir c#rrent stat#s.

'?(P

6a"ios an" %CC -77 console m#st e entere" int!e 8% "ataase.

?+'I!9 1.717

&. (?'(

Step 1. rom t!e 8% Client in"o5 select t!eSec#rity men# folloe" y t!e 6a"ios men#option.

Step 2. Select a ra"io from t!e list.

Step 3. 6i$!t@click an" c!oose 0ie etaile"6eport. '!is ill "isplay a "etaile" report oft!e selecte" ra"io.

Step &. 6evie an" verify t!e "ata in t!e etaile"6eport.

Step . Close t!e etaile" 6eport.

Step +. rom t!e 8% Client in"o5 select t!eSec#rity men# folloe" y Infrastr#ct#re an"t!en ConsolesDC*%sD'%9s.

Step -. 6i$!t@click an" c!oose 0ie S#mmary6eport. '!is ill "isplay a s#mmary of t!e%CC -77 information incl#"in$ its c#rrentor non@c#rrent state.

Step . 6evie an" verify t!e "ata in t!eS#mmari<e" 6eport.

Step 4. Close t!e S#mmari<e" 6eport.

PassKKKK FailKKKK 

%ont$omery Co#nty5 %arylan"Statement of Work

242  

Statement of Work:

Page 248: Motorola SOW - Reviewed by MoCo PM 2015-09-22

7/23/2019 Motorola SOW - Reviewed by MoCo PM 2015-09-22

http://slidepdf.com/reader/full/motorola-sow-reviewed-by-moco-pm-2015-09-22 248/309

!ver-(he-8ir +eke#ing D!(8+E DIf !ption is PurchasedE

J.$.1$.! Locked 'ut

1. ,?'$+IP(I!9

'!e 8% operator can "esi$nate a ra"io as Locke"

O#t.L W!en a ra"io !as een locke" o#t at t!e 8%5any rekey re/#est from t!e ra"io #ser is "enie" an"res#lts in a L;o ServiceL messa$e from t!e 8%.

;oteH '!e "evices #n"er test m#st !ave a vali" aira""ress re$istere" it! t!e 8% an" m#st eaccessile on t!e "ata system.

'?(P

6=IO@1 @ '=896OAP 1

6a"io #n"er test m#st !ave t!e 6ekey 6e/#estoption availale an" confi$#re" via CPS.

?+'I!9 1.7&7

&. (?'(

Step 1. rom t!e 8% Client in"o5 select t!eSec#rity men# an" t!en t!e 6a"ios men#item.

Step 2. Select 6=IO@1 from t!e list.

Step 3. Click t!e Open #tton5 or ri$!t@click an"c!oose Open.

Step &. An"er t!e 6a"io etails section5 c!eck t!eocke"@O#t option.

Step . Click on t!e Save an" Close #tton to en"t!e process.

Step +. Initiate a 6ekey 6e/#est from 6=IO@1.

Step -. rom t!e *vent 0ieer in t!e 8% Clientin"o5 verify t!at 6=IO@1 is s!on #n"erOperation 'ype.

Step . 0erify t!at t!e 6ekey 6e/#est from t!e ra"io#ser is "enie" an" L;o ServiceL ill e"isplaye" on 8% *vent 0ieer. ;ote t!att!is ill not impact normal voice operations5#nless t!e ra"io "oes not !ave t!e correct'*8s. ocke" o#t "enies t!e ra"io O'=6.

PassKKKK FailKKKK 

%ont$omery Co#nty5 %arylan"Statement of Work

Statement of Work: 243

Page 249: Motorola SOW - Reviewed by MoCo PM 2015-09-22

7/23/2019 Motorola SOW - Reviewed by MoCo PM 2015-09-22

http://slidepdf.com/reader/full/motorola-sow-reviewed-by-moco-pm-2015-09-22 249/309

 

!ver-(he-8ir +eke#ing D!(8+E DIf !ption is PurchasedE

J.$.1$.$ 0adio Ena&le

1. ,?'$+IP(I!9

 = 8ey %ana$ement acility (8%) operator can

select t!e previo#sly in!iite" ra"io an" re@enalet!e voice comm#nications an" #ser er$onomics#sin$ t!e enale comman".

;oteH '!e "evices #n"er test m#st !ave a vali" aira""ress re$istere" it! t!e 8% an" m#st eaccessile on t!e "ata system.

'?(P

6=IO@1 @ '=896OAP 1

6=IO@2 @ '=896OAP 1

6=IO@1 is c#rrently in t!e in!iite" state.

;oteH '!e ra"io m#st e c#rrent in t!e 8%

;oteH 6C% in!iits an" O'=6 in!iits orkinterc!an$ealy. If t!e ra"io5 t!at is properlypro$ramme"5 !as een in!iite" it! O'=65 it cane re@enale" it! 6C%.

?+'I!9 1.77

&. (?'(

Step 1. rom t!e 8% Client in"o5 select t!eSec#rity men# an" t!en t!e 6a"ios men#item.

Step 2. Select 6=IO@1 from t!e list.

Step 3. Click t!e *nale #tton5 or ri$!t@click an"c!oose *nale.

Step &. rom t!e *vent 0ieer in t!e 8% Clientin"o5 verify t!at 6=IO@1 is s!on #n"erOperation 'ype. '!e operation is complete!en t!e Operation Stat#s is Complete an"t!e Operation Pro$ress is 177.

Step . 0erify t!at 6=IO@1 can no comm#nicateit! 6=IO@2.

PassKKKK FailKKKK 

%ont$omery Co#nty5 %arylan"Statement of Work

244 

Statement of Work:

Page 250: Motorola SOW - Reviewed by MoCo PM 2015-09-22

7/23/2019 Motorola SOW - Reviewed by MoCo PM 2015-09-22

http://slidepdf.com/reader/full/motorola-sow-reviewed-by-moco-pm-2015-09-22 250/309

!ver-(he-8ir +eke#ing D!(8+E DIf !ption is PurchasedE

J.$.1$.6 0adio *ni&it

1. ,?'$+IP(I!9

 = 8ey %ana$ement acility (8%) operator can

select any ra"io an" completely "isale t!e voicecomm#nications an" #ser er$onomics #sin$ t!eIn!iit comman". '!e enale comman" reversest!ese states.

;oteH '!e "evices #n"er test m#st !ave a vali" aira""ress re$istere" it! t!e 8% an" m#st eaccessile on t!e "ata system.

;oteH Feroi<in$ an in!iite" ra"io ill "eem it#n#sale an" t!e ra"io ill only e #sale a$ain ifsent to a %otorola Sol#tions "epot for service. '!e8% ill "isplay a arnin$ if an attempt is ma"e to

<erio<e an in!iite" ra"io.

'?(P

6=IO@1 @ '=896OAP 16=IO@2 @ '=896OAP 1

;oteH '!e ra"io m#st e c#rrent in t!e 8%

?+'I!9 1.77

&. (?'(

Step 1. 0erify comm#nications eteen 6=IO@1an" 6=IO@2.

Step 2. rom t!e 8% Client in"o5 select t!eSec#rity men# an" t!en t!e 6a"ios men#item.

Step 3. Select 6=IO@1 from t!e list.

Step &. Click t!e In!iit #tton or ri$!t@click an"c!oose In!iit.

Step . rom t!e *vent 0ieer in t!e 8% Clientin"o5 verify t!at 6=IO@1 is s!on #n"er

Operation 'ype. '!e operation is complete!en t!e Operation Stat#s is Complete an"t!e Operation Pro$ress is 177.

Step +. 0erify t!at 6=IO@1 is t#rne" off an" cannotcomm#nicate it! 6=IO@2.

PassKKKK FailKKKK 

%ont$omery Co#nty5 %arylan"Statement of Work

Statement of Work: 245 

Page 251: Motorola SOW - Reviewed by MoCo PM 2015-09-22

7/23/2019 Motorola SOW - Reviewed by MoCo PM 2015-09-22

http://slidepdf.com/reader/full/motorola-sow-reviewed-by-moco-pm-2015-09-22 251/309

 

!ver-(he-8ir +eke#ing D!(8+E DIf !ption is PurchasedE

J.$.1$.7 0ekey 0e#uest

1. ,?'$+IP(I!9

 = s#scrier #nit !as t!e capaility to re/#est a

rekey from t!e 8%. If t!e s#scrier !as lost orman#ally remove" t!eir '*8s5 or !as possilymisse" an #p"ate or keyset c!an$eover5 t!ey maynee" to man#ally initiate a rekey.If all of t!e ra"ios keys are man#ally <erioi<e" fromt!e men# screen5 t!e A8*8s ill e lost5 !oevert!e 8ey oss 8ey (88) ill still "ecrypt ino#n"O'=6 messa$es. '!e ra"ios nee" to !ave t!is 8eyoss 8ey feat#re t#rne" on in t!e ra"io an" in t!eir8% recor". '!e rekey re/#est ill not ork if t!era"io is <eroi<e" from t!e O'=6 or if it <eroi<e" y"epressin$ its p#rple an" oran$e #ttons. In t!issit#ation5 t!e ra"io o#l" nee" to e 6e" or =#to

store an" forar"e".

;oteH '!e "evices #n"er test m#st !ave a vali" aira""ress re$istere" it! t!e 8% an" m#st eaccessile on t!e "ata system.

'?(P

6=IO@1 an" its associate" 8% recor" nee"s to econfi$#re" to s#pport 6ekey 6e/#est f#nctionality.

*it!er #se a 80 or t!e ra"io?s keypa" to "elete t!e'*8s o#t of 6=IO@1.

?+'I!9 1.77

&. (?'(

Step 1. Initiate a 6ekey 6e/#est from 6=IO@1.

Step 2. 0erify if t!e s#scrier !as a "isplay itmomentarily "isplays P*=S* W=I' !ilet!e operation is in pro$ress.

Step 3. 0erify5 if t!e s#scrier !as a "isplay5 it"isplays 6*8*Z* !en t!e operation iscomplete.

Step &. rom t!e *vent 0ieer in t!e 8% Clientin"o5 verify t!at 6a"io 1 is s!on #n"erOperation 'ype. '!e operation is complete!en t!e Operation Stat#s is Complete an"

t!e Operation Pro$ress is 177.

PassKKKK FailKKKK 

%ont$omery Co#nty5 %arylan"Statement of Work

246  

Statement of Work:

Page 252: Motorola SOW - Reviewed by MoCo PM 2015-09-22

7/23/2019 Motorola SOW - Reviewed by MoCo PM 2015-09-22

http://slidepdf.com/reader/full/motorola-sow-reviewed-by-moco-pm-2015-09-22 252/309

!ver-(he-8ir +eke#ing D!(8+E DIf !ption is PurchasedE

J.$.1$.8 Su&scri&er eroi@e

1. ,?'$+IP(I!9

'!e 8ey %ana$ement acility (8%) can select any

ra"io an" permanently erase all encryption keys#sin$ t!e Feroi<e comman". '!is comman" is notreversile it!o#t a p!ysical connection eteen t!es#scrier an" a 80. = 8% Operator can sen"t!is messa$e to a ra"io t!at nee"s to e e:cl#"e"from all sec#re" comm#nications. W!en t!e ra"ioreceives t!is messa$e5 all encryption keys ('*8s5A8*8s5 88) are "elete" from t!e ra"io5 an" it ispermanently "isale" in t!e 8% "ataase. '!e8% ill not perform any more key mana$ementservices to t!is ra"io #ntil it is re@initiali<e".

;oteH '!e "evices #n"er test m#st !ave a vali" air

a""ress re$istere" it! t!e 8% an" m#st eaccessile on t!e "ata system.

'?(P

6=IO@1 @ '=896OAP 16=IO@2 @ '=896OAP 1

,ot! ra"ios s!o#l" initially !ave 8eys.

;oteH W!en a ra"io is <eroi<e"5 t!e ra"io recor" in

t!e 8% is permanently fla$$e" to <eroi<e. If t!isfiel" is not #nc!ecke"5 t!e ra"io ill contin#e<eroi<in$ every time it is f#lly #p"ate".

?+'I!9 1.77

&. (?'(

Step 1. 0erify sec#re comm#nications eteen6=IO@1 an" 6=IO@2.

Step 2. rom t!e 8% Client in"o5 select t!eSec#rity men# an" t!en t!e 6a"ios men#item.

Step 3. Select 6=IO@1 from t!e list an" click t!eFeroi<e #tton5 or ri$!t@click an" c!ooseFeroi<e.

Step &. rom t!e *vent 0ieer in t!e 8% Clientin"o5 verify t!at 6=IO@1 is s!on #n"erOperation 'ype. '!e operation is complete

!en t!e Operation Stat#s is Complete an"t!e Operation Pro$ress is 177.

Step . 6=IO@1 no lon$er !as any keys. '!e ra"ioill "isplay L8ey ailL if set to sec#re mo"e.

Step +. Initiate a talk$ro#p call from 6=IO@2. 0erifyt!at 6=IO@1 "oes not #ns/#elc! since it"oes not !ave any keys to "ecrypt a#"io.

Step -. Connect a 80 to 6=IO@1 an" verify t!era"io !as no '*8s an" no 8*8s.

Step . rom t!e *vent 0ieer in t!e 8% Clientin"o5 verify t!at 6=IO@1 is s!on #n"erOperation 'ype. '!e operation is completeit! one fail#re. '!is s!os t!at t!e '*8san" A8*8s ere "elete" from 6=IO@1since a A8*8 is re/#ire" to perform a #llAp"ate.

Step 4. In or"er to re@initiali<e t!e ra"io in t!e 8%"ataase5 first #nc!eck t!e <eroi<e" fla$ int!e ra"io recor"5 t!en perform a 6e" or =#tostore an" forar" from t!e 80 to t!e 8%server t!en to t!e ra"io an" ack to 8%server.

PassKKKK FailKKKK 

%ont$omery Co#nty5 %arylan"Statement of Work

Statement of Work: 247 

Page 253: Motorola SOW - Reviewed by MoCo PM 2015-09-22

7/23/2019 Motorola SOW - Reviewed by MoCo PM 2015-09-22

http://slidepdf.com/reader/full/motorola-sow-reviewed-by-moco-pm-2015-09-22 253/309

 

J.8.19 O*"+T"E!"+&"! K"y& (I5 O$!& P0+-'"/)

J.$.16.1 Encry+ted =ello using '(erA5eAEternet eying

1. ,?'$+IP(I!9

'!e 8% operator can sen" an encrypte" messa$eto any console to confirm t!at console is on t!esystem an" t!at its encryption services aref#nctionin$.

;oteH If t!e console !as j#st een poere" #p5 makes#re to let it staili<e an" to lo$in via t!e console#ser interface to make s#re t!e console re$istersit! t!e 8%. 0erify 8% re$istration y oservin$t!e 8% event vieer to see t!at t!e test console!as re$istere".

'?(P

CO;SO*@1 @ '=896OAP 1

;oteH '!e console m#st e c#rrent in t!e 8%.

?+'I!9 1.717

&. (?'(

Step 1. rom t!e 8% Client in"o5 select t!eSec#rity men# an" t!en t!e Infrastr#ct#res#@men# an" t!en select t!e Consolesmen# item.

Step 2. Select CO;SO*@1 from t!e list.

