Montrose Cit · 7/15/2020  · the City of Montrose. To view and download complete Plans and...

24
City of Montrose, Michigan CONTRACT DOCUMENTS 2020 SIDEWALK INSTALLATION PROJECT Montrose Cit OFFICES _ _ £st. 18 9 9 1 updated RFP 7/15/20

Transcript of Montrose Cit · 7/15/2020  · the City of Montrose. To view and download complete Plans and...

Page 1: Montrose Cit · 7/15/2020  · the City of Montrose. To view and download complete Plans and Specifications at no charge, visit the City of Montrose website at cityofmontrose.us.

City of Montrose, Michigan

CONTRACT DOCUMENTS

2020 SIDEWALK INSTALLATION PROJECT

Montrose Cit

OFFICES ... __ ... _

___ �

£st. 1899

1

updated RFP 7/15/20

Page 2: Montrose Cit · 7/15/2020  · the City of Montrose. To view and download complete Plans and Specifications at no charge, visit the City of Montrose website at cityofmontrose.us.

City of Montrose, Michigan

TABLE OF CONTENTS

2020 Sidewalk Installation Project

Bidding Information

Notice To Bidders Instructions to Bidders Insurance Requirements W-9 Form

Contract Documents

Bid Proposal

Technical Specifications

Supplemental Specifications

Special Provisions

2

Page 3: Montrose Cit · 7/15/2020  · the City of Montrose. To view and download complete Plans and Specifications at no charge, visit the City of Montrose website at cityofmontrose.us.

NOTICE TO BIDDERS

2020 Sidewalk Installation Project

The City of Montrose, Michigan, is requesting sealed bids at the City Office of 139 S. Saginaw Street, Montrose, Michigan 48457, until 5:00 p.m. (local time), on September 10, 2020, at which time and place the bids will be publicly opened and read. All bids shall be submitted in a sealed envelope, plainly marked "2020 Sidewalk Installation Project ."

Proposals are solicited on a unit price basis, for the following work:

1) Sidewalk, Cone, 4 inch2) Sidewalk, Cone, 6 inch3) Subbase, LM4) Slope Restoration, Modified

All bid proposals must be accompanied by a bid bond, bank cashier's check, bank draft, or certified check for not less than five percent (5%) of the bid price, made payable to the City of Montrose.

To view and download complete Plans and Specifications at no charge, visit the City of Montrose website at cityofmontrose.us. Complete Plans and Specifications are available at the City of Montrose Offices, 139 S. Saginaw Street, Montrose, Michigan, 48457, (810) 639-6168, Monday through Thursday, 8:00 a.m. to 6:00 p.m.

The City of Montrose reserves the right to accept or reject any or all bids, to waive any irregularities in the bids, and to select the bid considered most advantageous to the city.

3

Page 4: Montrose Cit · 7/15/2020  · the City of Montrose. To view and download complete Plans and Specifications at no charge, visit the City of Montrose website at cityofmontrose.us.
Page 5: Montrose Cit · 7/15/2020  · the City of Montrose. To view and download complete Plans and Specifications at no charge, visit the City of Montrose website at cityofmontrose.us.
Page 6: Montrose Cit · 7/15/2020  · the City of Montrose. To view and download complete Plans and Specifications at no charge, visit the City of Montrose website at cityofmontrose.us.

10. Qualifications of Bidders

It is the intent of the Owner to award the Contract to a Bidder fully capable, both financially and with regard to experience, to perform and complete all work in a satisfactory and timely manner. Evidence of such competency must be furnished on the forms included in the proposal, listing projects of similar difficulty, scope of work, and size, which the Bidder has satisfactorily undertaken and completed.

It is the intention of the City to award the contract to a Contractor whose ability and financial resources are fully equal to the task of performing the work in a satisfactory manner. With this in view, the Proposal calls for at least three (3) references, using specific names of persons to contact concerning the Contractor's ability to do this particular class of work. References from municipalities are preferred. The mere ability to furnish a Performance Bond shall not be accepted as sufficient evidence of responsibility on the part of the Bidder. The Bidder may also be required to furnish evidence of his current financial status.

