MOP 4+6+6

31
1 MOP NOKIA SIEMENS NETWORKS FLEXI BTS (Up to 4/4/4)CONFIGURATION

description

MOP 4+6+6 - NOKIA BEST BTS MOP for integration proffesionals.......................................................................................

Transcript of MOP 4+6+6

Page 1: MOP 4+6+6

1

MOP

NOKIA SIEMENS NETWORKS FLEXI BTS

(Up to 4/4/4)CONFIGURATION

Page 2: MOP 4+6+6

2

Prechecks & Installation Activities• Pre-activity visit/survey of site to avoid access issue and location identification.• 1st activity survey of sites /check enough space available for installation of sites.• Check DC Power MCB available or not .• Check shelter and our all equipment like as Battery bank, HCT, VCT cable tray, power Plant etc ) proper grounded or not. • Team should be equipped with the Laptop, Latest Flexi EDGE BTS Manager version 3 build 0048 SW, Tested BTS LAN cable

(2 numbers).• Ensure that Planned Event Request is approved for the site.• Cross-check the hardware availability/state at site.• Confirm availability at site at least 1 hour before the activity time.• Contact Number of BSC ENGINEER – ([email protected])

Please fill the Pre-checks/Post checklist before/After the activity. Checklist is as given below.

Microsoft Excel Worksheet

Please Click Here

Page 3: MOP 4+6+6

Installation Process Flowchart

START

Flexi cabinet Installed & Proper Grouted

Installed ESMA& EASAPower card According to cabinet Marking

Installed duplexer/ TRX

Installed Guide Plate

Connect all external cable

Connect external power cables.Connect the ERxA cable. Connect the bus cables. Connect the internal power cables. Connect the RF cables. Connect the antenna jumper cables. Connect the transmission cables. Connect optional cables required for your configuration

Give power to BTS form DC power and Switched on BTS

And commissioned BTS according to configuration TX and RX soft cabling and fill the traffic manager of the BTS

After commission check any alarm in BTS

After integrated check call in TRX

Signoff BTS

END

Page 4: MOP 4+6+6

4

T0 – Activity start. PE Engineer at site.

T0+5min – Confirm NOC & collect pre-check logs , Create DB in BSC, Block the site

T0+40min – Switch OFF BTS installation TRX ,Power cards & Duplexer cards/ Switch ON BTS, Commission TRX

T0+25min – See site connect with BSC &NOC & De-block site

T0+30min – Post Checks Including call test

Brief Activity Timeline

If does not connect to BSC then check loop towards BCS find reason in PCM and ET & media.

If call not attend on bts then check all cable done properly on not.

Any H/W alarm then check in Help menu.

Contact Nokia Support through Uninor F0+35 min

T0-10min Patch all the External alarm in bts

After 2 hr Offer AT at project side to customer

Page 5: MOP 4+6+6

5

Installation Activity Procedure• Install the cabinet and optional items if needed as instructed in• Installing Flexi Cabinet for Indoor.• For checking the correct torque values, see Appendix C Torque values.• You can use the Checklist for cabling the modules in cabinet• installation as a connection checklist.• If you are installing any optional modules, see instructions in:• Installing Flexi Power Module (FPMA) in FCIA• Installing Flexi Power DC/DC Module 24V (FPDA) in cabinets• Team should be equipped with the Laptop, Latest OMT SW, Tested OMT cable (2 numbers).• Cross-check the hardware availability/state at site.Left side of the cabinet• Internal power cables• Bus cables• RF cables• External 24V cablesRight side of the cabinet • Antenna jumper cables• External power cables• Transmission cables• Optional cables:• External alarm and control (EAC)• Synchronization• Site support interface• Flexi power alarm• Local management port (LMP)• Location management unit (LMU)• Contact to NOC.

Page 6: MOP 4+6+6

Requirements for NSN Flexi BTS installation

• Operating temperature: -33°C to +50°C, temporarily +55°C– Same for all installations types (indoor and outdoor, with and without cabinet)

• It is recommended to install modules into shade, avoiding direct sunlight– In maximum usage temperature sun load of 1120W/m2 is taken in account

• In extreme conditions, e.g. high-salt mist (close to ocean) or polluted environment, outdoor cabinet with a filter is recommended

• Front and rear module covers are not used in cabinets that have a door, in all other cases they are mandatory

• For securing air-flow 40 mm open space behind modules is required – In cabinet and rack installations the open space can be behind cabinet if

sufficient air-flow to modules is secured (e.g. through gridded back wall)