Step 3. Click t!e *ncrypte" Bello #tton or ri$!t@click an" c!oose *ncrypte" Bello.

Step &. rom t!e *vent 0ieer in t!e 8% Clientin"o5 verify t!at CO;SO*@1 is s!on

#n"er Operation 'ype. '!e operation iscomplete !en t!e Operation Stat#s isComplete an" t!e Operation Pro$ress is177.

PassKKKK FailKKKK 

%ont$omery Co#nty5 %arylan"Statement of Work

24  

Statement of Work:

Page 254: Motorola SOW - Reviewed by MoCo PM 2015-09-22

7/23/2019 Motorola SOW - Reviewed by MoCo PM 2015-09-22

http://slidepdf.com/reader/full/motorola-sow-reviewed-by-moco-pm-2015-09-22 254/309

!ver-(he-?thernet "e#ing D!(?"E DIf !ption is PurchasedE

J.$.16.2 "ull +date to Console using '5E

1. ,?'$+IP(I!9

'!e entire set of encryption keys (in a""ition to ot!er 

state parameters) are sent to a console #sin$ t!e#ll Anit Ap"ate comman".

;oteH If t!e console !as j#st een poere" #p5 makes#re to let it staili<e an" to lo$in via t!e console#ser interface to make s#re t!e console re$istersit! t!e 8%. 0erify 8% re$istration y oservin$t!e 8% event vieer to see t!at t!e test console!as re$istere".

'?(P

CO;SO*@1 @ '=896OAP 3 (6eference console)CO;SO*@3 @ '=896OAP 3 (test console t!at ille #se" for O'*8 operation)It is ass#me" t!at CO;SO*@3 initially "oes not!ave any traffic keys #t "oes !ave a A8*8.

;oteH It is ass#me" t!at t!is test ill occ#r after allO'*8 confi$#rations are complete".;oteH '!is can e "one it! a 0P% ase" consoleor a sec#re car" ase" console.

?+'I!9 1.717

&. (?'(

Step 1. Initiate a sec#re call on '=896OAP 3 fromCO;SO*@1 to CO;SO*@3.

Step 2. 0erify t!at no a#"io is receive" onCO;SO*@3 eca#se t!e console "oes not!ave a key or !as t!e incorrect key.

Step 3. rom t!e 8% Client in"o5 select t!eSec#rity men# an" t!en t!e Infrastr#ct#res#@men# an" t!en select t!e Consolesmen# item.

Step &. Select CO;SO*@3 from t!e list.

Step . Click t!e #ll Ap"ate #tton5 or ri$!t@clickan" c!oose #ll Ap"ate.

Step +. rom t!e *vent 0ieer in t!e 8% Clientin"o5 verify t!at CO;SO*@3 is s!on#n"er Operation 'ype. '!e operation iscomplete !en t!e Operation Stat#s isComplete an" t!e Operation Pro$ress is177.

Step -. '!e console ill no !ave t!e c#rrent keys.o#le@click on CO;SO*@3 in t!e list an"verify t!at its stat#s is marke" c#rrent.

Step . ;o t!at CO;SO*@3 is c#rrent5 verifysec#re comm#nications eteenCO;SO*@1 an" CO;SO*@3.

PassKKKK FailKKKK 

%ont$omery Co#nty5 %arylan"Statement of Work

Statement of Work: 24!

Page 255: Motorola SOW - Reviewed by MoCo PM 2015-09-22

7/23/2019 Motorola SOW - Reviewed by MoCo PM 2015-09-22

http://slidepdf.com/reader/full/motorola-sow-reviewed-by-moco-pm-2015-09-22 255/309

 

!ver-(he-?thernet "e#ing D!(?"E DIf !ption is PurchasedE

J.$.16.3 "ull +date to rci(ing *nter-ace Ser(er

1. ,?'$+IP(I!9

'!e entire set of encryption keys (in a""ition to ot!er 

state parameters) are sent to a console #sin$ t!e#ll Anit Ap"ate comman".

;oteH If t!e =rc!ivin$ Interface Server (=IS) !as j#steen poere" #p5 make s#re to let it staili<e an" tolo$in via t!e =IS interface to make s#re t!e =ISre$isters it! t!e 8%. 0erify 8% re$istration yoservin$ t!e 8% event vieer to see t!at t!e test

 =IS !as re$istere".

;oteH It is ass#me" t!at t!is test ill occ#r after allO'*8 confi$#rations are complete".

'?(P

6=IO@1 @ '=896OAP 1 (Sec#re ' mo"e) =IS@1 @ '=896OAP 1 (Sec#re %o"e is lo$$e") test =IS t!at ill e #se" for O'*8 operation.CO;SO*@1 @ '=896OAP 1 (Sec#re %o"e) #se"as a reference console.

(It is ass#me" t!at =IS@1 initially "oes not !ave anytraffic keys #t "oes !ave a A8*8.)

;oteH '!is can e "one it! a 0P% ase" =IS or asec#re car" ase" =IS.

?+'I!9 1.717

&. (?'(

Step 1. rom t!e 8% Client in"o5 select t!eSec#rity men# an" t!en t!e Infrastr#ct#res#@men# an" t!en select t!e =IS men#item.

Step 2. Select =IS@1 from t!e list.

Step 3. Click t!e #ll Ap"ate #tton or ri$!t@clickan" c!oose #ll Ap"ate.

Step &. rom t!e *vent 0ieer in t!e 8% Clientin"o5 verify t!at =IS@1 is s!on #n"erOperation 'ype. '!e operation is complete!en t!e Operation Stat#s is Complete an"

t!e Operation Pro$ress is 177.

Step . '!e =IS ill no !ave t!e c#rrent keys.o#le@click on =IS@1 in t!e list an" verifyt!at its stat#s is marke" c#rrent.

Step +. Initiate a sec#re call on CO;SO*@1 it!'=896OAP 1. 0erify 6=IO@1 $ets t!ecall an" can respon".

Step -. 0erify t!e =IS !as lo$$e" t!e a#"io from t!e'=896OAP 1 call.

PassKKKK FailKKKK 

%ont$omery Co#nty5 %arylan"Statement of Work

25#  

Statement of Work:

Page 256: Motorola SOW - Reviewed by MoCo PM 2015-09-22

7/23/2019 Motorola SOW - Reviewed by MoCo PM 2015-09-22

http://slidepdf.com/reader/full/motorola-sow-reviewed-by-moco-pm-2015-09-22 256/309

%ont$omery Co#nty5 %arylan"Statement of Work

Statement of Work: 25"

Page 257: Motorola SOW - Reviewed by MoCo PM 2015-09-22

7/23/2019 Motorola SOW - Reviewed by MoCo PM 2015-09-22

http://slidepdf.com/reader/full/motorola-sow-reviewed-by-moco-pm-2015-09-22 257/309

J.8.1= S&55 C"+!5-'!"

,y t!eir si$nat#res elo5 t!e folloin$ itnesses certify t!ey !ave oserve" t!e system =cceptance 'estProce"#res.

  Si$nat#res

WI';*SSH

  Please Print ;ameH QQQQQQQQQQQQQQQQQQQQQQQQQQQQQQQQQQQQQQQQ InitialsH

  Please Print 'itleH QQQQQQQQQQQQQQQQQQQQQQQQQQQQQQQQQQQQQQQQ 

%ont$omery Co#nty5 % 6epresentative

WI';*SSH

  Please Print ;ameH QQQQQQQQQQQQQQQQQQQQQQQQQQQQQQQQQQQQQQQQ InitialsH

  Please Print 'itleH QQQQQQQQQQQQQQQQQQQQQQQQQQQQQQQQQQQQQQQQ 

 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX ateH XXXXXXX 

 XXXXXXXX 

 XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX ateH XXXXXXX 

 XXXXXXXX 

Page 258: Motorola SOW - Reviewed by MoCo PM 2015-09-22

7/23/2019 Motorola SOW - Reviewed by MoCo PM 2015-09-22

http://slidepdf.com/reader/full/motorola-sow-reviewed-by-moco-pm-2015-09-22 258/309

J.9 TRAINING PLAN (C.4.2.8.8)

J.9.1 O*"+*"

Motorola olutions, *nc. 'Motorola) understands that successful implementation and use of your

communications system depends on effective training. Motorola has developed a training plan forMontgomery County 'County) to ensure a comprehensive understanding of the County’s proposedsystem and all user equipment. Motorola is leveraging over >7 years of training eperience workingwith customers just like you to provide recommendations for your consideration. +he training plandetailed in the following pages incorporates customer feedback coupled with a best practicessystematic approach to produce effective course delivery and content.

(ur commitment to the County is to provide unsurpassed services that ensure the equipment operatesefficiently for the life of the system. +o do so, Motorola directly trains your personnel to utilie thesystem to its maimum potential.

County personnel will gain in-depth understanding of the power of your new system througheducation and proficient daily use. (ur high-quality training focuses on student needs. +he training is

complemented by detailed documentation and available continuing education programs.

Motorola will collaborate with the County to develop a final customied training plan that fits yourneeds. (ur goal is to ensure system administrators, technicians, and end users are skilled in usingyour new system.

J.9.2 T+'&& A$$+'-

(ur training solution delivers a combination of online training and field-based, instructor-led trainingin classrooms at County locations using operational equipment. Motorola will employ knowledgeableand eperienced instructors to deliver well-designed courseware and integrated lab activities.

+raining is based upon several key criteria?

• Course design is driven by an analysis of student needs. *t focuses on specific application rather

than theory.

• 4earning objectives are based upon what students need to accomplish on the job.

• @ands-on lab opportunities using Montgomery County-specific job aids are incorporated to

maimie learning and retention.

(ur instructors bring invaluable eperience and knowledge of customer communication solutions intotheir training approach. +his gives them better insight and understanding into the practical aspects ofMontgomery County manager, technician, and end user job functions. 2ach instructor has the provenability to communicate with novice as well as epert personnel.

'ource Materials

Motorola will provide the original source materials for all training materials as required by theCounty, so the County may produce its own customied training material for future training sessions.ource material will be organied and Motorola will instruct the County in its use.

?arl# ,eliver# of $ertain $ourses

$rior to the installation of any equipment that will require significant configuration, Motorola willsupply the County training in the configuration of that equipment. +his training will be kicked off

%ont$omery Co#nty5 %arylan"Statement of Work

254 

Statement of Work 

Page 259: Motorola SOW - Reviewed by MoCo PM 2015-09-22

7/23/2019 Motorola SOW - Reviewed by MoCo PM 2015-09-22

http://slidepdf.com/reader/full/motorola-sow-reviewed-by-moco-pm-2015-09-22 259/309

with pilot sessions with appropriate supervisor personnel to gain feedback for the later training ofuser personnel.

'chedule of (raining

Motorola with work with the County to schedule training sessions and recognies that training classesmay coincide with work shifts other than >?00 a.m. to 7?00 p.m., Monday through !riday.

%ont$omery Co#nty5 %arylan"Statement of Work

 Motorola Solutions Statement of Work: 255  

Page 260: Motorola SOW - Reviewed by MoCo PM 2015-09-22

7/23/2019 Motorola SOW - Reviewed by MoCo PM 2015-09-22

http://slidepdf.com/reader/full/motorola-sow-reviewed-by-moco-pm-2015-09-22 260/309

J.9.3 P+$"/ C0+"

Motorola has identified the following courses that are necessary to achieve the training goals forMontgomery County. Course description files for the recommended courses are provided in ection".=.5.=. Class delivery for instructor-led courses in the field will be tailored for your system andfeatures.

pecifically, our proposed training plan addresses the following categories as identified in your :!$?

• 2ecutive Management.

• ystem dministrators.

• Maintenance $ersonnel.

• 2nd ser +rain-the-+rainer.

• ;ispatcher +raining.

J.6.3.1 E?ecuti(e '(er(ie) 5raining

$ourse (itle (arget8udience

'essions ,uration 0ocation ,ate Participants

?%ecutive !verview

(Instr#ctor@le")

*:ec#tive%ana$ement

1 1 "ay 9ait!ers#r$5%

', Ap to 12

$ourse '#nopsis:

Overvie of p#rc!ase" system an" its components. '!is is "epen"ent on %ont$omery Co#nty?s specific nee"s. '!is"escription ill e ase" on cons#ltative "isc#ssions at time of "elivery.

J.6.3.2 System dministrator5ecnician 5raining Pase *

$ourse (itle (arget8udience

'essions ,uration 0ocation ,ate Participants

8'(+! L  & IG,

(runking w@M $ore!verview

(OnlineM self@pace")

Prere4uisite 1

System

 ="ministratorsan" 'ec!nicians

1 & !o#rs OnlineM self@

pace"

Prior to

Prere/#isite 2

Ap to 12

$ourse '#nopsis:

 =S'6O 2 I0G 'r#nkin$ it! % Core System Overvie self@pace" co#rse is t!e startin$ point of all =S'6O 2Inte$rate" 0oice G ata (I0G) tr#nkin$ it! % Core systems. In or"er to take ot!er classes5 st#"ents are re/#ire" tocomplete t!is co#rse an" otain a passin$ score on t!e correspon"in$ test. It presents a !i$!@level "escription of t!esystem?s call flo capailities5 components5 feat#res5 an" enefits. Please refer to co#rse "escription on pa$e 2+3.

,omain $ontroller8dministration for8'(+! &

(Instr#ctor@le")

System ="ministratorsan" 'ec!nicians

1 & "ays 9ait!ers#r$%

Prior toPrere/#isite 3

Ap to 12

$ourse '#nopsis:

'!is orks!op covers t!e a"ministrator an" mana$ement f#nctions in t!e =S'6O 2 "omain controller an" !o t!esef#nctions affect ot! #sers an" comp#ters in t!e =S'6O 2 system. earnin$ activities in t!is co#rse foc#s on !o to#se t!e "omain controllers to a#t!enticate5 a"minister5 an" a#t!ori<e #sers an" "evices in t!e =S'6O 2 system. 9ro#ppolicies an" or$ani<ational #nits5 6=IAS5 an" ;S str#ct#re ill e a""resse" "#rin$ t!is co#rse. Please refer toco#rse "escription on pa$e 2++.

%ont$omery Co#nty5 %arylan"Statement of Work

256  

Statement of Work 

Page 261: Motorola SOW - Reviewed by MoCo PM 2015-09-22

7/23/2019 Motorola SOW - Reviewed by MoCo PM 2015-09-22

http://slidepdf.com/reader/full/motorola-sow-reviewed-by-moco-pm-2015-09-22 261/309

$ourse (itle (arget8udience

'essions ,uration 0ocation ,ate Participants

8'(+! & IG,Introduction (o +adio'#stem Management8pplications

(OnlineM self@pace")

Prere4uisite &

System ="ministratorsan" 'ec!nicians

1 17 !o#rs OnlineM self@pace"

Prior to 6a"ioSystem

 ="ministrator Works!op

Ap to 12

$ourse '#nopsis:

'!is virt#al5 interactive co#rse provi"es a !i$!@level overvie of t!e %otorola 6a"io System mana$ement applicationst!ro#$! recor"e" "emonstrations of common system tasks. Please refer to co#rse "escription on pa$e 2+.