11. Interpretation of Documents

If any Bidder is in doubt as to the true meaning of any part of the Plans, Specifications or any Contract Document, he/she may submit to the Owner a written request for an interpretation thereof. Any interpretation made in response to such a query shall be made only by Addendum, duly issued, and a copy of such Addendum shall be mailed or duly delivered to each prospective Bidder. The Owner shall not be responsible for any other explanation or interpretation of the Contract Documents. Alternative proposals that are suggested by bidders will be given consideration, if presented before the bid opening. If accepted, an addendum will be issued and sent out to all potential bidders, so that they may bid on the alternatives that have been identified.

12. Execution of Bid Proposal

A Bid Proposal, which is not signed by the individual making it, should have attached thereto a Power of Attorney evidencing authority to sign the Bid Proposal in the name of the person for whom it is signed.

A Bid Proposal, which is signed by a partnership, shall be signed by all of the partners or by an Attorney-in-Fact. If signed by an Attorney-in-Fact, there should be attached to the Bid a Power of Attorney evidencing authority to sign the Bid Proposal in the name of the partnership and such Power of Attorney shall be signed by all partners of the partnership.

A Bid Proposal, which is signed for a corporation, should have the correct corporate name thereof and the signature of the President, or other authorized officer(s) of the corporation, manually written below the corporate name and on the line indicating "By: ____________ ." If such a Bid Proposal is manually signed by an officer other than the President of the corporation, a certified copy of a Resolution of the Board of Directors evidencing the authority of such officer(s) to sign the Bid Proposal should be attached thereto. Such a Bid Proposal should also bear the attested signature of the Secretary of the corporation and an impression of the corporate seal.

6

Page 7: Montrose Cit · 7/15/2020  · the City of Montrose. To view and download complete Plans and Specifications at no charge, visit the City of Montrose website at cityofmontrose.us.
Page 8: Montrose Cit · 7/15/2020  · the City of Montrose. To view and download complete Plans and Specifications at no charge, visit the City of Montrose website at cityofmontrose.us.
Page 9: Montrose Cit · 7/15/2020  · the City of Montrose. To view and download complete Plans and Specifications at no charge, visit the City of Montrose website at cityofmontrose.us.
Page 10: Montrose Cit · 7/15/2020  · the City of Montrose. To view and download complete Plans and Specifications at no charge, visit the City of Montrose website at cityofmontrose.us.
Page 11: Montrose Cit · 7/15/2020  · the City of Montrose. To view and download complete Plans and Specifications at no charge, visit the City of Montrose website at cityofmontrose.us.
Page 12: Montrose Cit · 7/15/2020  · the City of Montrose. To view and download complete Plans and Specifications at no charge, visit the City of Montrose website at cityofmontrose.us.
Page 13: Montrose Cit · 7/15/2020  · the City of Montrose. To view and download complete Plans and Specifications at no charge, visit the City of Montrose website at cityofmontrose.us.
Page 14: Montrose Cit · 7/15/2020  · the City of Montrose. To view and download complete Plans and Specifications at no charge, visit the City of Montrose website at cityofmontrose.us.
Page 15: Montrose Cit · 7/15/2020  · the City of Montrose. To view and download complete Plans and Specifications at no charge, visit the City of Montrose website at cityofmontrose.us.

