MoorMaster · MoorMaster® Reference sites Picton, New Zealand • MoorMaster 400 • Shore based...
Transcript of MoorMaster · MoorMaster® Reference sites Picton, New Zealand • MoorMaster 400 • Shore based...
![Page 1: MoorMaster · MoorMaster® Reference sites Picton, New Zealand • MoorMaster 400 • Shore based automatic mooring system • Capacity: 2x400 kN (2x40 tons) • In operation since](https://reader033.fdocuments.in/reader033/viewer/2022042001/5e6dda84c165e44f222a75bf/html5/thumbnails/1.jpg)
MoorMasterMoorMaster®®
SchleuseSchleuse
![Page 2: MoorMaster · MoorMaster® Reference sites Picton, New Zealand • MoorMaster 400 • Shore based automatic mooring system • Capacity: 2x400 kN (2x40 tons) • In operation since](https://reader033.fdocuments.in/reader033/viewer/2022042001/5e6dda84c165e44f222a75bf/html5/thumbnails/2.jpg)
MoorMaster®
Reference sites
Picton, New Zealand
• MoorMaster Type I-400
• Ship based automatic mooring system
• Capacity: 4x200 kN (4x20 Tons)
• In operation since 1998 on the vessel
“Aratere”, a rail passenger ferry
![Page 3: MoorMaster · MoorMaster® Reference sites Picton, New Zealand • MoorMaster 400 • Shore based automatic mooring system • Capacity: 2x400 kN (2x40 tons) • In operation since](https://reader033.fdocuments.in/reader033/viewer/2022042001/5e6dda84c165e44f222a75bf/html5/thumbnails/3.jpg)
MoorMaster®
Reference sites
Picton, New Zealand
• MoorMaster 400
• Shore based automatic mooring system
• Capacity: 2x400 kN (2x40 tons)
• In operation since 2005
![Page 4: MoorMaster · MoorMaster® Reference sites Picton, New Zealand • MoorMaster 400 • Shore based automatic mooring system • Capacity: 2x400 kN (2x40 tons) • In operation since](https://reader033.fdocuments.in/reader033/viewer/2022042001/5e6dda84c165e44f222a75bf/html5/thumbnails/4.jpg)
MoorMaster®
Reference sites
Melbourne, Australia
• 2x4 MoorMaster 400
• In operation since 2003
![Page 5: MoorMaster · MoorMaster® Reference sites Picton, New Zealand • MoorMaster 400 • Shore based automatic mooring system • Capacity: 2x400 kN (2x40 tons) • In operation since](https://reader033.fdocuments.in/reader033/viewer/2022042001/5e6dda84c165e44f222a75bf/html5/thumbnails/5.jpg)
MoorMaster®
Reference sites
Davonport, Australia
• 2x4 MoorMaster 400
• In operation since 2003
![Page 6: MoorMaster · MoorMaster® Reference sites Picton, New Zealand • MoorMaster 400 • Shore based automatic mooring system • Capacity: 2x400 kN (2x40 tons) • In operation since](https://reader033.fdocuments.in/reader033/viewer/2022042001/5e6dda84c165e44f222a75bf/html5/thumbnails/6.jpg)
MoorMaster®
Reference sites
Port of Dover, UK
• MoorMaster 800
• Shore based automatic mooring system
• Capacity: 1x800 kN (1x80 tons)
• Installed in 2005
![Page 7: MoorMaster · MoorMaster® Reference sites Picton, New Zealand • MoorMaster 400 • Shore based automatic mooring system • Capacity: 2x400 kN (2x40 tons) • In operation since](https://reader033.fdocuments.in/reader033/viewer/2022042001/5e6dda84c165e44f222a75bf/html5/thumbnails/7.jpg)
MoorMaster®
Reference sites
St. Lawrence, Canada
• MoorMaster 200LS
• Lock based automatic mooring system
• Capacity: 200 kN (20 tons)
• Installation February 2007
![Page 8: MoorMaster · MoorMaster® Reference sites Picton, New Zealand • MoorMaster 400 • Shore based automatic mooring system • Capacity: 2x400 kN (2x40 tons) • In operation since](https://reader033.fdocuments.in/reader033/viewer/2022042001/5e6dda84c165e44f222a75bf/html5/thumbnails/8.jpg)
MoorMaster®
Reference sites
Salalah, Oman (APM Terminal)
• MoorMaster 600
• Shore based automatic mooring system
• Capacity: 4x600 kN (4x60 tons)
• Installation August 2006
![Page 9: MoorMaster · MoorMaster® Reference sites Picton, New Zealand • MoorMaster 400 • Shore based automatic mooring system • Capacity: 2x400 kN (2x40 tons) • In operation since](https://reader033.fdocuments.in/reader033/viewer/2022042001/5e6dda84c165e44f222a75bf/html5/thumbnails/9.jpg)
Time (24th July 2007)
Fo
re/A
ft S
urg
e (
mm
)
Fore/Aft Surge CORNELIA MSK, Berth 4, Port of Salalah, 24th July 2007Vessel Moored with Ropes & Mooring units or Ropes Only
11:00:00 12:00:00 13:00:00 14:00:00 15:00:00 16:00:00 17:00:00 18:00:00 19:00:00-1500
-1000
-500
0
500
1000
1500
MoorMaster®
Market News – Salalah Port Services/APMT
• 4 MM600 units commissioned
in September 2006
• Khareef trials conducted July
to September 2007
this included:
- Wave measurement
- Ship Motion measurement
- KPI analysis
![Page 10: MoorMaster · MoorMaster® Reference sites Picton, New Zealand • MoorMaster 400 • Shore based automatic mooring system • Capacity: 2x400 kN (2x40 tons) • In operation since](https://reader033.fdocuments.in/reader033/viewer/2022042001/5e6dda84c165e44f222a75bf/html5/thumbnails/10.jpg)