8'(+! & IG, +adio'#stem 8dministrator<orkshop

(Instr#ctor@le")

System ="ministratorsan" 'ec!nicians

1 "ays 9ait!ers#r$5%

Prior to%ana$in$ t!e

System

Ap to 12

$ourse '#nopsis:

'!is orks!op covers a"ministrator f#nctions for an =S'6O 2 I0G system. earnin$ activities in t!is co#rse foc#s on!o to #se t!e "ifferent =S'6O 2 I0G system mana$ement applications. Participants ill e provi"e" it! anopport#nity to "isc#ss !o to str#ct#re t!eir or$ani<ation an" personnel for optimal =S'6O 2 I0G system #se. Pleaserefer to co#rse "escription on pa$e 2-7.

8'(+! & IG,Interfacing 'martone277 '#stemsD'martHNE

(OnlineM self@pace")

System ="ministratorsan" 'ec!nicians

1 +@12 !o#rs OnlineM self@pace" Prior to %ana$in$t!e System Ap to 12

$ourse '#nopsis:

 =S'6O 2 I0G 'r#nke" System Interfacin$ SmartFone 3+77 Systems (Smart) is "esi$ne" to allo comm#nicationeteen s#scrier ra"ios at e:istin$ 3+77 6 sites an" an =S'6O 2 I0G system. It is ase" on t!e 0oice Processor%o"#le (0P%) !ar"are platform an" enales t!e contin#e" #se of 3+77 6 sites an" s#scrier ra"ios it! t!e releaseof =S'6O 2 -.- or !i$!er. '!is self@st#"y trainin$ co#rse is inten"e" to provi"e information relate" to t!e installationan" f#nctionality of5 incl#"in$ t!e !ar"are an" softare associate" it!5 t!e Smart site converter in t!e =S'6O 2I0G system. Please refer to co#rse "escription on pa$e 2-3.

M$$ 377 'eries,ispatch $onsoles

!verview(OnlineM self@pace")

Prere4uisite 1

System ="ministrators

an" 'ec!nicians

1 1 !o#r OnlineM self@pace"

Prior to%CC -777

SeriesWorks!op

Ap to 12

$ourse '#nopsis:

'!is co#rse provi"es an overvie of t!e %CC -777 series of "ispatc! consoles. It incl#"es a "escription of t!e feat#resan" ill#strations of s#system arc!itect#re options. escriptions of s#system components an" ill#strations of si$nal floan" call processin$ are also incl#"e". Please refer to co#rse "escription on pa$e 2-&.

M$$ 377 'eries,ispatch $onsole<orkshop

(Instr#ctor@le")

System ="ministratorsan" 'ec!nicians

1 & "ays 9ait!ers#r$%

Prior to%ana$in$ t!e

System

Ap to 12

$ourse '#nopsis:

'!is co#rse familiari<es participants it! t!e installation5 confi$#ration5 mana$ement5 an" repair of %CC -777 SeriesIP "ispatc! consoles. It also covers =rc!ivin$ Interface Servers (=IS)5 =A IDO servers5 an" Conventional C!annel9ateays (CC9W). '!e foc#s is on a "etaile" "isc#ssion of console !ar"are an" !an"s@on activities it! t!einstallation an" confi$#ration of t!e %CC -777 Series IP "ispatc! consoles. Please refer to co#rse "escription on pa$e2-+.

%ont$omery Co#nty5 %arylan"Statement of Work

 Motorola Solutions Statement of Work: 257  

Page 262: Motorola SOW - Reviewed by MoCo PM 2015-09-22

7/23/2019 Motorola SOW - Reviewed by MoCo PM 2015-09-22

http://slidepdf.com/reader/full/motorola-sow-reviewed-by-moco-pm-2015-09-22 262/309

J.6.3.3 5ecnician 5raining Pase **

$ourse (itle (arget8udience

'essions ,uration 0ocation ,ate Participants

8'(+! & IG,=(+ 5777 +epeater 'ite<orkshop

(Instr#ctor@le")

'ec!nicians 1 3 "ays 9ait!ers#r$5%

Prior to Workin$on t!e System

Ap to 12

$ourse '#nopsis:

'!is orks!op "escries t!e components in t!e =S'6O 2 I0G system repeater site it! 9'6 777 e:pan"ale sites#system (*SS). '!is co#rse also presents !o t!e 9'6 777 *SS operates an" e:plains t!e tools an" met!o"savailale for tro#les!ootin$ components it!in t!e s#system. Please refer to co#rse "escription on pa$e 2-.

8PH $P' Programmingand (emplate uilding

(Instr#ctor@le")

'ec!nicians 1 2 "ays 9ait!ers#r$5%

Prior toPro$rammin$

Ap to 12

$ourse '#nopsis:

'!e =P CPS Pro$rammin$ an" 'emplate ,#il"in$ co#rse provi"es comm#nications mana$ement personnel an"tec!nicians it! t!e knole"$e an" trainin$ necessary to #il" templates an" pro$ram =P -777D-77 s#scrier ra"iosin t!e most efficient ay possile. '!e content5 parameters5 an" e:ercises "emonstrate" in t!is class apply to t!e

 =P -777 portale an" =P -77 moile. Please refer to co#rse "escription on pa$e 27.

(e%t Message 'ervice(raining

(OnlineM self@pace")

'ec!nicians 1 & !o#rs OnlineM self@pace" Prior to Workin$on t!e System Ap to 12

$ourse '#nopsis:

'!e =S'6O 2 'e:t %essa$in$ Service 'rainin$ is a self@st#"y trainin$ co#rse inten"e" to provi"e an overvie of t!eproce"#res necessary to "escrie t!e installation process5 an" #ser f#nctions of t!e =S'6O 2 i:e" %essa$in$ Clientan" t!e proce"#res necessary to install5 confi$#re5 an" a"minister t!e 'e:t %essa$in$ Server. Please refer to co#rse"escription on pa$e 22.

J.6.3.4 5ecnician 5raining '+tional

$ourse (itle (arget8udience

'essions ,uration 0ocation ,ate Participants

8'(+! IG, 'ecure$ommunications

(Instr#ctor@le")

'ec!nicians 1 "ays 9ait!ers#r$5%

Prior toWorkin$ on t!e

System

Ap to 12

$ourse '#nopsis:

'!is orks!op "escries plannin$5 installation5 confi$#ration5 operations5 an" tro#les!ootin$ of Sec#reComm#nications it!in t!e =S'6O 2 I0G system. Please refer to co#rse "escription on pa$e 23.

%ont$omery Co#nty5 %arylan"Statement of Work

25  

Statement of Work 

Page 263: Motorola SOW - Reviewed by MoCo PM 2015-09-22

7/23/2019 Motorola SOW - Reviewed by MoCo PM 2015-09-22

http://slidepdf.com/reader/full/motorola-sow-reviewed-by-moco-pm-2015-09-22 263/309

J.6.3.! End ser ,is+atc Console 5rainingD5rainAteA5rainer

$ourse (itle (arget8udience

'essions ,uration 0ocation ,ate Participants

M$$ 377 $onsole!perator with 8'(+!8PH Mo)ile-in-(ra#

1 trainin$ console(Instr#ctor@le")

ispatc!Operator 'rainers

2(&@!o#r 

sessions)

1 "ay 9ait!ers#r$5%

Prior toC#tover 

2&(12 for eac!

s!ift)

$ourse '#nopsis:

'!is co#rse provi"es participants it! an intro"#ction to t!e "ispatc! console5 its asic operation5 an" tailore" jo ai"st!at ill e availale for assistance in operation. '!ro#$! facilitation an" !an"s@on activities5 t!e #ser learns !o toperform common tasks associate" it! t!e console operation. Please refer to co#rse "escription on pa$e 2.

M$$ 377 $onsole!perator and 8dminwith 8'(+! 8P$Mo)ile-in-(ra#

1 trainin$ console

(Instr#ctor@le")

ispatc!S#pervisor 

'rainers

1(@!o#r session)

1 "ay 9ait!ers#r$5%

Prior toC#tover 

+

M$$ 377 $onsole !perator $ourse '#nopsis:'!is co#rse provi"es participants it! an intro"#ction to t!e "ispatc! console5 its asic operation5 an" tailore" jo ai"st!at ill e availale for assistance in operation. '!ro#$! facilitation an" !an"s@on activities5 t!e #ser learns !o toperform common tasks associate" it! t!e console operation. Please refer to co#rse "escription on pa$e 2.

M$$ 377 $onsole 8dmin $ourse '#nopsis:

'!is co#rse provi"es participants it! t!e knole"$e an" skills to mana$e an" #tili<e t!e %CC -77 consolea"ministrator f#nctions. '!ro#$! facilitation an" !an"s@on activities5 t!e participant learns !o to c#stomi<e t!e consolescreens. Please refer to co#rse "escription on pa$e 2+.

;oteH '!e first !alf of t!e "ay covers t!e console operator trainin$. '!e secon" !alf of t!e "ay covers t!e a"min trainin$.'!e #se of t!e Interactive *n" Aser 'ool 8it (i*A'8) ill also e covere" in t!e secon" !alf of t!e "ay.

%ont$omery Co#nty5 %arylan"Statement of Work

 Motorola Solutions Statement of Work: 25!

Page 264: Motorola SOW - Reviewed by MoCo PM 2015-09-22

7/23/2019 Motorola SOW - Reviewed by MoCo PM 2015-09-22

http://slidepdf.com/reader/full/motorola-sow-reviewed-by-moco-pm-2015-09-22 264/309

J.6.3.$ End ser 0adio 5rainingD5rainAteA5rainer

$ourse (itle (arget

8udience

'essions ,uration 0ocation ,ate Participants

8PH 3777 Porta)le D1ModelE and 8PH377

Mo)ile D1 ModelE!perator (raining

Atili<in$ t!e Interactive*n" Aser 'ool 8it

(Instr#ctor e")

6a"io 'rainers 1 1 ay 9ait!ers#r$%

Prior totrainin$

#sers

1

$ourse '#nopsis:'!is co#rse provi"es =P ra"io trainers it! an intro"#ction to t!eir ra"io5 its asic operation an" tailore" joai"s availale for assistance in operation. '!e learnin$ e:perience is a mi: of facilitation an" !an"s@onactivities to !elp #sers perform common tasks associate" it! t!eir ra"io operation. Se$mentation eteen#ser $ro#ps (i.e. Police5 ireD*%S5 an" P#lic Service) is enco#ra$e" to !elp foc#s instr#ction on t!e specificoperational iss#es of t!e in"ivi"#al #ser $ro#p. '!is co#rse is $eare" for c#stomers !o !ave an e:perience""e"icate" trainin$ staff in t!eir or$ani<ation. It provi"es t!e c#stomer?s i"entifie" trainin$ personnel it! t!eknole"$e an" practice applyin$ trainin$ tec!ni/#es t!at ill enale t!em to s#ccessf#lly train t!eir st#"ents.'rainers ill #se a#"io vis#al (Interactive *n" Aser 'oolkits E i*A'8)5 facilitation an" !an"s@onK activities tofacilitate learnin$ events s#pporte" y tailore" or c#stomi<e" trainin$ materials an" jo ai"es. '!ey illecome proficient in "isc#ssin$ common tasks associate" it! t!e operation of t!e c#stomer?s ra"ios. Pleaserefer to co#rse "escription in Section J.+.&.1&.

8PH 2777 Porta)le D1ModelE and 8PH277Mo)ile D1 ModelE!perator (raining

Atili<in$ t!e Interactive*n" Aser 'ool 8it

(Instr#ctor e")

6a"io 'rainers 1 1 ay 9ait!ers#r$%

Prior totrainin$#sers

1

$ourse '#nopsis:'!is co#rse provi"es =P ra"io trainers it! an intro"#ction to t!eir ra"io5 its asic operation an" tailore" joai"s availale for assistance in operation. '!e learnin$ e:perience is a mi: of facilitation an" !an"s@on

activities to !elp #sers perform common tasks associate" it! t!eir ra"io operation. Se$mentation eteen#ser $ro#ps (i.e. Police5 ireD*%S5 an" P#lic Service) is enco#ra$e" to !elp foc#s instr#ction on t!e specificoperational iss#es of t!e in"ivi"#al #ser $ro#p. '!is co#rse is $eare" for c#stomers !o !ave an e:perience""e"icate" trainin$ staff in t!eir or$ani<ation. It provi"es t!e c#stomer?s i"entifie" trainin$ personnel it! t!eknole"$e an" practice applyin$ trainin$ tec!ni/#es t!at ill enale t!em to s#ccessf#lly train t!eir st#"ents.'rainers ill #se a#"io vis#al (Interactive *n" Aser 'oolkits E i*A'8)5 facilitation an" !an"s@onK activities tofacilitate learnin$ events s#pporte" y tailore" or c#stomi<e" trainin$ materials an" jo ai"es. '!ey illecome proficient in "isc#ssin$ common tasks associate" it! t!e operation of t!e c#stomer?s ra"ios. Pleaserefer to co#rse "escription in Section J.+.&.1&..

%ont$omery Co#nty5 %arylan"Statement of Work

26#  

Statement of Work 

Page 265: Motorola SOW - Reviewed by MoCo PM 2015-09-22

7/23/2019 Motorola SOW - Reviewed by MoCo PM 2015-09-22

http://slidepdf.com/reader/full/motorola-sow-reviewed-by-moco-pm-2015-09-22 265/309

$ourse (itle (arget

8udience

'essions ,uration 0ocation ,ate Participants

8PH 2777 0i Porta)leD1 ModelE and8PH277 0i Mo)ile D1ModelE !perator(raining

Atili<in$ t!e Interactive*n" Aser 'ool 8it

(Instr#ctor e")

6a"io 'rainers 1 1 ay 9ait!ers#r$%

Prior totrainin$#sers

+

$ourse '#nopsis:'!is co#rse provi"es =P ra"io trainers it! an intro"#ction to t!eir ra"io5 its asic operation an" tailore" joai"s availale for assistance in operation. '!e learnin$ e:perience is a mi: of facilitation an" !an"s@onactivities to !elp #sers perform common tasks associate" it! t!eir ra"io operation. Se$mentation eteen#ser $ro#ps (i.e. Police5 ireD*%S5 an" P#lic Service) is enco#ra$e" to !elp foc#s instr#ction on t!e specificoperational iss#es of t!e in"ivi"#al #ser $ro#p. '!is co#rse is $eare" for c#stomers !o !ave an e:perience""e"icate" trainin$ staff in t!eir or$ani<ation. It provi"es t!e c#stomer?s i"entifie" trainin$ personnel it! t!eknole"$e an" practice applyin$ trainin$ tec!ni/#es t!at ill enale t!em to s#ccessf#lly train t!eir st#"ents.'rainers ill #se a#"io vis#al (Interactive *n" Aser 'oolkits E i*A'8)5 facilitation an" !an"s@onK activities tofacilitate learnin$ events s#pporte" y tailore" or c#stomi<e" trainin$ materials an" jo ai"es. '!ey illecome proficient in "isc#ssin$ common tasks associate" it! t!e operation of t!e c#stomer?s ra"ios. Please

refer to co#rse "escription in Section J.+.&.1&.

