MORAY FIRTH SMITHTON JUNCTION Legend...MORAY FIRTH A B E R D E E N T O I N V E R N E S S R A I L W A...

16
100 0 200 300 400 500 600 700 800 900 1000 1100 1200 1300 1400 1500 1600 1700 1800 1900 2000 2100 SMITHTON JUNCTION INVERNESS RAIGMORE INTERCHANGE HIGHLAND MAIN LINE INVERNESS RETAIL AND BUSINESS PARK SEAFIELD ROUNDABOUT MORAY FIRTH ABERDEEN TO INVERNESS RAILWAY LINE EXISTING A96 NV001 NV039 NV040 NV041 NV038 i l j f c k h n p g e d a o b m Rev Client Project Drawing title Drawing Status Drawing number Scale BIM No. DO NOT SCALE B2103500 @ A3 0 This drawing is not to be used in whole or part other than for the intended purpose and project as defined on this drawing. Refer to the contract for full terms and conditions. FINAL 1:10,000 Jacobs No. Legend Proposed Scheme (as per Draft Orders) SUDS (e.g. Basin or Pond)* Calculation Area Health & Education Buildings Sample Receptor Noise Mitigation Barrier Do Minimum Baseline Year Vs Do Something Baseline Year (with Mitigation) (L A10,18hr Free-field) Ground Floor x e 10 dB 5 d x < 10 dB 3 d x < 5 dB 1 d x < 3 dB 0 < x < 1 dB x = 0 dB -1 < x < 0 dB -3 < x d -1 dB -5 < x d -3 dB -10 < x d -5 dB x d -10 dB ? N 0 0.5 1 0.25 Kilometres Sheet 1 of 16 Figure 8.10a Environmental Statement Noise Level Difference Contour Map (Ground Floor) Do-Min. Baseline Year Vs Do-Something Baseline Year (with Mitigation) B2103500/EN/EIA/DR/810a 95 Bothwell Street, Glasgow, G2 7HX, UK. Tel: +44(0)141 243 8000 Fax:+44(0)141 226 3109 www.jacobs.com Rev. Rev. Date Purpose of revision Apprv'd Rev'd Checkd Orig/Dwn KA 0 SG ES Publication BMCK EHG NOV 2016 © Crown copyright and database right 2016. All rights reserved. Ordnance Survey Licence number 100046668. * Actual shape of pond/basin will be subject to detailed design

Transcript of MORAY FIRTH SMITHTON JUNCTION Legend...MORAY FIRTH A B E R D E E N T O I N V E R N E S S R A I L W A...

Page 1: MORAY FIRTH SMITHTON JUNCTION Legend...MORAY FIRTH A B E R D E E N T O I N V E R N E S S R A I L W A Y L I N E E X I S T I N G A 9 6 NV001 NV039 NV040 NV041 NV038 i j l f c k h n p

1000

200

300

400

500

600

700

800

900

1000

1100

1200

1300

1400

1500

1600

1700

1800

1900

2000

2100

SMITHTONJUNCTION

INVERNESS

RAIGMOREINTERCHANGE

HIGHLAND MAIN LINE

INVERNESSRETAIL AND

BUSINESS PARK

SEAFIELDROUNDABOUT

MORAYFIRTH

ABERDEEN TO INVERNESS

RAILWAY LINE

EXISTING A96

N V 001

NV039NV040

NV041

NV038

i ljf

c

kh

n p

ged

a

o

b

m

R ev

Client

P roject

Drawing title

Drawing Status

Drawing num ber

Scale

BIM N o.

DO NOT SCALEB2103500

@ A3

0T his drawing is not to be used in whole or part other than for the intendedpurpose and project as defined on this drawing. R efer to the contract for fullterm s and conditions.

FINAL1:10,000

Jacobs N o.

LegendP roposed Schem e (as per Draft O rders)SU DS (e.g. Basin or P ond)*Calculation AreaHealth & Education BuildingsSam ple R eceptorN oise Mitigation Barrier

Do Minimum Baseline Year Vs DoSomething Baseline Year (with Mitigation)(LA10,18hr Free-field) Ground Floor

x ≥ 10 dB5 ≤ x < 10 dB3 ≤ x < 5 dB1 ≤ x < 3 dB0 < x < 1 dBx = 0 dB-1 < x < 0 dB-3 < x ≤ -1 dB-5 < x ≤ -3 dB-10 < x ≤ -5 dB x ≤ -10 dB

?

N

0 0.5 10.25Kilom etres

Sheet 1 of 16

Figure 8.10aEnvironmental Statement

Noise Level Difference Contour Map(Ground Floor) Do-Min. Baseline Year Vs

Do-Something Baseline Year (with Mitigation)

B2103500/EN/EIA/DR/810a

95 Bothwell Street, G lasgow, G 2 7HX , U K.T el: +44(0)141 243 8000 Fax:+44(0)141 226 3109

www.jacobs.com

R ev. R ev. Date P urpose of revision Apprv'dR ev'dCheck dO rig/DwnKA0 SGES P ublication BMCK EHGNOV 2016

© Crown copyright and database right 2016. All rights reserved. O rdnance Survey Licence num ber 100046668.

