Monthly Review Meeting 1

12
Bodhgaya March 2015 Progress Gaya District Prakriti Chohan (Block Manager)

Transcript of Monthly Review Meeting 1

Page 1: Monthly Review Meeting 1

Bodhgaya March 2015 Progress

Gaya District Prakriti Chohan (Block Manager)

Page 2: Monthly Review Meeting 1

Major improvement in Facility

• Infection Prevention-Central sterilizatrion room ready (Equipment, consumables and trained Human Resource). OT extra furniture-chairs, 2 almirahs removed and pur inside the Central sterilizatrion room.

• Institutionally- Regular LR ANM (roster) weeking meeting by MOIC and BHM on Thursdays. Review of registers, complicated cases and further improvements.

• Record Keeping-LR, handover, reffer in, reffer out and reffer slip register are maintained. LR register showed improvements in L.M.P, weight, H/O PROM, Gravida/Para and BP.

• Regular QI meetings- With everyone involved in making the agenda and in the meeting.

• Indenting with everyone's participation- Support in indenting Equipment, consumable, supplies for LR, OT, NBCC and emergency

•Fund booking - Rs 1,00,000 from "procurement from MCH" fund head.

•YUVA kendra: Helped in searching with MOIC, BHM IEC material for staring it.

•FP corner: Corner and IEC material shortlisted for the same with MOIC and BHM.

•JBSY payment on time: Payment of JBSY on bed before patient is discharged and regular serving of meals.

Page 3: Monthly Review Meeting 1

Major Changes in Outreach

• HSC FLW attendance: increased (ASHAs 37% and AWW 22%). February ASHA and AWW attendance was 74 and 78 respectively. March ASHA and AWW attendance was 101 and 94 respectively.

• 25% of the ANMs participated in Annaprasan Diwas.

• HSCmeeting held as per agenda discussed in ANM meeting.

• Out of 23, 22 HSC meetings are conducted (96%)

• 12 AWW centres monitored for support to ICDS.

• ASHA Diwas 1 attended out of 2.

• Sector meeting attended 1 out of 2 held.

• 12 Home visits done in 3 HSCs.

• Attended ASHA facilitator meeting and rolled out content.

• 8 RI/VHSND sites monitored.

• Misoprostol tablet dosage information given to ANM to roll out by ASHAs in case of PPH in home delieveries or on the way with consensus of MOIC.

Page 4: Monthly Review Meeting 1

What went well

• Liasoning and full support of Health and ICDS staff.• Regular sharing of various feedbacks and suggestions. Participation by them in all

our activities very enthusiatically.• They value our contribution to a great level.• Participation and support asked by MOIC on Saturdays in health camps.

What didn't go well

• All sector meetings couldnt be held due to exam duty of LS.• AWW meeting couldn't be attended.

Page 5: Monthly Review Meeting 1

Support required

• From RTS: In 1 QI meeting and Labor room roster meeting .• From DM and DPO: Support in 1 ANM meeting.

Page 6: Monthly Review Meeting 1

05/03/23

Facility

Page 7: Monthly Review Meeting 1

05/03/23

Continued...

Page 8: Monthly Review Meeting 1

05/03/23

QI meeting Agenda

Page 9: Monthly Review Meeting 1

05/03/23

Outreach

Page 10: Monthly Review Meeting 1

05/03/23

Contin...

Page 11: Monthly Review Meeting 1

05/03/23

Contin...

Page 12: Monthly Review Meeting 1

05/03/23

Thank You