8PH 377 Mo)ileD$ontrol 'tationE

(Instr#ctor@le")

6a"io 'rainers 1 1 "ay 9ait!ers#r$5%

Prior toAsers Asin$t!e 6a"ios

+

$ourse '#nopsis:

'!is co#rse provi"es =P ra"io trainers it! an intro"#ction to t!eir ra"io5 its asic operation5 an" tailore" joai"s availale for assistance in operation. '!e learnin$ e:perience is a mi: of facilitation an" !an"s@onactivities to !elp #sers perform common tasks associate" it! t!eir ra"io operation. Se$mentation eteen#ser $ro#ps (i.e. Police5 ireD*%S5 an" P#lic Service) is enco#ra$e" to !elp foc#s instr#ction on t!e specificoperational iss#es of t!e in"ivi"#al #ser $ro#p. '!is co#rse is $eare" for c#stomers !o !ave an e:perience""e"icate" trainin$ staff in t!eir or$ani<ation. It provi"es t!e c#stomer?s i"entifie" trainin$ personnel it! t!eknole"$e an" practice applyin$ trainin$ tec!ni/#es t!at ill enale t!em to s#ccessf#lly train t!eir st#"ents.

'rainers ill #se a#"io vis#al (i*A'8)5 facilitation an" !an"s@onK activities to facilitate learnin$ eventss#pporte" y tailore" or c#stomi<e" trainin$ materials an" jo ai"es. '!ey ill ecome proficient in "isc#ssin$common tasks associate" it! t!e operation of t!e c#stomer?s ra"ios. Please refer to co#rse "escription inSection J.+.&.1&..

J.6.3.6 Logging 0ecorder 5raining

$ourse (itle (arget 8udience 'essions ,uration 0ocation ,ate Participants

erint 8udio0og (raining

 (Instr#ctor@le")

ispatc!S#pervisor5

System %ana$er 

1(&@!o#r 

sessions)

1 "ay 9ait!ers#r$5%

Prior toC#tover 

17(17 for eac!

session)

$ourse '#nopsis:

%otorola5 t!ro#$! its partner 0erint5 ill provi"e Professional Services via an on@site co#rse for a"ministrators an"

s#pervisor it! information an" practical skills re$ar"in$ t!e #se of t!e 0erint =#"iolo$ G =#"iolo$ Interaction >#ality

softare. 'rainin$ ill incl#"e system confi$#rations5 recor"in$ an" arc!ivin$ proce"#res

%ont$omery Co#nty5 %arylan"Statement of Work

 Motorola Solutions Statement of Work: 26"

Page 266: Motorola SOW - Reviewed by MoCo PM 2015-09-22

7/23/2019 Motorola SOW - Reviewed by MoCo PM 2015-09-22

http://slidepdf.com/reader/full/motorola-sow-reviewed-by-moco-pm-2015-09-22 266/309

J.6.3.7 Micro)a(e 5raining

$ourse (itle (arget 8udience 'essions ,uration 0ocation ,ate Participants

8I8( ?clipse GProvision M< +adio(raining

 (Instr#ctor@le")

'ec!nicians5System %ana$er 

1(eek lon$

co#rse)

"ay 9ait!ers#r$5%

Prior toC#tover 

17(17 for eac!

session)

$ourse '#nopsis:

'!e *clipse Installation5 Operation an" %aintenance co#rse teac!es st#"ents key f#nctions of t!e *clipseplatform. '!e co#rse incl#"es an overvie of all availale e/#ipment5 asic confi$#ration it! t!e Portal crafttool5 system commissionin$5 maintenance5 "ia$nostics an" tro#les!ootin$. '!e co#rse ill cover in "etail allaspects of #sin$ t!e *%S for fa#lt mana$ement5 confi$#ration mana$ement5 performance monitorin$ an"reportin$. ,y levera$in$ t!e e:tensive !an"s@on e:ercises5 st#"ents ill e ale to master t!e Pro0ision*%S feat#res an" si$nificantly re"#ce comple: confi$#ration time for "eployment.

%ont$omery Co#nty5 %arylan"Statement of Work

262  

Statement of Work 

Page 267: Motorola SOW - Reviewed by MoCo PM 2015-09-22

7/23/2019 Motorola SOW - Reviewed by MoCo PM 2015-09-22

http://slidepdf.com/reader/full/motorola-sow-reviewed-by-moco-pm-2015-09-22 267/309

J.9. C0+" D"-+$!&

J.6.4.1 S50' 2! *%F, )it M Core System '(er(ie) CS614299

,eliver# Method

(4+ Y (nline +raining

,uration

6 hours

(arget 8udience

ystem Managers, +echnical ystem Managers, ystem +echnicians, and pplication sers

$ourse !verview

+:( 17 *AP; +runking with M Core ystem (verview self-paced course is the starting point ofall +:( 17 *AP; trunking with M Core systems. *n order to take other classes, students arerequired to complete this course and obtain a passing score on the corresponding test. *t presents a

high-level description of the system’s call flow capabilities, components, features, and benefits.

Prere4uisites

Completion of the following courses or equivalent knowledge?

• %ridging the &nowledge <ap for +:( 17 'C+#00 or C+#0#).

•  8etworking 2ssentials in Communication 2quipment '8+=91).

• dvanced 8etworking in Motorola Communications 2quipment '8/+005).

0earning !utcomes

fter completing the course, the participant will be able to?

• 4ist and describe +:( 17 *AP; trunking with M Core system features and capabilities.

• ;escribe +:( 17 with M Core system sites and their components.

• ;escribe the paths used for control, voice, and data in an +:( 17 *AP; trunking with

M Core system.

• 4ist the servers and databases used in an +:( 17 *AP; trunking with M Core system.

• ;escribe voice and data signal flows, and mobility management.

%ont$omery Co#nty5 %arylan"Statement of Work

 Motorola Solutions Statement of Work: 263

Page 268: Motorola SOW - Reviewed by MoCo PM 2015-09-22

7/23/2019 Motorola SOW - Reviewed by MoCo PM 2015-09-22

http://slidepdf.com/reader/full/motorola-sow-reviewed-by-moco-pm-2015-09-22 268/309

$ourse Modules

Module #? ystem rchitecture.M-# Core rchitecture.M-1 Core rchitecture.M-5 Core rchitecture.Common erver rchitecture.

calability.Module # ummary.Module # :eview Gui.

Module 1? ystem !eatures and (ptions.!leible ite and *nterone 4inks.Channel $artitioning.(ther %and +runking.;ynamic ;ual Mode.2nhanced ;ata ervice.+elephone *nterconnect.;igital Mutual id.martJ ite Converter.**.# 8etwork <ateway.** >0003C* >000.;ynamic ystem :esilience.@igh vailability ;ata.:adio uthentication.Module 1 ummary.Module 1 :eview Gui.

Module 5? Lone Core Components.;irect ttached torage ;evice.;omain Controllers.Lone Controller.CM.$;<.<<8. 8etwork Management Components. 8etwork +ransport Components. 8etwork ubnets.ervers P ;atabases.Module 5 ummary.Module 5 :eview Gui.

Module 6? :emote ites.<+: >000 2pandable ite @ardware.:epeater ite.@$; (verlay.imulcast ubsystem.Console ite.Conventional Channel upport.ite tatuses.Module 6 ummary.Module 6 :eview Gui.

Module 7? *nformation +ypes P $aths.Control *nformation.Control $ath.

%ont$omery Co#nty5 %arylan"Statement of Work

264 

Statement of Work 

Page 269: Motorola SOW - Reviewed by MoCo PM 2015-09-22

7/23/2019 Motorola SOW - Reviewed by MoCo PM 2015-09-22

http://slidepdf.com/reader/full/motorola-sow-reviewed-by-moco-pm-2015-09-22 269/309

Aoice *nformation.Aoice $ath.;ata.;ata $ath.;ata $athI@$;.;ata $athI2nhanced ;ata. 8etwork Management *nformation. 8etwork Management $ath.*nformation $aths :outing.:outing !ailure cenarios.Module 7 ummary.Module 7 :eview Gui.

Module 9? Aoice P ;ata $rocessing.!inding the Control Channel.ffiliation P :egistration.Channel :equest.uthoriing the Call.ssignment of :esources.%usy Gueue.Call in $rogress.

!inishing a Call.2nhanced ;ata on :eserved ccess Channel.;ata $ackets P ignal !low.Module 9 ummary.Module 9 :eview Gui.

Module =? Mobility Management.ffiliation P :egistration.Aalid ites for an *ndividual.Aalid ites for a +alkgroup.ite ccess ;enial +ype.;ynamic ite ssignment.Continuous ssignment pdating.

;e-registration.:oaming.djacent ites.:* +hreshold.$referred ite.lways $referred ite.4east $referred ite.(ut of :ange.*nbound P (utbound.%alanced Coverage.(ut-of-range *ndications.canning.

$riorities in can.:equested ite.Module = ummary.Module = :eview Gui.

!inal ssessment.

%ont$omery Co#nty5 %arylan"Statement of Work

 Motorola Solutions Statement of Work: 265  

Page 270: Motorola SOW - Reviewed by MoCo PM 2015-09-22

7/23/2019 Motorola SOW - Reviewed by MoCo PM 2015-09-22

http://slidepdf.com/reader/full/motorola-sow-reviewed-by-moco-pm-2015-09-22 270/309

J.6.4.2 ,omain Controller dministration -or S50' 2!

,uration

6 days

,eliver# Method

*4+ Y *nstructor-led +raining

(arget 8udience

ystem dministrators, +echnical ystem dministrators, and ystem +echnicians

$ourse '#nopsis

+his workshop covers the administrator and management functions in the +:( 17 domaincontroller and how these functions affect both users and computers in the +:( 17 system.4earning activities in this course focus on how to use the domain controllers to authenticate,administer, and authorie users and devices in the +:( 17 system. <roup policies andorganiational units, :;*, and ;8 structure will be addressed during this course.

+he applications in this course only apply to customers with releases =.6 or newer.

Prere4uisite

Completion of the following courses or equivalent knowledge?

• +:( 17 *AP; with M Core ystem (verview 'C=#6100).

• +:( 17 *AP; Conventional with M Core (verview 'C=#6610).

• +:( 17 *AP; with 4 Core ystem (verview 'C=#6650).

$ourse !)*ectives

fter completing the course, the participant will be able to?

• nderstand the domain controller server platform.

• nderstand the ;8 hierarchy in the +:(17 system.

• *mplement :;* authentication in applicable devices in an +:( 17 system.

• se ctive ;irectory to control users in the +:( 17 system.

• nderstand group policy objects and how they impact users in the +:( 17 domain.

%ont$omery Co#nty5 %arylan"Statement of Work

266  

Statement of Work 

Page 271: Motorola SOW - Reviewed by MoCo PM 2015-09-22

7/23/2019 Motorola SOW - Reviewed by MoCo PM 2015-09-22

http://slidepdf.com/reader/full/motorola-sow-reviewed-by-moco-pm-2015-09-22 271/309

$ourse Modules

Module #? Course *ntroduction.

Module 1? nderlying dministrative oftware.

Module 5? ;omain Controller oftware.

Module 6? uthentication and uthoriation.

Module 7? ;omain Controller *mplementation.

Module 9? <roups, sers, and $olicies.

Module =? +roubleshooting *ssues.

%ont$omery Co#nty5 %arylan"Statement of Work

 Motorola Solutions Statement of Work: 267  

Page 272: Motorola SOW - Reviewed by MoCo PM 2015-09-22

7/23/2019 Motorola SOW - Reviewed by MoCo PM 2015-09-22

http://slidepdf.com/reader/full/motorola-sow-reviewed-by-moco-pm-2015-09-22 272/309

J.6.4.3 S50' 2! *%F, *ntroduction to 0adio System Management ++lications CS613291

,uration

#0 hours

,eliver# Method

(4+ Y (nline +raining

(arget 8udience

ystem Managers, +echnical ystem Managers, and ystem +echnicians

$ourse '#nopsis

+his virtual, interactive course provides a high-level overview of the Motorola :adio ystemmanagement applications through recorded demonstrations of common system tasks.

Prere4uisites

Completion of the following courses or equivalent knowledge?

• %ridging the &nowledge <ap for +echnicians 'C+#00).

+e4uired

+ake one of the following depending on system supporting?

• +:( 17 *AP; with M Core ystem (verview 'C=#5100).

• +:( 17 *AP; Conventional with M Core (verview 'C=#5610).

• +:( 17 *AP; with 4 Core ystem (verview 'C=#5650).

0earning !utcomes

fter completing the course the participant will be able to?

• ;escribe the purpose of 8etwork Management applications used in an +:( system.

• *dentify high-level capabilities of those 8etwork dministrator applications.

• !amiliarie with common operations allowed by those 8etwork dministrator applications.

%ont$omery Co#nty5 %arylan"Statement of Work

26  

Statement of Work 

Page 273: Motorola SOW - Reviewed by MoCo PM 2015-09-22

7/23/2019 Motorola SOW - Reviewed by MoCo PM 2015-09-22

http://slidepdf.com/reader/full/motorola-sow-reviewed-by-moco-pm-2015-09-22 273/309

$ourse Modules

Module #?ystem $rofile.Lone $rofile.Lone/atch.+* 4og Aiewer.

Module 1?nified 2vent Manager '2M).ffiliation ;isplay.

Module 5?:adio Control Manager ':CM).:eports.

Module 6?$rovisioning Manager.

Module 7?2MC *oni 8etwork Configuration Manager.

%ont$omery Co#nty5 %arylan"Statement of Work

 Motorola Solutions Statement of Work: 26!

Page 274: Motorola SOW - Reviewed by MoCo PM 2015-09-22

7/23/2019 Motorola SOW - Reviewed by MoCo PM 2015-09-22

http://slidepdf.com/reader/full/motorola-sow-reviewed-by-moco-pm-2015-09-22 274/309

J.6.4.4 S50' 2! *%F, 0adio System dministrator orkso+ CS614192

,uration

7 days

,eliver# Method

*4+ Y *nstructor-led +raining

(arget 8udience

ystem dministrators, +echnical ystem dministrators, and ystem +echnicians

$ourse '#nopsis

+his workshop covers administrator functions for an +:( 17 *AP; system. 4earning activities inthis course focus on how to use the different +:( 17 *AP; system management applications.$articipants will be provided with an opportunity to discuss how to structure their organiation and personnel for optimal +:( 17 *AP; system use.

+he applications in this course only apply to customers with releases =.6 or newer.

Completion of the following courses or equivalent knowledge?

• %ridging the &nowledge <ap I ystem dministrators 'C+#0#).

•  8etworking 2ssentials in Communication 2quipment '8+=91).

• dvanced 8etworking in Motorola Communications 2quipment '8/+005).

+ake one of the following depending on system supporting?

• +:( 17 *AP; with M Core ystem (verview 'C=#6100).

• +:( 17 *AP; Conventional with M Core (verview 'C=#6610).

• +:( 17 *AP; with 4 Core ystem (verview 'C=#6650).

• +:( 17 *AP; *ntroduction to :adio ystem Management pplications 'C=#510#).

$ourse !)*ectives

fter completing the course the participant will be able to?

• ;escribe the relationship between radio programming, console administration and system

management, and the impact of this relationship on system planning.

• 4ist the network management tools applicable at each phase of the system lifecycle.