Page 7: MOP 4+6+6

NSN Flexi BTS Power Consumption

BTS configuration. Cost optimized configuration and 24 TRXs / BCF

Power Consumption800/900 MHz (Watt)

Power Consumption1800/1900 MHz (watt)

Max Typ (@50% Load)

Max Typ(@50% Load)

1+1+1 710 710 752 752

2+2+2 1063 710 1138 752

3+3+3 1536 1013 1970 999

4+4+4 1948 1180 2098 1249

6+6+6 2873 1681 3090 1817

8+8+8 3758 2124 4050 2352

Page 8: MOP 4+6+6

Main modules of Nokia Flexi EDGE BTSSector module (3HU)• Logical module comprising

Dual TRX and Dual duplexer modules

System Module (3 HU)• O&M, power distribution,

system bus

Dual duplexer module (optional) (1HU)

• Duplexing & multicoupling, VSWR, Bias-T

• Min 1/ sector; paired with Dual TRX moduleDual TRX module (2HU)

• 2 carrier unit

• Either stand-alone or part of Sector module

HU = 44.4 mm

Page 9: MOP 4+6+6

• Module for BTS common functionalities and internal/external connections• Supports up to 6 DTRX modules (up to 12TRX) • 5 main functions of the module:

– SW downloading and storing, configuration management, reference clock and alarms

– Abis transmission– communication between modules via Ethernet switch– single point for power intake and power distribution to all modules– BTS internal and external synchronization

PDU (power distribution unit) 48V intake

Site support system

Nokia Flexi EDGE System Module (ESMA, 3HU)

HU = 44.4 mmInterchangeable Transport module:8xE1, 8xE1/T1 or 2x Flexbus

6x Ethernet to DTRX or RTC

PDU (power distribution unit) 6x48V to other modules

Out

1xEAC (External Alarm & Control)12x alarm inputs+6x control outputs

In

Synchronization

Local Management Port (LMP)

Q1 PortOptional flexi

power supply module

alarm

Page 10: MOP 4+6+6

Flexi EDGE Sector Module• Sector module is a logical unit consisting of 2 building blocks:

– Dual TRX (DTRX) module – Dual duplexer module

• Minimum one Sector module is needed per sector• There is space for 1-2 optional Wideband combiner (WBC) submodules in

DTRX module• Both units fit into a 3HU casing

Dual TRX module

Dual duplexer module

3HU

Page 11: MOP 4+6+6

Nokia Flexi EDGE Dual TRX Module (EXxA, 2HU)

• Dual TRX module (DTRX) is a 2 carrier TRX unit, used as: – a stand alone TRX module (2 TRX capacity)– or a Sector module with the Dual duplexer module (2 TRX capacity)– or as Double Power TRX, DPTRX (1 TRX capacity)– or for Intelligent Downlink Diversity, IDD (1 TRX capacity)

• DTRX consists of: – BASEBAND part that is common to both TRXs– RF part with 2 independent transmit (TX) chains and 4 receive (RX) chains– 0-2 Wideband combiner (WBC) sub-modules

• RX connections for diversity:– 2-way diversity: 2 RX inputs/DTRX used when both TRXs are in same sector

4 RX inputs/DTRX used when TRXs of the DTRX are in 2 different sectors

– 4-way diversity: 4 RX inputs/DTRX used (supported only with SRC or DPTRX)• DTRX connected to system module via single Gigabit Ethernet interface• Power feed from system module via single cable

4xRX TX 2

0-2xWideband combiners

1xBus

1xDTRX-DDU 1xPowerPhase feedback from WBC

(DPTRX)TX 1

HU = 44.4 mm

Page 12: MOP 4+6+6

Nokia Flexi EDGE Dual Duplexer Module (ERxA, 1HU)

• Dual duplexer (DDU) module together with Dual TRX create a logical Sector module– Min 1 DDU per sector is needed – DDU is attached to DTRX module

• DDU provides – duplex functionality to combine TX and RX signals to same antenna feeder – multicoupling– 2 antenna connections (for 1 or 2 sectors)

• 2 TX inputs and 4+4 RX outputs (4 RX from antenna 1 and 4 RX from antenna 2)• DDU contains

– 2 duplex filter– 2 Low Noise Amplifiers (LNAs) with high/low gain support for RX signal– 2 Bias-Ts with VSWR measurement functionality

• TRX loop is controlled through the DDU – Common TRX loop for all TRXs in same sector– Loop can be performed from either TX to any of 8 RX outputs (only 1 TX and 1 RX can be

simultaneously tested)

4xRX 1 TX 2TX 1 RX for external

BTS

RX for external

BTS

HU = 44.4 mm

Ant 1 Ant 24xRX 2

Page 13: MOP 4+6+6

Flexi EDGE Wideband Combiner• There are three variants:• EWGA 850/900 MHz Bands• EWDA 1800 MHz Band• EWPA 1900 MHz Band

• Specifications:• TXa or TXb to TXout <3.5dBm• Max power (CW) 48dBm (63 Watts)

• ”DP” Connector is for use in DPTRX mode.

