Morth 3100 Reinforce Earth

5
Rainforce Earth 3100 Rainforce Earth

Transcript of Morth 3100 Reinforce Earth

Page 1: Morth 3100 Reinforce Earth

Rainforce Earth

3100

Rainforce Earth

Page 2: Morth 3100 Reinforce Earth

2

Section 3100 Reinforced EarthA

nn

exu

re -

1

Hei

ght o

f ret

aini

ngD

esig

n lif

eLo

adin

gS

eism

ic z

one

–w

all

IS 1

893

(Par

t 1)

:200

2

SY

ST

EM

CO

ND

ITIO

N<

10m

> 10

m20

to 1

00<

20

yrs

Brid

ge o

rIR

CZ

one

IIZ

one

III,

yrs

any

heav

ytr

affic

IV &

Vlo

adlo

adin

g(D

L+LL

)(L

L)

Fle

xibl

e fa

ceY

esY

esY

es6

Yes

Yes

Yes

Yes

Yes

Met

allic

Dis

cret

e co

ncre

tere

info

rcem

ent

faci

ng s

yste

mY

esY

esY

esY

esY

esY

esY

esY

es

Blo

ck w

all

Yes

NO

NO

1Y

esN

O2

Yes

3Y

es3

NO

2

Rig

id fa

cing

Yes

NO

Yes

Yes

Yes

Yes

Yes

NO

Fle

xibl

e fa

ceY

esY

esY

es6

Yes

NO

Yes

Yes

Yes

Non

-met

allic

Dis

cret

e co

ncre

te(S

ynth

etic

)fa

cing

sys

tem

4Y

esN

O5

Yes

Yes

NO

Yes

Yes

Yes

rein

forc

emen

tB

lock

wal

lY

esN

ON

O1

Yes

NO

Yes

3Y

es3

NO

2

RC

C f

ull h

eigh

tY

esN

OY

esY

esN

OY

esY

esY

es

Tab

le 3

100-

1 S

elec

tio

n C

rite

ria

bas

ed o

n h

eig

ht,

du

rab

ility

an

d lo

adin

g f

or

vert

ical

ret

ain

ing

wal

ls

Page 3: Morth 3100 Reinforce Earth

3

Reinforced Earth Section 31001.

Pre

-cas

t blo

ck w

all c

an b

e us

ed o

nly

if th

e bl

ocks

are

cas

ted

by w

et m

ix c

oncr

ete

and

not b

y dr

y m

ixm

etho

d

2.B

lock

wal

l sy

stem

can

be

used

onl

y if

the

conn

ectio

n sy

stem

is m

echa

nica

l and

all

bloc

ks s

hall

beco

nnec

ted

by m

ain

or s

econ

dary

rein

forc

emen

t

3.O

nly

mec

hani

cal c

onne

ctio

n sy

stem

sha

ll be

use

d no

fric

tion

base

d co

nnec

tion

syst

em s

hall

be u

sed,

all b

lock

s in

top

tw

o m

eter

sha

ll be

con

nect

ed w

ith m

ain

or s

econ

dary

rei

nfor

cem

ent

to c

ater

for

impa

ct lo

adin

g

4.E

ach

faci

ng p

anel

sha

ll be

con

nect

ed w

ith m

inim

um 2

laye

rs (v

ertic

ally

) of r

einf

orce

men

t and

for s

trap

min

imum

4 n

umbe

rs o

f con

nect

or p

er p

anel

(2 in

hor

izon

tal a

nd 2

in v

ertic

al e

leva

tions

) sha

ll be

use

d.T

he m

ain

rein

forc

emen

t sha

ll be

con

nect

ed w

ith p

anel

by

mea

ns o

f onl

y m

echa

nica

l arr

ange

men

t.C

oncr

ete

to c

oncr

ete

cont

act s

hall

be a

void

ed b

y pr

ovis

ion

of E

PD

M b

earin

g pa

d in

hor

izon

tal j

oint

san

d cl

ear g

ap in

ver

tical

join

ts.

5.W

all c

onst

ruct

ed w

ith n

on-m

etal

lic (s

ynth

etic

) rei

nfor

cem

ent w

ith h

eigh

t mor

e th

an 6

m s

hall

not b

epe

rmitt

ed u

nles

s it

can

be s

atis

fact

orily

dem

onst

rate

d by

pre

viou

s ex

perie

nce

that

sim

ilar

high

stru

ctur

es h

as b

een

cons

truc

ted

usin

g ex

actly

the

sam

e sy

stem

by

sam

e sy

stem

pro

vide

r (he

ight

of

wal

l, ge

omet

ry, f

acin

g, re

info

rcem

ent,

conn

ectio

n, d

esig

n m

etho

ds, l

oadi

ng c

ondi

tion)

and

sub

ject

toap

prov

al o

f eng

inee

r in-

char

ge.