• *dentify the advantages and disadvantages of options available for the configuration of system

infrastructure and user parameters.

• se the report and real-time data to monitor performance and make adjustments necessary to

maintain acceptable system performance levels.

• 2plain the key factors that affect the planning of +:( 17 :adio ystems and create afleetmap.

Prere4uisites

Completion of the following courses or equivalent knowledge?

• %ridging the &nowledge <ap I ystem dministrators 'C+#0#).

•  8etworking 2ssentials in Communication 2quipment '8+=91).

%ont$omery Co#nty5 %arylan"Statement of Work

27#  

Statement of Work 

Page 275: Motorola SOW - Reviewed by MoCo PM 2015-09-22

7/23/2019 Motorola SOW - Reviewed by MoCo PM 2015-09-22

http://slidepdf.com/reader/full/motorola-sow-reviewed-by-moco-pm-2015-09-22 275/309

• dvanced 8etworking in Motorola Communications 2quipment '8/+005).

+ake one of the following depending on system supporting?

• +:( 17 *AP; with M Core ystem (verview 'C=#6100).

• +:( 17 *AP; Conventional with M Core (verview 'C=#6610).

• +:( 17 *AP; with 4 Core ystem (verview 'C=#6650).

• +:( 17 *AP; *ntroduction to :adio ystem Management pplications 'C=#510#).

%ont$omery Co#nty5 %arylan"Statement of Work

 Motorola Solutions Statement of Work: 27"

Page 276: Motorola SOW - Reviewed by MoCo PM 2015-09-22

7/23/2019 Motorola SOW - Reviewed by MoCo PM 2015-09-22

http://slidepdf.com/reader/full/motorola-sow-reviewed-by-moco-pm-2015-09-22 276/309

$ourse Modules

Module #? Course *ntroduction.Module 1? %asic Concepts of :adio ystem dministration.

+opic 1-#? /hy ;id +hey ;o it +hat /ayW+opic 1-1? :adio $rogramming vs. ystem Management.+opic 1-5? 4ist of Management pplications.

Module 5? Configuration.+opic 5-#? Configuration $rocess and +ools.+opic 5-1? dding :adios and +alkgroups to the ystem.+opic 5-5? 2diting 2isting :ecords in $M.+opic 5-6? etting ystem-4evel $arameters.+opic 5-7? Creating Managers and Controlling ccess.+opic 5-9? Managing Configurations with 8C.+opic 5-=? Configuring ites and Channels with $M.

Module 6? (peration and (ptimiation.+opic 6-#? 4icense haring.+opic 6-1? 4ive Monitoring of the ystem.+opic 6-5? :eport <eneration.+opic 6-6? 8etwork Maintenance +ools.

Module 7? Communications $lanning.+opic 7-#? !actors +hat *mpact Communications ystem $lanning.+opic 7-1? !leetmapping.

%ont$omery Co#nty5 %arylan"Statement of Work

272  

Statement of Work 

Page 277: Motorola SOW - Reviewed by MoCo PM 2015-09-22

7/23/2019 Motorola SOW - Reviewed by MoCo PM 2015-09-22

http://slidepdf.com/reader/full/motorola-sow-reviewed-by-moco-pm-2015-09-22 277/309

J.6.4.! S50' 2! *%F, 5runked System *nter-acing Smartone 3$99 Systems )it SmartG

,uration

9-#1 hours

,eliver# Method

(nline, self-paced

(arget 8udience

ystem +echnicians

$ourse '#nopsis

+:( 17 *AP; +runked ystem *nterfacing martLone 5900 ystems with martJ is designed toallow communication between subscriber radios at eisting 5900 :! sites and an +:( 17 *AP;system. *t is based on the Aoice $rocessor Module 'A$M) hardware platform and enables thecontinued use of 5900 :! sites and subscriber radios with the release of +:( 17 =.= or higher.+his self-study training course is intended to provide information related to the installation and

functionality of, including the hardware and software associated with, the martJ site converter inthe +:( 17 *AP; system.

$ourse !)*ectives

Course material is designed to enable you to?

• ;escribe the martJ ite Converter and its operation within the system.

• *dentify the major components and functionality.

• &now the requirements and components necessary to install a martJ site converter.

Prere4uisites

•  8one.

$ourse !utline

• martJ ite Converter.

• (verview.

• +heory of (perations.

• *nstallation.

• martJ ite Converter (ptimiation.

• martJ ite Converter (peration.

%ont$omery Co#nty5 %arylan"Statement of Work

 Motorola Solutions Statement of Work: 273

Page 278: Motorola SOW - Reviewed by MoCo PM 2015-09-22

7/23/2019 Motorola SOW - Reviewed by MoCo PM 2015-09-22

http://slidepdf.com/reader/full/motorola-sow-reviewed-by-moco-pm-2015-09-22 278/309

J.6.4.$ MCC 6999 Series ,is+atc Consoles '(er(ie) C':914

,uration

# hour 

,eliver# Method

(4+ Y (nline training

(arget 8udience

ystem dministrators and Console +echnicians

$ourse '#nopsis

+his course provides an overview of the MCC =000 series of dispatch consoles. *t includes adescription of the features and illustrations of subsystem architecture options. ;escriptions ofsubsystem components and illustrations of signal flow and call processing are also included.

Prere4uisite

Completion of the following courses or equivalent knowledge?

• %ridging the &nowledge <ap 'C+#00-2 or C+#0#-2).

•  8etworking 2ssentials in Communication 2quipment '8+=91).

• dvanced 8etworking in Motorola Communications 2quipment '8/+005).

+e4uired

elect the ystem (verview specific to your +:( 17 *AP; Core?

• +:( 17 *AP; with M Core ystem (verview 'C=#6100).

• +:( 17 *AP; Conventional with M Core ystem (verview 'C=#6610).

• +:( 17 *AP; with 4 Core ystem (verview 'C=#6650).

• +:( 17 *AP; Conventional with & Core ystem (verview 'C=#6600).• +:( 17 *AP; *ntroduction to :adio ystem Management pplications 'C=#510#).

$ourse !)*ectives

fter completing the course, the participant will be able to?

• ;escribe the features of MCC =000 series of dispatch consoles.

• 2plain various system architectures for dispatch console subsystems.

• ;escribe system components in a dispatch console subsystem.

• ;escribe the signal flow of call processing from a dispatch console.

%ont$omery Co#nty5 %arylan"Statement of Work

274 

Statement of Work 

Page 279: Motorola SOW - Reviewed by MoCo PM 2015-09-22

7/23/2019 Motorola SOW - Reviewed by MoCo PM 2015-09-22

http://slidepdf.com/reader/full/motorola-sow-reviewed-by-moco-pm-2015-09-22 279/309

$ourse Modules

Module #? Course *ntroduction.Module 1? Console rchitectures.

1-#? *ntroduction.1-1? Co-located Console ites.1-5? :emote Console ites.

1-6? C28+:C(M *nteroperability.1-7? ;ispatch Console ubsystem.1-9? Conventional Configurations.

Module 5? Console ubsystem Components.5-#? *ntroduction.5-1? Console (perator $osition.5-5? MCC =700 with <$*(M.5-6? MCC =700 with Aoice $rocessing Module 'A$M).5-7? MCC =#00.5-9? 4ogging ystem.5-=? Console lias ManagerIM&M =000.5->? uiliary *3( erver.5-B? Conventional Channel <ateway.5-#0? Conventional ite Controller.

Module 6? Console !eatures.6-#? Capacity.6-1? 2ample of Console !unctions.6-5? dministrator and ;ispatcher pplications.6-6? (ver-the-2thernet &eying '(+2&).

Module 7? Call $rocessing.7-#? *ntroduction.7-1? 4ink (p.7-5? Call :equest.7-6? Call etup.7-7? Call <rant.7-9? udio :outing.7-=? Call Continuation or +eardown.

%ont$omery Co#nty5 %arylan"Statement of Work

 Motorola Solutions Statement of Work: 275  

Page 280: Motorola SOW - Reviewed by MoCo PM 2015-09-22

7/23/2019 Motorola SOW - Reviewed by MoCo PM 2015-09-22

http://slidepdf.com/reader/full/motorola-sow-reviewed-by-moco-pm-2015-09-22 280/309

J.6.4.6 MCC 6999 Series ,is+atc Consoles orkso+ C':912

,uration

6 days

,eliver# Method

*4+ Y *nstructor-led +raining

(arget 8udience

ystem dministrators and Console +echnicians

$ourse '#nopsis

+his course familiaries participants with the installation, configuration, management, and repair ofMCC =000 eries *$ dispatch consoles. *t also covers rchiving *nterface ervers '*), J *3(servers, and Conventional Channel <ateways 'CC</). +he focus is on a detailed discussion ofconsole hardware and hands-on activities with the installation and configuration of the MCC =000eries *$ dispatch consoles.

Prere4uisite

Completion of the following courses or equivalent knowledge?

• %ridging the &nowledge <ap 'C+#00-2 or C+#0#-2).

•  8etworking 2ssentials in Communication 2quipment '8+=91).

• dvanced 8etworking in Motorola Communications 2quipment '8/+005).

+e4uired

• MCC =000 eries Console (verview 'C(80#6).

• +:( 17 *AP; with M Core ystem (verview 'C=#6100).

• *ntroduction to :adio ystem Management pplications 'C=#510#).

$ourse !)*ectives

fter completing the course, the participant will be able to?

• *nstall and configure the hardware and software components of the MCC =000 dispatch console

subsystem.

• $erform MCC =000 eries site connectivity and bandwidth management.

• $erform system administrator functions using the 2lite dministrator software.

• +roubleshoot installation and configuration problems for the MCC =000 eries dispatch consoles.

0a) +e4uirements

• *.

• J *3( servers.

•  8etwork Management +erminals at a ratio of # for every 6 students to ensure proper hands-on

training.

%ont$omery Co#nty5 %arylan"Statement of Work

276  

Statement of Work 

Page 281: Motorola SOW - Reviewed by MoCo PM 2015-09-22

7/23/2019 Motorola SOW - Reviewed by MoCo PM 2015-09-22

http://slidepdf.com/reader/full/motorola-sow-reviewed-by-moco-pm-2015-09-22 281/309

$ourse Modules

Module #? Course *ntroduction.Module 1? ;ispatch Console (verview.

1-#? !eatures.1-1? ystem Aiews.1-5? Call $rocessing.

Module 5? ;ispatch Console @ardware.5-#? ;ispatch Console Configuration.Module 6? J *3(s.

6-#? uiliary *nputs3(utputs 'u *3(s).Module 7? Conventional Communication.

7-#? Conventional Communication.Module 9? ;omain Controllers.

9-#? ;omain Controllers and ctive ;irectory.Module =? dministrator !unctions.

=-#? 2diting Current Configurations.=-1? etting p !olders and :esources.=-5? etting p u *3(s.=-6? Configuring +oolbars.=-7? 2diting $references.=-9? uto tarting the MCC =700 ;ispatch Console.=-=? etting up *nbound 2vent ;isplay.=->? M&M =700 Console lias Manager.

Module >? +roubleshooting.>-#? +roubleshooting with 2M.>-1? +roubleshooting MCC =000 eries Components.

%ont$omery Co#nty5 %arylan"Statement of Work

 Motorola Solutions Statement of Work: 277  

Page 282: Motorola SOW - Reviewed by MoCo PM 2015-09-22

7/23/2019 Motorola SOW - Reviewed by MoCo PM 2015-09-22

http://slidepdf.com/reader/full/motorola-sow-reviewed-by-moco-pm-2015-09-22 282/309

J.6.4.7 S50' 2! *%F, ;50 7999 0e+eater Site orkso+ CS614297

,uration

5 days

,eliver# Method

*4+ Y *nstructor-led +raining

(arget 8udience

<+: >000 ite +echnicians

$ourse '#nopsis

+his workshop describes the components in the +:( 17 *AP; system repeater site with <+:>000 epandable site subsystem '2). +his course also presents how the <+: >000 2 operatesand eplains the tools and methods available for troubleshooting components within the subsystem.

Prere4uisite

Completion of the following courses or equivalent eperience?

• %ridging the &nowledge <ap for +echnicians 'C+#00).

•  8etworking 2ssentials in Communication 2quipment '8+=91).

• dvanced 8etworking in Motorola Communications 2quipment '8/+005).

elect one of the following depending on system supporting?

• +:( 17 *AP; with M Core ystem (verview 'C=#6100).

• +:( 17 *AP; with 4 Core ystem (verview 'C=#6650).

• +:( 17 *AP; *ntroduction to :adio ystem Management pplications 'C=#510#).

$ourse !)*ectives

fter completing the course, the participant will be able to?

• ;escribe the +:( 17 *AP; repeater site with <+: >000 2 configurations and components.

• *dentify the <C$ >000 site controller functions and configuration requirements.

• ;escribe the connections and interfaces to the <C$ >000.

• ;iagnose and troubleshoot the <C$ >000.

• ;escribe the functionality of the <+: >000 2.

• Configure and troubleshoot the +:( 17 repeater site with <+: >000 2.

• Configure and troubleshoot the network transport subsystem.

%ont$omery Co#nty5 %arylan"Statement of Work

27  

Statement of Work 

Page 283: Motorola SOW - Reviewed by MoCo PM 2015-09-22

7/23/2019 Motorola SOW - Reviewed by MoCo PM 2015-09-22

http://slidepdf.com/reader/full/motorola-sow-reviewed-by-moco-pm-2015-09-22 283/309

$ourse Modules

Module #? Course *ntroduction.Module 1? <+: >000 :epeater ite.

1-#? <+: >000 :epeater ite (verview.1-1? (perational Modes.1-5? ite Configurations.

1-6? ite Components.1-7? +ime ynchroniation and !requency :eference.+est Zour nderstanding 2ercise.

Module 5? <C$ >000 ite Controller.5-#? <C$ >000 (verview.5-1? <C$ >000 $hysical ;escription.5-5? <C$ >000 Configuration.5-6? <C$ >000 ;iagnostics and +roubleshooting.+est Zour nderstanding 2ercise.

Module 6? <+: >000 2pandable ite ubsystem.6-#? <+: >000 2pandable ite ubsystem (verview.6-1? <+: >000 2pandable ite ubsystem +heory of (peration.6-5? <+: >000 2pandable ite ubsystem Configuration.6-6? <+: >000 2pandable ite ubsystem ;iagnostics and +roubleshooting.+est Zour nderstanding 2ercise.

Module 7? :adio !requency ;istribution ystem ':!;).7-#? :!; (verview.7-1? :!; $hysical ;escription.7-5? :!; Configuration.7-6? :!; ;iagnostics and +roubleshooting.+est Zour nderstanding 2ercise.

Module 9? 8etwork +ransport ubsystem.9-#? 8etwork +ransport ubsystem (verview.9-1? 2thernet witch ;iagnostics and +roubleshooting.9-5? ite <ateways.9-6? <ateway ;iagnostics and +roubleshooting.+est Zour nderstanding 2ercise.

Module =? <+: >000 ite Maintenance and +roubleshooting.=-#? +roubleshooting +ools.=-1? +roubleshooting Methodology.=-5? +roubleshooting :epeater ite 4ink.=-6? Motorola upport Centers.