The below unit prices shall include all labor, materials, overhead, profit, insurance, etc., to cover the finished work of the several kinds specified, and the Bidder agrees to perform all of the work described in the Specifications and/or shown on the Plans for the following unit prices:

ITEM DESCRIPTION QTY 1 6,300

100

904

Sidewalk, Cone, 4 inch Sidewalk, Cone, 6 inch Embankment, LM Restoration, ModifiedSidewalk, Rem

(written)

UNIT UNIT PRICE TOTAL COST SQ. FT. $ $ SQ. FT. $ $ CU. YD. $ $

$

TOTAL $ ---------------

---------------

(figures)

and /100 Dollars ---------------------

RESPECTFULLY SUBMITTED:

Company Name ________________________ _

Address ----------------------------

City ____________ ST ___ Zip Code _______ _

Area Code/Telephone Number _____________ Date ____ _

Fax -------------

EMAIL

Authorized Signature ______________________ _

Print of Type Name and Title ___________________ _

15

15 10 SQ. YD

LSUM$ $

Page 16: Montrose Cit · 7/15/2020  · the City of Montrose. To view and download complete Plans and Specifications at no charge, visit the City of Montrose website at cityofmontrose.us.
Page 17: Montrose Cit · 7/15/2020  · the City of Montrose. To view and download complete Plans and Specifications at no charge, visit the City of Montrose website at cityofmontrose.us.

City of Montrose, Michigan SUPPLEMENTAL SPECIFICATIONS 2020 Sidewalk Installation Project

1. Construction Specifications

The work under this contract shall be completed following the 2012 MOOT Standard Specifications for Construction along with the City of Montrose Special Provisions attached herein. This is not a state sponsored project; therefore, the payment of prevailing wages is not a requirement of this contract.

2. Construction Schedule and Notification

Work shall not begin before September 20, 2020. All work shall be completed by November 30, 2020. The contractor shall provide to the Engineering Aide a schedule indicating the order in which the sidewalks and ramps will be replaced. Contractor is responsible for notifying residents of construction affecting their property at least three days in advance of work. All notifications must be approved by Engineering Aide prior to start of work.

3. Additional Work By Contractor For Property Owner(s)

Any and all additional work between the contractor and property owner shall be handled and negotiated between the contractor and property owner. The city shall have no responsibility or liability for any additional construction.

4. Signing and Barricading

Lighted barricades or plastic drums must adequately protect all excavations. Type I, Type II, or approved plastic drums, shall be used at all excavations that will remain open overnight. Signing and barricading costs shall be borne by the contractor. The contractor shall provide the city with the telephone number of the signing company and the telephone number of a local contact person available during non-working hours to place or replace signs, signals, and barricades.

5. Sidewalk Grade Elevation

It is imperative that any continuous sections of sidewalk Installation be graded to allow water to drain both to the outside edge of the street side of the sidewalk and laterally to a driveway opening or perpendicular sidewalk connecting to the street. This may require raising either end of a continuous stretch of sidewalk to raise the grade to provide positive drainage. This may require the use of additional sand to elevate the sidewalk grade. The city will

17

Page 18: Montrose Cit · 7/15/2020  · the City of Montrose. To view and download complete Plans and Specifications at no charge, visit the City of Montrose website at cityofmontrose.us.
Page 19: Montrose Cit · 7/15/2020  · the City of Montrose. To view and download complete Plans and Specifications at no charge, visit the City of Montrose website at cityofmontrose.us.

9. Quantities

Although a compilation of measurements was taken, all quantities are estimated.

10. Sidewalk Construction, Quantities and Locations

11. Holidays

No work is to be scheduled by the contractor on Sundays, nor on thefollowing holidays or holiday weekends:

19

The pay items for Sidewalk, Conc, __ inch shall include placement of 4-inches of compacted granular MDOT Cl II material beneath the Grade S2 concrete. All excavation necessary to construct sidewalk and granular base shall be included in the sidewalk pay items and will not be paidfor separately. Additional embankment required to obtain the proper sidewalk grade will be paid for as Embankment, LM by the cubic yard, compacted in place, as noted inItem No. 5 above. See attached Sidewalk Plan for work locations.

