1 By E-mail PRASAR BHARTI (INDIA’S PUBLIC SERVICE BROADCASTER) DOORDARSHAN MAINTENANCE CENTRE FAIZABAD Phone/Fax: 05278-222093 E-mail: [email protected] No. 3(2)/2013-2014/TMT/DMC/FZD/ Date: 07.08.2013 The Addl. Director General (Engg - NZ), (Kind Attn.Smt. S. Sen Gupta, DDG) Akashvani & Doordarshan, Jamnagar House, Shahjahan Road, New Delhi-110011. Sub : CONCISE MONTHLY REPORT on the working of LPT under DMC FAIZABAD for the month month of July - 2013. Madam, Kindly find enclosed the technical monthly report of DMC Faizabad as mentioned above in respect of following relay centers. 1. SULTANPUR DD-I 2. SULTANPUR DD-II 3. RAEBAREILY 4. GAURIGANJ 5. JAGDISHPUR 6. LALGANJ (PRATAPGARH) DD-II 7. RUDAULI 8. MANAKAPUR (VLPT) Yours faithfully (S.N. YADAV) DY. DIRECTOR (ENGG.)

Transcript of MONTHLY REPORT OF DMC ·  · 2014-12-09Kindly find enclosed the technical monthly report of DMC...

1

By E-mail

PRASAR BHARTI

(INDIA’S PUBLIC SERVICE BROADCASTER)

DOORDARSHAN MAINTENANCE CENTRE FAIZABAD

Phone/Fax: 05278-222093 E-mail: [email protected] No. 3(2)/2013-2014/TMT/DMC/FZD/ Date: 07.08.2013

The Addl. Director General (Engg - NZ), (Kind Attn.Smt. S. Sen Gupta, DDG) Akashvani & Doordarshan, Jamnagar House, Shahjahan Road, New Delhi-110011.

Sub: CONCISE MONTHLY REPORT on the working of LPT under DMC FAIZABAD for the month month of July - 2013.

Madam, Kindly find enclosed the technical monthly report of DMC Faizabad as mentioned above in respect of following relay centers. 1. SULTANPUR DD-I 2. SULTANPUR DD-II 3. RAEBAREILY 4. GAURIGANJ 5. JAGDISHPUR 6. LALGANJ (PRATAPGARH) DD-II 7. RUDAULI 8. MANAKAPUR (VLPT)

Yours faithfully

(S.N. YADAV) DY. DIRECTOR (ENGG.)

2

MONTHLY REPORT

OF DMC FAIZABD

for the month of… JULY -2013…

1. GENERAL

1.1 DETAILS OF IMPORTANT TECHNICAL WORK DONE AT LPTs / VLPTs DURING THE MONTH

Name of Station Details of the important technical work done

REMARKS

LPT SULTANPUR

DD I Routine preventive maintenance has been done.

DD II Routine preventive maintenance has been done.

LPT RAIBARELY

Routine preventive maintenance has been done.

LPT GAURIGANJ

Routine preventive maintenance has been done.

LPT JAGDISHPUR

Routine preventive maintenance has been done.

LPT LALGANJ,

(Pratapgarh)

Routine preventive maintenance has been done.

LPT RUDAULI

Routine preventive maintenance has been done.

VLPT MANKAPUR

3

1.2 DETAILS OF OFFICERS / STAFF RELIEVED / JOINED FROM / AT DURING THE MONTH

DETAILS OF OFFICERS / STAFF JOINED DURING THE MONTH

Name Designation

Emp. No.

Relieved from Station

Relieving Date

Joined at Joining date

Transfer order No. and Date

DETAILS OF OFFICERS / STAFF RELIEVED DURING THE MONTH

Name Designation Emp. No.

Relieved from Station

Relieving Date

To join at Transfer order No. and Date

1.3 TOUR / LEAVE DETAILS OF ENGG. HEAD OF OFFICE / CONTROLLING OFFICERS DURING THE MONTH

NAME OF OFFICER

TOUR DETAILS PERIOD OF E.L. / MEDICAL LEAVE ALONGWITH ITS NATURE PERIOD PLACE

1.4 TRAINING DETAILS OF ENGG. HEAD OF OFFICE / STAFF DURING THE MONTH

NAME OF OFFICER / STAFF

DESIGNATION PERIOD PLACE NAME OF COURSE

From To

4

1.5 DETAILS OF NEW EQUIPMENTS RECEIVED AT DMC / LPTs / VLPTs DURING LAST SIX MONTHS

Name of Station

Name of equipment

Date of receipt of equipment

Received from

Whether put in to circuit

Performance of equipment

Remarks

SULTANPUR RAEBARILY GAURIGANJ JAGDISHPUR LALGANJ RUDAULI VLPT MANKAPUR

1.6 DETAILS OF SCROLLER

Name of Station

Working Status of Scroller-1

Working Status of Scroller-2

Revenue generated in

current month

Progressive revenue generated in current

financial year

LPT SULTANPUR

Ok Diverted to HPT Faizabad

Nil Nil

LPT RAEBARILY

Ok Def Nil Nil

1.7 ELECTRIC CONNECTION DETAILS

Name of Station

Availability of Electricity Whether Single Phase / Three

Phase

Sanctioned Load

Power Factor

SULTANPUR Yes 3Ø 20 KVA

RAEBARILY Yes 3Ø 10 KVA 0.85

GAURIGANJ Yes 3Ø 08 KVA 0.87

JAGDISHPUR Yes 3Ø 14 KVA 0.88

LALGANJ Yes 3Ø 25 KVA 0.98

RUDAULI Yes 3Ø 26.9 KVA 0.85

VLPT MANKAPUR

Yes Provided free of cost by ITI Mankapur

5

1.8 LAND / BUILDING DETAILS

Station

Name of Owner of

Land

Category of Owner (Deptt. / Govt. / Private)

Type of Building

(Porta Cabin / Permanent)

Is Building / Porta Cabin

constructed

departmentally

Rent of Setup

(Rs. p.m.)

Availability of Lease

Deed

Due Date of

Renewal of Lease

Deed

Due Date of

Revision of Rent

Remarks

SULTANPUR GOVT GOVT PERMANENT - Rent free No - - -

RAEBARILY GOVT GOVT PERMANENT - Rent free No - - -

GAURIGANJ GOVT GOVT PERMANENT - Rent free No - - -

JAGDISHPUR GOVT GOVT PERMANENT - Rent free No - - -

LALGANJ GOVT GOVT PERMANENT - Rent free No - - -

RUDAULI PRIVATE PRIVATE PERMANENT - 10000/- Yes 15/02/12 16/02/17 -

VLPT MANKAPUR

GOVT ITI Ltd. MANKAPUR GONDA

PERMANENT - Rent free No - - -

6

2. TECHNICAL

2.1 DETAILS OF WORKING OF TRANSMITTER FOR THE MONTH – JULY 2013

LPT SULTANPUR

LPT RAIBARELY

LPT GAURIGANJ

LPT JAGDISHPUR

LPT LALGANJ

DD II

LPT RUDAULI

VLPT MANKAPUR

DD I DD II

1 Test Hours 15.50 15.50 15.50 5.16 5.16 5.16 4.67 -

2 Scheduled Prog. Hours

597.25 558 598.55 597.96 597.26 558 598.55 744

3 Gear Breakdown Hrs.

- - - - - - - -

4 Power Supply Breakdown Hrs.

1.46 1.46 2.12 1.68 1.90 1.41 2.23 -

5 Other Causes Breakdown Hrs.

- - - - - - - -

6 Total Breakdown Hrs. (3+4+5)

1.46 1.46 2.12 1.68 1.90 1.41 2.23 -

7 Prog. Hours Radiated (2-6)

595.79 556.54 596.43 596.28 595.36 556.59 596.32 744

8 Total Hours of Working (1+7)

611.29 572.04 611.93 601.44 600.52 561.75 600.99 744

9

% B/D ={(Total B/D x 100)/ Scheduled Prog. Hrs.)}

0.24% 0.26% 0.35% 0.28% 0.32% 0.25% 0.37% -

10 Year of Commissioning XTR Make/ Power XTR Type Channel

of operation

05/10/2005 BEL-500W MUV 199 CH#34(+) 45M.-SS

31/3/2002 BEL-500W MUV 199 CH#28(-) 45M.-SS

28/7/2005 GCEL-500W 12U 500 CH#31(-) 45M.-SS

9/10/2002 BEL-500W MUV 199 CH#26 (.) 45M.- SS

22 Sept.2011 WML–12U 500W 11-V 0.2 UHF CH#25(+) 45M.- SS

26/01/11 WML-12U 500W 11-V 0.2 UHF CH#30(.) 45M.- SS

13/81998 GCEL 300W UHF300 CH#22(.) 45M. - SS

04/05/1988 GCEL -126 10W CH# 12 (.) 30M. Guy ed Mast

7

2.2 PROGRESSIVE TOTAL FROM 1ST APRIL OF CURRENT FINANCIAL YEAR 2013-2014

LPT SULTANPUR

LPT RAIBARELY

LPT GAURIGANJ

LPT JAGDISHPUR

LPT LALGANJ

LPT RUDAULI

VLPT MANKAPUR

DD I DD II

1 Test Hours 61 61 61 21.32 20.66 20.32 19.84 -

2 Scheduled Prog. Hours

2316.84 2196 2315.62 2315.72 2316.40 2196 2316.48 2928

3 Gear Breakdown Hrs.

- - - - - - - -

4 Power Supply Breakdown Hrs.

5.37 5.33 6.96 5.78 6.55 6.14 6.88 -

5 Other Causes Breakdown Hrs.

- - - - - - - -

6 Total Breakdown Hrs. (3+4+5)

5.37 5.33 6.96 5.78 6.55 6.14 6.88 -

7 Prog. Hours Radiated (2-6)

2311.47 2190.67 2309.46 2309.94 2309.85 2189.86 2309.60 2928

8 Total Hours of Working (1+7)

2372.47 2251.67 2370.46 2331.26 2330.51 2210.18 2329.44 2928

9

% B/D ={(Total B/D x 100)/ Scheduled Prog. Hrs.)}

0.23% 0.24% 0.30% 0.25% 0.28% 0.28% 0.30% -

8

2.3 DETAILS OF POWER OF TRANSMITTER FOR THE MONTH – JULY 2013

LPT SULTANPUR

LPT RAIBARELY

LPT GAURIGANJ

LPT JAGDISHPUR

LPT LALGANJ

LPT RUDAULI

VLPT MANKAPUR

DD I DD II

1 Rated Power of Transmitter (in KW / Watts)

500 Watt

500 Watt

500 Watt 500 Watt 500 Watt 500 Watt 300 Watt 10 Watt

2

Forward Peak Power of Transmitter

Video 500 Watt

500 Watt

500 Watt 500 Watt 500 Watt 500 Watt 300 Watt 10 Watt

Audio

3

Reflected Power

Video 3 Watt 3 Watt 3 Watt 3 Watt 1 Watt 10 Watt 1 Watt -

Audio

4 Since when Transmitter is on less than rated power (if applicable)

5 Reasons for less than rated power

6 Reasons for high reflection, if any

9

2.4 DETAILS OF LOW POWER RADIATION FROM TRANSMITTER (Sync Peak Video Power less than rated power)

LPT

SULTANPUR LPT

RAIBARELY

LPT GAURIGANJ

LPT JAGDISHPUR

LPT LALGANJ

LPT RUDAULI

VLPT MANKAPUR

DD I DD II

1 Dates

2 Duration

3 Power

(Radiation)

4 Reasons

5

Total duration of Low Power in

hours during the month

6 No. of

occurrences

7

Progressive total of occurrences of

Low Power Radiation

8

Progressive total of duration of Low Power Radiation

9

Complaints of reception, if any

& Reason of complaints

10

2.5 DETAILS OF MAJOR BREAKDOWN DURING THE MONTH– JULY (More than 15 minutes)

LPT ‘S Date Duration Period Reasons

for B/D Action taken to solve the

B/D

Preventive action taken to avoid such

breakdown in future From To

VLPT-MANKAPUR Date Duration Period Reasons for B/D Action

taken to solve the

B/D

Preventive action taken to avoid such breakdown in future From To

2.6 CATEGORY-WISE BREAKDOWN DURING THE MONTH– JULY

LPT’S

NAME OF LPT

GEAR POWER SUPPLY OTHER CAUSES Major Minor Major Minor Major Minor

No. Dur. No. Dur. No. Dur. No. Dur. No. Dur. No. Dur.

SULTANPUR

DD I - - - - - - 88 1.46 - - - -

DD II -

-

-

-

-

-

88 1.46 -

-

-

-

RAEBAREILY -

-

-

-

-

-

126 2.12 - - -

-

GAURIGANJ - - - - - - 101 1.68 - - - -

JAGDISHPUR -

-

-

-

-

-

114 1.90 -

-

-

-

LALGANJ -

-

-

-

-

-

85 1.41 -

-

-

-

RUDAULI - - - - - - 134 2.23 - - - -

11

VLPT - MANAKAPUR GEAR POWER SUPPLY OTHER CAUSES

Major Minor Major Minor Major Minor No. Dur. No. Dur. No. Dur. No. Dur. No. Dur. No. Dur.

0 0 0 0 0 0 0 0 0 0 0 0

2.7 CATEGORY-WISE PROGRESSIVE BREAKDOWN FROM OF CURRENT FINANCIAL YEAR 2013-2014

LPT’S

NAME OF LPT GEAR POWER SUPPLY OTHER CAUSES

Major Minor Major Minor Major Minor

No. Dur. No. Dur. No. Dur. No. Dur. No. Dur. No. Dur.

SULTANPUR DD I -

-

-

-

-

-

323 5.37 -

-

-

-

DD II -

-

-

-

-

-

321 5.33 -

-

-

-

RAEBAREILY -

-

-

-

-

-

416 6.96 -

-

-

-

GAURIGANJ -

-

-

-

-

-

335 5.78 -

-

-

-

JAGDISHPUR -

-

-

-

-

-

390 6.55 -

-

-

-

LALGANJ -

-

-

-

-

-

439 6.14 -

-

-

-

RUDAULI -

-

-

-

-

-

421 6.88 -

-

-

-

12

VLPT-MANKAPUR GEAR POWER SUPPLY OTHER CAUSES

Major Minor Major Minor Major Minor No. Dur. No. Dur. No. Dur. No. Dur. No. Dur. No. Dur.

0 0 0 0 0 0 0 0 0 0 0 0

2.8 PERFORMANCE FIGURES OF TRANSMITTER

LPT SULTANPUR

LPT REBAREILY

LPT GAURIGANJ

LPT JAGDISHPUR

LPT LALGANJ

LPT RUDAULI

VLPT MANKAPUR

Remark

DD I DD II

Frequency of Vision Carrier

Frequency of Aural Carrier

K Factor

(1) K-Bar

(2) K Pulse to Bar

(3) K2T

Differential Gain

Differential Phase

Signal to Noise Ratio

Vision Peak Power

13

2.9 VIDEO FREQUENCY RESPONSE

NAME OF LPT Freq (MHz) Gain in dB

-1.25 -0.75 0.0 1.0 1.5 2.0 3.0 4.43 5.0 5.30 5.50

SULTANPUR

DD I

DD II

RAEBAREILY

GAURIGANJ

JAGDISHPUR

LALGANJ

RUDAULI

VLPT- MANKAPUR

2.10 AUDIO PERFORMANCE FIGURES

LPT SULTANPUR

LPT RAIBARELY

LPT GAURIGANJ

LPT JAGDISHPUR

LPT LALGANJ

LPT RUDAULI

VLPT MANKAPUR

DD I DD II

Aural Carrier

Frequency response 50 Hz to 15 KHz

Distortion

Factor

F.M. Noise level

Frequency Deviation at 100% Modulation

14

2.11 WORKING STATUS OF 500W AUTO MODE TRANSMITTERS (Wherever applicable)

S.No. Name of LPT Xtr. Make, Model,

Channel Whether

Operating on Auto /

Manual Mode

Details of Fault

occurred

Current Working Status

(in detail)

Remarks

2.12 WORKING STATUS OF VLPTs (Wherever applicable)

Sr. No.

Name of VLPT

Ch. No.

Type of Transmitter

Rated Power

O/P Power

Reflected Power

Ex-1 Ex-2

PA1 PA2 ASU

Sr. No.

Name of VLPT

Batteries (In circuit)

Solar Panel Battery Charger

Charge Controller

Installed Damaged Remark Installed Damaged Remark

2.13 EARTH RESISTANCE (in Ohms)

Station

TX EARTH

PS EARTH

DG Set PDA-1 PDA-2 TOWER

Date of measurem

ent

Make, Model and type of Instrument

used for measurement

SULTANPUR 0.15 0.5 1.3 - - 0.98 27/05/13 Waco

Digital earth Resistance Meter

RAEBARILY 0.86 1.1 - - - 1.0 10/04/12 Waco

Digital earth Resistance Meter

GAURIGANJ 0.8 0.9 0.8 - 1.06 - 14/05/13 Motwani

Digital earth Resistance Meter

JAGDISHPUR 2.5 7.14 3.6 3.0 3.0 2.05 11/05/13 Waco

Digital earth Resistance Meter

LALGANJ 0.24, 0.25

1.0 1.36, 0.81

1.04 - 0.25 14/05/13 Waco

Digital earth Resistance Meter

RUDAULI 1.52 - 5.66 5.46 14.76 1.25 15/05/13 Waco

Digital earth Resistance Meter

VLPT MANKAPUR

- - - - - - - -

15

3. EQUIPMENTS HGJK& SPARES

3.1 REQUIREMENT OF SPARE COMPONENTS

Station Name of LPT

Name of Compon

ent

Part No. Name of Unit of

transmitter for which required

Quantity Required

Qty available at Station

Qty issued to Station during last six months

Justification for

requirement

SULTANPUR

DD I TPV 8100B - PA 02 Nos. For PA repair

DD II TPV 595 A - PA 02 Nos. For PA repair

RAEBARILY

GAURIGANJ TPV 8100B TPV 595

PA PA

02 Nos. 05 Nos.

For PA repair

JAGDISHPUR MOSFET

PTFA 043002 E

PA 03 Nos.

