MoP Flexi Packet Installation_Ver 01

download MoP Flexi Packet Installation_Ver 01

of 9

Transcript of MoP Flexi Packet Installation_Ver 01

  • 8/13/2019 MoP Flexi Packet Installation_Ver 01

    1/9

    MoP

    Flexi PacketInstallation

    SiSo India

  • 8/13/2019 MoP Flexi Packet Installation_Ver 01

    2/9

    Table of ContentsTable of Contents....................................................................................................... 2

    MoP Flexi Packet Installation Ver01 Page 2

  • 8/13/2019 MoP Flexi Packet Installation_Ver 01

    3/9

    1.Introduction..........................................................................................................4

    2.ork Flo!.............................................................................................................4

    ".Site Sur#e$...........................................................................................................4

    4.Site %eli#er$ &e'ort (S%&)................................................................................... *

    *.Material +itting.....................................................................................................*

    ,.&FI -ssurance.......................................................................................................*

    .Flexi Packet /ink Installation................................................................................ ,

    ./ink Coissioning.............................................................................................

    .Self -ssessent...................................................................................................

    10.Site Folder Pre'aration.......................................................................................

    11.-cce'tance Testing............................................................................................

    12.3ualit$ -udit......................................................................................................

    MoP Flexi Packet Installation Ver01 Page "

  • 8/13/2019 MoP Flexi Packet Installation_Ver 01

    4/9

    Flexi Packet Installation

    Metod of Procedure

    1. Introduction

    Tis Installation MoP is designed to su''ort te entire !ork 'rocess of installing

    Flexi Packet Micro5!a#e 6o'e site.

    2. Work Flow

    Tis Installation 'rocedure sould be executed in te follo!ing order7

    Site survey

    Material Kitting

    FI !ssurance

    Fle"i #acket Installation

    Self !ssess$ent

    Site Folder #re%aration

    !cce%tance Testing

    &uality !ssurance

    '. Site Survey

    Site Sur#e$ Includes #isiting te site and 're'aration of detailed re'ort including

    'otogra's and filling Sur#e$ Cecklist. !nne"ure (1ust be follo!ed to carr$

    out site sur#e$.

    &FI C4ecklistTransission.'df

    %uring Site sur#e$ cecking S'ace a#ailabilit$ for Micro5!a#e -ntenna 8 9%: onTo!er; S'ace for I%:; 'o!er su''l$; en#ironental conditions. Sur#e$ 9ut'ut !illinclude filling &FI Cecklist for Site; Floor Plan /a$out; I%: -llocation %ra!ing 8 Site%eli#er$ &e'ort (S%&) !itin 4 6ours or tielines as 'er /ocal 'ro

  • 8/13/2019 MoP Flexi Packet Installation_Ver 01

    5/9

    I%: -llocation ust be re'orted as gi#en in sa'le attaced la$out in case if I%:installation is re=uired in 1> ?xisting cabinet. Sa'le out'ut

    I%: -llocation.'df

    ). Site *elivery e%ort +S*,

    Site deli#er$ re'ort ust be 're'ared b$ te core installation Planner; S%& souldinclude all te aterial list i'orted @93 as !ell as /ocal @93. Sa'le S%& for

    reference is attaced belo!.

    Sa'le TransissionS%&.'df

    S%& re'ort ust contain te exact lengt for te %C 'o!er cable; %%F and 9'ticalCable.

    -. Material Kitting

    Material kitting sould be done in te circle !areouse b$ TI Partner under guidanceof /ogistic coordinator. Material kitting for 'er Flexi &adio site sould be as 'er ASAS'ecified Site %eli#er$ &e'ort (S*). Tis acti#it$ in#ol#es assurance of co'leteaterial deli#er$ at site including local as !ell as te i'orted ites.

    . FI !ssurance

    &FI -ssurance ust be done b$ te TI Vendor. %eclaring &FI B!nne"ure(1/souldbe used. Site sould be declared free fro Infra Punc Points and undred 'ercentread$ for Flexi Packet I%: 8 9%: Installation.