%ont$omery Co#nty5 %arylan"Statement of Work

 Motorola Solutions Statement of Work: 27!

Page 284: Motorola SOW - Reviewed by MoCo PM 2015-09-22

7/23/2019 Motorola SOW - Reviewed by MoCo PM 2015-09-22

http://slidepdf.com/reader/full/motorola-sow-reviewed-by-moco-pm-2015-09-22 284/309

J.6.4.8 PG CPS Programming and 5em+late Building

,uration

1 days in the field

,eliver# Method

*4+ Y *nstructor-led +raining

(arget 8udience

:adio +echnicians, ystem Managers, and anyone responsible for programming $J subscriberradios

$ourse '#nopsis

+he $J C$ $rogramming and +emplate %uilding course provides communications management personnel and technicians with the knowledge and training necessary to build templates and program$J =0003=700 subscriber radios in the most efficient way possible. +he content, parameters, andeercises demonstrated in this class apply to the $J =000 portable and $J =700 mobile.

Prere4uisites

&nowledge of the basic features and options of two-way radios, and the basic concepts ofconventional and trunking systems

$ourse !)*ectives

fter completing this course, the student will be able to?

• %uild $J =0003=700 templates using the $J Customer $rogramming oftware 'C$) $rogram

the specific parameters related to various :adio ystem configurations? Conventional, ingle ite+runking, imulcast, martLone, +:( 17, and +:( 17 J1.

• ;emonstrate detailed knowledge of $J C$ navigation, tools, options and features that make

efficient programming of the radio possible.• ;emonstrate a complete understanding of $J C$ efficiency tools, such as Cloning, ;rag and

;rop, Codeplug Comparison, :adio !lashing, dvanced ystem &ey dministration, and others.

%ont$omery Co#nty5 %arylan"Statement of Work

2#  

Statement of Work 

Page 285: Motorola SOW - Reviewed by MoCo PM 2015-09-22

7/23/2019 Motorola SOW - Reviewed by MoCo PM 2015-09-22

http://slidepdf.com/reader/full/motorola-sow-reviewed-by-moco-pm-2015-09-22 285/309

$ourse !utline

• *ntroduction to $J =000 :adio.

• *ntroduction to $J C$.

• $J C$ *nstall, etup, and Configuration.

•  8avigating $J C$.

• $J C$ ;ata +ransfer.

• nderstanding and *nterpreting :adio *nformation.• ;etailed :eview of Codeplug Contents.

• $J Conventional Codeplug %uild.

• $J +ype ** +runking Codeplug %uild.

• $J +:( 17 +runking Codeplug %uild.

• %uilding can 4ist.

• dditional3dvanced C$ !unctionality.

%ont$omery Co#nty5 %arylan"Statement of Work

 Motorola Solutions Statement of Work: 2"

Page 286: Motorola SOW - Reviewed by MoCo PM 2015-09-22

7/23/2019 Motorola SOW - Reviewed by MoCo PM 2015-09-22

http://slidepdf.com/reader/full/motorola-sow-reviewed-by-moco-pm-2015-09-22 286/309

J.6.4.19 S50' 2! 5e?t Messaging Ser(ice 5raining CS6211

,uration

6 hours

,eliver# Method

(nline, self-paced

(arget 8udience

*nstall +echnicians and ;ispatch (perators

$ourse '#nopsis

+he +:( 17 +et Messaging ervice +raining is a self-study training course intended to providean overview of the procedures necessary to describe the installation process and user functions of the+:( 17 !ied Messaging Client and the procedures necessary to install, configure, and administer the +et Messaging erver.

Prere4uisites

•  8one.

$ourse !)*ectives

pon completing this course, the student will be able to?

• ;escribe the requirements, components and configurations necessary for installation of the !ied

Messaging Client and +et Messaging erver.

• ;escribe the various test messaging users and their functions.

• *dentify the utilities used to manage and administer the +et Messaging erver.

$ourse !utline

• +runked :adio ystem.• /ide rea +runked ystem.

• $acket witched ystems-+:( 17 +runking.

• ;ata.

• :adio Call !eatures.

%ont$omery Co#nty5 %arylan"Statement of Work

22  

Statement of Work 

Page 287: Motorola SOW - Reviewed by MoCo PM 2015-09-22

7/23/2019 Motorola SOW - Reviewed by MoCo PM 2015-09-22

http://slidepdf.com/reader/full/motorola-sow-reviewed-by-moco-pm-2015-09-22 287/309

J.6.4.11 S50' 2! *%F, Secure Communications orkso+

,uration

7 days

,eliver# Method

*nstructor-led

(arget 8udience

ystem Managers, +echnical ystem Managers, and ystem +echnicians

$ourse '#nopsis

+his workshop describes planning, installation, configuration, operations, and troubleshooting ofecure Communications within the +:( 17 *AP; system.

$ourse !)*ectives

fter completing this course, the student will be able to?

• $lan, organie, and implement secure communications in an +:( 17 *AP; system.

• *nstall and configure a &ey Management !acility '&M!) system and related components.

• ;emonstrate centralied key management using (ver-the-ir-:ekeying '(+:).

• $erform ystem dministrator functions using the &M! server and &M! client.

• +roubleshoot installation and configuration problems for the &M! server, &M! client, and &M!

database.

• *mplement end-to-end encryption using the MCC =700 console subsystem.

Prere4uisites

Completion of the following courses or equivalent eperience?

• +:( 17 *AP; ystem (verview with a passing score on the post-test.

Completion of the following courses or equivalent eperience?

•  8etworking 2ssentials in Communication 2quipment.

• %ridging the &nowledge <ap for +:( 17.

OR

• %ridging the &nowledge <ap for +:( 17 for ystem dministrator.

%ont$omery Co#nty5 %arylan"Statement of Work

 Motorola Solutions Statement of Work: 23

Page 288: Motorola SOW - Reviewed by MoCo PM 2015-09-22

7/23/2019 Motorola SOW - Reviewed by MoCo PM 2015-09-22

http://slidepdf.com/reader/full/motorola-sow-reviewed-by-moco-pm-2015-09-22 288/309

$ourse !utline

*. ystem (verview.. ecure Communications Concepts.%. ecure 2quipment.C. ecure Communications in a +runked ystem.;. ecure Communications in a Conventional ystem.

**. $lanning and (rganiing.. Communication $atterns.%. +runking etup for (+: (perations.C. &M! and &A4 etup for (+: (perations.;. :adio etup for (+: (perations using C$.

***. *nstallation.. *nstalling the &M! @ardware and oftware.%. *nstalling the M<2< Components for a +runked ystem.C. *nstalling the Components for a Conventional ystem.

*A. Configuration.. Configuring a +runked ystem.%. Configuring a Conventional ystem.C. Configuring the &ey Management !acility '&M!).

;. Configuring the :adio.2. Configuring the Console.!. Configuring the &ey Aariable 4oader '&A4).

A. (ver the ir :ekeying '(+:).. Managing Currency.%. (+: Commands.C. :8C (+:.

A*. dministering and Monitoring.. ecurity Management.%. (verview of $erformance Management +ools.C. $erformance Management for +runked ystems.;. $erformance Management for Conventional ystems.

2. dministering the &M! erver.A**. !ault Management and +roubleshooting.

. !ault Management.%. ;etection, ;iagnostic and +roubleshooting +ools.C. +roubleshooting the &M! erver.;. +roubleshooting the &M! Client.2. +roubleshooting the &M! ;atabase.!. +roubleshooting :adio nit $roblems.

A***. MCC =700.. ecure Aoice with the MCC =700 Console3rchiving *nterface erver '*).%. ecure Card (verview.C. *nstallation of the ecure Card at the MCC =700 Console and MCC =700 *.

;. Configuration of ecure Card at the MCC =700 Console and MCC=700 *.2. (perations on a ecure MCC =700 Console and MCC =700 *.!. +roubleshooting a ecure MCC =700 Console and MCC =700 *.

%ont$omery Co#nty5 %arylan"Statement of Work

24 

Statement of Work 

Page 289: Motorola SOW - Reviewed by MoCo PM 2015-09-22

7/23/2019 Motorola SOW - Reviewed by MoCo PM 2015-09-22

http://slidepdf.com/reader/full/motorola-sow-reviewed-by-moco-pm-2015-09-22 289/309

J.6.4.12 MCC 6!99 ,is+atc Console '+erator 5raining E591$

,uration

6 hours

(arget 8udience

;ispatch Console (perators, upervisors, ystem dministrators, and upport $ersonnel

$ourse ,escription

+his course provides participants with an introduction to the dispatch console, its basic operation andtailored job aids which will be available for assistance in operation. +hrough facilitation and hands-onactivities, the user learns how to perform common tasks associated with the console operation.

$ourse !)*ectives

• $erform basic operational tasks of the dispatch console.

• tilie the provided job aids to perform specific tasks associated with the console.

• nderstand a high level view of the system configuration.

• @igh-level overview of the customer system configuration.

• <eneral console operation.• $roper operating procedures for specific customer features.

+ecommended Prere4uisites

•  8one.

"e# (opics

• (verview.

• Communicating with :adios.

• dvanced ignaling !eatures.

• :esource <roups.

• /orking with Configurations.

• /orking with u *(s.

• +roubleshooting.

%ont$omery Co#nty5 %arylan"Statement of Work

 Motorola Solutions Statement of Work: 25  

Page 290: Motorola SOW - Reviewed by MoCo PM 2015-09-22

7/23/2019 Motorola SOW - Reviewed by MoCo PM 2015-09-22

http://slidepdf.com/reader/full/motorola-sow-reviewed-by-moco-pm-2015-09-22 290/309

J.6.4.13 MCC 6!99 ,is+atc Console dministrator 5raining E5916

,uration

6 hours

(arget 8udience

;ispatch upervisors, ystem dministrators

$ourse ,escription

+his course provides participants with the knowledge and skills to manage and utilie the MCC =700console administrator functions. +hrough facilitation and hands-on activities, the participant learnshow to customie the console screens.

$ourse !)*ectives

• nderstand the menu items and tool bar icons.

• 2dit folders, multiselect3patch groups, auiliary input output groups, windows, and toolbars.

• dd3delete folders.

+ecommended Prere4uisites

•  8one.

"e# (opics

• *ntroduction.

• Configurations.

• !olders and :esource etup.

• Customiing !olders.

• uto tarting the MCC =700 ;ispatch Console.

• 2diting $references.

Configuring the +oolbar.• etting p u *(s.

• :esource <roups.

%ont$omery Co#nty5 %arylan"Statement of Work

26  

Statement of Work 

Page 291: Motorola SOW - Reviewed by MoCo PM 2015-09-22

7/23/2019 Motorola SOW - Reviewed by MoCo PM 2015-09-22

http://slidepdf.com/reader/full/motorola-sow-reviewed-by-moco-pm-2015-09-22 291/309

J.6.4.14 PG Porta&le and PG Mo&ileD5rainAteA5rainer

,uration

p to > hours

,eliver# Method

*4+ Y *nstructor-led +raining

(arget 8udience

$J +rainers, upervisors, and upport $ersonnel

$ourse '#nopsis

+his course provides $J radio trainers with an introduction to their radio, its basic operation, andtailored job aids available for assistance in operation. +he learning eperience is a mi of facilitationand hands-on activities to help users perform common tasks associated with their radio operation.egmentation between user groups 'i.e., $olice, !ire32M, and $ublic ervice) is encouraged to helpfocus instruction on the specific operational issues of the individual user group. +his course is geared

for customers who have an eperienced dedicated training staff in their organiation. *t provides thecustomer’s identified training personnel with the knowledge and practice applying training techniquesthat will enable them to successfully train their students. +rainers will use audio visual 'i2+&),facilitation and Ehands-onF activities to facilitate learning events supported by tailored or customiedtraining materials and job aides. +hey will become proficient in discussing common tasks associatedwith the operation of the customer’s radios.

+e4uired Pre-work

•  8one.

+ecommended Prere4uisite

• $revious two-way radio and training eperience.

$ourse !)*ectives

• @igh-level overview of the customer system configuration.

• <eneral radio operation.

• $roper operating procedures for specific customer features.

• $erform basic operational tasks of the radio.

• tilie the provided job aids to perform specific tasks associated with the radio.

%ont$omery Co#nty5 %arylan"Statement of Work

 Motorola Solutions Statement of Work: 27  

Page 292: Motorola SOW - Reviewed by MoCo PM 2015-09-22

7/23/2019 Motorola SOW - Reviewed by MoCo PM 2015-09-22

http://slidepdf.com/reader/full/motorola-sow-reviewed-by-moco-pm-2015-09-22 292/309

$ourse !utline

#9. %asics.#=. Controls.#>. +op and ide %uttons.#B. witches.10. 5 $osition toggle.1#. 1 $osition Concentric.11. @ome key.15. ;ata &ey.16. ;isplay.17. !ront ;isplay.19. +op ;isplay.1=. ;isplay light.1>. *ntelligent 4ighting.1B. $ush to +alk or ccessory $++ found on the microphone.50. @ub, hang up bo 'Mobile).5#. Menu.51. Menu creen natomy.55. 8avigating Menu creen.

56. :ecent Call 4ist 'Model 5.7).57. nified Call 4ist - Contacts 'Model 5.7).59. ;ual ided :adio 'Model 5.7).5=. ;ual Mics.5>. ;ual peakers.5B. ccessory Connector.60. pecific !eatures.6#. Changing +alkgroups3Channels.61. Changing Lones.65. Mute tones of keypad.66. +alkgroup Call.67. $rivate Call.

69. ccessing $rivate Call !eature.6=. *nitiating $rivate Call.6>. Call 4ist $rogramming.6B. nnouncement3ll Call 'Calls involving Multiple +alkgroups).70. *nitiating nnouncement3ll Call.7#. ;irect3+alkaround.71. !ailsoft.75. :adio $rofiles.76. ccessing and changing :adio $rofile.77. (ptional !eatures.79. can.7=. can program.

7>. $riority can.7B. ;ynamic $riority.90. +elephone *nterconnect.9#. ccessing +elephone *nterconnect !eature.91. *nitiating a $hone Call.95. $hone 4ist $rogramming.96. ;ata ervices.97. +et Messaging.

%ont$omery Co#nty5 %arylan"Statement of Work

2  

Statement of Work 

Page 293: Motorola SOW - Reviewed by MoCo PM 2015-09-22

7/23/2019 Motorola SOW - Reviewed by MoCo PM 2015-09-22

http://slidepdf.com/reader/full/motorola-sow-reviewed-by-moco-pm-2015-09-22 293/309

99. ccessing the +et Messaging !eature.9=. Creating a !ree !orm +et Message.9>. ending a ECanned +et Message.9B. <$.=0. (+$.=#. 2ncryption.=1. 2mergency.

%ont$omery Co#nty5 %arylan"Statement of Work

 Motorola Solutions Statement of Work: 2!

Page 294: Motorola SOW - Reviewed by MoCo PM 2015-09-22

7/23/2019 Motorola SOW - Reviewed by MoCo PM 2015-09-22

http://slidepdf.com/reader/full/motorola-sow-reviewed-by-moco-pm-2015-09-22 294/309

J.6.4.1! %erint Logging 0ecorder udio Log

,uration

p to > hours

,eliver# Method

*4+ Y *nstructor-led +raining

(arget 8udience

upervisors and ystem Managers

$ourse '#nopsis

+he purpose of the course is to equip administrators and system managers with information and practical skills regarding the use of the Aerint udiolog P udiolog *nteraction Guality software.

+e4uired Pre-work

•  8one.

+ecommended Prere4uisite

• $revious two-way radio and3or dispatch eperience.

%ont$omery Co#nty5 %arylan"Statement of Work

2!#  

Statement of Work 

Page 295: Motorola SOW - Reviewed by MoCo PM 2015-09-22

7/23/2019 Motorola SOW - Reviewed by MoCo PM 2015-09-22

http://slidepdf.com/reader/full/motorola-sow-reviewed-by-moco-pm-2015-09-22 295/309

$ourse !)*ectives

• @igh-level overview of the customer system configuration.

• <eneral radio operation.

• $roper operating procedures for specific customer features.

• $erform basic operational tasks of the radio.

• tilie the provided job aids to perform specific tasks associated with the radio.

• Course (utline - *ntroduction to udiolog− *dentify Components of udiolog

− 4og-on to udiolog

− @ow 4icensing works3niversal 4icense

− tart the udiolog erver 

− 4og-off udiolog

• udiolog %asic ecurity

− Configure ecurity (ptions

− ;efine ecurity (ptions

• :ecorder and Manager ModulesD :emote Monitoring Client

− Configure the :ecorder and Manager Modules

− 2plain @ow Calls are :ecorded

− E4iveF Monitor Calls

• rchiving

− Configure the rchive Module

− !ormat rchive Media

− Aiew rchive Media

− 2jecting P *nstalling ;A;-:M Cartridges

− Cleaning the ;A;-:M ;rive

− :estore calls from ;A;

• *nstall udiolog Client oftware 3 *nstall *C $re-requisites

• ;atabase (verview• ystem rchitecture

• udiolog Management Console 'MC)

• @ousekeeping and !orced Catalog :ecovery '/hen, /here P /hy)

• +roubleshooting %asics

%ont$omery Co#nty5 %arylan"Statement of Work

 Motorola Solutions Statement of Work: 2!"

Page 296: Motorola SOW - Reviewed by MoCo PM 2015-09-22

7/23/2019 Motorola SOW - Reviewed by MoCo PM 2015-09-22

http://slidepdf.com/reader/full/motorola-sow-reviewed-by-moco-pm-2015-09-22 296/309

J.6.4.1$ %*5 Micro)a(e D Ecli+se and Pro%ision 5raining

,uration

p to 7 days

,eliver# Method

*4+ Y *nstructor-led +raining

(arget 8udience

+echnicians and ystem Managers

$ourse '#nopsis

+he course teaches students key functions of the 2clipse platform and overviews all equipment,configurations, system commissioning, maintenance and troubleshooting.

+e4uired Pre-work

•  8one.

+ecommended Prere4uisite

• %asic understanding of electronics, telecommunications and *$ fundamentals.

• 2ach student must have an *%M compatible laptop with administrative rights to allow installation

of the $ortal craft tool.

$ourse !)*ectives

• %asic installation and configuration for 2clipse equipment and $roAision software.

• %asic diagnostics, troubleshooting and preventive maintenance of 2clipse equipment and also by

using $roAision.

%ont$omery Co#nty5 %arylan"Statement of Work

2!2  

Statement of Work 

Page 297: Motorola SOW - Reviewed by MoCo PM 2015-09-22

7/23/2019 Motorola SOW - Reviewed by MoCo PM 2015-09-22

http://slidepdf.com/reader/full/motorola-sow-reviewed-by-moco-pm-2015-09-22 297/309

$ourse !utline

• *nstallation and Commissioning

• 2thernet ;C’s

• 2clipse +erminals

• 2clipse (;3:! P Configuration

• $rovision *ntroduction

• $rovision *nstallation

•  8avigating $rovision

• ;eploying and Managing :adios and <eneric ;evices

• !ault Management3Configuration Management

• $erformance Monitoring P :eports

• 2clipse ystem (verview

• 2clipse 8ode

%ont$omery Co#nty5 %arylan"Statement of Work

 Motorola Solutions Statement of Work: 2!3

Page 298: Motorola SOW - Reviewed by MoCo PM 2015-09-22

7/23/2019 Motorola SOW - Reviewed by MoCo PM 2015-09-22

http://slidepdf.com/reader/full/motorola-sow-reviewed-by-moco-pm-2015-09-22 298/309

J.9.4 T" I&!"+'-!*" E&/ U"+ T% K!

Te Interactive !nd "ser Tool #it 'i2+&) is a revolutionary knowledge transfer tool designed toaccelerate learning. sing the i2+& allows trainers to customie operator training to match unique button, feature programming, and displays provided in the system. 2ach i2+& is user friendly andmenu driven. +he home page in every i2+& provides ecellent navigation to the multiple areas of

interest for the specific communication device. (perators select E<etting tartedF to view a highlyinformative video overview that helps build solid foundational knowledge and quickly brings usersup to speed on the operational theory of their specific device. +he tailored materials are developed on-site using tool kits that allow users to modify training materials when radio or console featureschange. $ersonnel are taught how to maneuver through and tailor the i2+& screens. +he tailoredselections are saved to an electronic file that the Motorola olutions training team sends to the printerto develop the training materials. +he trainers use the i2+& to generate their instructor guides,incorporating standard operating procedures, notes, and reminders. +his dynamic tool allows thecustomer to generate training materials on an as-needed basis depicting current features andfunctionality.

%ont$omery Co#nty5 %arylan"Statement of Work

2!4 

Statement of Work 

Page 299: Motorola SOW - Reviewed by MoCo PM 2015-09-22

7/23/2019 Motorola SOW - Reviewed by MoCo PM 2015-09-22

http://slidepdf.com/reader/full/motorola-sow-reviewed-by-moco-pm-2015-09-22 299/309

J.= CUTO?ER ROLLBACK PLAN (C.1;.2.3)+he cutover and rollback plan defines the steps needed to transition from Montgomery County’s'County) eisting martLone[ 5.0 system to the proposed new +:(Q 17 digital trunking system.+he County and Motorola will jointly develop a system migration and cutover plan during theimplementation phase of the project. Motorola olutions, *nc. 'Motorola) is proposing the installation

of the new +:( 17 system in parallel with the eisting martLone 5.0 system. (ur proposedcutover uses martJ[ site converter technology to ease the transition by forming a powerful hybridnetwork that blends the eisting martLone 5.0 remote sites with the new proposed +:( 17 sitesfor enhanced interoperability and migration fleibility.

+his approach will permit the County to decommission some of its aging equipment earlier in the project lifecycle. +his is important because of the recent timer board failures that have occurred withthe County’s mbassador 2lectronics %ank '2%). +hose 2% board failures will be eliminatedearly in the project schedule with the use of Motorola’s proposed martJ strategy. se of the martJstrategy is unique to Motorola, and is only available if the County chooses to replace its currentsystem with a system built on Motorola technology.

+his plan, when eecuted precisely, will allow the County’s users to transition as smoothly as possible and without interruption onto the new system. Motorola has implemented martJ siteconverter technology for successful customer upgrades including the ;istrict of Columbia, $rince/illiam County, the tate of ;elaware, and others. +hese customers eperienced a cutover that wasfleible and had minimum impact to its dispatch and radio users.

*t is not the purpose of this document to present a final plan, but rather to identify the key componentsthat will be transitioned, to highlight the challenges associated with those transitions, and to presentrecommended directions and solutions for each one of the key components.

+he final detailed plan will be developed as a joint collaboration between Motorola, the County’stechnical team, and the system users or their representatives.

+his preliminary Cutover $lan is divided in three phases?• $hase *I$re-Cutover $reparation.

• $hase **ICutover 2ecution.

• $hase ***I$ost-Cutover ctivities.

%ont$omery Co#nty5 %arylan"Statement of Work

 Motorola Solutions Statement of Work: 2!5  

Page 300: Motorola SOW - Reviewed by MoCo PM 2015-09-22

7/23/2019 Motorola SOW - Reviewed by MoCo PM 2015-09-22

http://slidepdf.com/reader/full/motorola-sow-reviewed-by-moco-pm-2015-09-22 300/309

J.=.1 P'" IP+"C0!*"+ P+"$'+'!&

+he pre-cutover phase is the most important phase. +his is where all the planning of the detailedcutover plan occurs for a successful cutover eecution. +he following outline establishes the starting point for cutover planning to aid the County and Motorola in the crafting of a viable cutover strategy.Careful, up-front cutover planning will enable the County and Motorola to work closely with end-

users to ensure that their activities are minimally disrupted.pon conclusion of the ;esign :eview phase of the project, the County and Motorola project teamwill commence activities to transform the following E$reliminary Cutover $lan (utlineF into acomprehensive and detailed Cutover $lan complete with a timeline of events that will guide thecollective actions leading up to, during, and following the actual transition from the County’s currentmartLone 5.0 system to the new +:( 17 $roject 17 '$17) system.

J.7.1.1 Preliminary Cuto(er Plan 'utline

(nce the new +:( 17 Master ite and MCC =700 consoles are installed and operational, the proposed martJ site converter will enable a seamless migration from martLone 5.0 to +:( 17.+he new +:( 17 Master ite, combined with the martJ site converter, will provide network

connectivity and control translation between the eisting martLone 5.0 remote tower sites and the proposed +:( 17 network control infrastructure Master ite.

+he martJ site converter accomplishes this by converting the eisting martLone 5.0 simulcastsubsystem site audio 'nalog and3or ;igital *M%2) and signaling information to *$ data packets thatare routed on the +:( 17 network 

+his unique hybrid configuration provides advanced migration and interoperability between the twosystem platforms? 5900 and B900. +his hybrid system enables full trunking functionality, includingemergency and *; display, between the two systems regardless of whether they are registered on amartLone site or an +:( 17 site. martJ allows the system to support talkgroups consisting ofmied martLone and $17 users. 8o patching is required. Mied talkgroups are handled

automatically by this system.+he proposed new MCC =700 dispatch consoles will operate in both legacy sites and the new$17 sites making the transitions to the new system smooth and with minimal interruption in service.

%elow is a detailed list of prerequisites, constraints, and assumptions that will need to be taken intoconsideration during this cutover planning phase.

J.7.1.2 *denti-ication o- Prere#uisitesConstraintsssum+tions

'#stem +eadiness

#. Motorola will install, interface, optimie, and test the MCC =700 dispatch console systems priorto cutover.

1. Motorola will install, interface, optimie, and test the selected logging recorder solution prior tocutover.

5. <rade of ervice '<o)3Channel Migration from 4egacy to the 8ew +:( 17 ystemIchannel migration plan shall be developed to minimie the impact the transition period will haveon the grade of service in both the legacy martLone system and the new +:( 17 system. sagencies and users migrate from one system to the other a minimum required number of channelsshould be kept in service to minimie system busies in both systems.

%ont$omery Co#nty5 %arylan"Statement of Work

2!6  

Statement of Work 

Page 301: Motorola SOW - Reviewed by MoCo PM 2015-09-22

7/23/2019 Motorola SOW - Reviewed by MoCo PM 2015-09-22

http://slidepdf.com/reader/full/motorola-sow-reviewed-by-moco-pm-2015-09-22 301/309

6. !CC 4icensing >00 M@I+he County will have relicensed eisting frequencies to operate in thenew +:( 17 system prior to the +:( 17 cutover.

7. cceptance3:eliability3:edundancy +esting?9. !unctional +estingIll !ield !unctional +esting should be performed and approved by the

County prior to the +:( 17 cutover.=. Coverage +estingI+he Coverage cceptance +est should be completed and accepted by the

County prior to the +:( 17 cutover.>. !leetmapping?B. ubscribersIll $17 subscribers capable of operating in the legacy martLone 5.0 system and

new +:( 17 system will be programmed with the new EaddedF +:( 17 code pluginformation tested and verified by the County and Motorola implementation team.

#0. ;ispatch ConsolesIll new proposed MCC =700 dispatch consoles will be tested and all screenlayouts approved by the County prior to cutover.

##. *nteroperabilityIll interoperability analog interfaces will be tested by the County and Motorolaimplementation teams.

#1. ;atabase $rovisioning3rchivingIystem databases will be loaded into the new +:( 17system, tested, and verified by the County and Motorola implementation teams.

#5. +rainingIll required training must be performed prior to cutover.

J.7.1.3 '(er(ie) o- te Pro+osed SmartG Migration+he major steps of a martJ site converter migration include?

#. Aalidate inventory of eisting martLone 5.0 equipment and apply firmware upgrades ifnecessary.

1. *nstall the +:( 17 Master ite.5. *nstall and interface the MCC =700 dispatch operator positions and 8etwork Management Clients

to the +:( 17 Master ite.6. *nstall the new martJ site converter and router at the +:( 17 Master ite.7. +est and configure conventional channel interfaces to the +:( 17 system.9. !reee any subscriber and talkgroup database related activities for the eisting martLone 5.0

system. (btain the eisting martLone 5.0 subscriber database and perform the database

conversion into the new +:( 17 Master ite.=. :e-route the imulcast ubsystem '5900 :! site links) to the martJ site converter, which then

interfaces into the +:( 17 network core. t the conclusion of this step, the new +:( 17Master ite and MCC =700 dispatch positions have complete control and interoperability withany users affiliated with both the eisting martLone 5.0 sites and any new operational+:( 17 resources as they are brought online.

>. fter a predefined period of operation, including a B0-day rollback period, remove eistingmartLone 5.0 Master ite and console equipment.

B. !ully install +:( 17 simulcast $rime ites and :emote ites.#0. $rogram subscriber fleet, new and eisting, to include the +:( 17 system and fleetmap.##. Migrate users to the +:( 17 system.#1. :emove all eisting martLone 5.0 simulcast subsystem equipment once all affiliated users have

transitioned to +:( 17 operation and a predefined period of operation, including a B0-dayrollback period, has elapsed.

%ont$omery Co#nty5 %arylan"Statement of Work

 Motorola Solutions Statement of Work: 2!7  

Page 302: Motorola SOW - Reviewed by MoCo PM 2015-09-22

7/23/2019 Motorola SOW - Reviewed by MoCo PM 2015-09-22

http://slidepdf.com/reader/full/motorola-sow-reviewed-by-moco-pm-2015-09-22 302/309

J.7.1.4 ,etailed 5imelineSe#uence o- E(ents

#. *nter-ystem cheduling :elationships ':adio3B##3C;34ogging)I detailed schedule of eventsfor the cutover will be developed jointly by Motorola and the County. +his schedule will includedetails about other systems essential for the operations of the ;ispatch Centers such as B##, C;,and the logging recorder.

1. !allback trategies3Contingency $lansI detailed fallback plan will jointly be developed by theMotorola and the County implementation team, in concert with County user grouprepresentatives. +his fallback plan will clearly identify the failures, causes, and3or events that willactivate the fallback plan, the backup subsystems to use, and who in the County will have theultimate responsibility to activate the fallback plan.

5. ;ates3+imeframes to void '@olidays, etc.)I+he detailed timeline and schedule will avoidholidays or special events occurring in the county that impact agencies operations. *t is desired toimplement the cutover at a time and date of low traffic in the system to minimie the impact onthe users.