LALGANJ MOSFET

PTFA 043002 E

PA 04 Nos. For PA repair

RUDAULI

VLPT MANKAPUR

3.2 REQUIREMENT OF SPARE EQUIPMENTS / CARDS / MODULES

Station Name of LPT

Name of Equirpment /Card/ Module

Part No. Name of Unit of

transmitter for which required

Quantity Required

Qty available at Station

Qty issued to Station during last six months

Justification for

requirement

SULTANPUR DD I

DD II

RAEBARILY

GAURIGANJ

JAGDISHPUR

LALGANJ

RUDAULI

VLPT MANKAPUR

16

3.3 AVAILABILITY OF SPARE -- COMPONENTS / MODULES / TRANSMITTER UNITS

Spare Components Station

Name of LPT Name of Spare

Component Qty. in Stock Working Status

SULTANPUR DD I

DD II

RAEBARILY GAURIGANJ

JAGDISHPUR LALGANJ Linear PSU For exciter 01 RUDAULI

VLPT MANKAPUR

Spare Transmitter Modules Station

Name of LPT Name of Spare

Component Qty. in Stock Working Status

SULTANPUR DD I

DD II

RAEBARILY GAURIGANJ

JAGDISHPUR

1.30V/80 Amp SMPS 2.Pallet PA 3.Pallet for DA

1. 01 2. 01 3. 01

1. OK 2. OK 3. OK

LALGANJ RUDAULI

VLPT MANKAPUR

Spare Transmitter Units Station

Name of LPT Name of Spare

Component Qty. in Stock Working Status

SULTANPUR DD I

DD II

RAEBARILY

GAURIGANJ 1.Excitter unit 2. UP Convertor 3. Base band convertor

1. 01 2. 01 3. 01

1. OK 2. OK 3. OK

JAGDISHPUR

LALGANJ

RUDAULI VLPT

MANKAPUR

17

3.4 DETAILS OF DEFECTIVE TRANSMITTER EQUIPMENT

STATION Make &

Model of Transmitte

r

Name of defective Tx equipment

Since when it is

defective

Action taken by Station for the repair

Shortcoming if any, being faced by

station for the repair

Remarks

SULTANPUR DD I

DD II RAEBARILY GAURIGANJ

JAGDISHPUR LALGANJ RUDAULI

VLPT MANKAPUR

3.5 WORKING STATUS OF AVR FOR TRANSMITTER

Station Capacity of AVR

Make and Type Working Condition ( Auto/Manual/def)

Action Taken for repair, if defective

SULTANPUR

DD I 10 KVA Sylvan 02 Auto -

DD II 10 KVA

1.Stabline 01 2.XDEL01

Auto Auto

2. 01 Defective

RAEBARILY 5 KVA 10 KVA

1.Toshniwal 01 2.Delta Instrument India, Servo 01

Auto Auto

GAURIGANJ 5 KVA 10 KVA

1. Sylvan 01 2.Toshniwal 01

Auto Auto

JAGDISHPUR 10 KVA Sylvan 01 Auto

LALGANJ 06 KVA Sylvan 01 Manual

RUDAULI 10 KVA XDL Manual

VLPT MANKAPUR

18

3.6 WORKING STATUS OF DIESEL / PETROL / KEROSENE GENERATOR SETS AT LPTs / VLPTs

Station Capacity of Generator

Make, Model and Type

Working Condition

Action Taken for repair, if defective

SULTANPUR DD I 12.5 KVA Kilosker HA294 OK

DD II 25 KVA Kilosker K GREEN OK RAEBARILY 15 KVA 02 No. Kilosker HA294 OK GAURIGANJ 15 KVA, 10 KVA Kilosker HA294 OK

JAGDISHPUR 25 KVA Kilosker K GREEN OK LALGANJ 25 KVA Kilosker K GREEN OK

RUDAULI 15 KVA 15 KVA

Kilosker HA294 Eicher

OK OK

VLPT MANKAPUR

- - -

3.7 TVRO ELECTRONICS

Station Make & Type

of IRDs Total No. available

Total No. Defective

Action taken by Station for repair

Remarks

SULTANPUR

DD I Scopus 2800 04 01

DD II 1.Ecostar

2.Changhong 01 02

01 01

RAEBARILY

1.Scopus 2800 2.Thamson 3.Changhong 4.Sky

03 01 01 02

01 01 00 02

GAURIGANJ Scopus 2800 03

JAGDISHPUR 1.Scopus 2800 2. Scopus 2900

02 02

01

LALGANJ Thamson 01

RUDAULI Scopus 2800 Thamson

03 01

VLPT MANKAPUR Scopus 2800 01

3.8 UPS

19

Station Make, Model and Rating of

UPS

Total No. available

Total No. Defective

Action taken by Station for repair

Remarks

SULTANPUR DD I

DD II

RAEBARILY APC back UPS 500VA

01 01

GAURIGANJ

JAGDISHPUR UPS – 6KVA Def. Communicated to CE (NZ)

LALGANJ UPS – 6KVA Def. Communicated to CE (NZ)

RUDAULI UPS - 6KVA Def. Communicated to CE (NZ)

VLPT MANKAPUR

3.9 AIRCONDITIONERS & AVRs

Station Total No. at

Station Defecti

ve Nos.