* Actual shape of pond/basin will be subjectto detailed design

Page 2: MORAY FIRTH SMITHTON JUNCTION Legend...MORAY FIRTH A B E R D E E N T O I N V E R N E S S R A I L W A Y L I N E E X I S T I N G A 9 6 NV001 NV039 NV040 NV041 NV038 i j l f c k h n p

3800

3900

4000

4100

4200

4300

4400

4500

4600

4700

4800

4900

5000

5100

1600

1700

1800

1900

2000

2100

2200

2300

2400

2500

2600

27002800

2900

3000

3100

3200

3300

3400

3500

3600

3700

ABERDEEN TO INVERNESS

RAILWAY LINE

CULLODEN

EXISTING A96

HIGHLAND MAIN LINE

BALLOCHJUNCTION

N V 002

N V 006

N V 003

N V 004

N V 005

NV042

NV043

NV044NV045

i ljf

c

kh

n p

ged

a

o

b

m

R ev

Client

P roject

Drawing title

Drawing Status

Drawing num ber

Scale

BIM N o.

DO NOT SCALEB2103500

@ A3

0T his drawing is not to be used in whole or part other than for the intendedpurpose and project as defined on this drawing. R efer to the contract for fullterm s and conditions.

FINAL1:10,000

Jacobs N o.

LegendP roposed Schem e (as per Draft O rders)SU DS (e.g. Basin or P ond)*Calculation AreaHealth & Education BuildingsSam ple R eceptorN oise Mitigation Barrier

Do Minimum Baseline Year Vs DoSomething Baseline Year (with Mitigation)(LA10,18hr Free-field) Ground Floor

x ≥ 10 dB5 ≤ x < 10 dB3 ≤ x < 5 dB1 ≤ x < 3 dB0 < x < 1 dBx = 0 dB-1 < x < 0 dB-3 < x ≤ -1 dB-5 < x ≤ -3 dB-10 < x ≤ -5 dB x ≤ -10 dB

?

N

0 0.5 10.25Kilom etres

Sheet 2 of 16

Figure 8.10bEnvironmental Statement

Noise Level Difference Contour Map(Ground Floor) Do-Min. Baseline Year Vs

Do-Something Baseline Year (with Mitigation)

B2103500/EN/EIA/DR/810b

95 Bothwell Street, G lasgow, G 2 7HX , U K.T el: +44(0)141 243 8000 Fax:+44(0)141 226 3109

www.jacobs.com

R ev. R ev. Date P urpose of revision Apprv'dR ev'dCheck dO rig/DwnKA0 SGES P ublication BMCK EHGNOV 2016

© Crown copyright and database right 2016. All rights reserved. O rdnance Survey Licence num ber 100046668.

* Actual shape of pond/basin will be subjectto detailed design

Page 3: MORAY FIRTH SMITHTON JUNCTION Legend...MORAY FIRTH A B E R D E E N T O I N V E R N E S S R A I L W A Y L I N E E X I S T I N G A 9 6 NV001 NV039 NV040 NV041 NV038 i j l f c k h n p

3800

3900

4000

4100

4200

4300

4400

4500

4600

4700

4800

4900

5000

5100

52005300

5400

5500

5600

57005800

5900

6000

6100

6200

6300

6400

2900

3000

3100

3200

3300

3400

3500

3600

3700

BALLOCHJUNCTION

ABERDEEN TO INVERNESS

RAILWAY LINE EXISTING A96

N V 006

N V 004

NV043

i ljf

c

kh

n p

ged

a

o

b

m

R ev

Client

P roject

Drawing title

Drawing Status

Drawing num ber

Scale

BIM N o.

DO NOT SCALEB2103500

@ A3

0T his drawing is not to be used in whole or part other than for the intendedpurpose and project as defined on this drawing. R efer to the contract for fullterm s and conditions.

FINAL1:10,000

Jacobs N o.

LegendP roposed Schem e (as per Draft O rders)SU DS (e.g. Basin or P ond)*Calculation AreaHealth & Education BuildingsSam ple R eceptorN oise Mitigation Barrier

Do Minimum Baseline Year Vs DoSomething Baseline Year (with Mitigation)(LA10,18hr Free-field) Ground Floor

x ≥ 10 dB5 ≤ x < 10 dB3 ≤ x < 5 dB1 ≤ x < 3 dB0 < x < 1 dBx = 0 dB-1 < x < 0 dB-3 < x ≤ -1 dB-5 < x ≤ -3 dB-10 < x ≤ -5 dB x ≤ -10 dB

?

N

0 0.5 10.25Kilom etres

Sheet 3 of 16

Figure 8.10cEnvironmental Statement

Noise Level Difference Contour Map(Ground Floor) Do-Min. Baseline Year Vs

Do-Something Baseline Year (with Mitigation)

B2103500/EN/EIA/DR/810c

95 Bothwell Street, G lasgow, G 2 7HX , U K.T el: +44(0)141 243 8000 Fax:+44(0)141 226 3109

www.jacobs.com

R ev. R ev. Date P urpose of revision Apprv'dR ev'dCheck dO rig/DwnKA0 SGES P ublication BMCK EHGNOV 2016

© Crown copyright and database right 2016. All rights reserved. O rdnance Survey Licence num ber 100046668.

* Actual shape of pond/basin will be subjectto detailed design

Page 4: MORAY FIRTH SMITHTON JUNCTION Legend...MORAY FIRTH A B E R D E E N T O I N V E R N E S S R A I L W A Y L I N E E X I S T I N G A 9 6 NV001 NV039 NV040 NV041 NV038 i j l f c k h n p

5900

6000

6100

6200

6300

6400

6500

6600

6700

6800

6900

7000

7100

7200

7300

7400

7500

7600

7700

7800

7900

8000

8100

8200

8300

8400

8500

8600

8700

8800

8900

90009100

92009300

94009500

96009700

9800

ABERDEEN TO INVERNESS

RAILWAY LINE

EXISTING A96

N V 007

N V 008

i ljf

c

kh

n p

ged

a

o

b

m

R ev

Client

P roject

Drawing title

Drawing Status

Drawing num ber

Scale

BIM N o.