    In case of 'ending Infra 'unc 'oint te sae ust be re'orted to te 9'erator.Coenceent of Site &eadiness can be done if criticala

  • 8/13/2019 MoP Flexi Packet Installation_Ver 01

    6/9

    0. Fle"i #acket ink Installation

    Flexi Packet installation co'rised of I%: 8 9%: (-ntenna 8 &adio :nit)

    Installation; -ll instructions are a#ailable for 9%: is a#ailable in attaced

    docuent.

    0* 5 3uickInstallation Duide.'df

    7.1.1 IDU Installation

    I%: installation ust be as 'er te allocation diagra or at allocated s'ace fro

    o'erator.

    Installation of grounding cable for I%: !it fixing accessories (cable ties);labels and connectors (lugs) u' to te defined lengt including testing of te

    co'lete cable run. Installation of 9'tical Patc Panel.

    /a$ing and terination of 9'tical Patc cable fro I%:.

    /a$ing of ?ternet and o'tical cables fro I%: to 9%:.

    Connecting ?1 cables !it %%F.

    Connecting -lar cables !it %%F.

    -51200 InstallationManual.'df

    7.1.2 ODU Installation

    9%: installation ust be on s'ecified ount and as 'er eigt s'ecified in Tx

    Planning %ata.

    MoP Flexi Packet Installation Ver01 Page ,

  • 8/13/2019 MoP Flexi Packet Installation_Ver 01

    7/9

    Installation of &adio :nit. for 0.";0.,; 1.2;1. etc. -ntenna as

    a''licable in 'lanning data. In Case of 1E1 /ink doubles 9%: need to be

    installed.

    Fixing of Ae! Flexi Packet &adio :nit on te To!er Mount !it all fixing

    accessories

    Installation of grounding cable for &adio :nit !it fixing accessories (cable

    ties); labels and connectors (lugs)

    /a$ing as !ell 'ro'er routing of Single IF Cable !it cla'ing blocks. If 1E1

    /ink tere !ould be t!o IF Cable need to be run.

    -''l$ing eater Proofing at a 'oint of I%: 8 IF cable connecti#it$.

    Connecting te 9%: !it I%: troug IF Cable.

    /abeling of Cables 8 accessories.

    7.1.3 Antenna Installation

    -ntenna Installation ust be on s'ecified ount and as 'er eigt s'ecified in

    Tx Planning %ata.

    Installation and fixing Flexi Packet Single Micro5!a#e -ntenna 0."; 0.,;

    1.2; 1. etc. as a''licable in Planning data.

    Installation of grounding cable for Micro5!a#e -ntenna !it fixing accessories(cable ties); labels and connectors (lugs) u' to te defined lengt includingtesting of te co'lete cable run.

    Fixing of Micro!a#e -ntenna on te To!er Mount !it all fixing -ccessories.

    Cou'ling of 9%: !it Ae! -ntenna !it 9%:.

    /abeling of Cables 8 accessories.

    . ink Co$$issioning

    Co'lete o' ust be installed eans bot A?-& ?A% 8 F-& ?A% icro5!a#e

    s$ste sould installed.

    Coissioning of 69P te I%: !it res'ect to Te 9%: as 'er ASA Planning

    data.

    Integration !it ?1 and confiration to te AMS Tea.

    Conducting all te rele#ant tests as 'er ASA Site Folder.

    MoP Flexi Packet Installation Ver01 Page

  • 8/13/2019 MoP Flexi Packet Installation_Ver 01

    8/9

    0 5 Coission.'df

    3. Self !ssess$ent-fter co'letion of all installation acti#it$; tere !ill be re=uireent to assess te

    Installation ork. Tis sould be done in 'resence of Pro

  • 8/13/2019 MoP Flexi Packet Installation_Ver 01

    9/9

    12. &uality !udit

    ASA a$ coence =ualit$ audit for installed sites to assure 3ualit$ 8 96S at site;TI Partner a$ 'artici'ate for te -udit. -udit sould be based on te sae -udit

    cecklist !ic is follo!ed during Self assessent of te Site.

    MoP Flexi Packet Installation Ver01 Page