• Connects to the ”DP” connector on DTRX (EXxA)

• One or Two can be fitted to a DTRX

TXa TXb

TXoutDP

Page 14: MOP 4+6+6

2-way Wideband Combining with 2-way RX diversity

4+4+4, 2 antennas per sector

Page 15: MOP 4+6+6

Flexi EDGE BTS Configurations – 1: Theoretical Objectives

• After completion of this module the participant will be able to:• Name the 5 main combining options• List the modules required for various common configurations• Describe the Nokia Smart Radio configurations• Describe the differences between Cost-optimised and Upgrade-optimised

configurations

Page 16: MOP 4+6+6

Flexi EDGE BTS Configurations – 2: Practical Objectives

• After completion of this module the participant will be able to:• Examine for correctly installed Flexi EDGE BTS• Identify the interfaces and connectors of the Flexi EDGE BTS• Examine for correctly installed cables on the Flexi EDGE BTS• Describe the Flexi EDGE BTS sector/TRX configuration options• Explain the differences between the combining options Double Power TRX,

By-pass combining, 2-way combining, 4-way combining, 6-way Remote Tune Combining (RTC) and Intelligent Downlink Diversity (IDD) and 4-way uplink diversity

• Annotate, on a diagram the bus, power and RF cable routing in configurations specified by the instructor

• Create physical configurations as specified by the instructor• Create a list of the required modules and ancillary components for the

configurations above

Page 17: MOP 4+6+6

Combining options and dual band for Flexi EDGE

• To minimize the number of antennas and maximize coverage and capacity, Flexi EDGE BTS supports wideband and RTC combining

• Five main combining options:

– By-pass combining– 2-way combining– 4-way combining – 6-way Remote Tune Combining (RTC)– Double Power (DPTRX)

• Flexi EDGE supports dual band configurations required in ANSI and ETSI markets:– GSM 800/1800– GSM 800/1900– GSM 900/1800

Page 18: MOP 4+6+6

Power And BUS Cabling

1. EASMA Power cable Slot 1 put in to 1st TRX.2. EASM A Bus cable put into 1st TRX Bus port.3. All the cabling same like as up to 4/4/4

configuration.4. Above 12 TRX using EASA card then also

done cabling 1st TRX Power and Bus cable put EASA 1st port.

Page 19: MOP 4+6+6
Page 20: MOP 4+6+6

Example: 2-way, 2UD – Module viewExample: 4 TRX/cell (4+4+4, one sector)

Page 21: MOP 4+6+6

2-way, 2UD, TX and RX CablingExample: 4 TRX/cell (4+4+4, one sector)

Page 22: MOP 4+6+6

6+TX Configuration

Tx Cabling

Rx Cabling

WBC

Page 23: MOP 4+6+6

6+RX Configuration Dual Port Antenna

Tx Cabling

Rx Cabling

WBC

Page 24: MOP 4+6+6
Page 25: MOP 4+6+6
Page 26: MOP 4+6+6
Page 27: MOP 4+6+6

27

AFTER THIS CLICK NEXT OPTION TILL THE WINDOW OF CURRENT ABIS ALLOCATION COME, IN THIS PUT THE TRAFFIC SLOT AS NOC HAS BEEN CREATED IN THE BSC, i.e TCH & TRX SIGNALLING AS GIVEN BELOW- & CLICK NEXT-TRAFFIC FILL AS PER CRF DATA BASE.

Page 28: MOP 4+6+6
Page 29: MOP 4+6+6
Page 30: MOP 4+6+6

30

AS BTS COME IN WORKING CONDITION , PLS CHECK ALARM ON THE SITE AND CALL ON THE All TRX and check all the sec properly handover each other and check call droppings in which sector. Our BTS is alarm free then we offer the customer for AT.

Page 31: MOP 4+6+6

YHANK YOU