DO NOT SCALEB2103500

@ A3

0T his drawing is not to be used in whole or part other than for the intendedpurpose and project as defined on this drawing. R efer to the contract for fullterm s and conditions.

FINAL1:10,000

Jacobs N o.

LegendP roposed Schem e (as per Draft O rders)SU DS (e.g. Basin or P ond)*Calculation AreaHealth & Education BuildingsSam ple R eceptorN oise Mitigation Barrier

Do Minimum Baseline Year Vs DoSomething Baseline Year (with Mitigation)(LA10,18hr Free-field) Ground Floor

x ≥ 10 dB5 ≤ x < 10 dB3 ≤ x < 5 dB1 ≤ x < 3 dB0 < x < 1 dBx = 0 dB-1 < x < 0 dB-3 < x ≤ -1 dB-5 < x ≤ -3 dB-10 < x ≤ -5 dB x ≤ -10 dB

?

N

0 0.5 10.25Kilom etres

Sheet 4 of 16

Figure 8.10dEnvironmental Statement

Noise Level Difference Contour Map(Ground Floor) Do-Min. Baseline Year Vs

Do-Something Baseline Year (with Mitigation)

B2103500/EN/EIA/DR/810d

95 Bothwell Street, G lasgow, G 2 7HX , U K.T el: +44(0)141 243 8000 Fax:+44(0)141 226 3109

www.jacobs.com

R ev. R ev. Date P urpose of revision Apprv'dR ev'dCheck dO rig/DwnKA0 SGES P ublication BMCK EHGNOV 2016

© Crown copyright and database right 2016. All rights reserved. O rdnance Survey Licence num ber 100046668.

* Actual shape of pond/basin will be subjectto detailed design

Page 5: MORAY FIRTH SMITHTON JUNCTION Legend...MORAY FIRTH A B E R D E E N T O I N V E R N E S S R A I L W A Y L I N E E X I S T I N G A 9 6 NV001 NV039 NV040 NV041 NV038 i j l f c k h n p

7700

7800

7900

8000

8100

8200

8300

8400

8500

8600

8700

8800

8900

90009100

92009300

94009500

96009700

9800

9900

10000

10100

10200

10300

10400

10500

10600

10700

10800

10900

11000

MID COULJUNCTION

EXISTING A96

N V 008

N V 009

i ljf

c

kh

n p

ged

a

o

b

m

R ev

Client

P roject

Drawing title

Drawing Status

Drawing num ber

Scale

BIM N o.

DO NOT SCALEB2103500

@ A3

0T his drawing is not to be used in whole or part other than for the intendedpurpose and project as defined on this drawing. R efer to the contract for fullterm s and conditions.

FINAL1:10,000

Jacobs N o.

LegendP roposed Schem e (as per Draft O rders)SU DS (e.g. Basin or P ond)*Calculation AreaHealth & Education BuildingsSam ple R eceptorN oise Mitigation Barrier

Do Minimum Baseline Year Vs DoSomething Baseline Year (with Mitigation)(LA10,18hr Free-field) Ground Floor

x ≥ 10 dB5 ≤ x < 10 dB3 ≤ x < 5 dB1 ≤ x < 3 dB0 < x < 1 dBx = 0 dB-1 < x < 0 dB-3 < x ≤ -1 dB-5 < x ≤ -3 dB-10 < x ≤ -5 dB x ≤ -10 dB

?

N

0 0.5 10.25Kilom etres

Sheet 5 of 16

Figure 8.10eEnvironmental Statement

Noise Level Difference Contour Map(Ground Floor) Do-Min. Baseline Year Vs

Do-Something Baseline Year (with Mitigation)

B2103500/EN/EIA/DR/810e

95 Bothwell Street, G lasgow, G 2 7HX , U K.T el: +44(0)141 243 8000 Fax:+44(0)141 226 3109

www.jacobs.com

R ev. R ev. Date P urpose of revision Apprv'dR ev'dCheck dO rig/DwnKA0 SGES P ublication BMCK EHGNOV 2016

© Crown copyright and database right 2016. All rights reserved. O rdnance Survey Licence num ber 100046668.

* Actual shape of pond/basin will be subjectto detailed design

Page 6: MORAY FIRTH SMITHTON JUNCTION Legend...MORAY FIRTH A B E R D E E N T O I N V E R N E S S R A I L W A Y L I N E E X I S T I N G A 9 6 NV001 NV039 NV040 NV041 NV038 i j l f c k h n p

9900

10000

10100

10200

10300

10400

10500

10600

10700

10800

10900

11000

11100

11200

1130011400

11500

11600

11700

11800

11900

12000

12100

12200

12300

12400

12500

12600

12700

12800

12900

13000

13100

13200

13300

1340013500

1360013700

INVERNESSAIRPORT

ABERDEEN TO INVERNESS

RAILWAY LINE

MID COULJUNCTION

EXISTING A96

N V 011

N V 010

i ljf

c

kh

n p

ged

a

o

b

m

R ev

Client

P roject

Drawing title

Drawing Status

Drawing num ber

Scale

BIM N o.

DO NOT SCALEB2103500

@ A3

0T his drawing is not to be used in whole or part other than for the intendedpurpose and project as defined on this drawing. R efer to the contract for fullterm s and conditions.

FINAL1:10,000

Jacobs N o.

LegendP roposed Schem e (as per Draft O rders)SU DS (e.g. Basin or P ond)*Calculation AreaHealth & Education BuildingsSam ple R eceptorN oise Mitigation Barrier

Do Minimum Baseline Year Vs DoSomething Baseline Year (with Mitigation)(LA10,18hr Free-field) Ground Floor

x ≥ 10 dB5 ≤ x < 10 dB3 ≤ x < 5 dB1 ≤ x < 3 dB0 < x < 1 dBx = 0 dB-1 < x < 0 dB-3 < x ≤ -1 dB-5 < x ≤ -3 dB-10 < x ≤ -5 dB x ≤ -10 dB

?

N

0 0.5 10.25Kilom etres

Sheet 6 of 16

Figure 8.10fEnvironmental Statement

Noise Level Difference Contour Map(Ground Floor) Do-Min. Baseline Year Vs

Do-Something Baseline Year (with Mitigation)

B2103500/EN/EIA/DR/810f

95 Bothwell Street, G lasgow, G 2 7HX , U K.T el: +44(0)141 243 8000 Fax:+44(0)141 226 3109

www.jacobs.com

R ev. R ev. Date P urpose of revision Apprv'dR ev'dCheck dO rig/DwnKA0 SGES P ublication BMCK EHGNOV 2016

© Crown copyright and database right 2016. All rights reserved. O rdnance Survey Licence num ber 100046668.

* Actual shape of pond/basin will be subjectto detailed design

Page 7: MORAY FIRTH SMITHTON JUNCTION Legend...MORAY FIRTH A B E R D E E N T O I N V E R N E S S R A I L W A Y L I N E E X I S T I N G A 9 6 NV001 NV039 NV040 NV041 NV038 i j l f c k h n p

12200

12300

12400

12500

12600

12700

12800

12900

13000

13100

13200

13300

1340013500

1360013700

13800

13900

14000

14100

14200

14300

14400

14500

14600

14700

14800

14900

15000

15100

15200

15300

15400

15500

15600

15700

15800

15900

16000

BRACKLEYJUNCTION

GOLLANFIELD

ABERDEEN TO INVERNESS

RAILWAY LINE

EXISTING A96

N V 011

N V 027

N V 012

i ljf

c

kh

n p

ged

a

o

b

m

R ev

Client

P roject

Drawing title

Drawing Status

Drawing num ber

Scale

BIM N o.

DO NOT SCALEB2103500

@ A3

0T his drawing is not to be used in whole or part other than for the intendedpurpose and project as defined on this drawing. R efer to the contract for fullterm s and conditions.

FINAL1:10,000

Jacobs N o.

LegendP roposed Schem e (as per Draft O rders)SU DS (e.g. Basin or P ond)*Calculation AreaHealth & Education BuildingsSam ple R eceptorN oise Mitigation Barrier

Do Minimum Baseline Year Vs DoSomething Baseline Year (with Mitigation)(LA10,18hr Free-field) Ground Floor

x ≥ 10 dB5 ≤ x < 10 dB3 ≤ x < 5 dB1 ≤ x < 3 dB0 < x < 1 dBx = 0 dB-1 < x < 0 dB-3 < x ≤ -1 dB-5 < x ≤ -3 dB-10 < x ≤ -5 dB x ≤ -10 dB

?

N

0 0.5 10.25Kilom etres

Sheet 7 of 16

Figure 8.10gEnvironmental Statement

Noise Level Difference Contour Map(Ground Floor) Do-Min. Baseline Year Vs

Do-Something Baseline Year (with Mitigation)

B2103500/EN/EIA/DR/810g

95 Bothwell Street, G lasgow, G 2 7HX , U K.T el: +44(0)141 243 8000 Fax:+44(0)141 226 3109

www.jacobs.com

R ev. R ev. Date P urpose of revision Apprv'dR ev'dCheck dO rig/DwnKA0 SGES P ublication BMCK EHGNOV 2016

© Crown copyright and database right 2016. All rights reserved. O rdnance Survey Licence num ber 100046668.

* Actual shape of pond/basin will be subjectto detailed design

Page 8: MORAY FIRTH SMITHTON JUNCTION Legend...MORAY FIRTH A B E R D E E N T O I N V E R N E S S R A I L W A Y L I N E E X I S T I N G A 9 6 NV001 NV039 NV040 NV041 NV038 i j l f c k h n p

14800

14900

15000

15100

15200

15300

15400

15500

15600

15700

15800

15900

16700

16800

16900

17000

17100

17200

17300

17400

17500

17600

17700

17800

17900

18000

18100

18200

18300

18400

18500

18600

16000

16100

16200

16300

16400

16500

16600

NAIRN WESTJUNCTION

ABERDEEN TO INVERNESS

RAILWAY LINE

EXISTING A96

GOLLANFIELD

N V 013

N V 027

N V 014

i ljf

c

kh

n p

ged

a

o

b

m

R ev

Client

P roject

Drawing title

Drawing Status

Drawing num ber

Scale

BIM N o.

DO NOT SCALEB2103500

@ A3

0T his drawing is not to be used in whole or part other than for the intendedpurpose and project as defined on this drawing. R efer to the contract for fullterm s and conditions.

FINAL1:10,000

Jacobs N o.

LegendP roposed Schem e (as per Draft O rders)SU DS (e.g. Basin or P ond)*Calculation AreaHealth & Education BuildingsSam ple R eceptorN oise Mitigation Barrier

Do Minimum Baseline Year Vs DoSomething Baseline Year (with Mitigation)(LA10,18hr Free-field) Ground Floor

x ≥ 10 dB5 ≤ x < 10 dB3 ≤ x < 5 dB1 ≤ x < 3 dB0 < x < 1 dBx = 0 dB-1 < x < 0 dB-3 < x ≤ -1 dB-5 < x ≤ -3 dB-10 < x ≤ -5 dB x ≤ -10 dB

?

N

0 0.5 10.25Kilom etres

Sheet 8 of 16

Figure 8.10hEnvironmental Statement

Noise Level Difference Contour Map(Ground Floor) Do-Min. Baseline Year Vs

Do-Something Baseline Year (with Mitigation)

B2103500/EN/EIA/DR/810h

95 Bothwell Street, G lasgow, G 2 7HX , U K.T el: +44(0)141 243 8000 Fax:+44(0)141 226 3109

www.jacobs.com

R ev. R ev. Date P urpose of revision Apprv'dR ev'dCheck dO rig/DwnKA0 SGES P ublication BMCK EHGNOV 2016

© Crown copyright and database right 2016. All rights reserved. O rdnance Survey Licence num ber 100046668.

* Actual shape of pond/basin will be subjectto detailed design

Page 9: MORAY FIRTH SMITHTON JUNCTION Legend...MORAY FIRTH A B E R D E E N T O I N V E R N E S S R A I L W A Y L I N E E X I S T I N G A 9 6 NV001 NV039 NV040 NV041 NV038 i j l f c k h n p

16700

16800

16900

17000

17100

17200

17300

17400

17500

17600

17700

17800

17900

18000

18100

18200

18300

18400

18500

18600

18700

18800

18900

19000

19100

19200

19300

19400

19500

19600

19700

19800

19900

16600

EXISTING A96

NAIRN WESTJUNCTION

ABERDEEN TO INVERNESS

RAILWAY LINE

N V 015N V 014

i ljf

c

kh

n p

ged

a

o

b

m

R ev

Client

P roject

Drawing title

Drawing Status

Drawing num ber

Scale

BIM N o.

DO NOT SCALEB2103500

@ A3

0T his drawing is not to be used in whole or part other than for the intendedpurpose and project as defined on this drawing. R efer to the contract for fullterm s and conditions.

FINAL1:10,000

Jacobs N o.

LegendP roposed Schem e (as per Draft O rders)SU DS (e.g. Basin or P ond)*Calculation AreaHealth & Education BuildingsSam ple R eceptorN oise Mitigation Barrier

Do Minimum Baseline Year Vs DoSomething Baseline Year (with Mitigation)(LA10,18hr Free-field) Ground Floor

x ≥ 10 dB5 ≤ x < 10 dB3 ≤ x < 5 dB1 ≤ x < 3 dB0 < x < 1 dBx = 0 dB-1 < x < 0 dB-3 < x ≤ -1 dB-5 < x ≤ -3 dB-10 < x ≤ -5 dB x ≤ -10 dB

?

N

0 0.5 10.25Kilom etres

Sheet 9 of 16

Figure 8.10iEnvironmental Statement

Noise Level Difference Contour Map(Ground Floor) Do-Min. Baseline Year Vs

Do-Something Baseline Year (with Mitigation)

B2103500/EN/EIA/DR/810i

95 Bothwell Street, G lasgow, G 2 7HX , U K.T el: +44(0)141 243 8000 Fax:+44(0)141 226 3109

www.jacobs.com

R ev. R ev. Date P urpose of revision Apprv'dR ev'dCheck dO rig/DwnKA0 SGES P ublication BMCK EHGNOV 2016

© Crown copyright and database right 2016. All rights reserved. O rdnance Survey Licence num ber 100046668.

* Actual shape of pond/basin will be subjectto detailed design

Page 10: MORAY FIRTH SMITHTON JUNCTION Legend...MORAY FIRTH A B E R D E E N T O I N V E R N E S S R A I L W A Y L I N E E X I S T I N G A 9 6 NV001 NV039 NV040 NV041 NV038 i j l f c k h n p

18600

18700

18800

18900

19000

19100

19200

19300

19400

19500

19600

19700

19800

19900

20000

20100

20200

20300

20400

20500

20600

20700

20800

20900

21000

21100

21200

21300

21400

21500

21600

21700

21800

21900

22000

ABERDEEN TO INVERNESS

RAILWAY LINE

N V 016

N V 017

N V 015

i ljf

c

kh

n p

ged

a

o

b

m

R ev

Client

P roject

Drawing title

Drawing Status

Drawing num ber

Scale

BIM N o.

DO NOT SCALEB2103500

@ A3

0T his drawing is not to be used in whole or part other than for the intendedpurpose and project as defined on this drawing. R efer to the contract for fullterm s and conditions.

FINAL1:10,000

Jacobs N o.

LegendP roposed Schem e (as per Draft O rders)SU DS (e.g. Basin or P ond)*Calculation AreaHealth & Education BuildingsSam ple R eceptorN oise Mitigation Barrier

Do Minimum Baseline Year Vs DoSomething Baseline Year (with Mitigation)(LA10,18hr Free-field) Ground Floor

x ≥ 10 dB5 ≤ x < 10 dB3 ≤ x < 5 dB1 ≤ x < 3 dB0 < x < 1 dBx = 0 dB-1 < x < 0 dB-3 < x ≤ -1 dB-5 < x ≤ -3 dB-10 < x ≤ -5 dB x ≤ -10 dB

?

N

0 0.5 10.25Kilom etres

Sheet 10 of 16

Figure 8.10jEnvironmental Statement

Noise Level Difference Contour Map(Ground Floor) Do-Min. Baseline Year Vs

Do-Something Baseline Year (with Mitigation)

B2103500/EN/EIA/DR/810j

95 Bothwell Street, G lasgow, G 2 7HX , U K.T el: +44(0)141 243 8000 Fax:+44(0)141 226 3109

www.jacobs.com

R ev. R ev. Date P urpose of revision Apprv'dR ev'dCheck dO rig/DwnKA0 SGES P ublication BMCK EHGNOV 2016

© Crown copyright and database right 2016. All rights reserved. O rdnance Survey Licence num ber 100046668.

* Actual shape of pond/basin will be subjectto detailed design

Page 11: MORAY FIRTH SMITHTON JUNCTION Legend...MORAY FIRTH A B E R D E E N T O I N V E R N E S S R A I L W A Y L I N E E X I S T I N G A 9 6 NV001 NV039 NV040 NV041 NV038 i j l f c k h n p

19700

19800

19900

20000

20100

20200

20300

20400

20500

20600

20700

20800

20900

21000

21100

21200

21300

21400

21500

21600

21700

21800

21900

22000

22100

22200

22300

23000

2310022400

22500

22600

22700

22800

22900

EXISTING A96

RIVERNAIRN

ABERDEEN TO INVERNESS

RAILWAY LINE

NAIRN

N V 016

NV046

NV047

NV054

NV048

NV050

NV049

NV052

NV051

NV053

i ljf

c

kh

n p

ged

a

o

b

m

R ev

Client

P roject

Drawing title

Drawing Status

Drawing num ber

Scale

BIM N o.

DO NOT SCALEB2103500

@ A3

0T his drawing is not to be used in whole or part other than for the intendedpurpose and project as defined on this drawing. R efer to the contract for fullterm s and conditions.

FINAL1:10,000

Jacobs N o.

LegendP roposed Schem e (as per Draft O rders)SU DS (e.g. Basin or P ond)*Calculation AreaHealth & Education BuildingsSam ple R eceptorN oise Mitigation Barrier

Do Minimum Baseline Year Vs DoSomething Baseline Year (with Mitigation)(LA10,18hr Free-field) Ground Floor

x ≥ 10 dB5 ≤ x < 10 dB3 ≤ x < 5 dB1 ≤ x < 3 dB0 < x < 1 dBx = 0 dB-1 < x < 0 dB-3 < x ≤ -1 dB-5 < x ≤ -3 dB-10 < x ≤ -5 dB x ≤ -10 dB

?

N

0 0.5 10.25Kilom etres

Sheet 11 of 16

Figure 8.10kEnvironmental Statement

Noise Level Difference Contour Map(Ground Floor) Do-Min. Baseline Year Vs

Do-Something Baseline Year (with Mitigation)

B2103500/EN/EIA/DR/810k

95 Bothwell Street, G lasgow, G 2 7HX , U K.T el: +44(0)141 243 8000 Fax:+44(0)141 226 3109

www.jacobs.com

R ev. R ev. Date P urpose of revision Apprv'dR ev'dCheck dO rig/DwnKA0 SGES P ublication BMCK EHGNOV 2016

© Crown copyright and database right 2016. All rights reserved. O rdnance Survey Licence num ber 100046668.

* Actual shape of pond/basin will be subjectto detailed design

Page 12: MORAY FIRTH SMITHTON JUNCTION Legend...MORAY FIRTH A B E R D E E N T O I N V E R N E S S R A I L W A Y L I N E E X I S T I N G A 9 6 NV001 NV039 NV040 NV041 NV038 i j l f c k h n p

21800

21900

22000

22100

22200

22300

23000

23100

23200

23300

23400

23500

23600

22400

22500

22600

22700

22800

22900

23700

23800

23900

24000

24100

24200

24300

2440024500

24600

24700

24800

24900

25000

25100

25200

25300

25400

25500

RIVERNAIRN

N V 018

N V 019

i ljf

c

kh

n p

ged

a

o

b

m

R ev

Client

P roject

Drawing title

Drawing Status

Drawing num ber

Scale

BIM N o.

DO NOT SCALEB2103500

@ A3

0T his drawing is not to be used in whole or part other than for the intendedpurpose and project as defined on this drawing. R efer to the contract for fullterm s and conditions.

FINAL1:10,000

Jacobs N o.

LegendP roposed Schem e (as per Draft O rders)SU DS (e.g. Basin or P ond)*Calculation AreaHealth & Education BuildingsSam ple R eceptorN oise Mitigation Barrier

Do Minimum Baseline Year Vs DoSomething Baseline Year (with Mitigation)(LA10,18hr Free-field) Ground Floor

x ≥ 10 dB5 ≤ x < 10 dB3 ≤ x < 5 dB1 ≤ x < 3 dB0 < x < 1 dBx = 0 dB-1 < x < 0 dB-3 < x ≤ -1 dB-5 < x ≤ -3 dB-10 < x ≤ -5 dB x ≤ -10 dB

?

N

0 0.5 10.25Kilom etres

Sheet 12 of 16

Figure 8.10lEnvironmental Statement

Noise Level Difference Contour Map(Ground Floor) Do-Min. Baseline Year Vs

Do-Something Baseline Year (with Mitigation)

B2103500/EN/EIA/DR/810l

95 Bothwell Street, G lasgow, G 2 7HX , U K.T el: +44(0)141 243 8000 Fax:+44(0)141 226 3109

www.jacobs.com

R ev. R ev. Date P urpose of revision Apprv'dR ev'dCheck dO rig/DwnKA0 SGES P ublication BMCK EHGNOV 2016

© Crown copyright and database right 2016. All rights reserved. O rdnance Survey Licence num ber 100046668.

* Actual shape of pond/basin will be subjectto detailed design

Page 13: MORAY FIRTH SMITHTON JUNCTION Legend...MORAY FIRTH A B E R D E E N T O I N V E R N E S S R A I L W A Y L I N E E X I S T I N G A 9 6 NV001 NV039 NV040 NV041 NV038 i j l f c k h n p

25000

25100

25200

25300

25400

2550025600

2570025800

NAIRN

EXISTING A96

RIVERNAIRN

ABERDEEN TO INVERNESS

RAILWAY LINE

NV046

NV047

NV054

NV048

NV050NV055

NV049

NV052

NV051

NV053

i ljf

c

kh

n p

ged

a

o

b

m

R ev

Client

P roject

Dra wing title

Dra wing Sta tus

Dra wing number

Sca le

BIM N o.

DO NOT SCALEB2103500

@ A3

0T his dra wing is not to be used in whole or pa rt other tha n for the intendedpurpose a nd project a s defined on this dra wing. R efer to the contra ct for fullterms a nd conditions.

FINAL1:10,000

Ja cobs N o.

LegendP roposed Scheme (a s per Dra ft O rders)SU DS (e.g. Ba sin or P ond)*Ca lcula tion AreaHea lth & Educa tion BuildingsSa mple R eceptorN oise Mitiga tion Ba rrier

Do Minimum Baseline Year Vs DoSomething Baseline Year (with Mitigation)(LA10,18hr Free-field) Ground Floor

x ≥ 10 dB5 ≤ x < 10 dB3 ≤ x < 5 dB1 ≤ x < 3 dB0 < x < 1 dBx = 0 dB-1 < x < 0 dB-3 < x ≤ -1 dB-5 < x ≤ -3 dB-10 < x ≤ -5 dB x ≤ -10 dB

?

N

0 0.5 10.25Kilometres

Sheet 13 of 16

Figure 8.10mEnvironmental Statement

Noise Level Difference Contour Map(Ground Floor) Do-Min. Baseline Year Vs

Do-Something Baseline Year (with Mitigation)

B2103500/EN/EIA/DR/810m

95 Bothwell Street, G la sgow, G 2 7HX , U K.T el: +44(0)141 243 8000 Fa x:+44(0)141 226 3109

www.ja cobs.com

R ev. R ev. Da te P urpose of revision Apprv'dR ev'dCheckdO rig/DwnKA0 SGES P ublica tion BMCK EHGNOV 2016

© Crown copyright a nd da ta ba se right 2016. All rights reserved. O rdna nce Survey Licence number 100046668.

* Actua l sha pe of pond/ba sin will be subjectto deta iled design

Page 14: MORAY FIRTH SMITHTON JUNCTION Legend...MORAY FIRTH A B E R D E E N T O I N V E R N E S S R A I L W A Y L I N E E X I S T I N G A 9 6 NV001 NV039 NV040 NV041 NV038 i j l f c k h n p

24700

24800

24900

25000

25100

25200

25300

25400

2550025600

2570025800

2590026000

26100

26200

26300

26400

26500

26600

26700

26800

26900

27000

27100

27200

27300 27400 27500 27600 27700 27800 27900 28000 28100 28200 28300 28400

28500

28600

28700

28800

NAIRN EASTJUNCTION

EXISTING A96

AULDEARN

N V 024

N V 022

N V 021

N V 023

N V 020

NV056

i ljf

c

kh

n p

ged

a

o

b

m

R ev

Client

P roject

Drawing title

Drawing Status

Drawing num ber

Scale

BIM N o.

DO NOT SCALEB2103500

@ A3

0T his drawing is not to be used in whole or part other than for the intendedpurpose and project as defined on this drawing. R efer to the contract for fullterm s and conditions.

FINAL1:10,000

Jacobs N o.

LegendP roposed Schem e (as per Draft O rders)SU DS (e.g. Basin or P ond)*Calculation AreaHealth & Education BuildingsSam ple R eceptorN oise Mitigation Barrier

Do Minimum Baseline Year Vs DoSomething Baseline Year (with Mitigation)(LA10,18hr Free-field) Ground Floor

x ≥ 10 dB5 ≤ x < 10 dB3 ≤ x < 5 dB1 ≤ x < 3 dB0 < x < 1 dBx = 0 dB-1 < x < 0 dB-3 < x ≤ -1 dB-5 < x ≤ -3 dB-10 < x ≤ -5 dB x ≤ -10 dB

?

N

0 0.5 10.25Kilom etres

Sheet 14 of 16

Figure 8.10nEnvironmental Statement

Noise Level Difference Contour Map(Ground Floor) Do-Min. Baseline Year Vs

Do-Something Baseline Year (with Mitigation)

B2103500/EN/EIA/DR/810n

95 Bothwell Street, G lasgow, G 2 7HX , U K.T el: +44(0)141 243 8000 Fax:+44(0)141 226 3109

www.jacobs.com

R ev. R ev. Date P urpose of revision Apprv'dR ev'dCheck dO rig/DwnKA0 SGES P ublication BMCK EHGNOV 2016

© Crown copyright and database right 2016. All rights reserved. O rdnance Survey Licence num ber 100046668.