Make and Model of defective

Date from which

defective

Reason for Being defective

Action taken by Station for the repair

Air conditioner

SULTANPUR 05 W AC 02 S AC

- - - - -

RAEBARILY 04 W AC 02 S AC

01 - - - -

GAURIGANJ 02 W AC 02 S AC

01 Voltas1.5 T - - -

JAGDISHPUR 03 S AC 01 - - - -

LALGANJ 03 S AC 01 - - - -

RUDAULI 03 W AC 1.5 01 W AC 1T

03 1.5 T

- - Unserviceable

VLPT MANKAPUR

01 W - - - - -

AVRs for ACs

SULTANPUR 06 - - - - -

RAEBARILY 04 - - - - -

GAURIGANJ 04 - - - - -

JAGDISHPUR 03 01 PDI Nov-12 Unserviceable

LALGANJ 03 - - - - -

RUDAULI 02 - - - - -

VLPT MANKAPUR

01 - - - - -

3.10 DETAILS OF DEFECTIVE INPUT / MONITORING AND MEASURING EQUIPMENTS

20

Station Name of defective equipment

Make and model of defective

equipment

Date from which

defective

Action taken by Station for the repairing

SULTANPUR

RAEBARILY 1.Color Pattern Generator 2. Earth Regestens meter 3. Color monitor

1. Philips Defective 2. WICO Defective 3. JVC Defective

GAURIGANJ

JAGDISHPUR

LALGANJ W FM TekTronics – 1731

Defective 30/03/2011

RUDAULI

VLPT MANKAPUR

3.11 WORKING FIGURES OF DIESEL GENERATORS

For LPTs only LPT

SULTANPUR

LPT REBAREILY

LPT GAURIGANJ

LPT JAGDISHPUR

Kirlosker K-Green

LPT LALGANJ

Kirlosker K-Green

LPT RUDAULI

DD I

DD II

Make Kirloskar K. GREEN HA294 HA294 HA294 HA394 HA294

HA294 HA294

Capacity 25 KVA 12.5 KVA

15 KVA 15 KVA

15 KVA 10 KVA

12.5 KVA 10 KVA 25 KVA

10 KVA 25 KVA

15 KVA 15 KVA

Utilization for transmission during the month

112.22 - 69.43 180.45 159.16 192.34 294.17

Test Hrs. for the month 2.58 - 5.16 - - 4.16 5.16

Total Working Hrs. for the month

114.80 - 74.59 180.45 159.16 196.50 299.33

Progressive utilization 487.38 230.64 781.53 760.66 874.09 1201.66

Occasion of utilization during the month

88 88 127 100 114 115 131

Progressive Utilization 323 321 418 347 390 500 424

Breakdown in service due to failure of D/G during the month

- - - - - - -

Average consumption of Diesel

3.17L/H

-

2.08L/H 2.03L/H

2.29L/H 2.12 L/H 2.20L/H 2.34L/H 2.94 L/H

Date of commissioning of DG set

Total Hours of working since date of commissioning

Reading of Hour Meter installed at DG Set at the end of month

Reading of Hour Meter installed at LT Panel at the end of month

21

4. CABLE OPERATORS MONITORING REPORT

MONITORING REPORT FOR THE IMPLEMENTATION OF CABLE TV NETWORK REGULATION ACT

ZONE: NORTH ZONE DMC: FAIZABAD MONTH: JULY- 2013

S.N

o

State & Name of

Monitoring Station

Name & Address of MSOs

DD CHANNELS TO BE CARRIED ON CABLE NETWORK Remarks/ Action Taken

(Identifying defaulter MSOs, Details about

complaints lodged with law enforcing agencies etc.)

Prime Band Channels

NON Prime Band Channels

DD

-Nationa

l

DD

-New

s

DD

-Reg./

Bhart

i

D

D-S

port

s

DD

-Urd

u

DD

-RS

Gayan

Dars

han

DD

-Bhart

i (if

not coverd

in

Prim

e B

and)

1 U.P.

Faizabad Central Shakti Cable Network

YES YES NO YES YES NO NO NO Both the cable operators are going to increase their channel capacity shortly then they will provide other channel also.

2 U.P.

Faizabad Central Cable

Network YES YES NO YES NO NO NO NO

3