6. $ersonnel3taffing :equirements 'County and Aendors)I+he County will coordinate the staffingrequired for the dates of cutover as well as the different third-party County vendors required to beon site during the cutover. +he Motorola team will define the staffing required for the cutover atdifferent sites and the dispatch center prior to cutover.

J.7.1.! PostACuto(er StrategyDSortA5erm and LongA5erm Su++ort 0e#uirements

(nce the transition to the new system is completed, the County and Motorola will determine howlong the legacy system should be kept operating to support any agency or radio users that have notmade the transition to the new system after the cutover.

J.=.2 P'" IIC0!*"+ E"-0!&

$hase ** of the plan is where the eecution of the predefined plan in $hase * takes place. high-levelview of the cutover is outlined below.

J.7.2.1 5runking *n-rastructure

Motorola’s tatement of /ork calls for a complete parallel implementation of the +:( 17 system.+his will include installation of the new +:( 17 equipment at the eisting :! sites, as well as atthe new :! site locations. t every site, all new antenna and transmission line will be installed.

;uring the creation of this preliminary plan, it was necessary to make some assumptions concerningthe following items. +hese assumptions will be addressed, validated, or changed in ;esign :eview as part of the overall transition plan?

• $re%uencies I!or the transition period, the two systems 'the legacy martLone system and the

new +:( 17 system) will not be able to be at full channel capacity at the same time. (nly one

system will be able to use any one particular pair of eisting >00 M@ frequencies at a time inorder to prevent interference. +his means that blocks of channels will be decommissioned fromthe martLone 5.0 system and provisioned on the +:( 17 system, and that the <rade ofervice '<o) for both systems will be temporarily reduced.

• Antenna &'stems I+his tatement of /ork requires four new =003>00 M@ antennas for each

site, which is the same configuration as the current system. *n order to meet the desired coveragerequirements, the new antennas must be located at the heights identified in our tatement of/ork. +herefore, the design requires that eight antennas 'four eisting and four new) be mounted

%ont$omery Co#nty5 %arylan"Statement of Work

2!  

Statement of Work 

Page 303: Motorola SOW - Reviewed by MoCo PM 2015-09-22

7/23/2019 Motorola SOW - Reviewed by MoCo PM 2015-09-22

http://slidepdf.com/reader/full/motorola-sow-reviewed-by-moco-pm-2015-09-22 303/309

together at each tower during the transition period. Motorola will conduct stress analyses todetermine the load capacity of the eisting sites based on the additional loading. *f the temporaryeight-antenna configuration is not feasible, alternate solutions can be discussed.

• Transport &'stem I+his tatement of /ork provides a new microwave system for all sites, as

required by the :!$. +he new microwave system is proposed in a ring configuration with onehot-standby spur. +o minimie the loading impact of additional microwave antennas on eistingtowers, Motorola proposes that the County utilie leased telco +#s to connect eisting martLone5.0 remote :! ites to the martLone simulcast $rime ite, for a temporary period, and only atthose eisting sites that are connected via microwave today. +he eisting martLone 5.0 remote:! ites that are connected via +#s over fiber today will not be transitioned to leased telco lines./hile the martLone 5.0 remote :! sites are operating via leased telco +# lines or +#s over fiber,the County’s eisting microwave system equipment is proposed to be decommissioned and itsantennas and waveguides removed. +he new proposed microwave equipment will then beinstalled.

• !isting &elters or !%uipment Rooms IMotorola has proposed new equipment shelters for the

eisting sites specified in :!$ olicitation mendment V5 but understands that the County canconsider reusing their eisting equipment shelters instead. t any eisting site where a newshelter will not be installed, equipment rearrangement will need to be coordinated toaccommodate the new +:( 17 system racks. +his rearrangement is epected to be fully

defined during the implementation phase. 8ot all ## eisting sites were available for site visitsduring proposal developmentD four were visited. t the four sites visited, rack space appears to beat a premium, but sufficient space in the aisles and walkways should be available to temporarilyaccommodate both the new and legacy system equipment.

*t is recommended that the new system be placed on the air with a minimum of four frequencies andwith new antenna systems. *f this is done, the system can be thoroughly tested for both functionalityand coverage prior to beginning the final transition. 2isting antenna systems and channels can then be decommissioned from the old system as more and more subscriber units are transitioned to thenew system.

J.7.2.2 Bridging te Current *n-rastructure )it te :e) System *n-rastructure

J.7.2.2.1 SmartG Site Con(erter

*n order to ensure that there are minimal interruptions to critical communications, it is necessary tohave in place an infrastructure component that will serve as a bridge between the eisting system andnew proposed system. Motorola is proposing that the martJ site converter be used as this bridge between the systems. mied network is enabled through the deployment of martJ site convertersthat convert martLone site audio 'analog and3or digital *M%2) and signaling information to *$ data packets routed on the +:( 17 network.

+he martJ converter will be located at the hady <rove Master ite equipment room. *t is importantto note that during the martJ cutover of the link from the legacy simulcast $rime ite to the martJsite converter, the legacy simulcast subsystem will operate in site trunking for a short period of time,

affecting dispatch console operation. Continuous dispatch communication will be maintained duringthis period via backup radios. +he user radios in the field will not be affected during this transition period.

%ont$omery Co#nty5 %arylan"Statement of Work

 Motorola Solutions Statement of Work: 2!!

Page 304: Motorola SOW - Reviewed by MoCo PM 2015-09-22

7/23/2019 Motorola SOW - Reviewed by MoCo PM 2015-09-22

http://slidepdf.com/reader/full/motorola-sow-reviewed-by-moco-pm-2015-09-22 304/309

J.7.2.2.2 5alkgrou+ Calls Bet)een Systems

ince the talkgroup *; used is in the martLone 5.0 fleetmap range '*; less than 6,000), then atalkgroup call can include the eisting 5900 'legacy martLone 5.0 system) users and the new+:( 17 system users. dditionally, interoperability will work for all digital talkgroups as well asanalog talkgroup members communicating with $17 talkgroup members. +his ability to seamlesslytalk between martLone and +:( 17 talkgroups is one of the main advantages of martJ.

County radio users will not have to guess which talkgroup they need to be on to communicate withother key work partners.

+his assumes that the fleetmap is coordinated such that the martLone 5.0 5900-baud fleetmap rangescontinue to be used in the +:( 17 system with non-overlapping *;s for talkgroups and individual*;s. *f the 5900-capable radios have the minimum version software, then there is no requiredreprogramming needed for the radios to continue 5900 operation on the 5900 :! sites.

J.7.2.2.3 ECC and ECC MCC 6!99 ,is+atc Consoles

*t is proposed that the new MCC =700 dispatch consoles will be installed in parallel with the eisting<old 2lite operator positions. +he County’s eisting conventional resources will be inventoried, and a

quote for any necessary sets of bridging amplifiers will be provided for any conventional resourcesthat require parallel control between the new and old console systems. +he MCC =700 consoles willhave direct access to the +:( 17 trunked talkgroupsD therefore, they will follow the transition ofthe subscriber units.

(nce the martJ converter is installed and operational, the radio dispatchers will stop using theeisting <old 2lite consoles and start using the new MCC =700 consoles with the legacy martLone5.0 simulcast subsystem. *t is recommended that the <old 2lite consoles be turned off, but remaininstalled for a period of time to be used as part of the B0-day rollback plan.

ince the consoles will operate in parallel during the transition, all information will be available on both the new and the legacy consoles. %ecause operating two consoles in parallel is awkward at best,the County and Motorola will collaborate on a plan to minimie the time required to do so by any

individual operator. +his will require a detailed understanding of each operator’s responsibilities andhow those responsibilities are affected by the transitioning of the various subscriber groups.

J.7.2.2.4 :e) and E?isting Logging 0ecorders

Motorola proposes the addition of a new logging recorder to record the +:( 17 system audio. $erthe :!$, two solutions are proposed. *ncluded in the base offering is 4ogging :ecorder olution ,from Aerint ystems. $roposed as an option is 4ogging :ecorder olution %, from 8*C2 ystems.(nce the new +:( 17 system enters into operation, the talkgroups will be recorded at the newlogging recorder. +he Motorola implementation team will work with the County to make sure all thedesired +:( 17 talkgroups are incorporated in the rchiving *nterface erver '*) talkgrouprecording plan prior to the cutover.

J.7.2.2.! Con(entional 0adio *n-rastructure

Conventional radio infrastructure that is connected to and controlled via a MCC =700 consoleConventional Channel <ateway 'CC</) can be logged by the new logging recorder solution. houldan eisting conventional resource require parallel control from both the eisting <old 2lite consolesystem and the new MCC =700 console system, a quote will be provided for any necessary bridgingequipment.

%ont$omery Co#nty5 %arylan"Statement of Work

3##  

Statement of Work 

Page 305: Motorola SOW - Reviewed by MoCo PM 2015-09-22

7/23/2019 Motorola SOW - Reviewed by MoCo PM 2015-09-22

http://slidepdf.com/reader/full/motorola-sow-reviewed-by-moco-pm-2015-09-22 305/309

J.=.3 P'" IIIP!C0!*"+ A-!*!"

fter the successful eecution of the cutover plan, post-cutover activities will commence to removethe components that are no longer needed for the operations of the new system. +he removal of thesecomponents will be eecuted with no disruption to operations of the new +:( 17 system.

+hese components include?

• 4egacy <old 2lite consoles.• 4egacy radio equipment racks, including martLone 5.0 and A@! equipment.

• martJ converters.

$rior to removal of any legacy system equipment and under the direction of the County, Motorolawill keep in operation the legacy martLone 5.0 system to support any agency or radio users thathave not made the transition to the new system after the cutover. $er the County’s :!$ requirements,Motorola proposes that the legacy martLone 5.0 system remain installed for a period of B0 daysafter cutover to the +:( 17 system. Motorola will work with the County during theimplementation phase to determine the best channel configuration between systems for this B0-day period.

J.=. C&-%0&s reflected above, a smooth, if somewhat intricate, transition from the eisting system to the newsystem can be achieved. +he new antenna system loading, requirements, and frequency managementduring the transition period will pose the greatest challenge to the transition team. +here will be otherchallenges to overcome as the transition plan is formulated, developed, and eecuted. +he County andMotorola project team has the eperience to meet these challenges. Aariations of the proposed cutover  plan have been used for other martLone customers within the %altimore-/ashington region andacross the .. Motorola’s depth of eperience in smoothly migrating city, county, and statewidesystems to $17 uniquely prepares Motorola for the migration task in Montgomery County.

%ont$omery Co#nty5 %arylan"Statement of Work

 Motorola Solutions Statement of Work: 3#"

Page 306: Motorola SOW - Reviewed by MoCo PM 2015-09-22

7/23/2019 Motorola SOW - Reviewed by MoCo PM 2015-09-22

http://slidepdf.com/reader/full/motorola-sow-reviewed-by-moco-pm-2015-09-22 306/309

ttacment H Project 2! 0adio System Payment Scedule

*+ RA,I- &.&T!M A.M!/T &C0!,"L!

+otal Contracted $rice - Complete $17 :adio

ystem

$roject &ick-(ff #0R

!inal ;etailed ;esign ;oc ;elivered 7.0R

ite Modifications

2CC 0.7R

2CC 0.7R

hady <rove 0.7R

<ermantown 0.7R

;ickerson 0.7R

MCC! 0.7R

@ampshire <reens 0.7R

$enn hop 3 ;amascus 0.7R

+akoma $ark 0.7R

 8:C 0.7R

+he 2nclave '%erkshire +owers) 0.7R

&enwood 0.7R

Guince (rchard 0.7R

!actory cceptance +esting Complete 1=.7R

 8ew +ower ite *nstallations

ite # #.0R

ite 1 #.0R

ite 5 #.0R

ite 6 #.0R

ite 7 #.0R

ite 9 #.0R

ite = #.0R

ite > #.0R

ite B #.0R

ite #0 #.0R

ite ## #.0R

*nstalled Component cceptance +esting

2CC 0.7R

2CC 0.7R

%ont$omery Co#nty5 %arylan"Statement of Work

3#2  

Statement of Work 

Page 307: Motorola SOW - Reviewed by MoCo PM 2015-09-22

7/23/2019 Motorola SOW - Reviewed by MoCo PM 2015-09-22

http://slidepdf.com/reader/full/motorola-sow-reviewed-by-moco-pm-2015-09-22 307/309

hady <rove 0.7R

<ermantown 0.7R

;ickerson 0.7R

MCC! 0.7R

@ampshire <reens 0.7R

$enn hop 3 ;amascus 0.7R

+akoma $ark 0.7R

 8:C 0.7R

+he 2nclave '%erkshire +owers) 0.7R

&enwood 0.7R

Guince (rchard 0.7R

ite # 0.7R

ite 1 0.7R

ite 5 0.7R

ite 6 0.7R

ite 7 0.7R

ite 9 0.7R

ite = 0.7Rite > 0.7R

ite B 0.7R

ite #0 0.7R

ite ## 0.7R

(perational ubsystem cceptance +esting 5.0R

ystem !unctional cceptance +esting #.0R

:adio Coverage Aerification cceptance+esting 1.0R

A@! ystem +esting #.0R

 8inety-;ay :eliability +esting 7.0R

+raining #.0R

!inal cceptance ignoff #7.0R

Total a'ment ecentage 122324

 8ote? +he purchase of subscriber units is not included in the $17 :adio ystem $ayment chedule.+herefore, any new subscriber units purchased through Contract 8umber #01B75B are invoicedseparately and payable upon shipment.

%ont$omery Co#nty5 %arylan"Statement of Work

 Motorola Solutions Statement of Work: 3#3

Page 308: Motorola SOW - Reviewed by MoCo PM 2015-09-22

7/23/2019 Motorola SOW - Reviewed by MoCo PM 2015-09-22

http://slidepdf.com/reader/full/motorola-sow-reviewed-by-moco-pm-2015-09-22 308/309

ttacment BH P2! 0adio System *n-rastructure Project A Cange 'rder "orm

Cange -rder /o3

,ate:

ro5ect /ame:

Customer /ame:

Customer ro5ect Mgr:

Te purpose of tis Cange -rder is to: (highlight the key reasons for this Change Order)

ro5ect 6 ro5ect ,ate:

*n accordance with the terms and conditions of the contract identified above between Montgomery County <overnment and

Motorola olutions, *nc., the following changes are approved?

PRICE ADJUSTMENTS

(riginal $roject Aalue? \

$revious Change (rder amounts for Change (rder numbersthrough  - - - \

+his Change (rder? \

 8ew $roject Aalue? \

COMPLETION DATE ADJUSTMENTS

(riginal Completion ;ate?

Current Completion ;ate prior to this Change (rder?

 8ew Completion ;ate?

%ont$omery Co#nty5 %arylan"Statement of Work

3#4 

Statement of Work 

Page 309: Motorola SOW - Reviewed by MoCo PM 2015-09-22

7/23/2019 Motorola SOW - Reviewed by MoCo PM 2015-09-22

http://slidepdf.com/reader/full/motorola-sow-reviewed-by-moco-pm-2015-09-22 309/309