* Actual shape of pond/basin will be subjectto detailed design

Page 15: MORAY FIRTH SMITHTON JUNCTION Legend...MORAY FIRTH A B E R D E E N T O I N V E R N E S S R A I L W A Y L I N E E X I S T I N G A 9 6 NV001 NV039 NV040 NV041 NV038 i j l f c k h n p

2560025700

2580025900

2600026100

26200

26300

26400

26500

26600

26700

26800

26900

27000

27100

27200

27300 27400 27500 27600 27700 27800 27900 28000 28100 28200 28300 28400 28500

28600

28700

28800

28900

29000

29100

ABERDEEN TO INVERNESS

RAILWAY LINE

EXISTING A96

NAIRN EASTJUNCTION

N V 024

N V 022

N V 021

N V 023

i ljf

c

kh

n p

ged

a

o

b

m

R ev

Client

P roject

Drawing title

Drawing Status

Drawing num ber

Scale

BIM N o.

DO NOT SCALEB2103500

@ A3

0T his drawing is not to be used in whole or part other than for the intendedpurpose and project as defined on this drawing. R efer to the contract for fullterm s and conditions.

FINAL1:10,000

Jacobs N o.

LegendP roposed Schem e (as per Draft O rders)SU DS (e.g. Basin or P ond)*Calculation AreaHealth & Education BuildingsSam ple R eceptorN oise Mitigation Barrier

Do Minimum Baseline Year Vs DoSomething Baseline Year (with Mitigation)(LA10,18hr Free-field) Ground Floor

x ≥ 10 dB5 ≤ x < 10 dB3 ≤ x < 5 dB1 ≤ x < 3 dB0 < x < 1 dBx = 0 dB-1 < x < 0 dB-3 < x ≤ -1 dB-5 < x ≤ -3 dB-10 < x ≤ -5 dB x ≤ -10 dB

?

N

0 0.5 10.25Kilom etres

Sheet 15 of 16

Figure 8.10oEnvironmental Statement

Noise Level Difference Contour Map(Ground Floor) Do-Min. Baseline Year Vs

Do-Something Baseline Year (with Mitigation)

B2103500/EN/EIA/DR/810o

95 Bothwell Street, G lasgow, G 2 7HX , U K.T el: +44(0)141 243 8000 Fax:+44(0)141 226 3109

www.jacobs.com

R ev. R ev. Date P urpose of revision Apprv'dR ev'dCheck dO rig/DwnKA0 SGES P ublication BMCK EHGNOV 2016

© Crown copyright and database right 2016. All rights reserved. O rdnance Survey Licence num ber 100046668.

* Actual shape of pond/basin will be subjectto detailed design

Page 16: MORAY FIRTH SMITHTON JUNCTION Legend...MORAY FIRTH A B E R D E E N T O I N V E R N E S S R A I L W A Y L I N E E X I S T I N G A 9 6 NV001 NV039 NV040 NV041 NV038 i j l f c k h n p

28400 28500

28600

28700

28800

28900

29000

29100

29200

29300

29400

29500

29600

29700

29800

29900

30000

30100

30200

30300

30400

30500

30600

30700

30800

30900

31000

31100

ABERDEEN TO INVERNESS RAILWAY LINE

HARDMUIR

EXISTING A96

N V 025

N V 024

N V 026

i ljf

c

kh

n p

ged

a

o

b

m

R ev

Client

P roject

Drawing title

Drawing Status

Drawing num ber

Scale

BIM N o.

DO NOT SCALEB2103500

@ A3

0T his drawing is not to be used in whole or part other than for the intendedpurpose and project as defined on this drawing. R efer to the contract for fullterm s and conditions.

FINAL1:10,000

Jacobs N o.

LegendP roposed Schem e (as per Draft O rders)SU DS (e.g. Basin or P ond)*Calculation AreaHealth & Education BuildingsSam ple R eceptorN oise Mitigation Barrier

Do Minimum Baseline Year Vs DoSomething Baseline Year (with Mitigation)(LA10,18hr Free-field) Ground Floor

x ≥ 10 dB5 ≤ x < 10 dB3 ≤ x < 5 dB1 ≤ x < 3 dB0 < x < 1 dBx = 0 dB-1 < x < 0 dB-3 < x ≤ -1 dB-5 < x ≤ -3 dB-10 < x ≤ -5 dB x ≤ -10 dB

?

N

0 0.5 10.25Kilom etres

Sheet 16 of 16

Figure 8.10pEnvironmental Statement

Noise Level Difference Contour Map(Ground Floor) Do-Min. Baseline Year Vs

Do-Something Baseline Year (with Mitigation)

B2103500/EN/EIA/DR/810p

95 Bothwell Street, G lasgow, G 2 7HX , U K.T el: +44(0)141 243 8000 Fax:+44(0)141 226 3109

www.jacobs.com

R ev. R ev. Date P urpose of revision Apprv'dR ev'dCheck dO rig/DwnKA0 SGES P ublication BMCK EHGNOV 2016

© Crown copyright and database right 2016. All rights reserved. O rdnance Survey Licence num ber 100046668.

* Actual shape of pond/basin will be subjectto detailed design