6.A

ll st

eel f

lexi

ble

faci

ng fo

r per

man

ent s

truc

ture

(des

ign

life

upto

100

yrs)

sha

ll be

hot

dip

gal

vani

zed

(min

imum

400

gm

/sqm

). F

or n

on-m

etal

ic (s

ynth

etic

) wra

p ar

ound

faci

ng, a

per

enni

al v

eget

atio

n co

ver

with

/with

out e

rosi

on c

ontr

ol b

lank

et s

hall

be e

nsur

ed.

Page 4: Morth 3100 Reinforce Earth

4

Section 3100 Reinforced Earth

Tab

le 3

100-

3 S

pec

ial c

on

dit

ion

fo

r u

se o

f m

etal

lic (

stee

l) r

ein

forc

emen

t

En

viro

nm

ent

Typ

e o

f fill

Ele

ctro

chem

ical

ch

arac

teri

stic

sp

HR

esis

tivi

ty (O

hm

.cm

)M

axim

um

sal

t co

nte

nts

(pp

m)

Out

of w

ater

Dra

inin

g or

5 T

O 1

0>

1000

gran

ular

Chl

orid

es <

100

Fre

sh W

ater

Gra

nula

r5

TO

10

> 30

00S

ulfa

tes

< 2

00

Tab

le 3

100-

2 D

ecis

ion

ch

art

for

rein

forc

emen

t ty

pe

acco

rdin

g t

o e

nvi

ron

men

tan

d a

pp

licat

ion

En

viro

nm

ent /

Typ

e o

f fill

Lo

w C

hlo

rid

esH

igh

Ch

lori

de

Fin

e S

oils

Lo

wan

d S

ulp

hat

esan

d S

ulp

hat

estr

eate

d w

ith

Rec

ycle

dA

cid

ic fi

llsE

xten

sib

ility

Hig

h r

esis

tivi

ty M

arin

ece

men

t o

rC

on

cret

eH

igh

Wal

lsA

pp

licat

ion

lime

Ab

utm

ents

cf ta

ble

belo

w10

< p

H <

12

9 <

pH

<11

2 <

pH

< 5

Bla

ck S

teel

< 2

0 yr

s5

< pH

< 1

0N

ON

ON

ON

OY

ES

Gal

van

ized

100

yrs

stee

l5

< pH

< 1

0N

ON

ON

ON

OY

ES

Po

lyes

ter

(PE

T)

yarn

100

yrs

, 4 <

pH

< 9

NO

YE

SN

O

PVA

, PP

&H

DP

E10

0 yr

s , p

H >

3

NO

steel

Page 5: Morth 3100 Reinforce Earth

5

Reinforced Earth Section 3100

FO

UN

DAT

ION

Har

d, S

oft

orD

ense

toIm

prov

edC

ON

DIT

ION

Dis

inte

grat

edm

ediu

mLo

ose

sand

/fo

unda

tion

Impr

oved

Roc

kde

nse

San

dcl

ayw

ith P

VD

,fo

unda

tion

Fou

ndat

ion

Syn

thet

icw

ith S

tone

trea

ted

with

rein

forc

emen

tco

lum

n/pi

lere

plac

emen

tE

xpec

ted

tota

l set

tlem

ent

Exp

ecte

d to

tal s

ettle

men

t<

50m

m>

50m

mO

nly

met

allic

rein

forc

emen

tA

ll ty

pes

of re

tain

ing

wal

l,up

to a

max

imum

hei

ght o

fsl

ope

and

abut

men

t1 can

be

All

type

s of

reta

inin

g w

all,

7.0m

for v

ertic

al w

all.

No

pure

cons

truct

ed.

slop

e an

d ab

utm

ent1

can

beab

utm

ent i

s re

com

men

ded.

cons

truc

ted

Syn

thet

ic re

info

rcem

ent w

ithfle

xibl

e fa

cing

upt

o a

max

imum

heig

ht o

f 7.0

m fo

r ver

tical

wal

lan

d 20

m fo

r ste

ep s

lope

.

1.T

he a

llow

able

pos

t con

stru

ctio

n se

ttlem

ent (

afte

r con

stru

ctio

n of

brid

ge d

eck)

sha

ll be

rest

ricte

d to

max

imum

25m

m.

Tab

le 3

100-

4 S

elec

tio

n c

rite

ria

bas

ed o

n f

ou

nd

atio

n c

on

dit

ion

The

sho

rt te

rm a

nd lo

ng te

rm p

erfo

rman

ce o

f rei

nfor

ced

soil

wal

l str

uctu

res

depe

nds

prim

arily

on

foun

datio

n so

ilco

nditi

on. H

ence

, it i

s m

ost i

mpo

rtan

t to

sele

ct a

ppro

pria

te te

chno

logy

dep

endi

ng o

f fou

ndat

ion

soil

cond

ition

and

also

type

of i

mpr

ovem

ent m

easu

res.

Dec

isio

n ch

art f

or re

info

rcem

ent t

ype

acco

rdin

g to

foun

datio

n / i

mpr

oved

foun

datio

n co

nditi

on: