PRASAR BHARTI
(INDIA’S PUBLIC SERVICE BROADCASTER)
DOORDARSHAN MAINTENANCE CENTRE FAIZABAD
Phone/Fax: 05278-222093 E-mail: [email protected] No. 3(2)/2013-2014/TMT/DMC/FZD/ Date: 07.08.2013
The Addl. Director General (Engg - NZ), (Kind Attn.Smt. S. Sen Gupta, DDG) Akashvani & Doordarshan, Jamnagar House, Shahjahan Road, New Delhi-110011.
Sub: CONCISE MONTHLY REPORT on the working of LPT under DMC FAIZABAD for the month month of July - 2013.
Madam, Kindly find enclosed the technical monthly report of DMC Faizabad as mentioned above in respect of following relay centers. 1. SULTANPUR DD-I 2. SULTANPUR DD-II 3. RAEBAREILY 4. GAURIGANJ 5. JAGDISHPUR 6. LALGANJ (PRATAPGARH) DD-II 7. RUDAULI 8. MANAKAPUR (VLPT)
Yours faithfully
(S.N. YADAV) DY. DIRECTOR (ENGG.)
2
MONTHLY REPORT
OF DMC FAIZABD
for the month of… JULY -2013…
1. GENERAL
1.1 DETAILS OF IMPORTANT TECHNICAL WORK DONE AT LPTs / VLPTs DURING THE MONTH
Name of Station Details of the important technical work done
REMARKS
LPT SULTANPUR
DD I Routine preventive maintenance has been done.
DD II Routine preventive maintenance has been done.
LPT RAIBARELY
Routine preventive maintenance has been done.
LPT GAURIGANJ
Routine preventive maintenance has been done.
LPT JAGDISHPUR
Routine preventive maintenance has been done.
LPT LALGANJ,
(Pratapgarh)
Routine preventive maintenance has been done.
LPT RUDAULI
Routine preventive maintenance has been done.
VLPT MANKAPUR
3
1.2 DETAILS OF OFFICERS / STAFF RELIEVED / JOINED FROM / AT DURING THE MONTH
DETAILS OF OFFICERS / STAFF JOINED DURING THE MONTH
Name Designation
Emp. No.
Relieved from Station
Relieving Date
Joined at Joining date
Transfer order No. and Date
DETAILS OF OFFICERS / STAFF RELIEVED DURING THE MONTH
Name Designation Emp. No.
Relieved from Station
Relieving Date
To join at Transfer order No. and Date
1.3 TOUR / LEAVE DETAILS OF ENGG. HEAD OF OFFICE / CONTROLLING OFFICERS DURING THE MONTH
NAME OF OFFICER
TOUR DETAILS PERIOD OF E.L. / MEDICAL LEAVE ALONGWITH ITS NATURE PERIOD PLACE
1.4 TRAINING DETAILS OF ENGG. HEAD OF OFFICE / STAFF DURING THE MONTH
NAME OF OFFICER / STAFF
DESIGNATION PERIOD PLACE NAME OF COURSE
From To
4
1.5 DETAILS OF NEW EQUIPMENTS RECEIVED AT DMC / LPTs / VLPTs DURING LAST SIX MONTHS
Name of Station
Name of equipment
Date of receipt of equipment
Received from
Whether put in to circuit
Performance of equipment
Remarks
SULTANPUR RAEBARILY GAURIGANJ JAGDISHPUR LALGANJ RUDAULI VLPT MANKAPUR
1.6 DETAILS OF SCROLLER
Name of Station
Working Status of Scroller-1
Working Status of Scroller-2
Revenue generated in
current month
Progressive revenue generated in current
financial year
LPT SULTANPUR
Ok Diverted to HPT Faizabad
Nil Nil
LPT RAEBARILY
Ok Def Nil Nil
1.7 ELECTRIC CONNECTION DETAILS
Name of Station
Availability of Electricity Whether Single Phase / Three
Phase
Sanctioned Load
Power Factor
SULTANPUR Yes 3Ø 20 KVA
RAEBARILY Yes 3Ø 10 KVA 0.85
GAURIGANJ Yes 3Ø 08 KVA 0.87
JAGDISHPUR Yes 3Ø 14 KVA 0.88
LALGANJ Yes 3Ø 25 KVA 0.98
RUDAULI Yes 3Ø 26.9 KVA 0.85
VLPT MANKAPUR
Yes Provided free of cost by ITI Mankapur
5
1.8 LAND / BUILDING DETAILS
Station
Name of Owner of
Land
Category of Owner (Deptt. / Govt. / Private)
Type of Building
(Porta Cabin / Permanent)
Is Building / Porta Cabin
constructed
departmentally
Rent of Setup
(Rs. p.m.)