Page 20: Montrose Cit · 7/15/2020  · the City of Montrose. To view and download complete Plans and Specifications at no charge, visit the City of Montrose website at cityofmontrose.us.
Page 21: Montrose Cit · 7/15/2020  · the City of Montrose. To view and download complete Plans and Specifications at no charge, visit the City of Montrose website at cityofmontrose.us.
Page 22: Montrose Cit · 7/15/2020  · the City of Montrose. To view and download complete Plans and Specifications at no charge, visit the City of Montrose website at cityofmontrose.us.
Page 23: Montrose Cit · 7/15/2020  · the City of Montrose. To view and download complete Plans and Specifications at no charge, visit the City of Montrose website at cityofmontrose.us.
Page 24: Montrose Cit · 7/15/2020  · the City of Montrose. To view and download complete Plans and Specifications at no charge, visit the City of Montrose website at cityofmontrose.us.

LEGEND

EXISTING SIDEWALK (TO REMAIN)

EXISTING SIDEWALK (REMOVE)

PROPOSED SIDEWALK

SIDEWALK PLAN

F&

V P

RO

JE

CT

N

O.

83

90

00

CITY OF MONTROSE

MONTROSE, MI

2020 SIDEWALK INSTALLATION PROJECT

SHEET 1 OF 1

Know what's below.before you dig.Call

R

NORTH

NORTH

NORTHNORTH STREET

PA

RK

S

T

RA

Y S

T

S

EE

B

ELO

W LE

FT

SE

E A

BO

VE

R

IG

HT

SEE BELOW LEFT

SE

E A

BO

VE

R

IG

HT

FE

HE

R D

R

NO

RT

H S

T

DATE: JULY 14, 2020

PARK STREET

PARK STREET

REMOVE EXISTING SIDEWALK AND PLACE

NEW 6" SIDEWALK AT CORRECT LOCATION.

EXTEND DRIVE TO NEW SIDEWALK

(PAID FOR AS Sidewalk, Conc, 6 inch)

4" CONCRETE SIDEWALK

NOTES:

1.

1

2

" EXPANSION JOINTS SHALL BE MAXIMUM OF 50' ON

CENTER

2.

1

2

" EXPANSION JOINT MATERIAL SHALL BE PLACED

BETWEEN SIDEWALK AND RIGID STRUCTURES.

3. INSOFAR AS POSSIBLE, SIDEWALK SHALL BE DIVIDED INTO

SQUARE UNIT AREAS BY MEANS OF CUT CONTROL JOINTS

NOT MORE THAN 36 SFT OR LESS THAN 16 SFT.

1/4" RADIUS

TYP.

MIN OF 4" GRANULAR

MATERIAL

2% SLOPE MAX

4'

AutoCAD SHX Text
DRIVE
AutoCAD SHX Text
DRIVE
AutoCAD SHX Text
DRIVE
AutoCAD SHX Text
DRIVE
AutoCAD SHX Text
DRIVE
AutoCAD SHX Text
DRIVE
AutoCAD SHX Text
171
AutoCAD SHX Text
208
AutoCAD SHX Text
212
AutoCAD SHX Text
VACANT
AutoCAD SHX Text
VACANT
AutoCAD SHX Text
DRIVE
AutoCAD SHX Text
DRIVE
AutoCAD SHX Text
DRIVE
AutoCAD SHX Text
DRIVE
AutoCAD SHX Text
VACANT
AutoCAD SHX Text
269
AutoCAD SHX Text
266
AutoCAD SHX Text
272
AutoCAD SHX Text
DRIVE
AutoCAD SHX Text
DRIVE
AutoCAD SHX Text
281
AutoCAD SHX Text
Danielh/M:\Proj837001-839000\839000 Montrose GC\GC Projects\Park Street Sidewalk\Cad\Plns\839900_01_Plan.dwg/M:\Proj837001-839000\839000 Montrose GC\GC Projects\Park Street Sidewalk\Cad\Plns\839900_01_Plan.dwgM:\Proj837001-839000\839000 Montrose GC\GC Projects\Park Street Sidewalk\Cad\Plns\839900_01_Plan.dwg
AutoCAD SHX Text
0
AutoCAD SHX Text
SCALE IN FEET
AutoCAD SHX Text
50
AutoCAD SHX Text
100