St. Lawrence Seaways
General information
![Page 11: MoorMaster · MoorMaster® Reference sites Picton, New Zealand • MoorMaster 400 • Shore based automatic mooring system • Capacity: 2x400 kN (2x40 tons) • In operation since](https://reader033.fdocuments.in/reader033/viewer/2022042001/5e6dda84c165e44f222a75bf/html5/thumbnails/11.jpg)
St. Lawrence Seaways
General information
![Page 12: MoorMaster · MoorMaster® Reference sites Picton, New Zealand • MoorMaster 400 • Shore based automatic mooring system • Capacity: 2x400 kN (2x40 tons) • In operation since](https://reader033.fdocuments.in/reader033/viewer/2022042001/5e6dda84c165e44f222a75bf/html5/thumbnails/12.jpg)
St. Lawrence Seaways
General information
![Page 13: MoorMaster · MoorMaster® Reference sites Picton, New Zealand • MoorMaster 400 • Shore based automatic mooring system • Capacity: 2x400 kN (2x40 tons) • In operation since](https://reader033.fdocuments.in/reader033/viewer/2022042001/5e6dda84c165e44f222a75bf/html5/thumbnails/13.jpg)
St. Lawrence Seaways
General information
• Max. ship sizes using the locks are
229m long by 24.3m beam
• On busy days up to 32 vessels can
pass a lock
• It takes 9-11 min. to fill/empty 91M
litres of water from the lock
• It takes up 15 min. to moore a ship
with conventional ropes
![Page 14: MoorMaster · MoorMaster® Reference sites Picton, New Zealand • MoorMaster 400 • Shore based automatic mooring system • Capacity: 2x400 kN (2x40 tons) • In operation since](https://reader033.fdocuments.in/reader033/viewer/2022042001/5e6dda84c165e44f222a75bf/html5/thumbnails/14.jpg)
MoorMaster®
St Lawrence Seaway – Conventional mooring
• 4 mooring lines out
• 3 shore crew to handle those lines
• All secure after 15 minutes
• Most ships equipped with onboard
fenders
![Page 15: MoorMaster · MoorMaster® Reference sites Picton, New Zealand • MoorMaster 400 • Shore based automatic mooring system • Capacity: 2x400 kN (2x40 tons) • In operation since](https://reader033.fdocuments.in/reader033/viewer/2022042001/5e6dda84c165e44f222a75bf/html5/thumbnails/15.jpg)
MoorMaster®
St Lawrence Seaway
• March 2007 Prototype MM200LS commissioned
• 3 months trial on several hundred ships
• Operation in all weather and down to +15o C
![Page 16: MoorMaster · MoorMaster® Reference sites Picton, New Zealand • MoorMaster 400 • Shore based automatic mooring system • Capacity: 2x400 kN (2x40 tons) • In operation since](https://reader033.fdocuments.in/reader033/viewer/2022042001/5e6dda84c165e44f222a75bf/html5/thumbnails/16.jpg)
MoorMaster®
St Lawrence Seaway – Trial spring 2007
• 51% of all ships successfully moored with MoorMaster®
• 35% not successfully moored due to special fender list
• 15% not successful moored due to too low freeboard or
special hull shape
![Page 17: MoorMaster · MoorMaster® Reference sites Picton, New Zealand • MoorMaster 400 • Shore based automatic mooring system • Capacity: 2x400 kN (2x40 tons) • In operation since](https://reader033.fdocuments.in/reader033/viewer/2022042001/5e6dda84c165e44f222a75bf/html5/thumbnails/17.jpg)
MoorMaster®
St Lawrence Seaway – Future
• 85% will be automatic moored with MoorMaster®
•15% will be moored with ropes to the bollard on top of the
MoorMaster®
![Page 18: MoorMaster · MoorMaster® Reference sites Picton, New Zealand • MoorMaster 400 • Shore based automatic mooring system • Capacity: 2x400 kN (2x40 tons) • In operation since](https://reader033.fdocuments.in/reader033/viewer/2022042001/5e6dda84c165e44f222a75bf/html5/thumbnails/18.jpg)
MoorMaster®
St Lawrence Seaway – Objectives to auto mooring choice
• Reduce manual handling of lines
• Reduce safety risk to personnel
• Time saving
Barge of 1,500 tonnes securing to mooring bollard on top
of the MoorMaster®
![Page 19: MoorMaster · MoorMaster® Reference sites Picton, New Zealand • MoorMaster 400 • Shore based automatic mooring system • Capacity: 2x400 kN (2x40 tons) • In operation since](https://reader033.fdocuments.in/reader033/viewer/2022042001/5e6dda84c165e44f222a75bf/html5/thumbnails/19.jpg)
MoorMaster®
MM200LS
![Page 20: MoorMaster · MoorMaster® Reference sites Picton, New Zealand • MoorMaster 400 • Shore based automatic mooring system • Capacity: 2x400 kN (2x40 tons) • In operation since](https://reader033.fdocuments.in/reader033/viewer/2022042001/5e6dda84c165e44f222a75bf/html5/thumbnails/20.jpg)
MoorMaster®
MM200LS
OS-KOM spol. s r.o. Zdíkovská 22, 150 00 Praha 5 Tel.: 00420 - 257 210 114 Fax: 00420 - 257 211 935 E-mail: [email protected] www.oskom.cz