Availability of Lease
Deed
Due Date of
Renewal of Lease
Deed
Due Date of
Revision of Rent
Remarks
SULTANPUR GOVT GOVT PERMANENT - Rent free No - - -
RAEBARILY GOVT GOVT PERMANENT - Rent free No - - -
GAURIGANJ GOVT GOVT PERMANENT - Rent free No - - -
JAGDISHPUR GOVT GOVT PERMANENT - Rent free No - - -
LALGANJ GOVT GOVT PERMANENT - Rent free No - - -
RUDAULI PRIVATE PRIVATE PERMANENT - 10000/- Yes 15/02/12 16/02/17 -
VLPT MANKAPUR
GOVT ITI Ltd. MANKAPUR GONDA
PERMANENT - Rent free No - - -
6
2. TECHNICAL
2.1 DETAILS OF WORKING OF TRANSMITTER FOR THE MONTH – JULY 2013
LPT SULTANPUR
LPT RAIBARELY
LPT GAURIGANJ
LPT JAGDISHPUR
LPT LALGANJ
DD II
LPT RUDAULI
VLPT MANKAPUR
DD I DD II
1 Test Hours 15.50 15.50 15.50 5.16 5.16 5.16 4.67 -
2 Scheduled Prog. Hours
597.25 558 598.55 597.96 597.26 558 598.55 744
3 Gear Breakdown Hrs.
- - - - - - - -
4 Power Supply Breakdown Hrs.
1.46 1.46 2.12 1.68 1.90 1.41 2.23 -
5 Other Causes Breakdown Hrs.
- - - - - - - -
6 Total Breakdown Hrs. (3+4+5)
1.46 1.46 2.12 1.68 1.90 1.41 2.23 -
7 Prog. Hours Radiated (2-6)
595.79 556.54 596.43 596.28 595.36 556.59 596.32 744
8 Total Hours of Working (1+7)
611.29 572.04 611.93 601.44 600.52 561.75 600.99 744
9
% B/D ={(Total B/D x 100)/ Scheduled Prog. Hrs.)}
0.24% 0.26% 0.35% 0.28% 0.32% 0.25% 0.37% -
10 Year of Commissioning XTR Make/ Power XTR Type Channel
of operation
05/10/2005 BEL-500W MUV 199 CH#34(+) 45M.-SS
31/3/2002 BEL-500W MUV 199 CH#28(-) 45M.-SS
28/7/2005 GCEL-500W 12U 500 CH#31(-) 45M.-SS
9/10/2002 BEL-500W MUV 199 CH#26 (.) 45M.- SS
22 Sept.2011 WML–12U 500W 11-V 0.2 UHF CH#25(+) 45M.- SS
26/01/11 WML-12U 500W 11-V 0.2 UHF CH#30(.) 45M.- SS
13/81998 GCEL 300W UHF300 CH#22(.) 45M. - SS
04/05/1988 GCEL -126 10W CH# 12 (.) 30M. Guy ed Mast
7
2.2 PROGRESSIVE TOTAL FROM 1ST APRIL OF CURRENT FINANCIAL YEAR 2013-2014
LPT SULTANPUR
LPT RAIBARELY
LPT GAURIGANJ
LPT JAGDISHPUR
LPT LALGANJ
LPT RUDAULI
VLPT MANKAPUR
DD I DD II
1 Test Hours 61 61 61 21.32 20.66 20.32 19.84 -
2 Scheduled Prog. Hours
2316.84 2196 2315.62 2315.72 2316.40 2196 2316.48 2928
3 Gear Breakdown Hrs.
- - - - - - - -
4 Power Supply Breakdown Hrs.
5.37 5.33 6.96 5.78 6.55 6.14 6.88 -
5 Other Causes Breakdown Hrs.
- - - - - - - -
6 Total Breakdown Hrs. (3+4+5)
5.37 5.33 6.96 5.78 6.55 6.14 6.88 -
7 Prog. Hours Radiated (2-6)
2311.47 2190.67 2309.46 2309.94 2309.85 2189.86 2309.60 2928
8 Total Hours of Working (1+7)
2372.47 2251.67 2370.46 2331.26 2330.51 2210.18 2329.44 2928
9
% B/D ={(Total B/D x 100)/ Scheduled Prog. Hrs.)}
0.23% 0.24% 0.30% 0.25% 0.28% 0.28% 0.30% -
8
2.3 DETAILS OF POWER OF TRANSMITTER FOR THE MONTH – JULY 2013
LPT SULTANPUR
LPT RAIBARELY
LPT GAURIGANJ
LPT JAGDISHPUR
LPT LALGANJ
LPT RUDAULI
VLPT MANKAPUR
DD I DD II
1 Rated Power of Transmitter (in KW / Watts)
500 Watt
500 Watt
500 Watt 500 Watt 500 Watt 500 Watt 300 Watt 10 Watt
2
Forward Peak Power of Transmitter
Video 500 Watt
500 Watt
500 Watt 500 Watt 500 Watt 500 Watt 300 Watt 10 Watt
Audio
3
Reflected Power
Video 3 Watt 3 Watt 3 Watt 3 Watt 1 Watt 10 Watt 1 Watt -
Audio
4 Since when Transmitter is on less than rated power (if applicable)
5 Reasons for less than rated power
6 Reasons for high reflection, if any
9
2.4 DETAILS OF LOW POWER RADIATION FROM TRANSMITTER (Sync Peak Video Power less than rated power)
LPT
SULTANPUR LPT
RAIBARELY
LPT GAURIGANJ
LPT JAGDISHPUR
LPT LALGANJ
LPT RUDAULI
VLPT MANKAPUR
DD I DD II
1 Dates
2 Duration
3 Power
(Radiation)
4 Reasons
5
Total duration of Low Power in
hours during the month
6 No. of
occurrences
7
Progressive total of occurrences of
Low Power Radiation
8
Progressive total of duration of Low Power Radiation
9
Complaints of reception, if any
& Reason of complaints
10
2.5 DETAILS OF MAJOR BREAKDOWN DURING THE MONTH– JULY (More than 15 minutes)
LPT ‘S Date Duration Period Reasons
for B/D Action taken to solve the
B/D
Preventive action taken to avoid such
breakdown in future From To
VLPT-MANKAPUR Date Duration Period Reasons for B/D Action
taken to solve the
B/D
Preventive action taken to avoid such breakdown in future From To
2.6 CATEGORY-WISE BREAKDOWN DURING THE MONTH– JULY
LPT’S
NAME OF LPT
GEAR POWER SUPPLY OTHER CAUSES Major Minor Major Minor Major Minor
No. Dur. No. Dur. No. Dur. No. Dur. No. Dur. No. Dur.
SULTANPUR
DD I - - - - - - 88 1.46 - - - -
DD II -
-
-
-
-
-
88 1.46 -
-
-
-
RAEBAREILY -
-
-
-
-
-
126 2.12 - - -
-
GAURIGANJ - - - - - - 101 1.68 - - - -
JAGDISHPUR -
-
-
-
-
-
114 1.90 -
-
-
-
LALGANJ -
-
-
-
-
-
85 1.41 -
-
-
-
RUDAULI - - - - - - 134 2.23 - - - -
11
VLPT - MANAKAPUR GEAR POWER SUPPLY OTHER CAUSES
Major Minor Major Minor Major Minor No. Dur. No. Dur. No. Dur. No. Dur. No. Dur. No. Dur.
0 0 0 0 0 0 0 0 0 0 0 0
2.7 CATEGORY-WISE PROGRESSIVE BREAKDOWN FROM OF CURRENT FINANCIAL YEAR 2013-2014
LPT’S
NAME OF LPT GEAR POWER SUPPLY OTHER CAUSES
Major Minor Major Minor Major Minor
No. Dur. No. Dur. No. Dur. No. Dur. No. Dur. No. Dur.
SULTANPUR DD I -
-
-
-
-
-
323 5.37 -
-
-
-
DD II -
-
-
-
-
-
321 5.33 -
-
-
-
RAEBAREILY -
-
-
-
-
-
416 6.96 -
-
-
-
GAURIGANJ -
-
-
-
-
-
335 5.78 -
-
-
-
JAGDISHPUR -
-
-
-
-
-
390 6.55 -
-
-
-
LALGANJ -
-
-
-
-
-
439 6.14 -
-
-
-
RUDAULI -
-
-
-
-
-
421 6.88 -
-
-
-
12
VLPT-MANKAPUR GEAR POWER SUPPLY OTHER CAUSES
Major Minor Major Minor Major Minor No. Dur. No. Dur. No. Dur. No. Dur. No. Dur. No. Dur.
0 0 0 0 0 0 0 0 0 0 0 0
2.8 PERFORMANCE FIGURES OF TRANSMITTER
LPT SULTANPUR
LPT REBAREILY
LPT GAURIGANJ
LPT JAGDISHPUR
LPT LALGANJ
LPT RUDAULI
VLPT MANKAPUR
Remark
DD I DD II
Frequency of Vision Carrier
Frequency of Aural Carrier
K Factor
(1) K-Bar
(2) K Pulse to Bar
(3) K2T
Differential Gain
Differential Phase
Signal to Noise Ratio
Vision Peak Power
13
2.9 VIDEO FREQUENCY RESPONSE
NAME OF LPT Freq (MHz) Gain in dB
-1.25 -0.75 0.0 1.0 1.5 2.0 3.0 4.43 5.0 5.30 5.50
SULTANPUR
DD I
DD II
RAEBAREILY
GAURIGANJ
JAGDISHPUR
LALGANJ
RUDAULI
VLPT- MANKAPUR
2.10 AUDIO PERFORMANCE FIGURES
LPT SULTANPUR
LPT RAIBARELY
LPT GAURIGANJ
LPT JAGDISHPUR
LPT LALGANJ
LPT RUDAULI
VLPT MANKAPUR
DD I DD II
Aural Carrier
Frequency response 50 Hz to 15 KHz
Distortion
Factor
F.M. Noise level
Frequency Deviation at 100% Modulation
14
2.11 WORKING STATUS OF 500W AUTO MODE TRANSMITTERS (Wherever applicable)
S.No. Name of LPT Xtr. Make, Model,
Channel Whether
Operating on Auto /
Manual Mode
Details of Fault
occurred
Current Working Status
(in detail)
Remarks
2.12 WORKING STATUS OF VLPTs (Wherever applicable)
Sr. No.
Name of VLPT
Ch. No.
Type of Transmitter
Rated Power
O/P Power
Reflected Power
Ex-1 Ex-2
PA1 PA2 ASU
Sr. No.
Name of VLPT
Batteries (In circuit)
Solar Panel Battery Charger
Charge Controller
Installed Damaged Remark Installed Damaged Remark
2.13 EARTH RESISTANCE (in Ohms)
Station
TX EARTH
PS EARTH
DG Set PDA-1 PDA-2 TOWER
Date of measurem
ent
Make, Model and type of Instrument
used for measurement
SULTANPUR 0.15 0.5 1.3 - - 0.98 27/05/13 Waco
Digital earth Resistance Meter
RAEBARILY 0.86 1.1 - - - 1.0 10/04/12 Waco
Digital earth Resistance Meter
GAURIGANJ 0.8 0.9 0.8 - 1.06 - 14/05/13 Motwani
Digital earth Resistance Meter
JAGDISHPUR 2.5 7.14 3.6 3.0 3.0 2.05 11/05/13 Waco
Digital earth Resistance Meter
LALGANJ 0.24, 0.25
1.0 1.36, 0.81
1.04 - 0.25 14/05/13 Waco
Digital earth Resistance Meter
RUDAULI 1.52 - 5.66 5.46 14.76 1.25 15/05/13 Waco
Digital earth Resistance Meter
VLPT MANKAPUR
- - - - - - - -
15
3. EQUIPMENTS HGJK& SPARES
3.1 REQUIREMENT OF SPARE COMPONENTS
Station Name of LPT
Name of Compon
ent
Part No. Name of Unit of
transmitter for which required
Quantity Required
Qty available at Station
Qty issued to Station during last six months
Justification for
requirement
SULTANPUR
DD I TPV 8100B - PA 02 Nos. For PA repair
DD II TPV 595 A - PA 02 Nos. For PA repair
RAEBARILY
GAURIGANJ TPV 8100B TPV 595
PA PA
02 Nos. 05 Nos.
For PA repair
JAGDISHPUR MOSFET
PTFA 043002 E
PA 03 Nos.
LALGANJ MOSFET
PTFA 043002 E
PA 04 Nos. For PA repair
RUDAULI
VLPT MANKAPUR
3.2 REQUIREMENT OF SPARE EQUIPMENTS / CARDS / MODULES
Station Name of LPT
Name of Equirpment /Card/ Module
Part No. Name of Unit of
transmitter for which required
Quantity Required
Qty available at Station
Qty issued to Station during last six months
Justification for
requirement
SULTANPUR DD I
DD II
RAEBARILY
GAURIGANJ
JAGDISHPUR
LALGANJ
RUDAULI
VLPT MANKAPUR
16
3.3 AVAILABILITY OF SPARE -- COMPONENTS / MODULES / TRANSMITTER UNITS
Spare Components Station
Name of LPT Name of Spare
Component Qty. in Stock Working Status
SULTANPUR DD I
DD II
RAEBARILY GAURIGANJ
JAGDISHPUR LALGANJ Linear PSU For exciter 01 RUDAULI
VLPT MANKAPUR
Spare Transmitter Modules Station
Name of LPT Name of Spare
Component Qty. in Stock Working Status
SULTANPUR DD I
DD II
RAEBARILY GAURIGANJ
JAGDISHPUR
1.30V/80 Amp SMPS 2.Pallet PA 3.Pallet for DA
1. 01 2. 01 3. 01
1. OK 2. OK 3. OK
LALGANJ RUDAULI
VLPT MANKAPUR
Spare Transmitter Units Station
Name of LPT Name of Spare
Component Qty. in Stock Working Status
SULTANPUR DD I
DD II
RAEBARILY
GAURIGANJ 1.Excitter unit 2. UP Convertor 3. Base band convertor
1. 01 2. 01 3. 01
1. OK 2. OK 3. OK
JAGDISHPUR
LALGANJ
RUDAULI VLPT
MANKAPUR
17
3.4 DETAILS OF DEFECTIVE TRANSMITTER EQUIPMENT
STATION Make &
Model of Transmitte
r
Name of defective Tx equipment
Since when it is
defective
Action taken by Station for the repair
Shortcoming if any, being faced by
station for the repair
Remarks
SULTANPUR DD I
DD II RAEBARILY GAURIGANJ
JAGDISHPUR LALGANJ RUDAULI
VLPT MANKAPUR
3.5 WORKING STATUS OF AVR FOR TRANSMITTER
Station Capacity of AVR
Make and Type Working Condition ( Auto/Manual/def)
Action Taken for repair, if defective
SULTANPUR
DD I 10 KVA Sylvan 02 Auto -
DD II 10 KVA
1.Stabline 01 2.XDEL01
Auto Auto
2. 01 Defective
RAEBARILY 5 KVA 10 KVA
1.Toshniwal 01 2.Delta Instrument India, Servo 01
Auto Auto
GAURIGANJ 5 KVA 10 KVA
1. Sylvan 01 2.Toshniwal 01
Auto Auto
JAGDISHPUR 10 KVA Sylvan 01 Auto
LALGANJ 06 KVA Sylvan 01 Manual
RUDAULI 10 KVA XDL Manual
VLPT MANKAPUR
18
3.6 WORKING STATUS OF DIESEL / PETROL / KEROSENE GENERATOR SETS AT LPTs / VLPTs
Station Capacity of Generator
Make, Model and Type
Working Condition
Action Taken for repair, if defective
SULTANPUR DD I 12.5 KVA Kilosker HA294 OK
DD II 25 KVA Kilosker K GREEN OK RAEBARILY 15 KVA 02 No. Kilosker HA294 OK GAURIGANJ 15 KVA, 10 KVA Kilosker HA294 OK
JAGDISHPUR 25 KVA Kilosker K GREEN OK LALGANJ 25 KVA Kilosker K GREEN OK
RUDAULI 15 KVA 15 KVA
Kilosker HA294 Eicher
OK OK
VLPT MANKAPUR
- - -
3.7 TVRO ELECTRONICS
Station Make & Type
of IRDs Total No. available
Total No. Defective
Action taken by Station for repair
Remarks
SULTANPUR
DD I Scopus 2800 04 01
DD II 1.Ecostar
2.Changhong 01 02
01 01
RAEBARILY
1.Scopus 2800 2.Thamson 3.Changhong 4.Sky
03 01 01 02
01 01 00 02
GAURIGANJ Scopus 2800 03
JAGDISHPUR 1.Scopus 2800 2. Scopus 2900
02 02
01
LALGANJ Thamson 01
RUDAULI Scopus 2800 Thamson
03 01
VLPT MANKAPUR Scopus 2800 01
3.8 UPS
19
Station Make, Model and Rating of
UPS
Total No. available
Total No. Defective
Action taken by Station for repair
Remarks
SULTANPUR DD I
DD II
RAEBARILY APC back UPS 500VA
01 01
GAURIGANJ
JAGDISHPUR UPS – 6KVA Def. Communicated to CE (NZ)
LALGANJ UPS – 6KVA Def. Communicated to CE (NZ)
RUDAULI UPS - 6KVA Def. Communicated to CE (NZ)
VLPT MANKAPUR
3.9 AIRCONDITIONERS & AVRs
Station Total No. at
Station Defecti
ve Nos.
Make and Model of defective
Date from which
defective
Reason for Being defective
Action taken by Station for the repair
Air conditioner
SULTANPUR 05 W AC 02 S AC
- - - - -
RAEBARILY 04 W AC 02 S AC
01 - - - -
GAURIGANJ 02 W AC 02 S AC
01 Voltas1.5 T - - -
JAGDISHPUR 03 S AC 01 - - - -
LALGANJ 03 S AC 01 - - - -
RUDAULI 03 W AC 1.5 01 W AC 1T
03 1.5 T
- - Unserviceable
VLPT MANKAPUR
01 W - - - - -
AVRs for ACs
SULTANPUR 06 - - - - -
RAEBARILY 04 - - - - -
GAURIGANJ 04 - - - - -
JAGDISHPUR 03 01 PDI Nov-12 Unserviceable
LALGANJ 03 - - - - -
RUDAULI 02 - - - - -
VLPT MANKAPUR
01 - - - - -
3.10 DETAILS OF DEFECTIVE INPUT / MONITORING AND MEASURING EQUIPMENTS
20
Station Name of defective equipment
Make and model of defective
equipment
Date from which
defective
Action taken by Station for the repairing
SULTANPUR
RAEBARILY 1.Color Pattern Generator 2. Earth Regestens meter 3. Color monitor
1. Philips Defective 2. WICO Defective 3. JVC Defective
GAURIGANJ
JAGDISHPUR
LALGANJ W FM TekTronics – 1731
Defective 30/03/2011
RUDAULI
VLPT MANKAPUR
3.11 WORKING FIGURES OF DIESEL GENERATORS
For LPTs only LPT
SULTANPUR
LPT REBAREILY
LPT GAURIGANJ
LPT JAGDISHPUR
Kirlosker K-Green
LPT LALGANJ
Kirlosker K-Green
LPT RUDAULI
DD I
DD II
Make Kirloskar K. GREEN HA294 HA294 HA294 HA394 HA294
HA294 HA294
Capacity 25 KVA 12.5 KVA
15 KVA 15 KVA
15 KVA 10 KVA
12.5 KVA 10 KVA 25 KVA
10 KVA 25 KVA
15 KVA 15 KVA
Utilization for transmission during the month
112.22 - 69.43 180.45 159.16 192.34 294.17
Test Hrs. for the month 2.58 - 5.16 - - 4.16 5.16
Total Working Hrs. for the month
114.80 - 74.59 180.45 159.16 196.50 299.33
Progressive utilization 487.38 230.64 781.53 760.66 874.09 1201.66
Occasion of utilization during the month
88 88 127 100 114 115 131
Progressive Utilization 323 321 418 347 390 500 424
Breakdown in service due to failure of D/G during the month
- - - - - - -
Average consumption of Diesel
3.17L/H
-
2.08L/H 2.03L/H
2.29L/H 2.12 L/H 2.20L/H 2.34L/H 2.94 L/H
Date of commissioning of DG set
Total Hours of working since date of commissioning
Reading of Hour Meter installed at DG Set at the end of month
Reading of Hour Meter installed at LT Panel at the end of month
21
4. CABLE OPERATORS MONITORING REPORT
MONITORING REPORT FOR THE IMPLEMENTATION OF CABLE TV NETWORK REGULATION ACT
ZONE: NORTH ZONE DMC: FAIZABAD MONTH: JULY- 2013
S.N
o
State & Name of
Monitoring Station
Name & Address of MSOs
DD CHANNELS TO BE CARRIED ON CABLE NETWORK Remarks/ Action Taken
(Identifying defaulter MSOs, Details about
complaints lodged with law enforcing agencies etc.)
Prime Band Channels
NON Prime Band Channels
DD
-Nationa
l
DD
-New
s
DD
-Reg./
Bhart
i
D
D-S
port
s
DD
-Urd
u
DD
-RS
Gayan
Dars
han
DD
-Bhart
i (if
not coverd
in
Prim
e B
and)
1 U.P.
Faizabad Central Shakti Cable Network
YES YES NO YES YES NO NO NO Both the cable operators are going to increase their channel capacity shortly then they will provide other channel also.
2 U.P.
Faizabad Central Cable
Network YES YES NO YES NO NO NO NO